Loading...
HomeMy WebLinkAboutNo. 0626 designating the East Bank Dev. Area, declaring the East Bank Dev. Area to be blighted, approving development plan/conditions under which relocation pmts. will be madeRESOLUTION 626 �'� RESOLUTION OF THE CITY OF SOUTH BEND REDEVELOPMENT COMMISSION DESIGNATING THE EAST BANK DEVELOPMENT AREA, DECLARING THE EAST BANK DEVELOPMENT AREA TO BE BLIGHTED AND APPROVING DEVELOPMENT PLAN AND CONDITIONS UNDER WHICH RELOCATION PAYMENTS WILL BE MADE WHEREAS, the City of South Bend Department of Redevelopment has, pursuant to the Redevelopment of Cities and Towns Act of 1953, as amended (the "Act "), conducted surveys and investigations and has thoroughly studied that area in the City of South Bend, County of St. Joseph, State of Indiana, hereby designated as the East Bank Development Area which is more particularly described by a line drawn as follows: A parcel of land being a part of the City of South Bend, Portage Township, St. Joseph County, Indiana and being more particularly described as follows, viz: Beginning at the point of intersection of the North right -of -way line of Sorin Street with the East right -of -way line of Niles Avenue in said City; thence South along said East right -of -way line of Niles Avenue to the centerline of the first fourteen (14) foot alley lying North of Cedar Street and between Niles Avenue and Hill Street; thence East along said centerline, to the centerline of Hill Street, a sixty -six (66) foot right -of -way; thence South, along said Hill Street centerline, to the centerline of Jefferson Boulevard; an eighty -two and one -half (82.5) foot right -of -way; thence West, along said Jefferson Boulevard centerline to the center of the St. Joseph River; thence in a Northwesterly and Northeasterly direction along the centerline of said River to its intersection with the projected North right -of -way line of said Sorin Street; thence East, along said projection and along said North right -of -way line to the East right -of -way line of Niles Avenue which is the place of beginning. ' WHEREAS, upon such surveys, investigations and studies being made, it has been found by the City of South Bend Redevelop- ment Commission that the above - described area has become blighted to an extent that such blighted conditions cannot be corrected by regulatory process or by the ordinary operations of private enter- prise without resort to the provisions of the Act, and it has been further found that the public health and welfare would be bene- fitted by acquisition in and redevelopment of such area under the provisions of the Act; and WHEREAS, the Commissioners have caused to be prepared maps and plats showing the boundaries of such blighted area, the location of the various parcels of properties, streets and alleys and other features affecting the acquisition, clearance, replatting, replanning, rezoning and redevelopment of such area, and indicating the parcels of property to be included or excluded in the acquisition and portions of the area to be acquired which are to be devoted to streets, alleys, levees, sewerage, parks, playgound and other public purposes under the redevelopment plan; and AV- WHEREAS, there was presented to this meeting of the Gover- .�' ing Body of the City of South Bend Department of Redevelopment for its consideration and approval, a copy of Development Plan for the project area dated October 3, 1980, which plan is entitled: 1 � "DEVELOPMENT PLAN EAST BANK DEVELOPMENT AREA SOUTH BEND, INDIANA" and consists of 24 pages; and WHEREAS, Title VI of the Civil Rights Act of 1964, as amended, and the regulations of the Department of Housing and Urban Development effectuating that title, provide that no person shall, on the grounds of race, age, sex, color or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination in the undertaking and carrying out of any federally assisted projects; NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF SOUTH BEND REDEVELOPMENT COMMISSION, GOVERNING BODY OF THE CITY OF SOUTH BEND DEPARTMENT OF REDEVELOPMENT: 1. That the East Bank Development Area, which is described in the first "WHEREAS" clause hereof, is blighted and constitutes a menace to the social and economic interest of the City of South Bend and its inhabitants and that it will be of public utility and benefit to acquire real estate in such area and redevelop the area under the provisions of the Act. 2. That the Department of Redevelopment proposes to acquire such real estate and the interests therein within the aforementioned boundaries as designated in the Development Plan and under the conditions set out therein. 