Loading...
HomeMy WebLinkAboutReject Bids - Main St Wayne St Garage Improvements Project No 118-096RINTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Kyle Silveus SUBJECT: Main and Wayne Garage Improvements, Project 118-096R DATE: March 29, 2019 IN4'v%101fP�u�N �Pihuh ihluP�w UYpiPU�N9WfN: ilk;�lagry�ryvry000�96�Ofirr�'m�I....egaveV�vrv�mm.��v.mv�nr: vksmi Mm�m+NgIBIM4�XSOf�ON��O����!9&�WA.Wrwu!�wi I�;�1�NWON�t4... Po�ut�v�liY+MM�N�fiv�Mul�,ti�„�,Wfv�'m'NWs's�vb On February 121h, 2019, the Board of Public Works opened and read bids for the above project. There was one bidder for the project: The Division of Engineering has reviewed the bid and recommends that the Board reject the bid. The bid is more than the project budget. The project scope will be adjusted and re -advertised at a later date. Please call with your questions. Enclosure fimAc Of BID TABULATION Main St/Wayne St Garage Improvements Project No: 118-096R For Bids Due: 2/12/2019 BASE BID Majority Builders, Inc. Item No. Line Item Quantity Unit Unit Price Cost 1 Main St./Wayne St. Garage Improvements 1 LS $ 742,000.00 $ 742,000.00 Roofing Substrate/Structural Repair Allowance No. 1 To Cover Required Substrate and/or Structural Repairs Not Outlined in the Drawings and 2 Noted Specifications 1 LS $ 10,000.00 $ 10,000.00 BASE BID TOTAL $ 752,000.00 Alternates Majority Builders, Inc. Item No. Line Item Quantity Unit Unit Price Cost 1 Vestibule Replacement 1 LS $ 60,400.00 $ 60,400.00 2 Paint Vertical Concrete Elements Above Canopy Along Main Street 1 LS $ 97,800.00 $ 97,800.00 Replace Existing Under Canopy Lighting with New Surface Mounted LED 3 Downlights 1 LS $ 11,150.00 $ 11,150.00 New Facade Up Lighting to Illuminate the Entirety of the Vertical Columns 4 on Bath Main and Wayne Street Facades ...._ .... 1 LS $ 25,000.00 $ 25,000.00 Replace Existing Perimeter Parking Level Chain Link Fencing with 11 Cable 5 Barrier Cable System ............ 1 LS $ 152,500.00 $ 152,500.00 Remove Existing Street Level Storefront Windows That Do Not Occur in a Condition Space. Fill in Openings with Brick to Match Existing Pattern and 6 .. Size. New Brick to Receive Painted Finish. ...... 1 ......__._................ W_ LS $ 8,400.00 $ 8,400.00 Provide Lockable Ground Level Stair Tower Doors Controlled by Keycard 7 Locking System 1 LS $ 21,240.00 $ 21,240.00 8 Repair Cracked Conrete Curb Along Parking Garage on Main Street Side 1 LS $ $ 9 Repair the Existing South East Non -Operating Westinghouse Elevator 1 LS $ $ TOTAL $ 376,490.00 Majority Builders, Inc. Base Bid T€:tall $ 752,000.00 Alternates' Total $ 376,490.00 Base Bid + Alternates Total $ 1,129,490.00 Addendum No. 1 Y ....................... _. .................................................... !Bid Bond Y _._..... _..... .W�W Wu_ WBE/MBE Form Y Non -Collusion Affadavit Y ._ ......... Pre -Qualification Y I hereby certify that the above truly and accurately represents quotes received for this project on DATE Kyle Silveus, PE, Assistant City Engineer Page 1 of 1 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOI ITH BEND_ INDIANA 46601-1 830 x � 1865 CITY OF • BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLICXV01M,4�-- April 9, 2019 Rick Slagle Majority Builders, Inc. 62900 US 31 S. South Bend, IN 46614 PHONE 574/235-9251 FAX 574/235-9171 RE: Rejection of Bids — Main St./Wayne St. Garage Improvements — Project No. 118- 096R Dear Mr. Slagle: The Board of Public Works, at its meeting held on April 9, 2019, approved the rejection of all bids for the above referenced project due to exceeding the budget. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. Please call this office if you have further questions regarding this matter at (574) 235-9251. Sincerely, Linda M Martin, Clerk GARY A. GILOT GENEVIEVE E. MILLER ELIZABETH A. MARADIK LAURA L. O'SULLIVAN THERESE J. DORAU BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date March 29, 2019 Name K le Silveus Department . Engineering _...... y�....... _ ...................................... ._ BPW Date Aril 9, 2019 Phone Extension 9083 IVI'ANG! � NVIVNIMNNm .. � NNPMM .-. ....... ........... ...... _.—Required Prior to Submittal to Board Legal ❑ Attorney Name Controller Controller review is required for all Contracts $5,000.00 or more anc greater than one year in length per the City Purchasing Policy Purchasing Check the ❑ Agreement 0 Professional Services ❑ Bid Opening Quote Opening F-1 Change Order No. _ Ease/Encroach. Other: Bid llctio Company or Vendor Name New Vendor MBE/WBE Contractor Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of F] ropriate Item Type C3 Contract ❑ Resolution Bid Award ❑ Quote Award ❑ C/O &PCANo. _ 7 Traffic Control for All Submissions D Proposal ❑ Addendum ❑ Req. to Advertise ❑ Title Sheet ired Information ❑ PCA TBD Yes ❑ No ❑ If Yes, Approved by Purchasing MBE ❑ WBE Main St./Wayne St. Garage Improvements 118-096R .�.�.�.�.�.�.�.��_� _� ��.._.�..................._._ w.�. RWDA ...................... ................................................m. 3.�24_....................... _ ����_�_...�..........mm.. -1050-460-42.02 N/A _ Roof and other Misc. Repairs to the Existing Parking Garage Tower s, Canopy, and Facade ❑ Required Contractor's Certification Form Attached (Non - Collusion, Non-Discrim i nation, Non -Debarment, E-Verh, Iran, etc. _ Required For Chan e�0_rders Only . Increase $ Decrease $ Previous Amount Current Percent of Change: New Amount Total Percent of Change: Dispersal After Appr oval Copy Original El E ❑ F