Loading...
HomeMy WebLinkAboutChange Order No 8 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOI ITH BEND. INDIANA 46601-1 830 V , 1865 CITY OF •' BEND PETE BUTTIGIEG, MAYI BOARD OF PUBLIC WORKS February 12, 2019 Tim Morey Ziolkowski Construction, Inc. 4050 Ralph Jones Drive South Bend, IN 46628 PHONE 574/235-9251 FAx 574/235-9171 RE: Change Order No. 8 - Erskine Clubhouse Renovation — Project No. 116-108 Dear Mr. Morey: The Board of Public Works, at its meeting held on February 12, 2019, approved the above referenced Change Order for an increase of $23,864, bringing the current contract amount to $1,013,990. Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK LAURA O'SULLIVAN THERESE J. DOkAU TM AIADocument G 1 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 17043 - Erskine Clubhouse Renovation Contract For: General Construction Change Order Number: 08 City Project #236563 Date: 8/28/2018 Date: 2/4/2019 OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) Board of Public Works Gregory A. Kil & Associates, Inc. Ziolkowski Construction Co., Inc. City of South Bend, IN 1316 County City Building (d/b/a) Kil Architecture / Planning 4050 Ralph Jones Drive 227 W Jefferson Boulevard 1126 Lincolnway East South Bend, IN 46628 South Bend, IN 466011830 South Bend, IN 46601 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Per the attached RCO #022, add $760.00 to modify two (2) exhaust fans and associated ductwork per RFI4038. Per the attached RCO #023, add $8,310.00 to provide labor, material and equipment to install IT/Data. Per the attached RCO #024, no change in cost to revise the lighting on the lower level. Per the attached RCO #027, add $3,062.00 to provide labor, material and equipment to remove unforeseen plaster ceiling, suspened ceiling tile and grid location on the ground floor level per RFi 002. Per the attached RCO #028, add $460.00 to provide labor and material to install R-13 foil faced insulation in west gable end wall per RFI 037. Per the attached RCO # 029, add $11,272.00 to provide labor, material and equipment to remove stone for two (2) new openings per referenced drawings. Base price is to use Tublite 14000 series Kynar White fixed windows. Glass to be 1" clear insulated withmuttons. The original Contract Sum was $ 907 000.00 The net change by previously authorized Change Orders $ 83,126.00 The Contract Sum prior to this Change Order was $ 990,126.00 The Contract Sum will be increased by this Change Order in the amount of $ 23,864.00 The new Contract Sum including this Change Order will be $ 1,013,990.00 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be March 22, 2019 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Gregory A. Kil & Associates, Inc. Ziolkowski Construction, Inc A ITE w t rDm1r/tca d CONTRACTOR (Firm name) SI T&C SIGNATURE t AAArchitectCr, (.m Ma r PR T AND TITLE PRINTED NAME AND TITLE Z-S•t DATE DATE Board of Public Works, City of South Bend, IN OWNER (k-h ru:arDr Of Pawic W46 SIGNATURE t, CEB �Ya DATE AIATM : T yIUA Document t n70mu.m, k 201t7a U pyrightmll 91791119w71r2000 , 2001 and 2017 by The Americanµ Institute reserved. tD .^ Instit a of Au"c 1te A hts ll o.u� W U. t y .V y Copyright t -a a at�a�aiu��"a¢tio nail tmmaWes, U nauthou'liz�ed ireproductuon oir iNstulbumbon �af this MAII Document, 11r any Iiummu°U`ion of it., may resuullt in seveum: a;lia i and ciriiurrutiiaaall penaffiea, and wilill The prosercuted to the uamaaxlirnuuumu extent 14masssill;ulle under the Ilaw, This document was produced by ALA software at 14:10:07 ET on 02104/2019 under Order No, 4725810215 which expires on 02/04/2020, and is not for resale, User Notes: TRANSMITTAL To: Ziolkowski Construction Project: Erskine Club House Renovation Attn: Tim Morey Fax #: No. Date: February 4, 2019 We are transmitting the following: Herewith Via Fax Under Separate Cover .......... Date: Copies: Description: Action: 2.4.19 3 Change Order #8 Sign This information is forwarded: For Your Use For Review & Comment Reviewed as Noted x For Your Approval For Your Files Other Remarks: Attached are 3 copies of CO #8 for Erskine signed by Greg. Please have Tim Morey Sign them and give to the Board of Public Works for approval and signature. Please return a digital copy to accountingkilarchitecture.com for our files. Thank you! CC: By: Angela Henry Kil Architecture/Planning K I L ARCHITECTURE PLANNING wwwAkrchitecture qQ 1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288,2654 VOICE 289, 2420 FAX City Of South Bend Venues, Parks and Arts Erskine Clubhouse Renovation Project No. 116-108 Ziolkowski Project # 17668 RCO # 022 1.9.19 DESCRIPTION: Modifying the two (2) exhaust fans and associated ductwork per RFI # 038. Item Scope of Work Estimated' Unit Subcontractor Material Total Labor Craft Labor Total No. Quantity Quote Unit Price Material Manhours Type Rate Labor cost Cost 0 $0.00 'so 0 $0.00 $t E.J. White 0, $684 $0.00 0 $0.00 See attached email dated 1.7.2019. 0 $0„00 $0, 0' Wool 0 _._ _ .... a.'. _.... $0.00 $0 � $0.00 'so 0 $0.00 0 0 ................ $0.00 $011 0 $0.00 $ 01 K00 0 0 $0.00 10 0 $0 00 0 $0.00 $0 0 $0.00. 0 0 $0.00 , 0 $0.00 $0 0 $0,00 0, $0.00 $0 0 $0.00 o 0 $0.00 0 $0.00 �., 0 0 $0.00 s0 a $0.00 ' _ $0.00 0 $0.00 .1 _...._0 0 $0.00"0 0 $0.00 $0 0 $0.00 ' 0 0 $0.00 0 o $0.00 $ s o $0.00 $ o $0.00 , 0 $0.00 o $0.00 I 0 $6.00 0 $0.00 0 $0.00 o $o.00 ; 0 0 $0.00'' 0 $0.00 , 30 ER10 �ubcontsactor Markup 5% Labor Markup Subcontract Total f750 Labor Total 0 15% Material Markup Material Total Payment & PerfBond , TOTAL RCO AMOUNT �� DATE 1M012019 City Of South Bend Venues, Parks and Arts Erskine Clubhouse Renovation Project No. 116-108 Ziolkowski Project # 17668 RCO # 023 1.10.2019 DESCRIPTION: Provide labor, material and equipment to install IT / Data per attached email. Note: Conduit and wire mold is not painted. If it needs painted we will provide a price once it is installed. Payment & Perf Bond $82 TOTAL RCO AMOUNT 8 J'10 Tim More Subject: FW: Erskine IT Change Proposal Request Attachments: Proposal Letter- IT conduit and wire adder pricing doc.doc; MX-2615N_20181210_ 172502.pdf From: Greg Kil [yoft( kil051t ( 11 � itf L(A'Ll LZ&Qall Sent: Friday, December 14, 2018 10:36 AM To: Patrick Sherman Cc: 11m Morey; Eric Stalheim Subject: FW: Erskine IT Change Proposal Request Patrick, See the question from Elite Electric via Tim Morey Can you confirm if you want the wire in conduit of some sort back to the IT Closet or is open air in the ceiling space ok? Thanks, Greg 4,,J[ I,IUARO, d',J/\ I Architect and Principal / f�llanrJil�o 1126 Lincolnway East, South Bend, IN 46601 0: 574.288.2654 1 M: 574.220.8867 1 www.kilarchitecture.com The information contained in this message and attachments, may be confidential or privileged information and is intended for the exclusive use of the recipient(s) only, If you are not the intended recipient, or an employee or agent responsible to deliver it to the intended recipient, you are not authorized to copy, disclose, distribute or take any action relating to the contents herein. If this email was sent to you in error, please immediately advise the sender by reply email or phone call and delete this message, Thanks. From: Tim Morey [jLijJl.�q,.hT re jqj] —1211-1y. q _�� Sent: Friday, December 14, 2018 10:13 AM To: Greg Kil <g, Subject: Fwd: Erskine IT Change Proposal Request Greg can you answer Brian's question below? Sent from my Whone Begin forwarded message: From: Brian Date: December 14, 2018 at 9:51:24 AM EST To:'Tim Morey' <tmo y@) &L� Lill & L) l > Subject: RE: Erskine IT Change Proposal Request Tim are they wanting the wire in conduit of some sort back to the IT Closet or is open air in the ceiling space ok? Thank you f 1, E11.1e Elect ric 2021 W601h 'Xhjr�-itleld .'Misha,waka, Indiana,46 545 8..55'-.,3592 From: Greg Kil Sent: Tuesday, December 11, 2018 4:31 PM To: Tim Morey Cc: Patrick Sherman; Kyle Silveus; Alicia Czarnecki; Eric Stalhelm Subject: Erskine IT Change