HomeMy WebLinkAboutOpening of Bids - Main St Wayne St Garage Roof Replacement Project No 118-096R - Majority Builders Incf
Jl
CITY OF SOUTH BEND, INDIANA'
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Main St./Wayne St. Garage Roof Replacement
Project No. 118-096R
For Bids Due February 12, 2019
PART I
(Must be completed for all bids. Please type or print)
Date: 2 12 19 Bidder (Firm): Majority Builders Inc.
Address: 62900 US 31 South
City/State/Zip: South Bend IN 46614 Telephone Number: 574 291-2091
Agent of Bidder (if Applicable); _
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
City of South Bead ,Main St./Wayne St. Garage Roof Ee lacenient
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Epoch Architecture & Planning
and dated 12 / 17 / 18 for the sum of (enter the Total Bid as shown on the Proposal)
oNr mlLaleid ova T+vtfWt- F/LNT foui2 ow9wi o rv1ru7'y AIAVo$ ( 12`� y91D�
(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on.a/seprate ttachment.
By +y Z"Iltlll {
(Printed Name of Person Signing)
ACCEPTANCE
The above bid is accepted this day of
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
James A. Mueller, Member
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
Version 7/20/2018 Contractor's Bid for Public Works - 2
20
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Main St./Wayne St. Garage Improvement:
Project Number: 118-096R
For Bids Due: February 12, 2019
Contractor Name: Majority Builders, Inc.
BASE BID
Item Description
No.
1 MAIN ST.NWAYNE ST. GARAGE IMPROVEMENTS
ROOFING SUBSTRATE/STRUCTURAL REPAIR
ALLOWANCE NO. 1 TO COVER REQUIRED
2 SUBSTRATE AND/OR STRUCTURAL REPAIRS
NOT OUTLINED IN THE DRAWINGS AND NOTED
Quantity Unit Total Amount
1 LS 7 ll 2, 00 0'---
1 1 LS
SPECIFICATIONS. $10,000
TOTAL BASE BID $ -15c 2 000
ALTERNATES (SEE ADD ALTS. ON SHEET GO-003 FOR ADDITIONAL INFO.)
Item
Description
Quantity
Unit
Total Amount
No.
I
VESTIBULE REPLACEMENT,
1
LS
$
60 400.00
2
PAINT VERTICAL CONCRETE ELEMENTS
1
LS
$
ABOVE CANOPY ALONG MAIN STREET.
97, 800.00
REPLACE EXISTING UNDER CANOPY LIGHTING
3
WITH NEW SURFACE MOUNTED LED
1
LS
$
DOWNLIGHTS.
11, 150.00
NEW FACADE UP LIGHTING TO ILLUMINATE
4
THE ENTIRETY OF THE VERTICAL COLUMNS
1
LS
$
ON BOTH MAIN AND WAYNE STREET FACADES,
25,000.00
REPLACE EXISTING PERIMETER PARKING
5
LEVEL CHAIN LINK FENCING WITH 11 CABLE
1
LS
$ 152,500.00
BARRIER CABLE SYSTEM.
REMOVE EXISTING STREET LEVEL
STOREFRONT WINDOWS THAT DO NOT OCCUR
6
IN A CONDITION SPACE. FILL IN OPENINGS
1
LS
$
WITH BRICK TO MATCH EXISTING PATTERN
8,400.00
AND SIZE. NEW BRICK TO RECEIVE PAINTED
FINISH.
PROVIDE LOCKABLE GROUND LEVEL STAIR
7
TOWER DOORS CONTROLLED BY KEYCARD
1
LS
$ 21; 240. 00
LOCKING SYSTEM.
8
REPAIR CRACKED CONCRETE CURB ALONG
1
LS
$
PARKING GARAGE ON MAIN STREET SIDE.
NO BID
9
REPAIR THE EXISTING SOUTH EAST NOW
1
LS
$
OPERATING WESTINGHOUSE ELEVATOR.
