Loading...
HomeMy WebLinkAboutNo. 3010 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Nimtz Parkway Multi-Use Path, Phase 1 Engineering Supplement #1)0 RESOLUTION NO. 3010 RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT ( Nimtz Parkway Multi -Use Path, Phase 1 - Engineering Supplement #1) 2910-11,3010-12 WHEREAS, effective January 1, 2012, the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, effective January 3, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for the limited purpose of contracting for and managing the completion of existing Projects; and WHEREAS, pursuant to the Master Agency Agreement, the Commission added the Nimtz Parkway Multi -Use Path, Phase I - Engineering to the Master Agency Agreement by way of an Addendum on June 28, 2011; and WHEREAS, the Commission desires to amend the Addendum by way of this Amendment. NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment Commission as follows: Section 1. The Commission hereby approves the Amendment to the Addendum to the Master Agency Agreement ( Nimtz Parkway Multi -Use Path, Phase 1 - (W Engineering Supplement #1) and hereby authorizes its execution in substantially the form attached hereto with such changes as the Commission may deem necessary or appropriate upon the advice of counsel, said execution thereof to be conclusive evidence of the Commission's approval of such changes. The Clerk is hereby directed to file a copy of this Amendment to the Addendum with the BPW. Section 2. This Resolution shall be in full force and effect after its adoption by the Commission. Section 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. ADOPTED at a meeting of the South Bend Redevelopment Commission held on March 13, 2012, at 4:00 p.m., in Room 1308, County -City Building, South Bend, Indiana FTT1 ATTEST: A�60 6Z Do ald L. Alford, 49crethry South Bend Redevelopment Commission 14 CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPME Marcia I. Jones, resident South Bend Redevelopment Commission • AMENDMENT TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT ( Nimtz Parkway Multi -Use Path, Phase 1 - Engineering Supplement #1) 2910-11,3010-12 This Amendment to the Addendum to the Master Agency Agreement (this "Amendment "), made and entered into as of the 27th day of March, 2012, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Nimtz Parkway Multi -Use Path, Phase 1 - Engineering Supplement #1 (the "Project "). WHEREAS, effective January 3, 2012, the Commission and the BPW entered • into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, effective January 3, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for the limited purpose of contracting for and managing the completion of existing Projects; and WHEREAS, pursuant to the Master Agency Agreement, the Commission added the Nimtz Parkway Multi -Use Path, Phase 1 - Engineering to the Master Agency Agreement by way of an Addendum on July 11, 2011; and WHEREAS, the Commission desires to amend the Addendum by way of this Amendment. • NOW, THEREFORE, in consideration of the mutual covenants and promises • contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: 1. The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement, to act as the Commission's agent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being originally described in "Exhibit A ", and now amended as described in "Exhibit B ", attached hereto and made a part hereof. 2. All of the terms and conditions of the Master Agency Agreement shall control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above. (Signature Page Follows) • N ATTEST: South Bend Redevelopment Commission ATTEST: Linda Martin, Clerk CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Gary Gilot, President Kathryn Roos, Member Don Inks, Member C� Exhibit "A" NIMTZ PARKWAY MULTI -USE PATH, PHASE 1— ENGINEERING See attached approval from the BPW dated July 11, 2011 A r A 1316 COUNTY -CITY BUILDING 227W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601 -1830 CITY OP SOUTH BEND STEPHEN J. LUECKE, MAYOR BOARD OF PUBLIC WORKS July 11, 2011 Mr. Roger Nawrot Abonmarche Consultants 750 Lincoln Way East South Bend, Indiana 46601 PHONE 574/ 235 -9251 FAX 574/235 -9171 RE: Professional Services Agreement — Nimtz Parkway Multi -Use Path Design Project No. 111 -052 Dear Mr. Nawrot: The Board of Public Works, at its meeting held on July 11, 2011, approved the above referenced Professional Services Agreement in the amount of $38,800.00. Enclosed is a copy of the Professional