Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Opening of Bids - Historic Leeper Park Improvements Project No 118-010A - Larson Danielson Construction Co
CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Historic Leeper Park Improvements — Bid Package 1 Project No. For Bids Due Date: 118-010A April R, 2018 18 PART (Must be completed for all bids. Please type or print) 4/18/19 Bidder (Firm): Larson Danielson Const . Co . , Inc, Address: 302 Tyler Street City/State/Zip: I LaPorte, IN 46350 Telephone Number: ®(219 ) 362-2127 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Historic Leeper Park Improvements —BP 1 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Lochmueller Group, Inc. and r n © dated Marc 3�iG� 1 ��C �j for the sum of enter the Total Bid as shown 0 the Proposal) ( al Base Bid lus Altern tes shown on Proposal) (Numerical) Enter su m of Tot The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit hi i s 11 be shown on a separate attach ent. LARSON DANIELSON X - By sEAL gnat ryu CONSTRUCTION CO., INC. Timothy F . Lars8�Rg f�esident (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of 20 Subject to the following conditions; BOARD OF PUBLIC WORKS Gary A. Gilot, President Suzanna M. Fritzberg, Member Elizabeth A. Maradik, Member Therese J. Dorau, Member Laura L. O'Sullivan, Member Attest: Linda M. Martin, Clerk Version 1/17/2019 Contractor's Bid for Public Works - 49 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Historic Leeper Park Improvements — Bid Package 1 Project Number: For Bids Due: 118-010A April 18, 2019 Contractor Name: Larson Danielson Construction ComL)any, Inc BASE BID rr��h ITEM DESCRIPTION QUANTITY UNIT UNIT ITEM COST TOTAL 1 MAINTAINING TRAFFIC 1.00 LS �� 9� � 4 2 CONSTRUCTION ENGINEERING 1.00 LS 3 MOBILIZATION AND DEMOBILIZATION 1.00 LS 3' itiG• 4 TREE, 10 IN., REMOVE 3.00 EACH 5 TREE, 18IN., REMOVE 4.00 EACH 6 TREE, 30 IN., REMOVE 4.00 EACH 37 Ala 7 TREE, 48 IN., REMOVE 3.00 EACH / q�3�y 8 TREE, 60 IN., REMOVE 1.00 EACH x yd 9 TREE PROTECTION 1.00 LS 1 �ID`r t y 10 STRUCTURES AND OBSTRUCTIONS, REMOVE 1.00 LS 11 DISPOSAL OF BIOSOLIDS (BOTTOM OF POND, 137.00 CYS UNDISTRIBUTED) xfir- 3I `7 12 48 24 IN STORM SEWER, REMOVE 105.00 LFT 3&- y®.�® 13 CURB, CONCRETE, REMOVE 34.00 LFT / �( LJ !L 05 14 CURB AND GUTTER, REMOVE 230.00 LFT C,o �ffo 15 CONCRETE STEPS; REMOVE 1.00 LS 16 REMOVE, PLAYGROUND EQUIPMENT 1.00 LS 17 SIDEWALK CONCRETE, REMOVE 605.00 SYS 18 RETAINING WALL, REMOVE -(AROUND POND) 742.00 LFT 11 d� �3 19 FENCE, CHAIN. LINK, REMOVE 574.00 LFT 20 CURB, ASPHALT, REMOVE 574.00 LFT LJ 21 CONCRETE, REMOVE (POND LINER) 183.00 CYS, 22 CONCRETE, REMOVE 1.00 CYS 23 SALVAGE BRICK PAVERS 28.00 SYS 24 SALVAGE TRASH CANS 2.00 EACH 25 DEWATERING, SPECIAL ; 1.00 LS e� . S -i 26 EXCAVATION, COMMON 1,985.00 CYS .} b3-15 27 BORROW 1,383.00 CYS co `IU 33 28 COMPACTED AGGREGATE #53, BASE 509.00 CYS I / 29 VARIABLE MILLING 93.00 SYS ^ Version 1/17/2019 Contractor's Bid for Public Works - 54 Project Name: Project Number: For Bids Due: Contractor Name: -BID/PROPOSAL CITY OF SOUTH BEND Historic Leeper Park Improvements — Bid Package 1 ................. 118-010A April 18, 2019 Larson Danielson Construction Company, Inc. 30 ASPHALT SURFACE 10.00 TON G q & (� /�� �/ k� 31 ASPHALT FOR TACK COAT 1.00 TON 1 32 PCCP, 8 IN. (FOUNTAIN PLAZA) 338.00 SYS 33 SIDEWALK, CONCRETE, 4 IN. 4,581.00 SYS r1 V 34 CURB RAMP, CONCRETE 79.00 1 SYS 35 DETECTABLE WARNING 62.00 LFT Ll 36 CURB, CONCRETE, MODIFIED (ART NODES) 51.00 LFT 3 37 CURB, CONCRETE, MODIFIED (HISTORIC STEPS) 39.00 LFT 60 38 CURB AND GUTTER, CONCRETE 311.00 LFT 39 CURB , CONCRETE 75.00 LFT 40 FLUSH CONCRETE BAND 179.00 LFT 41 CAST LIMESTONE BALL FINIAL 5.00 EACH •� m 42 CAST LIMESTONE URN 8.00 EACH 5��g 43 EROSION CONTROL BLANKET 32.00 SYS 2-: - 44 MULCHED SEEDING U-- .. 29,300.00 SYS5 45 NURSERY SODDING 866.00 aYS 46 FOUNTAIN AND EQUIPMENTINSTALLATION _ ,1.00 LS 47 FOUNTAIN START UP AND INSTRUCTION 1.00 LSE \-I 48 FOUNTAIN GRATE AND -FRAME 1.00 —I EACH 49 QUICK COUPLER _ 1.00 EACH 50 BACKFL OW PREVENTER COVER . 100 LS • �6� , ,����� � 51 3 IN. FOUNTAIN DRAIN -LINE 40.00 LFT C��� 52 48 24 IN DUCTILE IRON PIPE WITH GRANULAR 97.00 LFT BACKFILL 53 RELOCATE EXISTING WATER SPIGOT 1.00 EACH 54 CAP POND OVERFLOW 1.00 EACH 55- PIPE ENCASEMENT 80.00 LFT 56 CASTING, ADJUST TO GRADE 7.00 EACH 57 MANHOLE, 48 IN DIAMETER 2.00 EACH �-7� 8 3/4 IN WATER LINE 180.00 LFT19- l 59 3/4 IN WATER LINE TAP WITH CORP. STOP 1:00 EACH l 60 FOUNTAIN PLUMBING 1.00 LS o 9 Version 1/17/2019 Contractor's Bid for Public Works - 55 Project Name: Project Number: For Bids Due: Contractor Name: BID/PROPOSAL CITY OF SOUTH BEND Historic Leeper Park Improvements — Bid Package 1 118-010A April 18, 2019 1#65 Larson Danielson Construction Company, Inc. 61 FOUNTAIN ELECTRICAL 1.00 LS 62 LIGHT POLE 16.00 EA a v 63 LUMINAIRE 16.00 EA 64 SERVICE POINT CABINET 1.00 EA 65 SERVICE POINT CABINET FOUNDATION 1.00 EAR 66 GROUND ROD WITH CONNECTOR 17.00 EA 67 CONDUIT, PVC, 1 IN. 2,500.00 LFT _ 68 CONDUIT, PVC, 2 IN. 1,000.00 LFT 69 WIRE, THWN, NO. 2 COPPER, 3-1/C 500.00 LFT 70 WIRE, THWN, NO. 8 COPPER, 1-1/C 500.00 LFT 71 1 WIRE, THWN, NO. 6 COPPER 12=1/C 250.00 LFT 72 WIRE, THWN NO. 10 COPPER, 3-1/C . 2,500.00 LFT 73 CABLE -DUCT MARKER _ 2,500.00 LFT a 74 MULTIPLE COMPRESSION FITTING, 64.00 EA 13C WATERPROOFED 75 CONNECTOR KIT, FUSED 32.00 EA 76 INSULATION LINK, WATERPROOFED 32.00 EA 77 HANDHOLE, LIGHTING 3.00 EA �s ' 6 .®- 78 FOUNTAIN -FOUNQATIOWSLAB - 1.00 LS 79 CONCRETE STEPS (ALONG TENNIS COURT) 102.00 LFTc� i`-1,1 80 HISTORIC CONCRETE STEPS, REBUILD _ 75.00 LFT 81 CHEEKWALL - 90.00 LFT 82 INTERPRETIVE SIGN 3.00 EACH 1 Pak�J 83 BENCH, BACKED 4�0 EACH .-y 84 -BENCH, BACKLESS 8.00 EACH p 85 CUSTOM BENCH 6.00 EACH 86 BIKE RACK 6.00 EACH 87 TRASH CANS 3.00 EACH 88 SHADE TREE, 3 IN CAL, 23.00 EACH 89- FLOWERING TREE, 1.5" CAL. 25.00 EACH 0 , 90 FLOWERING TREE, CLUMP, 19.00 EACH 91 CONIFEROUS EVERGREEN TREE (10-12 FT.) 12.00 EACH dal 3f, Version 1/17/2019 Contractor's Bid for Public Works - 56 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Historic Leeper Park Improvements - Bid Package 1 Project Number: 118-010A For Bids Due: April 18, 2019 Contractor Name: Lsrson Danielson Construction Company,Inc 92 DECIDUOUS SHRUB, 48" CONT. 6.00 EACH O " 92 BROADLEAF EVERGREEN SHRUB, 1 GAL. 68.00 EACH NvU- a 93 PERENNIAL 1 GAL. 1,504.00 EACH 94 GROUND COVER, PLUG 2,000.00 EACH 95 PERENNIAL, TRANSPLANT 33.00 EACH 96 SHRUB TRANSPLANT 7,00 EACH 97 SOIL AMENDMENT 75.00 CYS a,1 5 98 SHREDDED HARDWOOD BARK MULCH 46.00 CYS �7 e`z 99 STEEL EDGING 840.00 LFT y��a 100 BRICK PAVERS 101.00 SYS I �� y b l�,5„ tiG 101 FOUNTAIN PLAZA BANDS 192.00 LFT �rc 102 RAILING 40.00 LFT TCO...... UTILITY ITV C ITI STS 4-.N i- _ 104 FOUNTAIN CONTROLLER ENCLOSURE 1.00 LS 105 EROSION CONTROL 1.00 LS 106 LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN. - -1-,180.00 - LFT cl Cl) 107 LINE, THERMOPLASTfC; SOLID, YELLOW, 41N, 11320:00 LFT 108 LINE, THERMOPLASTIC, SOLID, WHITE, 6 IN. 368.00 LFT , �1 1i 109- TRANSVERSE MARKING, THERMOPLASTIC, -STOP 26.Q0 LFT LINE WHITE' 24 IN. 110 TRANSVERSE MARKING, THERMOPLASTIC, 294.00 LFT y CROSSWALK LINE WHITE 24 IN. 111 GROOVING FOR PAVEMENT -MARKINGS 21528.00 LFT 112.. LEEPER PARK ART FAIR 1 LSZ�Gj 113 -FOUNTAIN CONTROL PANEL FRAME AND 1 LS d7 0 FOUNDATION 1 1 44 RECEPTACLE LOAD CENTER AND SUPPORT 1 LS FRAME BASE BID TOTAL C q ° Bidder (Firm): Larson Danielson Construction Company, Inc. Address: 3012 Tyler. Street City/State/Zip:-LaPorte, IN 46350 Telephone Number: 19 3 6 2 ®21 7 X m By LARSON DANIELSON (signature) Timothy F. Larson, President Es CONSTRUCTION CO,, .INC. (Printed Name of Person Signing) Version 1/17/2019 Contractor's Bid for Public Works - 57 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) LaPorte ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5,-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000;000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 1/17/2019 Contractor's Bid for Public Works - 51 4. Contractor does not knowingly employ 'or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by_ the State of Indiana as a Minority. Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 1/17/2019 Contractor's Bid for Public Works - 52 may result in forfeiture of contractual payments, I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 18th day of April, 2019 LARSON DANIELSON sEnt CONSTRUCTION CO,, INC, Larson Danielson Construction Company, Inc, Contractor/Bidder (Firm) X k :L-0.1 -z A.", Signature of Contractor/Bidder or Its Agent Timothy F. Larson, President Printed Name and Title Subscribed and sworn to before me this 18th day of My Commission Expires 9/8/23 County of Residence April �2019 X Notary Public Michele -."y Dzielinski LaPorte mM+ MICHELE CECELIA DZIELINSKI ' = La Porte County „yews My Commission Expires September 9, 2023 Version 1/17/2019 Contractor's Bid for Public Works - 53 IRLARSON DANIELSON Conwt'raxcdonCompany, Inc, WORK PLACE DRUG QUALRY CONSTRUCTION SINCE 1968 AND ALCOHOL ABUSE F.29 The use, possession, transportation, solicitation or sale of alcohol or drugs (illegal drugs or unprescribed drugs) by anyone while on Company business or premises is absolutely prohibited. In addition, the Company prohibits any employee being at work or working under the influence of alcohol or drugs, irrespective of the degree of physical or mental impairment the employee may be experiencing. This policy includes the intentional misuse of prescribed drugs as well as the illegal use of unprescribed drugs. Any violation of these rules by any employee while on company business or premises will be cause for disciplinary action, ranging from verbal or written reprimand to immediate discharge and referral to law enforcement agencies. The term "company premises" includes all property, buildings, structures, jobsites, parking lots and means of transportation owned by or leased to the company or that which is under the control of the company, the responsibility of the company or otherwise being utilized for company business. In an effort to establish a drug free work place for the safety of its employees, Larson Danielson Construction Co. Inc. will adhere to a drug testing program consisting of, but not limited to initial employment screening, scheduled random testing, and post -accident testing. Consequences for a positive test: Any employee who fails a drug test will be disciplined in the following progression: (A) After the first positive test, an employee will be: (i) suspended from work for thirty (30) days; (ii) directed to a program of treatment of rehabilitation; and (iii) subject to unannounced drug testing for one (1) year, beginning the day the employee returns to work. (B) After a second positive test, an employee will be: (i) suspended from work for ninety (90) days; (ii) directed to a program of treatment or rehabilitation; and (iii) subject to unannounced drug testing for one (1) year, beginning the day the employee returns to work. (C) After a third or subsequent positive test, an employee will be: (i) suspended from work for one (1) year; (ii) directed to a program of treatment or rehabilitation; and (iii) subject to unannounced drug testing for one (1) year; beginning the day the employee returns to work. In addition, all BCRC policies and procedures relating to drug and alcohol abuse, as detailed in the Health and Safety Manual, are relevant and applicable to this Company policy. Larson Danielson reserves the right to accept a standardized drug testing program, so long as said program contains similar criteria to that which is listed above. Post -accident drug testing will be required for all injuries requiring treatment beyond first aid, and any property damage accident where there is more than one thousand dollars damage. In all post -accident drug testing the Express Result testing, where available will be administered at the BCRC required testing facilities geographically located closest to the jobsite. Testing may also occur if there is reasonable concern that an employee is under the influence of alcohol or a controlled substance. L:\Filing System\Office\FORMS\Estimating Assistant Forms\Bid Forms\Work Place Drug and Alcohol Abuse F_29.docx1 of 1 1 /1 /08 1316 COUNTY -CITY BUILDING � PHONE 574/235-9251 227 W. JEFFERSON BOULEVARDS FAx 574/ 235-917] SOUTH BEND, INDLaNA 46601-1830 PEACE TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: March 28, 2019 To: All Bidders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: Historic Lee er Park Im rovements Project Number: 118-010A ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Larson Danielson Construction Company, Inc. Authorized Signature: x Timothy F Date: 3/28/19 arson, President LARSON DANIELSON CONSTRUCTION CO., INC. : 1316 COUNTY -CITY BUILDINGPHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171 SOUTH BEND, INDIANA 46601-1830 ` "' ,�� TDD 574/ 235-5567 x 1'11fi� � .r r CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: To: From Subject March 29 2019 All Bidders Linda M. Martin, Clerk Board of Public Works Addendum Number: 2 Project Name: Historic Leeper Park Improvements - Bid Package 1 Project Number: 118-01 OA ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM: Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Larson Danielson Construction Company, Inc. Authorized Signature: Date: Version 4/07/2015 X Timothy 3/29/19 F ," Larson, President " LARvON DA,NIELSON como�te 4 sEAI. ' CONSTRUCTION CO. INC. 118-010A Addendum #2 ,,. 