NO BID
TOTAL ALTERNATES
$
376490:00
Version 7/20/2018 Contractors Bid for Public Works - 7
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Main St./Wayne St. Garage Improvements INN
Project Number: 118-096Rt
For Bids Due: February 12, 2019"'��
Contractor Name: Majority Builders Inc.
TOTAL AMOUNT BASE BID + ALTERNATES
Bidder (Firm): Majority Builders, Inc.
Address:
City/State/Zip: South Bend IN Telephone Number: 574 291-209T
BY
,Signature)
Rick
_la
(Printed Name of Person Signing)
VOLUNTARY ALTERNATE:
Modernize elevator at south east corner based on Schindler Elevator
proposal: $404,700.00 added to total cost. Please note we highly
recommend defining elevator scope of work and soliciting bids
for this.
Version 7/20/2018 Contractors Bid for Public Works - 8
V1
1316 COUNTY -CITY BUILDING 14 PHONE 574/ 235-9251
227 W. JEFFERSON BOULEVARD y� t1 FAX 574/ 235-9171
SOUTH BEND, INDIANA 46601-1830 TDD 574/ 235-5567
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
Date: 2/1/2019
To: All Planholders
From Linda M. Martin, Clerk, Board of Public Works
Subject Addendum Number: 1
Project Name: Main Street / Wayne Street Garage Im rovements
Project No.: 118-096R
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM:
elf
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:In
Ot �rv� ��I ✓I�
Authorized Signature:
Date:
4G.
7. 1A Docu�meint A31 OTM - 2011 It
CONTRACTOR:
(Name, legal status and address)
Majority Builders, Inc.
62900 U.S. 31 South
South Bend, IN 46614
OWNER:
(.Name, legal status and address)
City of South Bend Board of Public Works
SURETY:
(Name, legal status and principal place
of business)
Hartford Accident and Indemnity Company
Hartford, CT
County -City Building Room 1316, 227 West Jefferson Blvd
South Bend, IN 46601
BOND AMOUNT:
Five Percent of the Total Bid ( 5% of Total Bid
PROJECT:
(Name, location or address, and Project number, if any)
Main St./Wayne St. Garage Improvements; Project No, 118-096R
This document has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in ibis Bond conflicting with said statutory or legal requirement shall be deemed deleted berefronm and.
provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so
furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this t 71b dayy of � �. .... M w�t� "�_' tttidca � Februa2019Inc
-� ���" ..,... (Prtncip
( tltte 3)—......
d Indemnity Company
Sire Hartfordeto�tdeattan Sldent
g ty party
...� (Title). Rick Sla'�Le Pr... _ .... M�..........
°..- „�"" � (Seal)
Trtlety
(Witness) .......— "...,t"��arotta.rL l�rrsaar Attc �. , _. _ m .......
(Title) °rnrey n Fact
CAt.t lluf11l You slllrloullld iiigmm an r dgl nal AIA Contract t: ocum�uroarurr@, nn umal " qV t:hiiis text allplllamrars hn IIIRIIED. Alin moidg nalll assures that
mallhuanm es Mil not be obscured
nt A310TM — 2010. Copyright m 1963, 1970 and 201 __.._,_,_._ rights
LUum;uuinmeunfl. dun protected _ _.�. _,,_. �... ....
Ind. AIA Document 0 by The American Institute of Architects. All rights reserved. ti!WAVtV�VOW4 M Il Iluu � AV�a�'
p by UP S,, Collpyd nglht II Law aund Ilnteumnatuswuma0 II ireatues. V,pumautlhoidzed uepd°oductdon or uVV^wffirEbuution of tlhiis AM" Docuunnent, o
any polion of it,
emay
rm It iu e. r6 uV and cirfium Gnall paeunalUes, and M1111 be prosecuted to tune umraxhTiuirn extent Iposslihlle u.aunder tune law,
s p permitted to reproduce (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail
The American Institute of Architects' legal counsel, copyright@aia.org. 061110
Direct Inquiries/Claims to:
THE HARTFORD
BOND, T-12
One Haord P W E OF A T- 0 R N YEX Hartford, Con a tcut06155
Elondi.CWiml@lbgh,ortford'.com
call: 888-2663488 or fax: 860-767-5835
KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: GIBSON INSURANCE AGENCY, INC
A enc Code: 36-212563
Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut
0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana
Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut
Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut
Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana
Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois
Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana
Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida
having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint,
up to the amount of Unlimited :
Nicole L. Bicknell, Cheryl E. Alkire, Theresa M. Burns, William J. Cerney III,
Sandra Junk, Jennifer Kasznia, Wesley Mantooth, Barbara E. Pearson, Megan E.