Services Agreement for your records. If you have any questions, please contact me at (5 74) 235 -9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Bill Schalliol, CED Patrick Henthom, Engineering Toy Villa, Engineering Rob Nichols, Engineering Beth Leonard, CED Judy Love, CED GARY A, GII.OT, P. E. DONALD E. INKS CARL P I..ITTRELL PRESIDENT MEMBER MEMBER L c. L-41 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date June 23, 2011 Department C &ED BPW Date July 11, 2011 Phone 235 -5842 Name Bill Schailiol o Legal ® Attorney Name L. Meteiver -a Controller review is required for all Contracts $5,000.00 or more o = m Controller ® and greater than one year in length per the City Purchasing .� m° Policy Other Appropriate Reviewers ❑ Check the Annrnnria #P Itam Tvna 2armimorl fnr All Crrhmic n:nnn rc.PnjurPn inrnrmnrinn -Company or Vendor Name Agreement New Vendor Contract Yes Proposal I ❑ Addendum If Yes, Approved by Purchasing Claim Nimtz Parkway Multi -Use Path - Engineering Project Project Number Bid Opening ❑ Bid Award I ❑ Req. to Advertise I ETT-itle Sheet $ 38,800.00 Quote Opening ❑ Quote Award ❑ Chg Order No. C/O & PCA No. PCA Ease. /Encroach. Lj Traffic Control ❑ Resolution ❑ Other: rc.PnjurPn inrnrmnrinn -Company or Vendor Name Abonmarche New Vendor Is Yes N No If Yes, Approved by Purchasing Project Name Nimtz Parkway Multi -Use Path - Engineering Project Project Number (Not yet assigned) lunding Source AEDA TIF Account No. 324 - 1050 - 460 -31.02 Amount $ 38,800.00 Terms of Contract PO No. Purpose /Description Design service proposal for Nimtz Parkway Multi -Use Path - Engineering Project r�r t; at oe t -j, - -r. , )ntv Amount of ❑ ❑ Increase Decrease Is 1 $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % PO No. Copy Original vispersai Hner Approval Roger Nawrot, Abonmarche Bill Schalliol, CED; Rob Nichols, Patrick Henthorn, Toy Villa, Engineering IABONMARCHE 0 = Confidence By Design June 22, 2011 Mr. Bill Schalliol City of South Bend Departmenf of Economic Development County -City Building, Room 1200 227 West Jefferson Blvd. South Bend, IN 46601 Engineering Architecture Land Surveying Mcrir+a /waterfront Community Planning Landscape Architecture Development Services RE: Nimtz Parkway Multi -Use Path From just east of the Blackthorn Golf Course entrance to the west side of Mayflower Road Dear Bill, Abonmarche Consultants is pleased to present this proposal to provide engineering services for the project referenced above. We have developed this proposal based upon our past meeting with you. We greatly appreciate the opportunity to submit our proposal and look forward to working with you on this project. Our proposed scope of services is set forth in Appendix A; the associated fees in Appendix C" B; and the proposed work schedule in Appendix C. If you have any questions or concerns, please do not hesitate to contact our office. If our proposal is acceptab'e, please sign and return the enclosed standard agreement to authorize us to proceed. We thank you for this opportunity to serve the City of South Bend. Sincerely, Abonm sulta , c. Ro r T. Nawrot, P & PLr S� Senior Project Manager F: \Proposals \City of South Bend \Nimtz Parkway Multi -Use Path \cvr Itr 06-22-11 750 Lincoln Way East 341 Airport North Office Pork 95 West Main Street 361 First Street South Bend, IN 46601 Forl Wane, IN 46825 Benton Harbor, tv11 49022 Monistee, MI 49660 574.232.8700 260.497 8323 269.927.2295 23i.723.1198 www.abonmarche.com 503 Quaker Street South Hoven, MI 49090 269.637.1293 sYr. ik B_ONM_A_R_CHE nfidence By Design Abonmarche Professional Services Agreement AGREEMENT between: Abonmarche Project Number: Client name: City of South Bend Community and Economic Development Department Date: Client address: 227 W. Jefferson Blvd., County -City Building. Rm. 1200, South Bend, IN. 46601 Phone Cell Fax: Email: June 22, 2011 574 -235 -4852 hereinafter referred to as the Client, and Abonmarche Consultants, Inc., referred to as Abonmarche. of 750 Lincoln Way East, South Bend, IN 46601. The Client contracts with Abonmarche to perform professional services with regard to the Cl ent's project generally. eferred to as: Project Nome: Nimtz Parkway Multi -Use Path Locotion: The path will be on the south and east side of Nimiz Parkway from the entrance to Blackthorn Golf Course to the west side of Mayflower Road. The professional services to be provided by Abonmarche, collectively referred to as the Work Pion, are as follows: Scope of work: Engineering and Surveying Services