3. That it is estimated that the cost of acquiring the properties in the area will be $884,800.00. 4. That it is hereby found and determined that the objectives of the Development Plan cannot be achieved through more extensive rehabilitation of the Project area. 5. That the Development Plan is hereby in all respects approved and the Secretary is hereby directed to file a certified copy of said Development Plan with the minutes of this meeting and to have a certified copy of said Plan recorded in the Office of the Recorder of St. Joseph County, Indiana. 6. That the United States of America be, and hereby is assured of full compliance by the City of South Bend Department of Redevelopment with regulations of the Department of Housing and Urban Development effectuating Title VI of the Civil Rights Act of 1964, as amended. Adopted at the Regular Meeting of the South Bend Redevelop- ment Commission held on October 3, 1980 at the office of the Commission, 1200 County -City Building, 227 West Jefferson Boulevard, South Bend, Indiana. Attest: A. Peter Dbnaldson, Secretary Redevelopment Commission CITY OF SOUTH BEND, INDIANA DEPARTMENT OF REDEVELOPMENT F. Jay Nim z, President Re ev nt Commission ■ ■ In Deve 100--ilpill-le nt .] . p a all l z7, ~ �� \d\ \� �� ��. DEPARTMENT OF REDEVELOPMENT SOUTH BEND, INDIANA EAST BANK DEVELOPMENT AREA DEVELOP14ENT PLAN SOUTH BEND, INDIANA TABLE OF CONTENTS Page IntroJuction . . . . . . . . . . . . . . . . . . 1 I. 'History of Project Area . . . . . . . . . . . . . 2 Ii. Description of Project . . . . . . . . . . . . . . 3 A. Boundaries of the East Bank Development Area . . . . . . . . . . . . . . 3 B. Goals & Objectives . . . . . . . . . . . . . . 3 C. Types of Proposed Redevelopment Activities . . . . . . . . . . . . . . . . . 4 III. Land Use . . . . . . . . . . . . . . . . . . . . . 5 A. Designation of Sub-Areas . . . . . . . . . . . 5 B. Development Controls . . . . . . . . . . . . . 5 C. Parking Regulations . . . . . . . . . . . . . 7 D. Transportation. . . . . . . . . . . . . . . 8 E. Public Improvements . . . . . . . . . . . . . 9 IV. East Bank Design Review Committee . . . . . . . . 10 A. Establishment of Committee . . . . . . . . . 10 B. Terms . . . . . . . . . . . . . . . . . . . . 10 C. Rules 10 D. Powers & Duties . . . . . . . . . . . . . . . 10 E. Design Guidelines . . . . . . . . . . . . . . 10 F. Building Permits . . . . . . . . . .. . . . 11 G. Review . . . . . . . . . . . . . . . . . . . 11 H. Amendments to Disapproved Plan . . . . . . . 11 I. Prevention of Speculation . . . . . . . . . . 12 J. Adequacy of Zoning & Other Codes & Regulations to Protect Project Area . . . . 12 K. Signs . . . . . . . . . . . . . . . . . . . . 12 V. Project Proposals . . . . . . . . . . . . . . . . 13 A. Land Acquisition . . . . . . . . . . . . . . . 13 B. Prope-fty Rebilitation . . . . . . . . . . . . 13 C. Redeveloper's Obligations 14 D. Tabulation Sheets . . . . . . . . . . . . . . 15 VI. Statutory Authority . . . . . . . . . . . . . . . 21 VII. Procedures for Changes in the Approved East Bank Development Plan . . . . . . . . . . 21 Map I . . . . . . . . . . . . . . . . . . . . . . 22 Map II . . . . . . . . . . . . . . . . . . . . . 