HomeMy WebLinkAboutOpening of Quotes - Century Center Upgrades & Renovation Project No 118-104A-R - R Yoder ConstructionQUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME Century Center Upgrades & Renovation
PROJECT NO. 118-104AR
QUOTES DUE 23 April 2019
BASE BID
Item
No. Description Quanti Unit Unit Price
Selective Demolition and
Renovation to the interior office
spaces as indicated on drawings.
Including but not limited to spaces
on the Lower, First, Second and
Third Levels
Firm: R. Yoder Construlolon Inc.
Address: 27453 CR 150 PO Box 69
Total Amount
Total Amount of Quote I $ 89 as-oo
City/State/zip: Nappanee, IN 46550 Telephone Number: 574) 773-3502
Fax Number:r574 773-4941
By
Randall E. Yoder
(Printed Name of Person Signing)
Version 4/2/2019 Page - 10 Public Works Quote
PROJECT NAME: Century Center Upgrades & Renovation
PROJECT NO. 118-104AR �-
QUOTES DUE 23 April 2019
(Must be completed for all quotes. Please type or print)
Date: 4-23-19 Firm: R. Yoder Construction Inc.
Address: 27453 CR 150, PO Box 69
City/State/Zip: Na anee IN 6550 Telephone Number: ( 574 ) 773-3502
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Citv of South Bend Cent u Center U rades &Renovations, Pro'ect No. 118-104AR
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
The Ci of South Bend, De artment of Public Works
and dated Aril 15, 2019 for the sum of (enter the Total Quote as shown on the Proposal) _
Er ., shown on Prorsel iNe .
(, dr S m o Total Quote plus Alternates sho p ) (Numerical)
If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the
itemization of the units shall be shown on a separate attachment.
The above quote is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Laura L. O'Sullivan, Member
By �ZL Y t! �� �1, -
(Signetur
Randall E. Yoder
(Printed Name of Person Signing)
ACCEPTANCE
day of
Genevieve E. Miller, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
20
Version 4/2/2019 Page - 6 Public Works Quote
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavi>!
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT,
CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY
VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE
OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF _Indiana )
) SS:
Elkhart COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that:
1. Contractor has not, nor has any other member, representative, or agent of the firm,
company, corporation or partnership represented by him, entered into any combination, collusion
or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent
any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made
without reference to any other bid and without any agreement, understanding or combination with
any other person in reference to such bidding. Contractor further says that no person or persons,
firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift,
commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment
activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency or
instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from
time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is
engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty million
dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty
million dollars ($20,000,000) or more in credit to another person for forty-five (45)
days or more, if that person will (i) use the credit to provides goods and services in
the energy sector in Iran; and (ii) at the time the financial institution extends credit, is
a person identified on list published by the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the Contractor subsequently learns is an unauthorized
alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of
Version 4/2/2019 Page - 7 Public Works Quote
Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3.
Contractor's documentation of enrollment and participation in the E-Verify Program is included
and attached as part of this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public
contract to certify that the subcontractors do not knowingly employ or contract with an
unauthorized alien, nor retain any employee or contract with a person that the subcontractor
subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is
participating in the E-Verify Program. The Contractor agrees to maintain this certification
throughout the term of the contract with the City of South Bend, and understands that the City
may terminate the contract for default if the Contractor fails to cure a breach of this provision no
later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by
the City of South Bend through its agencies, boards, or commissions shall not discriminate against
any employee or applicant for employment in the performance of a City contract with respect to
hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly
related to employment because of race, sex, religion, color, national origin, ancestry, age, gender
expression, gender identity, sexual orientation or disability that does not affect that person's ability
to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or
any combination of the foregoing including, but not limited to, public works contracts awarded
under public bidding laws or other contracts in which public bids are not required by law, the City,
its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain
participation by those Contractors certified by the State of Indiana as a Minority Business
("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest,
responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a
subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said
WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board
shall prohibit that person or entity from being awarded a City contract for a period of one (1) year
from the date of such determination, and such determination may also be grounds for terminating
the contact for which the discriminatory practice or noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall
be made a part of any contract which it may henceforth enter into with the City of South Bend,
Indiana or any of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for
employment in the performance of this contract with privileges of employment, or any matter
directly or indirectly related to employment, because of race, religion, color, sex, gender
expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of
this provision may be regarded as material breach of contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-
8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel
products or foundry products made in the United States on this project if awarded. I understand I
Version 4/2/2019 Page - 8 Public Works Quote
have an affirmative duty to notify the City in my bid that my proposal does not include the use of
steel products or foundry products made in the United States. I understand it is my sole obligation
and responsibility to provide a justification to the City, subject to review and approval, why the
cost of United States made steel or foundry products is unreasonable. Prior to award and upon
submission of bid which does not use steel products or foundry products made in the United States,
the City, through its director of public works, shall make a determination if the price of United
States made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public
works are true and correct.
