Loading...
HomeMy WebLinkAboutNo. 0762 designating Studebaker Corridor Dev. Area, declaring SCDA blighted, approving a dev. plan/conditions under which relocation pmts. will be made, and establishing allocation area for purposes of TIF1440- '711 '" g:- RESOLUTION NO. 762 =X� '=- c� = ?1 N U -r W M (D ID RESOLUTION OF THE SOUTH BEND REDEVELOPMENT 7-0,* COMMISSION DESIGNATING THE STUDEBAKER CORRIDOR"* '1C DEVELOPMENT AREA, DECLARING THE STUDEBAKER Car crt ,* CORRIDOR DEVELOPMENT AREA TO BE BLIGHTED, ;. APPROVING A DEVELOPMENT PLAN AND CONDITIONS UNDER WHICH RELOCATION PAYMENTS WILL BE MADE, AND ESTABLISHING AN ALLOCATION AREA FOR PURPOSES OF TAX INCREMENTAL FINANCING. '; U2 y WHEREAS, the South Bend Redevelopment Commission (Commission) is the governing board of the South Bend, Indiana, Department of Redevelopment (Department), and exists and operates under the m � a_ -n = GL M:4 'n rn C­3 0 0 a provisions of Indiana Code 36- 7 -14 -1, et seq., as amended from time to time (Act); and WHEREAS, the Department has conducted surveys and investigations and has thoroughly studied that area within South Bend hereby designated as the Studebaker Corridor Development Area (Area), more particularly described as followed: A parcel of land being a part of the City of South Bend, Portage Township, St. Joseph County, Indiana and being more particularly described as follows: Beginning at the intersection of the centerline of Prairie Ave. and the northerly right -of -way line of the New York Central Railroad; thence, southeasterly along said line to the southeast corner of Lot #20 in the recorded plat of "Martin & Tutt's Addition to the City of South Bend "; as recorded in the records of said county; thence, southeasterly to the southwest corner of Lot #12 in said plat; thence, east along the line between Lots 12 & 13 in said plat to the centerline of a north -south alley lying between Main and Michigan Streets; thence, south along said centerline to the centerline of the first alley north of Tutt Street; thence, east along said line 35.00 ft. to the centerline of the first alley west of Michigan Street; thence, south to the centerline of Sample Street; thence, west along said centerline to the alley lying between Michigan and Main Streets; thence, south along said line to the centerline of Indiana Street; thence, west long said line to the centerline of Franklin Street; thence, north along said line to the centerline of the South Bend & St. Joseph Railroad; thence, west along said line to the centerline of Kendall Street; thence, north along said line to the centerline of Cotter Street; thence, west along said line to the centerline of Prairie Ave.; northeasterly along said line to the centerline of Chapin Street as shown on the recorded plat of "Inter Belt Industrial Park" as recorded in Book 21 of plats on Page 1 in the records of said county; thence, north along said line to the centerline of Prairie Ave. as shown on said plat; thence, east along said line 363.11 ft. to a point of curvature; thence around a 286.48 ft. radius curve to the left an arc distance of 302.26 ft. to a point of tangent; thence, northeasterly along said centerline to the point of beginning. 4 - �I- 1.1 WHEREAS, upon such surveys, investigations, and studies made, the Commission finds that the Area has become blighted extent that such blighting conditions cannot be corrected by regulatory process or by the ordinary operations of private enterprise without resort to the provisions of the Act and that public health and welfare would be benefitted by acquisition in redevelopment of such Area under the provisions of the Act; and the and WHEREAS, the Commission has caused to be prepared maps and plats showing the boundaries of the Area, the location of the various parcels of property, streets, alleys, and other features affecting the acquisition, clearance, replatting, replanning, rezoning, or redevelopment of the Area, indicating that no parcels of property in the Area will be acquired by the Commission, and the parts of the Area that are to be devoted to public ways, levees, sewerage, parks, playgrounds, and other public purposes under the redevelopment plan for the Area; and WHEREAS, lists have been prepared indicating that no parcels of property are proposed to be acquired within the area, and therefore that no appraisals have been made of the fair market value of any parcels in the Area at this time; and WHEREAS, there was presented to this meeting of the Commission for its consideration and approval, a copy of the development plan for the Area, dated January 10, 1986, which plan is entitled Studebaker Corridor Development Plan, South Bend, Indiana (Plan); and WHEREAS, the Plan and the conditions under which the Commission will make relocation payments have been reviewed and considered by the Commission, and the Commission has developed a relocation policy to address relocation needs for the Area; and WHEREAS, Title VI of the Civil Rights Act of 1964, as amended, and the regulations of the United States Department of Housing and Urban Development (HUD) effectuating that title, provide that no person shall, on the grounds of race, age, sex, color, or national origin, be excluded from participation in, be denied the benefits of, or be subject to discrimination in the undertaking and carrying out of any federally assisted project. NOW, THEREFORE, BE IT RESOLVED BY THE SOUTH BEND REDEVELOPMENT COMMISSION, AS FOLLOWS: 1. The Studebaker Corridor Development Area (Area), which is described in the first "WHEREAS" clause hereof, is blighted and constitutes a menace to the social and economic interest of the City of South Bend (City) and its inhabitants, and it will be of public utility and benefit to acquire real estate in the Area in the future and to redevelop the Area under the provisions of the Act. 2. The Plan, attached hereto and incorporated herein, is hereby adopted as the Plan for the redevelopment of the Area. 3. The previously prepared maps and plats showing the boundaries of the Area, the location of the various parcels of property, streets, alleys, and other features affecting the acquisition, clearance, replatting, replanning, rezoning, or redevelopment of the Area, indicating any parcels of property to be excluded from acquisition, and indicating the parts of the Area to be devoted to public ways, levees, sewerage, parks, playgrounds, and other public purposes under the Plan are hereby approved. 