23 Introduction The East Bank Development Area offers the City of South Bend a unique opportunity. The Area, consisting of approx- imately 52 net acres, is located directly to the east of the Central Business District and is presently greatly underutilized.. The Development Plan that follows provides for a coordinated effort on the part of both the public and private sectors to convert this largely vacant area to a vibrant, urban, residen- tial community with compatible commercial and retail uses. With a concept based on the reopening of the East Race of the St. Joseph River, the Area is envisioned as a pedestrian oriented community, combining park improvements, pedestrian paths and open spaces with re -use of certain existing structures as well as encouraging new construction. In prior redevelopment projects large amounts of public sector actions were necessary to spur private development. Such is not the case with this particular project. The location and setting of the Area gives it a quality that is inherently In attractive to private developers. The major public sector investment will be the acquisition and reopening of the East Race and creation of a park along the banks of the race to complement the attractive riverfront envir- onment in the downtown area. South Bend Park Department plans for the race itself provide for recreational amenities in the form of canoeing and white water kayaking as well as providing for a fish ladder and pedestrian pathway system. Other acquisition, relocation and clearance activities will be limited as the primary emphasis will be on private sector participation. Thus, the role of the Department of Redevelopment becomes one of controlling the type and degree of c development as well as leveraging the public monies that are spent. South Bend finds itself in a position to transform this currently underutilized area, with the cooperation and involve - ment of the private sector, into a vital residential and commer- cial neighborhood that complements the downtown area and adds significantly to the tax base of the City. T -1- 10/3/80 1 L x i I. History of Project Area The East Race of the St. Joseph River played an important role in the early development of South Bend as an industrial city. Originally constructed in the 1840's, the raceway provided hydraulic power to local industries such as the Singer Corporation and the A.C. Stanley Manu- facturing Corporation. The East Race served a useful function for over one hundred years until it was filled in during the 1950's and 1960's. The memory of the race did not fade with its destruction. City residents, community groups, business leaders and public officials began to investigate ways of reopening the race to provide recreational opportunities. The concept of reopening the race was formally proposed in the "St. Joseph River Corridor Study" prepared by Lawson Associates in 1973. In that study recom- mendations were made to improve the riverfront throughout the central area of South Bend, pro- viding parks and pedestrian ways along the river's path. At that time, the study suggested a re -use of existing structures in the East Bank Area, along with compatible new construction, to create a predominately residential community with a mix of businesses and offices connected by a system of green spaces and pedestrian ways. Since that time the City of South Bend, through its Department of Redevelopment and Division of Planning, has been continuing this study and looking into existing conditions and land utilization in the Area. This Development Plan is the culmination of those efforts and sets forth the Cit -'s goals and plans for the re- emergence of the mast Bank Area as a more vital part of South Bend. -2- 10/3/80 ' i1 V ��ee�, . , r, air II. Description of Project A. Boundaries of the East Bank Development Area A parcel of land being a part of the City of South Bend, Portage Township, St. Joseph County, Indiana and being more particularly described as follows, viz: Beginning at the point of intersection of the North right -of -way line of Sorin Street with the East right -of -way line of Niles Avenue in said City; thence South along said East right - of -way line of Niles Avenue to the centerline of the first fourteen (14) foot alley lying North of Cedar Street and between Niles Avenue and Hill Street; thence East, along said centerline, to the centerline of Hill Street, a sixty -six (66) foot right -of -way; thence South, along said Hill Street center- line, to the centerline of Jefferson Boulevard, an eighty -two and one -half (82.5) foot right -of -way; thence West, along said Jefferson Boulevard centerline to the center of the St. Joseph River; thence in a North- westerly and Northeasterly direction along the centerline of said River to its inter- section with the projected North right -of- way line of said Sorin Street; thence East, along said projection and along said North right -of -way line to the East right -of -way line of Niles Avenue which is the place of beginning. B. Development Plan Goals & Objectives Goals and objectives for the redevelopment of the East Bank Development Area are: 1. To reverse the underutilization of existing land and structures through the creation of a downtown residential /mixed use area which will include: a. A medium density, pedestrian oriented residential development; b. Supporting neighborhood oriented commer_�al and retail development; -3- 10/3/80 i C. Adaptive re -use of certain existing buildings; and d. New construction. 2. To create an attractive park setting, to complement the riverfront environ- ment. 3. To stimulate private sector partici- pation and investment consistent with overall goals and objectives. 4. To increase the tax base of the area. C. Types of Proposed Redevelopment Activities Realization of East Bank Development Area objectives will be accomplished by a combination of public and private actions. These actions include, but are not limited to, the following:. property acquisition, relocation, clearance, vacation and dedication of public rights -of -way, provision for public facilities and improve- ments and any other activity pertaining to planning and implementing an urban redevelop- ment plan. -4- 10/3/80 III. Land Use A. Designation of Sub -Areas While the entire East Bank Development Area is envisioned as a residential /mixed use area as described in the Development Plan Goals and Objectives, two sub -areas have been designated in order to emphasize develop- ment priorities. The sub -areas are identi- fied on Map I. Area A: The highest priority shall be on Multi- Family residential with secondary emphasis on Commercial development. Area B: The highest priority shall be on Commercial development with secondary emphasis on Multi - Family residential. B. Development Controls The controls and regulations for the Development Area are designed to provide for development that is consistent with Plan Goals and Objectives and to assure a high level of urban design. 1. Within the Development Area the following uses will be allowed: a. Residential: multi - family and two family dwelling units b. Commer-al: Antique & Gift Shops Apparel & accessories Shops Artists materials & Supplies Arts & Craft Supplies Athletic Clubs Bakeries, retail Ball Rooms Banks Barbershops Bars, nightclubs, and lounges Beauty Shops -5- 10/3/80 Bicycle Shops Candy & Confectioneries, retail Child Day Care Centers & Nurseries Churches Cleaning & Laundry establish- ments, self - service & pickup Custom Tailors Delicatessens Drug Stores Dry Goods Education Institutions Fabric Shops Florists Garages, parking Greenhouses Groceries Hardware Stores Hobby Shop Hotels & Motels Interior Decorating Shops Jewelry Shops Knit Shops Labs, Dental & Medical Liquor Stores Leather Goods Letter Services Libraries Loan Companies Locksmiths Motion Picture Theatres Music Stores Offices Paint Stores Pet Shops Photo Equipment Photo Studio Plumbing Shops Printing Shops Public Utilities Repair Shops, Non Automotive Restaurants,.not including drive -ins Theatres Specialty Shops Specialty Food Shops Theatres Tobacco & Smoke Shops Toy Stores Variety Stores C. Public and quasi - public uses __6- 10/3/80 2. All proposed development is subject to review and approval by the East Bank Design Review Committee. 3. Minimum building height shall be two stories. 4. Height and area requirements shall be the same as those in the "G" Height & Area District as identified in Chapter 21, Article 4, Division 8 of the Municipal Code of the City of South Bend. 5. Off- premise signs may not be erected or placed within the East Bank Development Area. Sign size, design and placement shall be subject to review and approval by the East Bank Design Review Committee. 