as outlined in Appendix "A" Project schedule: See Appendix "C" Special Provisions: Abonmarche proposal /work plan, dated 6/22/11 is incorporated into this .Agreement by reference, and is limited to the services described therein. The Client agrees to promptly pay for services provided by Abonmarche for the Scope of Work according to the following: ee $) $38.800.00 (See Appendix "B ") Prior to commencement of services, the Client will specify any and all documentation that the Client requires for submission with the invoice for services provided by Abonmarche. Absent any special request from the Client, Abonmarche will send its standard form of invoice. If, after receipt of an invoice from Abonmarche, the Client has any questions, or if there ore any discrepancies in the invoice, the Client sholl identify the issue in writing within ten (10) days of its receipt. If no written objection is made within the ten (10) day period, on, such objection shall be deemed waived. Abonmorche invoices are due upon receipt. The Client has designated Mr. Bill Schalliol as its Representative. The Representative shall have the authority to execute any documents pertaining to this Agreement or amendments thereto, and for the approval of all change orders, addenda, and additional services to be performed by Abonmarche. The representative shall be the contact person for submission of all documents, invoices or communications. Authorization to Proceed and Guarantee of Payment: By signing this Agreement the Client authorizes Abonmarche to provide services described above, and that the Client is the responsible party for making payment to Abonmorche. By signing below, I ocknowleoo that I hove received and ogee to the Terms and Conditions on Pooe 2 of this Agreement and 1 understand that the Terms and Conditions take precedence over all prior orol cnd written understandings These Terms and Conditions con only be amended, supplemented, modified, or canceled by o written instrument signed by both parties. Any notice or other communications shall be in writing and shall be considered to have been duly given when persorally delivered or v n e third day after being deposited into first class certified moil, postage prepefd, return receipt requested. Authorized Client Re resentative Authorized Abonmarche R r entative Client. City of South Bend Board, of Public Works Signoture: Date Signed: 'dii�� Printed Name: _Ito er T._Nawrot, PE PLS Signatures: Title: Senior ProjectMonager —_ JULif Abonmarche Consultants, Inc. tJUi. 1 L(z(,I - -�� Originating Office: 750 Lincoln Way East South Bend, IN 46601 T 574.232.8700 F 574.251.4440 Date Signed. June 22, 2011 _ Revised 5.4 -11 Page 1 of 2 TERMS AND CONDITIONS Of PROFESSIONA4 SERVICES AGREEMENT 1. Agreement.. These Terms and Conditions shall be irccrporot -d by reference and shill prevail as the basis of the Client's Agreement to Abonmorche. Any Client document or communication in addition to or in conflict with these Terms and Conditions shall be subordinate and subject to these prorislons. 2. E%ecution. A.bonmarche has the option to render this Agreement null and void, 1 if it is not executed within thirty (30) days of deliver). 3. Client ResponslbWffers. The Client vrT1 provide all criteria and infor atinn concerning the requirements of the Project. The Client will assume responsibility for interpretation of contract documents and for construction oC.en•atlon and 1 will svol.e oil cioirns against Abonmorche that may be In any wo'y, connected. unless Abonmarche's services under this Agreement Include full -time construction cbser ;otion cr review of contractor's performance. 4. Performance. The standard of core for services performed by or provided ty Abonmorche ?411 be the care and skill ordinarily used by Abonmarche's I' pcofossion practicing under similar circumstances at the same time aril in the some locality- ALonmorche makes no warranty, expresed or implied, with respect to any services provided by Abonmorche. Abonmorche :kill not be liable for any da(m, damages, cost, or expense (including attome'y's fees] c, other liohility or loss not directly and sole, caused ty the negligent acts, errors. or Cmls6iora of Abonmorche. 5. Hourly R111Ing Rales. It payment is on on hourly rate, Client will poi Abort arche at the current honey billing rates. The hourly rates ore adjusted annually or as deemed oporopriote. 