Loading...
HomeMy WebLinkAboutAward Quote - 2019 Tree and Stump Removal Project No 119-012 - K&R Tree Service LLC1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOI JTH BEND. INDIANA 46601-1 830 Kevin Kenney K&R Tree Service LLC 1724 S. Grant Street South Bend, IN 46613 1865 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC S May 14, 2019 PHONE 574/235-9251 FAx 574/235-9171 RE: Quotation Award — 2019 Tree and Stump Removal — Project No. 119-012 Dear Mr. Kenney: The Board of Public Works at its meeting held on May 14, 2019, awarded the above referenced quotation to you in the amount of $27,055. Please forward the following documents � on,e su miti , _ 9 to my attention for Board of Public Works approval: 1) One (1) original of the Contract (enclosed); and 2) Certificate of Insurance naming the City of South Bend as an additional insured. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, N �� �w . r Linda M. Martin, Cte � 1 GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU INTER -OFFICE MEMORANDUM f. va DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING ins TO: Linda M. Martin, Clerk Board of Public Works FROM: Alicia Czarnecki, Project Engineer SUBJECT: Award Project No. 119-012 2019 Tree and Stump Removal DATE: April 23, 2019 Il�t'n�JitF"R'NN11lM1NWY1004��Uu1t�M1J12'i9NMN' NUIGUNNN1YUnN NWAO 1:WAtlIWN+.d XN NN1tIW...AF �VYIYf�WXE;IAIA%X NNWUWYgNNWNFhIy UaI UY BIYA1W kNYWIWHJNW4WM%itl I'Rifi'iMIYrt Yd IN'M'IIY�YVA�p11M�'M1't!pRYGIgbCv�INk�Yd h4�Y9dW0GfV4'YIYY UVLllVlFM1WfX. UIrvAM 1WN'Hitl%MIVtfI f�N,bfJdtldW�SNOWM6�Wlfr'M1q.;�1iSNV4'V�NId 410W'�9tl WtlUNnM1MM Hl pn On April 23, 2019, the Board of Public Works opened and read quotes for the above project. I have reviewed them and found them correct. The quoters ranked as follows; I recommend award of a contract for 2019 Tree and Stump Removal to the lowest responsive / responsible quoter, K& R Tree Service in the amount of $ 27,055.00. Sufficient funds have been has appropriated from MVH 2O2-0619-431.31-06. Please call with your questions (5903). Enc. Quote Tabulation A O o o O o O o o ~ N", O n O c0 O E fM a0 N M w N as m d — F v3 <» u3 e» v3 u3 V3 U Y 0 O 0 o 0 0 0 0 0 0 0 0 o ` O � N o o fD N o O uo� V C N K3 ffl fA PA fH 69 O O O O O O O Y l[7 LO LO O M O O CD w LO U H In CO Lq O O d m y 0) d G9 b9 ',,. fA fA Pfl Y> Wb ~ O 0 O O O 0 08 dn �[ LO '.... 0 ui N 00 Cl) 0) cm LO o LO o O N .E N EA 6s V3 v) fA 69 — O O O O O O O O 0 O O O O O N O O O 00 0 O O 0 o U) Ci C a so E E 00 N N N N N W — y fA fA fA fA M w t y d °,0 0 o 0 0 0 0 0 0 00 0 0 rn c a o (D 0 0 LO 0 0 00 0 0 N 0 0 0 0 M O C W N C = N O O N en fA U3, 69 EA 69 a > > Q w w w w a w w in o ei F m 0 O m.o c o CO cy IL O Q 0 0 0 N LL � O H Z Z Z Z Z 0 00 0 00 c0 M V W > > > > > O O O O O O i w w w w w l �—pN M V �II)�,,,.0 Y Q Z rq 0 N M N Q 0 U N O a 0 N N a QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME 2019 Tree and Stump Removal PROJECT NO. 119-012 QUOTES DUE April 23, 2019 at 9:30am Local Time Item No. Description Quantity Unit Unit Price Total Amount 1 TREE, REMOVE, 6-IN ... 1 EA . . .................... . . ...... . A . .. . ..... 2 TREE, REMOVE, 10-IN 1 EA 0 3 TREE, REMOVE, 18-IN 5 EA $ 4 TREE, REMOVE, 30-IN . ..... . 15 EA . ........... 5-4��O � $ i 7S 5 TREE, REMOVE, 48-IN 1 EA Aim. fu) � $ 07- oo- 6 STUMP, REMOVE 8 EA 'P/ W 0 6> , 1"4, $ 166b w '00 Total Amount of Quote $ &Dt Firm: Addrew /Vq Si City/State/Zip: 466UTeleplhone Number: ....... . . . Fax Number: By . .. ............... (Printed Name of Petson Version 1/17/2019 Page - 12 Public Works Quote CITY OF SOUTH BEND, INDIANA N T HQUOTE E0R_PL1I3LIQXM PROJECT NAME: 2019 Tree and Stump Removal PROJECT NO. A119-012 QUOTES DUE .� ..... .. .... pril 23, 2019 at 9:30am Local Time Date: Address: City/State/Zip: (Must be completed for all quotes. Please type or print) Firm: 1 � . e - /. :.