Loading...
HomeMy WebLinkAbout12/21/1920 Board of Public Works Minutes243, Board met in regular session at 10:00 A.M. John F. De Haven absent. the following communeatioA was ordered, sent to the, Southern Michigan -Railway Company by the Board. Southern Mic4 gan Railway Co. S.outh Bends Ltd iar a Gentlemen,:-' Attention R. R. Smith, Mgr. Replying to your, letter of December 17th., in re: rd t.o the cement curb along the,railwiy tracks on North Michigan Street betwee-n 1%r Shore Drive and Wakewa Avenue the Board of Public Works consent to -the payment by your Company to the Hi hays Materials Com any of the amount°due them for the installation of curb along railway racks on &Rove mentioned street. ° ° This consmnt is given by the Board of Public Works on the express under- standing that the Highways Materials Company file with this Board,& complete release oovering the payment of any sum due them for the construction;of this curb. Ver truly, ° 21 Order Of The Board Of finblic Works,. The fallowing communication received from R. R. Smith of the Southern. Michigan Railway Company. Dec. 17;1920: Board of Public Work Ci$y of South Bend, Works, Gentlemen:- With* reference to the installation -of the coon& curb on North Michigan Street between North Shore Drive and Wakewa.Avenue. Yourrecords will show that this company agreed to pay the city.of South Bend for the curb which was installed about one foot outside of our rails between the above points. The Highways Materials Company.has requested me to write you stating that our x willingness to pay them direct for this work instadd of paying the city. This Companywill be glad to make payment direct to the company which made the installation provident _ the City of South Bend will assign this amount to the Highways Materials Company. r Yours very truly, Rr. .Rr. SM ITH RRSj M.• ° ° 2nd. Vice Pres. & Gen. Mgr. Petition filed for li ht at the corner of California Avenue and De Maude AVenme_ Same referred to Beaning for reper . Partial estimate allowed Williston Construction Co. on Walnut St..... 11,Q .L ° Communication received from New York Central Ry. Co H. W. Fenno Dit Eggineer in regard to renewal of Portage Avenue Bridge over the Michigan Central Division. Bard granted permission to close Portage Avenue at this point for a period of three (3) weeks from December 29th1., 1920, arrangements to be made by the Street Commissioners for de tit::urs . Engineer filed assessment roll and final estimate for -pipe sewer on Stanfield Street from Howard Street to Corby Street, under iMprovement Resolution No.' s06. :n the City of South Bend, Indiana. Resolved that notices to the assessments be pubished on the 28th. day of December 1920 and on the 4th. day of January 1920'in the South Bend Daily Tribune, stating that°this Board will give a hearing on the amount of assessments at its office in the City Ball on the 12th. day of January 1921 at 7:15 P.M. Resolved further, that the entire work under -the above contract he accepted and approved and the final estimate thereon allowed; 244 Tuesday December 21st.._192O. Continued: Eng veer filed assessment roll and final estimate for grade, curb and walk`on Catalpa Avenue from Indians Avenue.to Olive'r Street, under ]improvement Resolut on No.«'746. 1n the City of.South Bend, Indiana. Resolved that notices as t the assessments be published for six consecutive days in the South Bend Daily Tribune, commencingg January 3rd.1921 stating that this.Board will have a hearing an the amount of` such assessments at its - office in the City Hall on the 12th. day of January 1921 at 7:15 P,M. Resolved a:rth6tethat;the entire work under the Oo've contract be accepted and approved.aud the final estimate --thereon allowed. Ert ineer filed assessment roll and final estimate for grade, curb ,a and walk on Main Stret'fr®m Ewing Avenue -to south lane of Woodside Street, under b:provement Resolutioa`No-440. the City of South Beiao, Ind 4kna,, to Resolved further, that notice as the assessments be published for. six consecutive days commencing -on the 3rd. &y-of January, 1921 in -the South Bend Daily Tribune >statinfthat this Board will give a hearing on the amounts of such assessments at its of ice- in the City Hale o the Rth. day of January 1921 at 7:15 PM Resolved further, that the entire work under the above contract be accepted and approved and the final estimate thereon allowed, Engineer filed assessment roll and final estimate for resurfacing of Law:ndale Avenue from Lincoln Way West to North line of Van Buren Street, under Improvement Resolution No. 812.` IN the City of South Bend, Indiana. Resolved that notices as to the assessments be published for six consecutives days,commencing on the. 3rd. day of January 1921 in the South Bead Daily Tribune, stating that this Board will ggive a hearing on the amount of sueh.assessment at its office in the City Hall on the 12th. day of January 1921 at 7:15 P.M. Reselved,farther, that the entire work.uader -the above contract be accepted and approved. a:nd the final estimate thereon allowed: Engineer filet assessment roll and final ,estimate for Bituminous - Macadam pavement on North Michigan Street from North Short Drive to Wakewa Avenue, under Idprovement° Resolution No. 804.. In the City of South Bend, Indiana. Resolved that notices as t the assessments be published for six consecutive days commencing on the 3rd. day of January 1921 in the South Bend Daily Tribune, stating thet this Board,will give a hearing on the amounts of such assess- ments at its office in the City Hall on the..12th._day of'January 1921 at 7:15 P,M., Resolved further that the entire work under the above contraot be accepted and approved and the final estimate thereon allowed. En ineer ppiled assessment roll and ti al estimate for. -walk an grad grading.OA E.