18 6. Reimbursable Expenses, Relmbursabie expenses, the actual costs incurred directly or indirectly for the Client's Project, will be charged at Abonmorche's 19 current rates. Examples of reimbuaable e: <penses include. but are not limited to: mileage, tests and analyses, special equipment services. postage and delivery charges, telephone and telefox chages, - copying, printing, and binding charges, commercial ironsportatlon, meals, lodging. °•pectol fees. licenses, any p`rmils. Subccnsultonf and outside fechnicol or professional services v:iN be charged on the basis of the actual costs times a factor of 1.15. 20. 7. Additional Services. Additional services that may be prcvide-d pursuant to the Agreement or any subsequent modification of the Agreement will be authorized, ,vhvn pcssibla, by .vAlten amendment signed on behalf of the Client and Abonmorche. Additional servk_es, performed by Abonmorche are wbiect 21, to oil Terms and Conditons and the Client will be responsible for payment. Should The Client, regulator; agency. a ony public b -dd; or Inspector direct modification or addition to services covered by this Agreement, the cost will be 22. added to the agreed price. Requests for extra services should be made in varifing via a change order. but none the less, Abonmorche Is entitled to be gold ,x extra services provided whether or not l is in writing. 8. Underground Structures or Buried URRtks. The Client is responsble for idenfiricallon and location or oil public and private buried stru_tures on the Client's property and the Project site, such as, but not limited to, storage tanks 23. and lines, or go:, water, sewer. electrical, phone, Cable- or any other public or private U1Pdtie'$. It is agreed that Abonmorche 's rot responsible for accidental damage to utilities or underground structures, .whether known. unknov,n or improperly located. The client shall be responsible for desi-`m fees R changes ore 24. necessary. Utility locatino or marking semlces provided by Abonmarche are not substitutes for complying with the utility owner notification requirements or the locating se Aces (WI systerrs) required prior to an excavation. Utilities shoran as located by ground penetrating radar are approximate only. No excavation took place to verify the positions shown or to verify the type of utility lexcepf as 25. noted). Careful excavation u required for verification of the buried utility. The owner or customer os5umes the risk of error and the actual location of the underground ullity. Abonmorche is no' prei:dinp any certification or guarantee regarding the exact Iccotion Cf any underground ufilily. 9. Underground Conditions. Atonmorche shall have no responsibility for The t identify otion of existing or unforeseen /differirra underground conditions. The ' Contractor shall hove sole responsibility for determining the nature of t underground conditions and the means and methods of cleating Aith those ^G. conditions- Abonmarche Is entitled to rely upon the information provided by teoiechnicol consuttants and shall have no responsibility for the accuracy or correctness of the data contained in the geotechnicd reports. i IO.SIW Access and Security. With the exception of oCcess rights that land surveyors are afforded by la.v, the Client w71 provide Abonmorche access to the Project site and the Client will be responsible for obtaining arn• necessary permision from any affected third party property awner :. for use of their ands. The Client is solely respor a for site iecurity. Abonmorche, unless specifically stated otherwise in on amendment to this Agreement. Any electronic media provided under this Agreement to the Client are only for the con•:enience of the Client. Any conclusions or Information obtained or dewed hem such electronic files viol be at the users sole r'r,k. S.Ronds and Per"&. The Client -rll t,2 tosponsibie for the adoption of any site access or right cf way bonds that ma: be initialed on their behalf. At completion of Abonmarche's sen4ces, the Client wilt to' a responsibility and pay any ongoing bond or permit costs for any bonded or permitted services. 