Dated this 23rd day of April , 2019
Subscribed and sworn to before me this 23rd
My Commission Expires
11-20-2020
County of Residence
R. Yoder Construction, Inc.
Contract ire' y
Signature of Contractor/Bidder oIts Agent
Randall E. Yoder, President
Printed Name and Title
day of April 201
Notary Public
Elkhart
PATRICIA KAY KAYLOR
Notary Public- Seal
State of Indiana
L
ommission Expires Nov 20, 2020
Version 4/2/2019 Page - 9 Public Works Quote
ro'ect manual for:
2018.02543
Century Center Up—g-rades &
120 South Dr. Martin Luther King Blvd.
South Bend, IN 46601
issued for Final Design Package
date 15 April 19
01
-.-..`' AMERICAN 7266 SHADELAND STATION
jj�M � STRUCTUREPOINT TEL,;; °'7.5580 F;,x 3 7 5 0270
INC. www.stmciurepoint.wm
SCOPE OF WORK
F SOUTH Bt:ND
PROJECT NAME: Century Center Upgrades & Provisions
PROJECT NO. 118-104AR
QUOTES DUE 23 April 2019
PROJECT DESCRIPTION
Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to
provide and install Selective Demolition and Renovation to the interior office spaces as indicated on
drawings. Including but not limited to spaces on the Lower, First, Second and Third Levels, improvements
according to the intent of the plans and specifications at The Century Center.
PREVAILING SPECIFCIATIONS AND DESIGN & CONSTRUCTION STANDARDS
A. American Structurepoint Contract Documents, are to be used on this project.
B. Each Quote provider is specifically instructed to become completely familiar with the most recent
version of the American Structurepoint Contract Documents prior to submitting a quote.
C. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the American Structurepoint
Contract Documents and are to be used only in conjunction with the American Structurepoint Contract
Documents.
D. In the event of conflict between the SPECIAL PROVISIONS and the American Structurepoint Contract
Documents, the SPECIAL PROVISIONS will govern.
III. TERM "OR EQUAL"
A. Prevailing Specifications: None
B. Additions
1. Where the term "or equal" is used in these specifications, the Quote provider deviating from
specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its
proposed article or equal. The City of South Bend shall be the sole judge in determining if the "or
equal' offered meets the specification.
IV. TAX EXEMPT
A. Prevailing Specifications: None
B. Additions
1. Materials and properties purchased under contract with the Owner that becomes a permanent part
of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax).
The exemption number will be furnished to the Contractor upon award.
V. INDEMNIFICATION
A. Prevailing Specifications: None
B. Additions
1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents,
officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees,
and other expenses, arising from or out of the negligent performance of this Contract by Contractor,
or because of arising out of any defect in the goods, materials or equipment supplied by the Quote
provider.
VI. INSURANCE
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions:
Version 4/2/2019 Page - 1 Public Works Quote
1. All Contractors and subcontractors doing business with the City of South Bend shall present a
Certificate of Insurance showing coverage in the following minimum amount:
a. General Liability: Premises -Completed Operations or Products, Bodily Injury and Property
Damage Combined Single Limit - $5,000,000.
b. There shall be no exclusion for explosion, collapse or underground hazard.
c. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000.
d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000.
e. The City of South Bend shall be named as additional insured on the Certificate of Insurance.
VII. CONTROL OF WORK
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions:
1. The complete responsibility for this project lies with the Director of Public Works of the City of South
Bend, Indiana acting through his authorized representatives.
