Loading...
HomeMy WebLinkAboutOpening of Bids - Three Twenty at the Cascade Exterior Insulation and Finish System Project No 118-074B-R - Skyline Plastering IncCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK w. Project Name Three Twenty at the Cascade —Exterior Insulation and Finish System (E„I,F. ,) Project No. 118-074 B-R For Bids Due March 12, 2019 PART I (Must be completed for all bids. Please type or print) Date: t" Bidder Firm Address: City/State/Zi : " �.— t _..._, p Telephone Number:2,77 1 Agent of Bidder (if Applicable): _w Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: -� . " the City of South Bend, Indiana, in accordance with plans and specifications prepared by: �l and dated P �" ... w for the sum of (enter the Total Bid as shown on the Proposal) .. ^ t (Enter sum of Total Base Bid shown on P op .__.. (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown 94 separate attachment. By r (Signature) ��d e1 � 6V) (Printed Name at Person Signing) ACCEPTANCE The above bid is accepted this day of Subject to the following conditions., BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member Suzanna M. Fritzberg, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 7/20/2018 Contractor's Bid for Public Works - 2 `11 BID/PROPOSAL uw rzr`�s CITY OF SOUTH BEND Project Name: Three Twenty at the Cascade — Exterior Insulation and Finish System" Project Number: 118-074 B-R,a� d,w t F For Bids Due: March 12, 2019 Contractor Name: Li BASE BID Item No. Description Exterior Insulation and Finish System (E.I.F.S.) 1 Texture #1 (Accent Band at Level1 and Roof Parapet Wall 2 Texture #2 (Main Body at Levels 2-7) 3 Texture #3 (Horizontal Band at Floors and Band below Roof Parapet Walls) ALTERNATE #1 Item Description No. Exterior Insulation and Finish System E.I.F.S. Standard Plaster Finish Applied to 4 DensGlass Substrate at Entry Arch. Includes Finish Plaster on Concrete Base. Finish shall be Texture #1. ALTERNATE #2 Item Description No. Exterior Insulation and Finish System E.I.F.S.) Vertical Wave Pattern on Field -applied E.I.F.S. System. E.I.F.S. Finish is 5 Texture #4. Insulation shall be Shop -cut 3D Wave Pattern with 2" Deep Reveal. Finish is Field-aDDlied. Quantity Unit Unit Price 1 Lump 439.00 Sum 1 Lump Sum 1 Lump ' Sum BASE BID TOTAL Quantity 1 Unit Unit Price Total Amount Total Amount Lump a418. 00 �(tl,436-00) Sum ALTERNATE #1 TOTAL Quantity Unit Unit Price Total Amount 1 Lump 0+4 Sum r4onoo ALTERNATE #2 TOTAL Ua e 1001. GV Version 7/20/2018 Contractor's Bid for Public Works - 7 BID/PROPOSAIL k,CTIF�� CITY OF SOUTH BEND'` Three Twenty at the Cascade — Exterior Insulation and Finish System N Project Name: 10, E.LF.S.'A Project Number: 118-074 B-R� - For Bids Due: March 12, 2019 e Contractor Name: � ,. ILS . A Ci ALTERNATE #3 Item [Description Quantity Unit P CeTotal Amount xterior Insulation and Finish System E.I.F.S. Vertical Wave Pattern on Pre -fabricated Panels in Lieu of Field -applied E.I.F.S. Panels shall be Shop -cut 3D Wave 6 Pattern with 2" Deep Reveal. Finish is 1 Sump Applied on Shop -fabricated on Panels. Finished Panels are Installed in the Field as a Wall Panel System ALTERNATE #3 TOTAL Bidder (Firm): 69 Address: j.- City/State/Zip: Telephone Number:, } 1 /00 By (Signature) (Printed Name of Person Signing) Version 7/20/2018 Contractors Bid for Public Works - 8 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH H2AN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF 1L ) SS:. 4,"J COUNTY The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 7/20/2018 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 7/20/2018 Contractors Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 1/ day of &d , 201) Subscribed and sworn to before me this 11,11 My Commission ExpiresDhA/ 13 02 C� County of Residence 1T Cont r< r/Bidder (Firm) Si nature of Contractor/Bidder or Its Agent Printed NaUVId Title day of f ►''1 �.0 m o Publlle" V OFFICIAL SEAL RUDOLF ENGEL NOTARY PUBLIC, STATE OF IWNOIS My Commission Expires Jan. 13, 2020 Version 7/20/2018 Contractors Bid for Public Works - 6 Docum�ent A31OTM - 2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: (;'trine, legals/a/us and address) Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 OWNER: (Xame, legal slalres and address) City of South Bend 227 W. Jefferson Blvd, Suite 1316 South Bend, IN 46601 SURETY: (''nine, legals/a/us avid principal place of huviness) Old Republic Surety Company P. O. Box 1635 Milwaukee, WI 53201-1635 Malling Address for Notices 1411 Opus Place, Suite 450 Downers Grove, IL 60515 BOND AMOUNT: $ 5% Five Percent of Amount Bid PROJECT: (,Vance, locallon or address. and Project inunher, if aiti j This document has important legal consequences. Consultation with an attorney is encouraged with respect to Its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. EIFS Work Three Twenty at the Cascade, 320 E. Colfax Avenue at St. Joseph River, South Bend, IN 46617 - Project# 118-074-B-R The Contractor and Surety are bound to Ilia Owner in the amount set forth above, for ilia payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond arc such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the 1'rgiect and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perlimn the work covered by.said bid, then this obligation shall be null and void, otherwise to remain in lull lbrce and ellect. The Surely hereby %vaives any notice ol'un agreement between the Owner and Contractor to extend the line in which the Owner may accept the bid. Waiver ol'nutice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time liir acceptance ol'bids speciled in the bid documents, and the Owner and Contractor shall obtain the Surety's consent liir an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to n Contractor, the term Contractor in this Bond shall be dccmcd to be Subcontractor and ilia term Owner shall be dccmcd to be Contractor. When this Bond has been lurnished to comply with a statutory or other legal requirement in the location of the Project- any provision in this Bond conflicting with said statutory or legal requirenienl shall be deenied deleted herelFont and provisions coniimning to such statutory or other legal requirement shall be deenied incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a connnon law bond. Signed and scaled this 12th day of March, 2019 (li'llrr iA4 ra J k*v� (!f'inresa) Christina L. Garry Skyline Plastering, Inc. (P)irrclpal) (Seal) Old Republic Surety Compan ; OIIiORAT� o (Srrr e n9 rst«p SEAT !!!plGCI PEiVYO (7`llle Moore orney-in- ac �,,,w�` Isll-' / S-0054/AS 8/10 State of County of Illinios DuPa e SURETY ACKNOWLEDGEMENT (ATTORNEY -IN -FACT) I, Christina L. Garry Notary Public of DuPage County, in the State of Illinios , do hereby certify that James 1. Moore Attorney -in -Fact, of the Old Republic Surety Company who is personally known to me to be the same person whose name is subscribed to the foregoing instrument, appeared before me this day in person, and acknowledged that she signed, sealed and delivered said instrument, for and on behalf of the Old Republic Surety Company for the uses and purposes therein set forth. Given under my hand and notarial seal at my office in the City of Downers Grove in said County, this 12th day of March 1 2019 J) Notary Public Christina L. Garry My Commission expires: January5, 2021 °NOTARYpUav GARRy hty O �s P�� T� TTI ��c r1 { � N to 2o'?' * "LD REPUBLIC SURETY COMPANY *� POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That OLD REPUBLIC SURETY COMPANY, a Wisconsin stock Insurance corporation, does make, constitute and appoint: James I. Moore its true and lawful Attorney(s)-in-Fact, with full power and authority, not exceeding $50,000,000, for and on behalf of the company as surety, to execute and deliver and affix the seal of the company thereto (if a seal is required), bonds, undertakings, recognizances or other written obligations in the nature thereof, (other than ball bonds, bank depository bonds, mortgage deflclency bonds, mortgage guaranty bonds, guarantees of Installment paper and note guaranty bonds, self-insurance workers compensation bonds guaranteeing payment of benefits, asbestos abatement contract bonds, waste management bonds, hazardous waste remedlation bonds or black lung bonds), as follows: Execution Date: March 12, 2019 Surety Bond number: Bid Bond Principal: Skyline Plastering, Inc. Obligee: City of South Bend