6.Thkd party Invoteksg. N the Client directs Abonmorche to involr� lhkd party paten. Atonmarche rnll do so, but the Client agrees to be ultimately responsible fcsr Abonmorche's compensotion until the Client provides Abonmorche vvlth the third party's w,Tlten acceptance of all terms of this Agreement and until Abonmorche agrees to the substitution. .Third Party Renefklarl". Nothing contained in this Agreement shall creole o confroctual retotionsh -p with or a cause of action in fovor of o third party against either the Client or Abonmorche. Abonmarche's services under this Agreement ore being perforni i solely for the Client's benefit. and no other porn; or entity shall have any doim against Abonmorche be:ause of this Agreement or performance or nonperformance of services hereunder- The Client and Abonmorche agree to require a similar provision in all contracts with contractors, subcontractors• subconsultonts, cendo -s and ocher entities irraolvod in this Project to carry out the intent of this pro: ision. .Suspension of Services. In the event of non- poymeni by Client, Abonmorche swill have the absolute tight to cause performance of any services. .Co lroctor's Work: Abonmorche malt have no authority to direct or control the Work of the Contractor or to stop the Work of the Contractor. Abonmorche shall not be liable to cry party for the failure of the Contractor to perform the wort; content with the Plan_ and Specifications and applicable Codes and Regulations. Abonmorche shall have no responsibility or bn Noble for safety procedures of the Contractor or its subcontractors. Consequential Damages. The Client and Abonmorche walve consequential damages for claims, disputes• or other molten In question relating to services provided as a part of !hi: Agreement, includinn for example, but not limited to, loss of business. Governing LaW. This ?.greement will be deemed to have been made in St. Joseph County, Indiana and shall be governed by and coristrued In occordonce, vvUh the laws, of the Slate of Indana. Venire. The parties (o) irrevocably submit to the jurisdiction of arty Indiana court sitting in St. Joseph County, !ndiano in any action arising out of this agreement, and (b) waive. to the Viest extent that they may effectively do so, this defense of an inccnvenlent forum. The parties also agree that a final judgment in any such action shall be conclusr�e and may be enforced in other jurisdictiora by suit on the judgmem, or in any other manner provided by law, ConsklereUors. The successors, executors, administrators, and legal representatives of the Clk�nt and Abonmarche are hereby bound onto the other with respect to the covenonts, Agreements, and obtipotions of this Agreement. Acts of God. Neither the Client nor Abonmarche "i have any lability for nonperformance cause•] in whole or in part by causes beyond Abonmorche's reasonable control. Such causes include, but are not limited to, Acts of Goat, civil unrest and wor. Icbor unrest and strikes, acts of authorities, and events that could not berecsonabl•= anticipated. TertnMollon. Either the Crlenl or AMnmarche may terminate th Agreement by giving ten (10) days written notice to the other party. In such an event. the Client will pay Abonmorche In full for all services previously authorized and performed prior to the effecttie date of the termination, plus (at the discretion of Abonmorche) o termination charge to cover finalization of sepAces necessary o bring ongoing services to a logical conclusion. Upon recelpf of such payment. Abonmorche will return to the Client oil do_uments and Information hill are the property of the Client. Entire Agreement. This Agreement contains The entire agreement between the parties and there nre no agreements, representations, statements, or understandings which have been relied on by the parties which are not stated n this Agreement. End of Agreement. I1.Consulfards. Abonmorche may engage Consultants at the request of the Client Reviewed by City of South Bend Legal Department 5/4/11 to perform services which are Typically, the Client's responsibility, such as sur ••eys, gootechnicaf and environmental assessment,,. Thn Client agrees that Abonmorche will not be responsible for, or in onv manner guarantee, the performance or services by The Consultants. The Gent agrees that Abonmarche •will not be liable for cnt claim, IlelbNity. or defense cost for Injury or loss sustained ty any party allegedly cotrGd by the Cortsultonts' negligence or w;!:ful misconduct. 12.0pinlam of Cost Any opinions of probable construcfion cost and /or total project cost provided by Abonmorche will Lc on the basis of experience and judgment, but these are ontt estimates. Abonmarche does not worront that ads or ultimate construction air total project test, grill not vary frorr, such estimates. 