Loading...
HomeMy WebLinkAbout3A Claims 4.25.2019Claims submitted REDEVELOPMENT COMMISSION Redevelopment Commission Claims April 25, 2019 for approval 324 R R WET DE VE LOPMENT AREA C&S Masonry Restoration LLC R&R Excavating, Inc Zach Hurst, P.E. City of South Bend Jones Petrie Rafinski Kil Architecture Planning Slatile Roofing & Sheet Metal Co., Inc. 429 FUND RIVER EAST DEVELOPMENT TIF Precision Wall Systems Christopher B, Burke Engineering LLC 30 FU N P SQ UTH SIDE TIF AREA 01 HRP Construction, Inc. 2 TIF PARK BONA CAPITA L Lochmueller Group Lawson -Fisher Associates P.0 Smithgroup Alliance Architects Explanation of Project 152,415.63 Lafayette Building Skylight & Masonry Repairs 398,525.00 Fat Daddy's Building Demolition 5,320.00 Consultant Engineering Services 22,321.00 Legal Services 8,672.25 Downtown East-West Streetscapes 5,140.32 Architectural Consultation for the Lafayette Building Skylight & Masonry Repairs 99,412.56 Liberty Tower Exterior Renovations - Division A 223,772.50 Three Twenty at The Cascade -Glazed Assemblies 60.65 East Race Sewer Analysis 136,659.39 Miami St. Basin Drainage Improvements 54,928.38 Historic Leeper Park Improvements 78,916.06 SBN-West Bank Corridor Improvements Final Design 135,894.25 Seitz Park Prelim & Final Eng. 34,288.00 Howard Pk Redevelopment Total 1,052,299.30