Loading...
HomeMy WebLinkAboutOpening of Quotes - Hydrant Flow Testing Project No 119-041 - M.E. Simpson Co IncQUOTE/PROPOSAL 114 PLACE CITY OF SOUTH BEND �� r PROJECT NAME Hydrant Flow Testing PROJECT NO. 119-041 .. .........- ._................. QUOTES DUE April 23, 2019, 9:30am, Local Time Item No. li Description Quantity Unit Unit Price Total Amount 1 Fire Hydrant Flow Test 1099 EA $49.00 $ 53,851.00 Total Amount of Quote $ 53,851.00 Firm: M.E. Simpson Co., Inc. Address: 3406 Enterprise Ave. City/State/Zip: Valparaiso, IN 46383 Telephone Number: ( 800) 255-1521 Fax Number: 31-2444 By Jr (Signatr Michael D. Sing span, I (Printed Narne of Person Signing) Version 4/2/2019 Page - 11 Public Works Quote w CITY OF SOUTH BEND INDIANA 4w CQNTRAC-TOR'S QUOTE FOR PUBLIC WRK PROJECT NAME: Hydrant Flow Testing PROJECT NO. 119-041 QUOTES DUE A i�rtl_23 201"9L9:30am Local Time (Must be completed for all quotes. Please type or print) Date: 23, 2019 Firm: M.E. Simpson Co., Inc. Address: 06 Enterprise Ave. City/State/Zip: Valparaiso, IN 46383 Telephone Number: ( 800 ) 255-1521. Agent of Bidder (if Applicable): Michael Simpson Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The Ci of South Bend Department of Public Works and dated Aril 23 2019 for the sum of (enter the Total Quote as shown on the Proposal) I'if Three' ho isand Ei t I1 i ne Dol)ar a:rtcl Cents $ 53,851.00 (Enter Sum of Total Quote shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. The above quote is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member Laura L. O'Sullivan, Member By , "........:::...................... " Michael D. Sim (Printed ACCEPTANCE .............. day of _ ���ature� CEO of Person Signing) 20 Genevieve E. Miller, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 4/2/2019 Page - 7 Public Works Quote When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) )SS.. Porter COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran' means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Version 4/2/2019 Page - 8 Public Works Quote Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16- 8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I Version 4/2/2019 Page - 9 Public Works Quote have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this _.. 22 day of Aril , 2019 Subscribed and sworn to before me this 22 My Commission Expires �1 3.c County of Residence M.E. Sim son Co., Inc. ContractorBi deer-"m— Sigi of Coe rector/Bi� r or Its Agent Michael D. Simpson, CEO Printed Name and Title day of Aril ...mm......... � 20 19ITIT .-J Notary Public vsr •, Cd;'07YNoLEWI3 My Commission r' Expires „or SEAL "s*' July 30,2021 Commission Number 646260 La Porte County Version 4/2/2019 Page - 10 Public Works Quote CONTRACTOR'S QlJ T TO PROVIDE City of South Bend, IN Fire Hydrant Flow Testing Project No. 119-041 Due: April 23, 2019, 9:30 AM ME , IMPSON 1 Co., Inc. E, IMPSO April 23, 2019 City of South Bend Department of Public Works 227 W. Jefferson Blvd. Room 1316 South Bend, IN 46601 Dear Sir or Madame: M.E. Simpson Co., Inc. is pleased to present the City of South Bend, Indiana our proposal for its Fire Hydrant Flow Testing Project No. 119-041. We are honored to be considered for this work and are confident our team will help make the project a success. M.E. Simpson Co., Inc. is a Professional Services Firm dedicated to developing and providing programs and services designed to maximize peak performance for our clients' water distribution systems. Many of these programs are universally recognized as a part of "Best Management Practices" (BMPs) for utilities. We pride ourselves on delivering solid solutions using the highest quality technical and professional services by way of state-of-the-art technology and a skilled and well -trained staff of professionals. Our highly educated engineers and technical team are committed to the success of this project. They will be ready at a moment's notice to relieve your staff's burden and ensure a seamless continuation of your services. Our services were developed and refined to provide utilities with programs that can be customized to meet their needs. From complete "Turn -Key" services to assisting with the development of "in-house" programs for utilities, M.E. Simpson Co., Inc. serves our clients with this ultimate goal: to deliver to the public the implicit faith that "the water is always safe to drink". Thank you for your consideration and this opportunity to acquaint you with our services and offer this response. We are committed to exceeding your expectations. Sincerely you. Michael D. Simpson Chief Executive Officer Mich el D. Si son