4. The previously prepared list indicating that no parcels of property within the Area are to be acquired at the present time are hereby approved. 5. The estimated cost of acquiring property in the Area, as determined by taking the average of two separate appraisals made by independent appraisers, is $0. orm 6. In determining the location and extent of the Area proposed to be acquired for redevelopment, the Commission has given consideration to transitional and permanent provisions for adequate housing for the residents of the Area who will be displaced by this redevelopment project, and the Commission hereby adopts the South Bend Central Relocation Policy as the policy by which the Commission will be guided in providing for such persons displaced by action of the Commission. 7. The Commission finds that the objectives of the Plan cannot be achieved through more extensive rehabilitation of the Area. 8. The Plan is in all respects approved, and the Secretary is directed to file a certified copy of the Plan with the minutes of this meeting and to record a certified copy of said Plan in the office of the Recorder of St. Joseph County, Indiana. 9. For purposes of the allocation provisions of the Act, authorized by I.C. 36- 7- 14 -39, the Area is hereby designated as Studebaker Corridor Allocation Area (South Bend Allocation Area 6), more particularly described as follows: A parcel of land being a part of the City of South Bend, Portage Township, St. Joseph County, Indiana and being more particularly described as follows: Beginning at the intersection of the centerline of Prairie Ave. and the northerly right -of -way line of the New York Central Railroad; thence, southeasterly along said line to the southeast corner of Lot #20 in the recorded plat of "Martin & Tutt's Addition to the City of South Bend "; as recorded in the records of said county; thence, southeasterly to the southwest corner of Lot #12 in said plat; thence, east along the line between Lots 12 & 13 in said plat to the centerline of a north -south alley lying between Main and Michigan Streets; thence, south along said centerline to the centerline of the first alley north of Tutt Street; thence, east along said line 35.00 ft. to the centerline of the first alley west of Michigan Street; thence, south to the centerline of Sample Street; thence, west along said centerline to the alley lying between Michigan and Main Streets; thence, south along said line to the centerline of Indiana Street; thence, west long said line to the centerline of Franklin Street; thence, north along said line to the centerline of the South Bend & St. Joseph Railroad; thence, west along said line to the centerline of Kendall Street; thence, north along said line to the centerline of Cotter Street; thence, west along said line to the centerline of Prairie Ave.; northeasterly along said line to the centerline of Chapin Street as shown on the recorded plat of "Inter Belt Industrial Park" as recorded in Book 21 of plats on Page 1 in the records of said county; thence, north along said line to the centerline of Prairie Ave. as shown on said plat; thence, east along said line 363.11 ft. to a point of curvature; thence around a 286.48 ft. radius curve to the left an arc distance of 302.26 ft. to a point of tangent; thence, northeasterly along said centerline to the point of beginning. 10. Any taxes levied on real or personal property I.C. 6 -1.1 in the Studebaker Corridor Allocation Area Allocation Area No. 6) (Allocation Area) in 1985, for 1986, and thereafter, except as hereinafter provided, benefit of any public body entitled to a distribution -3- as RM imposed under (South Bend collection in for the thereof, shall 1 be allocated and distributed as provided in the allocation and distribution provisions of the Act, and more particularly as follows: (a) the proceeds of the taxes attributable to the �r lesser of: (1) the assessed value of the property for the assessment date with respect to which the allocation and distribution is made; or (2) the assessed value finally determined for immediately preceeding allocation provisions, March 1, 1985, shall be allocated to, paid into the funds of entitled to a distribu of all of the property as the assessment date the effective date of these which assessment date is and when collected shall be the respective taxing units Lion of such taxes. (b) the property tax proceeds in excess of those described in subdivision (a) above shall be allocated to the South Bend redevelopment district and when collected paid into a Special Fund, hereby created, for the Studebaker Corridor Allocation Area to be known as Studebaker Corridor Allocation Area (South Bend Allocation Area No. 6) Special Fund (Special Fund), that may be used by the Commission only to: (A) pay the principal of and interest on any obligations payable solely from allocated tax proceeds which