1316 COUNTY -CITY BUILDING �J 1 it PHONE 574/ 235-9251 227 W. TEFFERSON BOULEVARD �W� �111, ��°. FAX 574/ 235-9171 SOUTH BEND, INDIANA 46601-183 0 w "Ck TDD 574/235-5567 o d w+ f^Cjsai a„�ti r n � 11I6 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: Aril 11 2019 To: All Bidders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 3 Project Name: Historic Leeper Park Improvements - Bid Package 1 Project Number: 118-0 l0A ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: �A ` 6: _ `'-\ This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Larson Danielson Construction Company, Inc. p . u Authorized Signature: X "i Timothy F. Larson, President Date: 4/15/19 LARSON DANIELSON SF AL CONSTRUCTION CO., INC. Version 4/07/2015 118-010A Addendum #3 OHIO FARMERS INSURANCE COMPANY Westfield Group®1 Park Circle, P O Box 5001, Westfield Center, Ohio 44251-5001 Conforms to Document A31 OTA° - 2010 " '' Boni' CONTRACTOR: SURETY: (Name, legal status and address) (Name, legal status and principal place of business) Larson -Danielson Construction Co., Inc OHIO FARMERS INSURANCE COMPANY 302 Tyler Street 1 Park Circle, PO Box 5001 La Porte, IN 46350 Westfield Center, OH 44251-5001 OWNER: (Name, legal status and address) City of South Bend 227 W. Jefferson Blvd. South Bend, IN 46601 BOND AMOUNT: Five percent (5%) of the attached bid PROJECT: (Name, location or address, and Project number, if any) Historic Leeper Park Improvements -BP 1 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the i .e ash t alht�- construed as a statutory bond and not as a common law bond. Signed and sealed this 18th day of LARSON DANIELSON ION CO., INC. Larson -Danielson Constructs n o., lnc (Principal) (Seal) Terry A. Larson, tary-Treasurer(Witne) (Title) . Timothy F. Larson, President `` aL Je OHIO FA.R..MERS INSURANCE � COMPA�N�Y t'� r aur t � ,(Sea()(Wtness) S Christine A. Allen Attornoy-l'n-Fact (TIWIe Printed with permission from The American Institute of Architects (AIA) and the Surety & Fidelity Association of America (SFAA) by Westfield Group®. Westfield Group vouches that the language in the document conforms exactly to the language used in AIA Document A310Tm 2010. BD5084 OFWWN (10/2010) THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER # AND ISSUED PRIOR TO 11/29/18, FOR ANY PERSON OR PERSONS NAMED BELOW. General POWER NO. 1304762 01 Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. Ohio Farmers Insurance Co. CERTIFIED COPY Westfield Center, Ohio Know All Men bi� These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a 11C and collectively as ""Companies,". duly ,ohjo organized and existin under the laws, of the State of Ohio, and having its principal office in Westfield Medina County, do by these ffeUnts, make, consill?'ute and a oint ONA,LD L. ROSENBAUM, MELIMA M. YATES, CHRISTINE A. ALLEN, CATHERINE E. MYERS, BETHANI MORRIS, KATHY D. HENRICH, JENNIFER S. SALAT, CASSANDRA LEMLEY, JOINTLY OR SEVERALLY of LA PORTE and State of IN its true and lawful Attorney (s) -i n- Fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - -- - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - -- LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE UOTR=, OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed bg the President,, sealed with the corporate seal of the applicable Company and dulyattested by its Secretary, herebyratifying and confirming all that the said Attorney(s)-irl may do in the premises. Said appointment is made under and b authorM of the ollowmj resolution adopted b the Board of Directors of each of the WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INS RANCE C:OMPA Y and OHIO FARMER INSURANCE COMPANY. "Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall be and is hereb vested with full power and authority to, appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for arid on behalf Ythe Company subject to the following provisions; The Attorney. in -Fact. may be jiven full power an authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements of indemnityy and other conditional or obligatory undertakings and any and all notices and documents canceling terminating h 'I liabillity tfaereunders and any such instruments so executed by any such Corporate Secretary." c a e Company's "Be it Further Resolved, that the ny if signed hereafter affixed to any Attorney -in- Fact shalt be as binding u I Coo" as !pan ree any $ h e or such desl nat r I of 't' z power olattorne oranzicertificate relating ej - ting thereto - -eto by a 1 -nite, and mile signatures or, facsimile seal shall be v2- , t� 9 Corn cl f csl d and inding: upon e Company with respect to a (Each adopted at a meeting held on FebRfar8, 2000). In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHQ FARMERS INSURANCE COMPANY have caused these resents to be Sig ned by their National Surety Leader and Senior Executive and their corporate seats to be hereto BER A D�, 20 affixed this 29th day of NOVE� 18 Corporate 11011 ...... WESTFIELD INSURANCE COMPANY Seals 44 S WESTFIELD NATIONAL INSURANCE COMPANY Affixed OHI FARMERS INSURANCE COMPANY DampUL z OYER, pill :M .0 1848.1 . . . ........ ........ By:State of Ohio Dennis P. Baus, National Surety Leader and ...... County of Medina Ss.: Senior Executive On this 29th day of NOVEMBER A.D., 2018 , before me personally came Dennis P. Baus to me known, who, being by me duly sworn, did deTo,se and say, that he resides in Wooster, Ohio; that he is National Surety, Leader and Senior Executive of WESTFIELD INSURANCE t C MPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERSINSURANCE COMPANY, the companies described in and which executed the above instrument; that he knows the seals of said Companies; that the seals affixed to said instrument are such corporate seals; that they were so affixed by order of the Boards of Directors of said Companies; and that he signed his name thereto by like order. Notarial pil Sealy 1 A L Aff ixed 0 AVO r David A. Kotnik, Attorney at Law, Notary Public State of Ohio qwq" Ai 6 My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code) County of Medina ss.: of 0 1, Frank A, Carrino, Secretary of WESTFIELD, INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in fur, force and effect. In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 18thday of April 2019 0"'"Vlloll 1y11Z4N,- Ooq'?1�01NA( .. FCC M . . ..... . 0 % z SEAL :rn, L-L BPOAC2 (combined) (06-02) Secretary 18480 Frank A. Camino, Secretary 1316 COUNTY -CITY BuiLDiNr, 227 W. JEFFERsoN BOULEVARD SouTH BEND. INDiANA 46601-1830 CITY OF SouTH BEND PETE BuT-TIGIEG, MAYOR BOARD OF PUBLIC WORKS September 5, 2018 Mr. Timothy Larson Larson Danielson Construction Co., Inc. 302 Tyler Street LaPorte, IN 46350 RE: Pre -Qualification Verification Dear Mr. Larson: PHONE 574/235-9251 FAX 574/ 235-9171 This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend, This Pre -Qualification status is effective for twelve (12) months from the date of this letter, "I'hereafter you are required to re -submit: a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year.. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre-Qualifed Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 23 5-925 1. Sincerely, 4U,da M. Martin. GARY A. GILOT DAVID P. RELOS EUZABETH A. MARADiK JAWS A. WELLER TBERESE J. DoRAu CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Historic Leeper Park Improvements — Bid Package 1 Project No. For Bids Due 118-010A April ll� 2019 rrrnc^w ' 18 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted X Form [MWBE-2.1]. 1 , 2, 3 X Acknowledge Receipt of Addendum(s) included with the bid. X All required additional information is included with the bid. X Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Larson Danielson Const . Co . , Inc. Date: 4/18/19 By Authorized Representative: Signature: X Print Name & Title: Timothy F . Larson, President Version 1/17/2019 Contractor's Bid for Public Works - 48 LARSON DANIELSON CONSTRUCTION CO., INC. PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 1/17/2019 Contractor's Bid for Public Works - 50 1 2. 3 SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? Completion Contract Amount Class of Work Date Name and Address of Owner 14,000,000.00 GC 2018 Valparaiso Comm. Schools-HS Renovation 2,014,000.00 GC 2018 Valparaiso Comm. Schools -Porter Co. Career Center 6,900,000.00 GC 2018 Porter Twp. Schools - HS West Renovation 5,000, 000.00 GC 2018 City of East Chicago - Community Ctr, Site 41 & Site #2 What public works projects are now in process of construction by your organization? Expected Contract Amount Class of Work Completion Name and Address of Owner Date 18,820,000.00 GC 2019 City of South Bend - Howard Park Redevelopment 8,763,000.00 GC 2019 School City of Hobart - HS Natatorium 2,317,000.00 GC 2019 Tri-Co School Corp. - HS Pool Improv, 2,053,000.00 GC 2019 NICTD - Gary Compound Addition Have you ever failed to complete any work awarded to you? NO If so, where and why? 4. List references from private firms for which you have performed work. Wal-Mart Stores, Inc, 2001 SE 10th St. Bentonville, AR 72712 University of Notre Dame 200 Facilities Building IU Health LaPorte Hospital P. O. Box 250 Task Force Tips 2351 Industrial Drive The Boeing Company 100 N. Riverside Notre Dame, IN 46556 LaPorte, IN 46352 Valparaiso, IN 46383 Chicago, IL 60606 SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE Explain your plan or layout for performing proposed work. (E'xarnples could incicrc16; a narrative of when you could begirt work, complete the project, number of workers, etc. and any other Information which you believe would enable the governmental unit to consider your bid.) Larson -Danielson anticipates commencing project coordination upon receipt of a contract, Notice to Proceed, or Letter of Intent We will then begin awarding subcontracts and purchase orders based on sequence of work p psequence_ of tasks as generally accepted throughout the to be erformed Work will be performed in common m,.....-�.. construction industry and as it pertains to this project. Average crew sizes range from 5-6 skilled tradespeople, 9 1 9 P () � g performed. although subject to change based on schedule and the specific task s being erforme Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. p projects in the last five (5) years. Please see attached list of subcontractors we have worked with on public works ro' If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor on the proposed project. Larson -Danielson does plan to utilize subcontractors. Subcontractor information will be provided as required in the relevant bidding documents. 4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors may also be required to be listed by the governmental unit. Larson -Danielson owns a wide variety of heavy equipment and mid to small sized equipment/tools, including but not limited to equipment for earthwork, masonry, concrete, carpentry, access equipment and transportation equipment. Specific lists of equipment will be provided as required by the relevant bidding documents, 5, Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, please explain the rationale used which would corroborate the prices listed. YES 1.35 "SECTION II, ITEM 2 — BELOW IS A LIST OF SUBCONTRACTORS THAT WE HAVE USED ON PUBLIC WORKS PROJECTS DURING THE PAST FIVE (5) YEARS" Earthwork/Sitework Hubinger Landscaping D&M Excavating 11191 S. Broadway 9896 W. 300 N. Crown Point, IN 46307 Michigan City, IN 46360 Gypsum/Metal Studs/Acoustical G. E. Marshall Huggett-Betten 1351 Joliet Rd. 3470 Little Castle Rd. Valparaiso, IN 46384 Stevensville, MI 49127 Pavey Excavating Kleckner Interior Systems 2020 Ohio St. 1176 Damon Lane LaPorte, IN 46350 Chesterton, IN 46304 Asphalt Paving & Striping FloorinR Rieth-Riley Construction Midwest Tile & Interiors 7500 W. 511 Ave. 1805 N. Cedar Street Gary, IN 46406 Mishawaka, IN 46545 Walsh & Kelly Interior Finishes 1700 E. Main St. 1616 W. 3rd St. Griffith, IN 46319 Osceola, IN 46561 Fencing Master Tile Milestone Fence 1205 W. Lincoln Hwy. 13399 McKinley Hwy. Merrillville, IN 46410 Mishawaka, IN 46545 Painting Northwest Indiana Fence Stan's Painting & Decorating 1758 W. Lincolnway 440 Sullivan St. Valparaiso, IN 46383 Hobart, IN 46342 Security Industries Prism Painting 1000 Georgiana St. 368 Kennedy_ Ave. Hobart, IN 46342 Schererville, IN 46375 Landscaping Elevators Fuerbringer Landscaping & Design Otis Elevator 22530 Brick Rd. 1010 E. Jefferson Blvd, South Bend, IN 46628 Mishawaka, IN 46545 T & J Landscape Service Concrete 12615 Wicker Ave. Hooks AV LLC Cedar Lake, IN 46303 1041 Sheffield Ave. Dyer, IN 46311 L:\Filing System\Office\FORMS\Estimating Assistant Forms\Bid Forms\96 96A\96 Subcontractor List Attachment 1-35.docx 2/12/1 S 1.35 Concrete Constructors Fire Protection 684 N. 600 E. Ryan Fire Protection Westville, IN 46391 9740 E. 148th St. Noblesville, IN 46060 C & S Concrete 7353 McConnell Rd. Kropp Fire Protection Lowell, IN 46356 59685 Market St. South Bend, IN 46614 Structural Steel Omega Structural Steel F. E. Moran Fire Protection 1640 Main Street 2165 Shermer Rd., Suite D Griffith, IN 46319 Northbrook, IL 60062 C & C Iron USA Fire Protection 6409 Hendricks St. 28427 Ballard Dr. Merrillville, IN 46410 Lake Forest, IL 60045 Munster Steel Co. Mechanical 9505 Calumet Ave. Circle R Mechanical Munster, IN 46321 6620 Shepherd Ave. Portage, IN 46368 Stevens Iron Works 6852 Mercedes Lane D. A. Dodd, Inc. DeMotte, IN 46310 14 E. Michigan Ave. Rolling Prairie, IN 46371 R22firn E. C. Babilla, Inc. St. Johns Plumbing 3974 Harrison St. P:O. Box 204 Gary, IN 46408 St. Johns, IN 46373 Korellis Roofing; Inc. Bloomfield Mechanical 1333 169th St. 0636 Melton Rd. Hammond, IN 46324 Portage, IN 46368 Midland Engineering Electrical 52369 US 33 North Continental Electric Co., Inc. South Bend, IN 46637 9501 E. 5th Ave. Gary, IN 46403 Storefront & Entrances & Glazing Trout Glass & Mirror EMCOR/Hyre Electric Co. 1579 S. Calumet Ave. 2655 Garfield Ave. Chesterton, IN 46304 Highland, IN 46322 J.W. Werntz Supply Circle R Electric 1002 Kerr St. 5740 Central Ave. South Bend, IN 46601 Portage, IN 46368 Lazzaro Co. 5880 Broadway Merrillville, IN 46410 L:\Filing System\Office\FORMS\Estimating Assistant Forms\Bid Forms\96 96A\96 Subcontractor List Attachment 1-35.docx 2/12/18 1.32 TGeneral Form No. 96-a. Prescribed by the State Board of Accounts of Indiana. Revised 1949. Standard Questionnaires and Financial Statement for Bidders Prescribed by THE STATE BOARD OF ACCOUNTS OF INDIANA For use in investigating and determining the qualifications of bidders on public construction when the aggregate cost of any such work or improvement will be Five Thousand Dollars or more. These statements to be submitted under oath by each bidder with and as a part of his bid, as provided by Chapter 306, page 1248, Acts of 1947. Submitted to Citv of South Bend "oWoration By Larson -Danielson Construction Co. Inc. .... A Co -partnership An Individual Address 302 T ler Street LaPorte, IN 46350 Date submitted Aril 18 —, 2019J Filed L:\Filing System\Office\FORMS\Estimating Assistant Forms\Bid Forms\96 96A\96A Financial Statement Revised 1949 1_32 docx 2/14/18 Sec. 2 of an Act entitled "AN ACT concerning the awarding of contracts for the performance of public work and authorizing the board of accounts to prescribe certain forms to be used in ascertaining the responsibility of contractors who submit bids for the performance of such work, providing for plans and specifications, providing for bids repealing certain laws and declaring an emergency." (Approved March 13, 1947.) Sec. 2. Whenever the aggregate costs of any work or improvement will be five thousand dollars ($5,000.00) or more, for the purpose of enabling such board, commission„ trustee, officer or agent to ascertain and determine which of the bidders submitting bids for the performance of any such public work is, in the judgment of such board, commission, trustee, officer or agent, the lowest and/or best bidder and to exercise intelligently the discretion hereby conferred on such board, commission, trustee, officer or agent each bidder shall be required to submit under oath with and as a part of his bid a statement of his experience, his proposed plan for performing such work and the equipment which he has available for the performance of such work and a financial statement. The statements hereby required shall be submitted on forms which shall be prescribed by the stated board of accounts. The forms so prescribed shall be designated, respectively, as the experience questionnaire, the plan and equipment questionnaire and the contractor's financial statement, and shall be based, so far as applicable, on the standard questionnaires and financial statement for bidders as approved and recommended by the