February 12, 2019
Carla Lepper
United Consulting
8440 Allison Pointe Blvd., Suite 200
Indianapolis, IN 46250
RE: Supplemental Agreement No. 2
Dear Ms. Lepper:
PHONE 574/235-9251
FAx 574/235-9171
The Board of Public Works, at its meeting held on February 12, 2019, approved the above
referenced agreement regarding Appraisal Problem Analysis Costs and Phase II
Environmental Assessment Activities for Coal Line Trail Phase I in the amount not to
exceed $22,815.
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK LAURA O'SULLIVAN THERESE J. DORAU
This SUPPLEMENTAL AGREEMENT ("Agreement') is made and entered into on this date Feb 12 , by
and between the City of South Bend, acting by and through its proper officials, CTOCAL PUBLIC AGENCY"
or "LPA'� and UNITED CONSULTING, an Indiana corporation ("CONSULTANT').
WI TNESSETH
WHEREAS, the CONSULTANT did, on April 26, 2016 enter into an Agreement with the LOCAL PUBLIC
AGENCY for Engineering Services and Documents in relation to the following described project:
Des. No, 1401810
Coal Line Trail, Phase I; from Lincoinway West to
Riverside Drive in LaPorte District
This supplement is required to add the following new services to the original scope of work:
Phase II Environmental Site Assessment and Appraisal Problem Analysis (APA)
WHEREAS, in order to provide for completion of the work it is necessary to amend and supplement the
Engineering Agreement.
NOW, THEREFORE, it is agreed by and between the parties as follows:
L Appendix "A nis amended to read as follows:
E.6. PHASE II ENVIRONMENTAL SITE ASSESSMENT
The CONSULTANT shall complete a limited Phase II Environmental Site Assessment along
the Coal Line Trail. The proposed locations and spacing of the borings are based on the
results of the Phase I Environmental Site Assessment.
The CONSULTANT shall complete a total of 14 soil borings to characterize the soils at the
identified locations. The borings shall be advanced to depths ranging from five to eight
feet below the existing ground surface. Soil samples shall be collected on a continuous
basis at approximate 2-foot intervals throughout the depth of each boring. Each recovered
soil sample shall be classified and screened in the field for the presence of volatile organic
vapors using a portable photoionization detector (PID) and visually evaluated for obvious
visible indications of potential impacts. A total of 24 soil samples shall be submitted for
analysis.
Supplemental Agreement version 6-2011
Groundwater is not expected to be encountered within the borings. If groundwater is
encountered, temporary 0.75-inch diameter PVC piezometers equipped with five feet of
slotted screen shall be installed in each boring in which groundwater is encountered during
drilling or the conclusion of soil sampling activities. All groundwater samples shall be
submitted for analysis of volatile organic compounds (VOC) including naphthalenes and
lead scavengers per EPA Method 8260. If groundwater samples are collected near areas of
concern with potential petroleum impacts, groundwater samples shall also be analyzed for
lead per EPA Method 6010B.
The CONSULTANT shall prepare a report summarizing the findings. This report shall
include available background information, the results of laboratory testing, a discussion
relative to the presence of detected constituents, conclusions, and if required,
recommendations for further activities. The levels of detected constituents will be
compared to IDEM's updated Remediation Closure Guide (RCG) screening levels to assess
potential regulatory and/or handling/disposal implications.
S. APPRAISAL PROBLEM ANALYSIS
The CONSULTANT shall prepare a parcel -by -parcel examination of the project site to
determine the extent of each taking and the appraisal approach to be utilized by the
appraiser.
The CONSULTANT shall provide Indiana Department of Transportation (INDOT) approved
appraisers to complete the Appraisal Problem Analyses (APA's).
The APA report shall include a summary sheet setting out the following:
1. Parcel Number
2. Owner's Name
3. Size of Property
4. Amount of R/W to be acquired
5. Types of R/W to be acquired
6. Recommended appraisal form
lll. Appendix "C7is amended to read as follows:
E.6. PHASE II ENVIRONMENTAL SITE ASSESSMENT
The CONSULTANT shall notify INDOT and the LOCAL PUBLIC AGENCY at least one week in
advance of mobilizing to the site to initiate sampling.