are incurred from the redevelopment district for the purpose of financing or refinancing the redevelopment of that Allocation Area; (B) restore the debt service reserve for bonds payable solely or in part from allocated tax proceeds in that Allocation Area; (C) pay the principal of and interest on bonds payable from allocated tax proceeds in that Allocation Area and from the special tax levied under I.C. 36- 7- 14 -27; (D) pay the principal of and the interest on bonds issued by the City to pay for local public improvements within the Allocation Area, to reimburse the City for expenditures made by the City for local public improvements (which include buildings, parking facilities, and other items described in I.C. 36- 7- 14- 25.1(a)) within that Allocation Area, or for rental paid for by the City for a building or parking facility within that Allocation Area under any lease entered into under I.C. 36 -1 -10; provided, however, that if future uses of property tax proceeds allocated to the Special Fund are authorized or permitted by amendment to the Act, including I.C. 36- 7- 14 -39, after the effective date of this resolution, those uses shall also be authorized or permitted for property tax proceeds allocated to the Special Fund. 11. Inasmuch as a portion of the Studebaker Corridor Allocation Area (South Bend Allocation Area No. 6) is located within an enterprise zone created under I.C. 4- 4- 4 -6.1, when the money in the -4- Special Fund is sufficient to pay when due all principal of and interest on bonds described in subdivisions (A), (C) and (D) of paragraph 10 and is not needed for other purposes described in subdivision (B) and (D) of paragraph 10 or as permitted by amendments to the Act, including I.C. 36- 7- 14 -39, the excess in this Special Fund shall be paid to the City for uses permitted by I.C. 36- 7- 14- 39(g). 12. When the funds are no longer needed for purposes permitted in paragraphs 10 and 11 above, money in the Special Fund in excess of that amount shall be paid to the respective taxing units in the manner prescribed I.C. 36- 7- 14- 39(b)(1). 13. Property taxes and property tax proceeds as used in this resolution shall mean taxes imposed under I.C. 6 -1.1 on real property and taxes imposed under I.C. 6 -1.1 on depreciable personal property that has a useful life in excess of eight (8) years, as determined by the State Board of Tax Commissioners. 14. The Secretary is directed to file certified copies of this Resolution with the St. Joseph County Auditor and the Portage Township Assessor. 15. The United States and HUD are assured of full compliance by the Commission and the Department with HUD regulations effectuating Title VI of the Civil Rights Act of 1964, as amended. 16. This Resolution, together with supporting data, shall be submitted to the Area Plan Commission of St. Joseph County and the Common Council of the City, as provided by I.C. 36- 7- 14 -16, for their approval of the Resolution and Plan, and if approved by both bodies, the Resolution and Plan shall be submitted to public hearing and remonstrance as provided by I.C. 36- 7- 14 -17, after public notice in accordance with I.C. 36- 7 -14 -17 and I.C. 5 -3 -1. Adopted at a meeting of the South Bend Redevelopment Commission held on January 10, 1986, at the Office of the Commission, 1200 County -City Building, 227 W. Jefferson Boulevard, South Bend, Indiana 46601. CITY OF SOUTH BEND, INDIANA DEPARTMENT OF REDEVELOPMENT '4 • F. Jay Ni tz, Pr sident m mm nt Coissio Commission -5- A, TES, Romat %j'. Piase ki , Secretary CITY OF SOUTH BEND, INDIANA DEPARTMENT OF REDEVELOPMENT '4 • F. Jay Ni tz, Pr sident m mm nt Coissio Commission -5- s i i i STU. 1 �c 1 1 1 1 i 1� t C il SG. 1.11711 DEPARTMENT OF REDEVELOPMENT SOUTH BEND, INDIANA PLAN STUDEBAKER CORRIDOR DEVELOPMENT PLAN SOUTH BEND, INDIANA TABLE OF CONTENTS Page No. Introduction............... ..............................1 T. NTSTORTCAT, PFRSPFCTTVF .... ..............................3 A. Role in local economy B. Psychological impact C. Strengths and weaknesses II. CURRENT USAGE ............. ..............................6 A. Industrial B. Warehousing C. Office space D. Vacant space III. REDEVELOPMENT STRATEGY ..... .............................10 A. Summary of options B. Key elements IV. OPTIONS FOR REDEVELOPMENT ... .............................11 A. Light industrial park B. Developable sites C. Industrial redevelopment V. PROJECT PROPOSALS ........... .............................16 A. Land acquisition B. Property rehabilitation C. Developer's obligations VI. STATUTORY AUTHORITY ........ .............................18 VII. PROCEDURE FOR AMENDMENT OF PLAN .......................... 18 ,L60'Af1.1 LIST OF MAPS Map A Area Boundary Map B Building Use - Main Plant Complex Map C Zoning Map D Developable Sites Map E Property Acquisition LIST OF TABLES Table 1 Utilization of Space Table 2 Occupancy Table 3 List of Property Acquisition rr r INTRODUCTION c }+� 1 711 The Studebaker Corridor Development Plan provides the City of ■. South Bend with a stragegy to reuse and revitalize one of the community's potentially great assets, the land and buildings within the Studebaker Industrial Complex and adjacent area. The project area, which encompasses the main plant complex of the former Studebaker Motor Corporation, as well as other underutilized land adjacent to the plant, consists of approximately 220 acres located near the southwest portion of the Central Business District. The to revitalization of this area will provide a needed stimulus to existing users while enhancing the potential for attracting new businesses and industries. The Development Plan that follows is