2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel,
equipment and supplies to perform all work required under this item. There will be no direct payment
for this item.
3. The contractor is responsible to maintain the site which includes but is not limited to; dust control,
site security, erosion control, and protecting adjacent properties.
4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No
work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South
Bend Department of Public Works.
VIII. LEGAL RELATIONS
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions:
1. The Owner, where mentioned in these documents, is the City of South Bend. The Architect, where
mentioned in these documents, is American Structurepoint, Inc.
2. The Contractor shall apply for and obtain any and all required permits for the work from local, state,
and federal agencies and shall comply with permit requirements, including the St. Joseph County
/ City of South Bend Building Department.
3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor
shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with
the Secretary of State of Indiana to engage in business within the State of Indiana.
4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner
reserves the right to immediately terminate the public work project awarded should the Contractor
be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result
in the forfeiture of Contractor's performance bond to the Owner.
IX. PROSECUTION AND PROGRESS
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions:
1. The project will have a construction schedule of sixty (60) calendar days for all work. The contract
time will start when the Notice to Proceed is delivered and signed.
2. The City, Architect, and Contractor will hold a pre -construction meeting following award of the
contract. The date of the Notice to Proceed will be agreed at that meeting.
3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site.
X. CHANGE OF CONTRACT TIME
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions
Version 4/2/2019 Page - 2 Public Works Quote
1. The Contract Time may only be changed by Change Order. Any Claim for an extension in the
Contract Time shall be based on written notice delivered to the Department of Public Works within
seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent
of the claim with supporting data shall be delivered within fourteen (14) calendar days after such
occurrence unless an official of the Public Works Department allows an additional period of time to
ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost
to delays beyond the control of the Contractor if a claim is made in accordance with this provision.
Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor
disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God.
2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An
extension is granted for weather conditions significantly more severe than normal if the Contractor
demonstrates to the satisfaction of the City that the delay in the progress of the work was due to
such weather. The basis to define normal weather with be the data compiled by the United States
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA).
3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including
fault or negligence of Contractor's subcontractors, caused the delay, or for which any remedies are
provided under any other provision of this agreement.
4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of
any rights or remedies existing under this contract at law or in equity.
XI. DEFAULT AND TERMINATION
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions:
1. Events of Default shall include Contractor's failure to perform any of its obligations under this
contract including failure to commence work at the time specified, failure to perform the work in
accordance with these specifications, unauthorized discontinuation of the work, failure to carry out
the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or
regulations, and failure to comply with any other term of this contract.
2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit
Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is
not cured within the ten (10) day cure period, the City may at any time thereafter terminate this
contract in which case the termination shall be final and effective.
3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies
provided under separate provisions of this contract, the right of set-off against any payments due
or to become due to the Contractor against the retainage, the right to take over and complete the
Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that
the Contractor has in order under Contractor's subcontracts are assigned to the City, subject to the
City's right to take assignment of all or only selected subcontracts at the City's discretion. The sole
obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed
after the date of the assignment. In the event a conditional assignment has not been executed, the
Contractor shall execute or cause to be executed any assignment, agreement, or other document
that may be necessary in the sole opinion of legal counsel to the City's Board of Public Works to
evidence compliance with this provision. The Contractor shall promptly deliver such documents
upon the City's request. In the case of such assignment, unless otherwise agreed in writing, The
Contractor remains liability to subcontractors for any payment already involved, and for any claim,
suit or cause of action based upon or resulting from any error, omission, negligence or other breach
of contract by the Contractor, its officers, employees, or agents arising prior to the date of
assignment to the City.
XII. LIQUIDATED DAMAGES
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions:
1. The contractor shall proceed with the work at such rate of progress to insure full completion within
the Contract Time. It is expressly understood and agreed, by and between the Contractor and the
Version 4/2/2019 Page - 3 Public Works Quote
Owner, that the Contract Time for completion of the work described herein is a reasonable time,
taking into consideration the average climatic and economic conditions and other factors prevailing
in the locality of the work, and excludes the time for unavoidable delays which were beyond the
control and without the fault of the Contractor.
2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time
granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages
a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in
default after the time of completion stipulated in the Contract Documents.