Riesenberg, Jordan Scheiber, Mark E. Wobbe of SOUTH BEND, Indiana
their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as
delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the
nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and
executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have
caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant
Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are
and will be bound by any mechanically applied signatures applied to this Power of Attorney.
I IS
�.- .
+► a" ��It`�rW w���� '�" ��''+gX�xlp R'A!g1"t ""� .���W.'^ ,�'�w. w�.
John Gray, Assistant Secretary M. Ross Fisher, Senior Vice President
STATE OF CONNECTICUT
ss. Hartford
COUNTY OF HARTFORD
On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and
say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations
described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said
instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his
name thereto by like authority.
aKathleen T Maynard
Notary Public
CERTIFICATE My Commission Expires July 31, 2021
I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct
copy of the Power of Attorney executed by said Companies, which is still in full force effective as off,, f
Signed and sealed at the City of Hartford. re, 6
00
u,"t,
W-W waywrI�% ?@7I 4 � s .""kt9Yr4Narv'°� +"air 7 0
Kevin Heckman„ Assistant Vice President
POA 2018
1316 COUNTY -CITY BUILDING
227 Vd..1rr Fr,,R.soN BoUI. EVAIRD
Solrm ffi..'ND.1NDIANA 116601-1930
CITY OF * BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLICWORKS
September 18, 2018
Mr. Steven Slagle
Majority Builders, Inc.
62900 U.S. 31 S.
South Bend, IN 46614
RE: Pre -Qualification Verification
Dear Mr. Slagle:
Pi-IoNI 574/ 235-9251
FAX 574/ 235-9171
This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South
Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you
are required to re -submit a complete application for continuation of pre -qualification status prior to December 31
for the upcoming calendar year.
A copy of this Verification better must be included with every bid exceeding $150,000 submitted to the City of
South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-9251.
Sincerely,
Linda M. Martin, Clerk
GARY A. GILOT DAVID P. RELOS ELIZABETH A. MARADIK JAMEs A. MUELLER THERESE J. DORAU
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Main St./Wayne St. Garage Roof Replacement
Project No. 118-096R
For Bids Due February 12, 2019
Contractor Name: Majority Builders Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 8/16/2018 Special Provisions - 6
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 8/16/2018 Special Provisions - 7
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) ✓
By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments'
(i)
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii)
Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) Y
Evidence that I am utilizing a surety company which is on the United States
Department of Treasury's Listing of Approved Sureties as required in the bid
specifications or contract.
(iv)
List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
Version 8/16/2018 Special Provisions - 8
(i) Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) Evidence of participation in apprenticeship and training programs, applicable to the
work to be performed on the project, which are approved by and registered with
the United States Department of Labor's Office of Apprenticeship, or its successor
organization.
(vii) Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: February 12 2019
(Sign Here)
Rick Slapl.elV es deiit............ .....
(Print Name Here)
Majority Builders, Inc.