and to bind OLD REPUBLIC SURETY COMPANY thereby, and all of the acts of said Attorneys -in -Fact, pursuant to these presents, are ratified and confirmed. This appointment is made under and by authority of the board of directors at a special meeting held on February 18, 1982. This Power of Attorney is signed and sealed by facsimile under and by the authority of the following resolutions adopted by the board of directors of the OLD REPUBLIC SURETY COMPANY on February 18,1982. RESOLVED that, the president, any vice-president or assistant vice president, in conjunction with the secretary or any assistant secretary, may appoint attorneys -In -fact or agents with authority as defined or limited In the Instrument evtdencing the appointment in each case, for and on behalf of the company to execute and deliver and affix the seal of the company to bonds,: undertakings, recoginlzances, and suretyship obligations of all kinds: and said officers may remove any such attorney -in -fact or agent and revoke any Power of Attorney previously granted to such person. RESOLVED FURTHER, that any bond, undertaking, recognizance, or suretyship obligation shall be valid and binding upon the Company (i) when signed by the president, any vice president or assistant vice president, and attested and sealed (if a seal be required) by any secretary or assistant secretary; or (ii) when signed by the president, any vice president or assistant vice president, secretary or assistant secretary, and countersigned and sealed (if a seal be required) by a duly authorized attorney -in -fact or agent; or (iii) when duly executed and sealed (if a seal be required) by one or more attorneys -in -fact or agents pursuant to and within the limits of the authority evidenced by the Power of Attorney issued by the company to such person or persons. RESOLVED FURTHER that the signature of any authorized officer and the seal of the company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the company; and such signature and seat when so used shall have the same force and effect as though manually affixed. IN WITNESS WHEREOF, OLD REPUBLIC SURETY COMPANY has caused these presents to be signed by its proper officer, and its corporate seal to be affixed this 1 St day of October 2018 OLD REPUBLIC SURETY COMPANY rORPOR SEAL 0 nn Assistant Secretar STA E OF WISCONSIN, COUNTY OF WA`' * President UKESHA - SS Btl�9M� On this 1st day of October 2018 , personally came before me, -- Alan Pavlic and to me known to be the individuals and officers of the OLD REPUBLIC SURETY COMPANY who executed the above instrument, and they each acknowledged the execution of the same, and being by me duly swom, did severally depose and say: that they are the said officers of the corporation aforesaid, and that the seal affixed to the above Instrument is the seal of the corporation, and that said corporate seal and their signatures as such officers were duly affixed and subscribed to the said Instrument by the authority of the board of directors of said corporation. r�YQ " •w , Notary Public My Commission Expires: September 'S 2022 CERTIFICATE (Expiration of notary's commission does not invalidate this instrument) I, the undersigned, assistant secretary of the OLD REPUBLIC SURETY COMPANY, a Wisconsin corporation, CERTIFY that the foregoing and attached Power of Attorney remains in full force and has not been revoked; and furthermore, that the Resolutions of the board of directors set forth in the Power of Attorney, are now in force. ,�pw,rx rr ��d vxi a wu� ce*rzer,ur,. ffi SEe'L ,S Signed and sealed at the City of Brookfield, WI this 12th da March 2019 ORSC 22262 (306) �k"*^�ercuR�aarM�N4"w�`�'� �44elv� Assistant Secretary 1316 C'O N I-Y-0i v B iLDING 227 W..Ya'Ft::RS0N .Boi_lu-NA.RD SOUTH BEND, fNIDz.lN.a 46601-1930 i "1"td A I; i1B�r6 Puo yr 5'74/ 235-9251 FAK 571/235-9ll7ll TDD 5 74/ 235....5567 CITY OF BEND PETE BU'[TlGfFG, MAYOR BOARD O:IWORKS Date: February 7, 2019 To: All Plan Holders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: �...�..._..._ �.� �..........w_..ww......� __ _ ..�.�..._..�_���_......����. tuber: 7 Project Name: Three Twenty at the Ca IT WWW�WWWWWWWWWWWWWWWWWWWWW WW scade —Composite Wall Panels Project Number: 118-074 C ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: ebAI&M I 1�4 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Sk L41 W P Authorized Signature: Date: 3111 / I Version 4/2/2015 AX 13 16 C OUN FY-(-I I Y BtIII,DIN( 227 W..I viiiRSON BOULEVARD .SOUTFIBF-1 ID INDIANA.466(1I-1930 I1HONE. 574./235-9251 FAX 574/ 23.5-9171 "ll'DD 7 74/ 235•-5.567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC S Date: January 17, 2019 To: All Plan Holders From ....... Linda M. Martin, Clerk, wBoard of Public Works Subject _... __............_...................wwwwww Addendum Number: 6 Project Name: Three Twenty at the Cascade — Composite Wall Panels Project Number: 118-074 C ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: Jan AA 18*, / This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MAST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature: Date:/l/ // Version 4/2/2015 1 316 COUNTY -CITY BUILDING 227 W ,YEFFERSON 1L3oullaARD SOUTH Benin, INDIANA 46601 •-n 830 IN65 PHONE 57 / 23.5•-92.5 4 FAX 57=4/ 235•-9 71 `4 DD 574/ 235•-5.56 7 CITY OF BEND PETE BUTTIGIEG, MAYOR BOARD i Date: January4, 2019 To: All Plan Holders From Linda M. Martin, Clerk. Board of Public Works Subject Addendum _._......... .. .............. ........_.... _..... 5 ndum Number: ... --................... �_._._.......................................................................... Project Name: Three Twenty at the Cascade — Composite Wall Panels Project Number: 118-074 C ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 411L. ;-r->i This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Akq li4t Authorized Signature: Date: / i 1316 COUNTY-Cn Y 13r?n.DtNG 227 W. JEFFERSON BouLEVARD S01TH BizND, INDIANA 46601-1830 PIAI o- w Pi iow', 574/ 235-9251 FAN 574/ 235-9171 TDD 5741; 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: December 6, 2018 To: All Plan Holders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 4....._.......................... WWWWWWWW w---- Project Name: Three Twenty at the Cascade — Composite Wall Panels Project Number: 118-074 C ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes; The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: I^XA e oiks Authorized Signature: Date: 3/1C'. Version 4/2/2015 1 316 C OUNTY-C ri-Y BuH.DfNG 227 W. h.1,FERSON BouLEVARD So rm BEND, INDIANA 46601-I830 PHOW,, 574/ 235-9251 F,�` 574/ 235-9171 TDD 574/ 235.5567 CITY OF SOUTH BEND PETS BUTTIGIEG, MAYOR BOARDLIC WORKS Date: November 20, 2018 To: All Plan Holders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 3 Project Name: Three Twenty at the Cascade — Composite Wall Panels Project Number: 118-074 C ACKNOWLEDGEMENT MENT OF RECEIPT OF ADDENDUM. Date Received: Ntid rone,_c210.- ...m. - _�...................... _._ .... This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: 11� F14J1WZP 14C Authorized Signature: Date: Version 4/2/2015 1316 COUNTY —CITY BUILDING 227 W. JEFFERSON BOULEVARD SOU[H BEND, INDIANA 46601-1830 C' s^iweac.� 2865 PHONE 574/235-9251 FAX 574/ 235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 6, 2018 To: All Planholders From Linda M. Martin, Clerk, Board of P......... Subject Addendum Number: 2 Project Name: Three Twenty at the Cascade — Composite Wall Panels Project Number: 118-074 C ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: r� �.O 16 _' This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST, also be included with your bid package upon submittal. TIIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature.. Date: Version 4/2/2015 1316 COUNTY -CITY BUILDING 227 w.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 PPACK' 1 . PHONE 574/235-9251 FAX 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: October 30, 2018 To: All Plan Holders From Linda M. Martin, Clerk, Board of Public Works _...