designed to guide a coordinated effort that involves both public and private resources for the purpose of transforming this underutilized area into a viable commercial and industrial site. Currently, the physical obsolescence of several industrial buildings has precluded any direct involvement by the private sector. The passage of time will only intensify this problem and make it more costly to correct. With several successful developments underway nearby - namely Monroe Industrial Park and the East Bank Development Area - the time to initiate positive change is at hand. An integral part of the Studebaker Corridor Development Plan is low the recognition that existing industrial buildings offer the advantage of a low per square foot cost as compared to the price of comparable new construction. This inherent advantage, coupled with supporting public improvements such as improved roads and private r investment such as structural rehabilitation and environmental cleanup will make the area more attractive to private investment. At the same time, the strategy recognizes that not all the large buildings within the main plant complex can be rehabilitated because of the lack of market demand for the multi -story industrial space or because rehabilitation is not feasible from a physical or financial standpoint. Special emphasis is also placed on the identification of underutilized sites for the purpose of encouraging new development. Other acquisition, relocation and clearance activities might occur in areas adjacent to the main plant complex for the purpose of +� attaining a wholly compatible land use within the development area. 01 By adopting this plan the City of South Bend will be taking a first step in the long term process of revitalizing the Studebaker Corridor. The City will also gain the immediate benefits of the tax increment that will be captured in this allocation area. By utilizing a coordinated approach involving the public and private sectors, this area can once again become a flourishing commerical and industrial center that complements the Central Business District i and significantly increase the City's tax base. r iw ir. -1- 1/10/86 w.p uu uL 01 El Sam •u(io.0 NORTH SECTION CL 1 fcyt y P([' i ( SOUTH SECTION Elm F GuITtK ' j, J Studebaker Corridor Development Plan Map Boundary _2- EIF] U-1 r-T-1 FF FIF�, 1 try � \e Tin 1 Vot �. -A-- w I � � 1 I j � ' ICE ❑C 1 r—�r —i 1111�� eri 17 F- 1/10/86 i � I I . HISTORICAL PERSPECTIVE sW!147 1 ' The Studebaker Corridor Development Area is bounded, generally, by the Conrail (i.e., formerly Penn Central) tracks on the north, the north /south alley between Main and Michigan Streets on the east, Indiana Avenue and Cotter Streets on the south, and Prairie Avenue on the west (see Map A). It's exact boundaries are as follows: A parcel of land being a part of the City of South Bend, Portage Township, St. Joseph County, Indiana and being more particularly described as follows: 1 -3- 1/10/86 Beginning at the intersection of the centerline of Prairie Ave. and the northerly right -of -way line of the New York Central Railroad; thence, southeasterly along said line to the southeast corner of Lot #20 in the recorded plat of "Martin & Tutt's Addition to the City of South Bend "; as ' recorded in the records of said county; thence, southeasterly to the southwest corner of Lot #12 in said plat; thence, east along the line between Lots 12 & 13 in said plat to the centerline of a north -south alley lying between Main and Michigan Streets; thence, south along said centerline to the centerline of the first alley north of Tutt Street; thence, east along said line 35.00 ft. to the centerline of the first alley west of Michigan Street; thence, south to the centerline of Sample Street; thence, west along said centerline to the alley lying between Michigan and Main Streets; thence, south along said line to the centerline of Indiana Street; thence, west long said line to the centerline of Franklin Street; thence, north along said line to the centerline of the South Bend & St. Joseph Railroad; thence, west along said line to the centerline of Kendall Street; thence, north along said line to the centerline of Cotter Street; thence, west along said line to the centerline of Prairie Ave.; northeasterly along said line to the centerline of Chapin Street as shown on the recorded plat of "Inter Belt Industrial Park" as recorded in Book 21 of plats on Page 1 in the records of said county; thence, north along said line to the centerline of Prairie Ave. as shown on said plat; thence, east along said line 363.11 ft. to a point of curvature; thence around a 286.48 ft. radius curve to the left an arc distance of 302.26 ft. to a point of tangent; thence, northeasterly along said centerline to the point of beginning. 1 -3- 1/10/86 U" s'S6'• x.1'111 Historically, the Studebaker Motor Corporation was the hub of heavy industry in South Bend as well as the surrounding area. At its peak employment in the 1930's over 22,000 persons were employed there. Following World War II, Studebaker began cutting back its rr operation and there was a steady decline in the 1950's and early 1960's. When Studebaker finally closed its doors in 1964, "{ employment was approximately 6,000. ON During its peak years, Studebaker utilized several factors that strengthened its position as a prime industrial force in the local and regional economy. These included: favorable transportation access • large pool of skilled labor • large concentration of buildings Ironically, some of these very same factors eventually combined to r. weaken Studebaker. The advancing age of its buildings, coupled with their unsuitability