(Name of Company)
62900 US 31 SgLith
(Address of Company)
South' )Bend
(City)
Indiana
(State)
574-291-2091
(Telephone Number)
Version 8/16/2018 Special Provisions - 9
Business Name: MAJORITY BUILDERS INC
Entity Type: Domestic For -Profit Corporation
Creation Date: 11/01/1973
Principal Office Address: 62900 U.S. 31 S., SOUTH BEND, IN, 46614,
USA
BUSINESS INFORMATION
CONNIE LAWSON
INDIANA SECRETARY OF STATE
02/08/2019 11:41 AM
Business ID: 197311-020
Business Status: Active
Inactive Date:
Expiration Date: Perpetual
Jurisdiction of Formation: Indiana Business Entity Report Due 11/30/2019
Date:
Years Due:
9111,1111,011
Title Name Address
Vice President Steven C. Slagle 5902 York Rd, South Bend, IN, 46614, USA
Secretary MARK W. SLAGLE 60598 CROWNRIDGE DR., SO BEND, IN, 46614, USA
President RICK E. SLAGLE 67590 PINE RD., NORTH LIBERTY, IN, 46554, USA
[171, 7
Type: Individual
Name: STEVEN C. SLAGLE
Address: 5902 YORK RD., SOUTH BEND, IN, 46614 - 0000, USA
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Main St./Wayne St. Garage Roof Replacement
Project No. 118-096R
For Bids Due February 12, 2019
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted
Form [MWBE-2.1].
"f Acknowledge Receipt of __L_ Addendum(s) included with the hid.
. All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
This checklist submitted with the Bid,
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Majority Builders,Inc. Date: 2 12 19
By Authorized Represen actr�:
Signature: ,:L
Print Name & Title: Rick
Version 7/20/2018 Contractor's Bid for Public Works -1
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 7/20/2018 Contractor's Bid for Public Works - 3
3.5 PROJECTS COMPLETED IN LAST 5 YEARS (cont.)
Project_Name/Owner Amount Date
Plymouth Schools 1,216,640.00 2016
611 Berkley Street
Plymouth, IN
Uni-First 1,299,937.00 2016
Blackthorn Corporate Park
South Bend, IN
Steve Hyman
Ameriplex Complex 9,295,369.00 2017
Dylan Drive
South Bend, IN 46628
Jeff Smoke
Furrion Innovation Center 4,566,660.00 2017
52567 Indedpendence Court
Elkhart, IN
Matt Fidler
GVS @ SJRMC 452,032.00 2017
610 Douglas Road
Mishawaka, IN
Sherry English
Heart City Health 663,657.00 2017
236 Simpson Avenue
Elkhart, IN
Dean Bergeman
Kazi Medical Bldg 1,165,342.00 2017
6915 Fir Road
Mishawaka, IN
Dr. Amer Kazi
LionsHead 1,296,506.00 2017
305 Steury Avenue
Goshen, IN
Gary Graham
3.5 PROJECTS COMPLETED IN LAST 5 YEARS (cont.)
Pro ect Natne/O ner Amount Date
Ozinga Office Bldg 754,629.00 2017
715 West Ireland Road
South Bend, IN
Chuck Houin
Scrap Metal Services
54450 Smilax Road
New Carlisle, IN
Nick Schlipp
Cass Hudson Addition
2300 Charlotte Avenue
Elkhart, IN 46517
Eric Larson
FedEx Distribution Ctr
5150 Dylan Drive
South Bend, IN 46628
Setzer Properties
Derby, Inc. Addition
24350 State Road 23
South Bend, IN 46614
Dave Karrafa
Elkhart Chamber
418 South Main Street
Elkhart, IN 46516
Kyle Hannon
Elkhart Plastics
3300 North Kenmore Street
South Bend, IN 46628
Jack Welter
1,078,424.00
876,445.00
10,927,421.00
527,737.00
418,913.00
889,505.00
2017
2017
2017
2017
2017
2017
Centier Bank -Heritage 666,896.00 2017
Heritage Square
Granger, IN 46530
Dan Plank
Pro"ect Name/Owner Amount Date
St. Pius X Renovations
52553 Fir Road
Granger, IN 46530
Bill Schlatterback
Clubhouse of St. Joe Cnty
1153 Northside Boulevard
South Bend, IN 46615
Nelson Vogel
Argos Spec Building
Marshall County EDC
2864 Miller Drive
Plymouth, IN 46563
Jerry Chavez
Boys & Girls Club of Marshall County
PO Box 232
Plymouth, IN 46563
ArtJacobs
CTDI Building
Great Lakes Portage Prairie II, LLC
122 South Michigan Street
South Bend, IN 46601
Jeff Smoke
Courtyard by Marriott
Southhold, LLC
247 North Dixieway
South Bend, IN 46637
A.J. Patel
12,412,544.00
710,000.00
1,871,517.00
2,120,602.00
16,579,445.00
9,560,541.00
2017
2017
2018
2018
2018
2018
RM Distributors Addition 1,527,844.00 2018
4004 Technology Drive
South Bend, IN 46628
Scott Carrico
Proiect Name/Owner Amount Date
Walnut Hill Center 760,351.00 2018
1201 South 11 h Street
Goshen Day Care, Inc.