�..................................................._wmwm mm. Subject Addendum Number: ber: 1 Project Name: Three Twenty at the Cascade — Composite Wall Panels Project Number: 118-074 C ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUI'1! Date Received: VyVgr I 1mr 1� �o This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: r / 1 rLC.. .. Authorized Signature: Date: -5/ II Version 4/2/2015 SKYLINE Project No. 118-074 B-R Exterior Insulation Finish System by Skyline Plastering Inc. 232 Westgate Drive, Carol Stream, IL 60188 (630) 627-1 100 r-1 C1W —LeCa — _D : T"U 3 .4 c. R! C11:-.E F? C r-dEL OF -I TI? F-- File Number 5954 -729-6 r L of Office f Wht AR(retarm of 9:e ARTICLES OF «Rt OF SKYLINE PLASTERING, XMC. XWOOPPOVATMTHE STATE OV _ HAVE BEEN FILED OF THS SECUtTARY OF STATE RS PROVIDnD BY TOE BUSINESS CORPORANION ACT OF A.D. 1984. ilow Therefore,." H. Ryan, Secretaryof by - of the powers _ r in me by this !cei-tificate and attach hereto a copyApplication the aforesaid corpor6tion. WowingAn 1 o set my hand and cause to be affixed the Great Sea] of the State of Illinois, at the City of fI , this 31ST day of OCWOBBR A.D. 19-97 andof the Independence of the United States the two hundred and 229D w Secretary of State G212.2 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Three Twenty at the Cascade — Exterior Insulation and Finish System —(EFI.SJ Project No. 118-074 B-R For Bids Due March 12, 2019 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. / Proper bid security included. The bidder has the option of providing either a Certified Check �/ or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely \/� executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of MBEANBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted Form ['MWBE,'-2,1]. Acknowledge Receipt of _ Addendum(s) included with the bid. V/ All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. Y This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: AMR— � � � ��w :�w,� Date: � By Authorized Representative; Signature: Print Name & Title: Version 7/20/2018 Contractor's Bid for Public Works - 1 'd-av44- PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/20/2018 Contractors Bid for Public Works - 3 O)JAN w W Vl 2 a� owQ z H Lu w m0 Lu 0 z z U) LL Om0 v2> Ow �in G z Q H 0 z_ 5 z oQ �a w () m� �a �w �m O�LL w m E GI 0: m ti O 00 E z U L N 0 O � a` m _ 0 o o d 0a CL m C w N O = O 0 0 EU Q W `0 om � C o_ cm v m v IL m a) 0 0 w o m O L a L) u) n r 0 a o t m a_ni c 0 Uy zE cc cc E Z .......... W W m 0 Vl N Q T o!S � E_ m E Z O m N E m Z c rn 00 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS " This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration (" IDOA" ), 11 Project Number: Three7Twen at the Cascade — Exterior Insulation Dater Twenty on and Finis Sy tern lq Project Name: (E.I.F.S.) Bidder: Contact Person: Address: City: Email: ax rft L3 ` ___............... State: L Im r" To determine whether a bidder has demonsatedgood faith efforts to retch the MBENVBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS wwW W.w MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (hftp://www.in.gov/idoa). ...... ACTION ADVERTISE/CONTACT : In order for our bid to be deemed responsive, ( 1 y p nsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE,IWBEs reasonable time to respond. Perform any and all necessary steps to provide written notice Ina manner reasonably calculated to inform MBEIWBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively, Utilize fare -existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBENVBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed.. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBENVBEs, including providing such MBENVBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. ......... SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBENVBEs in order to increase the likelihood of meeting the MBENVBE goals (including breaking down contracts into smaller units to facilitate MBENVBE participation) __ ...._._ .............. CONTRACT RECORDS: The bidder has maintained the following records for each MBENVBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBENVBE was unqualified to perform the job, *Proper demonstration of Good Faith Effort requires your initials next to all the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 7/20/2018 Contractor's Bid for Public Works - 10 L)kF11P CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM a. inn nrx ry,; FORM MWBE-2.1� MBE/WBE CONTACTED° This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE, OF Project Number: 118-074 B-R MBE/WBE Participation Goal Project Name: Three Twenty at the Cascade - Exterior Insulation and Finish System E.I.F. Bidder:, f P, -1`"^I By ( g ure) (Title) Date MBE/WBE Firm ' Iles ------- Owner or Contact at MBE/WBE Firm ! m C 7— TeIephone:7Cyg,9Ct!5,,0W/7_4Fax: ° ° qcl5,jEmail: ed TYPE OF WORK SOLICITED FOR THIS PROJECT: ... ................................. RESULTS OF CONTACT WITH THE MBENVBE FIRM; rt * �� a I + c 1 MBEM/BE Firm AISAI _r/ `oni Owner or Contact at MBE/WBE Firm r,-A— Telephone: 4L:30 _9CJ2_— /t601 Fax: / TYPE OF WORK SOLICITED FOR THIS PROJE T: RESULTS OF CONTACT WITH THE MBE/WBE FIRM; - il: , �l"k�@ pW Version 7/20/2018 Contractor's Bid for Public Works - 11 Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: 2018 Completed Projects Skyline Plastering has successfully completed the following projects this past year: Mercy Health Riverside 1136 S Wabash Starbucks Chicago Campus Heritage House Target Broadview DaVita Whiteside Target Highland Park Parkview Elementary Thomas Jefferson Elementary Target Norridge Target Rockford Burger King Fifth Third Bank Blackhawk Bank Target Glendale Heights Target Hodgkins Target Machesney Park Moxy Hotel BMW Westmont Presbyterian Homes Tierra Linda Apartments Rolling Meadows High School 1980 N Milwaukee 820 S Michigan Ave Pepper Chicago Office Luther Burbank Elementary Evergreen Park Retail Woodmans Food Market Central Campus Health Center The Hoxton Chicago CVS New Lenox McDonalds Lindenhurst McDonalds Delany Rd Dick's Sporting Goods UIC Student Housing Coopers Hawk New Lenox Four Winds Casino West Chicago High School Marquette University 54 W Hubbard Old Chicago Post Office Knollwood Country Club Lincoln Park Cultural Center WEC Library Mount Prospect Library 900 N Michigan 210 N Carpenter Chicago 1115 W Fulton Chicago 833 N Clark St Chicago GM World If you have any additional questions regarding our recently completed projects, please feel free to contact us. Sincerely, Peter Klyachenko President Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: Current Public Projects Under Contract To Whom It May Concern, Skyline Plastering is currently under contract for the following projects: PROJECT CONTRACT DUE DATE COMPLETION Blue Chip Casino - Michigan City, IN $580,560 711119 0% CHA Pope - Chicago, IL $600,102 4115119 93% Skyline Plastering has never defaulted on a contact in all our years of business. Please let me know if you have any additional questions or concerns at this time. Sincerely, Peter Klyachenko Jr. President Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: 2018 Completed Project - Private Firm References Skyline Plastering has successfully completed the following projects this past year: Pepper Construction - Eric Bullion Mortenson Construction - Neil Wisker Power Construction - Tim Giegerich Leopardo Construction - Damian Eallonardo Linn Mathes Construction - Henry Young Turner Construction - Tim Makar Optima, Inc - Matt Cison Graycor Construction - Andy Bruce Bear Construction - Christine Lussow If you have any additional questions regarding our recently completed projects, please feel free to contact us. Sincerely, Peter Klyachenko President Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: Plan & Equipment for Proposed EIFS Work Skyline Plastering is proposing to install the EIFS scope of work at the Three Twenty at The Cascade. We have separated a qualified project manager, field foreman, general superintendent, and sufficient qualified journeymen laborers / plasterers to perform the work. An executive project manager is already appointed to oversee and manage the team actively to insure safety, quality, and schedule standards are met. We have included a combination of swing stages, aerial and/or scissors lifts, and scaffolding to provide sufficient manpower and the safest and most competitive means with which to install the EIFS work. ITEM DURATION START DATE END DATE Contract Docs 10 Days 3/19/19 3/29/19 Submittals 10 Days 3/19/19 3/29/19 Pre -Construction 5 Days 4/1/19 4/5/19 Mobilization 5 Days 4/8/19 4/12/19 EIFS Installation 55 Days 4/15/19 7/7/19 Close -Out Docs 5 Days 7/10/19 7/14/19 All employees on site will be payroll staff of Skyline, no sub -contractors