HomeMy WebLinkAboutChange Order No 9 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction1316 COUNTY -CITY BUILDING
227 W.JEFFERSON BOULEVARD
SOUTH BEND_ INDIANA 4660I -I 930
rrr�
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF IC WORKS
March 12, 2019
Mr. Tim Morey
Ziolkowski Construction, Inc.
4050 Ralph Jones Drive
South Bend, IN 46628
PHONE 574/235-9251
FAx 574/235-9171
RE: Change Order No. 9 — Erskine Clubhouse Renovation - Project No. 116-108
Dear Mr. Morey:
The Board of Public Works, at its meeting held on March 12, 2019, approved the above
referenced Change Order for an increase of $62,852, bringing the current contract amount to
$1,076,842.
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK LAURA O'SULLIVAN THERESE J. DORAU
1,1
8AIA Document TM -2017
Change Order
PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
17043 - Erskine Clubhouse Renovation Contract For: General Construction Change Order Number: 09
City Project #236563 Date: 8/28/2018 Date: 03/01/2019
OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address)
Board of Public Works Gregory A. Kil & Associates, Inc. Ziolkowski Construction Co., Inc.
City of South Bend, IN
1316 County City Building (d/b/a) Kil Architecture / Planning 4050 Ralph Jones Drive
227 W Jefferson Boulevard 1126 Lincolnway East South Bend, IN 46628
South Bend, IN 466011830 South Bend, IN 46601
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments
attributable to executed Construction Change Directives.)
Per the attached RCO #026 Rev.1, add $7,413.00 to provide labor, material and equipment to remove service sink in closet GI 1 and install
new base mounted mop sink. Also install a floor sink near the proposed sink in the old boiler room areas.
Per the attached RCO #030, add $22,098.00 to provide labor, material and equpment to enlarge restooms per Alt #1.
Per the attached RCO # 031, add $23,314.00 to provide labor, material and equipment to construct new kitchen in lower lever per Alt #2.
Per the attached RCO #032, add $848.00 to provide labor, material and equipment to add three (3) additional door grilles per RFI #035.
Per the attached RCO #033, add $3,067.00 to provide labor, material and equipment to rework the existing kitchen feeder.
Per the attached RCO # 035, add $2,265.00 to provide labor, material and equipment to repair 78 sf of ceiling on the main level.
Per the attached RCO 4037, add $3,175.00 to provide labor, material and equipment to fur new Storage Room G-09.
Per the attached RCO #038, add $672.00 to provide labor, material and equipment to fur out +/-10' of wall next to Storage Room G-09
The original Contract Sum was 907,000.00
The net change by previously authorized Change Orders $ 106,990.00
The Contract Sum prior to this Change Order was1,013,990.00
The Contract Sum will be increased b this Chang e Order in the amount of
The new Contract Sum including this Change Order will be $ 1,076.842. 0
The Contract Time will be increased by Zero (0) days.
The new date of Substantial Completion will be March 22, 2019
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Gregory A. Kil & Associates, Inc. Ziolkowski Construction, Inc Board of Public Works, City of South
Bend, IN 1u r.t
UD
ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (j jqmf�f pt161i(' o
N
AIA Document G791 "'"* — 2017. Copynght "11979, 1987, 2000 d 2'001 and 2017 by The America" Instilute Of Arckmlt6a fay, r � �aaa�rvr� , W�� � t0 a
Alk" t0oc urnont is prautauatasut by US, Copy"r,°ugM h aaaw and intarnaatiaanM Ttsualos iijn a�uufbori'aed raprrud uuMtV n of a;rtstft utiuum at ttuirui stalk"' eucrurwoont, pair
any portion art H, may result 6n severe 6,01 and er rinal penatties' and MR be Pro secu lied to the ommkwasiammauon extent pass fWe under tho Garr This
document was produced by MA software at 15.03.35 ET on 03)01/2019 under Order No, 81/9973501 which expires on 02129=20and is not for resa e.
User Notes: (3B9AeA4 )
1. 0
S NAT SIG RE
!Du"Rdl KHNCAR' „AIA Architect
PRINTEb NAME AND TITLE PRINTED NAME AND TITLE
"-Z 14
27 - , / 4)
DATE " DATE
SIGNATURE
PRINTED NAME AND TITLE
DATE
AIA Document G701 T11 — 2017. Copyright@ 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. WAIRIIMIING& "'171h is
MAIII DocAurrient !is Ipiroteacted by US, Copyiriight Law and internatiourall i reaties, Unaut1hoirized irepiroditiuetton air dilskirflbution oftfiriis AM" K)ocuirnent, air
ainy paMoin of it, may i !in seveire civilll and cirimikiail penallties, and wilill The Irprosecuuted to the unaxiiiinuirn extent pmMiliflie undertirm law, This
document was produced by AIA software at 15:03:35 ET on 03/01/2019 under Order No, 8119973501 which expires on 02/29/2020, and is not for resale,
User Notes: (3139AIDME)
DATE 1 /24/2019
City Of South Bend Venues, Parks and Arts
Erskine Clubhouse Renovation
Project No. 116-108
Ziolkowski Project # 17668
RCO # 026 Rev. 1
1.24.2019
DESCRIPTION:
Provide labor, material and equipment to remove service sink in closet G11 and install new
base mounted mop sink. Also, install a floor sink near the proposed sink in the old boiler room areas.
(Floor sink will need to be verified before cutting.)
Item
Scope of Work
itstimated
Unit
Subcontractor
Material
'Total
Labor
Craft
Labor
Total
No.
Quantity
Quote
Unit Price
Material
Manhours
Type
Rate
Labor
C t
Cost
za Labor
0
$0.00
20
Car
$55,45
i �IO9
Saw cufflng, Dern;o 9nd Fran2l t_ ....._
0
$0.00
2
Supt.
$57,45
0
.
$0.00
SO
7
Labor
$4:146
$00+4
ZCI Material
0
$0.00
0
0
$000
; $0,
Concrete„ steel studs. 518"' moister board.
0
$0.00
0
$0.00
" tl
FRP panels one 1 wall will need to be
1
$50 00
0
$0.00
'', "" 0
framed out for lumbin fixtures. The other
0
$0.00
" : Ct'
0
$0.00
" 0
walls will remain as Is ;
0
$0.00
0
$0.00
7
0
$0.00-
0
0
$0.00
B.J. White
_.._
0
_ ..........
_...._ $4,618
$0.00
$tl
0
_
$0.00
, 0
0
......
$0.00
0;...:....,�
-
0
$0.00
"""...""... ..."
....
$0.00:
Misc Tools $3 / hr.
0
$3.00
.•
: " $
0
$0,00
.
..........
m 0
$0.00
, :
0
0
$0.00
0
$0 00
°; "'.. so
01
som
`::--.:" "„" $0'
0
$0.00';""
0
$0,00
...... $ '
0
$0.00
-. ""::7 " 0
__ 0
$0.00�
,.,; . $0
0
$0.00„
.. .:,. 0
o $0,00
Sol
0 $000
u contractor M arkup
°,:Labor
Markup
Subcontract Total 0
Labor Total
15% Material Markup
"
=; "
Material Total
Payment & Perf Bond
TOTAL RCO AMOUNT "
r i ) � d
b 5t
r
1
p r
I
i
t
p
l
r
� .�`�h1. ram .; ry+—r1,� %✓��� I
1 �
� �
�J
I
f
4
i
r
r
ur
'
r ,
"Asy COO
}
M. r ';»:
�I
�
� %
r
3'41 l art a
flap "" p a
r
y �f�p "g
..,... ,. _ _'. M1.6� i',y�'m, ,..E Y_'-1I
I pre
aa
—PO P
1
I
r[ � rvLLi^ I
" t' �-0"n r-4 _,�yo. �V h1.,, ��d �, tl�.-� "_o�:V 4y�'..�., f _,._t ..f .,.✓,tee r. �1
,,II1w�p
W.. % Rn: i..�.. w,'
�, z,. �d"'-, ,.. ��,.,, _..
