Loading...
HomeMy WebLinkAboutNo. 3011 approving/authorizing the execution of an addendum to the master agency agreement (Mayflower Road Planning Study)iRESOLUTION NO. 3011 RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION APPROVING AND AUTHORIZING THE EXECUTION OF AN ADDENDUM TO THE MASTER AGENCY AGREEMENT (Mayflower Road Planning Study) 3011 -12 WHEREAS, effective January 3, 2012, the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Mayflower Road Planning Study to the Master Agency Agreement by way of . this Addendum. NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment Commission as follows: Section 1. The Commission hereby approves the Addendum to Master Agency Agreement (Mayflower Road Planning Study) and hereby authorizes its execution in substantially the form attached hereto with such changes as the Commission may deem necessary or appropriate upon the advice of counsel, said execution thereof to be conclusive evidence of the Commission's approval of such changes. The Clerk is hereby directed to file a copy of the Addendum with the BPW. Section 2. This Resolution shall be in full force and effect after its adoption by the Commission. Section 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. ADOPTED at a meeting of the South Bend Redevelopment Commission held on April 10, 2012, at 4:00 p.m., in Room 1308, County -City Building, South Bend, Indiana 46601. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT Marcia I. Jones, ident South Bend Redevelopment Commission ATTEST: `�..- South Bend Redevelopment Commission ADDENDUM TO MASTER AGENCY AGREEMENT (Mayflower Road Planning Study) 3011 -12 This Addendum to Master Agency Agreement (this "Addendum "), made and entered into as of the 24th day of April, 2012, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Mayflower Road Planning Study (the "Project "). (W WHEREAS, effective January 3, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Mayflower Road Planning Study to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: 1. The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement, to act as the Commission's agent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being morespecifically described in "Exhibit A" attached hereto and made a part hereof. (W 2. All of the terms and conditions of the Master Agency Agreement shall A 26--.1 control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above. ATTEST: South Bend Redevelopment Commission ATTEST: Linda Martin, Clerk CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Gary Gilot, President Kathryn Roos, Member Don Inks, Member 0 Exhibit "A" Mayflower Road Planning Study See attached proposal from Abonmarche dated March 7, 2012 • AB N MARCHE 0 � 4 Confidence By Design March 7, 2012 City of South Bend Redevelopment Commission County -City Building, Room 1200 227 West Jefferson Blvd. South Bend, IN 46601 ATTENTION: Mr. Bill Schalliol, Project Manager RE: MAYFLOWER ROAD PLANNING STUDY Proposal for Professional Services Dear Bill: Engineering Architecture Land Surveying Marina/ Waterfront Community Planning Landscape Architecture Development Services Abonmarche Consultants is pleased to present this proposal to provide engineering services for the project referenced above. We have developed this proposal based upon our past meetings and discussions. We greatly appreciate the opportunity to submit our proposal and look forward to working with you on this project. Our scope of services and proposed work schedule are set forth in Appendix A, along with the associated fees in Appendix B and schedule in Appendix C. If our proposal is acceptable please sign and return the enclosed standard agreement to authorize us to proceed. We thank you for this opportunity to serve the City of South Bend. If you have any questions or concerns, please do not hesitate to contact our office. Sincerely, Abonmarche Consultants, Inc. ohn W. Linn, PE, Principal /Chairman of the Board 750 Lincoln Way East 341 Airport North Office Park 95 West Main Street South Bend, IN 46601 Fort Wayne, IN 46825 Benton Harbor, MI 49022 574.232.8700 260.497.8823 269.927.2295 www.abonmarcho.com 361 First Street Manistee, MI 49660 231.723.1198 503 Quaker Street South Haven, MI 49090 269.637 1293 L 14 March 7, 2012 Proposal for Planning Study Mayflower Connector Bridge South Bend, Indiana APPENDIX "A" WORK PLAN PROJECT UNDERSTANDING 4 PROJECT APPROACH Page 1 The project concept consists of extending Mayflower Road from Cleveland Road to Nimtz Parkway, including a new bridge over the Indiana Toll Road (1- 80/90). The benefit of the concept is to provide enhanced connectivity between the Blackthorn Office Park and retail /commercial properties along Cleveland Road; benefiting both business areas. This interconnect /access also opens the door to additional development potential and market