Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Amendment No 1 to PSA - Lawson Fisher Assoc - East Bank Trail Slope Stabilization Design Services
1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND. INDIANA 46601-1 830 'OLITIJ & x � 1865 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU I S May 14, 2019 Michael Guzik Lawson -Fisher Associates PC 525 W. Washington Avenue South Bend, IN 46601 RE: Amendment No. 1 to Professional Services Agreement Dear Mr. Guzik: PHONE 574/235-9251 FAX 574/235-9171 The Board of Public Works, at its meeting held on May 14, 2019, approved the above referenced amendment regarding East Bank Trail Slope Stabilization design services in the amount not to exceed $13,700, for a new total of $104,440. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, 94AN)q", W 'n Linda M. Martin, Clerk Enclosure GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU This is EXHIBIT K, consisting of 3 pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated July 26, 2018. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 The Effective Date of this Amendment is: May 14, 2019. Background Data Effective Date of Owner -Engineer Agreement: July 26, 2018 Owner: Board of Public Works, City of South Bend, Indiana Engineer: Lawson -Fisher Associates P.C. 525 West Washington Street South Bend, Indiana 46601 Project: Professional Design Services for the East Bank Trail Slope Stabilization City Project No. 118-306 Nature of Amendment: [Check those that are applicable and delete those that are inapplicable.] X Additional Services to be performed by Engineer Modifications to services of Engineer Modifications to responsibilities of Owner X Modifications of payment to Engineer X Modifications to time(s) for rendering services Modifications to other terms and conditions of the Agreement Description of Modifications: Lawson -Fisher Associates (LFA) was selected by the City of South Bend (City) to generate a Schematic Design for the East Bank Trail Slope Stabilization Repairs. The Schematic Design alternatives were presented to the City on January 29, 2019. The City has requested that LFA prepare the selected preferred alternative to address the remedial efforts along the damaged project area. This supplemental is for the following: Prepare preliminary design documents and construction estimate for review by the city. Conduct a field review meeting with city staff to secure comments. Exhibit K — Amendment to Owner -Engineer Agreement. EJCDC® E-500, Agreement Between Owner and Engineer for Professional Services. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 • Revise preliminary plans from city comments received. Develop a final plan submission that will include plans, special provisions, quantities, and a bid proposal sheet. Submit prepared documents for city review and receive comments. • Finalize plans, special revisions, and the proposal sheet as bidding documents for soliciting quotes from invited contractors. • Provide quote period services for answering questions and preparing any necessary addendums. All questions and answers shall be through city staff through said period. Attend a pre -bid meeting as may be requested by the city. Attend the pre -construction meeting with the city and successful contractor. • Provide construction phase services as may be required. Preliminary plans and construction estimate above shall be completed within 21 days from notice to proceed. After field check and city comments, the final plan submission shall be completed within 14 days. Quote packages shall be available for distribution by the city within 7 days from when final plan comments are received. Under Article 2 Section C2.0113 Compensation ADD the following to the original agreement: 4. A Lunp Sum (LSUM) amount of $11,200 for preliminary design documents, final plan submission, and bidding documents as described in the modification to the scope of services above. An hourly not to exceed (HNTE) budget amount of $2,500 for Quote Period and Construction Phase Services as described above. Agreement Summary: Original agreement amount: $ 90,740.00 Net change for prior amendments: $ 0.00 This amendment amount: $ 1,700.00 Adjusted Agreement amount: $ 104,440.00 Change in time for services (days or date, as applicable): 180 days Exhibit K — Amendment to Owner -Engineer Agreement. EJCDC® E-500, Agreement Between Owner and Engineer for Professional Services. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. OWNER: City of South Bend, Indiana Board of Public Works Title Gary A. Gilot, President By: ........ .................. ............ _............... _..._.... ............_.................... ._..... ..._._. .... _....... _ ...._...... Title: Genevieve E. Miller, Member By: Title: L ura O'Sullivan, Member By: Title: E Izabeth A. Mara ik, Member By: Title: Therese J.f Dorau, Member Attest: Title: inda Martin, Cierk Date: -May May 14, 2019 ENGINEER: Lawson -Fisher Associates P.C. 525 W. Washington Avenue South Bend, Vj,6h,46601By m. Title: Michael J. Guz,e fesident Date Signed: May 8, 2019 Exhibit K — Amendment to Owner -Engineer Agreement. E1CDC® E-500, Agreement Between Owner and Engineer for Professional Services. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date May 6, 2019 mmmmm mm Name.......Ro..e.r....Nawrot.............. ,��..� .. ........ Department Engineering BPW Date May 14, 2019 Phone Extension 5932 uuw.�omomommuavvvvvmuwmrc�mriuwv omi�uwwu�e��Nrminrrrnttriic _. , �� ��� i xi wuuw im�mi�uwmmmmmmmmmmmmmuiuimmmuiuiuwwwwmw ma�eu�. Required Pnor to Submittal to Board ..__...._ww .........._ .. _ _.._.... w ......._.... _._.__... Legal ❑ Attorney Name Clara McDaniels Controller Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing Check the LJ Agreement R Professional Services ❑l Bid Opening [l Quote Opening Change Order No. ❑ Ease/Encroach. Other: Amendment No. )ruts Item_T m' .....-. Contract Resolution or All _mubmissions Proposal El Bid Award ❑ Req. to Advertise ❑ Quote Award ❑ C/O & PCA No. ❑ PCA ❑ Traffic Control Required Information Addendum ❑ Title Sheet Company or Vendor Name Lawson -Fisher Associates P.C. ._.......... ........ .. �.�. ....... �_ ..........�_.._ ❑ Yes ® No ❑ If Yes, Approved by New Vendor Purchasing mmmmmmm MBE/WBE Contractor MBE � WBE __.,.... MBE/WBE Contractor Requested ........ - ......... [❑ No 0 Yes Name of Co ap................................ Project Name East Bank Trail Slope Stabilization Design Services Project Number 118-306 mm mmm Funding Source Liability Insurance Fund Account No. 226-0419-672.42-03 Amount $ 13 ,700.00 Terms of Contract NTE Purpose/Description The de si n of the necessa repairs to restore -�......�........ the trail into safe operation after the study phase. The total contract amount with this amendment is 04,440.00. Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) m� w�_ ........_........... eq ired For Change Orders n!. �.� .. Amount of F1 Increase $ n Decrease $ Previous Amount CurrentPercent of Change: ..�..�..�.........�.� New Amount $ ...............................�.�.�.�....m............... �����.................................�........................�.... � ......-- Total Percent of e /0 .- Dis rsal After A proval Copy Original