are planned for the work. All aerial and scissors lifts are to be rented from either Kropp Equipment or Sunbelt as previously quoted, All swing stages are to be rented from Prime Scaffold or Designed Equipment as previously quoted. All Sto materials will be purchased either from FBM or L&W Building Supply as previously quoted. All starter boards or custom foam panels are to be purchased with Stucco Moulding as previously quoted. All scaffolding, tools, toolboxes, safety equipment, etc will be provided by Skyline Plastering. If you have any additional questions regarding our recently completed projects, please feel free to contact US. Sincerely, Peter Klyachenko President 232 Westgate Drive SNPiAsTimo Carol Stream, IL 60188 630-627-1100 630-627-7711 Fax Project Name: Three Twenty at the Cascade Location: South Bend, IN Submitted To: Panzica Building Corporation Address: 41E E Monroe Street, Suite 320 City, State, Zip: South Bend, IN 46601 Date Of Plans: 2/14/19 (Rev S) System: EIFS Date: 3/7/19 Attn: Jeffrey S. Novotny Phone: 574.234.0124 Cell: 574.532.6930 Email: `snovotn Snzicai,n t. In reference to the above project I would like to submit my quotation on EIFS. Skyline Plastering, INC. proposes to furnish all materials, union labor, supplies, equipment, insurance, and supervision necessary to perform the EIFS work in accordance manufacturer's specifications. Proposal EXCLUDES any flashing, weeps or soffit vents unless specified below. Proposal based on regular working hours, no overtime or shift work. Excluded are permits and permit fees, engineering and engineering fees, shop drawings and as built drawings, dumpsters and temporary barricades. Proposal is good for 9O days. Exterior Insulation Finish S steal-StoTherm ci Essence or e ual >Install EIFS system with 2" EPS insulation, basecoat, mesh, and standard textured finish. >Standard textures include sand fine, medium, and swirl textures. >Includes manufacturer's standard fluid -applied air/moisture barrier over substrate behind EIFS. >Includes EIFS per EIFS texture finish schedule notes 1-4 per plans. >Includes for sealant joint installation where EIFS meets EIFS or where EIFS meets dissimilar material. >Figured work to be performed from swingstages, landing platform to be provided by others in advance. >Sequencing and dimensions must be coordinated with window installer for alignment. >Excludes caulk joint between metal cap and EIFS. >Excludes EIFS application over unapproved by manufacturer substrates - see manufacturer's specifications. >Excludes any walk -way scaffolding. >Excludes any sidewalk permits, by others. >Excludes any framing, sheathing, or painting - by others. >Excludes any metal, coping, flashing, vents, or otherwise. >Excludes any other areas of alterations. >System design for a PB system. >Allteinnate.ff),; Credit for direct applied plaster finish to be applied over densglass substrate by others. >Alieicn .le #2:. Add for "wavy" pattern EIFS with sand fine finish to be field-appled at north elevation. >AIlteii nak.l #3: Add for "wavy" pattern EIFS panels with sand fine finish to be appled at north elevation $ 475,800.00 (1,935.00) 82, 900.00 85, 700.00 Note: Includes 2018-2019 Union Labor Rate. This proposal does not include any cost for providing temporary heat or enclosure. Additional cost and arrangements must be made by the owner G General Contractor with SPI. Texture and color to be selected by architect, owner, or general contractor 14 days prior to start date. Written confirmation is required. Any changes in construction documents involving EIFS scope of work or change orders must be approved by SPI in writing. Progress payments are due 30 days from invoice. All payments are to be sent via next day delivery. Responsible to pay reasonable attorney and collection fees if collection services are required. ' ire/rMAK Skyline Plastering, INC., warrants that its work will be free from defects in workmanship for a period of ONE Year from date of completion. Peter Klyachenko Jr. pater i n�i L(L r mm gr Skyline Plastering, Inc. PLEASE SIGN AND RETURN VIA FAX TO 630-627-7711 Signature / Title: Date of Acceptance: ORGANIZATION INFORMATION Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Phone: 630-627-1100 Fax: 630-627-7711 Website: w_yy,,skvJinep Sri g I, Date of Incorporation: October 31st, 1997 Organization Type: S-Corporation Corporate Officers: • Peter Klyachenko Jr, President • Vladimir Uspenskiy, Vice President Geographical Areas of Work: Northern IL, Southern Wisconsin, & Northern Indiana "Skyline travels for specific clients and projects across the USA and into Canada Description of Operation: Commercial Subcontractor specializing in Ornamental Plaster, Acoustical Plaster, Cement Plaster, Gypsum Plaster, Lime Plaster, Venetian Plaster, Exterior Insulation Finish Systems (EIFS), Direct -Applied Exterior Finish Systems (DEFS), EIFS Panel Fabrication, Custom EIFS Moldings, Metallic EIFS Finishes, Various Faux Plaster Finishes, Fluid -Applied Air/Moisture Barriers, Cultured Stone, & Thin Brick Core Competencies: We specialize in highly technical and sizable projects using the systems above in the following applications: • Vertical Buildings (High, Medium, and Low -Rise) • Historical Renovation & Preservation • Schedule Driven Projects Requiring Extra Man Power • High End Commercial • Higher Level of Detail (Many Cornice & Trims, Excessive Reveals, etc) • Higher Level of Quality (Smooth Applications, Pearlescent Smooth Metallic Finishes) • Projects with Difficult Access (Above Adjacent Properties, Railways, Tight Site Footprints) Types of Buildings: • Senior Living • Multi -Family • Hospitality • High Rise • Healthcare & Hospitals • High End Industrial • High End Retail & Offices • Shopping Malls • Luxury Residential • Corporate Centers • Historical Preservation • College & Universities • Religious • Restaurants • Museums & Libraries • Education K-12 • Arenas and Stadiums • Retrofit & Renovation There are a variety of qualities that separate our firm and below are just a few reasons to work with an industry leader like Skyline Plastering: • Experience. Skyline Plastering has successfully installed over 100 million dollars of plaster over the past 20 plus years on projects of all kinds and size. • Track Record. Skyline is the most respected union plaster company across Chicagoland, achieving this accolade took manyyears of hard work but it would not have been possible with out our loyal customersyear afteryear. • Craftmanship. It is our attention to detail and training that separates our crews from the rest. Most of our plasters have been working with Skyline for 10 or moreyears and many all20 plusyears and counting. • Safety Record, EMR Rating of.73 as of 2018. Our installers have OSHA 30, swing stage, scaffolding, and various other job specific training offering you a safe jobsite. • Relationship. We value return customers and look to build long term relationships spanning multiple projects. We strongly believe it is important to look beyond just one project • Service. Our responsive team is eager to assistyour specific needs big or small and with our contacts within the industry we are able to assist so that no time is lost to paperwork. • Warranty. We have successfully warranted millions in work through full cycles of warranty as a business of 20 years. We address warranty issues promptly, thankfully in 20 years none have been a result offailure in application. • Assurance. We carry EIFS Insurance (this additional insurance policy specifically excluded from other GL policies) helping customers limit their long-term risk. • Innovation. Skyline has been involved in innovation at the manufacture level and continues to uphold better practices for better performance. We help manage the risk of any cladding application with our culture of quality. • Manpower. As the largest plasterfirm in Chicago, we have the manpower to meetyour schedule. • Insurance. Highest Umbrella Insurance Policy among competitors at 5 mil and GA oft mil. • Leadership. Skyline leads the industry in both new & restoration work., exterior & interior plaster work across Chicagoland. Providing detail -oriented quality installation from budgeting to final product. FINANCIAL INFORMATION Federal Tax ID: 36-4197183 Dunn & Bradstreet Number: 11-901-4251 Certified Public Accountant: Mueller 1707 N. Randall Rd, Suite 200 Elgin, IL 60123 PH 847.649.8173 