Chief Execut' a Officer 3406 Enterprise Avenue Valparaiso, IN 46383 800.255.1521 T 888.531,2444 F Michael,Simpson@mesimpson.com M.E. Simpson Co., Inc. I Fire Hydrant Flo / ater ain Capacity Testing Program Page 1 SCOPE OF WORK Fire Hydrant Flow/Watermain Capacity Testing Program FieldThe c vice for the Fire Hydrant/ a ai a aci Testing Program is understood M.E. Simpson Co., Inc. will furnish all labor, material, transportation, tools, and equipment necessary to flow test hydrants in the water distribution system selected by the Utility. M.E. Simpson Co., Inc. shall be required to provide such skilled and trained personnel and equipment necessary to complete the work herein specified. There will be a minimum of Two Persons per team working on the Fire Hydrant Flow/Watewrmain Capacity Tgji ro ram at a,ll times. ♦ Work in an orderly and safe manner to insure protection of the local residents, Utility employees, and the Field Staff so that no avoidable accidents occur. ♦ All Field Staff will have readily observable identification badges worn while in the field. All vehicles used in the field will have company signs attached. The flow testing equipment to be used will be that which was described in the "Equipment to be used" section. ♦ M.E. Simpson Co., Inc. Personnel will meet with the Utility to review the project guidelines and answer any questions on procedures. ♦ The initial layout of the project will need to involve distribution Utility staff to help identify the flow patterns in the distribution system, flow testing from larger mains into smaller mains, from the water sources (pump stations and water storage structures), out into the system loops and dead ends. ♦ Any pressure zones in the distribution system will be identified on the water atlas prior to developing the fire hydrant flow -testing program. This will need to be done with distribution personnel prior to the start of the program. ♦ As a part of the Fire Hydrant Flow/Watermain Capacity Testing program, mapping discrepancies found on the current water atlas will be noted and included as a part of the final report so the Utility can make needed corrections. This will be included as a part of the periodic reporting to the Utility, thus enabling the Utility to keep up with mapping corrections. ♦ A progression map shall be maintained for each section under study indicating hydrants assessed on the map. This will be especially helpful in quickly determining the work progress of the crews in the field. ♦ It may be necessary to conduct parts of the Fire Hydrant Flow/Watermain Capacity Testing during "off hours" such as at night. This may be required in areas of high traffic volume where traffic may affect the ability to conduct safe flow testing, and traffic volume may affect the ability of the Project Team to be able to safely access hydrants on busy streets. The Project Team will give 24-hour advanced notice of intent to flow test hydrants in a particular area that may require after hours work or nighttime work. This is so the Utility can plan for the area to be worked in, give notification to the Police department, as well as other Public Works Divisions as to the activity that will take place. ♦ M.E. Simpson Co., Inc. will use large flow testing signs in designated areas to notify areas to be tested and inspected. M.E. Simpson Co., Inc. can provide the Utility an informational letter briefly explaining the fire hydrant flow -testing program to include with the customer's normal water bill. Frequently, special mailings are used for customer notification. If you choose a special mailing, the Village will be responsible for the postage and printing costs. M.E. Sirripson Co., Inc. I Fire Hydrant Flow/ ater ain Capacity Testing Program fuage 2 ♦ M.E. Simpson Co., Inc. can issue a press release to briefly explain the fire hydrant flow -testing program and the areas affected. The press releases can be sent to; local newspapers, local radio stations and the Cable Company. This type of customer notification can greatly reduce the number of customer complaints about dirty water. ♦ All of the fire hydrants will be recorded on the water atlas and assigned numbers, using your existing numbering system or by creating a numbering system for you, prior to the development of the fire hydrant flow -testing program. This data is critical to establishing an effective and water conserving fire hydrant flow -testing program. ♦ All of the pertinent information for each fire hydrant that is flow -tested will be documented. This data is critical to establishing an ongoing flow -testing and maintenance program. The following is