3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay
in completion of the work is due to the following and the Contractor has promptly given written
notice of such delay to the Owner and Engineer/Architect.
a. To any preference, priority, or allocation order duly issued by the Owner.
b. To unforeseeable causes beyond the control and without the fault or negligence of the
Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner,
acts of another Contractor in the performance of a Contract with the Owner, fires, floods,
epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and
unforeseeable weather.
XIII. RETAINAGE AND FINAL PAYMENT
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions:
Payments will be made every thirty (30) calendar days. Contractor is required to submit the
completed "AIA Document G702TM - 1992" form to the City of South Bend Board of Public Works
along with electronic certified payrolls for the billed time period.
Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of
payments throughout the duration of the project.
Before final payment and retainage are released the Contractor must satisfy the following:
a. All parts and labor meet requirements stated in the specifications.
b. Provide copies of test reports or cut sheets on all materials supplied.
c. Provide As -Built drawings in accordance with the City of South Bend Prevailing Specifications
for Public Works.
d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver
of Lien.
XIV. WARRANTY
A. Prevailing Specifications: None
B. Additions
1. All Parts shall include the following:
a. Performance specifications
b. Bill of Materials
c. Warranties on all parts
d. Installation and safety requirements
XV. OTHER UTILITIES
A. Prevailing Specifications: None
B. Additions:
1. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone,
etc. in order to assure that all utilities that need to be replaced or relocated can be done with a
minimum disturbance to service. The Contractor shall also be responsible for coordinating
Version 4/2/2019 Page - 4 Public Works Quote
schedules with the various utilities such that they can proceed with their relocation work as
efficiently as possible.
2. If the odor of natural gas is detected in a work area at any time during the course of work, the
Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also
immediately notify the residents of adjacent properties. The Contractor shall advise the residents
to evacuate their homes immediately if the odor is present within the dwelling.
3. Unless an allowance is specified in the bid tab, the restoration of existing building sprinkler systems
damaged by the Contractor's operations shall be repaired at no cost to the City and Owner of the
system. If an allowance is provided in the bid tab, the City will reimburse the Contractor up to the
allowance amount for sprinkler repairs. Restoration of sprinkler systems damaged by the
Contractor's operations exceeding the allowance will be considered incidental to the contract.
XVI. DESCRIPTION OF WORK
A. Prevailing Specifications: None
B. Additions
1. Work to be performed shall include furnishing all labor, services, materials, insurance and
equipment to Complete Work.
2. The Base Bid covers Selective Demolition and Renovation to the interior office spaces as
indicated on drawings. Including but not limited to spaces on the Lower, First, Second and Third
Levels, according to the intent of the Plans and Specifications.
3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and
their property from damage caused by the Contractor's operations.
XVII. PLANS
A. Prevailing Specifications: American Structurepoint Contract Documents
B. Additions:
1. The plans consist of 9 Sheets.
2. The work shall conform to the plans.
3. The drawings are schematic in nature.
4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials.
5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern.
Version 4/2/2019 Page - 5 Public Works Quote
CONTRACTOR'S BID FOR PUBLIC WORK - FORM 96
State Form 52414 (R2 / 2-13) / Form 96 (Revised 2013)
Prescribed by State Board of Accounts
PART
(To be completed for all bids. Please type or print)
Date (month, day, year). April 23, 2019
1. Governmental Unit (Owner):. City of South Bend
2. County St. Joseph
3. Bidder (Firm): R. Yoder Construction, Inc
Address: 27453 CR 150 PO Box 69
City/State/ZlPcode: Nappanee/IN/46550
4. Telephone Number: 574-773-3502
5. Agent of Bidder (if applicable):.
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete
the public works project of City of South Bend Century Center Upgrades & Renovations Project No. 118-104AR
(Governmental Unit) in accordance with plans and specifications prepared by City of South Bend , Department
of Public Works
and dated April 15, 2019 for the sum of
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the
notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the
notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract if accepted by the governmental unit. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment.
The contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee,
or applicant for employment, to be employed in the performance of this contract, with respect to any matter
directly or indirectly related to employment because of race, religion, color, sex, national origin or ancestry.
