Loading...
HomeMy WebLinkAboutChange Order No 1 - Century Center Storage Mezzanine Project No 118-036E - R Yoder Construction Inc1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOIITH BEND_ INDIANA 46601-1 830 :Y. w I1�%s x CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDIC WORKS May 14, 2019 Brad Yoder R. Yoder Construction, Inc. 27453 County Road 150 Nappanee, IN 46550 PHONE 574/235-9251 FAx 574/235-9171 RE: Change Order No. 1 - Century Center Storage Mezzanine — Project No. 118-036E Dear Mr. Yoder: The Board of Public Works, at its meeting held on May 14, 2019, approved the above referenced Change Order for an increase of $243.52, bringing the current contract amount to $104,243.52. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, bW_,�,A , �, I 0_0� V9 Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAMA L. O'SULLIVAN THERESE J. DORAU CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER 5/2/2019 118-036E Century Center Stora a Mezzanine 2/12/2019 PCR #1-Cost of additional labor The original contract sum Net change by previously authorized change orders The contract sum prior to this change order By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time TOR Contractor g tore Printed Namd Title R. Yoder Construction Inc Company Name 27453 County Road 150 Address N net, IN 46550 City, State, Zip ___wm ..... —---------- UIncreased 11 Decreased 5/2812019 0 days..._.. 0 days 5/28/201ry9 $ 104,,000.00 $ 0.00 $ 104„000. 00 $ _ ITw 243.52 $ ,. .. 104„243.52 0.23 % 0.23 101N MANAGER CITY OF SOUTH BEND BOARD OF PUB C R, Approved � Date. � Gary A. Gilot, President Genevieve E. Uillerember Elizabeth A. Maradik, Member Th rese J.,Doau Member aura O'Sullivan, Member DEPARTMENT OF PUBLIC WORKS *" DIVISION OF ENGINEERING MPYY,i'N•. Project Number: 118-036E Project Name: Century Center Storage Mezzanine Change Order #: 1 DATE INITIATED: 5/2/2019 BPW DATE: Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). Construction change: Cost of labor to move 11 additional lights. Attachments: (List documents support change — required) 1. Cost provided by contractor Amount of Iiiii Increase / ❑ Decrease: $ 243.52 Categories (Pick One): Previously approved Change Order(s): $ 0 .......................... ❑ Scope of Work -- ❑ Differing Site Conditions, Changed Conditions Current Percent of Change: 0.23 % ❑ Conflicted Specifications and Drawings �.mm.____............. ____ El Failed Materials New Total Amount: $ 104,243.52 ❑ Error 8 Omission Total Percent of Change: 0.23 ............................................ % ❑ Final Quantity Adjustment Funding Secured From: cv e (filled out by PM) 7 3 O 0 0 p O e(-)0 RECOMMENDED BY: Greg McGowan Project Inspector (Print Name) (Si" turo) (Date) REVIEWED BY: Toy Villa Construction Manager (Print Name) (Signature) (Date) APPROVED BY: Rebecca Plantz d 5 Engineering Project Manager (Print Name) (Signature) (Date) APPROVED BY: Kara Boyles K. , - City Engineer (Print Name) (Signat re) (Date) Gregory McGowan From: Brad Yoder <brad@ ryoderconstruction.com > Sent: Tuesday, May 7, 2019 8:16 AM To: Gregory McGowan Cc: Rebecca Plantz; 'ed kowalczyk' Subject: RE: mezz change order Attachments: PCR#1 118-036E Century Center Storage Mezzanine.pdf G reg, CO1 1. Move up (26) lights above the mezzanine in lieu of the (15) shown on the drawings. Brad Yoder R. Yoder Construction C: 574.305.0698 O: 574.773.3502 1 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 5/6/2019 Department Public Works ..................................................................................m........�..m................................ �w a ....... Name Becca Plantz Division/Bureau Engineering BPW Date 5/14/2....... _.._ .... ..�.. �_... .... ..._�___.�... m m.... 019 Phone Extension 5998 mumuimuiuuuuuuuuuuuuuuuuuumuwiuiuiuiuiuimwuuuuwwuwi oannm�mmmmam aa^rrr�mim uu M rmruaru�iu mi�� mmmmmNN ....... _.. .......�_..�..__. � Board ....... ............w R uired Prior to Submittal to _........_�.._._.......... ���-........ Legal ❑ Attorney Name: Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Check the �} Agreement Amendment Professional Services [ Bid Opening [l Quote Opening ® Change Order No. 1 El Ease/Encroach. F Other: Topriate Item T ype — [l Contract [] Resolution El Bid Award Quote Award C/O & PCA No. Traffic Control: for All Submissions U Proposal ElReq. to Advertise Required Information El PCA Addendum ❑ Title Sheet ❑ Required Contractor's Certification Forms Attached (Non - Collusion, Non Discrimination, Non -Debarment E-Verify9 Iran, etc. Reguired For Change Orders O n Lea „_ _.._._._......._.........��. Amount of Increase n ee se $ 243.52 ......... _ �..�.A...,_...................................�................. Previous Amount $ 104,000.00 , � 0.2............. Current Percent of Change: .......................... m.��.�............................................�.�.��.�.�.�.�.�.�.� .,.�,�,,,� ........... 23% New Amount $ 104,2.m................ 43.52 Total Percent of Change: 0 23 /o 0 Dispersal After ADoroval Copy Original ❑ F]