a list of the information gathered. o If requested, all Fire Hydrant caps will be greased for ease of operation o Fire Hydrant nozzle size used for each test will be recorded o Residual Pressure will be recorded for each Fire Hydrant tested o Static Pressure will be recorded for each Fire Hydrant o Flow, GPM (Gallons Per Minute), will be recorded for each Fire Hydrant flowed o The amount of time it takes to flush each Fire Hydrant will be recorded. An estimate will be made of the amount of water used during the operation of each Fire Hydrant test o Fire Hydrants that are in need of repair, painting, color coding, or have operation defects will be noted with an estimate of repairs needed to make the hydrant operational. o The date tested and technicians operating the Fire Hydrant will be recorded. o The Fire Hydrant address or location will be recorded. ♦ The Project team will set up the flow testing program in such a way that hydrants are operated near the water source first, then the team will move away from the water source in an organized manner to keep water discoloration and distribution disturbances to a minimum. The "flow" hydrant shall be downstream of the "residual" hydrant, thus insuring proper residual readings for full potential fire flow (re: AWWA M-17 manual, page 41). ♦ Fire hose and deflection tubes will be utilized, as required, to direct flushing water away from traffic, pedestrians, underground Utility vaults, and private property. ♦ Pressure gauges are used to determine the residual pressure during the flow -testing process while insuring that the distribution system pressure remains above 20 psi. Any incidents of the distribution system being unable to supply a residual of 20 psi in the surrounding area will be brought to the immediate attention of the Utility Superintendent. ♦ After the Fire Hydrant has been flushed, M.E. Simpson Co., Inc. will verify that the hydrant is seated and is draining properly. We will also check the Fire Hydrant with a FCS S30 or Gutermann AquaScope electronic listening device to ensure that the hydrant is not leaking. A majority of fire hydrant leaks go un-noticed because they are small leaks draining out through the drain holes at the base of the hydrant. Using the S30 or Gutermann AquaScope will help eliminate this type of leakage. ♦ All pressure gauges used in the field will undergo daily testing against a "standard" gauge to insure the field gauges are accurate during the flow -testing project. Any gauges that are found to not be within acceptable limits will be replaced with gauges that are within accepted standards. This will insure the observed static and residual pressures are accurate and reliable. M.E. Simpson Co., Inc. I Fire Hydrant FIB / atermain Capacity Testing Program Page 3 M.E. Simpson Co., Inc. takes great care when operating, flow -testing the customer's fire hydrants in their water distribution system. Even with our years of proven experience in water system operations problems occasionally occur. �f1.gjjyklra it tkiat b� leak oii fciiII d,u,riirag,,t p ... � t.l �i._ .tl.. Ir wwlrm aral� �.'.. ar r tl m lnn .. n r s Q!Ahe Water .�y um��f������ky oir j,Q Bible wflve or (nnnnoW�lnnr>aunu tlun� )n tlo° nr�tl:n II�tl_.e.. r�ar.. to e.the wat � t�rrni�dn, fiD@a�tf °�sUr�� water ��.�i�� �u.o_t " n and tntlbi(fit i�.���2: 4n_pp5!�ib U„ $n Gntl U Ui �in �"a�;U4R V�"�:'��`&!s� i.. �AUln pn� n �,� .lUn4',....� anrnUn „ �)e he r ""�,�� IC�n�ailn e for w.w.w.w.s w. ..................... . o the a d IY n�I�UlU�Ues inR�UvU� qal d9c�l'l.eir r n��S...rr�)I�n�eli�. NFPA Color Ceding Standards Municipal, Private, and Non -Potable fire -hydrants should not be painted the same color (the body of the hydrant) according to the NFPA. Each of the three types should follow the color code listed below. The bonnet and nozzle/pumper caps are also to be color -coded according to the hydrants' rated flow rate at 20 psi (see below). The NFPA has published standards regarding the maintenance and color coding of fire hydrants (NFPA 291). The scheme is as follows: n4i NFPA MIM Municipal System: Private System: Re Non -Potable System; Ii ,ih_ � n,n tiro=rtF�, Hydrant ratings at 20 psi. Class C Less than 500 GPM 1°ed Class B 500-999 GPM Class A 1000-1499 GPM Green Class AA 1500 GPM & above Light Blue M.E. Simpson Co., Inc. I Fire Hydrant FIB / aterrnain Capacity Testing Program Page 4 The M.E. Simpson Co., Inc. Project Team will welcome having staff of the Utility observe field procedures while the flushing program is in progress. They will be happy to explain and demonstrate the equipment and techniques that are employed by M.E. Simpson Co., Inc. for calculations of fire flows. This may be useful for the staff of the Utility in understanding the parameters of hydrant flow testing, especially during an emergency such as a fire where proper flow is needed for the fire department. . E. Simpson Co., Inc. will perforrn the olio in .° Project Team will meet daily with assigned Utility personnel to go over areas of flow testing for prior workdays and plan current day and next two days' areas to flow test. At the end of each day, or as requested, a list of any broken or inoperable valves or hydrants will be turned in. Each step of the fire hydrant flow -testing program will be identified and the hydrants used for each flow -test will be documented in a fire hydrant flow -testing report. Maintain a progression map to be included with the final report of the project indicating areas flow tested and areas that have been tagged for flow testing. The Utility will be provided with flow information in Pro--Maps""/Pro-HydraintO an electronic fire hydrant database. This documentation allows for the flow -testing program to be repeated at a later date. This electronic program is designed to be a complete system for your Utility to establish an effective fire hydrant flow testing, flushing and maintenance program. The electronic database provides an inventory record system, hydrant maintenance and scheduling. The database includes a complete hydrant flow - testing program for calculating flow test results. Pro-IMaps" /Pro..I..lydraiint" is a hydrant record database (ODBC). This data will be available in an electronic format to the Utility with the appropriate access. The data will be maintained offsite at a secure location. M.E. Simpson Co., Inc. can also provide the Pro Maps"m/Piro IHydrantO, electronic database, that has the abilities to access and reproduce and edit all aforementioned hydrant location and flow testing information. This program will have the capability to generate upon demand: The individual Hydrant Flow Test reports that includes the flow test data, static pressure and residual pressure, and potential flow at 20psi. A summary listing of all Hydrants with identified defects. A complete listing of all Hydrants by numerical or indexed order. A complete listing of all Hydrants by alphabetically reference to street and cross street names. All pertinent information such as port size, number of ports, flow test results, general condition of the hydrant, and color coding for the NFPA rating. Hydrant location will be documented from existing landmarks and will be a part of each Hydrant record. M.E. Simpson Co., Inc. I Fire Hydrant Flow/ ater ain CapacityTesting ProgramPage 5 Information collected by M.E. Simpson Co., Inc. during the program and any other information provided by the Utility shall be regarded as CONFIDENTIAL and will not be shared without permission from the Utility or unless required by law. Develop a Flow Testing log of activity to be included with the final report that will include the following; 1. Type of problems observed 2. Location of same for problems discovered . Total estimated water used (to be included on each flow test result) 4. Mapping errors on the water atlas 6 Prepare the final report at the completion of the project which will include all Fire Hydrant Flow/Watermain Capacity Testing reports, other problems found in the system during the course of flow testing that need the attention of the Water Utility. This final re ort shall be n^adeITITva�IITb9 for submission to the Water Department within thirty 30 work days of the letion ofthe fieldwork. Assumptions & Services Provided by the Utility The Utility will furnish, in an electronic format, all maps, atlases, (two copies) and records necessary to properly conduct the flow testing program. The Utility will make available, on a reasonable but periodic basis, certain personnel with a working knowledge of the water system who may be helpful with general information about the water system. This person will not need to assist the Project Team on a full-time basis, but only on an "as needed" basis. The Utility will supply information regarding pressure zone boundary valves, and any other information that may make the job of flow testing easier to perform. The Utility will assist, if needed, to help gain entry into sites that may be difficult to enter due to security issues or other concerns. Equipment to be Used The following equipment will be used for fire hydrant operation and maintenance work during the unidirectional flushing program for the Utility. All materials listed will be on the job site at all