J
, e„ ,,. ,,, p �a+.�� .,w„� .._
,. � �... ,
J
f
<
� 1
1
N
�
m
y
1
d a 4 e
M
V
wvi
t
e
�'z:
a Ph bu".�;'M.''7ai
h9�'"r E,�,^�Y.. �
,b6ry"„�J
d�
11,44
y
p
"�
rim _..
A
qy
E
p
4� �
V
rym �,y �y�,p ,,✓✓ w
_
WW
Ud
Q"
_....
i
,....
, `._ _.., ...._ m ........ ............
(CD[M, MUSTEE Mop Service Basin— Model 63M
PrAferrad by the, "Prot"
SEE PAGE 2 rOR A LIST OFACCESSOR)ES1
* All Musteo basins are one-piece molded from high impact resistant
DURASTONEI structural fiberglass (24!' x 24")
* Integral, molded -in drain for connection to 3" ASS, PVC ($ch. 80)
or cast iron
* Available drain seats for connection to T'pipis or 3" soil pips
I Complete range of accessories to meet specific application needs
. Colorfast marbleized white finish
30E��
Mustao Mop Service Basins meet or exceed performance requirements as listed:
• International Association of Plumbing and Mechanical Officials (IAPMO)l Listed
• Warnock HersW (Canada) listed—CSA test standards; Mop Basins - 41345,0
• American National Standards Institute (ANSI)-Specificaflon Z 124-2011
• American Society of Testing and Materials (AS110) D 636 E 84 and E 152
• CANIULC $102-07 Burn avid Smoke Test
01T��
'ArIl M_ I
Ganeral; Fuenish and insrqllrls shnwr, an plans, Mop
2'arvil.e eanin modal 63M, is rnanufaaftrred VW F1,
MudeL, &Sons, his, Unit to be cina-piece rnoldrd
fibergiass made w1th matched. matal maid s using
extreme heat =,I parerp. Height *hall be tV 'Mth not
h less tan 1"viNde Pho.!der. a.? Size 24"W.'Draio shall be
'nix r,,.dly molded, aoroplate with drain reel for h1r.RatWhen
of 3"ASS, PVC (Soh, MU) and iron pipe,
sMdnlciss steel etrAnar Perfoanance tested to M"k or Bxcrw, d AN of Z IM-2011 and FHA) H UD UPA -73, INeIg"i, 45
Jbs,° cubic feet 42, jnot,?Ji In ;onnplianra with local oodea
I FU j TX7
Sectional VMW
loll
ME
Top View
T
F
IQ""
24'
lil!
-A -
i-
Rk
LL?&81ee &Sons,blo, - 6424Wast164th street - grook Pak, OH44142 a Phoneu710,2673100 - F=216.287.9997
MUSTEE C—mil! in mustee.com. - WON wwwmusdelamm - Proudly made in the USA
Novull: our suflilfluGuammmmm In pamr:1 i1nPvsvesm.lMWjTMN In Owg."t. W.&.1 uiurd%uflq. wift"AWINA,
PM-N p..Wng 1100a3 h, U S A,
%', Mop Service Basin — Model 63M
MUSTEE ies
Prijlarred by the "PIOS" Accessor"
0* service Faucet
049171
M
63-600A 6 7103100277 6
Heavy duty, Chrome plated brass dual handle Sink faucet with top reinforcing bar and pail hook
on Spout.
Wb� Hose and Hose Holder
Model klo. UPC
65100
6 M031 00I-962
Heavy duty 518" d1a. reinforced 31" rubber hose with brass couplings an one and. Spring loaded,
morded rutilreir hose holder mounts on Stainless steel wall plate.
�= M
Model W. UPC
55.600 6 71031 00195 5
Three spring -loaded rubber holders Mounted to a 3" x 24' starniscs Steel wall plate. Click hem fear
more infarmallon-
> Bumper Guards
1,1 Available in high impact resistant molded vinyl (3 versions) or stainless steel (2 Versiorls).
UPC
Model No.
High Impact -resistant YInYI
63,40120-314" Long 6 7103100290 7
SW: niess steel
63.403 20-3/4' Long 6 71031 00409 3
It* DURAGUARD- Wall Guards
Protects wall surfaces from splashing and damage from impart 12" height, 20 gauge #204 stainless Steel.
Model No. UPC
67,2424 TWO panels & bracket for 24" x 24' carrier 6 71031 00293 a
L I 67.24C One panel & Carrier bracket 6 71031 00296 2
00 Optional Seals
For intuallaflons with the following pipe connections:
Model No. UPC
65.308 For 2" PVC, ABS and iron 6 71031 00303 4
65.309 For 3" PVG, ABS and iron,(Included w1mop basin) 6 71031 003041
65.311 For 3' sail pipe (No -Hub) 6 71031 00305 8
(EL MUMED & SUM, Inc, ® 64M YOMI 16*11 Shtet - Brook Park, OH 44142 ® P40no! 210267,31W • Fox! 216-NV40997 gp. MUSTEE E-Maji, . WGb- wWw.m"tftrn - Pcoudly mod. i" us USA Mau— our antlmow Gmrtihvew to P mm-0 oos —oft Go uo to Plu"u" sP-AW 1— nut" P...t. p..dj.U. Mae1w and Rdnioqj Oo 0.5,A,
Quotation
f
QUOTE TOSHIP TO.
` i Y
BEND,SOUTH 1 Fil. / SOUTH
CUSTOMER NUMBER JOB NAME / PO NUMBER JC3B NAME / RELEASE NUMBER SALESPERSON
10648 ERSKINE EXTRA IT IVI Shane Burgess
WRITER SHIP VIA TERMS EXPIRE DATE FREIGHT EXEMPT
Jason Windemuller 02/20/2019
ITEM # BIRDER CITY DESCRIPTION UNIT PRI
CE EXl' PRICE
* * MOP BASIN
lea MUSTEE 63M 24 X 24 MOP SERVICE SINK 166,67 1%67
lea CHICAGO FAUCET 897MPRCF W/369 106.67 106.67
lea MUSTEE 65.700 HOSE & HOLDER 25.33 25.33
lea MUSTEE 65.600 MOP HANGER 3 X 24 46.67 46.67
lea MUSTEE 63.40 SS BUMPER GUARD 28.00 26.00
lea MUSTEE 67.24C DURAGUARD WALL PLATE 146.67 146,67
Subtotal .. 520,01
FLOOR SINK
lea SIOUX 661-3P2 PVC SQ FLR SN Wt 60.00 60,00
lea PVC COME BOTTOM STRAINED 661®D 13.33 13.33
�t�ta0 ��...m. 93.�33 �
FREIGHT �*� ti
lea FREIGHT; OUT 99.57 99, a7
This Ouch, tlon is controlled by IEYNA's standard terms and conditions
CiCdA" a inndrord Perms"} found at Subtotal 712.91
ttias;Xitw arw.otrintstpzyrNy.monti 9ernwsaafondPiionsr�Tuotation
terry rsiNarrr terms oror as �e sty raj�actrwri. 7011". extant thoro is a S& H Charges 0.00
oon9licthutsroanany r , termsay�C'in 9
an the tat rt of itrJs i�uotation and FTNA"s ' t'nttard Terms, the terms
a ^ n9mxht an thwu a o�f'I r t1Mst�at2on control.