interest. This development will likely consist of a mixture of uses including hotel, retail, restaurant, office and other similar commercial and office uses. PROJECT PLANNING STUDY (Abonmarche Scope of Services) TASK #1 EXISTING CONDITIONS / BASE MAPS This task consists of gathering the needed record data of existing features within the study area. This includes obtaining city GIS maps and aerial photographs, utility information, roadway configurations, etc. This also includes the preparation of base maps for use in the study. Engineers Architects Planners Surveyors March 7, 2012 Proposal for Planning Study Mayflower Connector Bridge South Bend, Indiana TASK #2 PRELIMINARY TRANSPORTATION ANALYSIS Page 2 This task will consist of the study of the impacts to traffic patterns in the region as a result of the Mayflower interconnect concept. We will assess mobility in, around, and through the study area, including opportunities for restricted access for the ITR. This will include several meetings with the City and the ITR Concession Company. This is not a detailed Traffic Impact Study, which may or may not be required as part of final project approvals. TASK #3 CONCEPTUAL ROADWAY /BRIDGE DESIGN This task will include the development of a conceptual design of the roadway and bridge structure, including a detailed review of the geometric requirements of all the road /highway components. This will also include a preliminary bridge structure size and type selection. TASK #4 LAND USE CONCEPTS This task will include the development of schematic land use concepts, based upon the conceptual roadway design, to assist with the analysis of potential benefits of the implementing the interconnect concept. Stakeholder Meetings / Consensus Building Keys to the formulation of useful schematic designs are the discussions between the City and key stakeholders. Key stakeholders include land owners in the study area, the City, the ITR Concession Company, etc. We will meet with these stakeholders to gather input and feedback. Additional meetings may be held as needed and /or as identified by client, not included in this proposal. TASK #5 PROJECT COSTS ANALYSIS This task will consist of the preparation of estimate total project costs to implement the interconnect concept. TASK #6 IMPLEMENTATION PROCESS AND SCHEDULE This task will consist of the preparation of an outline of the approval process and timeline to implement the interconnect concept. We will also prepare a report which will include all of the findings and results of this study. Engineers Architects Planners Surveyors March 7, 2012 Proposal for Planning Study Mayflower Connector Bridge South Bend, Indiana APPENDIX "B" SCHEDULE OF FEES Proiect Planning Study ................... ............................... Task # 1 Existing Conditions /Base Maps Task #2 Preliminary Transportation Analysis Task #3 Conceptual Roadway /Bridge Design Task #4 Land Use Concepts Task #5 Project Cost Analysis Task #6 Implementation Process and Schedule TOTAL: Engineers Architects Planners Page 3 ... $12,900 $12,900 Surveyors March 7, 2012 Proposal for Planning Study Mayflower Connector Bridge South Bend, Indiana APPENDIX "C" SCHEDULE Feasibility Study Phase Task #1 Existing Conditions /Base Maps Task #2 Preliminary Transportation Analysis Task #3 Conceptual Roadway /Bridge Design Task #4 Land Use Concepts Task #5 Project Cost Analysis Task #6 Implementation Process and Schedule Engineers Architects Planners Anticil Comr- March 16 March 23 March 30 April 6 April 6 April 13 Surveyors r= 0 NARC_HE E Confidence By Design Abonmarche Professional Services Agreement AGREEMENT between: Client Name: CITY of SOUTH BEND, REDEVELOPEMENT COMMISSION Abonmarche Project Number: Date: 03/07/12 Client Address: COUNTY -CITY BUILDING, ROOM 1200, 227 WEST JEFFERSON BLVD. Phone: 574- 235 -5834 SOUTH BEND, IN 46601 Cell: Fax: 574 - 235 -9021 Email: hereinafter referred to as the Client, and Abonmarche Consultants, Inc., referred to as Abonmarche, of 750 Lincoln Way East, South Bend, IN 46601. The Client contracts with Abonmarche to perform professional services with regard to the Client's project generally referred to os: Project Name: MAYFLOWER ROAD PLANNING STUDY Location: MAYFLOWER ROAD FROM CLEVELAND ROAD TO NIMTZ PARKWAY SOUTH BEND, INDIANA The professional services to be provided by Abonmorche, collectively referred to as the Work Plan, are as follows: Scope of work: DESCRIBED IN APPENDIX A Project schedule: OUTLINED IN APPENDIX Special Provisions: NONE Abonmarche proposal /work plan, doled March 7, 2012 is incorporated into this Agreement by reference, and is limited to the services described therein. The Client agrees to promptly pay for services provided by Abonmarche for the Scope of Work according to the following: fee as detailed in APPENDIX B: $ 12,900.00 AS DETAILED IN