joint conference on construction practices, for use in investigating the qualifications of bidders on public construction work, and the forms so prescribed are hereby prescribed as the forms which shall hereafter be used by all such boards, commissions, trustees, officers and agents in obtaining the information which is required in the administration of this act. If the information submitted by any bidder on the forms herein prescribed is found, on examination, to be unsatisfactory, the bid submitted by such bidder shall not be considered. (Burns Statutes 1933, Sec. 53-109) Sec. 2, Chapter 306, Acts of 1947. TO THE BIDDER --- The following forms of questionnaires and financial statement are prescribed by the State Board of Accounts in conformity with the statute set out on the preceding page. These forms, properly filled out and attested, must accompany each bid of five thousand dollars or more on any public work. The forms are designed to cover all contracts for all kinds of work and the bidder is required to answer such questions as are pertinent to the work upon which his is bidding. The purpose of the questionnaire and financial statement, as set forth in the law, is to enable the awarding body to determine the qualifications of the bidder to carry out successfully the contract if the same is awarded to him. The bidder will find it to his advantage to answer fully all questions coming within the range of the work upon which he is bidding. Particular attention should be given the "Financial Statement" and the details relative to the assets and liabilities set out. This form is made in extensive detail to that the bidder may explain his assets and liabilities in proper sequence and in a uniform manner. T. M. HINDMAN, State Examiner K] C r mration Submitted by Larson -Danielson Construction Co. Inc. A Co -Partnership An Individual Principal Office at 302 Tyler Street. LaPorte, IN 46350 To Citv of South Bend EXPERIENCE QUESTIONNAIRE The signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers to interrogatories hereinafter made. 1. How many years has your organization been in business as a general contractor under your present business name? III 2. How many years experience in General construction work has your organization had: (a) As a general contractor 111 (b) As a sub -contractor 3. What projects has your organization completed? Contract Amt. Class of Work When Completed Name & Address of Owner $14,000,000 LLGeneral Const 2018 Val araiso Comm School HS Revov. $2,014,000 General Const. _ ....__._......._.. 2018 _mm..._. Valparaiso Comm. Schools — Porter Co. "__ ________________.......................... Career Career Center $6,900,000 .W..._ General Const. - -_m m_m_—_ ,.IT 2018 .__. - _.. wm . ....... Porter Twp. Schools — HS West RenovationmM .w_.. r_ $5,000,000 ....._..._.m....w.._..._ General Const. _.._.�...._ 2018 ..v ... .r.w.___. City of East Chicago — Community Ctr., Site #1 & Site #2 3-A. What projects has your organization now in process of construction? Contract Amt. Class of Work _ When to be Completed ------------------- Name & Address of Owner -_---_. .m.___m_.. .....w_.. ........_ ...-----.------._m W W4Y $18,820,000 General Const. 2019 City of South Bend — Howard Park Redev.m _ ....... ._...n.__ _ $8,763,000 ......._.. _ __ __,, ___. _..m General Const .... _w_._W _.W.._..., 2019 ._ ... ...... Schoolof'Hobart HS Natatorium . 000 T _.._ General Const ............... 2019 _.__..._ _.a . _City . aTri-Co School Corp HS Pool 1111P $2#053,000 General Const. 2019 fmm a LLLLy NICTD - Gary Compound Addition 4. Have you ever failed to complete any work awarded to you? No If so, where and why? 5. Has any officer or partner of your organization ever been an officer or partner of some other organization that failed to complete a construction contract? No If so, state name of individual, other organization and reason therefore. 6. Has any officer or partner of your organization ever failed to complete a construction contract handled in his own name? No If so, state name of individual, name of owner and reason therefore. 7. In what other lines of business are you financially interested? N/A n 8. For what corporations or individuals have you performed work, and to whom do you refer? Wal-Mart Stores Inc. Bentonville AR Of Notre Dame South Bend, IN LaPorte Hospital LaPorte, IN Task Force Tips Valparaiso, IN The Boeing CoMpgLny Chicago, IL 9. For what cities have you performed work and to whom do you refer? City of Michigan City Board of Public Works City of La Porte Citv Planner City of Hammond Board of Park Commissioners City of Hobart Director of Development City of South Bend City of Mishawaka Dqpt. of Public Works Dept. of Engineering 10. For what counties have you performed work and to whom do you refer? La Porte County Board of Commissioners Lake County Board of Commissioners Porter Count v Commissioners St. Joseph County Board of Commissioners Starke Coun 11. For What State bureaus or departments have you performed work and to whom do you refer? Division of Public Works & Safetv Director State Armory Board Coniniandant Indiana Dept. of TranSDortation Chief Engineer Indiana Port Commission John W. Hughes, P. F. Indiana Dept. of Administration Westville Correctional Center 12. Have you ever performed any work for the U. S. Government? 1987 - U, S. Coast Guard Michigan, City, IN 2003 - State of Indiana Mil.itar,y.National Guard Armory Remington IN 2005 - State of Indiana National Guard Armory Gary, IN 2008 - State of Indiana Militga Army Aviation Gary, IN 13. What is the construction experience of the principal individuals of your organization? tNDIVIDUAL'S NAME Timodiv F. Larson I'll -------- - --- --- --- --- ---- `k"�eqy A. Larson ............................. Thomas A. Walter -- ........ - .......... I .............. Mark A. Danielson .. . ......... I ........................... David -J..Merkel ...- Patrick Lockwood Ray Rehlander PRESENT POSITION OR OFFICE President Secretary/Treasurer ............... ... ...... I.....,..... V-.P./Design ._ ....... _ V-P/Field Operations ................ I ... V-P/Project Mgmt. ........... ............. I ........ Asst, VP/Sr. Project Mgr. Gen'l SuDerint. YEARS OF CONST. EXPERI -ENCE 44 MAGNITUDE & TYPE IN WHAT CAPACITY? OF WORK General Const. Engineer/Est./PM ..... General C!�nSt. ........ —.- .............. ['Es mating/Project Mgr, General Const. Engineer/Est./PM 36 General Const. Field Officer 24 General Const. Engineer/Est./PM 25 General Const. r.........-...........I. Estimating/Project I .. Mgr, ......... 33 General Const. Carpenter 5 PLAN AND EQUIPMENT QUESTIONNAIRE The Signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers to interrogatories hereinafter made. In what manner have you inspected this proposed work? Explain in detail. Larson- Danielson estim and sDecifications provided for bidding purposed on this )roject and have communicated with subcontractors and suDDliers in evaluating the full scope of work for this project, 2. Explain your plan or layout for performing the proposed work. Larson -Danielson anticivates commencing project coordination upon receiZ of a Contract Notice to Proceed, or Letter of Intent. We will then begin awarding subcontracts based on sequence of work to be performed in order to begin on -site construction as soon as — possible. Work will be performed in corninon seCILICIlCe of tasks as it relates to this pmiect that provides for the best quali end product. 3. The work, if awarded to you, will have the personal supervision of whom? A Proiect Manager and Su erintendent will be assianed to thisproject following notification .of the bid results. *4. Do you intend to do the hauling on the proposed work with your own forces? If so, give amount and type of equipment to be used. If hauling is needed this is to be determined following, notification of bid results unless stated otherwise in supplemental bid documents, *5. If you intend to sublet the hauling or perform it through an agent, state amount of sub- contract or agent's contract, and if known, the name and address of sub -contractor or agent, amount and type of his equipment and financial responsibility: If hauling is needed, this is to be determined followine notification of bid results unless stated otherwise in supplemental bid documents. Items 4, 5, 6 and 7 may not be applicable in all building contracts; if not, omit. *6. Do you intend to do the grading on the proposed work with your own forces? If so, give type of equipment to be used. If grading is needed this is to be determined following notification of bid results unless stated otherwise in su lemental bid documents * 7. If you intend to sublet the grading or perform it through an agent, state amount of sub- contract or agent's contract, and, if know, the name and address of sub -contractor or agent, amount and type of his equipment and financial responsibility. If aradina is needed, this is to be determined following notification of bid results unless stated otherwise in supplemental, bid documents. Do you intend to sublet any other portions of the work? If so, state amount of sub -contract, and, if known, the name and address of the sub- contractor, amount, and type of his equipment and financial responsibility. Larson Danielson does intend on srublettine a Dortion of the work for this Dro"ect. Additional inforniatiori will be orovided as re wired. 9. From which sub -contractors or agents do you expect to require a bond? Bonding will be rc uired on sub -contractors or agents at Larson-Danielson's discretion.. 10. What equipment do you own that is available for the proposed work? If equipment list is required at bid time f6r this project, please refer to su lemental bid documents. 11. What equipment do you intend to purchase for use on the proposed work, should the contract be awarded to you? We do not intend to purchase gpy equipment for this project. 12. How and when will you pay for the equipment to be purchased? Not Applicable 11 Do you propose to rent any equipment for this work? This will be determined followin notification of bid results, Additional information will be provided as required. 14. Have you made contracts or received firm offers for all materials within prices used in preparing your proposal? Do not give names of dealers or manufacturers. Yes Dated at LaPorte, IN this 18th day of April 52019 By r Terry,,,A,.,,,,Larson Sew_..._..._..._ ---....._._ (Name & Title of Person Signing) STATE OF INDIANA COUNTY OF LA PORTE Larson -Danielson"_ Construction"_Co. Inc. (Name of Organization) BY Timothv F. Larson. President (Name & Title' ` LARSON DANIELSON SS 1EA1, CONSTRUCTION CO,, INC. Timothy F. Larson being duly sworn, deposes and says that he is President of the above Larson -Danielson Const. Co. Inc. and that the answers to the questions in the foregoing questionnaires and all statements therein contained are true and correct. Subscribed and sworn to before me this 18th of County of Residence LaPorte My Commission Expires September 8, 2023 2019 Michele C. Dzielin i, Notary Public q; MICHELE CECELIA DZIELINSKI" w v m La Pode County ,s. My Commission Expires 8 y q, SOPIPmh 8 2023 H N W 0 W W� O wzg ca mW0 ra x U) W c� mLU mH U)yW �a 0 m O W LU JO� LL _ W W c�2> m 0 � z Q 0 NJ O c A E C• O tE m O C. >, W m 0 c m� 2 O c C > cm O ++ C v — _ ; r .m CD V 3 Q O V d a� Y +y+ _E C� W � d 3 C d w � 3 mm w o 33 O` 4- O O Y V % r E c 'C y CD C. >� M IG � t m L r 3 �3 v m as > a° a 3 +>'+ W G! .0 .0 W O 3 C. O W L 41 E d a N o N N as :3 d N W c t �' 3 I--= 0 o\0 Ln 0\0 O ca O 0 W C m co d W m `m 7 CL 0 m E as Q J v .` m y, cu ~ U Qj H E c0 z U a �Ie IL O O U] U v � H'O � .H rd 4J Q 0 u o �4 O 4M) O W U] 00 �4 r, V- rd O T- vm� U E z UL N N O � m N f0 moo N �- d 0-0 m C V-. N O 0 O a E 0 0 EU Q LU `m m o� 0m a -✓ , 0 r o r 012 �- _0 I d d c L ^ Y 0 0 L 0 N g )C 0 U N L U Q ^ `Z c O O C d o L m aai o� U d ME a W m m 2 0 co U) v v Q od E co z H \ 00 \ cQ 0 M F- O U) m a w E -P z O 'C rI W E-i v U) CITY OF SOUTH BEND''" MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY s DEVELOPMENT PROGRAM 4 t' FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 118-01 Date: 4/18/19 Project Name: Historic Leeper Park Improvements — Bid Package 1 Bidder: Larson Danielson Construction Company, Inc. Contact Person: Timothy F . Larson, President Address: 302 Tyler Street City: LaPorte State: IN Email: tfl@ldconstruction.com Telephone: 219 - 3 6 2 - 212 7 Zip: 46350 To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa), ACTION (ADVERTISEICONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following:. 1® Attend.all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. 2® Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 1/17/2019 Contractor's Bid for Public Works - 59 CITY OF SOUTH BEND`'"�� MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY ; DEVELOPMENT PROGRAM FORM MWBE-2.1 MBE/WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 1 OF 1 Project Number: 118-010A Project Name: Bidder: By: X (Signature) MBE/WBE Participation Goal `j `J. Historic Lee per Park Im rovements - Bid Package 1 Larson Danielson Construction Company, Inc. m Timothy F. Larson, President 4/18/19 (Title) MBE/WBE Firm LARSON DANIELSON Owner or Contact at MBE/1NBE Firm LL CONSTRUCTION CO,, INC, Telephone: Fax: Em TYPE OF WORK SOLICITED FOR THIS PROJECT: NOTE: See attached Good Faith Effort GradeBeam-ITB's to Subs Leaal Notice in. The h Bend Tribune Posted to Various on-line PlanRooms RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBE/WBE Firm Owner or Contact at MBE/WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT. - RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Version 1/17/2019 Contractor's Bid for Public Works - 60 LEALARSON DANIELSON 302 Tyler Street - LaPorte, Indiana 46350 ���, � tenon Company, Inc. (219) 362-2127 • Fax (219) 362-2848 QUALITY CONSTRUCTION SINCE IWO PROJECT: City of South Bend-Leeper Park Improvements ID DATE: / 18/ 19 CERTIFICATION REQUIREMENT: 7% MBE - 5% "WBE 4/4/ 19-Posted on PlanRooms: Bid Clerk, Bid Tool, Builder's Exchange, CND -Reed, F.W. Dodge, Indiana Planroom, isgft, NACIAF, (National Construction News & Reed Construction Data 4/ 10/ 19-Invitations to Bid sent via GradeBeam (see attached Call Sheet), 4/ 12/ 19-Posted Bidding Opportunity on mwbeidoa.in.gov website (see attached) 4/ 12/ 19 & 4/ 13/ 19-Published Legal Notice in The South Bend Tribune (see attached) 4/ 12/ l 9-Reminder to Bid sent via GradeBeam e-mail 4/ 16/ 19-Reminder to Bid sent via GradeBeam e-mail www.ldconstruction.com Equal Opportunity Employer 111i all lot all 11 " 'i 1 1 1 IF& Mel Aoip nW,00la 'AW rad'"), 11 iiiiiiiii III! I MENEM= III i MIMM mycx,t, �jj� 7,Z] ] �17,, rpA. "71 e4 'S fli frnlOwe A0, � 4 &0,4 gnu oe a kkvw Trani '41 Uwvo.d t41 - D'Ank, * Pp od 14;a P"t n u - te 4Z- 19 1 "AN VA MD Michele Dzil FW: Planri Notifications T) W MCKIM TxVW (illowilifil Wil V-,, 'Ri Ddmq� ASSUWl M.