6. The Department of Redevelopment recognizes that there presently exist in the Area certain uses which do not conform to the Development Plan Goals, Objectives and Controls. q,:ch uses will be allowed to continue unless the Department acquires the subject property through its regular acquisition procedures. a. Such uses may only be expanded within existing buildings. b. If such uses are damaged by fire or other means to an extent of less than 50% of its replacement cost, the use may be reconstructed, but if such damage is in excess of 50% of the replacement cost, the use may not be reconstructed except in accordance with the provisions of this Development Plan. 7. When feasible, utility lines shall be placed underground. C. Parking Regulations I. No surface parking lots may be allowed along any waterway. -7- 10/3/80 2. Surface Parking lots of over ten spaces shall be screened from view as per adopted Design Guidelines. 3. Whenever possible, required parking shall be on site. However, off site parking will be allowed up to a distance of 500 feet from the main entrance of such use. 4. The construction of parking structures is recommended. 5. Multiple standards are recommended for parking stalls to accomodate compact as well as full -size automobiles. D. Transportatio-: t 1. The arterial streets of Jefferson Blvd., Colfax Avenue, LaSalle Street and Hill Street will remain. 2. Portions of existing streets will be closed to through traffic to encourage a residential environment and allow for additional parking. (Neap II) The portions to be closed are: a. Niles Avenue between Jefferson Blvd., and Washington Street; b. Niles Avenue between Madison Street and Cedar Street with the rerouting of Niles to Cedar Street; C. Hydraulic Avenue between LaSalle Avenue and Madison Street; d. Ginz Avenue between Colfax Avenue and Washington Street right -of -way extended. 3. Colfax Bridge and street between St. Joseph Street and Hill Street shall be improved per State Highway Department plans. 4. Transpo bus routes are encouraged to remain. It is recommended that bus shelters be placed in strategic locations. -8- 10/3/80 CIF -9- 10/3/80 E. Public Improvements 1. In addition to the construction of the East Race the following public improvements are 3 recommended: a. The closed portion of Niles Avenue between Jefferson Boulevard and Washington Street is to be widened to 52 f_P ^t to facilitate the construction of a 450 parking area; b. Construction of a continuous pedestrian pathway along the East i Bank of the St. Joseph River on an x easement that is to be dedicated to the City. r, 9 CIF -9- 10/3/80 IV. East Bank Desi Review Committee ,r In order to achieve a high level of design and insure a feeling of continuity throughout the development area; an East Ban]' jesign Review Committee is hereby established. The following paragraphs explain the makeup and duties of that committee. A. Establishment of Committee An East Bank Design Review Committee of five members shall be established consisting of the Executive Director of the Department of Redevel- opment who shall serve as Chairman of the Committee, the City Engineer, the Director of the St. Joseph County Area Plan Commission, the 1 City Building Commissioner and one member appointed by the Redevelopment Commission. B. Terms: Members of such committee shall serve wi out pay for the duration of this Develop- ment Plan. Vacancies occurring through death, resignation or other causes, shall be filled for the unexpired term in the same manner as original appointments. C. Rules: The Committee shall adopt such rules and procedures as are necessary to conduct its business. Among other things, such rules may provide for the dates and times of meetings and hearings. D. Powers and Duties: The Committee shall function in an advisory capacity to the Redevelopment Commission. It shall review the proposals of the developers from the point of view of architecture, site planning, open space and other applicable considerations, and for compliance with the standards set forth in the Fast Bank Design Guidelines. In exercising these duties the Committee