Tr E k E iIT II BI I II E c ru THIS i U01 i I Amount Due 712.91
Prices are firm for 30 days. Price subject to change after 30 days.
PliniM Elyr:_JWNDE_MU On 1f2112019 9L2:28 AM
Im
0
2911
? m ~
NIN
; !.
DATE 2f1/2019
City Of South Bend Venues, Parks and Arts
Erskine Clubhouse Renovation
Project No. 116-108
Ziolkowski Project # 17668
RCO # 030
Z7.2019
PESCRIPTION:
Provide labor, material and equipment to enlarge restrooms per (ALT. # 1).
Note., Some cost have gone up since bid day.
Item SGIO�PeOIWO�Ik��E5ufi.-atedl Unit Subcontractor Unit Price
M.� t�""ltal . Labor
h.. Ty
aft pe
Unit Price Material Manhours TVpe
o Quantityd Zour,tear'o�r t FR.t. Labor
LRS WvlLvInAl Cost $4L2a93_
$45
$0,00
art
_VRId
0
0
ii'd Ohisii�
; Lhis±
ibnal
$2�00
$QWd/
be an addeleoncal cost,
0
S0,00
........... . . . . . . . . . ...... ......... .
so, 00
0
roval
uLTY
0
1,
0
6
0
'00
0
-6
00
01" 1
5% Labor Markup
Subcontract Total _�fii q Labor Total
15% Material Markup $0
Material Total SD
Payment & Perf FIrpid
TOTAL RCO AMOUNT
Are m
Ers[I"t"Ine Clubhouse
Edward
12112 S, Wak—iii : !St
4u m x.e (574) 28 7..013 I
Contact. S lowif-) 8,kjrq ,;s
h uussetnasu�ppR;yr,i:olir'D"v
Enclosed are, Babbitt als and/or shop drawings oi-� the foObwing, items b6ng
propose,d for use on 'the alsove referenc(,,W project, Thl s inforrnation i� nc,)t
lntendcad to be, all-inchisive, bUt rs.ither contains rnaterial we feel pertJnent to this
project.
T'he imiages on 'these submittal sheets hz.-ive been scanned in to create m,istojj,)
subm,itta) shee,ts for, the abovo ref rence proje.f--t, All tradernark,,,,,; and patrz�),,rlts
apply to thea manufacturer of the materlals.
Pease return an approved set of s�.,ibmitt,,,)Is to El-[,.,JA Supply Coimpany af,.�, soc)n
as possMe, [Relea,;e of rnateriaprior to engYneer's approval �s the contractoCs
acceptancf�., of rnaterial as submitted. 'The rfitima< responsiNlity for ordering
mat�eria� that conformns to the proect sprecffic-
,ations, lies witl-i the contractor,
Subrnttas and/or shop draMngs on additional material wHI be provided upon
request,
If YOU havee a[ �,y que-stion,s regarding 'this inforrnation, Please clo riot hestate to
contact us,
FtFla `:. AIPPItr S 101293,%02
Era kme (,'Itjbhouse
Table Of Contents
VENDOR VENDOR PART' DESCRIP'TION PAGE
WIC-2
KOHLER
KOHLER
U-1
KOHLER
SLOAN
S-
AMERMCAN S
JO�MAF), VALV
K 3998-0
1.28 GPI"- TULET
5
K-4731 -C-0
TOILET SEAT
7
K-4991 -E'F-
HIGH -EFFICIENCY UR
10
3782643
SLOAN 186-0125 D
12
22SB625228
STAINLESS STEEL KI
4-275.550-0
KITCHEN FAUCET
17
305-408
SINK STRAINER
19
Ebia Supply S 102933602
Ersklne C"Aubhouse
WC—
cu�suPo�3�oxsysno�
�nmneouux*ose
. . ... . .... .
N' I
Features
Vitreous china.
Regular height Elongated bowl.
Class Five® flushing system.
Includes left-hand polished chrome trip lever.
1.28 gpf (4.8 1pf).
2-1/8" (54 mm) fully glared trapway.
12" (305 mm) rough -in.
Less seat and supply,
11 -1/4" (286 mm) x 8-1/4" (210 mm) water area.
30" (762 mm) x 18" (457 mm) x 29-1/4" (743 mm),
Floor mount / Floor outlet.
Components
Product includes:
K-4198 Elongated Bowl
K-4467 Toilet Tank
Additional included componentis: Tank cover, Trip lever, Bolt
cap accessory pack, and Tank accessory pack,
Codes/Standards
ASME Al 12.19,2/CSA B45A
DOE - Energy Policy Act 1992
EPA WaterSensee
KOHLER@ One -Year Limited Warranty
See websito for deladed warrarity information,
Available Color/Finishes
Color tiles intended for reference only.
Color Code Description
IN
0 White
96 Biscuit
47 Almond
7 Black BlackTM
USAiCanada: 1-800-4KOHLIER(1-80U-4166- . 4537)
Kohler Co. reserves the right to make revisions without notice to product specifications. THE BOLD 1.�.For the most current Specification Sheet, go to %AM
M _kq R.
2.12-2018 04:49 - Dt� L _ LE
M
I Finished Wall
Nlr
'5 61
3/4'
(19 mm)
(762 mm)
B-IY2'
(216 mm)
2-3/411
(70 mm)
X, 14-1/2"
(368 mm)
12'(305 mm) of Outlet
Technical innormation
All product dimensions are nominal.
Toilet type: Two-piece, Floor -mount
Waste Outlet: Floor
Bowlshape.- Elongated front
Flush type, Class Five
Will
%.Yldss grgoi Fit
K-3998
F -6j;Fe7j-j-- - ----I
nstallations
Use a 451 double Do not
wye fitting, doubleiati° «rrn4ary lee
�-18" (457 mm)
29-1/4"
(743, mm)
5" (127 mm) A
Front of Bowl
(413. 'nM)
)"o- . ........ .
10 114"
'2W mm)
(257 mm)
3/8" NPT Supply
(114 mm) Finished Floor
Trap passageway:
2-1/8" (54 mm)
Water Consumption
Full:
1.28 gpf (4.8 1pf)
Water surface size:
11-1/4"x 8-1/41' (286 mm x 210 mm)
Rim to water surface:
5-1/4" (133 mm)
Rough -in:
12" (305 mm)
Seat -mounting holes:
5-1/2" (140 mm)
Notes
Install this product according to the installation
instructions.
For back-to-back toilet installations: Use only a
45" double wye fittjujg.
OSA/Car) M� I �l�wst��ER (1 -800-4.- 7)Kohler CO, reseryteght to make revisions without notice to product specifications, '111"BOLD [00or te mosrrpcification Sheet, go to AyV',�kjg) 'L r jM. OF
2-12-2018 04:49 KOHLER,
Features
Solid polypropylene plastic,
Elongated open -front seat,
Ergonomic contour adds additional comfort,
Integrated handle allows user to easily raise and lower the ring.
Stainless steel hinge arms and hardware.
Heavy duty.
Without cover,
ADA compliant when installed with an ADA compliant toilet.
Check hinge stops seat from leaning back and applying pressure
on tank/flushometer.
Strg on0'
Commercial Heavy -Duty To �Iei S�'
K-4731 .1i
0 1 - I , 1, � 11,
PTW Mi 1071E, 12 6111
KOHLER@ One -Year Limited Warranty
See wobsile for detailed warranty inrorma , Ijon.