- ktAga '?W1)-'CLl WIW" A Plans Include Ursion-Darillelson Construction Company, Inc. as accepting quotas on the following projecil PROW Porter Township School Corp/loons Grove HS Secure Entry BID DATE: 4/17/19 MMAM Johnstetbaum, PROJECT: South Band, City oWstal Leeper Park Improvements, OP I 010 DATE: 41111/19 ESTIMATOR: John Stalbolum PME PMT THAT Projects can be viand and/or downloaded at"O�Ldpl�sntfgm rq,,, Public Jobs, IqL Think you, Octal C, OWlindid EafinnatorAsalialand Larson -Danielson Construdon Ca„ Inc. Call Sheet $ A Package: City of South Bend -Historic Leeper Park Improvements -Bid Package 1 Total Records: 199 Status: Not Sent ,No Response ,Will Bid ,Will Not Bid ,Bidded ,UnDecided - ...-._ .-.-._ ........... .� 033000 - Cast -In -Place Concrete ITOID Organization Attention Work Mobile Fax Email Status Qualification Certification - Name Phone Phone Last Agency - Updated Number- ExpirationDate 138487760 Consumers Mike (269) (269) (269) mikemcgowan@consumersconcrete.com No Concrete McGowan 925- 760- 925- Response Corporation 3109 3805 7807 138487820 Deichman Rusty (574) (574) rustyd@deichmanexcavating.com No Excavating Co Estimating 722- 735- Response Inc. 7677 0424 138487582 Eagle Concrete Kermit (574) (574) kerm@eaglereadymlx.com No Union- Agency Bender 642- 642- Response Not Provided-- 4455 4508 138487579 G.E. Marshall, Inc. Eric Cannon (219) (219) erlcc@gemarshall.com Will Not 10/10/2013 Union- Agency 462- 462- Bid 12:18:18 PM Not Provided— 3415 3964 138487761 Kuert Concrete Tim Miller (574) (574) (574) tim@kuert.com Will Blvd Union- Agency 232- 971- 232- Not Provided-- 9911 6024 9977 138487761 Kuert Concrete Steve Fidler (574) (574) tim@kuert.com Will Bid Union- Agency 232- 232- Not Provided-- 9911 9977 138487756 Ozinga Ready Mix/ Zachary (219) (219) (708) zachbabcock@ozinga.com No Union- Agency Transit Mix Babcock 949- 240- 326- Response Not Provided-- 9800 6772 4295 ext. 240 138487590 07iliga, Central Cecil (574)" (574)' (574) cecllspencer@ozinga.com No Union -Agency Region Spencer.. 5337 536- 5347 Response Not Provided— 0415 3496 4528 ext. 2133 138487590 OZiliga, Central Scott (574)• (574) (574) scott.underwood@aggregate-us.com No Union -Agency Region Underwood 299- 536- 534- Response Not Provided-- 4351 9371 4528 138487823 premium Max Yeakey (574) (574) maz@premiumconcreteonline.com No WBE-IN - State Concrete 264- 266- Response ofIndiana- $e!V%Ce.9 0196 5392 -DBE-IN - DOT- -,Union- Agency Not Provided-- 138487823 Premium - - Rob Becker (574) (574) rbecker@premlumconreteonllne.com No WBE-IN - State Concrete 264- 26.6- Response of Indiana - Services 0196 5392 -,DBE-IN - DOT- -,Union- Agency Not Provided=- 138487473 Rieth-Riley Angelo (574) (',574) (574) amazzocchi@rieth-riley.com Will Bid Union- Agency Construction Mazzocchi 288- 532- 233- Not Provided— Co, Inc. - 8321 0033 3464 South Bend 138487876 Spring Creek (419) (419) estimating@scbsi.us Will Not Building 628- 628- Bid Supplies 457s 0001 138487602 The B/akley Estimating (317) (317,) estimating@blakieys.com No 1/11/2012 Non -Union - Corporation 842= 842= Response 8:50:45 AM Agency Not 9600 3651 Provided--,VOB- Agency Not PioWded-- 044300 - Stone Masonry .� ,ti .,. ITBID Organization Attention Work Mobile Fax Email_., atus Status n Qualification tific o Certification - Name Phone Phone last Agency - Updated Number- ExpirationDate 138488723 Architectural Curt Adams (812) (812) curtiswadams@sbcglobal;net No Stone Sales, 279- 279- Response Inc 2421 1691 138488724 Evans Frank Ira (812) (812) fira@evanslimestone,com No Union- Agency Limestone 279,- 275- Response Not Provided -- Company 9744 2408 138488721 Indiana Cut (812) (812) kathy_bakecheckard@lndystone„com Will Not WBE-IN - State Stone Inc. 275- 275- jeff_scholl@indystone.com Bid of Indiana- 0264 0266 -,Non-Union- Agency Not Provided-- 138488722 Indiana Tim Sproull (800) (812) tsproull@ilco.com No Union- Agency Limestone 457- 275- Response Not Provided - Company Inc. 4026 3344 -,Non-Union- Agency Not Provided— �I 055200 - Metal Railings �„ _ ITB ID Organization Attention Work Mobile Fax Email Status Qualification Certification - Name Phone Phone Last Agency - Updated Number- ExpirationDate 138487843 Ace Steel Rudy Pou (269) (269) rpou@aol.com No MBE -MI - State Erection Inc 792- 792- Response of Michigan- 0311 0372 -,DBE-IL - DOT- -,DBE -IN - DOT- -,DBE -MI - State of Michigan--,DBE- OH W Ohio Department of Transportation- -,DOT -MI - State of Michigan- -,Union- Agency Not Provided-- 138487523 Almet Inc. Dan (260) (260) dpatterson@almetinc.com Will Not Union- Agency Patterson 493- 493- Bid Not Provided- 1556 1299 -,Non-Union- Agency Not Provided- .. -,AISC- Agency Not Provided- -,AISC-U.S. - Amerlcan Institute of Steel Construction— 138487523 Almet, Inc. Thomas (260) (260) tbada@almetinc.com W'Iaf Not. Union- Agency Bada 493- 493- Md Not Provlded- 1556 1299 -,Non-Union- Agency Not Provided- -,AISC- Agency Not Provided- -,AISC-U.S. - American Institute of Steel Construction— 138487586 Alternate Gayton (574) No Non -Union - Building Marks 780- 936- Response Agency Not Systems, Inc. 6198 4437 Provided-- 138487660 Architectural Jonathan (800) (570) sales@archltecturaliron.com Will Not Iron Co. Roberts 442- 296- Bid 4766 4766 138487751 Art Iron, Inc. Renee Haas (419) (419) reneeh@artiron.com No 2/26/2010 DOT -OH - State DNA 241- 241- Response 8:03:07 AM of Ohio--,Union- 1261 6129 Agency Not Provided--,Non- Union- Agency Not Provided- -,AISC- Other- -,AISC- Agency Not Provided- -,AISC=U.S. - American Institute of. Steel' Construction- •,AWS- Other-- 138487525 Builders Iron Works, Tony (574) (574) tbalentine@biwsteel.com No Union- Agency Inc. Balentine 254- 254- Response Not Provlded- 1553 1598 -,AISC- Agency Not Provided-- 136487526 C & B Steel Rob (219) (219) bbgtone@aol.com No Estimating 992- 992- Response 2230 2270 138487527 C & C Iron, Inc. Michael Crlst (219) (219) cnclron@comcast.net Will Not 10/4/2011 Union- Agency 769- 769- Bid 10:47:00 AM Not Provided- 2511 2999 -,AISC- Agency Not Provided-- 138487529 Chicago Decking Mike Lareau (219) (21..9) mlareau@chlcago-steel.com Will Not WBE-IN - State 447• 947- Bid ofIndiana- 3939 7215 -,WBE-NV - - National Minority Supplier Development Coun--,Unlon- Agency Not Provided-- 138487530 Construction Perry (763) (763) perryH@cslminnesota.net No Union- Agency Systems, Inc Haberer 479- 479- Response Not Provided-- 1717 2507 138487531 Crane Industrial Terry Minix (574) (574) Info@ciscocrane.com No Union- Agency Service 272- 272- Response Not Provided- Company Com an 5388 5363 AISC- Agency Not Provided-- 138487870 Davis Iron Larry (248) (248) larrygrimes@davisironworksinc.com Will Not 4/12/2013 VBE-MI - State Works, Inc. Grimes 624- 624- Bid 10:IS: 34 AM of Michigan- 5960 7030 -,VOSB- Other- -,Union- Agency Not Provided-- 138487532 Evans Metal Bruce (574) (574) brute@evansmetal.com No Union- Agency Products Co., Rienks 264- 970- Response Not Provided- I(IC. 2166 1001 Non-Union- ext. 104 Agency Not Provided-- 138487897 Geiger & Peters, Barry (317) (317) Hochstedler@gpsteel.com No 2/3/2012 AISC- Agency Inc. Hochstedler 359- 359- Response 7:51:49 AM Not Provided- 9521 9525 -,AISC-U.S. - ext. 110 American Institute of Steel Construction— 138487907 Genzink Steel Mark (616) (616) mgenzink@genzink.com No Genzink 494- 392- Response 8457 2423 138487496 Hampton Robert (219) (219) ryannhampton@yahoo.com No Ironworks Hampton 510- 926- hamptonlronworks@yahoo.com Response 4420 6662 138487497 Helgeson Steel, Matt Duthie (574) (574) itb@helgesonsteel.com No Union- Agency Inc 293- 293- Response Not Provided-- 5576. 7099 138487497 Helgeson Steel, Christine (574) (574) itb@helgesonsteel.com No Union —Agency Inc. Helgeson 293- 293= Response Not Provided— 5576 7099 138487859 Lenex Steel (317) ('3'17) dale.west@lenexsteel.com No Union- Agency Company 818- 818- jim.harrington@lenexsteel.com Response Not Piovided- 1622 1255 -,AISC- Agency Not Provided- ' -,AISC-U.S. - American Institute of Steel Construction-- 138487533 Munster Steel- Jeanne (219) (219) rr66bins@inu6stersteel.com Will Not 3/7/2011 WBE-Agency Company Inc. Robbins 924= 924- Bid 3:47:09 AM Not Provided- 5198 5147 -,WBE-IN - State of Indiana -,DOT, IL - DOTf -A)Won• Agency Not Provlded- .,AISC. Agency Not: Provided- -,AISC"-LI.S. . American Institute of Steel Construction-- 138487533 Munster Steel David Driver (219) (219) ddrlver@munstersteel.com WIII Not 3/7/2011 WBE- Agency Company Inc. 924- 924- Bid 3:47:09 AM Not Provlded- 5198 5147 -,WBE-IN - ext,.228 State of Indiana--,DOT- IL - DOT- -,Union- Agency Not Provided- -,AISC- Agency Not Provided- - -,AISC-U.S. - Amerlcan Institute of Steel Construction-- 138487737 Rosema John (260) Construction, DeVries 482- Inc. 6501 138487548 *SCOTT STEEL (219) SERVICES, INC. 226- 9855 138487574 Spohn Associates, Eric Spohn (317) Inc. 921- 0021 138487574 Spohn Associates, Brad Hoff (317) Inc. 921- 0021 138487544 Stone City David Hobbs (812) Ironworks, Inc. 279- 3023 (260) jdevrles@rosemaconstruction.com No 482- Response 6510 (800) scoff@scottsteelservices.com No 424- Response 2603 (317) espohn@spohnassociates.com 921- 2453 (317) (317) bhoff@spohnassociates.com 454- 921- 7527 2454 (812) bld@sclfab.net 279- 2005 No 8/19/2011 Response 1:44:13 AM Union- Agency Not Provided -- Union- Agency Not Provided- -,AISC- Agency Not provided- -,AISC-U.S. - Amerlcan Institute of Steel Construction- 1096061- 12/31/2009 Union- Agency Not Provided -- No 8/19/2011 Union- Agency Response 1:44:13 AM Not Provided -- No 5/18/2011 SBE-Agency Response 1:47:12 AM Not Provided- -,SBE-IN - State of Indiana- -,Large Business - Agency Not provided- -,Union- Agency Not Provlded- -,AISC- Agency Not Provided— 138487511 Testa Steel Michael (815) (815) mtesta4@aol.com Will Not Constructors, Testa 729- 729- Bid Id7c, 4777 4795` 138487802 The Blakley Estimating ('317) (317) estimating@blakleys.com No 1/11/2012 Non -Union - Corporation 842- 842- Response 8:50:45 AM Agency Not 9600 3651':, Provlded=-,VOB- Agency Not Provided— 1384B7672 William Baker Valerie (317) (317) (317) valerle@wmbakerco.com WIII Not 9/29/2010 Union- Agency Company Baker 253- 752- 253- Bid 8:38:28 AM Not Provided-- 5248 0300 5760 138487547 Wilson Iron Works, Darrin (219) (219) wiwinc@sbcglobal.net Will Not 10/20/2010 Union- Agency Inc. Grabek 663- 663- Bid 1:29:49 AM Not Provided— 7900 7938 138487547 Wilson Iron Works, Rex Yelich, (219) (219) Wiwinc@.sbcglpbal.net ,. Will Not 10/20/2010 Union- Agency Inc, 663- 663- Bid 1:29:49 AM Not Provlded-- 7900 7936 101400 - Signage -m--. ...... .-............................. ..--.. ITB ID Organization Attention Work Mobile Fax Email Status Qualification -- ..... .. Certification - Name Phone Phone Last Agency - Updated Number- ExpirationDate 138489918 Burkhart Sign Janette (574) Systems Burkharr 234-4444 Miller 138489918 Burkhart Sign Ryan Kring (574) Systems 208-6918 138489919 Diskey Jessica (260) Architectural Estimating 424-0233 Signage 138489920 Essential Roger Long (317) Architectural 253-6000 Signs, Inc. ext. 104 (574) bpickering@burkhartadv.com No 287- Response 7078 (574) rkring@burkhartadv.com No 208- Response 6917 (260) bids@diskeyslgn.com No 424- Response 0668 (317) roger@essentialsigns.com 253- 6100 138489921 Freeman's Signs Fred (317) (317) fred@freemansigns.com Freeman 697.-2828 27�- 2674 138489922 Hall Signs, Inc. Brian (800) (812) (812) bfaulkner@hallsigns.com Faulkner .284-7446 272-2091 332- ext„104 9816 Will Not Bid WIII Not Bid No Response union- Agency Not Provided- -,Non -Union - Agency Not Provided -- WOE -IN - State of Indiana- - WBE-IN - City of Indianapolis- -,Union- Agency Not Provided- -,Non -Union - Agency Not Provided-- 1.38489923 Landmark ,Sign Scott Lovell (877) , _ (219) . _ (20) scoff@landmarksign.com Will Not 7/16/2010 Union- Agency Group 70Z-9577 406-0211 762-: Bid 4:40:28 AM Not Provided-- 4259 138489924 Marshall Building John (317) (317) jcharpie@marshallbldgspec.com No Union- Agency Specialties Co., Charpie 635-388B 635- Response Not Provided -- Inc. 7353 138489924 Marshall Building Bruce Volkel (317) (317) bvolkel@marshallbldgspec.com No Union- Agency Specialties CO., 635-3888 635- Response Not Provided -- Inc. 7353 138489935 Olee Creative Clarissa (574) (574) (574) clarissas@oleecreative.com Will Not WBE-IN - State Schmidt 256-0901 286-1107 255- Bid ofIndiana-- 7966 138489925 Poblocki Sign Daniel (414) (414) dschermann@poblocki.com No Union- Agency Company LLC Schermann 453-4010 453- Response Not Provided— 3070 138489926 Region Signs, Estimating (219) (219) regionsigns@aol.com No WBE-IN - State Inc. Estimator 473-1616 473- Response of Indiana-- 9905 138489927 Rupel Engineered Rex (574) (574) repco@frontier.com No Union- Agency Products Co. Widmeyer 522-3882 522- Response Not Provided -- Sr 0541 138489928 Sign Solutions Thomas (317) (317) tmhopkins4@gmail.com No Non -Union - Hopkins 881-1818 859- Response Agency Not 6360 Provided-- 138489929 Steindler Signs & TOM (219) (219) tom@steindlersigns.com No 11/18/2014 Graphix Steindler 733-2551 733- Response 9:57:14 AM 9631 220000 - Plumbing ITB ID Organization - on , Attention � �� Work Mobile ...----x �������� _.....,.. .... ...... P'bx Email ... Status Qualification ... ......... ... . ... Certification - Name Phone Phone Last Agency -Number - Updated ExpirationDate 138487858 AMS Mechanical Larry (630} (630) .Islmpspn@ams-pmt-COM No 8/1/2018 Union- Agency Not Systems, Inc. Simpyon_ 320- 887- -.. Response 6:44:48 AM Provided-- 7799 0770 138487600 Area Sheet David (219) (219) (219) davidleonard@areasheetmetal.com No 9/29/2010 Union- Agency Not Metal, Inc. Leonard Jr. 942- 712- 942- Response 5:57:23 AM Provided--,Non- 7700 8349 1157 Union- Agency Not Provided— 138487600 Area Sheet Kevin (219) (219) commercial@areasheetmetal.com No 9/29/2010 Union- Agency Not Metal, Inc. Anderson 942» - 942+ - Response 5:57:23 AM Provided--,Non- 770`0 1157. Union- Agency Not Provided-- 138487866 B. C. Mechanical Mike Fields (269) (269) ' mike@bcmechanicalinc.com Will Not Union- Agency Not Inc. 663- 662- Bid Provided-- 5335 2755' 138487846 Benchmark Jessie _ (765) (7'65) (574). 'jheffley260@earthiink.net No Union- Agency Not Mechanical Heffley 452- 430- 826- Response Provided-- 9500 6484 2024 138487601 Bloomfield Estimating (219) (219.) . ' info@bloomfieldmechanical.com Will Not Union- Agency Not Corporation Estimator 763- 763- Bid Provided-- 7470 1380 138487632 BRENNECO Scott Page (765) (765) greg@brenneco.corn No 448= 447^ Response 6190 0257' 138487632 BRENNECO Greg _ ('765) (7651) .--'greg@brehneco.com' No Brenneman 448•... 447- Response 6190 0257 138487602 Centerline Tony Johns (574) (574) tonyjohnscl@aol.com Will Not Union- Agency Not Mechanical 233- 233- Bid Provided -- Contracting 3909 6525 138487602 Centerline Tim Rizzo (574) (574) timrizzocl@aol.com Will Not Union- Agency Not Mechanical 233- 233- Bid Provided -- Contracting 3909 6525 138487656 D.A. DODD INC. Rob Fisher (219) (219) (219) robfisher@dadodd.com Will Not MBE -IN - State 778- 363- 778- Bid Minority Business 4302 6248 2981 Development- -03/01/2017,Union- Agency Not Provided-- 138487656 D.A. DODD INC. Jacob Miller (219) (219) (219) jacobmlller@dadodd.com Will Not MBE -IN - State 778= 229- 668- Bid Minority Business 4302 0725 1628 Development- -03/01/2017,Union- Agency Not Provided-- 138487914 DEE CRAMER Rick White (574) INC. 289" A35'1, 138487914 DEE CRAMER Mathew (810) INC. Cramer 579- 5000 138487867 Dirig Steve (260) Sheetmetal Mueller 484- 4844 ext. 228 138487880 Dynamic Mike Bacsa (574) Mechanical 257- Services, Inc. 0123 ext. 228 138487603 Edward 3. White Kevin (574) Company Kozlowski 289- 6351 138487604 Griffen P & H, Shane Bays (574) Inc. 295- 2440 138487604 Griffen P & H, Mike (574) Inc. Emmert 295- 2440 138487605 Herrman & Larry Cripe (574) Goetz, Inc. 282- 2596 138487606 Ideal Tim Stuver (574) Consolidated, 282- Inc. 1228 138487606 Ideal Troy (574) Consolidated, Gurtner 282- Inc., i228 138487854 Morris Sheet Jason (574) Metal Sergeant 971- Corporation 4469 138467608 OJS Building Teresa (574) Services Inc. Brainerd 287- 2936 138487608 03S Building Brian Sears (574) Services Inc. 287- 2936 138487908 Poynter Sheet Jim Burton (317) Metal 893- 1193,. 