13.0wnership of Work Product. Abonmorche will remain the owner of all or!ginol diavdnps, report:, and other materials provided to the Client. whether in hard copy or magnetic medla form. The Client is outhorized to use the copies provided try Abonmorche only in connection vAth the Project. Any other use n reuse by the Client for any purposes whatever Mil be at the Client's risk and full legal responsibility, without Iiabirity to Abonmorche and tth; Client will defend, indemnify, and hold Abonmorche hormfess from all caims, damages, asses. and expenses, including attorney fees arising out of or resullinc there from. ,.Electronic Media. Copies of data, reports, drawings, specifications. and other moieriols furnished by Abonmorche that may be relied upon b; the Client ore limited to the printed copies (also kncwn as hard copied that are delivered to the Client pursuont to the services under this Agreement. Computer files of text, data. graphics. or of other types of electronic media are the sde possession of Revised 5-4-11 Page 2 of 2 June 22, 2011 City gl'Sowh Genet Proposal for Engineering Sen -ices Nimh Parkwav Multi-use Path Page 1 of 3 APPENDIX "A" Work Plan PRQJl +_%-_:T SCOPE The proposed project consists of the desigl and development of bid documents for the construction of a multi -use path 8 feet in width from the entrance to Blackthorn Golf Course to the west side of Mayflower Road over a distance of 4,400 feet. A rest area will be developed near the golf course 15t1i tee. This project will require field survey, roadway design and landscape design_ The topographic survey will survey the area from the south and east curb line to the (.xisting right-of-way line in the areas that were not surveyed previously for the Mayflower Se« er Project. Lighting for the path will be designed to mount on the path side of the existing light poles. SCOPE OF SERVICES The scope of services proposed herein includes the design and development of bid documents for the project and are further described as follows: Task #1: Field Surrey (a) Obtain recorded plats, deeds of all adjacent properties, and section line documentation; (b) Obtain utility maps for all of the utilities in the existing right of way; (c) Establish the existing right of ways and set construction control lines. Witness survey horizontal control points; (d) Run benchmark levels circuit setting temporary benchmarks no further than 500 feet apart., (e) Obtain location of existing manholes, storm water inlets and rater valves. Detail measure existing manholes to get inverts and sewer sizes; (f) Locate existing utilities that are in the right of ways; (g) Obtain topographic data; (li) Plot the topographic survey and develop existing contours. Task #2: math. Design (a) Prepare plan and profile sheets from the topographic survey; (b) Develop proposed typical sections; (c) Design proposed grades and geometrics; (d) Plot existing and proposed cross sections in all areas at intervals of 50 feet; (e) Design the rest area; (f) Prepare preliminary estimate of probable construction costs; 48 (g) Prepare maintenance of traffic plan and construction staging sequences; Engineers Planners Architects Surveyors • June 2 2. 2011 City gl'South Bend Proposal, for Engineering Services Ninil_ Parkway Multi -use Path Page 2or3 (h) Submit preliminary field check plans to the City; (i) Attend field check meeting with the City; (j) Revise the preliminary plans from the preliminary field check meeting; (k) Finalize landscape and intersection details; (1) Prepare a sign plan and sign summary; (m) Develop erosion control plans and permit; (n) Calculate project quantities including earthwork using the cross sections; (o) Prepare the project special provisions and specifications; (p) Final design of path lighting plan; (q) Submit the final plans and special provisions for the City; (r) Revise the final plans and special provisions per the City review; (s) Revise the cost estimate; (t) Revise the special provisions; (u) Submit the tracings and special provisions to the City for biddiM ) A Geotechnical Investigation will be provided by the City if necessary. Any right -of- way engineering services will be an additional service. Task 43: Bid Period (a) Attend the pre -bid meeting; (b) Answer bidding questions; (c) Prepare necessary addendums to the contract bid documents; (d) Attend bid opening and the tabulate bids. Task #4: Construction Period (a) Attend pre - construction conference; (b) Answer City, Contractor, and public questions from the field; (c) Review shop drawings and check construction compliance in accordance with the contract document; (d) Attend field progress meetings as required by the City. Engineers Planners Architects S U f VeV0rs is Jane 22, 2011 City o, f South Bend Proposal far Engineering Sei-vices Ninuz Parkway Alulti -use Path Page 3of 3 APPENDIX "B" SUMMARY OF FEES Identified below are the estimated costs based upon the "Scope of Services" in Appendix "A ". Abonmarche will invoice the City on a monthly basis for the percentage completed for the lump suns tasks to an amount of $38,800.00. The following are the fees for the various tasks: Task #1 Field Survey ...................... ..................