Available Color/Finishes
Color NO intended for reference only,
C010F Code Description
0 White
96 Biscuit
47 Almond
7 Black Bl,c.,kT.
1-8Q0-4K,0Hl-f§T(1-80 0"-4-56-45 7), A ses. 0 LD LOOK
Kohler Co, reserves the right to make revisions without notice to produL pcification
THE B
For the most current Specification Sheet, go to OFKOHLER.
B-31-2017 04:01
no supv'&y " i y w!"
4 Jd I ) C
313/16" (198 mm)
14-1/4" (362
Technical information
Ali Product dimensions are nominal.
Seatshapetype: Elongated
Seat front type: Open front
Seat hinge type: Check
Seat -mounting holes-, 5-1/2" (140 mi
Stronghold,
I
Commercial Heavy -Duty Toilet Se
K-4731 -If
_7
18.. 18-3/4'
(457 1 mm) (476 mm)
Notes
Install this product according to the installation
guide.
USA/Gana w 1-800-
Kohler Co. reseryth es e right to make revisions W1 out notice to product specifications, TIA-_ BOLD LOOK
For the most current Specification Sheet, go to
OFKONLER.,
B-31-2017 0401
0 � ,"j �)2
Ef:3m (IuNlo
Higl-i--efficiency Urin,;�--,)l 10
try i Supjp�/ s-o2a 6()
Features
Washout urinal.
3/4" top spud,
0.125 gpf (0,47 1pf) to 1.0 gpf (3.8 1pt).
14" (356 mm) extended rim.
Will replace K-4904-ET.
Water Conservation & Rebates
WmerSense-compliant when used with a 0.125 gpf or 0.5 gpf
WaterSense llushoaWer.
Recommended Accessories
K-10668 WAVE DC 118 GPF Urinal Flushonleter
K-10949 Tripoint"'I DCV8 (IPF Urinal Flushometer
K-13520 Manual f/8 GPF U6nal Flushometer
K-7528 WAVE HES -1/8 GPI: Urinal Flushornoter
K-7546 Tripoinpr, HES 1/8 OPF Urinal Flushometer,
K-10675 WAVE DC 0.5 GPF Urinal Flushometer
K- 10958 Tripoinill", DC 0.5 GPF Urinal Flushometer°
K-753-/ Tripoini'm HES 0,5 GPF UrimM Flushometel-
K-7526 WAVE HES 0.5 GPF Unnal flushonloter
K-13519 Manual 0,5 GFIF Urinal` Rushometer
K. 10,676 WAVE DC 1.0 GPF Wshdwn Flusshometer
K-10960 TripaintIm DC 1.0 GPF Wshdwn Flushometer
K-13518 fvfanuW 1,0 GPF Wsfidwn Flushorneter
K-7539'rripoint"m HES I wO GPF Blwout FluW,rorjjejer
K-7542 Tripoint"A HES, 1,0 EIPF Wshdwn Flushorneter
K-7527 WAVE HES 1,0 GPF Vth'didwn Hushoineler
Bardon"
Codes/Standards
ASME At 12. 19-2/CSA 845A
DOE - Energy Policy Act 1992
EPA WaterSense(D
California Energy Commission (CEC)
,ADA
IGG/ANSI At 17.1
CSA 96,51
KOHLER'S One -Year Limited Warranty
See vveharte for detailed warranty information,
Available Colorill"inishes
C010f tiles intended for reference only.
Components Color Code Description
Additional included cOMponent/s. 3/4" inlet spud, 2" outlet spud, 0 White
Strainer, and Hangers (2), 96 Biscuit
47 Almond
US 'anada: 1-800-41MI-L-H (1-8M'156-4537)
Korb
ohler Co. reserves heir ght to make revisions without notice to product specifications. I E BOLD LOOK
For the most current Specification Sheet, go to wwvqr)k , OFKOHLER,
9-11-2018 11:52
Z 0,a 0 P 11 �'� Y
2" NPT
Tap
21 " (533 mm)
Standard Installation
13' (330 mm)
ADA, CSA B651
Installation
T' (76 mm)
34' Spud
191,
(4,93 mm)
24 " (610 ninj)
Standard Installation
17" (432 min)
�359 rnrn)"',
ADA Installation
16-7/8" (429 mm)
CSA E3651 Installation
Floor
Technical information
All Product dimensions are nominal.
Flush outlet Washout
technology:
Spud size: 3/4", Inlet, `fop
Min- Water per Flush: 0.125 gal (0.5 Q
Max. Water per Flush: I gal (3.8 L)
Designed for Ifie above water use when installed with a
water -saving flushometer,
Bardon TM
R�gKi Eft-ilemy-ftiod
K-4991 -ET
18" (457 nim)
j2"'(305 mm)
tp
26-7/8"
(683 mm)
4 0'- 1/2 "
0 029 mm)
To Fluor
2" NPT
Tap,,,l
(6 rrim)
6" (152 mm)
Notes
Instatl this product according to the installatio
guide,
Refer to manufacturer's instructions and local
codes for flushorneter requirements, I
A 4
'Will"
UbAlGanada: 1 4KOHLE R (1 -800456-4537)
Kohler Go. reserves the right to make revisions without notice to product specifications, RAE KXD 10OK
For the most current Specification Sheet, go to vq
bF
9-11-2018 11:52 KOHLER,,
LJT]; SU u0v S02,,-J,33,far')2
SL 0AI`%4,
I
CODE INUMMM
3 782.643,
DIU.SCMMON
OJ25 gpf, Dana) Fjleered Bypa:ss, pajnst°ied Chrome. FlMsh, Sgle Flkjs�),
5kMA(A) Ii xpowsl NlamW Flushofnekvra
DEFTAILS
* Rush volum'ea 0'1?5� gpf (05 t.pf)
* NnlshPvfisNad Chrome o.:P,
Valve: Djaphrogm
Sypass!Dual -Fllitered Bypass
ValwBody M Aeflal: Seml. red Yeamss
hXture Type, jrjjf)aj0
hxture Crnnectiow Fop
Rough ln Dimmer ;Ow 11 `V5," (292nnnn)
5pud Coupfirq (19rnrn)
5uppiy Npe"�s 6` (19rylm)
FEATURES
QuIO:' Exjpfxi"',(J, F"'Iaphragm Type, Omme Plated Mgh Efficiency
Urinal
* PERNIIMO" 5� nt6e.dc Rubber Naphragm Mth O(IM Bypz),ss
* -Vdk' LES. Screwdilver Bak-Chv-IkO AngUe Stop Mtn Vandal Resistant
5"tap CdP
* Vacuum Bireakeir Mth Hush Connection
* 51pud Coupfing and 5pud Rjngx far Tep Spud
* Sweat ScHer ,A(Mpter Mth csweg, ;� ujte and Cast WaH FIange
* NW14101d-Opm Handle aywS No Irxtreii naU Volume Advstrnent to
Insure water Callservadon
* Wgh Fffl(Jency f1us6h accufacy
* D74phmgm, Handle Packing and Vacuum rare: eirMokied from
PEMNIEXQ) Rubber Co: qqpourid for Chhmmlne Resistanc e,
ADA Camp lh.)nt MetM Oidflatlng NwtiHokl-Opcsin HaridIe
SLOANIV MANLIAL F1 U514WUTER
SLOAN 186-0,125-UP
Vog'Wtbn Not Shown., Sutton 'Fixtwe OW ActuaWr
COMPI IANCES & CER WKAIIONS
(ADA CurrlpHao, cUPC CortMed, WaterSensA, L.ksroj, BAA
COMOM)to Sldlifi(x5 LITI) Creffits, EPD, U wD)
RECOMMIT."INDED SPECIFICAT,10W
VaNP Body, Covm, RlilpiPce aml Control Stop shaU Lip lin
contonmince q0th ASM Allby Chssillcation forSern% R(,-,,d
Eirass, VaWe 5haH be in corjjplj,�ujce jejith appIn:,ibe
scmUns of ASS E 1037 and ANSUASK, 112,19.1
VALVE! OPERAIING IRIIIESSuIRIE (FLOWMG)
15-80 K (1,03-552 kPa). S0,Cci6lC ffXUwcs may ir�equlre gmeater
piresnore .r f1j,"fl)UNcturer
requiremw,,
DOIAHMLOADS
511k)"Jo hy";1�04"'Uoxl lnF'Jiru"Aionc
';Sosm Nmini:'h)
Rej,.',a+T and
Hush Tlawrl"Rl"pmr and h1a�rtera'we Goide
Rq4r- gymd CWde
Ioan RePa)'WJ PAPA '1+ NUVW C, GAO�
Additamal OWN1110PdS
NOTES
M infonnaflon conTmned wfthln ths dor.uyneit sulojer,& l()
change wlthout nalcP_
Lnokhig (Cm otheir vai iatdons of the SLOAN 186 product? V4,,w
th( " -"hoc't W11aIIIoptjon�['
5RId a COMINAiWe urinM for ffif iushomet�N,
Fd� ml F, ao m p otib4 mab "r chief" for fh�s f I Usl wlrfwte�'
SWaD 10500 SaYmour Ave, Firanklhm Park, H 60131
Phoneu 000,982 'A 19 , Faxs EIW3,447A.124 - =;hmm(,onj
Codp ?.78264".] , Ooymuvmdfed WW2,9118 ReW�xed 06/09/18 V,�,'qq
p r �Iuly S a29 ;' :`60'�
SEA J."JAN,
m
SLOAN,* MAN UM Fiimsiiomii:� min
SWAN 186--0J25--DBp
—Vd" MIN,
(57 mm)
214,11 I.R&
SUPPLY
(DI 20 mm)
(121 awn)
CENTERLINE
EHLINE
OF FIXTURE
FIN, FLOOR
WALL
Sofrtaql Yo)506 SeYfftuu�Ave„ Firanklin Park, H. 601,"31
F'1110W� 8'00,982,503�1 � NIX� 300,447.4329,, �1c,'mj,,,,
Code, 3 (82643 w Dowd oaded 08(?g/ , 18 - Relnsc'd 06/0u4?18 - vja'"j jl"at.p
paqc t ")( �
I , to ,a
F` 41,,s Clubhouse
9,
City Of South Bend Venues, Parks and A
Erskine Clubhouse Renovation
-roject No. 116-108
FIFINIIII P�
QESCR
Provide labor, material and e
Aftei nate Bid
(Sft attache�
WT RWYli
thare will e
Dedurt Wlov
Scope of Work
Em
91IMMMEM
9
U'UQFKr]C301' marxup
Subcontract �--$23.21
al Total Labor Obi Craft LT.b.r
T-t-I
ce Material Manhours Type Labor
$0 0
L
$0
C
-T
$ '66
6,
6
Lp
15% Material Markup N
$
Material Total F77 O
Payment & Pert Bond
TOTAL RCO AMOUNT
dIAjq ffldrKuj)�
Labor Total �-
Erskine Clubhouse
Edward J. White., Inc.
Ebria Supp�y S102933602
� 2 o 2 S, \Nah)ut Sj:
SC�U[h Bend, IIIN 46619
Pl� (574) '287-0132
Fax: (574) 287-013 �
'ontact, shane E'd.rrgass
Enck)sed are s(,,irnitta�s shop drawings on thee foHoMng Hter-ns b(-)�nqj
proposed for on the, above ref(,m,eir)t_,E..,,- proje.ct, 171,1s
inf orryiz,1 tic) n, is not
intended to [,.,)e ;,,)H- inclusive, but rather ,'.',,Ontains rnater,W w(� p,, �,ti(,,.et) t to taj s
I he irinages ori these subrnittas1-ie(,As ha Nfe bec�r,,iri scainner'.] in to create custorn
st.ibrnittasheets for the above r(,Aference piroject, AH tri.,iderrlwks, and Patents
apply to the rnalllUfticturer of the rnirt tf.z,0a[s.
rP�ease return an approv(,�d set of subm�tu.--fl,s U.) ETNA Supp�y Carnpany as soon
&.,, possibl,,,,,,`. Release ()f it 19tlelr-4prior to engIn(,-,er's approval is the n'
cotrr actor's
I.
acceptance of rmiter'.W as submVtted, The, ult ' irTiatE) rc,-,,�sp<-)nsR)Mt,y for order8n�,.,)
rnaterial that conforaxis to the riroject specrNC,atiOns fies Mi ' h the Contrar:tor,
Subrn,(tta�s and/or sl-ioi,�) drawinoz".
gs ri idd�flona� mia,iterW will be proMed U��,)on
If YOU have any c4uestions re.�gar6ng this inforrnatkm, please do 0-tot iesitat,, �P to
C-ontact �..Is
f!-'*P1-,-V S� Pliffly '� 10293 Z602
"rim 01,,e
From- jbucher@ejwhiteinc.net
Sent: Saturday, January 26, 2019 12:19 PM
To, Tim Morey
Subject: RE: Erskine Clubhouse
Attachments: Quote - Stalkers - Alt. #1 & #2 Increases (With EJW M,U.),pdf
Importance: High
MR
Please see attached. Per you-'rrecWest, the following are cost increases associated with post -bid acceptance of
a an add on here for additional paintgrill-asseciatffwith Alternate #2, We
n
need a response back ASAP confirming that it i
Alternates #1 & #2. Note that the
re that tilskerinates and„ priee-irref6ses were accepted (the paint grip can
wait). We are getting ready to install Un'q=ro-wnd,TNd_nqed to know for rough. -ins and drains:
All'67MM — Lower Level Restroorns
The increases in plumbing for this alternate result from the plumbing fixtures . . . ......... . .......
4% ures and cppperplj�ing-, The increase in HVAC
comes fro rri1RKTd_U"ffiat two exhaust grilles need to be purchased since t h&tvV6—'gri lies the alternate stated to delete
were already order tuns ice the alternate was not accepted t' he
* - b 6ginningofthe job. The grilles cannot be returned.
Labor, $01 NS�SN
Cop
per .
a Pipe & Fittings."$47 3),
® Plumbing Fixtures-,
* E. J. White J,55,98'6ass Material M;'kqyp: $53.61
1�
St-1 er Sheet Metal: $86.00
J. White 101 Gross Subcontractor -Marie '_Ur��'.'sa5ls
AdditiDna1Add fbrA1ternate#1: +$452,93
The increases in plumbing for this alternate result from the plumbing fixtures and copper piping. The increase in HVAC
comes from the fact that one barrel diffuser on the spiral duct that was supposed to be eliminated with the alternate at
the beginning of the project has already been purchased. One new diffuser needs to be purchased for the bar area. The
base bid grille cannot be returned.
• Labor: $0
• Copper Pipe & Fittings: $21.93
• Plumbing Fixtures: $76.18
• E. J. White 15% Gross Material Mark -Up: $17.32
• Stalkers Sheet Metal: $153.00
• E. J. White 10% Gross Subcontractor Mark -Up., $17.00
ill iiiijill''111111111111
To: Jeff
Re. Akernates (ErAine)
alternate #I
Vve exhaust griiis due to already having the I
Be eliminated, --gdl.s 'f 4 114-fltEl'nate caHed to
rial $ 85"00
b,ur $ 0
Total
Total Add: $95.56
After hate #2
We will be adding (1) four way modoiar core! diffuser with diffuser box due to already having the diffuser
the alternate tailed to be eliminated,
Matedai
Labor
+10 OSS Mar[c-Up Tbra I Add $ 1.53�00
tj g� r4KL [r
Alternate,41.2 'Add- $170.00
INS alternate calls For (1) 9" standard spirai from main duct fi,j—w;-r'� '-.-if-paint grip is decided cri wr.,
spirat to paint grip
M
Total
Thank you
Total Add: $409.89
VENDOR
INDEX
INFO
WC-2
K 0 1-1 L E IR
KOPH-ER
U-1
�K I i I.- E R
S
AMER�CAN S
AMERNCtkN S
75 M A R VA L- V
Table, Of Contents
VENDOR PART DESCRIPTIO14
K-3998-0
K 4.73 1 - C-0
K 4991 - ET-
3782643
1.28 GPF "T'01 L,E'T
I 0H ETSEAT
H I G N� I - E F F I IE N CY u R
SLOAN 186-0A 25 D
22SE3625228 STAHNLESS Sl-f,:-,,,E] IZi
427555CW Kil"O"IEN FAUCET
305-408 SRAK STRAHNER
PAGEI�'
17
19
"Dria supp�y
07rine chjblhou��—
Stah-dess Steel Kitchen Sinbc ... . .... I E�
Kitchen Faucet ....... V7
Una SUPPPV Sl 02953MI�
Emom cWsKme
0
U 22SB.6252283S.076
• Colony ADA Single Bowl Sink
• 3 hole
6" deep bowl
20 Gauge Stainless steel
• Top Mount Installation
• Bottom Sound Deadening Pads with undercoating
• Waste fitting included
- Cutout template, installation instructions and top
mount hardware included
o 27" (686mm) cabinet required
- Limited Lifetime Warranty
Q 22SB.6252284S.076 Stainless Steel Sink
* Colony ADA Single Bowl Sink
* 4 hole
* 6" deep bowl
• 20 Gauge Stainless Steel
• Top Mount Installation
• Botlom Sound Deadening Pads with undercoating
• Waste fitting included
Cutout IPMI)late, installation instructions and top
mount hardware included
* 27" (686mm) cabinet required
* Limited Lifetime Warranty
(635 x 559 x 152mm)
Each Bowl Size:
21-1/4" (540mm) wide
15-1/8" (384mm) front to back
61' (152mm) deep
Following Specifications:
ZEN" CNATAIMMIN
.. ...... . . . . ..... -_
To e Specified:
- . .... .......
B
Q Color: Stainless Stoe1,075
=M011
C,IVERSE FOR ROUGHING -IN
Pei" the Plumbing Fixture Schedule"
scheduled to be ",r
specified is only three holes and is not stated to be provided with a
sprayer. Please verify if a 3 or 4-hole version is required. If a 4-hole
version is needed, please specify if a sprayer is to be #�rovicled with it.
Note. If a sprayer is required, it will be an additional cost!
INMMMMEAMERMANSMTH D1$Af31UnESAC1 aVIDE"HIES AN P
ANW A $1 Vi ACCESSIBLE AND USEIABLE OWL WIWI$ AND
FACILITIES • CHECK LOCAL CODES
L59
SPR1_,22SD,62522638,07F, C010KTY2,5X22AnA a91 bwl Revl V17
COLONr 25 x 22 ADA SINGLE BOWL
STAINLESS STEEL KITCHEN SINK
BARRIER FREE 20 GAUGE STAINLESS STEEL
f- 6
25"
HOLE FOR
22SB62.522B48
ONLY
11 n
(57mm)
. . . . ......
/3x o1-112' 0
(03amm)
0
' 0'125mm)'7
si
114nim)
'P
9.3/41 22-IJ16"
(247mm) j (561 mm)
12-1/1111
(slamm)
21-al8l
(543nirri)
NQTES�
* DIMENS*W SI'lOWN F(V tl OCASION OF Stwpi 4M AND `P` TRAP ARE SUCIGUTED.
R'UNGS NOTINCLUDR) Wil FH NXTURE AND MOST BE ORDERED SEPARATFLY,
SEAUN(l (AMPS UNDAtl)PPLIED BY OTHERS
IMPORTANT:
Thnmo ,jeo subprt to change orcan'.'ellatlom- N6 roepowvyAblily k3 a�'wmlod for urge of ouper:iwduln ¢ar voidadvages,
2017 A"
- L60 - —
PART OF LIXIL 5 P 22,SB 6252283 S-U 75 Col onyM22A CIA sgl hwl Aev N 117
SUPKAV �: � (32"�3,5C,,U12
25r,
0 ")MI
Durable brass construction, 1/4 turn washerless ceramic disc
valve cartridges, Durable casi brass waterway with I male
Inlel shank a. Brass gooseneck swivel spoutand lever,
handles. Metal eSCniche orl plate (esruWboon, st7e 10-5/161
x ti ti 29pni/8,3LIminrnaximum flow rate, t 5ql)iTV5,7
Umn, Nwo rare for Ft5 models,.
(3 4275,550 Kitchen Faucet
Lever Handles, Less Handspray,
4275.550.Fl5 Kitchen Faucet
Same as above, IlLupirn flow rate.
Q 4275.551 Kitchen Faucet
Lever Handles. Separate Color -Matched Handspray,
U 4275.651.FI5 Kitchen Faucet
Same as above. 1,59pm flow rate,
Ceramic Disc valve Cartridges. Assures a lifetime of
drip -free perfoanaire,
Cast Brass Waterways with "City Shanks"; Strong and
durable. Integral tabs on casting provide a wobi)le-free
installation,
Lead Free. Fauept contains 5 0.25% total lead content by
weighted average,
Simple InStallatiort: Fast and easy onp. pc.-wson
installation. Faucet drops In from top, Quicl<!spin nuts secure
raur,O In place
SUGGESTED SPECIFICATION:
Two handle kitchen faucet shall feature brass construction with all brass Inlet shanks and coupling MRS. Brass gooseneck
swivel spmil, Shalt also reature 1/4 turn washarless; ceranve disc
valve cartridges that are reversible for use an eilher,,hoj- Or
.. cold' side, Faucat shalt tie American Standard Model ff4P75,5----.
Q 2011 AS America Inc.
ME
S tY 10 That Works B otter
CODES AND STANDARDS
&w--���4-"-- *kyowiq
codes andIstandards:
ASIVIE A112.18.1
CSA 8 125
loop'
COLONY SOFT
Wit!"I' BRASS GOOSMECK SPOUT
FLOW RATE
2.5
2.0-
a.
1.0
0.5-
1 20 40 60 80 100
INLET PRESSURE (PSI)
71ow rates shorn am W mixed hot and w�Id.
MGM
FLOW RATE'
w
a.
1.6
U,
it.
20 40 60 80 100
INLET PRESSURE (PSI)
'Flaw Mte6VIUM
are for Mixed hot andcoTd,
Finish
Finish
0)t1ons
0 "'ons
Product
c FNurmnber
Polished
0 ',shed
Chrome
Chrome
FIVE)
FIVE)
-Stainless
Description
Steel-
002
(17
075
4275.550
Kftchen faucet, Lever handles. Less Handspray,
lHandspray
4275.550.1715
Same as
Same as above. 1.5gprrV&7 Umin. flow rate.
4127 & 55 1:
Lever handles, Separate Color-Matjohed
4275.551F15
Same as above, 1.5gpm/5,7 Umin. low rate.
Meets 010 American
Disabilihes Act Guidelines
and ANSI
A1171 Requirements for the
physically cWienged.
0 2011 AS Amprfeft tvw,
MR
Er,jldrj,E� Diabhouse
M i
High quafity arxi i0w COSt Makes this deep cup strairipr
a perfect choice, Made of 100 grade smh-dess steel, it
features a unique post that can switch frornstralning to
a positivp leak -pro& rubber seal with just a quarter turn
r'notlon. With as latge zinc lock nut and tail nUt it is alSO
easy to instafl,
Fits sinks which have a thickness between 1116" and 314"
WARMNG16 p"c',di cj,,,m IUPQ5,PU NO CV
OT"'11CM5 ackildfing
cror,SIN� I .� (a I 4(j rri� a Co c�qi ssc� �,jfljc Cj, I o(oj jjp,,�c,' Wh Ch 15 CIGIAM 1v 00 1 A N, .�r
to '— "J, 6 S VV3 'n; I" g 0"
J
V 4% t
.No.
Materials
305-408
1
Hx)dle
Chrome Plated Zinc
2
Straim" RmIket
S5430
3
Body
Polished SS430
4
Rohh&'M�iher
BUPA-N
5
C�jp
Galvani2.ed Steel
6
Lock N(a
Zinc
7
Seal Ring
polyethylene
3
Ta I I III at
Zinc
WQ�
i n, 11 u A, s F6, i io i i r:,, q
IN r"! q; Info m ar1ml a u bic'-'c t k .r,jumj?. wkhcNaI w4kC'k
4.12,101 is jorriarvalve - www.jomarvalvexo--fIn-7
i (D 2 3, C > 2
City Of South Bend Venues, Parks, and Arts
Erskine Clubhouse Renovation
Project No. 116-108
RCO # 032
2.8.2019
QESgRIPTION.
Provide labor, material and equipment to add three (3) additional door grilles per RFl # 035.
Item Scope of Work JE5114*1 Unil 3u�conlractor
MNo,Quantity�b.Lit
RM
0
Subcontract Total
rlal Total Labor Craft Labor Total
race
Material Manhours Type Rate Labor
�qwt"--- ---- — —"— --ZZ
$0 6 carp�M f� $33
—0
500.0 0 $00 $
go
$0.00 $
. ................ . . 6—"
'P 'Uu�
i6'-001 , -
nmo 6 =
$0.00a
$000'
0
SO 00
15% Material Markup
Material Total IMo
Payment & Perf Bond
TOTAL RCO AMOUNT
Labor Total
fl� =
M=ftWMW=MffXA=RWWNWRXX=
From: jbucher@ejwhiteinc.net
Sent: Monday, January 07, 2019 12-56 PM
To: Tim Morey
Subject: Erskine Clubhouse Rbnovations - Pricing for Changes Associated with RF1 #035 - Door
Grilles
Attachments: Quote - Stalkers Sheet Metal - RFI.#035.pdf, Submittal - Door Grilles,pdf
Please see attached. This price is for adding the three door grilles per RA #035. The total is $415.56. Breakdown is as
follows:
• Stalker's Sheet Metal: $374.00
• Subcontractor Mark -Up (+10% Gross): $41.56
RER99TATM19
Grilles have a lead time of approximately 4 weeks from date of order. Grille color is WHITE but can be painted to match
surrounding finishes as desired (painting, if required, is by others). Cut sheet is attached.
Please advise,
Thanks
Jeff'rey M. Bucher, Jr.
Vice -President
JO
1011 South iNfihpit SL, South Bend, IN 46601
Office. (574) 289-6351
Fwx: (574) 289-3755
Cell: (574) 532-3488
FAnail:
Web:
Project B 3jf NEI_81ZI
Date L2
Roof, Aroh offleo _Mnlshall and Wells
o/
Enginau us Prepirer 6Lid aqrlikq
0mg,ractor rq,�. 60l ylaur rcimtvt znae, Version 2014,0,425
T-700L
Main Product
T-700L T70OL-1
+ 0.__._....___. , . ___._.
TVPe A 17116" 77'oefiili econ 114"
External Screw—,,",
I Inv
*------------— D � 114"
Duct Size 0
Available sizes (D" x r)")
6" x 4" throuql,. 30"x 30" in I" inGrennents, Wmensions are in irifhes, opening -,ize, stintild l)a duQk Size ± q�%
Once Mount, Borlar-1
Duct Width Duct Heigflt GiriiTft 67AWidth Grille CA Height
10 io12,125 1 12,125
T70OL-1
Grille offers the largest free area possible with a no view through design
• Inverted V-blades block vision: provide rnore stiffness; and greater resistance to darnage from bumps and kicks.
• Widely used in doors and as an exhaust/raturn grille where plenum and duct interiors needs to be concealed,
Hortzontal blades are spaced 'Wapart
MaterIal: Steel
Emffmv��
lD Quantity Tag WIDTH IN INCHES
10
SORDER I -SURFACE MOUNT
FINIISH 26 - WHITE
FAUTENING A - SCREW e IOLES
M
ACCE83ORY 1 AF - AUXILIARY FRAME
ACCEVSORY 2 NONE
1*70:OL�l
Page I of 2 - Edge Version 201140,425 - Product Information is Subject to Change without notice
Dato G 0017"IL'
Arthiteof Offica LOaLqhaLtan 1�&Ls
Praparer LmAy
Engineer
CQntraolor wwlm &mw,. Version 2ol 4,C)4C
Des", nation
T700L.-1
AF - AvOinoy Framet
Page 2 of 2 - Edge Version 2014..0,425 -, Product Information is Subject to Change without notice
S,c
TALKER"AS6
HEATING & AIR CONDITIONING, INC.
P:.O. BOX 3681
SOLNU BEND, INDIANA 46619
(574) 234-2009
We propose to furnish and install (3) 10x1O door grills with auxiliary frames for combustion air to
mechanical rooms.
Material $ 254M
Labor $ 120.00
Total $ 374.00
(items Not included)
Cutting of doors
Painting of grills or frames
City Of South Bend Venues, Parks and Arts
Erskine Clubhouse Renovation
Project No. 116-108
LESCRLPTION'
Provide labor, material and eqUiPment to rework the exijl[ff�. kitchen
rMglng on and not to code,
Payment & Perf Bond��
TOTAL RCO AMOUNT
Ziolkowski Construction
4050 Ralph Jones Drive
South Bend, Indiana46(128
AM,): Tini Mbrey
dLe-c
2021. N Merrifield
Mishawaka, IN 46545
Fax (574) 855-3592
Cell (574) 334-0259
Quote #C 10569-5
February 11, 2019
Erskine Golf Course Club lJouse-Kitchen Feeder Rework.
Scu —,e qc—work
0 Derno Existing Kitchen Feeder that is loft handing and is not per NECa
4 The manner in that the conduit is now is a safety issue,
a We prcpose to rcinove this conduit and wire from the new electrical panel back to the
junction box that is directly below the panel.
0 The new beaker feeding this panel is a 100 amp, so we will install a 100 arnp Beeder
C�
which will reduce the size fioni a2l" to a 1 14".
• The new conduit will be installed per code and will make the physical appearzuicc
much better than it is presently,
• Labor 24 hours @ $X00 $1,680A
• Material $830.00
0 Over Head and Profit 10% $25 1,00
Not to Exceed
TWO Yhousand&nlen Hundred&rty One cold (loll 00 4jojj(ja,,� $2,761,00
(Sales tav axcludc,4�)
Warranties
Fne.,inecring - Flite Electric %vill R gtiarantee its engincering fi-mn d6a cts fora 1,vriodof one year,
flardware— Manufacturer's wal-GUItics will �nIpply ten call eqifipment covered in 0iis propmal.
Elite Elcclric wilt 'lot replace or warrant damage due to negligence, vandalism or acts
ot'God
Limits of Proposal
Proposal considers the exisience of systeiri drawings to indicate oirrent accurate con rwnra, fion.
This proposal considers work boing done during normal working, hours. O/Tis n 0
ot Covered by this proposal.
Delays by othorsacne not considered by this pr(,)f.xxsaL
This prop cos l donot collskler thelbihire, 0 , if existing hardware devices rejajjjjeaj dbr reuse.
Civility Costs of ariy son are, excl tiffed froi n t1ij is pro a]
CLating, patching, PailltiO&a is not ii'lChAdCd in this proposal.
Paige 1 of 2
Security, Speakers, not included iry ffijs proposud
State Drawings, riot iriciti(le(I in tIlis pj°opo&tj
CAD (hI riot included in this proposa�
Terms of Proposal
- 100% due not 3 0 upon completion of project
Cost Guarantee — Qumatim, is valid for 3 0 days from th , e date of subtaittal,
Statei i
---,
I have read rind agme to the definitionand ternis of this, proposal. I have the atifficwity to older the work-
i equL-ited. I give Elite Electric the atithority to carry out flie tel-nis ()l, this pl,(),30s'11.
Corn awry Name
MMUMMM
(kl:JR, CS)M ML—FN,![��N'F
At Hite Electric, the custonjet-s concerns are our rasp onsN, We ofl'(r• ye,r,,r*g of combined in field service
experience, enoilleered application and precision setup wid,r e�.I installation. We will treat You with coulleous
cv
respoosiveness and knowledgeabe prof,,Sionafisrn. It is our conirnitment to provi(le soltgions tbratl indtistrhd
needs.
Call with any questions,
"I'liank You,
te a ItUric
Page 2 of 2
City Of South Bend Venues, Parks and Arts
Erskine Clubhouse Renovation
Project No. 116-108
Ziolkowski Project # 17668
RCO # 035
2.14.2019
DESCRIPTION:
Provide labor, material and equipment to repair 78 sf of ceiling on the main level.
Item I Scope of Work Estimated Unit I Subcontractor) Material Total I Labor I Craft I Labor Total
No. Quantity Quote Unit Price Material Manhours Type Rate I Labor
0
$0.00
0
0
0
0
0
0
Subcontract Total
15% Material Markup
Material Total
Payment & Perf
TOTAL RCO AMOUNT
3100rMarkup
Labor Total
DAFT 20112019
City Of South Bend Venues, Parks and Arts
Erskine Clubhouse Renovation
'Project No. 116-108
Ziolkowski Project# 17668
RCO # 037
2.21.2019
DESCRIPTION:
Provide labor, material and equipment to fur new Storage Room G-09,
Existing walls have lead paint and is flacking off.
Item
Scope of Work
Estimated
Unit
Subcontractor
Material
Total
Labor
Craft
Labor
Total
No
Quantity
Quote
Unit Price'
Material
Manhours
Type
Rate
Labor
. .....
..........
.............
Ea b-o r
.
. . . ......
$0,00
so
..................... . ..
C M
------- ----
$55,45
..__Cost -
$1,331
$0,00
$0
0
$0,00
so
Tappand Finish
0
. .. ... . ..... . . . .
..... . ..........
— - ----------- -
$0,00
................ ..
$o
..... .... .... .. . .... .... . ... ....
2
Lab
S4346
$87
...... . ............. .
........... 0
$0�00
$0
a
$0,00
$0
- ----- ------ - ----- .... ............ . . . - - - - - — - - ------------
Malteri,21111
01
$0,001
1
11iq
$0,00
1111-lTj
Furinq material and Drywall
1
$256
$0,001'
$0
$23700
. ... ....
—$(),0-07 ....... . .
Subcontract Total
15% Material Markup $741
Material Total
Payment& Perf Bond
TOTAL RCO AMOUNT
Labor Total
DAFF Zi?lt2QW
Item
No.
City Of South Bend Venues, Parks and Ar
Erskine Clubhouse Renovation
Project No. 116-108
Ziolkowski Project# 17668
DESCRIPTION:
Provide labor, material and equipment to fur out =/- 10'fo wall next to Storage Room G-09.
Existing wall has lead paint and is flaking off.
Scope of Work �Estimated Unit Subcontractor Material I total Labor craft Labor Total
I Quantity I I Quote UnitPriceMaterial Imanhours Type Rate i Labor
00
$0,0D
so
- ---
------------------- -------------
:4,,3 16
$43
0
$0 no
Painters
�Mo
--$6766-
�6
�8.q nn . . . . . . ............... F1
'$51.40
"'
�6i'Fl
0
.........
..... ........... . . .
00
�
0
.. . . .0
.......
$000
. ...............
$0,00
$0,00
0
$000
50
0
$0.00
$0
0
0
0
Subcontract Total L--M Labor Total
15% Material Markup
Material Total
Payment & P&f Bond
TOTAL RCO AMOUNT
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date3/4/19......................................................................_
Name aleSveus Department Ep 'mm em emrin -
BPW Date l2 iq Phone Extension 9083
IMP IN IVIVPo.MI SdEm �IWIMMmmw �ffiwWWWW NMNNNNNNI�6' >+wmvmnmm�m mm�mmmm�%p��py;,pWN'M'M�i�BiY� ift/... I�pM,I' M�P,M�'d',W',W1PoI+. ft
�... ... ......... ��.....���.....mm..
mmmmFuired Prior to Submittal to Board
Legal E] Attorney Name Clara McDaniels
Controller El Controller review is required for all Contracts $5,000.00 or more anc
greater than one year in length per the City Purchasing Policy
Purchasing n Michael Schmidt
Check the Appropriate Item Type —
LJ Agreement
Professional Services
Bid Opening
Quote Opening
® Change Order No. 9
El Ease/Encroach.
E] Other:
LJ Contract
F1 Resolution
n Bid Award
El Quote Award
El C/O & PCA No,
❑ Traffic Control
for All Submissions
I Proposal El Addendum
❑ Req. to Advertise ❑ Title Sheet
ired Information
❑ PCA
Company or Vendor Name Ziolkowski Construction Inc
New Vendor EYes EJ No E] If Yes, Approved by Purchasing
MBE/WBE Contractor F1 MBE ❑ WBE
MBE/WBE Contractor Requested ❑ No ❑ Yes Name of Company
Project Name Erskine Clubhouse Renovation
Project Number 1 � 16-108
�..... _....... ........._._.
Funding Source �,ft C.A P,-A
Account No. .LaL.._ L®r 4_52.
Amount $62,852
Terms of Contract
Purpose/Description
Restroom and Kitchen bar work, ceiline repair, mop floor sink.
Kitchen feeder rework.
n Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination„ Non -Debarment„ , Iran,
auired For Chage Orders OnI
Amount of Z Decrease $, increase 62,8�.5.�........._....�666
m...........................�.�.�.�..m........
Previous Amount $ 1,013,990.00
Current Percent of Change: 6.2%
New Amount $ 1,076 ..............�... .��.......
_ ,842.00
Total Percent of Change: 18.73%
Dispersal After Approval
Copy Original
® [ Kyle Silveus
.. ....atri.ck........................ w.....
® ❑ Sherman
. �...................._��...... m �----
_..... ��.