for conversion to other industrial uses, and structural shifts within the automotive industry all contributed to the demise of the Studebaker Corporation. r. Although the loss of Studebaker was a blow to the local economy, South Bend gradually diversified its employment among the .p service, retail and manufacturing sectors. While the city's economy has, by and large, recovered, the Studebaker Corridor has not. In 'OW fact, this area has been steadily deteriorating since the early No 1960's. While the economic loss of Studebaker's manufacturing has been absorbed over time, the physical as well as psychological effects linger on in the form of vacant land and under - utilized buildings that are linked to the widespread perception that this situation is not likely to reverse itself. Symbolic of this, the six -story Shetland Properties building, once at the center of a sprawling auto - manufacturing complex, looms large and vacant, wr overlooking a revitalizing downtown. The main strengths of the Studebaker Corridor, as they relate av to potential redevelopment, are as follows: A central physical position within St. Joseph County. "" A prime location near downtown as well as the Monroe Industrial Park. 11r Good access to both rail and highway transportation. The Studebaker Corridor connects easily to the city and region via several major connectors and arterials 1"W (i.e., Main, Sample, Lafayette, and Prairie) and is just minutes away from the Indiana Toll Road and U.S. 31 bypass. Potential rail service is provided through links with the Norfolk & Western and Conrail (formerly Penn Central) systems. F ire -4- 1/10/86 Several solid, existing users, especially in the south plant complex, such as Allied Products, and South Bend Lathe. A high level of utility service. A large amount of vacant land, especially in the t adjacent areas, which could be used for new development or to expand existing parking or business. Several large, under - utilized buildings which offer the potential of inexpensive space for firms which do not require, or cannot afford, new industrial space. The supportive services and incentives that can be provided by the Urban Enterprise Zone and the Urban Enterprise Association, such as tax relief, low interest loans, property tax credit and other financial incentives. On the other hand, the Studebaker Corridor also has some disadvantages to be overcome before any substantial redevelopment can occur. These include: �► The badly deteriorated conditions of several buildings, especially in the north section of the main plant complex. A generally poor environmental condition throughout the main plant complex. This includes such eyesores as leftover industrial debris, unused rail tracks, overgrown grass, weeds and abandoned vehicles. An obsolete interior street pattern and fencing system which is inadequate to meet the needs of current and future users. ' The physical obsolescence of several buildings whose vertical, multi -story configurations may be unsuitable for modern, horizontially- oriented production. �r -5' 1/10/86 WM rM V. II. CURRENT USAGE S(; ,.1'"111 Although the Studebaker Corridor Development Area is zoned for heavy ('E') and light ('D') industrial purposes, actual current usage exhibits a much less intense utilization of space. Although the most prevalent occupied use is industrial, which comprises 32.7% of all building space, almost one -half (48.6 %) of the available space is vacant, with warehousing (16.2 %) and office (2.50) uses comprising the remainder. Industrial The major industrial users in the main plant complex are South " Bend Lathe (building #72), Avanti Motor Corporation ( #33, et al), Allied Products ( #86, et al) and Huckins Tool and Die ( #69). Although these industries are operating at or near capacity (the .. status of Avanti being an exception), several are experiencing lack of parking and yard space. Warehousing There are several types and sizes of warehousing operations located in both the north and south sections of the main plant complex. This use constitutes a popular type of operation in the project area. This is due to the large amount of floor space available, its relatively inexpensive cost and the generally small capital or maintenance expense needed to run a warehouse in the main plant complex. The largest warehouses are Standard Surplus ( #53, 58), which maintains an inventory of Studebaker - related parts and merchandise, and South Bend Warehouse ( #69). The Michiana Regional Warehouse and other users occupy a portion of the old Foundry building ( #85), which is a very under - utilized space. Unfortunately, the foundry's sheer size, its style of construction and generally deteriorated physical condition preclude any more intense use at this time. Midwest Distributing Company has its warehousing facility in building #112. Valley Equipment operates in building #1A. L Office Space Corridor Properties ( #92) and its tenants occupy the largest office building in the main plant complex. Like other users in this vicinity, these tenants need more space for parking. A small amount of office space is also leased at Vandalia Station ( #lA). �w. Vacant Space The three buildings that comprise Shetland Properties ( #84, et al) constitute the largest single vacant space in the main plant complex with only a bare minimum being utilized. The buildings themselves are in good condition and might be better utilized by a combination of tenants, especially if the truck and rail docks could be brought up to modern standards. -6- 1/10/86 rr. The Transwestern /Rhodes building ( #47, et al) is mostly vacant as well, with only a small portion of its total