__._. Telephone Number: L'�, o o — Agent of Bidder (if Applicable): _ Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: __.. _ �......PPublic... _W e Ctt of South Bend, .De artment of orks and dated for the sum of enter the Total Quote as shown on the Proposal) rTotal o LnteSum of Quote osN) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice, Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. The above quote is accepted this k Subject to the following conditions: A BOARD OF PUBLIC WORKS Gar A ilot, Pres E eth A. Marac aura L. O`Sulli Version 1/17/2019 By �keei,i as ACCEPTANCE Genevieve E. Miller, Member .� ' we J D r u, m er er T r h, :r A t .s : Linda M. Martin, I _._.. Page - 8 Public Works Quote BOARD OF PUBLIC WORKS CITY OF SOUTH BEND INDIANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 14th Day of May, 2019, by and between, K&R Tree Service LLC, 1724 S. Grant Street, South Bend, IN 46613, HEREINAFTER called the Contractor, and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: PROJECT NO. 119-012 DESCRIPTION: 2019 TREE AND STUMP REMOVAL COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $27,055 FUNDING: MVH The unit prices for this improvement were those prices as received and accepted by the Board on the 23rd Day of April, 2019. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC W R K&R TREE SERVICE LLC Gary A.ilot President Ell et i Am M Membe Printed Name Genevieve E. Miller, VLaura L. O'Sullivan, Signature Member Mc bo Therese J. Dorau, Member Attest:mm mm Ala M Ala t Clerk CERTIFICATION (To be completed if Contractor is a Corporation) I, —.. , certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Corporate Secretary Seal BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date Aril 2.5 019 _.............. y Name Alicia Czarnecki Department EnQineerinS BPW HH„� Date tension 5903 � � NI,a l' 4 2Ii l i�" Phone Extension Rewired Prior to Submittal to Board _—...._ _. ...... _....._...._ _..................... .................... BPW Attorney Attorney Name Dept. Attorney Attorney Name Purchasing Check the Appropriate Item Type — El _gr ❑] Professional Services Agreement Contract uired �� �)wrAll Submissions �..........._ ❑ Open Market Contract F-1 Amendment/Addendum Bid Opening Bid Award uote Opening Q p ® Quote Award E] Proposal Opening ❑ C/O & PCA No. ❑ Chg. Order, No. Traffic Control �] Other: Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description uired Information LJ Proposal E] Special Purchase, QPA ❑] Req. to Advertise EJ Reject Bids/Quotes R PCA ❑ Resolution �] Ease./Encroach K & R Tree Service Yes If Yes, Approved by Purchasing ❑] No ❑ MBE ❑ WBE Completed E-Verify Form Attached 2019 Tree and Stump Removal 119-012 MVH 202-0619-431.31-06 $27,055.00 ❑ Title Sheet F] Yes ❑ No Remove trees and stumps for sidewalk; replacement at various locations in South Bend. For Ck�rtrr �c Orders Or�rl Amount of Increase $ ........... _.w..........,................_.....�.,.,.,.,.,.,.,. m....................�.�.�...,,,,,, . Previous Amount $ Increase % Current Percent of Change: Decrease �(% New Amount $ Increase Total Percent of Change: Decrease /o g Time Extension Amount: New Completion Dat e: _..........,...,_...... W 1316 CouNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SO[ JTH BEND. INDIANA 46601-1 830 Lisa Keigley KC Tree, Inc. 8913 E. US Hwy. 20 New Carlisle, IN 46552 111�N CITY OF • BEND PETE BUTTIGIEG, MAYOR BOARD i+WORKS May 14, 2019 PHONE 574/235-9251 FAx 574/235-9171 RE: Quotation Award — 2019 Tree and Stump Removal — Project No. 119-012 Dear Ms. Keigley: The Board of Public Works, at its meeting held on May 14, 2019, awarded the above referenced quotation to K&R Tree Service LLC in the amount of $27,055. We thank you for bidding and hope you will bid with us again in the future. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, 1 Linda M. Martin, Clerk GARY A. GILOT GENEVIEVE E. MILLER ELIZAJ3ETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU