HomeMy WebLinkAbout6A (3)I 4(;1
RESOLUTION NO. 3069
RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION
APPROVING AND AUTHORIZING THE EXECUTION OF
AN ADDENDUM TO THE MASTER AGENCY AGREEMENT
(Orchestra Pit Lift)
WHEREAS, effective January 1, 2012, the South Bend Department of
Redevelopment, acting by and through its Redevelopment Commission (the
"Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a
Master Agency Agreement which authorized the BPW to act as agent for and on behalf
of the Commission for certain projects during 2012; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the Orchestra Pit Lift Project to the Master Agency Agreement by way of this
Addendum.
NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment
Commission as follows:
Section 1. The Commission hereby approves the Addendum to Master
Agency Agreement (Orchstra Pit Lift) and hereby authorizes its execution in substantially
the form attached hereto with such changes as the Commission may deem necessary or
appropriate upon the advice of counsel, said execution thereof to be conclusive evidence
of the Commission's approval of such changes. The Clerk is hereby directed to file a
copy of the Addendum with the BPW.
Section 2. This Resolution shall be in full force and effect after its adoption
by the Commission.
Section 3. Commission staff members are authorized to execute on behalf of
the Commission any documents necessary to carry out the intent of this resolution.
ADOPTED at a meeting of the South Bend Redevelopment Commission held on
August 16, 2012, at 9:30 A.M., in Room 1308, County -City Building, South Bend,
Indiana 46601.
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
ADDENDUM TO
MASTER AGENCY AGREEMENT
(Access Agreement for Orchestra Pit Lift Donation)
This Addendum to Master Agency Agreement (this "Addendum "), made and
entered into as of the 9th day of August, 2012, by and between the South Bend
Department of Redevelopment, acting by and through its Redevelopment Commission
(the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly
organized and existing pursuant to the laws of the State of Indiana, acting by and through
its Board of Public Works (the "BPW ") for purposes of the Commission designating the
BPW to act as the Commission's agent to undertake the Access Agreement for Orchestra
Pit Lift Donation (the "Project ")
WHEREAS, effective January 1, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for certain projects during 2012; and
WIIEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the Access Agreement for Orchestra Pit Lift Donation to the Master Agency
Agreement by way of this Addendum.
NOW, THEREFORE, in consideration of the mutual covenants and promises
contained herein, and for other good and valuable consideration, the receipt of which is
hereby acknowledged, the BPW and the Commission agree as follows:
1. The Commission hereby empowers and appoints the BPW, pursuant to the
Master Agency Agreement, to act as the Commission's agent for the limited purpose of
contracting for and managing the completion of the Project, the scope of said Project
being more specifically described in "Exhibit A ", attached hereto and made a part hereof.
2. All of the terms and conditions of the Master Agency Agreement shall
control this appointment and this Addendum shall be attached to the Master Agency
Agreement.
3. Members of the Board and Members of the Commission arc authorized to
execute on behalf of the Commission any documents necessary to carry out the intent of
this Addendum.
IN WITNESS WHEREOF, the undersigned execute this Addendum to Master
Agency Agreement to be effective as of the date first written above.
ATTEST:
South Bend Redevelopment Commission
CITY OF SOUTH BENI),
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
CITY OF SOUTH BENI), INDIANA
BOARD OF PUBLIC WORKS
GatvrGiIc4. President ,-N
s, Memb
Ijon Inks,'Member
Michael C. Mecham, Member
Mark W. Neal, Member
AT T ST:
Li da Martin, Clekk
Exhibit "A"
Access Agreement for Orchestra Pit Lift Donation
Project Scope and Description: Execute Access Agreement for Redevelopment ONA'ned
Property to all the donation of the construction of an orchestra pit lift. Oversee
completion of the project.
Bud get: SNone
1200 S. CouN'n =CITY BUILDING
227 W JEFFERSON BLVD.
SouTH BEND, INDIANA 46601 -1830
July 27, 2012
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
REDEVELOPMENT COMMISSION
Mr. Dennis Andres
Executive Director
Morris Performing Arts Center
Dear Dennis:
PHONE 574 /235 -9371
FAx 574/235 -9021
t� -pF
I -
i
JUL 30 2012
At its meeting on July 26, 2012, the Commission authorized installation of a new orchestra pit
lift at the Morris. Enclosed for your records is your letter with approval signed by the
Commissioners.
Sincerely,
Cheryl Phipps
Recording Secretary
Enclosure
MARCIA JONES DAVID VARNER NANCY KING GREG Dowws DONALD ALFORD STEPHANIE SPIVEY
PRESIDENT VICE PRESIDENT SECRETARY MEMBER MEMBER MF.1fBFR
July 16, 2012
Redevelopment Commission
City of South Bend
JUL 19 ? 1317
Morris Entertainment, Inc. hereby seeks approval to purchase and have installed an orchestra pit lift
inside the theater. The agreement to perform the work on this project was initiated over twenty years ago
between the City of South Bend and Moms Entertainment, Inc., a 501 [c] 3 corporation. The project has
the full support of the management of the Morris Performing Arts Center.
The original major restoration/renovation begun on December 31, 1998, reopening the venue in February
of 2000 did not include a new orchestra pit lift due to the lack of available funds. The orchestra pit lift
project is estimated at $210,000.00. Morris Entertainment, Inc. is pleased to report that it has raised all
funds necessary to fully finance this final restoration/renovation project, including a matching grant from
the Community Foundation of Saint Joseph County, Indiana. Research has been completed on orchestra
pit lifts and we are satisfied that the Serapid brand will meet all the requirements and needs of the Morris.
Therefore, we seek approval to proceed with the purchase and installation of a new orchestra pit lift. We
also wish the Board of Public Works to serve as our agent and the City's Engineering Department to
oversee the project. The project will be fully funded by Morris Entertainment, Inc. A Letter of
Understanding between Morris Entertainment, Inc. and the City of South Bend will be executed upon the
Redevelopment Commission's approval of the project. Thank you for your prompt attention to this
matter.
Sincerely,
r
1pesi /
dent, Moms Entertainment, Inc.
IS l 1 L3T.
DME
it�rL
Dennis J. s
Executive Director, Morris Performing Arts Center
APPROVED
SOUTRBEND
J
12 July, 2012
REVISED II QUOTE # 12- 0604 -1 BDT FIRM
Morris Performing Arts Center
Attention: Mr. Jim Monroe
Ref: Morris Performing Arts Center — South Bend, IN
Orchestra Lift(s)
Dear Mr. Monroe,
We are pleased to provide the following FIRM QUOTE proposal for the Orchestra Lift system for
the project referenced above. This proposal is based on information sent via email, drawing
A4.00 dated September 30, 1998 as well as telephone conversations and a site visit which
detailed some of the lift parameters and overall sizes. This proposal presents two schemes.
The first is a "one" lift scheme and the second is a "two" lifts scheme. No formal specification
was provided. Assumptions were made for any missing information using state of the art lifting
parameters and /or industry standards. A project "kick -off' visit by our design engineer and
project manager is included in this proposal. During this visit all the requirements and
specifications for the lift will be defined and agreed upon prior to the commencement of the
engineering design process(s).
LIFT PARAMETERS — One (1) Lift Scheme:
• Total surface area (each lift):
• Approximate dimensions:
• Travel:
• Dynamic Load Base:
• Static Load Base:
• Estimated Dead Load:
• Dynamic load:
• Static load:
• Estimated speed of travel:
• Guiding system:
• Estimated power consumption:
Approximately 400 S.F.
45' -6" X 8' -10"
11' -4"
50 psf + Dead Load
125 psf + Dead Load
30 psf
32,000 lb.
62,000 lb.
5 fpm
Elevator Rail Guides
Two Gear Motors @ 7.5 Hp ea. (to be confirmed)
SERAPID, INC 1
540018 Mile Road Internet: www.serapid.com Tel: (586) 274 -0774
Sterling Heights, MI 48314 Mail: info- us(a-)-serapid.com Fax: (586) 274 -0775
0.
One Lift Scheme System is composed of the Followinq:
LIFTING MECHANISM:
• Four (4) LinkLift columns, each including:
LL80 Rigid Chain Columns capable of developing 11'4' of stroke
LL80 Drive Housing with spline shaft and reducer hub options
LL80 Enclosed Chain Storage Magazine
• Motorization package including:
Planetary Gear Reducers
Universal Shafts
Two Drive gear motors rated at 7.5 Hp each with built -in brake (confirmation of
size T.B.D)
ENGINEERING PACKAGE & SUBMITTALS
Engineering package including:
Shop drawings showing location, size, and mounting details for the lifts
Lift platform primary structural frame and sub -frame details
Mounting details for the drive train
Safe Edge Astragal & Limit Switch(s) locations
Electrical power & control One Line Riser Diagram
1 site visit for engineering and site condition evaluation
O & M Manuals and As -built drawings
Training & Commissioning
Drawings to be stamped by a Structural Engineer licensed in the State of NY
STRUCTURAL STEEL PLATFORMS, SKIRTS AND GUIDES
• Deck structures and supporting structure primed and painted
• Skirt structural framework (no finishes)
• Maximum static deflection of structural span = L /600 or 1/4"
• Lift Systems to be guided via Elevator Rail or Captured Rail Guides
• All structural finishes to be flat black primer
SERAPID, INC 2
540018 Mile Road Internet: www.serapid.com Tel: (586) 274 -0774
Sterling Heights, MI 48314 Mail: info- us(&serapid.com Fax: (586) 274 -0775
ELECTRICAL CONTROLS
• Electrical controls including all miscellaneous panels and safety switches for lift
operation only
• Variable Frequency Drive
• Three (3) preset trim positions
• Pressure sensitive Safe Edge Astragal at shear edges
• Hand held pendant controller with 50' S.O. (2 @ 25') cable pinned connector,
momentary up /down push buttons & mushroom type E -stop
• Floor Pockets are by Electrical Contractor
• Cable Baskets by Electrical Contractor
INSTALLATION
• Installation labor & supervision is included based on eight hour work days, five day work
weeks with NO overtime. All overtime required will be reimbursed at full rate + 15 %.
• Full availability & access to the lift pit with means of rigging from above for hoisting
purposes must be provided.
• Installation is limited to the mechanical drive trains, lift structures & guides.
• Adequate building access is required with no elevation changes from unloading area.
• Installation labor is included at NON Union & NON Prevailing wage rates
• Freight to the job site is included
MISCELLANEOUS
• Warranty: 12 month from time of shipment. Serapid standard terms apply
• Payment terms as follows:
15% due at date of approved engineering design
70% due at date of delivery of lift components to site
10% due at completion of installation
5% due at acceptance of system
All invoices net 30
CLARIFICATIONS
Scope INCLUDED in proposed work:
• Limit Switches for Ultimate Stopping Positions.
• 1/0 capacity in Control System to facilitate interlock systems
• Four Door Interlock Systems (1 Double + 2 Single) (installation by Electrical Contractor).
• Signage
• P.E. Stamp by a professional engineer licensed in the State of New. York
• Astragal Shear Protection System (installation by Electrical Contractor)
• Maintenance Visits
SERAPID, INC 3
540018 Mile Road Internet: www.serapid.com Tel: (586) 274 -0774
Sterling Heights, MI 48314 Mail: info- us(&-serapid.com Fax: (586) 274 -0775
16
• Training /Commissioning
• 1/0 capacity for Safety Interlocks
• Temporary Usage
• All field conduit, wiring & terminations (power and control) including, but not limited to
installation of all peripheral systems such as shear protection, door interlocks, warning
systems, etc.
• Installation of all Electrical Components including, but not limited to, shear protection,
warning systems, interlock systems, limits & encoders.
Traveling Cables
• Cable Baskets
• Removable Safety Railing Panels at Downstage, Stagel-eft, StageRight and Upstage
perimeters of lift platform. Safety Railings to be constructed of structural steel piping.
• Railing Sockets & Socket Caps in Lift platform
• Daisy Chain Interlock System at Railings
• Disconnects at each of two motors (by Electrical Contractor)
• All wood gap control, wood infill & wood ledgers
• Wood sub - flooring, finish flooring & wood skirt fascias
• Pit must be clean, well lit and dry with structural concrete floor adequate to sustain
imposed loads.
• Adequate pit depth required.