Bank Contact: David J Randa First National Bank 127 South 1st Street, Suite 303 Geneva, IL 60134 Bonding Surety: Kevin Scanlon Columbia Agency, a Division of HUB International Midwest Limited 1005 W Laraway Rd New Lenox, IL 60451 PH 815.215.4711 Insurance Company: Tim Ohm Country Financial 245 S Gary Ave, Carol Stream, IL 60188 PH 630.668.4518 Workers' Compensation Experience Modifier (EMR): 2016 0.73 EMR 2017 0.72 EMR 2018 0.73 EMR Attorney: Jeff Keller Keller Legal Services 620 W Roosevelt Rd, Suite #2 Wheaton, IL 60187 Sales Volume: Three Years' Revenue of $23,400,000 Recently Completed Projects: Fisher Nuts Corporation, Elgin, IL— Mark 1 Restoration Fa4ade Renovation, Insulated Cement Plaster $1,700,000 Northwestern Memorial Hospital, Chicago, IL —Thorne & Associates New Construction, Exterior Insulation Finish System Cladding $550,000 Central DuPage Hospital — Bed Pavilion, Winfield, IL — Pepper Construction New Construction, Venetian & Marmorino Plaster $800,000 The Strand Hotel — Linn Mathes Construction Historical Renovation, Ornamental Plaster Restoration $608,0000 Elysian Hotel, Chicago, IL — Bovis Lend Lease New Construction, Cement Plaster & Limestone Finish $500,000 The Langham Hotel, Chicago, IL — Anning Johnson New Construction, Venetian, Ornamental, & Acoustical Plaster $450,000 Covenant Village, Northbrook, IL — Leopardo Construction New Construction, Cement Plaster $400,000 Aurora St. Charles Senior Homes, St. Charles, IL — Linn Mathes Construction Historical Renovation, Ornamental Plaster & EIFS $406,000 Palmer House, Chicago, IL — Pepper Construction Historic Renovation, Ornamental Plaster $1,000,000 AMC Oak Brook Mall, Oak Brook, IL — Graycor Construction New Construction, EIFS $900,000 The Promenade of Oak Brook, Oak Brook, IL — Harbour Contractors New Construction, EIFS, Fluid -Applied Air & Moisture Barrier, and Cultured Stone $1.3 mil Our Strategic Accounts: Walmar:t, a e money. III,,,ili e Ibetter. 232 Westgate Drive I Carol Stream, IL 60188 Tel: 630.627.1100 1 Fax: 630.627.7711 wmL,'Ay iue'3 I� j.Q arrgc&.w,ma cn Intricate Ornamental Plaster I Gypsum Plaster I Cement Plaster I Stucco / Hard -coat systems I Exterior Insulation Finish Systems Acoustical Plaster I Lime Plaster I Thermocromex I Veneer Plaster I Venetian & Marmorino Plaster I TexStone I Fresco Finishes Armourcoat I Baswaphon I Fellert I Pyrok I StarSilent I Thin Brick & Cultured Stone I Fluid -Applied Air & Moisture Barriers Historical Plaster Restoration I Insulated Stucco Systems I EIFS Panels by StoLite or Dryvit FedderLite I Pre -Fab EIFS EIFS Metallic Panels I Dryvit NewBrick I Vapor Barrier Systems THE RITZ-CARLTON COMMUNICATIONS ENABLED LIFETIME' ,se�aRT�wc��,' Ards f n rui r,.ri��m�r ru,« r;nPY�r ' l JC Penney TRADE REFERENCES Supplier Contact L&VVBuilding Supply 1O99Greenleaf Ave. Elk Grove Village, |L60O07 Rod Lopez, Rep 224'325'0958 Westmont Interior Supply House 1030Vandustria|Drive Westmont, |L605Sg Jim Dunn, Rep 630'852'4600 Henry FrerkSons 3l35VVBelmont Ave Chicago |L60618 Matt Wolf, Rep 773'58S'O80O'ext. Ill Kropp Equipment, Inc. 1OZ0South Kennedy 5chemrviUe,|N46375 Karen Flanagan, Rep 630-289-6666 1061NRaddamRd Stucco Molding Batavia, |L6O510 Paul K|yachenko,Office Mgr 630~482'2590 Bracing Systems, Inc 4N350Old Gary Ave Hanover Park, |L6O133 Bob Williams, Rep 630665'2732 Skyline Plastering, Inc. 1 232 Westgate Drive, Carol Stream, IL 60188 1 Tel: 630.627.1100 1 Fax: 630.627.7711 1 www.skylineplastering.com 4 O C 0 cu U Q C cu ai C C cu L aD Q 0 W C. O C O U yL+ N .C: C N U) m r M O M O N cu 0 wN C N O yO O N m N C C N .O O .N O C C O N O n Q� c `o mU a N m o m uj C C co Fa O m 7 U E cr 7 7 m " N > m N C CCO m _ N C m O. O co E N U m m � T',U ) a-0 N mwio� 07:�u2 in 76 U C 2 :3 C a) N inmcc C E 7 2), � T m.-a `p O -CIO n. o N p,� C U N U C m O C — Q O_ - CL �O mm O N +N+ U (9 m U m N O N C_ m O co ooaa)) L o m o cL E p N m U d'a m O C CU m o p N o cn w Ty O 9 — O cu a 2— (D ram. O — U C m m N 7 d Q C a) E U m `° N N 7 U C i 7 m O .N � a U a) O C � T m C 10 m Co = O N Ea C U p m O o— D_ U � O (� N c (n C m 0 w __ O L O Ncc U vo a O Q / W LL w` F— C co �r LU N N U O L V J a s U M ;�MIIIA�' L C 0 � N cu LO M O M O wg c cuo,o N 2] U C 'y N O) CO N O c (O rp C N O N N C 'O O- M O •- O nab C O mU a) o m 'D c a o a) cc w E Co' 2� T c fO a)CM wM _ 0C� o. o E co N . U (6 � U T U N E a� co U) o m c c=1 :�o U y fD Ur2 C�6 7 7 C .O in N W �p C C E O Q O U .t N 2) C T N U Q mC�2 caa,Q N O O O C OM -a U C f6 E O C n Q — O N O � y U O U fO 7 N C N O U 0 Cc o n m U d-0 c6 O C cU m 0 'y 0cn O O ' O_� N � N N 7 O w U C ID (O N 3 7 Q E U (D f0 7 U C �O N � a U N � O N H p. C ` T N f0 = O NE U O oo= CL :-° o m U) U) CD 0 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Three Twenty at the Cascade — Exterior Insulation and Finish System E.I. F.S.�........_......._._._..... ...... Project No. 118-074 B-R For Bids Due March 12, 2019 Contractor Name: The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 315t for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/2018 General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after considering all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/2018 General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) — Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. Version 7/20/2018 General Conditions - 8 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledg ments: (i)_ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) ✓ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) Z By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments, (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _ List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) � Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 (ix) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: (Si n Here) vi (Print Name Hery LA D' g b (Address of Compa (City) M1 (State) 106 (Telephone Number) Version 7/20/2018 General Conditions - 10 INBiz: Your one -stop source for your business. https://bsd.sos.in.gov/publicbusinesssearch (http://www.INBiz.IN.gov) Business Search Business Search Result PrincipalRegistered Business Name Business ID Entity Type Office Status Name Type Agent Name Address 232 2014090900576 (/PublicBusinessSearch WESTGATE SKYLINE FOREIGN Foreign CORPORATION /BusinessInformation?businessId=982821& DR, CAROL PLASTERING, LEGAL For -Profit SERVICE Active businessType=Foreign%20For STREAM, INC. NAME Corporation COMPANY Profit%20Corporation&isSeries=False) IL, 60188, USA Page 1 of 1, records 1 to 1 of 1 Return to Search 1 of 1 3/8/2019, 11:22 AM APPROVED AND FILED CONNIE LAWSON INDIANA SECRETARY OF STATE 08/15/2018 12:51 PM BUSINESS ID 2014090900576 BUSINESS TYPE Foreign For -Profit Corporation BUSINESS NAME SKYLINE PLASTERING, INC. ENTITY CREATION DATE 09/08/2014 JURISDICTION OF FORMATION Illinois PRINCIPAL OFFICE ADDRESS 232 WESTGATE DR, CAROL STREAM, IL, 60188, USA YEARS 2018/2019 EFFECTIVE DATE 08/15/2018 EFFECTIVE TIME 12:51 PM REGISTERED AGENT TYPE Business Commercial Registered Agent NAME CORPORATION SERVICE COMPANY ADDRESS 135 North Pennsylvania Street, Suite 1610, Indianapolis, IN, 46204, USA - Page 1 of 2 - APPROVED AND FILED CONNIE LAWSON INDIANA SECRETARY OF STATE 08/15/2018 12:51 PM TITLE Secretary NAME PAUL SAVENOK ADDRESS 232 WESTGATE DR, CAROL STREAM, IL, 60188, USA TITLE President NAME PETER KLYACHENKO ADDRESS 232 WESTGATE DR, CAROL STREAM, IL, 60188, USA TITLE Vice President NAME VLADIMIR USPENSKIY ADDRESS 232 WEST GATE DR., Carol Stream, IL, 60188, USA IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE STATEMENTS CONTAINED HEREIN ARE TRUE, THIS DAY August 15, 2018. SIGNATURE PETER KYACHENKO TITLE President Business ID : 2014090900576 Filing No.: 7996579 - Page 2 of 2 - 10/26/2018 9:09:52 AM License $125.00 Check 8385 $125.00 kwidawsk 18047 No. 5828-19 REGISTRATION $125.00 ST. JOSEPH COUNTY AND CITY OF SOUTH BEND, INDIANA October 26, 2o18 WHEREAS, SKYLINE PLASTERING, INC. having this day paid to the Building Department the sum of One Hundred Twenty Five Dollars and Zero Cents is hereby REGISTERED to operate in the unincorporated areas of ST. JOSEPH COUNTY and the CITY OF SOUTH BEND, as a Building Contractor I THIS REGISTRATION EXPIRES: October 11, 2019 Building Commissioner a a _ Charles, CAS lota.. — 232 WESTGATE DRIVE CAROL STREAM, IL 60188 (630)627-1100 THIS REGISTMTION IS NOT TRANSFERABLE Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: Previous Business Names Statement To Whom It May Concern: Skyline Plastering has operated under the same business name since our founding on October 31St,1997. Sincerely, C�&� Peter Klyachenko President Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: No Determinations Against Skyline Plastering To Whom It May Concern: Skyline Plastering has no determinations by a court or government agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Beacon and related acts, within the last preceding five (5) years. Sin �� wel�y, Peter Klyachenko President Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 4661S RE: Statement Regarding Staffing/Labor Resources To Whom It May Concern, Skyline Plastering is recognized as a premier union plastering sub -contractor for the Midwest region. Since October of 1997 we have been signatory to the Plasterers and Laborers Union of Chicago. Our company has historically and continues to employ 30-40 men in the off season and 40-80 men during our peak season. Our staffing labor plan for the Three Twenty at the Cascade is to employ plasterers & laborers from the following affiliates: Operative Plasters' & Cement Masons' International Association • Cement Masons Local #502 Plaster Area #5 • Local #692 State of Indiana MUNA! - the Laborers' International Union of North America • Laborers Local #68 • Laborers Local #81 Our current back log allows for more work in the coming months, we currently have access to 20-30 qualified and trained men who we consider a part of our labor force and more through our union affiliates if necessary. We are confident in our ability to hire and employ properly skilled men in order to deliver a successful project. We are excited to offer our services to meet the challenging schedule taken on by Panzica. Please let me know if you have any additional questions or concerns at this time. Sind, Peter Klyachenko Jr. President Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: Statement of Hiring Individuals and/or Independent Contractors To Whom It May Concern, Skyline Plastering will insure all men who are hired or employed by our company will be properly classified under all federal, state, and local city laws and ordinances. We do not currently plan to hire any independent contractor for the Three Twenty at The Cascade project but if required during the project any and all independent contractors will be held to the same standard. Please let me know if you have any additional questions or concerns at this time. Sincerely, r Peter Klyachenko Jr. President "Unifie OPERATIVE PLASTERERS' AN'� ' OF THE 0hN 739 SOUTH 25th AVL1` PHONE: 708-5'' March 11, 2019 Reference: Skyline Plastering Inc. To Whom It May Concern: fsJ ��o�r rehgti, bilk 1914 MC:N^wNT'' A60 �N�NTERNATIONAL ASSOCIATION DO STATES N c)C CANADA E -�I I LLWOO,, ILLINOIS 60104 100 l�"A: 708�544mm0232 As a signatory contractor with the International Union of Cement Masons' Union Local 502, Skyline Plastering Inc. is required by Collective Bargaining Agreement to participate in an applicable Apprenticeship and Training program approved by and registered with the United States Department of Labor's Bureau of Apprenticeship and Training. I am submitting this letter, along with our Certificate. Our Apprenticeship Program 11L008820041 is registered with the Department of Labor, Bureau of Apprenticeship and Training. If you have any questions, please feel free to call 708-544-9100 Ext. 214. Sincerely, Lawrence J. Picardi Sr. Secretary -Treasurer 91 u�6 r r � CV O L11 O Z U O J Z O z z 0 Q F- Z W C/) W O U Z oei J J WO U O f— J Z J W W m-- pq G1 0- Q Z O 4 W d z O C/) d Z W LU CU L- C:) W Q Q W O LL L11 _r 00 C) 00 �Cr 1 ` 1 H C W c gq ULLJ O U W Q W Of- .,.. W C C� C✓J LC IIR-i" P i ��� � 11 1 juc��� Z11'j_VR A"31016-021 � 0 , '' 11 1 SPI management pledges that we will take reasonable action to create and maintain a workplace free from substance abuse. SPI management will work to increase awareness of the dangers of substance abuse within our workplace and throughout the construction industry. 232 Westgate Drive I Carol Stream, IL 60188 Tel: 630.627.1100 1 Fax: 630.627.7711 VAA_skynhp AgSjprim ,mp Yj Installers of: Exterior Insulation Systems I Interior/Exterior Coatings & Finishes Veneer Plaster I Stucco / Hard -coat systems TABLE OF CONTENTS Scope of Policy Page 3 Definitions 3 Policies and Procedures 3 Testing Procedures I. Drug Screening of Applicants for Employment 5 II. Drug Screening of Transferred Employees 7 III. "For Cause" Testing Procedures 7 IV. Causal/Incident-Related Testing 9 V. Random Testing 10 VI. Reinstatement, Return -to -Duty and Follow -Up Testing/Rehabilitation Programs 10 VII. Drug and Alcohol Testing Requirements for Employees with a Commercial Driver's License (CDL) 10 VIII. Disciplinary Policies and Procedures 11 IX. Policy Amendments 12 X. Confidentiality Statement 12 Drug /Alcohol Test Consent Form 13 SCOPE OF POLICY This document contains procedures for implementing a drug and alcohol testing program at Skyline Plastering, Inc. The company prohibits the use, possession, sale, purchase, manufacture, distribution, transfer or consumption of alcohol and all illegal drugs, including legally regulated drugs. This program applies to all employees and potential employees of the company, as well as subcontractors at all tiers, including non -bargaining and bargaining unit employees. DEFINITIONS Banned Substances: Illegal substances, as defined by federal/state laws, including: a. Amphetamines b. Opiates c. Phencyclidine (PCP) d. Cocaine e. THC (Marijuana/Cannabinoids) f. Intoxicants (drug and alcohol) g. Synthetic drugs Third -Party Administrator: The company may retain a third -party administrator to perform testing and reporting procedures, but is currently handled by the company's safety manager. POLICIES AND PROCEDURES A urine drug screen shall be administered under the following circumstances. 1. Pre -Hire Drug Screening. All potential employees must submit to a urine drug screen no later than the commencement of employment. Pre -hire drug screening will test for the presence of illegal drugs and substances and the illegal use of prescription drugs. This screen does not include an alcohol test. Potential employees who refuse to submit to this test will not be permitted to work for the company. If the employer participates in a pre-screen/certification program through a collective bargaining agreement (CBA) or other arrangement, and the potential employee has undergone a prior screening to which, through the CBA or other arrangement, the company is provided access to the results/certification, then the potential employee shall be deemed to have complied with the company's pre -hire drug screening requirements. 2. Testing for Cause. All employees may be tested for cause when a reasonable suspicion exists that the employee appears to be under the influence of illegal drugs or illegally using prescription drugs, synthetic drugs and/or alcohol. 3. Causal/Incident-Related. All employees who are involved with, or may have contributed to, an incident that results in property damage or requires treatment beyond onsite first aid are required to submit to a drug screen and alcohol test. (Note: a company may also require a drug screen and/or alcohol test for incidents resulting in first aid treatment. Please consult your state/local laws pertaining to testing procedures to verify if such a practice is permissible). 4. Random. When permitted by law, employees may be randomly selected for unannounced drug and alcohol screening using a scientifically/statistically valid computerized number generation process. Employees are notified of selection no more than 48 hours prior to testing. 5. Reinstatement, Return -to -Duty and Follow -Up Testing. After signing an agreement or participating in substance abuse counseling established by the company, the employee must complete a drug screen before returning to active employment. TESTING PROCEDURES I. Drug Screening of Applicants for Employment Upon applying for employment, applicants must visit the office of Skyline Plaster, Inc. They will be advised whether specimen collection will occur at Northwestern Medicine Central Dupage Hospital located at 25 North Windfield Rd., Winfield, IL. 0190, or at another approved clinic offsite. 2. Each applicant will read and sign a Drug Screen Consent Form prior to any test being administered. 3. On a pre-printed, itemized form furnished by the employer, each applicant will be asked to identify any medication he/she is taking or has taken during the 30 days preceding the test. 4, A formal chain of custody will be established for every drug screen. 5. A split sample consisting of two urine collection containers sealed in a plastic container will be furnished to the applicant. (Note: Testing may be performed by a third -party administrator.) The containers must contain an amount of urine sufficient for one Enzyme Medical Immunoassay Test (EMIT) and two Gas Chromatography/Mass Spectrometry (GC/MS) tests (no less than 2 ounces of urine per container). Each applicant's urine specimen will be collected and temperature tested for verification. The second container will be used in the event the first container becomes contaminated. 6. Before the specimen leaves the applicant's sight, the urine containers will be sealed with security tape that has been initialed by applicant. 7. Specimens collected onsite will be transported to a laboratory in accordance with the chain of custody procedures. A portion of the sample will be tested using the EMIT; if positive, another portion and/or the split sample will be tested for verification using the GUMS test. 8. The remainder of the urine specimen and split sample will remain at the laboratory for 30 days following the test. 9. Upon signing a form giving consent to use the urine sample for drug screening, the applicant is eligible for employment on a 72-hour probationary basis. This consent form is co -signed by the collection specialist. 10. Any applicant who refuses to submit to a drug screening will not be eligible for employment. 11. The employer receives the drug test results within 72 hours. If the applicant's test results in a confirmed positive, as confirmed by a medical review officer (MRO), he/she will be terminated immediately and paid for all hours worked, if permissible by state/local law. The individual will not be eligible for employment with the employer for a period to be determined by the employer, not exceeding one year. If hired later by the employer, and contingent on a negative drug screen, the employee may be tested periodically without notice for a period of up to one year from the date of hire. 12. If any individual who has tested positive by the MRO wants to confirm the results of the GUMS test, he/she may do so by having a GUMS test performed on the previously collected split urine specimen at a certified National Institute on Drug Abuse (NIDA) or Substance Abuse and Mental Health Services Administration (SAMHSA) laboratory of his/her choice. The specimen will be shipped directly from the employer's lab to the lab of the employee's choice. The costs of this test will be borne by the employee. If the results of this test are negative, the individual will be reinstated with full back pay and benefits, and will be reimbursed for the cost of the test. The individual must exercise the option of a second GUMS test within 24 hours of being notified of the positive results. 13. Pre hire drug screens include tests for at least the following (a five -panel drug screen): a) Amphetamines b) Opiates c) Phencyclidine (PCP) d) Cocaine e) THC (Marijuana/Canabinoids) The company reserves the right to administer testing for additional substances (For more information on seven -panel, 10-panel, 12-panel and hair follicle tests, refer to the "Best Practices" section of the Construction Coalition for a Drug- and Alcohol - Free Workplace website at www,dro yfreeeoiistriiction or )-) II. Drug Screening of Transferred Employees The procedure for testing employees transferred from another jobsite is the same as the pre -hire procedure. III. "For Cause" Testing Procedures 1. All employees working for the company may be tested for illegal drugs, substances, synthetic drugs and alcohol if there is reasonable suspicion that the employee is under the influence of alcohol, any of the substances identified in paragraph 13 or abuse of prescription medication. For the purpose of this program, the term "reasonable suspicion" shall be defined as "aberrant behavior or unusual on -duty behavior of an individual employee who: (a) is observed on duty by either the employee's immediate supervisor, higher ranking employee, or other managerial personnel who have been trained to recognize the symptoms of drug abuse, impairment or intoxication (observations shall be documented by the observers); (b) exhibits the type of behavior that shows accepted symptoms of intoxication or impairment caused by controlled substances or alcohol or addiction to or dependence upon said controlled substances; and (c) such conduct cannot reasonably be explained by other causes such as fatigue, lack of sleep, side effect of prescription or over-the-counter medications, illness, reaction to noxious fumes or smoke. 2. Testing of this type will not be conducted without the written approval of the company's superintendent or designated manager. The jobsite superintendent or designated manager must document in writing who is to be tested and why the test was ordered, including the specific objective facts constituting reasonable suspicion leading to the test being ordered, and the name of any source(s) of this information. One copy of this document shall be given to the employee before he/she is required to be tested. After receiving a copy of the document, the affected employee shall be given enough time to read the document. 3 When a supervisor, higher ranking employee or other managerial personnel has reasonable suspicion to believe an employee is using, consuming or under the influence of an alcoholic beverage, non-prescription controlled substance (other than over-the-counter medication), and/or non -prescribed narcotic drug while on duty, that person will notify the jobsite superintendent or designated manager for the purpose of observation and confirmation of the employee's condition. The employee will be given an opportunity to explain his/her condition, such as reaction to a prescribed drug, fatigue, lack of sleep, exposure to noxious fumes, reaction to over-the- counter medication or illness. If, after this explanation, the jobsite superintendent or designated manager continues to have reasonable suspicion that the employee is using, consuming and/or under the influence of an alcoholic beverage, non -prescribed controlled substance or non - prescribed narcotic while on duty, then, by a written order signed by the superintendent or designated manager, the employee may be ordered to immediately submit to a drug and alcohol screen. Refusal to submit to testing after being ordered to do so may result in disciplinary action up to and including discharge. 4. Employee drug screens for cause will include testing for alcohol, as well as the same drugs as the pre -hire screening test. Each employee will read and execute a consent form prior to any test being administered. Failure to execute the consent form will result in termination. 5. Reasonable suspicion testing shall be performed at a NIDA/SAMHSA- approved clinic. The individual will be immediately accompanied to the clinic by a company representative. Samples will be taken as per the pre -hire procedure. 6. An EMIT test and, if positive, a confirming GUMS test, will be performed on the urine sample. The remainder of the sample and the split sample will be stored at the laboratory for 30 days. 7. If an employee's test is positive, his/her employment will be terminated immediately. The employee will be given a copy of the results of the drug screen. He/she may have the second container tested at his/her own expense as per the pre -hire procedure. 