Breach of this covenant may be regarded as a material breach of the contract.
CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS
(If applicable)
I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory
obligation to use steel products made in the United States (I.C. 5-16-8-2). 1 hereby certify that I and all
subcontractors employed by me for this project will use U.S. steel products on this project if awarded. I
understand that violations hereunder may result in forfeiture of contractual payments.
The above bid is accepted this
following conditions:
Contracting Authority Members:
ACCEPTANCE
day of , subject to the
PART II
(For projects of $150,000 or more — /C 36-1-12-4)
Governmental Unit: City of South Bend
Bidder (Firm) R. Yoder Construction, Inc
Date (month, day, year):
04/23/2019
These statements to be submitted under oath by each bidder with and as a part of his bid..
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
Completion
Contract Amount
Class of Work
Date
Name and Address of Owner
399,600.00
TCU Innovation Lab
10/2018
School City of Mishawaka, IN
283,500.00
Library Remodel
02/2018
Mishawaka Penn Harris Library, Mishawaka, IN
778,887.00
Vocational School
03/2018
Wawasee Schools, Syracuse, IN
361,380.00
Park Improvements
07/2018
Honeywell Park, Wabash, IN
2. What public works projects are now in process of construction by your organization?
Expected
Contract Amount
Class of Work
Completion
Name and Address of Owner
Date
2,145,300.00
Door and Hardware Replacement
09/2019
School City of Mishawaka, IN
430,490.00
Standby Generators
10/2019
City of Goshen, Goshen, IN
2,343 700 00
School Renovations
10/2019
Baugo Community Schools, Elkhart, IN
3. Have you ever failed to complete any work awarded to you? No If so, where and why?
4. List references from private firms for which you have performed work.
Barger Packaging
Bellman Oil Company
Land O' Lakes Purina Mills
American Senior Communities
Lippert Components
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, complete the project, number of workers, etc. and any other information which you
believe would enable the governmental unit to consider your bid.)
Comply with schedule to begin and complete as stated in contract using necessa
equipment and manpower to complete. We have a team of tradesman fully capable
of completing project on schedule and on budget.
2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
Griffen P&H
Anglin Electric
Interior Finishes - Flooring
Schrock Masonry
3. If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit in the event that you subsequently determine that you will use a
subcontractor on the proposed project.
A list of subcontractors will be submitted if awarded the bid
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
We have or have access to all equipment necessary to complete the project
5. Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
Yes, we have received proposals from subcontractors
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination of the bidder's capability for completing the project if awarded.
SECTION IV CONTRACTOR'S NON — COLLUSION AFFIDAVIT
The undersigned bidder or agent, being duly sworn on oath, says that he has not, nor has any other
member, representative, or agent of the firm, company, corporation or partnership represented by him, entered
into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such
letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is
made without reference to any other bid and without any agreement, understanding or combination with any other
person in reference to such bidding.
He further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale.
SECTION V OATH AND AFFIRMATION
I HEREBY AFFIRM UNDER THE PENALTIES FOR PERJURY THAT THE FACTS AND INFORMATION
CONTAINED IN THE FOREGOING BID FOR PUBLIC WORKS ARE TRUE AND CORRECT.
Dated at 8:00 am this 23rd day of April 2019
R. Yoder Constriction, Inc.
(N o +r too
By
President
(Title of Person Signing)
ACKNOWLEDGEMENT
STATE OF IN )
Elkhart ) ss
COUNTY OF )
Before me, a Notary Public, personally appeared the above -named Randall E. Yoder and
swore that the statements contained in the foregoing document are true and correct.
Subscribed and sworn to before me this 23rd day of April 2019
Notary ublic.
My Commission Expires: 11-20-2020
County of Residence: Elkhart ,
=PATRICIAAYLOR Sealnallov 20, 2020
m
U
C
C
O
U
2
U
c
0
U
aD
0
0
rn
co
0
m
O
LO
LO
co
It
z
ai
0
c
m
0-
CL
m
..
O
LL
U)
F-
U
w
NON
w
CL
U)
Y
U_
J
m
CL
LL
O
c
a)
m
O
m
4-
0
d
i
.o01
0
ao
m
-v
0
LL
El