APPENDIX B Prior to commencement of services, the Client will specify any and all documentation that the Client requires for submission with the invoice for services C tbovided by Abonmarche. Absent any special request from the Client, Abonmarche will send its standard form of invoice. after receipt of an invoice from Abonmarche, the Client has any questions, or if there are any discrepancies in the invoice, the Client shall identify the issue in iting within ten (10) days of its receipt. If no written objection is made within the ten (10) day period, any such objection shall be deemed waived. onmorche invoices ore due upon receipt. The Client has designoted Mr. BILL SCHALLIOL as its Representative. The Representative shall have the authority to -" ����, � - ­­ -'!d -w­ ti,„ - ,v, u ... ur a irwFeiu, ano for me oPprovai or on change orders, addenda, and additional services to be perforr*ed by Abonmarche. The representative shall be the contact person for submission of all documents. invoices or rnmmunirntinnc Aulttorhration to Proceed and Guarantee. of Payment: By signing this Agreement the Client authorizes Abonmarche to provide services described above, and that the Client is the responsible party for making payment to Abonmarche. 8v sianino below. f acknowledge that I hnv. rpcP vPr� nn�r , ,,ee • ere r These Tema and Conditions con only be amended, supplemented, modified, or canceled by a written instrument signed by both parties. Any notice or other communications shall be in writing and shall be considered to have been duly given when personally delivered or upon the third day otter being deposited into first class certified mail, postage prepoid, return receipt requested. _ CITY OF SOUTH BEND Client: REDEVELOPMENT COMMISSION Signature: -- Printed Name: Title: -- _ ATTEST: Signature: _ Printed Name: Title: Originating Office Address: BOARD of PUBLIC WORKS f Signature: i Signature: Signature: Signed: j Date Signed: 05 -19 -11 HN W. LINN, PE PRESIDENT / CEO ABONMARCHE CONSULTANTS, INC. 750 Lincoln Way East South Bend, IN 46601 T 574.232.8700 F 574.251.4440 March 7, 2012 COSB reviewed 05-04-11 Page 1 of 2 TERMS AND CONDITIONS OF PROFESSIONAL SERVICES AGREEMENT 1. Agreement. These Terms and Conditions shall be incorporated by reference and shall prevail as the basis of the Client's Agreement to Abonmarche. Any Client document or communication in addition to or in conflict with these Tema and Conditions shall be subordinate and subject to these provisions. 2. Execution. Abonmorche has the option to render this Agreement null and void, 1 1 If It is not executed within thirty (30) days of delivery. 3. CMO RespongMes. The Client will provide ok criteria and information concerning the requirements of the Project. The Client will assume responsibility for interpretation of contract documents and for construction observation and 1 1 will waive all claims against Abonmarche that may be In any way connected. unless Abonmorche's services under this Agreement include full -time construction observation or review of contractor's perfomance. A. Pedosmasee. The standard of care for services performed by or provided by Abonmarche will be the care and skill ordinarily used by Abonmarche's 1 17 profession practicing under similar circumstances at the same lime and In the some locality. Abonmarche makes no warranty, expressed or Implied, with respect to any services provided by Abonmarche. Abonmarche will not be liable for any claim, damages. cost, or expense (including attorney's fees) or other liability or loss not directly and solely caused by the negligent acts, errors. or omissions of Abonmorche. 5. Hourly Ming Rates. If payment h on on hourly rate, Client will pay Abonmarche at the current hourly billing rates. The nouns rates are adjusted annually or as deemed appropriate. 1 18- 6. Refmbursali ExpeMes, Reimbursable expenses, the actual costs Incurred directly or indirectly for the Client's Project, will be charged at Abonmarche's 1 19. current rates. Examples of reimbursable expenses include, but ore not limited to: mileage, tests and analyses, special equipment services, postage and delivery charges, telephone and telefox charges, copying, printing, and binding charges, commercial transportation, meals, lodging, special fees, licenses, and permits, Subconsultont and outside technical or professional services will be charged on the basis of the actual costs times a factor of 1.15. 2 20, 7 Additional Services. Additional services that may be provided pursuant to the Agreement or any subsequent modification of the Agreement will be authorized, when possible, by written amendment signed on behalf of the Client and Abonmarche. Additional services, performed by Abonmorche ore subject 2 21. to all Terms and Conditions and the Client will be responsible for payment. Should the Client, regulatory agency. or any public body or inspector direct modification or addition to services covered by this Agreement, the cost will be 2 22, added to the agreed price. Requests for extra services should be made in writing via a change order, but none the less, Abonmarche h entitled to be paid for extra services provided whether or not It is in writing. 