Goshen, IN 46526
Bill Coughlin
LionsHead Warehouse
827 East Lincoln Avenue
Goshen, IN 46526
Gary Graham
LionsHead New Corporate Offices
305 Steury Street
Goshen, IN 46526
Gary Graham
1,486,00.00
4,144,080.00
2018
2018
Lippert Corp Office 2,145,808.00 2018
4100 Edison Lakes Parkway
Mishawaka, IN 46545
Jami Schnur
Section I Experience Questionnaire
Response to Question #2
Public Works Projects under Construction
None at this time
Non -Applicable
Ancilla Domini Sisters, Inc.
9601 Union Road
Donaldson, IN 46513
Susan Black
Elkhart General Hospital
600 East Boulevard
Elkhart, IN 46514
Tom Johnson
Cross Aluminum
Mayflower Road
Niles, Michigan 49120
Jackie Leets
South Bend, Indiana 46614
Section I Experience Questionnaire
Response to Question #3
Section I Experience Questionnaire
Response to Question #4
Private References
Ryan Rans
Great Lakes Capital, LLC
112 West Jefferson Blvd.
South Bend, IN 46601
Steve Garatoni
SGD,LLC
2043 South Bend Avenue
South Bend, IN
Stanley Clark School
3123 Miami Street
South Bend, Indiana 46614
Section II Plan and Equipment Questionnaire
Question #1 Response
Majority Builders, Inc. intends to start work upon receipt of "Notice to Proceed". A Gantt
project schedule will be generated highlighting the sequencing of work, the trades involved,
and benchmark dates. Subcontractors, suppliers as well as Majority Builders' employees will
coordinate under the direction of a fulltime jobsite superintendent and office project manager
to complete construction of the project on time.
Section II Plan and Equipment Questionnaire
Question #2 Response
Name Brief Description
BC Mechanical, Inc. Mechanical Contractor
882 Anderson Road
Niles, MI 49120
North Central Mechanical, Inc. Mechanical Contractor
1721 North Cedar Street
Mishawaka, IN 46545
Ross Masonry, Inc. Masonry Contractor
2414 Autumn Trails Drive
Mishawaka, IN 46544
Shambaugh & Son, LP Fire Protection Contractor
56575 Twin Branch Drive
Mishawaka, IN
Pritchard Mechanical, Inc. Mechanical Contractor
23598 State Road 2
South Bend, IN 46619
Section II Plan and Equipment Questionnaire
Question #3 Response
List of project subcontractors will be provided upon request within 48 hours.