shall follow the procedures and act within the limitations established in subsequent sections. E. Design Guidelines The Redevelopment Commission, shall by Resolution, adopt a set of Design Guidelines for use by developers as they are planning their project. The East Bank Design Review Committee will base their recommendation to the Redevelopment Commission on how well the proposals have followed these guidelines. -10- 10/3/80 The Design Guidelines may be reviewed and revised as necessary by Redevelopment Commission action. F. Building Permits: No permit shall be issued by the South Bend uilding Department for the construction of any building in the project area or the reconstruction, alteration, or rehabilitation of any building in the area unless the application for such permit shall bear an endorsement by the Committee that such proposed construction is appropriate and conforms to the standards set forth in the East Bank Design Guidelines. G. Review: All development plans filed hereunder shams —be accompanied by preliminary and final architectural plans and. /or engineering drawings and specifications for the work involved. Such plans shall be reviewed for compliance with the standards and objectives of the Development Plan and Design Guidelines. Within thirty days from and after the date on which a development plan is filed with the Committee, Saturdays, Sundays and legal holidays excluded, the Design Review Committee shall submit its recommendations in writing to the Redevelopment Commission, stating in the case of a disapproval, the reasons therefor, and a copy of such recommendation shall be given to the applicant(s), the Building Department and the Executive Director of the St. Joseph County Area Plan Commission. In addition, the Committee shall indicate what modifications in plans or specifications are necessary to accomplish compliance. H. Amendments to Disapproved Plan: Within not more than thirty days after a disapproval, the applicants filing a development plan which has been disapproved, may file with the Com- mittee an amendment to such plan or an amended plan which shall be limited exclusively to changes made necessary to accomplish compliance with the gro,,nds for disapproval stated by the Committee. An amendment or amended plan shall be approved or disapproved within not more than thirty days after filing thereof. -11- 10/3/80 I. Prevention of S eculation: Purchase contracts will provide that the re eve oper agree that his purchase of the property is for the purpose of redevelopment and not for land speculation. Prior to the com- pletion of his redevelopment project, the redeveloper may not sell, lease, or otherwise transfer such land (or improvements) without the prior written consent of the City of South Bend, Department of Redevelopment. J. Adequacy of Zoning and Other Codes and Regulations to Protect Protect Area. As explained above, the new land uses in the project area will be subject to the established provisions of the South Bend Zoning Ordinance. All such uses will also be subject to the requirements of the Building Code and similar regulations. These codes and regulations in conjunction with the land use provisions, building requirements and restrictions as well as the design and development objectives established. by the Plan will adequately protect the Development Area. K. Signs All proposals for signs within the Development Area shall be reviewed by the Committee and evaluated as to their keeping with the standards established in the Design Guidelines. -12- 10/3/80 V. Project Proposals A. Land Acquisition The Land Acquisition Plan Map (attached)and Tab- ulation Sheets(pages 15 through 20) indicate real property to be acquired for redevelopment. The Tabulation Sheets also set forth parcel ownership and square footage for such land. Upon the acquisition of such properties, the City of South Bend Department of Redevelopment will either: 1. Demolish the structure or structures thereon and dispose of the land for redevelopment at its fair market value, excepting those cases when land is sold or leased to another public body pursuant to Indiana Code 18- 7 -7 -20, for uses in accordance with the Development Plan; or 2. Sell or lease the property to purchaser or lessee at its fair market value, excepting those cases when property is sold or leased to another public body pursuant to Indiana Code 18- 7 -7 -20, for uses in accordance with the Development Plan subject to its being rehabilitated in conformance with the East Bank Design Guidelines. B. Property Rehab itation All properties in the East Bank Development Area shall comply with the standards set forth in all applicable statutes, codes and ordinances, as amended from time to time, relating to the use, maintenance, facilities, and occupancy of existing property, including but not limited to, the Building, Plumbing, Heating, Electrical and Housing Codes. All properties within the Development Area shall be maintained so that the appearance of the premises and all buildings thereon shall reflect a level of maintenance in keeping with the standards of the area. -13- 10/3/80 Q2 - s ._-3...% C. Redevelopers' Obligations Awk The land acquired by the City of South Bend Depart- ment of Redevelopment will be disposed of subject to an Agreement between the Department and the Redeveloper. The Redeveloper will be required by the contractual agreement to observe the Land Use and Building Requirements and Objectives of this Development Plan. They will further be required to submit a redevelop - ment schedule satisfactory to the City of South Bend Department of Redevelopment. The Redeveloper will not be permitted to defer the start of construction for a period longer than that required for the preparation of necessary redevelopment plans, their review, and approval by the City of South Bend Department of Redevelopment. i 1. In addition, the following provisions will be included in the Agreement. a. That the Redeveloper will submit to the Department a plan and schedule for the proposed development. b. That the purchase of the land is for the purpose of redevelopment and not for specu- lation. C. That the land will be built upon and improved in conformity with the objectives and provisions of the Development Plan. d. That the building of improvements will be commenced and completed within a reasonable time. e. That the redevelopers, their successors or assigns, agree that there will be no dis- crimination against any person or group of persons on account of race, creed, color,sex, age, national origin, or ancestry in the sale, lease, sublease, transfer, use, occupancy, tenure, or enjoyment of the premises therein conveyed, or improvements erected or to be erected thereon, nor will the Redeveloper himself or any person claiming under or through him establish or permit any such practice or practices of discrimination or segregation with reference to the selection, location, number, use, or occupancy of tenants, lessees, sublessees, or vendees in the premises therein conveyed, or improvements erected or to be erected thereon. -14- 10/3/80 D. TABULATION S'HEETS SQUARE FOOTAGE SQUARE FOOTAGE BLOCK PARCEL OWNER TO BE ACQUIRED NOT TO BE ACQUIRED 1 Mental Health Center of 200,757 St. Joseph County 2 Welber P. Traub 197,863 3 Artificial Ice Co. 43,096 I1 1 Mill Race, Inc. 31,545 2 & 3 Mark Gallagher 28,997 4 Frank Langsenkamp 28,178 5 Mill Race, Inc. 17,760 6 Mill Race, In 17,400 7 Mill Race, Inc. 8,280 8 Mill Race, Inc. 9,120 9 Mill Race, Inc. 4,995 10 Mill Race, Inc. NE 63' of West leg SW 212' of West of East Race Leg of East Race 11 Mill Race, Inc. 47,712 12 Main Engineering 47,912 13 David & Alberta Stouffer W' 130 Lot 34 East 188' Lot 34 14 David & Alberta Stouffer 2,265 15 Jerry Taylor 4,264 16 Robert Voratovic 7,194 17 David & Alberta Stouffer W' 36' Lots 35,36 E 225' Lots 35,36 3 18 David & Alberta Stouffer 3,742 19 Mill Race, Inc. 19,074 20 Mill Race, Inc. 36,830 21 1st Bank SW Michigan 7,140 1 Trustee -15- 1_0 /3 /190 3LOCK e li Ali li I� I� li D. Tabulation Sheets (continued) PARCEL 22 23 24 A B 1 2 3 4 5 6 7 8 9 10 11 OWNER Mill Race, Inc. Mill Race, Inc. Mill Race, Inc. Main Engineering David Stouffer Samuel Coffman Samuel Coffman SBN Maennerchor Ann Michaels Majorie Drinski