138487923 pRO SERVICES, Jeff (57,4) INC. Jagneckl 341- 4676 138487587 Shambaugh & Todd (.260�) Son (HVAC) 487- Poinsett 7787 (574) rickw@deecrameccom No 289- Response 3755 (810) (810) mattc@DeeCrameccom No 579- 579- Response 4714 2664 (260) steve@dirigsheetmetal.com No 483- Response 9555 (574) mbacsa@dynamicmechanical.net No 257- Response 0126 (574) (574) kkozlowski@ejwhiteinc.net No 274- 289- Response 0733 3755 (574) sbays@griffenph.com Will Not 295- Bid 2520 (574) memmert@griffenph.com Will Not 295- Bid 2520 (574) Icripe@hgservices.com No 282- Response 2645 (574) Idealtroy@yahoo.com Will Not 282- Bid 1128 (574) (574) tgurtner@idealconsolidated.com Will Not 532- 282- Bid 5563 1128 (260) (260) jason@morrlssheetmetal.com No 639- 489- Response 2139 $$227 (574) tbrainard@ojsbsi.com _ No 287- Response 2839 (574) bsears@ojsbsi.com No 28.75. Response 2939 (812) (317) jburton@poyntersheetmetal.com No 322- 893- Response 1969 1494 (469) jjagnecki@prosatwork.com No 327- Response :1'342 (200) tpoinsett@shambaugh.com Will Not 4,97- Bid 1695 138487587 Shambaugh & Tony Pink (574) (574) (574) tpink@shambaugh.com Will Not Son 255- 876- 255-. Bid 2170 6298 2175 ext. 208 138487587 Shambaugh & Mark (574) 574- (574) mmanninen@shambaugh.com Wilt Not Son Manninen 255- 876- 255- Bid 2170 4757 2175 138489933 Vic Trippel (574) (574) yictrippel@5bcglobal.net No 259" 259• Response 52,24 5226 Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided-- . Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided--,Non- Union- Agency Not Provided• - Large Business - Agency Not Provided--,Union- Agency Not Provided--,Non- Union- Agency Not Provided--,LBE- Agency Not Provided -- Large Business - Agency Not Provided--,Union- Agency Not Provided--,Non- Union- Agency Not Provided--,LBE- Agency Not Provided= - Large Business - Agency Not Provided--,Union- Agency Not Provided--,Non- Union- Agency Not Provided--,LBE- Agency Not Provided-- WBE- Agency Not Provided--,Union- Agency Not Provided-- 260000 - Electrical 1TB,ID Organization Attention Work Mobile Fax Email Status Qualification Certification - Name Phone Phone Last Agency -Number - Updated ExpirationDate 138487858 AMS Mechanical Larry (630) (630) Islmpson@ams-pmt.com No 8/1/2018 Union- Agency Not Systems, Inc. Simpson 320- 887- Response 6:44:48 AM Provided-- 7799 0770 138487845 Brite Electric, Steve Zornig (574) (574) (574) szornig@briteelectrlc.net WIII Not Union- Agency Not Inc. 272- 220- 272- Bid Provided— 2615 7702 2616 138487701 Cable Susan (773) (773) Susan@ccinc.us No WBE-IL - City of Communications, Hurley 925- 925- Response Chicago--,WBE- Inc 1344 9225 Agency Not Provided--,DBE- Agency Not Provided--, FBE- Agency Not Provided--,Union- Agency Not Provided-- 138487830 Elite Electrical Brian (574) (574) (574) bwrobleski@fourway.net UnDecided LLC Wrobleski 968- 334- 855- 0227 0259 3592 138487888 ErmCO, Inc. (317) (317) cfritzlen@ermco.com WIII Not 2/6/2012 Union- Other- 780- 780- Bid 1:44:18 AM -06/30/2013,Union- 2923 2853 Agency Not Provided-- 138487605 Herrman & Larry Cripe (574) (574) Icripe@hgservlces.com No Union- Agency Not Goetz, Inc. 282- 282- Response Provided-- 2596 2645 138487872 Hi -Tech Electric John Young (260) (260) jyoung@hi-techelectic.net No Union- Agency Not 665- 385- Response Provided— 7773 6675 138487831 IBID County (269) (269) josha@Vb4dcountyelectric.com No Unbn- Agency Not Electric, Inc. 92.5-'• " 925- Response PvcMteed,.. 0647 0675 138487606 Ideal Tim Stuver (574) (574) idealtroy@yahoo.com WIII Not Union- Agency Not,. Consolidated, 282- 282- Bid Provided -- Inc. 1228 1.1.2.8 138487606 Ideal Troy Guutn'er (5174) (574) (574) tgurtner@idealconsolidaied.com Will Not llnkm- Agency Not, Consolidated, 2-8? 2"' 282-, Bid Provided— Inc, 1228 5563 10.28 138487541 Kane Electric, (21,9) (2;19) bob@kane-electric.com No Union- Agency Not Inc, 865= 865-' Response Provided-- 4167 4168 138487832 Koontz -Wagner Jason Cloch (574) (574) (574) jcioch@kwservices.com Will Not Union- Agency Not Electric, Inc. 280"' 261. 287- Bid Provided-- 2553 3550 6613 138487542 L&S Electric Dave (21,9) (219) Iselectric@sbcglobal.net No Union- Agency Not Hinshaw 932- 931- Response Provided— 8504 0144 138487542 L&S Electric Ron Lubas (219) (219) Iselectric@sbcglobal.net No Union- Agency Not 932- 931- Response Provided— 8504 0144 138487833 Linear Electric Kevin (269) (269) kevin@linearelectriclnc.net Wal Not Union- Other - Inc. Stewart 927- 927- estlmates@linearelectricinc.net Bid -,Union- Agency 61.60 6170 Not Provided-- 138487833 Linear Electric Ron Dockery (269) (269) r'on@linearelectr'icinc.oet WIII Not Union- Other - Inc. 927"'' 927- Bid -,Union- Agency 6.160 6170 Not Provided— 138487899 Long Electric (260) (260) No Co., Inc. 484_ 483-- Response 0735 6185 138487674 Martell Electric, LLC Anjle (574) (574) areeves@nnar'teileiectric.com WIII Bid 2/4/2016 DOT -MI - State of Reeves 271,- 271- 4:45:24 AM Michigan--,Unlon- 5000 5400 Agency Not Provided-- 138487834 McMann Electric, Steve (!574) (574) terrimcmann@mcmannelectric.com No WBE-IN - State of Inc. McMann 674- 674- Response Indiana--,Union- 5748 5739 Agency Not Provided— 138487766 Mead & White, Joe Slipocz (574) (574) (574) joe@meadwhlte.com WIII Not DOT -MI - State of Colip Electric 288- 876- 288- Bid Michigan--,Union- Company 4708 9727 4709 Agency Not Provided-- 138487651 ,Meade Electric Dan (708) (708) dp@meadel00.com Will Not 9/9/2010 Union- Agency Not Estimating 588- 588- Bid 3:49:25 AM Provided--,Non- 2500 2501 Union- Agency Not Provided--,LBE- Agency Not Provided-- 138487651 ,Meade Electric Wade (708) (708) dp@meadel00.com Will Not 9/9/2010 Union- Agency Not Lietzau 588- 588- Bid 3:49:25 AM Provided--,Non- 2500 2501 Union- Agency Not Provided--,LBE- Agency Not Provided-- 138487835 Pemberton -Davis Mike Taff (574) (574) mtaff@pembertondavis.com Will Not Electric 277- 204- Bid 7001 2565 138487625 Sargent Electric Co. Anthony (219) (219) anicholson@sargentelectric.com WIII Not 8/25/2016 Union- Agency Not Nicholson 397- 397- Bid 10:05:32 AM Provided-- 0133 0206 138487625 Sargent Electric Co. Dennis (219) (219) dhathaway@sargentelectric.com Will Not 8/25/2016 Union- Agency Not Hathaway 397- 397- Bid 10:05:32 AM Provided-- 0133 0206 138487659 Schwartz Electric Mark Carter (574) (574) markc@schwartzelect.com Will Not Union- Agency Not 862- 862- Bid Provided-- 4221 3915 138487587 Shambaugh & Todd (HVAC) (260) (260) tpoinsett@shambaugh.com Will Not Large Business - Son Poinsett 487- 497- Bid Agency Not 7787 1695 Provided--,Union- Agency Not Provided--,Non- Union- Agency Not Provided--,LBE- Agency Not Provided-- 138487587 Shambaugh & Tony Pink (574) (574) (574) tpirik@shambaughicom Will Not Large Business - Son 255- 876- 255= Bid - Agency Not 2170 6298 3175 Provided- -,Union-ext. Agency Not 208 Provided--, Non- Union- Agency Not Provided--,LBE- Agency Not - Provided-- 138487587 Shambaugh & Mark (574) 574- (574) mmannlnen@shambaugh.com Will Not Large Business - Son Manninen 255- 876- 255- Bid Agency Not 2170 4757 2175 Provided--,Union- Agency Not Provided--,Non- Union- Agency Not Provided--,LBE- Agency Not Provided— 138487644 Shaum Elec Co Deb Bradley (V4) (574) deb@shaumelectrgc.com Will Bld Union- Agency Not Inc 64 262"'. Provided-- 4tg.. 9 51.86' 138487599 Sweney Electric Phil Shikany (Y,19) (219) philshikany@sweneyelectric.com No 6/28/2011 Union- Agency Not Co., Inc. 769 759 Response 5:56:26 AM Provided-- 6007 0565, 138487599 Sweney Electric Tom (219) (219) tcniermeyer@sweneyelectric,com No 6/28/2011 Union- Agency Not Co., Inc. Niermeyer 769- 769 - Response 5:56:26 AM Provided-- d'aG' 07 0565 138487852 The PIPCO Nicole (309) (309) nlcoleo@p9pco-co,com Will Not Union- Agency Not Companies Ltd. Owens 962- 692. Bid Provided-- 4060 2311 . 138487836 Tri- City Data & Troy (574) (574) tmarrese@trlcltydata-electric.com Will Not Union- Agency Not Electric Marrese 968- 968- Bid Provided-- 5889 3810 138487777 Western Mark (317) (314) marka@ivesternspecialtycontractors.com No Union- Agency Not Specialty Antoskiewlcz 377- 773- Response Provided Contractors 6040 4562 310000 -Earthwork ITB ID Organization Attention Work Mobile Fax Email Status Qualification Certification - Name Phone Phone Last Agency - Updated Number- ExpirationDate 138487809 3-D Sales Inc. (219) russ@3-d-sales.com No 322- Response 3330 (615) michaelalessio@alessiocompanies.com No 725- Response 6742 Russ (219) Derderian 322- 3030 138487890 Alessio & Sons Michael (815) Co. Alessio 725- 5513 138487478 Atlas Building Lynann (260) (260) offmgr@atiasbulldingsys.com No Union- Agency Services, Inc. Harmon 563= 563- Response Not Provided-- 3166 3167 138487819 Beer & Jeff Beer (574) (574) jbeer@beerandsiabaugh.com No Union- Agency Slabaugh 773- 773- Response NotProvlded- 3413 7635 -,Non-Union- Agency Not Provided-- 138487602 Centerline Tony Johns (574) (574) tonyjohnscl@aol.com WIII Not Union- Agency Mechanical 233- 233- Bid Not Provided -- Contracting 3909 6525 138487602 Centerline Tim Rizzo (574) (574) timrizzocl@aol.com Will Not Union- Agency Mechanical 233- 233- Bid Not Provided -- Contracting 3909 6525 138487725 ClarkCo Tony Clark (574) (574) tclark91@mapienet.net Will Not Non -Union - Excavating 862- 862- Bid Agency Not 4323 4155 Provided-- 138487816 Crosby Dawn (260) (260) dcrosby@crosbyexcavating.com No Union- Agency Excavating, Inc. Crosby 447- 447- Response Not Provided-- 1053 6226 138487578 D & M Ryan Miller (219) (219) ryan@dandmexcavating.com No Union- Agency Excavating 872- 874- Response Not Provided-- 9378 3523 138487820 Deichman Rusty (574) (574) rustyd@deichmanexcavating.com No Excavating Co Estimating 722- 735- Response Inc 7677 0424 138487579 G.E. Marshall, Inc. Eric Cannon (219) (219) ericc@gemarshall.com Will Not 10/10/2013 Union- Agency 462- 462- Bid 12:IS: 18 PM Not Provided— 3415 3964 138487821 HRp Jered Baker (574) (574) estimating@hrpconytruction.com WIII Not Union- Agency Construction, 271. 271' Bid_ Not Provided -- Inc. 700 0524 ext. 310 138487727 Indiana Earth, Jimmy (57,4) (574) ;jkabelearthl0@yahoo.com Will Bid Union -Agency Inc. Kabel 674 674- Not Provided-- 6488 6480 138487731 K&S Engineers, Dibakar (219) (219) dsundi@kandsengineers.com No MBE- Agency Inc. Sundi 924= 924- Response Not Provided- 5231 5271 -,MBE-IN - ext, 105 State of Indiana--,MBE- IN - City of Indianapolis- -,DBE -IN - DOT- -,SDBE- Agency Not Provided- . . -,Union- Agency Not Provided— 138487662 NibloCk Mark Dewitt (574) (574) mdewltt@nlblockexc.com No DOT -MI - State Excavating & 644" B"" Response of Michigan - Asphalt 4437 4575 .. -,Union- Agency ext, 118 Not Provided- -,Non -Union - Agency Not Provided— 138487580 pavey Michael (219) (219) (`21,1) mike@paveyinc.com Will Not 2/24/2014 Union- Agency Excavating Pavey 362- 608- 126.. Bid 3:18:13 AM Not Provided-- 2305 9696 l^1ib6 138487472 phend & Brown, Brent Lamb (800) (574) ('" T 1) blamb@phend brown.com No LEED- Agency Inc. 998- 527- 6Ri:M Response Not Provided- 4234 6508 1p''ue"i "' -,Union- Agency Not Provided— 138487869 R & R Mark (574) (574) (574,) mweaver@rrexravating.com Will Not Union- Agency Excavating Weaver 256= 536- ° u6' Bid - Not Provided-- 2467 0632 2473 138487869 R & R Terry (5'/4) (" 74) terryo@rrexcavating.com Will Not Union- Agency Excavating Opaczewski 256- 256 Bid Not Provided-- . ... 2467" 2473 138487473 Rieth-Riley Angelo (574) (574) (574) amazzocchl@rieth-riley.com No Union -Agency Construction Mazzocchl 288- 532- 233, Response Not Provided -- Co, Inc. - South 8321 0033 3464 Bend 138487822 Ritschard Don (574) (574) (574) ritl204@datacruz.com WM Md WBE-IN - State Brothers, Inc. Ritschard Jr. 288- 360- 288- of Indiana- 4777 5201 5438 -;DBE-IN - State of Indiana- -,Union- Agency Not Provided- -,EDGE- Agency Not Provlded-- 138487852 The PIPCO Nicole (309) (309) nlcoleo@plpco-co.com Wilk Not Union- Agency Companies Ltd. Owens 962- 692- Bid Not Provided-- 4060 2311 138487643 Thomas Jason Young (574) (574) jy.thomasexc@embargmail.com No Union- Agency Excavating 892- 892- Response Not Provided-- 5255 5275 ext. 23 138487857 Woodruff & Bruce (941) (941) (941) brucew@woodruffandsons.com Will Not 10/10/2011 Large Business - Sons, Inc. Woodruff 756- 713- 755- Bid 2:43:50 AM Agency Not 1821 2026 1379 Provided-- 138487857 Woodruff & Kyle W. (219) (219) kylew@woodruffandsons.com Will' Not 10/10/2011 Large Business - Sons, Inc. 872- 879- Bid 2:43:50 AM Agency Not 8605 5339 Provided-- �� 321216 - Asphalt Paving . WW._ ITB ID Organization Attention Work Mobile Fax Email Status Qualification Certification - Name Phone Phone Last Agency - Updated Number- ExpirationDate 138487470 ArntAsphalt Brian (574) (269) (574) bkhuston@arntasphaltco.com Will Not Union- Agency Sealing, Inc. Houston 233- 208- 288- Bid Not Provided-- 1505 4915 9113 138487595 E&B Paving, Inc. (260) 459- 6334 138487579 G.E. Marshall, Inc. Eric Cannon (219) 462- 3415 138487906 Michael Kinder & Doug (260) Sons, Inc. Kinder 744- 4359 138487662 NibloCk Mark Dewitt (574) Excavating & 848- Asphalt 4437 ext, 118 138487590 Ozingo, Central Cecil (574) Region ,Spencer 533- 0415 �xt. 2133 138487590 Ozinga, Central Scott (574) Region Underwood 299- 4351 138487875 Performance Steve (574) paving, Gilliland 327• Sealcoating & 20710 Maintenance, LLC 138487472 Phend & Brown, Brent Lamb (600) Inc. 998 4234 138487823 Premium Max Yeakey (574) Concrete 264- Services 0196 138487823 premium Rob Becker (574) Concrete 264- Services 0196 138487473 Rieth-Riley Angelo (574) Construction Co, Mazzocchi 288- Inc. - South 8321 Bend 138487471 Walsh & Kelly Kevin Kelly (574) Inc. - Elkhart or 288- LaGrange 4811 138487471 Walsh & Kelly Dustin (574) Inc. - Elkhart or Hilary 825- LaGrange 9429 (260) jeff.bender@ebpaving.com No 459- jason.richmond@ebpaving.com Response 6063 (219) ericc@gemarshall.com Will Not 10/10/2013 462- Bid 12:18:18 PM 3964 (260) dklnder@kinderandsons.com No 456- Response 1351 (574) mdewitt@niblockexc.com No 848- Response 4575 (574) (574) cecilspencergo4gga,com No 536- 534- Response 3496 45p, (574) (574) scott.underwood@aggregate-us.com No 536• 534• Response 9371 4528 (574) (574) Steve@pbpaving.com No 524- 327- Response 0166 2068 (574) (574), blamb@phend-brown.com No 527•• 658„ Response 6508 4584 (574) max@premlumconcreteonline.com No 266- Response 3'92 (574) rbecket@premiumconreteonline.cam No 266- Response 5392 (574) (574) amazzocchi@rieth-riley.com 532- 233- 0033 3464 (574) dougk@waishkelly.com 289- 7174 (574) dustinh@waishkelly.com 