Section II Plan and Equipment Questionnaire
Question #4 Response
450 Dozer
650 Dozer
850 Dozer
(2) 1845-c Skid Loader
Volvo Artic Dump Truck
(2) 580E Extended Case Backhoe
Int. Dump Trucks
(2) Erection Cranes
Compactors
Grader
Semi Storage Trailers
Concrete Equipment
Concrete Breakers for Equipment
Semi with Drop Neck Trailers
Air Compressors
Scaffolding Wagons
Concrete Saws
Misc. Steel Concrete Forms
Transits with digital read outs
Wood shapers, table saws, radial
saws for woodworking
9030 Excavator
821Loader
644 J.D. Front End Loader
Moxy Haul Truck
(2) Komatsu Artic Truck
9050B Excavator
Mac Flatbed Truck
Forklifts
792 Excavator
Landscape Grader
Concrete Wall Forms
(6) Hand Held Compactors
Drilling Rig
(4) Tag Trailers
Air Gun tools for framing Scaffolding and
Many types of drills & hand tools
Over 15 Company trucks
Trenchers
Lasers for grading and Acoustical
ceilings
Landscape Tractor
NOTE: This is by no means a complete list of our Company resources, but it does indicate our
capabilities.
Section II Plan and Equipment Questionnaire
Question #5 Response
We have received material pricing.
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indi.an.a..... )
) SS:
St. Joseph COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 7/20/2018 Contractors Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of
South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 7/20/2018 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 12th day of Feb , 20 19
Majority Builders Inc..
Corltraur/E adder (Firm)
Signature of Contradlo /bidder or Its Agent
Rick Slagle / President
Printed Name and Title
-
Subscribed and swornto before me this 12th day of February„ 2019
My Commission Expires 11 /8 / 24 ..-
Notary Public Shane Blotkamp
County of Residence Elkhart County
Version 7/20/2018 Contractor's Bid for Public Works - 6
}
H
W
W
U)
a�
ow�
H
0
m w 0
a
pzz
y U) C
0 m 0.
z 0
t) Z >
OW
3a
0
z
Q
0
z_
9
W
m
O
C.
C
•2O
O ++
C u
V •l0
d 3
•O �
as
r•+
V! y
J y
O Gs
E
U fA
� C
a 'y
C
m 10
w 0
'3
o`
y O
O
0 c
r
C �
a >,
t
ar
ms
d >
C�
0
W
d �
ao
0 c.
O N
U!
O y N
dN
CD UM)
d - C
a:
E�.Q
0 m d
N N C
m= o
46
m
O
W
m
EL
W
m
2
E
Q
m
coo
O
H
N
E
O U
z
U F-
a>
O N
0-
a�
'd
r-I
O
PU
to p
OD O
ao cd
T
T
N
E
z
U�
N N
a` m
m 0)w o
0
a0
m
c
m
o =
0
n
0 0
Qw
m
pw
00
S"
c�
a
m
� o
€v
'ot m
a d
.0,
o 0
o a�
CL
o
U N
U) od
N
`j
Q76
4s}
o
CS'
0a�
d oq
L
NN
c of
i t
U
E
m
r
m
4
6
W
1
w
ca
E
z
I
0*1
N
N
(D
m
0
(U
E
m
xz
•� C
E
7
U)
O
Y
_U
7
a
0
a
m U)
t
E2
c
0
U
co
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY.
DEVELOPMENT PROGRAM~„;� j
FORM MWBE-2.0''
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
1
Project Number: 118-096R Date: 2112/19
Project Name: Main St./Wayne St. Garage Im rovetents
Bidder: Majority BUilders. Inc.
Contact Person: Joe Tinervia Telephone: 574-29141-2091 `
Address: 62900 US 31 SoUth
City: South Bend_ State: IN Zip:
Email: 'oe@ma'orit builders cam
To determine whether a bidder has demonstrated good faith efforts to reach the MBENVBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend fequires that all perspective bidders complete no less than 2 of the following:
11. Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and
subcontracting opportunities.
Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE/WBEs reasonable time to respond.
UPerform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform NIBEANBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
CUtilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBENVBE firms.
V
**Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBENVBEs,
including providing such MBENVBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
........ ........ _W
MALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBENVBEs in order to increase the likelihood of meeting the MBENVBE goals (including breaking down
contracts into smaller units to facilitate MBENVBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBENVBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
.2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBENVBE was unqualified to perform the job.
*Proper demonstration of Good Faith Effort requires your initials next to all of the above bOxe .Piny
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 7/20/2018 Contractor's Bid for Public Works - 10