floor area being used for storage. The old Foundry building ( #85), although partially utilized by several tenants, remains vacant for most of its total floor space. Although this space was once considered to have potential as `r industrial condominimum space, the building is deteriorated and would require extensive repair for re -use to occur. Public Space The South Bend Community School Corporation's administrative offices are located in building #62, which is being utilized to full .. capacity. Also, the City of South Bend's Municipal Services Facility consists of new buildings that house the police and fire departments as well as a garage and several storage areas for up vehicles, equipment and materials. .or w. +r. -7- 1/10/86 � I IIII. REDEVELOPMENT STRATEGY SW � -171_1 The redevelopment strategy for the Studebaker Corridor Development Area is centered on three major options which may be implemented separately, on an incremental basis, or in combination. A strategy consisting of several development options is required because of the complex interaction between: (1) the market demand for specific types of industrial and warehouse space; (2) limited public resources; (3) the size, type, and configuration of the individual industrial structures; (4) the questionable physical and financial feasibility of renovation of several of the structures; and, (5) the large scale of the project both in terms of the acreage and the total building volume. • the development of key sites in the north main plant the redevelopment of the north main plant The key elements of this strategy include: • acquisition, rehabilitation and clearance activities, where appropriate, coupled with supportive public works improvements • the identification of developable sites • a new interior access road in the north section • a building rehabilitation program • a general environmental clean -up in the area J A-10- 1/10/86 In the face of dwindling federal funds, this strategy is designed to leverage private sector initiative with public support activities which will upgrade the condition of the area while re -using under - utilized and /or vacant land and buildings. Briefly, the three major options are: • the redevelopment of areas adjacent to the main plant complex as a light industrial park • the development of key sites in the north main plant the redevelopment of the north main plant The key elements of this strategy include: • acquisition, rehabilitation and clearance activities, where appropriate, coupled with supportive public works improvements • the identification of developable sites • a new interior access road in the north section • a building rehabilitation program • a general environmental clean -up in the area J A-10- 1/10/86 IV. REDEVELOPMENT OPTIONS ts6`4~111 Light Industrial Park One major option would be the redevelopment of land adjacent to the main plant complex. For the purposes of discussion, this area is divided into two smaller sub -areas based on existing land uses and suitability for future redevelopment as a light industrial park. tSub -area A, bounded by Sample on the north, the alley running north -south between Main and Lafayette on the east, Indiana Avenue on the south and Franklin Street on the west, is adjacent to the main plant complex and has the most vacant and under - utilized land and buildings. The land use in this sub -area is mixed. Residential structures, vacant lots, commercial and light industrial uses dominate. The condition of the majority of the residences is poor. OF These conditions, coupled with an industrial - oriented zoning, makes this sub -area suitable for new light industrial development. The ongoing deterioration of this sub -area is of prime concern to owners and tenants. Several vacant land parcels in this sub -area have already been acquired by adjacent users. If this process could be hastened by municipal assistance, this sub -area could be used for expansion and new development while arresting its growing blight and undesirability. Sub -area B, bounded by Sample on the north, the north -south alley between Main and Michigan on the east, Indiana on the south and the alley between Main and Lafayette on the west, is a predominantly commercial and light industrial area with small concentrations of residences and several large, vacant land parcels. The relatively large size of the commercial structures, as well as their generally good physical condition, make retention and expansion of this sub - area's existing land use a viable strategy. Particular attention should be given to the 1100 -1300 blocks of S. Main where there are several large parcels of vacant land suitable for redevelopment. Likewise, the 1000 block of S. Main has several parcels of land which are either vacant or under - utilized. The prime location of this land, along a major thoroughfare, makes it a good area for new development and /or expansion. Developable Sites The second major option concerns the development of several sites in or near the north section (i.e., north of Sample Street) of the main plant complex. Four potential sites have been identified (see Map D) and are discussed below. A-11- 1/10/86 3 Site B, located between the Avanti Motors ( #33, et al) and Shetland Property ( #84 et al) buildings, covers approximately 180,000 s.f. (4.0 acres) of developable land. This site could be subdivided in several different ways. For example, it could be kept intact for new infill development, subdivided for the expansion of an existing business or subdivided and used for some combination of new development, expansion and parking. This parcel has access from S. Lafayette at the present time