8. Underground Struetrues a Ruled Utilities. The Client is responsible for Identification and location of all pubic and private burled structures on the Client's property and the Project site, such as, but not limited to, storage tanks 2 23. and lines, or gas, water, sewer, electrical, phone, cable, or any other public or r r private utilities. It is agreed that Abonmarche is not responsible for accidental damage to utilities or underground structures, whether known, unknown or Improperly located. The client shall be responsible for design fees it changes are 2 24. necessary. Utility locating or marking services provided by Abonmorche are not substitutes for complying with the utility owner notification requirements or the r r locating services (81 1 systems) required prior to an excavation. Utilities shown as located by ground penetrating radar are approximate only. No excavation took place to verify the positions shown or to verify the type of utility (except as 2 25. T noled). Careful excavation is required for verification of the buried utility. The owner or customer assumes the risk or error and the actual location of the underground utility. Abonmorche is not providing any certification or guarantee regarding the exact location of any underground utility. 9. Underground Conditions. Abonmorche shall have no responsibility for the I I Identification of exiling or unforeseen /differing underground conditions. The Contractor shall have sole responsibility for determining the nature of t t underground conditions and the means and methods of dealing with those 2 26. conditions. Abonmorche is entitled to rely upon the Information provided by geotechnical consultants and shall have no responsibility for the accuracy or u u correctness of the data contained in the geotechnical reports. i in IO.SHo Access and Security. With the exception of access rights that land surveyors ore afforded by low, the Client will provide Abonmorche access to the Project site and the Client will be responsible for obtaining any necessary permission from any affected third party property owners for use of their lands. The Client 's solely responsible for site security. Abonmarche will return to the Client all documents and information hat are the properly of the Client. EnMre Agreement. This Agreement contains the entire agreement between the pariles and there are no agreements, representations, statements, or nderstandings which have been relied on by the parties which are not stated this Agreement. End of Agreement 11.CosuMaMs. Abonmarche may engage Consultants at the request of the Client Reviewed by City of South Bend Legol Deporiment 05/04/2011 to perform services which are typically the Client s responsibility, such as surveys, geotechnlcal and environmental assessments, The Client agrees that Abonmarche will not be responsible fa, or in any manner guarantee, the performonce of services by the Consultants. The Client agrees that Abonmarche wilt not be liable for any claim, liability, or defense cost for injury or loss sustained by any party allegedly caused by the Consultants' negligence or willful misconduct. 12.0pNlons of Cod. Any opinions of probable construction cost and /or total project cost provided by Abonmarche will be on the basis of experience and judgment, but these ore only estimates. Abonmorche does not warant that bids or ultimate construction or total project costs will not vary from such estimates. 13.0wnenhip of Work Product. Abonmarche will remain the owner of all original drawings, reports, and other materials provided to the Client, whether in hard copy or magnetic media forth. The Client Is authored to use the copies provided by Abonmarche only in connection with the Project, Any other use or euse by the Client for any purposes whatever will be of the Client's risk and full ,gol responsibility, without liability to Abonmarche and the Client will defend, ndemniy, and hold Abonmarche harmless from all claims, damages, losses, and expenses, including attorney fees arising out of or resulting there from. 14.Eleatrork A%ft. Copies of data, reports, drawings. specifications, and other materials furnished by Abonmarche that may be relied upon by the Client ore limited to the printed Copies (also known as hard copies) that are delivered to the Client pursuani to the services under this Agreement. Computer files of text, data, graphics. or of other types of electronic media are the sole possession of COSB reviewed 05 -04 -11 Page 2 of 2