R. Kuykendall, et. al. R. Kuykendall, et. al. Bert Liss Indiana & Michigan Electric Co. and East Bank Center County Commissioners Robert & Senola Batteast 12 Robert & Senola Batteast 13 Robert & Senola Batteast 14 Maurice. Van DeVelde, et. al. 15 Crescent Realty Corp. 16 Rose Fuel 17 Bert Liss SQUARE FOOTAGE TO BE ACQUIRED 22,189 23,219 1,161 W 22' of Parcel 2 -11 W 35' of Lots 38, 39,40,41,42 SQUARE FOOTAGE NOT TO BE ACOUIRED 6,732 4,356 26,188 8,514 39,204 13,068 4,166 5,255 4,457 2,724 8,842 135,789 E 44' of Parcel 2 -11 1,466 2,933 4,801 30,136 E 55' of Lots 38,39,40,41,42 11,781 -16- 10/3/80 2i2 /1R /Rn D. Tabulation Sheets (continued) SQUARE FOOTAGE BLOCK PARCEL OWNER TO BE ACQUIRED 18 Bert Liss 19 R. Kuykendall, et. al. 20 Jessie Inwood 21 Instant Prin *'_..8 Service, Inc. C Indiana & Michigan Electric 28,269 Company 0 Char -King, Inc. 1 Opelika Manu. Corp. 2 SBN Screw Prod., Inc. 3 Niles Avenue Partnership 4 Julius Tucker 1 Niles `,venue Partnership 2 & 3 Niles Avenue Partnership 61,260 31,490 Beg. NW cor.: East 22',S' 212', W' 4' & N 212' to POB SQUARE FOOTAGE NOT TO BE ACQUIRED 4,020 8,043 6,675 27,639 41,000 38,734 E' 150' of Lots 46, 47, 48 17,748 17,032 1 Rose Fuel & Materials 32,670 2 Anthony P. Sergio 5,445 3 Joe Simeri 16,335 4 Maurice J. Hoban 10,890 1 Rose Fuel & Materials 67,650 2 James Longstreet 2,772 3 Gene Muia 8,118 -17- 10/3/80 P12/18/an LO CK i Ib 1 a i i I i f L >.� D. Tabulation Sheets (continued) PARCEL 4 5 6 7 0 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 OWNER Antonio Stancati Seltenright, Inc. Joyce Seltenright Michael Ross SQUARE FOOTAGE TO BE ACQUIRED Conrail Rose Fuel & Materials Rocco Simeri Joseph Harms, Jr. Herbert Kissell Gertrude Van De Walt James Kabol Joseph Kambol Lewis A. McGann Martin C. and Maurice J. Hoban Lewis A. 1111cGann J. C. Lauber Co., Inc. (Agatha Lauber Trust) Agatha Mootz Joseph Ziker Louis J. Brehmer Joseph A. Luther Linus R. Michaels John F. Friedline Dale A. Brink Andrew J. Spite we SQUARE FOOTAGE NOT TO BE ACQUIRED 10/ 380 R12/1 /80 10,890 34,175 8,395 3,300 2,130 43,740 4,290 6,600 5,445 5,445 10,890 16,335 5,445 10,890 21,780 24,420 8,250 5,328 3,367 3,515 4,785 4,785 10,890 10,890 BLOCK 9 s 6 E ! I ! ! i i I � l D. Tabulation Sheets (continued) PARCEL 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 OWNER James Kambol Ernest L. Bryant Morgan A. Kett 7 :..im Morgan A. Ketcham Harold Nelund Andrew J. Spite SQUARE FOOTAGE. TO BE ACQUIRED Ralph J. Andreae, Sr. George L. Hammerschmidt Harold E. Nelund Thomas Gibson, et, al. Harold E. Nelund Midwest Aluminum Siding John H. Lloyd, Jr. Ellen Dosmann (N 33 ") 11. English and H. Dosmann (S 102') Robert J. Bilski Edward J. Luther, Beverages, Inc. Lawrence Luther Edward J. Luther, Beverages, Inc. & Economic Dev. Comm. Lawrence Luther Walter Outlaw Lannie Boggans SQUARE FOOTAGE NOT TO BE ACQUIRED -19- 10/3/80 P.7 2/1,9/80 10,890 10,890 10,890 3,960 14,460 3,360 10,890 22,275 7,938 2,457 2,805 17,730 7,020 3,300 3,300 D. Tabulation Sheets (continued) 3LOCK PARCEL OWN ER 10 1 Andrew Troeger & Co., Inc. 2 Robert Bilski 3 Robert Bilski 4 Jacob Spevak 5 James Oesterle 6 Jefferson Hill Partnership 7 Marlin Miller 8 Andrew Troeger & Co., Inc. -20- SQUARE FOOTAGE SQUARE FOOTAGE TO BE ACQUIRED NOT TO BE ACQUIRED 32,670 6,072 12,716 2,992 10,890 30,888 6,138 16,335 10/3/80 IZ1 2/18/80 VI. Statutory Authorit The controls, regulations and land use restrictions contained in this Development Plan are for the specific purposes of implementing the East Bank Development Plan pursuant to Indiana Code 18 -7 -7 -1 et. seq. i� 1 VII. Procedure for Changes in the Approved Urban Renewal Plan The East Bank Development Plan may be modified or varied at any time by a resolution of the City of South Bend Redevelopment Commission. Any change affecting any property or contractual right can be effectuated only in I accordance with applicable State and Local Law. -21- 10/3/80 ■ ■ ■ ■ ■ E3 CEDAR ST cz) a F-1 a 0 0 a ❑ E. MADISON ST ■ ■ CD a ■ CD ED ■ ■ a Do E. LA SALLE ST. ■ ■ E. C 0 L FAY ASE. AST BANK - DEVELOPMENT AREA MAP 11 RANSPORTAT erial —ollector E--J [1310ma IIIIIIIIIIIIIIIII IEAST BANK DEVELOPMENT AREA .- 2 3 -