$7,900.00 Task #2 Path Design ...................................... ............................... 5,6 .$2 $25,600.00 Task# #3 Bid Period .......................................... ............................... ......................$2,800.00 Task #4 Construction Period ........ ............................... ......................$2,500.00 Total Amount: APPENDIX "C" ANTICIPATED SCHEDULE Completion Time $38,800.00 Task #1 Field Survev Within 14 days from the Notice to Proceed Weather Permitting Task #2 Path Design Within 45 days from the Notice to Proceed Task #2 is exclusive of City review tune. Engineers Planners Architects Surveyors 14 if "ken the prospective COlttractor is enable to certify to any of the statements heloto, it shall attach an explanation to this Affidavit. NON - COLLUSION, NON- DEBARMENT AFFIDAVIT, EMPLOYMENT ELIGIBILITY VERIFICATION AND NON - DISCRIMINATION COMMITIN'LENT STATE/ OF INDIANA } 151. JDS COUNTY } SS: The undersigned Contractor, being duly sworn upon his/her /its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative; or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, fimas, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and IL2.. Neither Contractor nor any of its rese are rinci als p p Presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor does not knowingly employ or contract Mth an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he /she /it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E - "- Verify Program as defined by I.C. 22- 5- 1.7 -3. Contractor's documentation of enrollment and participation in the E- Verify Program is included and attached as part of this bid /quote; and 4. Contractor shall require his/her /its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E- Verify Program, The Contractor agrees to maintain this certification throughout the term of the contract with the City. of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City; and F- Non - Collusion Non- Debarment davit Revised June 2011.doc (WI 5. Contractor shall not discriminate against any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, handicap, national origin or ancestry. Breach of this provision may be regarded as a material breach of the contract. Dated this day of 20// �l�D/'1MC1'0'G6rla Crari�y /�it<r%�r rr1G Contract Midder (Fir ) 1 ture of Contractor /Bidder or Its Agent Printed Name and Title Subscribed and sworn to before me this 57-14 day of JUL.y , 20 If My Commission Expires 12 - D 4 - 2014 CNotayy Public County of Residence ST. J o SE P14 =L.MUELLER LLER IJC IANAcember 4, 2014 " r- Non - Collusion Non- Debarmcnt Affidavit—Revised June 2011.doc • Exhibit "B" NIMTZ PARKWAY MULTI -USE PATH, PHASE 1— ENGINEERING SUPPLEMENT #1 See attached proposal from Abonmarche dated February 27, 2012 = ABO_NMARCHE Confidence By Design February 27, 2011 City of South Bend Department of Economic Development County -City Building, Room 1200 227 West Jefferson Blvd. South Bend, IN 46601 ATTENTION: Mr. Bill Schalliol, Project Manager RE: NIMTZ PARKWAY MULTI -USE PATH City Project No. 110 -052 Abonmarche Project No. 11 -0480 Dear Bill: Engineering Architecture Land Surveying Marina /Waterfront Community Planning Landscape Architecture Development Services (W Enclosed are two copies of Professional Services Agreement Amendment No. 1 for the above referenced project. This amendment increased the agreement amount by $6,400.00 for the additional design work necessary for the independent path lighting system, the upgrading of the electrical service points, the additional rest area and the block retaining walls. Please return one copy to us after the Board of Public Works has approved the amendment. We appreciate your consideration of our request. If you have any questions, please do not hesitate to contact our office. Sincerely, Abon Consult nts, Inc. Roger T. Nawrot, PE & RLS, Senior Project Manager C)50 Lincoln Way East South Bend, IN 46601 574.232.8700 341 Airport North Office Park 95 West Main Street Fort Wayne, IN 46825 Benton Harbor, MI 