288- 4811 Will Bld Wlll Bld Will Bld Union- Agency Not Provided -- DOT -MI - State of Michigan- Union- Agency Not Provided- -,Non -Union - Agency Not Provided -- Union- Agency Not Provl&d= Union- Agency Not Provided— Union- Agency Not Provided— LEED—Agency Not Provided- -,Union- Agency Not Provided-- WBE-IN - State of Indiana- -,DBE -IN - DOT- -,Union- Agency Not Provided— WBE-IN - State of Indiana- -,DBE -IN - DOT- -,Union- Agency Not Provided -- Union- Agency Not Provided=- Union- Agency Not Provided— Union- Agency Not Provided-- 138487652 Walsh & Kelly, Paul (219) (219) paul@walshkelly.com No 3/21/2016 Union- Agency Inc. Manoski 924- 924- Response 9:36:53 AM Not Provided- , 5900 8768 -,Union-IN - DOT-- 138487652 Walsh & Kelly, John Wall (219) (219) (219) johnw@walshkelly.com No 3/21/2016 Union- Agency Inc. 924- 746- 924- Response 9:36:53 AM Not Provided- 5900 3628 8768 -,Union-IN - DOT-- 138487672 William Baker Valerie (317) (317) (317) valerle@wmbakerco.com Will Not 9/29/2010 Union- Agency Company Baker 253- 752- 253- Bid 8:38:28 AM Not Provided— 5248 0300 5760 321416 - Brick Unit Paving ITB ID Organization Attention Work Mobile Fax Email Status Qualification Certification - Name Phone Phone Last Agency - Updated Number- ExpirationDate 138489912 Decorative Bruce (574) (269) decorativebrlck@aol.com Will Not Brick Paving Wilson 876- 684- Bid 1512 0405 138487715 Fuerbringer Dan (574) (574) contactus@fuerbringerlandscaping.com Will Bid Union- Agency Landscaping & Fuerbringer 271- 271- Not Provided -- Design, Inc. 9714 2861 138489910 LPS Pavement Trent Davies (800) (630) trentd@lpspave.com Will Bld 3/18/2013 Union- Agency CO. 232- 551- 5:29:06 AM Not Provided- 1770 2105 -,Non-Union- Agency Not Provided-- 138489910 LPS Pavement Patrick (800) (630) patrick@lpspave.com Will Bld 3/18/2013 Union- Agency Co Sandness 232- 551- 5:29:06 AM Not Provided- 1770 21.05 -,Non-Union- Agency Not " - Provided— 138489911 MidweSt Joel Elfering (847)' (847) (847) , midwestbrickpaving@msn.com No Union- Agency Brickpaving Inc 838- 815- 838- Response Not Provided— 6550 4624 6552 138489911 MidweSt Kurt Radke (847) (847) kradke@midwestbrlckpaving.com No Union- Agency Brickpaving Inc 638- ' 838` Response Not Provided-- 6550 6552 138489908 T&J Landscape Dominic (219) (219) (219) dominic2dtjlandsc6peservices.com Will Not Union- Agency Services Zuccarelli 374- 677- 374- Bid Not Provided-= 9900 4844 9950 321723 = Pavement Markings ----- -.. ITB ID Organization Name Attention 'Work Mobile,;: Fax Email Status Qualification Certification - Phone - Phone Last Agency - Updated Number= ExpirationDate 138487470 ArntAsphalt Brian (574) (269) (574) bkhuston@arntasphaltco.com Will Not Union -Agency Sealing, Inc. Houston 233-1505 208-4915 288- Bid Not Provided-- 9113 138489909 Boyd Asphalt Inc. Scott Miller (219) (219) (219) smiller@boydasphalt.net No Union- Agency 462-5359 241-5977 548- Response Not Provided-- 8235 138487875 Performance. Steve (574) (574) (574) ste_ve@p2paving.com No Unpin -Agency Paving, Gilliland - 327-2070 524-OJ,66 327= Response Not NoAded-"- Sealcoating & 2068 Maintenance, LLC 138487473 Rieth-Riley Angelo (574) (574) (574) amazzocchi@rieth-rlley.com No Union- Agency Construction Co, Mazzocchl .288-8321 532-0033 233- - Response Not Provided -- Inc. - South Bend 3464 138487471 Walsh & Kelly Inc. Kevin Kelly (574) (574) dougk@walshkelly.com Will Bid Union- Agency - Elkhart or 288-4811 289- Not Provided -- LaGrange 7174 138487471 Walsh & Kelly Inc. Dustin (574) (574) dustinh@walshkelly.com Will Bid Union- Agency - Elkhart or Hilary $25.942.9 288- Not Provided-- LaGrange 4811 29000 - Planting 1 J ITB ID Organization Attention g Work Mobile ... --- -_------- Fax . ......... Email .. ...... ... .... Status Qualification Certification - Name Phone Phone Last Agency -Number - Updated ExpirationDate 138487874 Douglas, ,jenny (574).. (574) jennydouglaslandscape@yahoo.com Will Bid Union- Agency Not Landscape, Schultz 287- 267- Provided -- Inc. 8908 8199 138487715 Fuerbringer Dan (574j Landscaping & Fuerbringer 271- Design, Inc. 9714 138487863 Future Group (586) 755- 0900 (574) contactus@fuerbringerlandscaping.com Will Bid 271- 2861 (586) fencer@futurefencecompany.com Will Bid 1/30/2013 755- 3:37:14 AM 7456 138487716 Ginger Valley Dan Freeze (574) (574) (574) info@gingervalley.com 271- 217- 277- 0202 2710 1320 138487717 Greenfield Del Troyer (574) (574) delt@greenfieldlandscape.com Landscape 533- 533- Services 9544 5818 138487718 Hydro-Tek Bruce (574) (574) Braniff 773- 773- 4140 2357 138487475 Lawn & Turf Dustin (260) (260) dustin@lawnandturFland.com Landscaping, Trahin 747- 478- Inc. 3298 9189 138487719 Lovisa & Joe Barone (574) (574) joe@lovlsaandbarone.com Barone Jr. 252- 252- Landscape 5252 5949 Associates ext. 103, 138487719 Lovisa & Jeremy (574) (574) jeremy@lovisaandbarone.com Barone Estimating 252- 252- Landscape,, 5252 5949 Associates 138487720 SlUsserS John (800) (574) jdw@slussers.com Green Thumb, Williamson 762- 722- Inc. 7442 1628 138487722 SroUfe Mark Sroufe (574) (574) sroufelandscaping@gmail.com Landscape 223- 224- Nurseries 2769 2769 -. 138487721 Thompson Sara Swiazk (574) (574) sara@thompsonlandscape.com Landscape 862. 862+ Company 1712 1314 9xt. 205 138487477 WiSSCO Greg Batten (574) (574) (574) gbatten@wisscoirrigation.com Irrigation, Inc. 277- 532- 277- 9851 8872 9860 ORACLE-1 GradeBeam No Response No Response No Response No Response WIII Not Bid Will Not Bid No Response No Response No Response No Response Union- Agency Not Provided-- SBE- Agency Not Provided--,SBE- MI - State of Michigan- -,DOT -IL - DOT- -,DOT -MI - State of Michigan--,Union- Agency Not Provided--,Non- Union- Agency Not Provided--,AISC- Agency Not Provided -- Union- Agency Not Provided -- Union- Agency Not Provided--,Non- Union- Agency Not Provided -- Union- Agency Not Provided -- Union- A9enry Not Prowded-- WBB-IN state of Ind'lana• W,WBE-IN City of IndMnapolis- -07/31/201,4„tUnWn. Atgemy Not Pro Wded•- Unbn- Agency Not Pr'oW'Wda'd. UnOn� Agency Not Provided- - I ro 0 Im �Mml i12.1' M"',IiAIV " wo CL E 2 as 2 oV c c C:) ol ov c 0 .0 co C-4 Ln cio > 12 u Za A aj r,4 c m Q) cu E to 4i 0 Z 41 r,4 = r- Ln n- u 0 a. E 0 i� = m = Qj Li ui T LL4 LL ui rt (A m u r4 Ql -C m r'4 (U < L. ra -0 m > 2 -C L CL E c w E IV cu VI > 4) CL 0 r W CL M lu "o C 0 m w In r- .1 DANIELSON 302 Tyler Street •LaPorte, Indiana 46350 Construction 7 p '7 , Inc. (219) 362-2127 - Fax (219) 362-2848 QUAUTY CONSMCTION SINCE 1908 Bidding Opportunity Larson -Danielson Construction Company, Inc. is actively seeking Certified MWBE contractors to bid and work with on the following project: City of South Bend Board of Public Works - Historic Leeper Park Improvements, BP 1 Location: South Bend, IN Bid Date:. Quotes are due on or before Thursday, 4/18/19 by 9:30 am (CDT). Quotes can be e-mailed to Idbids@Idconstruction.com or faxed to 219-362-2848. Additional Information: Subcontractors are responsible to review all plans, plan sets and specifications and are to bid per the plans "and specifications. Contact: General questions and how to obtain plans and specifications — Michele Dzielinski, mcd(@ldconstruction.com or 219-575-6047. www.ldconstruction.com Equal Opportunity Employer South Bend TRIBUNE The voice that connects us. This is the proof of your ad scheduled to run on the dates indicated below. Please proof read carefully if changes are needed, please contact us prior to deadline at (574) 235-6161 or email at legals@sbtinfo.com. Date: 04/08/19 Account #: 107907 Company Name: LARSON DANIELSEON Contact: Address: 302 TYLER ST LA PORTE Telephone: (999) 362-2127 Fax: Ad ID: 654778 Start: 04/12/19 Stop: 04/13/19 Total Cost: $10.56 # of Lines: 18 Total Depth: 2.236 # of Inserts: Ad Class: Government Phone # (812) 331-4281 Email: lleahy@heraldt.com Publications. - South Bend Tribune SB Online NOTICE TO MINORITY/ WOMEN BUSINESSES Actively seeking bids from certi- fied MWBE businesses in many construction trades for City of South Bend, IN - Historic Leeper Park Improvements Plans are available, phone 219- 362-2127 for further information. Our bid is due 4/18/19 at 9:30 am (CDT). LARSON DANIELSON CONSTRUCTION COMPANY, INC. 302 Tyler Street, LaPorte, IN 46350 hspaxlp 2x 4:12 4:13 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Historic Leeper Park Improvements — Bid Package 1 Project No. 118-010A For Bids Due April 9; 2019 Contractor Name: 18 Larson Danielson Construction Company, Inc The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31st for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/2018 General Conditions - 7 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/2018 General Conditions - 8 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. Version 7/20/2018 General Conditions - 9 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). List identifying all former business names. Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) - Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 10 (ix) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: 4/18/19 X e (Sign Here) Timothy F. Larson, President (Print Name Here) Larson Danielson Construction Company, (Name of Company) 302 Tyler Street (Address of Company) LaPorte (City) IN, 46350 (State) 219-362-2127 (Telephone Number) LARSON DANIELSON Inc siaj CONSTRUCTION CO., INC, Version 7/20/2018 General Conditions - 11 Entity Type: Domestic For -Profit Corporation Creation Date: 01/07/1937 Principal Office Address: 302 TYLER STREET, LAPORTE, IN, 46350, USA Jurisdiction of Formation: Indiana Title Name President Timothy F Larson Secretary Terry A Larson Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 01/31/2021 Date: Years Due: Address 1102 S. Fieldstone, LAPORTE, IN, 46350, USA 220 Glencoe Dr, VALPARAISO, IN, 46383, USA Vice President Thomas A. Walter 302 Tyler Street, LaPorte, IN, 46350, USA Vice President Mark A. Danielson 302 Tyler Street, LaPorte, IN, 46350, USA Type: Individual Name: Timothy F. Larson Address: 302 Tyler St., La Porte, IN, 46350, USA MULARSON DANIELSON 302Tyler Street • LaPorte, Indiana 46350 Construction Company, Iw. (219) 362-2127 • FAX (219) 362-2848 4UAUTV CONSTRUCTION SINCE IWO 4 �.M �N N A� ' 1 Attachment (ii) All Larson Danielson labor is provided through local trade unions. Individuals that will perform work on the public work project on behalf of Larson Danielson Construction Company, Inc. will be properly classified as either (1) an employee or (2) an independent contractor, under all applicable state and federal laws and local ordinances. Timothy F. Larson, President �� a 18 19 ���, LARSON DANIELSON CONSTRUCTION CO., INC, www.ldconstruction.com Equal Opportunity Employer GG I 11, E�- s-, April 9, 2019 City of South Bend 227 W. Jefferson Blvd. South Bend, IN 46601 Re: Larson -Danielson Construction Co., Inc. Historic Leeper Park Improvements — BP 1 To Whom It May Concern: The Ohio Farmers Insurance Company part of the Westfield Insurance group of companies is listed on the Federal Treasury List of Approved Sureties. Ohio Farmers Insurance Company has an A.M. Best Rating of "A" (Excellent) with a Financial Size Category of "XIV". Ohio Farmers Insurance Company has been the surety for Larson -Danielson Construction Co., Inc. for 31 years and currently are willing to consider bonds in the $75 million range with backlogs exceeding $150 million. Larson -Danielson Construction Co., Inc. is currently in good standing with Ohio Farmers Insurance Company, they are a valued client and our experience with this contractor has been most satisfactory. We are more than willing to consider providing bonds on any project that Larson - Danielson Construction Co., Inc. may seek to obtain. Our approval of such a request would be conditioned upon applicable underwriting considerations at the time of the bond request. This letter is not an assumption of liability. We have issued this letter only as a bonding reference requested by our client. We are proud to recommend this fine organization to you. Should you require additional information regarding Larson -Danielson Construction Co., Inc. bond program, please feel free to contact our office. Sincerely, GENERAL INSURANCE SERVICES, INC. Chris Allen On behalf of Ohio Farmers Insurance Company Commercial Lines Service La Porte I Michigan City I Valparaiso I Hobart www.genins.com THIS POWER OF ATTORNEY STIPERCEDES ANY PREVIOUS POWER BEARIWTfjtS SAME POWER It AND ISSUED PRIOR TO 05103/17. FOR ANY PERSON OR PERSONS NAMED BELOW. General Power of Attorney CERTIFIED COPY Westfiel d Know Aft fKen is�r These Presents., That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations. hereinafter referred to Indl7alduattyr as a "Cornpp�any"" and collectively as "Companies,' duly organized,and existin� vendor the laws of Cite Stata*, of Olato, and having its principal of0ce in Waslfielal Center, Medina County. Ohio, do by these DAefsNIEL M KAMINS I,const1THEO le and,OI��nTAYLOR, RONALD L. ROSENSAOK PAMELA S',TERZINO,.MARSHA K. WEISS,, MELINDA M. YATES, CHRISTME A. A'LLEN, CATHERINE C MYERS, W14AN'I MORRIS, KATHY D,. HEINRICH, JOINTLY OR SEVERALLY of LA PORTE and Stale of IN its Celle and lawful Attorrtay(s)-in•Fact, twlitt fiat[ powet and authorli�vT hereby conferred In its name. place and stead; to cxecule, acitnowvledge and deliver any and all bonds, recogn➢zancas, undertakings, or other Instruments or Contracts of suretyship• - - ..., . .... .... ., . , ....., . ,. , .. .... .. , ... �.. ,.... , .. . LIMTATtO ' T1lN'S +POWER OF ATTORNEY CANNOT BE USED -TO EXECUTE NOTE GUARANTEE. MORTGAGE DEFICIENCY, MORTGAGE , OR RANIr, DEPOSirORY'BONDS. and to bW any of the Conropaaati s thdrotryy as fully slat to Tito same extent as if suclgi ttonds vwaro'signed by life Presidanf, sealed veldt flee r�strprlraT e ti�iprlerr 0 Said 0 i tl�nneyN nand Ido�u d� dan�l h secretary, � hereb ollgt icrog and confirming,all Chet the said Aklorne�l(s) Itro Fpct t �v dp let p Y y rasofullon,•ad ted b Cites Beard of Directors of eachh of the WE TFIELD TNSURAN�COMPAMY,'4VESTFIELD I+lA1IONAt tlNS4tRANCi'CONtPA�IY-and t�iilCl F RMEI1� INSURANCE CCIIwtPAhlY, -Be tt rfesoIV that Cho Pfoslcteatt any Senior Executive, any Secretary, or any Fidelity to Surely Operations ecutive or other Executive Shalt fro and Is here yvested rrilh fuli powwer and authority to appolill any one or: more suitable persons as Altorney(S �In-Fact to represent and act for attd on ttelwalf of the Company Sett"ect to tf foitraWl provlste+nsr Thaw Altornayln-AW, may be g ven full power ar , auuiolrity,for' and In the name orand,on, behalf of the Curnpany, to execute, acknowledge and deliver, any and all hands, recognizonces, cortTractf, agreom"enTs of indomni end other conditl6nal or obligatory undertakings and any and all notkes said d0cutnents oaatcaltng or terminating t ,, Ccr "s, tiattlllly: t o of •and any such. Instruments sea executed by Av such Attrrraatrµrn»Feet shau be as Ilinding upaMt'the Company es�iftsignod lay ilse Prosrrfs nt and sealed and atteSlecl by tiro Co to Secretary^ lea t Furtfaar Resoll,r/, that Cho si atatae'of arty surit dostgrtat parsoft apd the aal,ot lbw Compaq hereto%r or harealter a?iixed to any power of attorne�r ctr stnY oertlricate re�atln lhea;o by facsitniNe, ar+d a power of attorney or +cortll'idsate�earing f�mlNe sitjraatures"or facslla�lNe semi sltaNf be laalid °aaRf hlrclinp upon.lNtaa onsh(rafty +wrdt rospe+ct to an�rbond or undertaking ttr' wwttictl It iwattaclted. (Each adopted at a meeting hold `on Fabru tf; 21It10)^ fin tYtfrrass �aa� WESTFIELO INSUI2rtNCE COMP ANY, itwESfFIELD NATIONAL INSUMNCE COMPANY and OHIO FARMERS INSURANCE COItPANY have caused these presents la tto signed fay daeir National Surety Leader and Senior Executive and their corporate seals to be harato atfgxed this gard�da�py� of MAY A D ?Ail . Yw�ir alcYn MA y 0.;1 AM6 N d! i ; .,.