HomeMy WebLinkAboutAmendment No 1 to PSA - Jones Petrie Rafinski Corp - Downtown East-West Streetscape Project1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND_ INDIANA 46601-1830 k � 1865 i, I • 1 1 ; � i' 1 '; April 23, 2019 Dave Rafinski Jones Petrie Rafinski Corporation 325 S. Lafayette Blvd. South Bend, IN 46601 RE: Amendment No. 1 to Professional Services Agreement Dear Mr. Rafinski: PHONE 574/235-9251 FAx 574/235-9171 The Board of Public Works, at its meeting held on April 23, 2019, approved the above referenced amendment for additional design work for the Downtown East-West Streetscape Project in the amount not to exceed $24,194, for a new total of $216,454. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. G1LOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU R This is EXHIBIT K, consisting of pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated 01-07, 2019. AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1. 1. Background Data: a. Effective Date of Owner -Engineer Agreement: 04-11-2017 b. Owner: Department of Public Works, City of South Bend, Indiana C. Engineer: Jones Petrie Rafinski Corporation (JPR) d. Project: Downtown East-West Streetscape (NO. 117-041) 2. Description of Modifications: [NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments.] a. Engineer shall perform or furnish the following Additional Services: The initial project scope for the Downtown East-West Streetscape Phase 1 project was to consist of surface design of pavement and sidewalks, reconfigure approach to the LaSalle Apartment parking lot, maintain existing curbs in place and to close identified existing vaults. During the design process the following items have been added to the initial project scope: 1) Colfax Avenue & North Michigan Street: - Remove & replace protions of curbs; - Curb bump -outs were added to the project to provide additional pedestrian crossing safety (adding to curb/curb ramp/spont elevations/storm sewer/maintenance of traffic design & utility coordination. - Maintian some vaults in place, involving need for ground penetrating radar work and full time JPR inspection of vaults, design of sidewalk reconstruction details over vaults, and building access & pedestrian traffic contingencies: - Pavement cores for mill & rsurface design & considering curb reveal; - Material changes to intersection pavement; - Addition of small diameter storm sewer collection system within Colfax Avenue for future roof drain connections. This increased utility coordination Page 1 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. needs, required additional survey of structure inverts, interior roof drain investigation, and added profile view requirements to plan drawings; Incorporated the remoal of cantilever sign structures within the downtown area. 2) North Michigan Street - Initial design of North Michigan Street between LaSalle Avenue and Colfax Avenue was expanded during the design process to include an extensive plaa design from the face of the Morriss Performing Arts Center to the west side of the John Hunt Plaza Fountain. This required additional meetings with the City of South Bend Engineering Department, Community Investments, and Venues, Parks and Arts to ensure that the overall design met the needs of the various anticipated program activities that the City holds. The work also required additional plan changes to the overall layout, decorative hardscape materials and features, landscaping, and lighting /power services Additional design work and revisions to the plaza area and vehicular circulation adjacent of the LaSalle Apartment development. Changes of the roadway profile grading requiring additional spot elevations designs, new storm sewer contingencies, and variantions to the maintenance of traffic plans in order to carefully coordinate wit the Morris Performing Arts Center schedule; Reconfiguration of the traffic signal roadway detection system. b. The Scope of Services currently authorized to be performed by Engineer in accordance with the Agreement and previous amendments, if any, is modified as follows: c. The responsibilities of Owner are modified as follows: d. For the Additional Services or the modifications to services set forth above, Owner shall pay Engineer the following additional or modified compensation: 1) Construction Documents $14,250.00 2) Construction Services $ 5,625.00 3) Pavement Cores and GPR $ 4,319.00 a) Pavement cores for roadway $2,917.00 b) Pavement cores for vault caps $1,402.00 4) Total Additional Services Request $24,194.00 e. The schedule for rendering services is modified as follows: f. Other portions of the Agreement (including previous amendments, if any) are modified as follows: [List other Attachments, if any] Page 2 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 3. Agreement Summary (Reference only) a. Original Agreement amount: $1.92.,2 0,00 b. Net change for prior amendments: 1.0 c. This amendment amount: $24,194M d. Adjusted Agreement amount: $, 216z454.00 The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, including those set forth in Exhibit C. Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is OWNER: Rom rd of PiAlk Works By: �..... Title: Date S igrre� ENGINEER: By: Dave Rafinski Title: Vice President Date Signed: 01-07-2019 Page 3 (Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date April 12, 2019 Name Roger T. Nawrot Purchasing Check the p,.j Agreement Professional Services Bid Opening Fl Quote Opening M Change Order No. El Ease/Encroach. Other: Amendment #1 Company or Vendor Name Department Public Works Division/Bureau Engineering iropF1 Contract or All Submissions nate Item �rpe -Required Proposal Resolution ❑ Bid Award Req. to Advertise El Quote Award ❑ C/O & PCA No. ❑ PCA ❑ Traffic Control: New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Required Information Jones Petrie Rafinski Cor ration Li Yes N No Purchasing MBE ❑ WBE w No F1 ITYes Name of Com Addendum ❑ Title Sheet If Yes, Approved by Downtown East-West Streetscape ......... 117-041 _...... $24,194.00 Not to Exceed This includes the additional design work additional design work at John Hunt Plaza, reconfigure the traffic signal detection at Michigan Street & Colfax Avenue, revision to the plaza area at the LaSalle Hotel, addition of a storm sewer during the final design period and design sidewalk over an existing vaulted basement. The total contract amount with this amendment is 16„454.00 ....... _.... J Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) m .......... �R uired. For Change Orders OnP,y�....... _mm..�....__M. Amount of Increase $ ...... .._.......... .. _.............. _ El Decrease $ Previous Amount $ Current Percent of Change:. % New Amount $ Total Percent of Chanqe: % ...� _ _.._ . Dispersal After Approval Copy Original BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM ❑ ❑ ❑ ❑ ❑ ❑