but would greatly benefit from enhanced interior access. Site A 5604711 Site A encompasses approximately 175,000 s.f. (3.8 acres) of new development developable land just west of the South Bend Warehouse ( #69). At the corner of Sample and Lafayette, where the present time this land is strewn with junk, debris and abandoned vehicles; there is also much overgrown grass and other vegetation of developable that is not maintained and contributes to an undesireable the present time, this site is under - utilized appearance. This site has good vehicular access from Prairie Avenue. An interior access road would provide further access to the as site from Lafayette and Sample Streets. excellent access afforded by both Sample Site B Site B, located between the Avanti Motors ( #33, et al) and Shetland Property ( #84 et al) buildings, covers approximately 180,000 s.f. (4.0 acres) of developable land. This site could be subdivided in several different ways. For example, it could be kept intact for new infill development, subdivided for the expansion of an existing business or subdivided and used for some combination of new development, expansion and parking. This parcel has access from S. Lafayette at the present time but would greatly benefit from enhanced interior access. 5604 711 7 ___/ / —1 I Site C One of the most attractive sites for new development exists at the corner of Sample and Lafayette, where several vacant parcels of land combine for 150,000 s.f. (3.3 acres) of developable land. At the present time, this site is under - utilized as parking. Site C has the advantages of extremely high visibility, as well as excellent access afforded by both Sample and Lafayette Streets. There are several development options for this property. The best use. of course. would be a new cnmmPrcial nr inrinGt-rial HPVFlnnmPnl- 5604 711 7 ___/ / —1 I N l� M :S YOIAVI S s D r N 1S N17M S I I 11 � M 00 ll IT ' N fin\ OAI6 3113AVAVI N1()OS >: 00 k't7n ..:...h.r,..:.,..... ,.0<3:v d' •.+:,r> AS NIIIANVU3 S il) 111 M. I S I A OOS S Studebaker Corridor Development Plan MapD Developable Sites -13- jxI N • h 2a 1 1S NIdVN� S 1 rn r-A 4J 0 In 1'1011IIM S :S YOIAVI S s D r N 1S N17M S I I 11 � M 00 ll IT ' N fin\ OAI6 3113AVAVI N1()OS >: 00 k't7n ..:...h.r,..:.,..... ,.0<3:v d' •.+:,r> AS NIIIANVU3 S il) 111 M. I S I A OOS S Studebaker Corridor Development Plan MapD Developable Sites -13- jxI N • h 2a 1 1S NIdVN� S 1 �4 711 Industrial Redevelopment The third option of the overall Redevelopment Strategy consists of the redevelopment of the north section of the main plant complex. The north section of the Studebaker Plant Complex is the most under- utilized portion, as well as the most deteriorated. Several buildings, such as Shetland Properties ( #84, et al) and irr Transwestern /Rhodes ( #47, et al) are virtually vacant while others have fallen into disrepair from years of marginal maintenance and use. Specific elements concerning this option include: Long -range plans for appropriate acquisition, clearance and relocation, a new interior access road, a building rehabilitation /maintenance program and a general environmental clean -up of the area. Where necessary, existing structures should undergo a limited maintenance program to correct deterioration and enhance appearance, thus increasing the marketability of the individual building as well as improving the area in general. Specific measures include, but are not limited to, the following: Weatherproof roof and retrofit with insulation. I" Clean, paint and tuckpoint exterior walls. low Repair cracked and broken windows, including casements. Repair or replace broken doors. Install adequate truck and rail docks. Repair vertical systems such as elevators and conveyors. Clean and paint interiors, as needed. Specific objectives to correct environmental deficiencies include, but are not limited to, the following: Removal of the overhead conveyor system that spans several of the plant buildings. A general upgrading of the plant complex, including new lighting and landscaping. The expansion and paving of key parking lots in order to provide adequate parking for existing tenants as well as prospective users. A new system of fencing, both around the exterior of, and inside, the plant complex itself. A key element to the successful redevelopment of the north section is the construction of a new interior access road. This -14- 1/10/86 � I I" 1 i 4W 1 I* t road could have entrances from three major thoroughfares - Prairie Avenue, Sample Street and Lafayette Street - and would provide needed vehicular access to all existing sites and buildings, as well as any new development. At the same time, this road would provide access to over 11 acres of land at three of the four developable sites discussed earlier. Additional benefits of such a road include improved security as a result of better lighting throughout the area, as well as improved aesthetics due to new curbing and landscaping. 