times. Pumper Port Diffuser, Hose Monster 2.5" Port diffusers, Hose Monster / Pollards Certified and field tested flow gauges Valve keys FCS S30 or Gutermann AquaScope listening device to ensure the hydrant isn't leaking All necessary hand tools ♦ Truck mounted Arrow Board/Signage, and warning lights on trucks Traffic control equipment, including properly sized traffic cones with reflective stripes, when needed or required A "Schonstedt"/"Chicago Tape"/"Fisher" magnetic locators A "Radio Detection line locators M.E. Simpson Co., Inc. I Fire Hydrant Flo / aterrnain Capacity Testing Program Page 6 M.E. Simpson Co., Inc.'s Safety Programs cover all aspects of the work performed by M.E. Simpson Co., Inc. We take great pride in our safety plan/policy/program and that is evident in our EMR scores over the last five years. The safety of our employees, the utilities employees and that of the general public is our #1 priority. Our Safety Plan/Policy/Program, with all of its parts, is 60 pages in length. In an effort to be more efficient and less wasteful we do not print copies of the safety program for RFPs. There is nothing secretive or proprietary contained within our plan/policy/program and we are happy to share its contents. If you would like a PDF copy of our plan/policy/program please contact Terrence Williams, Operations Manager, at 800.255.1521 and a copy of our program will be sent via email to you. Below is an overview of our plan/policy/program: piety is a major part of any project. M.E. Simpson Co., Inc. always provides a safe work environment for its employees. Our staff is trained in General Industry OSHA rules, Confined Space Entry & Self -Rescue, First Responder First Aid, CPR, and Traffic Control. While in the field on your project, M.E. Simpson Co., Inc. and its employees will follow all of the necessary safety procedures to protect themselves, your staff and the general public. g s mtor f !y .. �5ti� w .. Thai use of a "one 1person" lealk detection team isdangerous and iirnnliniracticall where water rnnai ns run under roadways, it wound be a dangerous 1precedent to aliow a "one peirsorn" teairn to access irnairn lime y" �, w " with head di P rnos n , and at the sarne time valves located in the roadway, atteq] t try„N ten to,1h valve a try to contirr:fl tiraffffiic flow at that 1peirson"s loa.adon 'irn the street„ Therefore M.E. Simpson Co., Inc. adheres to the following: The Project Manager and the Field Manager will be trained in accordance withh OS111A Standard 1.910 (General Industry) and be in possession of an OSHA 10 1-iour or 30 Dour Card. Any listening points located in a "confined space" such as pit and vault installations that require entry will be treated in accordance with the safety rules regarding Confined Space Entry, designated by the Utility, The Department of Labor and OSHA. o All personnel are trained and certified in Confined Space Entry & Self -Rescue. We will follow all safety rules regarding First Responder First Aid & CPR, designated by the Utility, The Department of Labor and OSHA. o All personnel are trained and certified in First Responder First Aid & CPR. We will follow all traffic safety rules, designated by the Utility, The Department of Labor, OSHA, and the Illinois Department of Transportation (per MUTCD). o All personnel are trained and certified, by the AMERICAN TRAFFIC SAFETY SERVICES ASSOCIATION (ATSSA) in Traffic Control and Safety. _ Current nt documentations uof �t�;tiy tuWAaupMlmtnrng pa�u°� c��t��Fur �lc�rn can, I-)t� t����t�ulc��� �c�t.. Ol pqtr� f��ur r°anal �a�u _ ".............. H yThese�..ertifications are cutFuen an uai� to (latr".... for „ ), Corr "I lar �p� t p�� ratnot !'el, t n9tulnt�.�� M.E. Simpson Co., Inc. I Fire Hydrant Flow! atermain Capacity Testing Program Page 7 I 1YD11RANTS TO BE FLOW TES F The total number of hydrants to be flow tested for the Utility is approximately 1,099. The number of hydrants tested may vary from the estimated number above. Any additional hydrants shall be charged a per unit price. Project Start Date: TIIM Hold Kick-off meeting: T1311), to cover goals and objectives of Project. Fieldwork to be completed and documented: 'Ti BID days depending on number of hydrants to be flow tested. Hydrant Reports: Twenty (20) working days after fieldwork is completed for the project. wa ✓ SCOPE OF WORK CITY OF SOUTH BEND` PROJECT NAME: Hydrant Flow Testing PROJECT NO. 119-041 QUOTES DUE Aril 23 2019 9:30am Local Time PROJECT DESCRIPTION A. The project includes the furnishing of all equipment, material, insurance, and labor for hydrant flow testing various fire hydrants within the City of South Bend, IN. PREVAILING SPECIFCIATIONS AND DESIGN & CONSTRUCTION STANDARDS A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN & CONSTRUCTION STANDARDS, most recent version, are to be used on this project. B. Each Quote provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION STANDARDS prior to submitting a quote. C. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2018 INDOT Standard Specifications for the letting effective after September 1, 2017. D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. III. TERM "OR EQUAL" A. Prevailing Specifications: None B. Additions 1. Where the term "or equal" is used in these specifications, the Quote provider deviating from specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its proposed article or equal. The City of South Bend shall be the sole judge in determining if the "or equal" offered meets the specification. IV. TAX EXEMPT A. Prevailing Specifications: None B. Additions 1. Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. V. INDEMNIFICATION A. Prevailing Specifications: None B. Additions 1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, or because of arising out of any defect in the goods, materials or equipment supplied by the Quote provider. VI. INSURANCE Version 4/2/2019 Page - 1 Public Works Quote A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 103 B. Additions: 1. All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a. General Liability: Premises -Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b. There shall be no exclusion for explosion, collapse or underground hazard. c. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000. d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. e. The City of South Bend shall be named as additional insured on the Certificate of Insurance. VII. CONTROL OF WORK A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 105 B. Additions: 1. The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. 3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South Bend Department of Public Works. Vill. LEGAL RELATIONS A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 107 B. Additions: 1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where mentioned in these documents, is the City of South Bend Division of Engineering. 2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the St. Joseph County / City of South Bend Building Department. 3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result in the forfeiture of Contractor's performance bond to the Owner. IX. PROSECUTION AND PROGRESS A. Prevailing Specifications: 2018, INDOT Standard Specifications Sec. 108 B. Additions: 1. The project will have a completion date of One hundred fifty (150) calendar days. The contract time will start when the Notice to Proceed is delivered and signed. 2. The City, Engineer, and Contractor will hold a pre -construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. X. CHANGE OF CONTRACT TIME Version 4/2/2019 Page - 2 Public Works Quote A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108 B. Additions 1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor's subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XI. DEFAULT AND TERMINATION A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108 B. Additions: 1, Events of Default shall include Contractor's failure to perform any of its obligations under this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may at any time thereafter terminate this contract in which case the termination shall be final and effective. 3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that the Contractor has in order under Contractor's subcontracts are assigned to the City, subject to the City's right to take assignment of all or only selected subcontracts at the City's discretion. The sole obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City's Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City's request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liability to subcontractors for any payment already involved, and for any claim, suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. XII. LIQUIDATED DAMAGES A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108 B. Additions: Version 4/2/2019 Page - 3 Public Works Quote 1. The contractor shall proceed with the work at such rate of progress to insure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given written notice of such delay to the Owner and Engineer/Architect. a. To any preference, priority, or allocation order duly issued by the Owner. b. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. XIII. RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 109 B. Additions: 1. Payments will be made every thirty (30) calendar days 2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3. Before final payment and retainage are released the Contractor must satisfy the following: a. All parts and labor meet requirements stated in the specifications. b. Provide copies of test reports or cut sheets on all materials supplied. c. Provide As -Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. XIV. WARRANTY A. Prevailing Specifications: None B. Additions 1. All Parts shall include the following: a. Performance specifications b. Bill of Materials c. Warranties on all parts d. Installation and safety requirements XV. OTHER UTILITIES A. Prevailing Specifications: None B. Additions: 1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in Indiana) or 1-800-382-5544 (outside of Indiana), or via wwwjndiana8l1.a, at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before proceeding Version 4/2/2019 Page - 4 Public Works Quote with construction. It shall also be the Contractor's responsibility to contact any other utility that is not contacted by Indiana811 and verify the utility locations. 2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, etc. in order to assure that all utilities that need to be replaced or relocated can be done with a minimum disturbance to service. The Contractor shall also be responsible for coordinating schedules with the various utilities such that they can proceed with their relocation work as efficiently as possible. 3. If the odor of natural gas is detected in a work area at any time during the course of work, the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also immediately notify the residents of adjacent properties. The Contractor shall advise the residents to evacuate their homes immediately if the odor is present within the dwelling. 4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the Contractor at no additional cost to the City or the Owner of the system. XVI. MAINTENANCE OF TRAFFIC A. Prevailing Specifications: 2018, INDOT Standard Specifications Sections 105 & 801 B. Additions: 1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform Traffic Control Devices" and the City of South Bend Design and Construction Standards. 2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or closures and required to be filled out and sent to the Department of Public Works 3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary facilities shall be left unattended in the right-of-way of any street or left parked overnight without proper marking and lighting. 4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its proposed schedule of operations for the review of the Engineer. The schedule of operations as reviewed by the Engineer shall be maintained at all times. 5. There will be no direct payment for this work. XVII. DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions: 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to flow test various fire hydrants within the City of South Bend. 2. The Contractor shall provide documentation of test results and all relevant information related to the hydrants in the form of a report. 3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and their property from damage caused by the Contractor's operations. XVIII. PLANS A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. The plans consist of 4 Sheets. 2. The work shall conform to the plans. 3. The drawings are schematic in nature. 4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. 5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. XIX. HYDRANT FLOW TESTING A. Prevailing Specifications: None B. Additions: Version 4/2/2019 Page - 5 Public Works Quote 1. The Contractor shall provide a minimum of two people per team working on the fire hydrant flow testing at all times. 2. The hydrants that are tested will be evenly distributed throughout the four pressure zones. 3. Specific locations to test will be determined at the preconstruction meeting. 4. A progression map shall be maintained for each section under study indicating hydrants assessed on the map. This will be included in the final report. 