8. Alcohol detection will be based on an evidential breath alcohol device approved by the National Highway Traffic Safety Act. If an employee's test results indicate he/she is legally intoxicated at or above the state of jurisdiction's legal limit, he/she may be subject to discipline up to and including discharge. IV. Causal/Incident-Related Testing Subject to applicable law and consistent with reasonable suspicion, the company reserves the right to require its employees to present themselves for testing within 24 hours following an employee's involvement in an accident, near accident or an incident resulting in lost work time, property damage, and/or injury to any employee or other person while on the company's premises, on the job or otherwise working for the company. V. Random Testing Subject to applicable law, the company reserves the right to require its employees to present themselves for random, unannounced testing. The company will adopt an objective procedure, using a statistically valid number generation process, to randomly select employees to be tested. Upon anonymous selection, the company will notify the employee(s) to report immediately for drug testing. The company solely determines the time and frequency of random drug tests. Any employee may be selected for random testing in accordance with state/local laws. An employee could be randomly selected for testing more than once a year. VI. Reinstatement, Return -to -Duty and Follow -Up Testing/Rehabilitation Programs The company maintains a referral relationship with drug and alcohol abuse services. Additionally, certain health insurance benefits may provide help to employees who suffer from substance abuse and/or other personal or emotional problems; however, it is the responsibility of each employee to seek necessary professional assistance before alcohol and drug problems lead to disciplinary action. If the company mandates a sponsored rehabilitation program, the employee will be subjected to a drug screen following the procedures outlined in Section I (Drug Screening of Applicants for Employment) prior to reinstatement. In addition, per post -rehabilitation program monitoring guidelines, the company may subject the employee to follow-up testing for a period to be determined in cooperation with the rehabilitation program and employer. Testing will follow the procedures outlined in Section V (Random Testing). VII. Drug and Alcohol Testing Requirements for Employees with a Commercial Driver's License (CDL) The [Jnited States Department of i-aaisportation (DOT) requires that all employees maintaining tai iaag a CD . atid operating ec n rnercial tiiotor vehicles be sub ec'ted to the drug screen policies outlined in the "Testing Procedures" section of this document. CDL employees, per the DOT, are required to submit to a minimum five -panel drug screen for the presence of: 1. Amphetamines 2. Opiates 3. Phencyclidine (PCP) 4. Cocaine 5. THC (Marijuana/Canabinoids) A positive test result requires the employee to be immediately removed from operating any commercial motor vehicles on public roadways. In addition, employees whose test produces a positive result must complete return -to -duty and follow-up testing after completion of an approved rehabilitation program as prescribed by a substance abuse professional. Follow-up testing must include a minimum of six unannounced, directly observed drug screens within 12 months of the initial return -to -duty screen following the procedures outlined in Section V (Random Testing). For more information on the DOT's CDL drug screening requirements, visit: httt)://www.fmcsa.dot.v,ov/documents/DLugAlcohol Test Brochure2009 508com pliant rev VIII. Disciplinary Policies and Procedures For examples of disciplinary procedures and appeals processes, visit the "Best Practices" section of the Construction Coalition for a Drug- and Alcohol -Free Workplace website at www.drugfreeconstruction.com. First Offense Disciplinary actions defined by the company. Second Offense Disciplinary actions defined by the company. Appealing Disciplinary Action Appeals process defined by the company. Substance Abuse Rehabilitation Following a positive result, the company retains the right to enter the employee into an approved substance abuse rehabilitation program. Upon completion of the program, the employee will be subjected to drug screening procedures outlined in Section VI (Reinstatement, Return -to -Duty and Follow -Up Testing/Rehabilitation Programs). IX. Policy Amendments Review Procedures The company will undertake a comprehensive review of the policy biennially. A review panel consisting of senior management, safety professionals and site employees will assess the relevance and current status of the policy's components, as well as incorporate updated procedures and requirements that will ensure the policy meets or exceeds industry requirements. Any policy changes made as a result of the review will be made available and provided to every employee as an addendum to the company's Employment Policies and Procedures Handbook. In addition to the biennial policy update, the company may undertake revisions due to new regulatory requirements. Any revisions made outside the biennial review will be provided as a separate addendum to all employees. X. Confidentiality Statement Employee information, including drug screen results and rehabilitative programs, will be treated as medical records and will remain strictly confidential following HIPAA guidelines for patient confidentiality. Employee requests to release the results of drug screens to any party outside the company must be made in writing and given to the employee's immediate supervisor and designated safety and health officer. Drug/Alcohol Testing Release Form Pre Hire Release form for obtaining urine samples for drug screening and permission to furnish the results to the company. For Cause Release form for obtaining urine samples for drug screening and permission to furnish the results to the company. Release form for obtaining NHTSA-approved evidential breath alcohol test and permission to furnish the results to the company. Post Incident Release form for obtaining test samples for drug and alcohol screening following any incident requiring medical care. I hereby authorize Skyline Plastering, Inc., its physicians or agents, to take the indicated sample from me to use for the purposes indicated above. I understand why these samples are being requested and I give permission for the results to be released to the company and to my employer (if different). I further release and hold harmless the owners, the company and its contractors from any consequences arising out of the drug and/or alcohol test or results therefrom. Name (please print) Signature (required) Street City Social Security Number Date State Zip Phone Number ��(with areacode) ............... ��� Witness Date Employer Occupation \ F- ci \vi 2 } $ § \ \ / \ � > \ ci \ / $ / /\ z /\ Ld z \/ \ w/ § &} y »\ / $/ ƒ \\ / � r . \/ ) J \ 6{ { k � \ \ 0 � NZ® 6 o _ < - � G _ / « \ \ \ § § » \ 3 § 4 3 7 u 2 §\{ k ) § \ w ) _ k 2 z I § s » ° z W � k cc%° e z n: ~ 2 / ¢ \ \ \ / \ } \ / / LA $ CL \ f\ t\ y g \ a/[ / \/ & al § \/z} \ \ ƒ j } \ z ƒ j /k \ b + z \ � \ � i � z z § / } / \ � > / a a a \ � 67 LLY f *¥ { /± b /ƒ f \ .ci y¥ 3\ \\ \\ 4k }/ § \/ 5\ \ Ln K/ % j E EQ e 0� R } / \ ( u Ln ] R . Y \ } / IL @ _ \ % \ \ § } <g § </ cc \+ i \/§ m \§ Nz \ k Q \o/k§ K to ) § \ z \ fw « § \ e e 6 c 2 Of Of m 00 e E LA 2 E ( / § § \ ® § y \ 2 \ \ \ \ ( \ / \ \ z \ 0 6 mƒ= y z « 0 3 m 0- 0 7 z _ :m Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: Statement of Tax Liabilities To Whom It May Concern, Skyline Plastering has not in the past three years and does not currently have any federal, state, or local tax liens or tax delinquencies owed to any federal, state, or local taxing body at this time. Please let me know if you have any additional questions or concerns at this time. Sincerely, _96� Peter Klyachenko Jr. President Peter Klyachenko Jr. Skyline Plastering, Inc. 232 Westgate Drive Carol Stream, IL 60188 Department of Public Works 1316 County -City Building South Bend, IN 46615 RE: Similar Project Reference List Last Three Years To Whom It May Concern, Skyline Plastering has had the pleasure to successfully complete our contracts on the following projects over the past three years: Four Winds Casino - South Bend, IN $356,739 Aloft - South Bend, IN $235,000 Double Tree Hotel - Evansville, IN $788,640 Mercy Health Riverside Campus - Rockford, IL $347,341 The Hoxton - Chicago, IL $161,005 Moxy - Chicago, IL $481,360 Hilton Garden Inn - Chicago, IL $288,801 Home 2 Suites - Chicago, IL $299,243 820 S Michigan - Chicago, IL $534,966 AMC Theater & Garage - Oak Brook, IL $709,958 Tierra Linda - Chicago, IL $207,757 Optima Tower I - Chicago, IL $97,314 Optima Tower II - Chicago, IL $192,739 GM World - Detroit, MI $201,822 2929 Carlson New Office Building - Hammond, IN $200,350 Please let me know if you have any additional questions or concerns at this time. S ricerely, Peter Klyachenko Jr,. President