-Wayne Street frot St. Louis Blvd. to the first alley west, under prow ment resolution No. 831. In the City of South Bend, Indiana. Resbly-ed that notices as -to the assessments be published for *six consecutive days commencing on the 3rd. day of January 1921 in the South Bend Daily Tribune statin that -this Board will give a hearing on the amount of such assessments a its office in the City Hall on the 12th, day of January 1921 at 7:15 . P. M. Resolved further that the entire work under the above contract be accepted and approved and the finaiestimate thereon allowed. Engineer filed ssessment roll and final estimate for rade, curb and ,walk on Various �treet under Improvement Resolution No. 778. n the lity of South Bend, Indiana. Resolved that notices.as to the assessments be published for six 'consecutive days commencing on the 3rd. day of January 1921 in the South Bend Daily Tribune, stating that this Board will give a hearing on the amount of such -assessment - at its office in the City -Hall on the 12th' day of January 1921 at 7:15 P:M.' Resolved -further that the entire work under the above contract be accepted and approved and the final estimate thereon allowed Engineer filed assessment roll and final estimate for grade, curb and wa k on Chapin Street from Indiana Avenue to Oliver -Street, (bow Bruce Street), under 14provement Resolution No. 745. In the City of South Bend, Indiana. Resolved that notices as to the assessments be published.for six con;socutives days commencing on the 3rd. day of January 1921 in the South Bend Daily Tribune, stating that this Board will give a hearing on the amount of such assessment at its office in the City Hall on the 12th. day of January 1921 at 7:15 P.M, Resolved further that the entire work under the above contract be aceepted_amd approved and the final estimate thereon allowed. tl w � m n wy�Jrer.a sr® ru w- a Dr. Freyermuth appeared before the Board and requested permission to have City pay for telephone at Isolation Hospital and Clinic. -Same granted by the Board. 2nd, Plat of Edgewater Place Addition approved as follows: - DESCRIPTION OF PLAT. The annexed plat re preSents the second , plat of Edgewater Place addition to the City of South Bend. The.attached-plat includes lots 8,9 1 1 ,12 and.14 in Ed ew ter Plla a Addition, Lot 1 1 Hare Co rt Addiition il is a on of ae Riiv Av in be%we.en Aron Ave. and ffarper,Cour�. The dimendlffla o1 a jots anvil w���� of ��e street$ and alleys are given in feet -and fractions thereof. -Edgewater Drive has heretofore been,opened by ;the. Board of Public Works and is hereby shown as forlherly opened by,said Board.. The lots are indicated by letters as shown on the plat. The alley in the.rear of Lot "N" is --largely for the benefit of Lot "M" kut is hereb dedicated for public use: .The alley shown on the westerly side of said lot N""is hereW dedicated to public use by a deed from Srah C. Hier and husband to Whitcomb & Keller and recorded in Deed Record No. 163 on Page 505. IN WITNESS WHEREOF, Whitcomb & Keller acknowledge the execution 'of this plat by'its President, Attested by the Secretary Treasurer, this 20th. day of December 1920. Whitcomb 41 Weller By_ FRED W. KELLER STATE OF INDIANA �SS ST. JOSEPH COUNTY Attest Leslie C. Whitcomb Before me, the undersigned, a Notary Public -in and for said County came Fred W. Keller, President and Leslie C. Whitcomb, Secretary -Treasurer and acknowledged the execution of the attached plat. Witness my hand and offical seal this 20th. day of December 1920. MY commission expires 'CLAUDINE BRICKELL SMOKE 4u>1y109192.0 (SEAL) Notary Public The following communication received, read and placed on file. Dee, 16119200' Mr. George A. Robertson, South Bend , Ind . Dear Sir Answering yours of Dec. llth.. relative to fire damage. on the Auditorium Theatre Building. As per your request, I made a thorough inspection of this building and find that while fire was- -tremely hot, the damage was almost entirely to the contents- of the building; furniture, seats, carpet's, draperies, etc., and some of ,the interior wood worm such as window and door casings, balcony and gallery railings and boxes, and a very small section 'of the main floor. There is no damage whatever to the general construction Walls were not effected at all. In fact there is no damage that in any way effects the strength of the building - with the exception of a new floor joist and they are only slightly burned on one edgge and can be very easily re -placed. Structural and supporting members are in no way effeeted Part of the finish coat of plasterly is slightly damaged from excessive heat and water.` The general construction o this building is, concrete, foundation, heavy .masonry brick walls, cast iron columns, and steel girders supporting -the wood floor con- struction, of 3X14 joist. -Main roof and ceilings are supported on heavy steel trusses spanning full width of Auditorium, supported on heavy steel columns built in masonry walls and resting on top of concrete foundation. Roof is covered with tar and gravel roofing.,' Interior.of.building is plastered on wire lath with asbestos fiber plaster. The building-.r is equipped with a very complete sprinkler system, in basement, and store rooms on first floor, ws well as in corridors and passage ways. These sprin*lers are exposes under the ceilings. Throughout the Auditorium there is a complete sprinkler system in the space` between the main floor and the store room ceilings, also in the space between the Audi-, torium ceiling and roof. While the fire in this building was probably the hotest that has ever taken: place in a buolding in South Bend but did,no damage to,the construction of the buildingt. is due to good design and construction,`Asbestos fibered fireproof plastering and the complete system. Yours very truly, H. G. CHRISTMAN CO. HGC:IC BYA* G. CHRISTMAN .j 9 ,