+0NA1 a r � RA WESTFIELD INSURANCE COMPANY Vials q w w ,w WESTFIELD NATIONAL. INSURANCE COMPANY' hx p + a •,O%Il'FARMERS INSURANCE COMPANY Owl State or Ohio +w,a"^""'"'" be this P. , Baus, National, SLtrety Leader and County of Wdina ss:; Senior Exectative, On this 011yd 'clay of MAY A.D., 2017 , before me pMorially,e nrae,Elenpis P. Bails"to mo- known, -who, being by me dttly sw6fri.Ald do se.apd soyT, that hm resides in Wooster,•f�Itlol tlial`he Is-Naticl6aI,Su iatyy Leadtrr anti Senior Exetctttive of WESTFIEID INSURANCE Choy ware NY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO, FARMER t SURANGE ,COMPANY, the "companies described In and which C MPA executed The abow'e lnstrunnent; .that I , Wiomrs.ttae seals or sold It santes, that fit ;sEpts, sllixdcl to Bald InstrurnonL are soot corporate seats: Lhat ere so affixed by ord r'of the Boards of Directors of SaW' Offipa hies. arnd.that he signed his name thereto by like order. Notarial wv�+ Scar It"�t A II- ,, Affixed • David A, Itotr ik, Attorney at Law, State or dhio wa " �o My t 'ormnlsslon Bees Not ExpIrpe+c (S, 147,90hio Revised Code) County of Medina ss.: e o IF 1, Frank A. Corrine, Secretary or WESTFIELD INSURANCE. COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do' hereby certify, that the above and' foregoing Il a true and correct coy of a Power or Attorney, executed by said con anies, w hich is dill in full force and effect, and furthermore the resolutions of the Boards of Directors, ,set out in Ciao Pourer of Attorney are In full Iorco and effI!4 In lNltn[es ivliireaf I have hereunto set my hand and affixed act eeafs of sold Companies at Wesifi'old Center, Ohio, Oils '30th day, of October 6 2018 - �y+N,aNaNNaaa,�� -1 4x,�,Stltt,p � .Ott wL wr � 1. +'.:+ LB ' Frank A. Carrino, Secretary. y a'a„a,»aa�' 0-0 BPOAC2 (combined) (06.02) Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: Allegius Credit Union Interior Renovations @ MPA Architects $ 241,000 2014 Burns Harbor South Bend, IN Burns Harbor, IN American Renolit Calendar # 35 Renovation Frost Engineering & $ 1,302,000 2018 La Porte, IN Consulting Mishawaka, IN Appletree Ventures, LLC Storage & Truck Wash Addition Valparaiso, IN Axelberg Wisconsin aka General New Plant and Office Sheet Metal Works South Bend, IN Larson -Danielson Construction Co., Inc. La Porte, IN InterActive Studio Grand Rapids, MI $ 4,215,000 2018 $ 15,580,000 2018 Axelberg Wisconsin, LLC Park Infrastructure Danch, Harrier & $ 1,500,000 2016 South Bend, IN Associates South Bend, IN B & B Manufacturing New Plant Office Larson -Danielson $ 3,700,000 2016 La Porte, IN Construction Co., Inc. La Porte, IN B & C Featherbone, LLC Expansion of Journeyman DkGr, LLC $ 2,115,000 2016 Distillery Indianapolis, IN Three Oaks, MI Balfour Beatty Construction New Children's Hospital Zimmer, Gunsul, Frasca $ 794,000 2018 BP 8A & 6B Portland, OR South Bend, IN Barton Malow Company Campus Crossroads The S/L/A/M $ 680,000 2017 Isolation Mats Collaborative Remington, IN Glastonbury, CT Barton Malow Company UND CC BP8B-18 East, The S/L/A/M Collaborative $ 2,007,000 2018 West & South Gen. Trades Glastonbury, CT Notre Dame, IN Barton Malow Company UND CC South Building The S/L/A/M Collaborative $ 2,800,000 2018 BP 9C — 19 Glastonbury, CT Notre Dame, IN Barton Malow Company UND CC BP 13 Millwork The S/L/A/M So L4 Wood Ceiling Collaborative $ 127,000 2017 Notre Dame, IN Glastonbury, CT Barton Malow Company UND BP 14 Stadium Integrated Design $ 1,125,000 2016 Winterization Solutions Norte Dame, IN Troy, MI \\Idt630\storage\Filing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 1 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: Beacon Health System Concrete/Masonry @ Zimmer, Gunsul, Frasca $ 1,490,000 2017 Memorial South Bend Portland, OR Energy Center Expansion South Bend, IN Blue Chip Casino, LLC Natural Gas Conversion Falk PLI Engineering $ 950,000 2015 Michigan City, IN & Surveying Portage, IN Blue Chip Surgical Partners Center for Minimally Boulder Architects $ 2,266,000 2014 Invasive Surgery Boulder, CO Munster, IN Boeing Company Floor Tile Replacement Not Applicable $ 524,000 2014 Project Chicago, IL Boeing Company Millwork Project Not Applicable $ 834,000 2014 Chicago, IL Boeing Company Restroom Partition Project Not Applicable $ 172,000 2014 Chicago, IL Boeing Company Restroom Upgrades 22nd, Panto-Ulema $ 332,000 2015 23rd & 24th Floors Chicago, IL Chicago, I,L CBRE, Inc. c/o Boeing Company Curtain Wall Modification Klein & Hoffman, Inc. $ 993,000 2015 Chicago, IL Chicago, IL CBRE, Inc. c/o Boeing Company Modifications to 1st & Klein & Hoffman, Inc. $ 245,000 2014 16th Floor Restrooms Chicago, IL Chicago, IL CBRE, Inc. Fifth Third Bank 2"d Floor Earles Architects & $ 185,000 2015 Renovations Associates Valparaiso, IN Schererville, IN Carisse Corns, Dr. Growing Smiles New Larson -Danielson $ 228,000 2014 Dental Office Construction Co., Inc. Valparaiso, IN La Porte, IN Carmeuse North America Silo Foundation Enspect, Inc. $ 825,000 2016 Gary, IN Merrillville, IN Carmeuse North America Alt Fuel,Metal Buildings Enspect, Inc, $ 280,000 2016 Gary, IN I Merrillville., IN Carmeuse North America Equipment Foundations L B & W Engineering $ 400,000 2016 Portage, IN Allentown, PA \\Idt630\storage\Fi1ing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 2 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: Carmeuse North America Lime Terminal Foundations Enspect, Inc. $ 1,820,000 2016 Buffington Harbor Merrillville, IN Gary, IN Carmeuse North America Kiln Concrete at Enspect, Inc. $ 650,000 2014 Buffington Harbor Merrillville, IN Gary, IN Carmeuse North America Slab on Grade Enspect, Inc. $ 690,000 2014 Gary, IN Merrillville, IN Chesterton, Town of Thomas Park Remodel James F Giannini & $ 260,000 2019 Chesterton, IN Associates Chesterton, IN City of Hobart Redevelopment Festival Park Gateway Ratio Architects $ 565,500 2014 Commissioners Phase I Indianapolis, IN Hobart, IN City of La Porte City Hall Renovation The Troyer Group, Inc. $ 1,120,000 2014 La Porte, IN Mishawaka, IN Come About, Inc. Redamak's Remodel Spalding Design Group $ 740,000 2018 (dba Redamak's) New Buffalo, MI Mishawaka, IN Community Foundation of SMMC Delivery Suite Shive Flattery $ 1,935,000 2018 Northwest Indiana Remodel Valparaiso, IN Hobart, IN Community Foundation of SCH Administration Carras-Szany-Kuhn $ 480,000 2015 Northwest Indiana Remodel/Addition Associates East Chicago, IN Schererville, IN Community Foundation of TCH-MRI Suite Renovation VOA Associates, Inc. $ 581,400 2015 Northwest Indiana Phase I Highland, IN Munster, IN Crown Point Community CPCSC-Multi-District Schmidt Associates $ 1,033,000 2018 School Corporation Projects Indianapolis, IN Crown Point, IN Crown Point Community CPCSC District Wide Carras-Szany-Kuhl $ 600,000 2014 School Corporation Security Upgrades Schererville, IN Crown Point, IN Cross Pointe Christian Church Building Additions Larson -Danielson $ 332,000 2016 Valparaiso, IN Construction Co., Inc. Valparaiso, IN Culver Academies Flag Pole Plaza Larson -Danielson $ 195,000 2017 Culver, IN Construction Co., Inc. La Porte, IN \\Idt630\storage\Fi1ing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I- 40.docx 4/11/19 3 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: D.A. Dodd, Inc. HVAC Improvements @ Odle, McGuire Shook $ 250,000 2015 Boston Middle School Architects La Porte, IN Indianapolis, IN D.A. Dodd, Inc. HVAC Improvements @ Odle, McGuire Shook $ 272,000 2015 Kesling Middle School Architect La Porte, IN Indianapolis, IN East Chicago, City of New Community Center Short Elliott Henderickson $ 2,505,000 2018 Site Package # 1 Appleton, WI East Chicago, IN East Chicago, City of Eastern Pulaski Community School Corporation Eastern Pulaski Community School Corporation Elkhart General Hospital Elkhart General Hospital First Source Bank New Community Center Site Package # 2 East Chicago, IN Eastern Pulaski Elementary School Winamac, IN Bid Package # 1 Winamac Community Middle & High Schools Winamac, IN West Wing Vertical Expansion Elkhart, IN Tenant Improvement at West Wing Vertical Expansion Elkhart, IN New Branch Bank Valparaiso, IN Short Elliott Henderickson $ 2,700,000 2019 Appleton, WI Gibraltar Design Indianapolis, IN Gibraltar Design Indianapolis, IN Anderson Mikos Architects Oak Brook, IL Anderson Mikos Architects Oak Brook, IL Hebard & Hebard Architects South Bend, IN First Source Bank New Banking Center Hebard & Hebard North Calumet Architects Valparaiso, IN South Bend, IN First Source Bank New Warsaw Branch Bank Hebard & Hebard Warsaw, IN Architects South Bend, IN G.E. Marshall, Inc. Site Concrete @ Howmet Not Applicable La Porte, IN GP1, LLC I_TA Classroom Facility GPD Group Kingsbury, IN Marion, IN $ 4,065,000 2017 $ 2,700,000 2017 $ 5,700,000 2016 $ 1,705,000 2016 $ 1,370,000 2015 $ 1,222,000 2017 $ 2,864,000 2017 $ 415,000 2015 $ 503,000 2017 \\Idt630\storage\Filing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 4 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: HMS Host Food Service Fit -Out Work Environetics Group $ 2,323,000 2018 3N Wilbur Shaw Service Architects Area and 3S Knute Rockne Englewood Cliffs, NJ Service Area Rolling Prairie, IN HMS Host Food Service Fit -Out Work Environetics Group $ 740,000 2017 7N Ernie Pyle Architect's P.C. Howe, IN Englewood Cliffs, NJ HMS Host Food Service Fit -Out Work Environetics Group $ 740,000 2017 7S Gene Stratton Architect's P.C. Howe, IN Englewood Cliffs, NJ Hagerman, Inc. VU Campus Ministries Nagle Hartray $ 568,900 2015 Building Chicago, IL Valparaiso, IN Hagerman, Inc. VU Sorority Housing Design Collaborative $ 886,000 2016 Valparaiso, IN Fort Wayne, IN Hagerman, Inc. VU Track and, Field and DLZ Architects $ 232,800 2014 Storage Shed Hammond, IN Valparaiso, IN Hammond Group, Inc. Hammond Expanders Larson -Danielson $ 1,066,000 2016 Renovations Construction Co, Inc. Hammond, IN La Porte, IN Hammond Redevelopment Hammond Sports Complex American StructurePoint $ 1,075,000 2018 Commission Hammond, IN Indianapolis, IN Harbor Automotive Group, Inc. Harbor Portage Reimage Larson -Danielson $ 450,000 2015 Michigan City, IN Construction Co., Inc. La Porte, IN Haverstock Funeral Home Phase II Remodel Behrens Design & $ 156,000 2015 La Porte, IN Development Waite Park, MN HealthLinc Clinic,Renovation Larson -Danielson $ 2,685,000 2018 Mishawaka, IN Construction Co., Inc. La Porte, IN HealthLinc Knox Clinic Buildout Larson -Danielson $ 375,000 2015 Knox, IN Construction Co., Inc. La Porte, IN Highland, School Town of Highland HS/MS Athletic Gibraltar Design $ 203,500 2018 Improvements Indianapolis, IN Highland, IN \\Idt630\storage\Fi1ing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 5 of 15 Larson -Danielson Construction Company — project Experience List Client: Project: Architect: Value: Comp: Highland, School Town of Johnston/Southridge Gibraltar Design $ 605,000 2018 Elementary 2017 Indianapolis, IN Improvements Highland, IN Highland, School Town of Merkley & Warren Gibraltar Design $ 1,220,500 2018 Elementary Schools Indianapolis, IN Highland, IN Hobart, School City of Hobart Middle School Gibraltar Design $ 1,660,000 2018 Cafeteria/Kitchen Addition Indianapolis, IN Hobart, IN Horizon Bank Horizon Bank Pine Haas Associates $ 182,000 2017 Street Parking Facility Michigan City, IN Michigan City, IN Howmet Corp (ALCOA) Additional Work Items Not Applicable $ 127,000 2016 La Porte, IN Howmet Corp (ALCOA) Howmet Casting Plant 2 Larson -Danielson $ 19,548,000 2016 La Porte, IN Construction Co., Inc. La Porte, IN Howmet Corp (ALCOA) Tank; Pads & Platform Not Applicable $ 120,000 2016 La Porte, IN IBEW Local 153 Exterior Building. KIL Architects $ 503,000 2018 Improvements , South Bend, IN South Bend, IN ITR Concessions Company, Inc. Travel PlazasReplacement Environetics Group $ 13,895,000 2018 3N Wilbur Shaw Service Architects Area at MP 56 Englewood Cliffs, NJ 3S Knute Rockne Service Area at MP 56 Rolling Prairie, IN ITR Concessions Company, Inc. Travel Plazas Mile Environetics Group $ 12,187,000 2017 Post 126 @ Howe Architects Howe, IN Englewood Cliffs, NJ IU Health La Porte Hospital Cooling Tower/ Moake Park Group, Inc. $ 540,000 2015 Connector Link Fort Wayne, IN La Porte, IN IU Health Starke Hospital Starke Rural Health MKM Architecture & $ 472,000 2015 Clinic Design Knox, IN Fort Wayne, IN Izaak Walton League Concrete Foundations Stutler Architects $ 160,000 2018 Portage, IN Portage, IN \\Idt630\storage\Filing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 6 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: J.G. Bowers Starbucks Merrillville Expressive Architecture $ 830,000 2017 Building Shell Southfield, MI Merrillville, IN KJSR R/E, LLC New Smart Toyota Larson -Danielson $ 8,490,000 2015 Dealership Construction Co., Inc. Davenport, IA La Porte, IN Kabelin Ace Hardware Fire Restoration Granger Not Applicable $ 790,000 2016 Kabelin Ace Hardware Granger, IN Kankakee Valley School 2015 Addition & Interior Hebard & Hebard $ 1,300,000 2016 Corporation Renovation @ Demotte Architects Elementary School South Bend, IN Demotte, IN Kankakee Valley School Storm Shelter Hebard & Hebard $ 307,100 2014 Corporation Improvements Architects Wheatfield, IN South Bend, IN Kiewit Energy St. Joe Energy Center Kiewit Energy $ 2,915,000 2018 New Carlisle, IN New Carlisle, IN Lake Central School Corporation Additions/Renovations Schmidt Associates $ 36,315,000 2016 to Lake Central HS Indianapolis, IN St. John, IN Lake Central School Corporation BP #3 Prots_man Schmidt Associates $ 11,065,000 2015 Elementary Indianapolis, IN St. John; IN. Lake County Board of Superior Court Parking Lot Larson -Danielson $ 244,000 2014 Commissioners Gary, IN Construction Co., Inc. La Porte, IN La Porte, City of Beechwood Renovation RQAW Corporation $ 540,000 2018 La Porte, IN La Porte, IN La Porte, City of New Street Department Global Engineering & $ 1,278,000 2016 Facility Land Surveying La Porte, IN Michigan City, IN La Porte, City of Plaza 618 , Arkos Design $ 270,000 2016 La Porte, IN Mishawaka, IN La Porte Community School 2016 Boston & Kesling Odle, McGuire Shook $ 3,300,000 2017 Corporation Schools Architects La Porte, IN Indianapolis, IN La Porte Community School Improvements to Kiwanis Odle, McGuire Shook $ 1,240,000 2014 Corporation Field Architects La Porte, IN Indianapolis, IN \\Idt630\storage\Fi1ing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 7 of 15 Larson -Danielson Construction