49022 260.497.8823 269.927 2295 www.abonmarche.com 361 First Street Manistee, Mi 49660 231, 723.1 198 503 Quaker Street South Haven, Mi 49090 269.637.1293 0 PROFESSIONAL SERVICES AGREEMENT AMENDMENT NO. 1 NIMTZ PARKWAY MULTI -USE PATH CITY PROJECT NO. 111 -052 This Amendment to our Agreement entered into July 11, 2011, between the City of South Bend, Indiana, Board of Public Works, referred to as "CLIENT" and Abonmarche Consultants, Inc. referred to as "ABONMARCHE ". Amend Agreement Change: A NOT -TO- EXCEED FEE OF: $ 38,800.00 to $45,200.00 AS SHOWN IN APPENDIX B Amend Appendix "A" Change to: PROJECT SCOPE The proposed project consists of the design and development of bid documents for the construction of a multi -use path 8 feet in width from the entrance to Blackthorn Golf Course to the west side of MGyfleweF ReGd Moreau Court over a distance of 4,400 feet. A r �� eG Rest areas will be developed near the golf course 15th tee and 18th green. This project will require field survey, roadway design and landscape design. The topographic survey will survey the areas from the south and east curb line to the existing right -of -way line in the areas not surveyed previously for the Mayflower Sewer Project. Lighting for the path will be designed exisfiRg light poles as an independent system with new poles and separate wiring from the existing Nimtz Parking street lighting system. The new path wiring will require the existing lighting service points to be upgraded to handle the additional electrical load. To limit impacts to adjacent property modular block retaining walls will be designed in two locations. Amend Appendix "B" Change To: The Total Lump Sum Amount of $38,800.00 to $45,200.00. Task #2 - Path Design - $25,600.00 to $32,000.00. Change: Total of $ 38,800.00 to $ 45,200.00. (All other terms and conditions of the Agreement remain in effect. F: \Projects \2011 Projects \11 - 0480 \CORR - MEMO \amend 1 agrmnt 2- 27- 12.doc Sheet 1 of 2 PROFESSIONAL SERVICES AGREEMENT AMENDMENT NO. 1 ' NIMTZ PARKWAY MULTI -USE PATH CITY PROJECT NO. 111 -052 Abonmarch.%Consultants, Inc. Rover T. Nawrot, PE & PLS Senior Project Manager Date Signed: February 27, 2012 L41 City of South Bend, Board of Public Works Date Signed: F: \Projects \2011 Projects \11 - 0480 \CORR - MEMO \amend 1 agrmnt 2- 27- 12.doc Sheet 2 of 2 PROFESSIONAL SERVICES AGREEMENT AMENDMENT NO. 1 NIMTZ PARKWAY MULTI -USE PATH CITY PROJECT NO. 111 -052 This Amendment to our Agreement entered into July 11, 2011, between the City of South Bend, Indiana, Board of Public Works, referred to as "CLIENT" and Abonmarche Consultants, Inc. referred to as "ABONMARCHE ". Amend Agreement Change: A NOT -TO- EXCEED FEE OF: $ 38,800.00 to $45,200.00 AS SHOWN IN APPENDIX B Amend Appendix "A" Change to: PROJECT SCOPE The proposed project consists of the design and development of bid documents for the construction of a multi -use path 8 feet in width from the entrance to Blackthorn Golf Course to the west side of ed Moreau Court over a distance of 4,400 feet. A rest eG Rest areas will be developed near the golf course 151h tee and 18th green. This project will require field survey, roadway design and landscape design. The topographic survey will survey the areas from the south and east curb line to the existing right -of -way line in the areas not surveyed previously for the Mayflower Sewer Project. Lighting for the path will be designed toF URf GR the path side -Gf the existiRg sigh+ poles as an independent system with new poles and separate wiring from the existing Nimtz Parking street lighting system. The new path wiring will require the existing lighting service points to be upgraded to handle the additional electrical load. To limit impacts to adjacent property modular block retaining walls will be designed in two locations. Amend Appendix "B" Change To: The Total Lump Sum Amount of $38,800.00 to $45,200.00. Task #2 - Path Design - $25,600.00 to $32,000.00. Change: Total of $ 38,800.00 to $ 45,200.00. "Ov All other terms and conditions of the Agreement remain in effect. F: \Projects \2011 Projects \11 - 0480 \CORR - MEMO \amend 1 agrmnt 2- 27- 12.doc Sheet I of 2 PROFESSIONAL SERVICES AGREEMENT AMENDMENT NO. 1 (W NIMTZ PARKWAY MULTI -USE PATH CITY PROJECT NO. 111 -052 Abonmarche Consulta ts, Inc. o T. Nawrot, PE & PLS Senior Project Manager Date Signed: February 27, 2012 c. 11 City of South Bend, Board of Public Works Date Signed: F: \Projects \2011 Projects\11 -0480 \CORR - MEMO \amend 1 agrmnt 2- 27- 12.doc Sheet 2 of 2