1 -15- 1/10/86 V. PROJECT PROPOSALS Land Acquisition Although there is no land acquisition identified'in this plan, it is anticipated that some land acquisition, relocation and Vw clearance will occur in the future. When this occurs, the City of South Bend Department of Redevelopment will either: 1. Demolish the structure or structures thereon, if any, and dispose of the land for redevelopment at its fair market value, excepting those cases when land is sold or leased to another public body, pursuant to Indiana Code 36- 7- 14 -22, for uses in accordance with the Development Plan; or 2. Sell or lease the property to purchaser or lessee at its fair market value, excepting those cases when property is sold or leased to another public body pursuant to Indiana Code 36- 7- 14 -22, for uses in accordance with the Plan. Property Rehabilitation All properties in the Area shall comply with the standards set forth in all applicable statutes, codes and ordinances, as amended from time to time, relating to the use, maintenance, facilities, and occupancy of existing property, including, but not limited to, Chapters 6, 8, 9, and 21 of the South Bend Municipal Code. All properties within the Area shall be maintained so that the appearance of the premises and all buildings thereon shall reflect a level of maintenance in keeping with the standards of the Area and the requirements of the South Bend Municipal Code. In addition, the following provisions, plus other appropriate provisions, will be included in the Agreement: Developer's Obliaations The land acquired by the Redevelopment Commission will be disposed of subject to an Agreement between the Commission and the Developer. The Developer will be required by the Agreement to observe the land use and building requirements and objectives of this Plan and to carry out all development within an agreed time Law period. The Agreement and Deed contain other provisions required by the Commission and the United States Department of Housing and Urban Development. 1. An approved plan for the project and a time schedule for start and completion of the project. 2. That the purchase of the land is for the purpose of 1 -16- 1/10/86 �s6C redevelopment and not for speculation. Purchase contracts will provide that the Developer agree that purchase of the property is for the purpose of redevelopment and not for land speculation. Prior to the completion of the redevelopment project, the Developer may not sell, lease, or otherwise transfer such land (or improvements) without the prior written consent of the South Bend .. Redevelopment Commission. i n improved 3. That the land will be built upon and imp o ed in conformity with the objectives and provisions of the Plan. 4. That the building of improvements will be commenced and completed within a specified period of time. 5. That the Developers, their successors or assigns, agree that there will be no discrimination against any person or group of persons on account of race, creed, color, sex, age, transfer, use, occupancy, tenure, or enjoyment of the premises therein conveyed, or improvements erected or to be erected thereon, nor will the Developer himself or any person claiming under or through him establish or permit any such practice or practices of discrimination or segregation with reference to the selection, location, number, use, or occupancy of tenants, lessees, sublessees, or vendees in the premises therein conveyed, or improvements erected or to be erected thereon. L, e 1 -17- 1/10/86 I� t t` 1 t i �r 1� f 1 1 1 1, 1 1 1 VI. STATUTORY AUTHORITY The controls, regulations and land use restrictions contained in this Plan are for the specific purpose of implementing the Studebaker Corridor Development Plan pursuant to Indiana Code 36- 7- 14 -1 -et. seq. VII. PROCEDURE FOR AMENDMENT OF THE APPROVED DEVELOPMENT PLAN The Studebaker Corridor Development Plan may be amended by resolution of the South Bend Redevelopment Commission. Any change affecting any property or contractual right can be effectuated only in accordance with applicable state and local law. 1/10/86 J� goo NORTH SECTION SOUTH SECTION I I oaks, r MB I A E wo A :t r fF1 �r slot f � t1* S B f A E B Studebaker Corridor ,Development Plan Map E Property Acquisition -20- F\ I J ❑❑ i ❑ ❑Q1` —iii � ��iin � ��T—� None of the above property will be acquired at the present time. 1/10/86 TABLE 1 Utilization of Space* (in square feet) Studebaker Plant Complex Industrial Warehousing Office Vacant 1,570,620 s.f. (32.7 %) 777,244 s.f. (16.2 %) 120,000 s.f. ( 2.5 %) 2,340,680 s.f. (48.6 %) 4,808,544 s.f. (100 %) * Not including 148,900 s.f. of office space used by the South Bend Community School Corporation and approximately 100,000 s.f. occupied by Municipal Services Facility buildings. Source: Studebaker Corridor Study Updated July 1985 -21- 1/10/86 Z X �v 4a Q) U It N a �a B, Q) a s U Fm 4- 4- 4- 4� 1- 4a +-) ui vi m m ui cn r- m O Itzr o 000 U O co O O o 0 o r er C:) U-) • °4 r ri cq o o' r` N r- l0 cr m 0 v � t- d M l0 . 4- 1- 4� 4- 1 - 4- 4- 4� 4� 1- 4•a 4a N N N N I O O O O O o 0 0 0 0 0 0 CCCCIIILJJJ OOOOOOOl00000 O (: O rte • 01) 0 0 M O o 0 m r, O O r4 �r O M 0p CV 0 Cl) 0 N \0 N l0 r- 00 r-1 ­4 l0 N Ln 00 _q N N �r —4 —1 00 r4 ro o0IZV000000000 000000000000 oorr`rnqzToMooOtr c7 OMr-I� NMOD N0000 Lnt.ornt.orIqr1-4r•- ,ko too�.o -� r N N Lrn ICr r-1 Ln Ln F. 00 000 : • 00 M � � —1 In Ir M O M a) co •H MICr00r- MC ra ,-i M Lr) C rn r- r; —1 H�" r� 01- 41(")Mr- al0(N NLr)w00 kD 00 M m V r-i 0\ r— m 00 0 r- -22- dp w 0 4- ui 0 0 VT M �o C �I1 4- O w 00 r l0 N ow 0 0 41 �r Ln 0 0 0 rO O b 00 U ?, v +� U O En Flo, O r-i • rl U w N . r{ U v rs m N rG A r_ O m U 8 U rs m b � Q) 1/10/86 m rt •--q O -P 4 v v v3c0 IS -�� v • °4 v 24 '8 Q v+�rovm � v � LZ ° v 4-1 r� -1 o tp75 o a° Q u °)' xv 4 8 CH roEvnra �roa -H 41 �ro 3 r� � I ro G 4-) U �4-) rty ?�U.U�U1 O rJ�r�ll F. 00 000 : • 00 M � � —1 In Ir M O M a) co •H MICr00r- MC ra ,-i M Lr) C rn r- r; —1 H�" r� 01- 41(")Mr- al0(N NLr)w00 kD 00 M m V r-i 0\ r— m 00 0 r- -22- dp w 0 4- ui 0 0 VT M �o C �I1 4- O w 00 r l0 N ow 0 0 41 �r Ln 0 0 0 rO O b 00 U ?, v +� U O En Flo, O r-i • rl U w N . r{ U v rs m N rG A r_ O m U 8 U rs m b � Q) 1/10/86 ri TABLE 3 IList of Property Acquisition Block Parcel To be Not to be Number Number Owner Acauired Acauired 1 INo property is to be acquired at this time. it 1 1 1 1 �c 1 i 1 -23- 1/10/86