Company —Project Experience List Client: Project: Architect: Value: Com La Porte -Community School LP CAC & Administration Odle, McGuire Shook $ 1,940,000 2014 Corporation Parking Lot Addition Architects La Porte, IN Indianapolis, IN La Porte Community School LPHS Performing Arts Schmidt Associates $ 636,485 2018 Corporation Center Indianapolis, IN La Porte County Board of Commissioners La Porte County Board of Commissioners La Porte County Board of Commissioners La Porte County Board of Commissioners La Porte County Board of Commissioners La Porte County Public Library La Porte County Public Library La Porte Property 5 LLC La Porte Urban Enterprise Liberty Township Lighthouse Place Premium Outlets La Porte, IN La Porte County Repair of Bridges 84, 86 & 129 La Porte County CR 1000N Bridge Replacement La Porte, IN La Porte County Repair Bridges 97, 104 & 236 La Porte, IN La Porte. County EMS Building La Porte, IN Stevens Treatment Center Addition La Porte, IN Multi -Branch Project La Porte, IN Site Development @ Coolspring Michigan City, IN Culver's Restaurant La Porte, IN JPR Jones Petrie $ 478,000 2016 Rafinski Elkhart, IN Lawson -Fisher Associates $ 50,000 2015 South Bend, IN JPR-Jones, Petrie, $ 350,000 2015 Rafinski South Bend, IN Gerometta & Kinel $ 828,000 2015 Chesterton, IN R.L. Brown Construction $ 430,000 2014 La Porte, IN D MKM Architecture & Design Fort Wayne, IN Larson -Danielson Construction Co., Inc. La Porte, IN Vanilla Box. Remodel Not Applicable pemo & Carpentry La Porte, IN Steel Erection -EMS Facility Pyramid Architecture/ North Liberty, IN Engineering Indianapolis, IN Lighthouse, Place Info Rohn & Associates Center Cedar Lake, IN Michigan City, IN $ 400,000 2017 T & M Work 2017 $ 1,565,000 2016 $ 173,000 2018 $ 123,000 2016 $ 400,000 2015 \\Idt630\storage\Fi1ing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I 40.docx 4/11/19 8 of 15 Larson -Danielson Construction Company — project Experience List Client: Project: Architect: Value: Comp: Lutheran University Associates VU Softball/Tennis/ Larson -Danielson $ 495,000 2015 dba Valparaiso University Locker Rooms & Pavilion Construction Co, Inc. Valparaiso, IN La Porte, IN MAAC Foundation Building Addition Larson -Danielson $ 685,000 2017 Valparaiso, IN Construction Co., Inc. La Porte, IN MAAC Foundation Fire Training Facility Larson -Danielson $ 395,000 2017 Renovation Construction Co., Inc. Valparaiso, IN La Porte, IN MSD of Boone Township Hebron Middle School Fanning/Howey Assoc. $ 190,000 2018 Improvements Indianapolis, IN Hebron, IN Marcus Construction Rail Receiving Foundations Negen Architects $ 2,700,000 2016 at Hammond Potash Cold Spring, MN Hammond, IN Maverick Real Estate, LLC Maverick Trucking & Short, Elliot, Hendrickson $ 4,500,000 2016 Service Munster, IN Portage, IN Meijer, Inc. Meijer Valparaiso # 297 Progressive AE $ 2,099,900 2018 Valparaiso, IN Grand Rapids, MI Meijer, Inc. Maintenance Agreements Not Applicable T & M Work 2018 Various Locations (East) Stores # 120, 121, 127 & 128 Meijer, Inc. Maintenance Agreements Not Applicable T & M Work 2018 Various Locations (West) Store # 149, 165, 170 & 266 Meijer, Inc. Meijer. # 152 Whitestown Bergmann Associates $ 1,620,000 2014 c/o Rockford Construction Co. Zionsville, IN East Lansing, MI Memorial Hospital and 58 Bldg. 7E Bed Tower Creative Design Systems $ 854,000 2014 Health Systems Conversion South Bend, IN South Bend, I_N Merrillville Fire Department Administration Building Carras-Szany-Kuhn $ 525,000 2017 Project Schererville, IN Merrillville, IN Methodist Hospital CT Scan — Southlake VOA Associates, Inc. $ 352,000 2016 Merrillville, IN Chicago, IL Methodist Hospital Sprinkler Compliance VOA Associates, Inc. $ 4,090,000 2016 Projects -South lake and Chicago, IL Northlake Campuses Merrillville & Gary, IN \\Idt630\storage\Filing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 9 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: Michigan City, City of Cleveland Park Global Engineering & $ 286,000 2017 Redevelopment Land Surveying Michigan City, IN Michigan City, IN Michigan City, City of Michigan City Police American $ 10,060,000 2017 Station StructurePoint, Inc. Michigan City, IN Indianapolis, IN Michigan City Public Library Interior Remodel (CMC) Product Architecture & T & M 2018 Michigan City, IN Design Chicago, IL Miller -Davis Company UND — North Dining Hall Tower Pinkster $ 1,015,000 2017 Remodel Kalamazoo, MI Notre Dame, IN Mishawaka, City of Battell Park DLZ Indiana, Inc. $ 150,000 2018 Rosemary's Garden South Bend, IN Mishawaka, IN. Mishawaka, School City of Irion's Strength & Schmidt Associates $ 450,700 2018 Conditioning Center Indianapolis, IN Mishawaka, IN Monosol, LLC Civil Work for Drop Lot & Palm & Associates $ 615,000 2016 Access Road New Carlisle, IN La. Porte, IN Mortenson Construction Concrete .Package for FGM Architects, Inc. $ 1,565,000 2014 Valparaiso University Chicago, IL Valparaiso, IN Mortenson Construction VUSH Carpentry/ FGM Architects, Inc. $ 368,000 2014 Millwork @ VU Chicago, IL Valparaiso, IN Neo Industries (Indiana) Trench & Platform Not Applicable $ 105,000 2015 Portage, IN New York Blower Company Lab Expansion & Larson -Danielson $ 1,134,000 2014 Modernization Construction Co., Inc. La Porte, IN La Porte, IN North Liberty Township EMS Building Foundations Pyramid Architecture/ $ 154,000 2016 North Liberty, IN Engineering Indianapolis, IN North Township Trustee Wicker Memorial Park Hutton and Hutton $ 280,000 2017 Ridge Road i Fence Architect & Engineering Highland, IN Hammond, IN \\Idt630\storage\Fi1ing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 10 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: Northern Indiana Commuter Dune Park Remodel 2017 DLZ Indiana, Inc. $ 400,000 2018 Transportation District Chesterton, IN South Bend, IN Northern Indiana Commuter Michigan City DLZ Indiana $ 1,800,000 2017 Transportation District Maintenance Building Infill South Bend, IN Michigan City, IN Northern Indiana Commuter NICTD Dune Park Station/ Gerometta & Kinel $ 223,000 2016 Transportation District Office Summer 2015 Architects Renovation Chesterton, IN Chesterton, IN Northern Indiana Commuter Dune Park High Level URS $ 2,730,000 2014 Transportation District Platform Chicago, IL Chesterton, IN Northern Indiana Commuter East Chicago Stairs Larson -Danielson $ 140,000 2015 Transportation District East Chicago, IN Construction Co., Inc. La Porte, IN OpCen Centier IT Suite — Balance Architectural $ 1,092,000 2018 Addition & Renovations Studio Merrillville, IN South Bend, IN Performance Services Oaklawn & Meadowlawn Performance Services $ 332,300 2017 ElementarySchool Indianapolis, IN Renovations . Monticello, IN ; Performance Services Additions &Remodeling Performance Services $ 350,000 2017 to Rolling Prairie, Olive & Indianapolis, IN Prairie View Elementary Schools New Carlisle & Rolling Prairie, IN Performance Services General Trades & Concrete Performance Services $ 398,000 2016 Package for Misc. Reno @ Indianapolis, IN South Central HS Union Mills, IN Peoples Bank New Highland Branch Robert Priesol $ 826,000 2017 Highland, IN, Whiting, IN Pepper Construction UND-Nieuwland Hall BSA LifeStructure $ 320,300 2017 Notre Dame, IN Indianapolis, IN Portage Township Schools Interior Remodel @ Gerometta & Kinel $ 258,000 2014 Jones Elementary Chesterton, IN Portage, IN \\Idt630\storage\Filing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I 40.docx 4/11/19 11 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project: Architect: Value: Comp: Portage Township Schools Porter County Board of Commissioners West Renovations at High School Portage, IN Alliance Architects South Bend, IN Larson -Danielson Construction Co., Inc. La Porte, IN Porter Regional Hospital VOC - New Open MRI Design Organization $ 395,000 Valparaiso, IN Valparaiso, IN Porter Township School Corporation Purdue University Purdue University QSR Properties, LLC Reith-Riley Construction New Animal Shelter Valparaiso, IN $ 6,875,000 2018 $ 2,728,000 2017 2014 Porter Lakes Elementary Schmidt Associates $ 2,200,000 2017 Additions & Renovations Indianapolis, IN Hebron, IN Biochemistry Greenhouse MPA Architects $ Lafayette, IN South Bend, IN HGRH Mist Greenhouse MPA Architects $ Replacement South Bend, IN West Lafayette, IN Starbucks Coffee DXU Architects $ La Porte; IN. Chicago; IL Michigan City 11th Street Global Engineering & $ Rehabilitation Land Surveying Michigan City, IN Michigan City, IN 250,000 2014 479,000 2016 861,700 2017 71,500 2016 Sacred Heart Catholic Church Activity Center Addition Dh2W Architects $ 1,140,000 2014 La Porte, IN: Michigan City, IN Shopone Centers Reit 011ie's Fit Out Hershman Architects Inc. $ 895,000 2018 dba DFG La Porte LaPorte, IN Cleveland, ON St. Mary's College Outdoor Athletic Complex The Collaborative, Inc. $ 2,502,000 2016 Notre Dame, IN Toledo, OH St. Joseph Co. Board of PSAP Consolidated Project DLZ Indiana, LLC $ 435,000 2015 Commissioners BP#1 SB Police Dept. HQ South Bend, IN South Bend; IN - St. Joseph Regional Medical CDU Patient Holding VOA Associates, Inc. $ 814,000 2016 Center Mishawaka, IN Highland, IN Serra Works of Schererville, LLC Additions/Renovations Tricarico Architect & $ 2,905,000 2017 BMW Schererville & Design Parking Lot Expansion Wayne, NJ Schererville, IN Share Foundation New Senior Center James F. Giannini & $ 625,000 2017 La Porte, IN Associates Chesterton, IN \\Idt630\storage\Fi1ing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 12 of 15 Larson-Danidson Construction Company — project Experience Lust Client: Project: Architect: Value: Comp: Shree Siddhivinayak, LLC Dunkin Donuts Jeffery A. Scott $ 805,000 2015 La Porte, IN Architects Farmington, MI Space Center, Inc. Build Out for Plastic Larson -Danielson $ 150,000 2015 Packaging Construction Co., Inc. La Porte, IN La Porte, IN Sunoco, Inc. Building Fit -Out Cornerstone Consulting $ 834,500 2018 3N and 3S Allentown, PA Rolling Prairie, IN Sunoco, Inc. New Building @ Cornerstone Consulting $ 4,656,000 2018 Elkhart Toll Plazas Allentown, PA Elkhart, IN Sunoco, Inc. Building Fit -Out Cornerstone Consulting $ 302,000 2017 Howe, IN @ 7N Allentown, PA Sunoco, Inc. Building Fit -Out Cornerstone Consulting $ 302,000 2017 Howe, IN @ 7S Allentown, PA Susser Petroleum Sunoco ITR Project Cornerstone Consulting $ 5,114,000 2017 Property Co., LLC North and South Plaza's Engineers Portage, IN Allentown, PA Swanson Center New Facility, Renovation Gerometta & Kinel $ 1,960,000 2015 Michigan,City, IN Chesterton, IN Task Force Tips New Mezzanine Larson -Danielson $ 155,000 2018 Valparaiso, IN Construction Co., Inc. La Porte, IN Task Force Tips New Loading Dock Canopy Larson -Danielson $ 141,500 2015 Valparaiso, IN Construction Co., Inc. La Porte, IN Town of Highland Public Safety Facility BP#2 Wilson Estes Police $ 3,552,000 2016 Highland, IN Architects Kansas City, MO Tri-County School Building Tri-County Intermediate Gibraltar Design $ 892,000 2017 Corporation School 2016 Improvements Indianapolis, IN Wolcott, IN Tyco Integrated Security LP Schools Security Odle, McGuire Shook $ 125,000 2016 Access Controls Architects La Porte, IN Indianapolis, IN University of Notre Dame Ash Silo Foundation Karges-Fa u Icon bridge $ 138,000 2015 Notre Dame, IN St. Paul, MN \\Idt630\storage\Filing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 13 of 15 Larson -Danielson Construction Company — Project Experience List Client: Project; Architect: Value: comp: University of Notre Dame Additions & Renovations Arkos Design, $ 1,389,000 2018 to Badin Hall Mishawaka, IN General Trades Notre Dame, IN University of Notre Dame Brownson Hall Stair DLZ Indiana $ 93,000 2014 Improvements South Bend, IN Notre Dame, IN University of Notre Dame Cooling Tower 6 & 7 Karges-Faulconbridge $ 1,075,000 2017 Replacement St. Paul, MN Notre Dame, IN University of Notre Dame DeBartolo Center Alliance Architects $ 105,000 2014 Barrier Removal South Bend, IN Notre Dame, IN University of Notre Dame Flanner Hall Elevator Arkos Design $ 72,000 2016 Renovation, . Mishawaka, IN Notre Dame, IN University of Notre Dame Grace Hall Elevator Arkos Design $ 72,000 2017 Notre Dame; -IN Mishawaka, IN University of Notre Dame Giovanini Commons & Alliance Architects $ 1,085,000 2018 Stayer Center South Bend, IN Notre Dame, IN University of Notre Dame Hesb,urgh Library North Arkos Design $ 280,000 2016 Entrance Plaza & Quad Mishawaka, IN Notre Dame, IN University of Notre Dame Landscape Service Building Alliance Architects $ 272,000 2018 Interior Renovation South Bend, IN Notre Dame, IN University of Notre Dame Landscape Service Larson -Danielson $ 106,000 2017 Storage Building Construction Co, Inc. Notre Dame, IN La Porte, IN University of Notre Dame Morris Inn Interior Alliance Architects $ 374,000 2015 Renovations South Bend, IN Notre Dame, IN University of Notre Dame Residence Halls Railing Arkos Architects $ 192,000 2014 Improvements Mishawaka, IN Notre Dame, IN University of Notre Dame Ricci Field Support Then Design Architecture $ 685,000 2018 Building Willoughby, OH Notre Dame, IN \\Idt630\storage\Fi1ing System\Office\Policies & Procedures\LD company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 14 of 15 Lp rson- Danielson ConstructionCompany — Project Experience List Client: Project: Architect: Value: Comp: Valparaiso Community Schools Additions and Renovations Gibraltar Design $ 4,415,000 2018 To Memorial Elementary Indianapolis, IN School Valparaiso, IN Valparaiso Community Schools Cooks Corner and Gibraltar Design $ 4,685,000 2018 Memorial Elementary Indianapolis, IN New Gym and Stage Valparaiso, IN Valparaiso Community Schools Porter County Career & Gibraltar Design $ 2,008,000 2018 Tech Center Indianapolis, IN Valparaiso, IN Valparaiso University Valparaiso University Valparaiso University Van Rensselaer School Corporation Von Tobel Lumber Company Wal-Mart Stores, Inc. West Talmer N7, LLC Whiting, City of Woodruff & Sons, Inc. ZTKL, LLC Campus Improvements Shive Hattery $ 1,098,000 2018 Phase I Bloomington, IL Valparaiso, IN VU Chapel/Kretzmann Abonmarche $ 259,500 2017 Sidewalk Access Project 2 Valparaiso, IN Valparaiso, IN VU Mueller Hall Renovation Moake Park Group $ 450,000 2016 Valparaiso, IN Fort Wayne, IN Renovations to Van Elementary & Gym HVAC at High, School Rensselaer, IN Emergency Structural Rebuild Schererville, IN Remodel Michigan City Store #-1487-213 Michigan City, IN New Medical Clinic North Judson, IN Sheridan Outdoor Plaza Phase 01 Whiting, IN Thomas Rose Industrial Park Signs La Porte, IN New Clinic Valparaiso, IN LWC, Inc. $ 560,200 2014 Richmond, IN Keeler -Webb Associates $ 306,000 2015 Carmel, IN Harrison, French & $ Associates Bentonville, AR MKM Architecture & Design Fort Wayne, IN Context & Design $ Fortville, IN Haas & Associates Michigan City, IN Larson -Danielson Construction Co., Inc. La Porte, IN 476,000 2016 $ 1,002,000 580,000 2016 $ 53,000 2016 $ 2,883,230 2014 \\Idt630\storage\Filing System\Office\Policies & Procedures\LD Company Procedure Manual\09 - Office Operations\Office Operation Forms\A305 Past 5 Years Project Experience List I_40.docx 4/11/19 15 of 15