5. All of the pertinent information for each fire hydrant that is flow tested will be documented in a fire - hydrant flow testing report. This data is critical to establishing an ongoing flow -testing and maintenance program. The following is a list of the information gathered. a. If requested, all fire hydrant caps will be greased for ease of operation b. Fire Hydrant nozzle size used for each test will be recorded c. Residual Pressure will be recorded for each Fire Hydrant tested d. Static Pressure will be recorded for each Fire Hydrant e. Flow, GPM (Gallons Per Minute), will be recorded for each Fire Hydrant flowed f. The amount of time it takes to flush each Fire Hydrant will be recorded. An estimate will be made of the amount of water used during the operation of each Fire Hydrant test. g. Fire Hydrants that are in need of repair, painting, color coding, or have operation defects will be noted with an estimate of repairs needed to make the hydrant operational h. The date tested and technicians operating the Fire Hydrant will be recorded i. The Fire Hydrant address or location will be recorded 6. Fire hose and deflection tubes will be utilized, as required, to direct flushing water away from traffic, pedestrians, underground utility vaults, and private property. 7. Pressure gauges are used to determine the residual pressure during the flow testing process while insuring that the distribution system pressure remains above 20 psi. Any incidents of the distribution system being unable to supply a residual of 20 psi in the surrounding area will be brought to the immediate attention of the Engineer. 8. All pressure gauges used in the field will undergo daily testing against a "standard" gauge to insure the field gauges are accurate during the flow testing project. Any gauges that are found to not be within acceptable limits will be replaced with gauges that are within accepted standards. This will insure the observed static and residual pressures are accurate and reliable. 9. Hydrant flow testing will be paid for at the contract unit price for "HYDRANT FLOW TESTING...... EA" as indicated on the itemized proposal sheet. Version 4/2/2019 Page - 6 Public Works Quote City of South Bend Public Works Phone: 574.235.9251 Engineering Division ov Email: dhonson@southbendin.gov 227 W. Jefferson, County City Building 1316 g South Bend, IN 46601-1830 TRAFFIC CONTROL AND OCCUPANCYRE'QUE'ST "SUB 11T 5 WORKING II AYS M111NIMUM PRIOR "I" l:'1110TECT TAIR"I" IDA"I"IE PI....AN YOUR SIARI. DATE ACC OR[)IINGI....Y F0 AVC: 11'..) DELAYS Comlplete 1111 5 Incomplete Submittals Cannot Be Processed 11 Parking Lane Travel Lane 1:1 Full Road Closure 1:1 Alley 1:1 Sidewalk Closure Excavation/Boring? > Requires Excavation Form Sidewalk? > Requires Sidewalk permit New Approach? > Curb Cut application Submission Date: Applicant/Company: Name: Email Address: Office Phone #: Cell Contractor Performing Work: On -Site Contact: Phone #: office Cell Project STREET ADDRESS (s°:f: 1 10 W. Smith RD.): Project Location (Block limits/Streets From and To): "Requested Start & End Dates: Requested Start & End Times: **Occupancy beyond 90 days requires completion of Long Term Occupancy Request Application. Reason for Closure: in Affected Customers: Cry <afrn "'wsp s A..)de NoN,.r�I',,M,Doq ving.Y(.)fE,'qy Ms 1uE:�s an G„,1 aQ„,. Qm.0. �ss concerns with Qm,%ff(�0.>NG""Q,,,.N Q,„. C.o a'Dq orn er'a'V ..,. Al iA( H "'Iifs" FC'"N. L0 WINGITEMS: 1. Traffic Control Plan 2. Detour Plan 3. Barricades, Signs, or Flashers Placement (Refer to MUTCD for Traffic Control Device Requirements) See' reverse for (::'f1ueckff,sf Failure to use traffic control for traffic restrictions or closures will result in stop work orders and/or delay in permitting. THIS OCCUPANCY PERMIT REQUEST IS NON -TRANSFERABLE AND A SIGNATURE SUBJECTS THE NAMED CONTRACTOR/PERMITTEE TO ALL APPLICABLE RULES, DUTIES AND OBLIGATIONS IMPOSED BY THE CITY OF SOUTH BEND MUNICIPAL CODE AND TO ALL REGULATIONS IMPOSED BY THE SOUTH BEND BOARD OF PUBLIC WORKS. Applicant Signature Date ENGINEERING OFFICE USE ONLY: Approved Approved as Noted Revise Not Approved Comments: City of South Bend/Engineering Division Authorized Signature Date: Version 3.3 [1/11/2019] TRAFFIC CONTROL CHECKLIST IIP OSE: S RE:EX F SEA E C`;�T�:�IE�IISII-S, II EE),K.°YC'A_I1S11;S, P IE E)E�:�SIEIE�'II PSI" , /��"�E P�II..RS, II -M-.I (:'lE�lN(,,;Y �E. m . Ifs D EE:NFOIRCEb IIE:[gIlµ PIEEIRS(DIE�IINIEII._ M4E) E=:=QLJPIP EI .r • Submit Traffic Control with any Occupancy Request in the City of South Bend. • Maps shall follow MUTCD Traffic Control Device guidelines, but do not submit MUTCD examples as your traffic control. INCLUDE THE LL ► . ❑ Street map showing CURRENT street status Can show aerial or streets only ❑ Street names ❑ Striping and sidewalks ❑ North Arrow ❑ Location of Activity Area and placement of vehicles and equipment in the work space ❑ Location of manholes or other facilities within work space ❑ Barricades, signs and/or flasher placement ❑ Taper distance/Advanced warning signage ❑ Traffic detour plan traffic control: Nor