Scope NOT INCLUDED in proposed work:
• All Infill platforms, all other platform and infill works and all associated work
• Site Dynamic Load Test
• Concrete work & embeds
• Floor Pockets
• Mechanical /Structural remedial work at existing closure panels
• All wagons, tracks, track storage and all associated work
• All demolition, removal of existing equipment and patching
• All taxes, bonds, certificates, licenses and /or permits
FIRM QUOTE price for lift package as described above:
BASE BID — ONE LIFT SCHEME
TWO HUNDRED NINE THOUSAND ONE HUNDRED US DOLLARS
SERAPID, INC 4
5400 18 Mile Road Internet: www.serapid.com Tel: (586) 274 -0774
Sterling Heights, MI 48314 Mail: info- usaserapid.com Fax: (586) 274 -0775
NOTE:
ABOVE PRICING INCLUDES ALLOWANCES OF $12,000.00 FOR ELECTRICAL WORK
AND $14,000.00 FOR WOOD WORK AS DESCRIBED BELOW. UNTIL WHICH TIME FIRM
PRICING HAS BEEN SOLICITED FROM OUTSIDE SOURCES, PRICING RELATIVE TO
THESE ITEMS ARE SUBJECT TO REVISION.
Electrical Allowance includes, but is not limited to the following:
• Installation of Lift Motor Control Cabinet in locked storage room and Lift Control Station
at DS Right CMU proscenium wall.
• Wire, conduit and terminations for providing incoming 50A, 480V power to Lift Motor
Control Cabinet
• Conduit runs and control & power wiring from Lift Motor Control Cabinet in locked
storage area to the following locations: lift pit J.B., interlocked doors J.B.s, daisy chain
interlocked closure panels J.B., interlocked audience railings J.B & Control Station @ DS
Right proscenium wall
• Two (2) 6 pole, 30A, NF disconnects for Lift Brake /Motors
• Control and Power Wiring Terminations at the Lift Motor Control Cabinet, all J.B.s,
motors (2), pit disconnects (2) and Control Station
• Installation of peripheral safety systems components including Shear Protection System,
Door interlock switches, access hatch interlock switch, Daisy Chain S.O. sections at
Closure Panels, Daisy Chain S.O. sections at Audience Railings.
Wood allowance includes, but is not limited to the following:
• Y2" Neoprene pads at V -0" CC (ea) 300 @ $2.00 = $600.00
• Sub -floor 2 layers Y2" ply (sheets) 35 @ $50.00= $1,750.00
• 5/4 T &G Hardwood Finish Floor (sf) 400@ $20.00= $8,000.00
• Finish Hardwood Flooring (sf) 400@ $3.00= $1,200.00
• Wood Ledgers (2) (If) 224@ $5.00 $1,120.00
• Wood Finish at platform & guides (If) 112@ $10.00 $1,120.00
NOTE: Actual thickness of wood floor system is yet to be determined. Thickness of
flooring system will be limited to allowable dimension to achieve the 30" pit depth.
Thank you for the opportunity to furnish this Firm Proposal. Please contact us if you have
questions or comments.
Regards,
Bruce Downer
SERAPID INC
SERAPID, INC 5
5400 18 Mile Road Internet: www.serapid.com Tel: (586) 274 -0774
Sterling Heights, MI 48314 Mail: info- us(ci)serapid.com Fax: (586) 274 -0775
12 July, 2012
Mr. Jim Monroe — Facility Operations Manager
Morris Performing Arts Center
211 North Michigan Street
South Bend, IN 46601 -1202
Reference: Serapid Lift System
Subject: Installation Labor Rate
Dear Mr. Monroe,
Please be advised that the hourly labor rate for a Serapid Lift Installation Field Mechanic
is $40.00 per hour plus all expenses.
Expenses include air fare, lodging, transportation & per diem food expenses.
Please contact me should you have any questions or comments regarding this matter.
Thank you and,
Kind regards,
Bruce Downer
SERAPID INC
Serapid, Inc. Tel: (586) 274 -0774
5400 18 Mile Rd. www.serapid.us (800) 663 -4514
Sterling Heights, MI 48314 info- us(&- se rapid. corn Fax: (586) 274 -0775
vO -W f - 14 11 . UJ rnV['1-
August 7, 2012
Jim Monroe
Via FAX: 574 -23S -5604
Re: Morris Performing Arts Center, South Bend, IN
1-011 t uol/ 10101
This is written confirmation that all structural steel to be used in the SERAPID lift system at the Morris
Performing Arts Center will be manufactured in the United States,
Sincerely,
Bruce Downer
SERAPID, Inc.
SERAPID, INC. Tel: (586) 274 -0774
5400 18 Mile Rd. www.serapid.us (800) 663 -4514
Sterling Heights, MI 48314 info -us serapid corn Fax: (586) 274 -0775