Drilling and sampling activities shall be completed within 2 calendar days following notice to
proceed from the LOCAL PUBLIC AGENCY.
Laboratory analysis will be completed within 14 calendar days following the completion of
sampling.
A draft report shall be provided within 14 calendar days after completion of the laboratory
analyses. A final report shall be provided to INDOT within 3 calendar days following receipt
of the draft report comments from the LOCAL PUBLIC AGENCY.
Supplemental Agreement version 6-2011
S. APPRAISAL PROBLEM ANALYSIS
All parcels complete within 45 calendar days after completion of right-of-way engineering.
IV, Appendix "Dais amended to read as follows:
A.1. The total not to exceed fee in Section A.1 shall be changed from $544,425 to $567,240
representing an increase of $22,815.
A.2. The CONSULTANT will be paid for the work performed under this Agreement on a lump
sum basis in accordance with the following schedule:
e. Environmental Services
6. Phase II Environmental Site Assessment $ 16,000
A.3. The CONSULTANT will be paid Unit Rates for the work performed under this Agreement in
accordance with the following schedule:
uanti Unit Price Total
d. Appraisal Problem Analysis (APA) 29 parcels $235/parcel $6,815
The remainder of this page is intentionally left blank
Supplemental Agreement version 6-2011 ®- e
V. Except as herein modified, changed and supplemented, ail terms of the original
engineering agreement dated April 26, 2016 and Supplement No. 1 dated
March 14, 2017 shall continue in full force and effect.
IN WITNESS WHEREOF, the parties hereto have executed this
UNITED CONSULTING
Dave �rVs&6'
BY:
Michael Rowe, Vice President
DATE:
11), -z-oic-)
Supplemental Agreement No. 2
LOCAL PUBLIC AGENCY
BY: �
Gary A. Gilot, Board President
BY: A
Suzanna Tritzber, Member
BY:
Laura Oi'Sb !van, Member
BY: A
Wilt -
Elizabeth A. Maradik, Member
F10
Therese J. Dorau, Member
DATE: �—/ /
ATTEST
Linda M. Martin, 16'rk
Supplemental Agreement version 6-2011 '
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date February 4, 2019
Name Kyle Silveus
Department Public Works
Division/Bureau Engineering
BPW Date February 12, 2019 Phone Extension 9083
ieuired Prior to Submittal to Boar _ ...
Legal ® Attorney Name: Clara McDaniels
Controller ❑ Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing ❑
Check the
L J Agreement
D Professional Services
Bid Opening
Quote Opening
Change Order No.
El Ease/Encroach.
Z Other: Contract Supplement
Michael Schmidt
�.
)ropdate Item T
Contract
L_J Resolution
for All Submissions
Proposal
❑ Bid Award ❑ Req. to Advertise
El Quote Award
[ C/O & PCA No. ❑ PCA
Traffic Control:
Company or Vendor Name
New Vendor
MBE/WBE Contractor
MBE/WBE Contractor Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Required Information
United Consult
Yes Z No Li If Y
MBE W....BE__
❑...W.. __..
No Yes Name of Comeanv
Coal Line Trail Phase I
ENG 115-063 DES No: 1401810
Riverwest TIF
324.1050.460.42.02
Phase I: Increase of $22,815
Total fee not to exceed
Addendum
❑ Title Sheet
Purchasi
Scope additions include: Appraisal Problem Analysis (APA)
costs and Phase II Environmental assessment activities
_I Required Contractor's Certification Forms Attached (Non- ...................a
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.)
....._.. Increase a fired For Change Orders On�
Amount of ❑ _...... _ ly
Decrease .. ....... ........ ._......
El $
Previous Amount $
Current Percent of Change:
New Amount
....... ........
Total Percent of Change
..........
Dispersal After A roval
Copy Original
®El Kyle Silveus
® ❑ Chris_ Dressel
El El . _.. ...�_.......