Laserfiche WebLink
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME East Bank Sinkhole Repairs <br />PROJECT NO. 118-306A <br />QUOTES DUE April 9"'. 2019 <br />BASE BID <br />Section 1. East Bank Riverwalk Sinkhole Repair <br />Item Description Quantity Unit Unit Price Total Amount <br />No. <br />1-1 Mobilization and Demobilization 1 LS 2 845.00 2 845.00 <br />1-2 Clearing and Grubbing 1 LS 5. 515.00 <br />1-3 <br />Sidewalk, Remove <br />70 <br />SYS <br />20.00 <br />1,400.00 <br />1-4 <br />Curb, Remove <br />75 <br />LFT <br />15.00 <br />1,125.00 <br />1-5 <br />Curb Turnout, Remove <br />12 <br />LFT <br />25.070 <br />300.00 <br />1-6 <br />Common Excavation <br />5 <br />CYS <br />150.00 <br />L 750.00 <br />1-7 <br />Borrow <br />30 <br />CYS <br />40.00 <br />1,200.00 <br />ww.._ <br />1-8 <br />Compacted Aggregate No. 53 <br />10 <br />TON <br />150.00 <br />1,500.00 <br />1-9 <br />Concrete Sidewalk, 4 IN <br />70 <br />SYS <br />125.00 <br />8,750.00 <br />1-10 <br />Concrete Curb <br />75 <br />LFT <br />75.00 <br />5,625.00 <br />1-11 <br />Curb Turnout, Concrete <br />13 <br />LFT <br />136.QQ <br />...... <br />1-12 <br />Bench <br />2 <br />EA <br />2,790.00 <br />5,580.00 <br />1-13 <br />Wood Fence <br />75 <br />.......... _..... _ <br />LFT <br />175.00 <br />13,125.00 <br />1-14 <br />Topsoil <br />15 <br />CYS <br />100.00 <br />1,500.00 <br />1-15 <br />Erosion Control Blanket <br />60 <br />SYS <br />15.00 <br />900.00 <br />1-16 <br />Slope Stabilizing Seed Mixture <br />5 <br />LBS <br />75.00 <br />375.00 <br />1-17 <br />Sodding <br />40 <br />SYS <br />45.00 <br />1,800.00. <br />1-18 <br />Geotextiles for Riprap <br />2 <br />SYS <br />20.00 <br />40.00 <br />1-19 <br />Glacial Stone Riprap, Revetment <br />2.5 <br />TON <br />250.00 <br />625.00 <br />1-20 <br />Silt Fence <br />200 <br />LFT <br />5.70 <br />1,140.00 <br />BASE BID TOTAL <br />55, 863.00 <br />ALTERNATE #1: PLACE PLATE ON FAILED PORTION OF STRUCTURE AND BACKFILL <br />Item <br />No. <br />Description <br />Quantity <br />Unit Unit Price <br />Total Amount <br />Al-1 <br />Steel Plate, 1/2IN <br />1 <br />LS 1,865.00 <br />1,865.00 <br />A1-2 <br />Borrow <br />... _............ -. <br />90 <br />... <br />CYS 0 <br />............... <br />3,600.00 <br />A1-3 <br />Common Excavation <br />75 <br />CYS 25.00 <br />1,875 .00 <br />ALTERNATE #1 TOTAL <br />7 340.00 <br />Version 1 /17/2019 Page - 23 Public Works Quote <br />