Proposal Request Tim, I have reviewed the following Change to Erskine with the City of SB and have outlined a Change Proposal for your Electrical Sub to price: Erskine IT/DATA Change Request: Please provide a price to install the following per the attached proposed plans. Scope to include: 1. W.A.P. (Wireless Access Point) Interior mount: 2 locations: one at the Lower Level (Sheet A1.1) and one Main Level (Sheet A1.2) 2. W.A.P, (Wireless Access Point) Exterior Mount: 2 locations: one at the north porch and south elevation (Sheet A1.2) 3. Cat 6 data outlets: Provide home runs Cat 6 wiring from Rack to IT/Data outlets and each WAP. Outlet to have 2 data ports per box location with terminal ports for users to plug-in (either POS system registers, HVAC control, etc). Provide locations as shown on attached Sheet A1.1, A1.2 and A1.3 C. Install Data Server Rack (Rack provided by Owner) in Basement in Mech Room G06, lower level. Include dedicated 120v, 20A circuit to this rack for power. 5Owner (City) will provide switch, W.A.P. devises for contractor to mount. If Elite Electrical has any que5tions in order to quote the above, please let me know. am y Architect and Principal 1126 Lincolnway East, South Bend, IN 46601 0: 574.288.2654 1 IVI: 574.220.8867 1 www.kilarchitecture.com The Information contained in this message and attachments, may be confidential or privileged information and is intended for the exclusive use of the recipient(s) only. If you are not the intended recipient, or an employee or agent responsible to deliver it to the Intended recipient, You are not authorized 10 ouPY, disclose, distribute or take any aClicrl relating to ifie contents herein, If this email was sent to you in error, please immedfatety advise the sender by reply eniafl or phone tail sand delete this rnessage. Thanks, w U) z CL 0 C) D :3 ow CL U, w 0 (n U) mi noan Y- co M U) EL LilOwL . ......... 777777' r. f wh dtt g�Ej �ig'q ail go I jifif 2� (D 0 0 (D Q lip, 51 0 e 0 (D 0060 -2 92 12 10 000 0 u m:s gu (� WO o O s <u wC�0. a a au it all a 1 Ig y 11 f h al a IN Do a as ao Ziolkowski Construction 4050 Ralph Jones Drive South Bend, Indiana 46628 Attn: Tim Morey 2021 N Merrifield Mishawaka, IN 46545 Fax (574) 855-3592 Cell (574) 334-0259 Quote #C10569-3 January 4, 2018 ErsIdne Golf Course Club House -IT conduit and wire adder Scope of Worle- IT Addet, 0 Install I/" emt conduit or flexible metallic conduit depending on the situation, from each IT device location back to the IT Rack location:. Price assumes combining Cat 6 cabling in the %" conduit on the home runs back to the rack per each floor as we are able to do. o Price includes pulling 1- Cat 6 cable to each location identified. 0 Terminations on both ends will be by others. If a drop comes down an exposed wall in a public area we can run the drop in wire mold if die owner would like. e Labor 70 hours @ 70.00 = $4,900.00 Material $1,900.00 O/H & Profit 10% $680.00 Price -Deduct Not to Exceed $ 7,480.00 (Sales tax excluded) � "� Conditions Warranties - Engineering — Elite Electric will guarantee its engineering from defects for a period of one year. - Hardware — Manufacturer's warranties will apply to all equipment covered in this proposal. - Warranty Exclusions — Elite Electric will not replace or warrant damage due to negligence, vandalism or acts of God Limits ofProposal - Proposal considers the existence of system drawings to indicate current accurate configuration. - This proposal considers work being done during normal working hours. O/T is not covered by this proposal. - Delays by others are not considered by this proposal. - This proposal does not consider the failure of existing hardware devices retained for reuse. - Utility Costs of any sort are excluded from this proposal Elite Eleehtc Page r of 2 - Cutting, patching,, painting is not included in this proposal. - Security, Speakers, not included in this proposal - State Drawings, not included in this proposal - CAD drawings not included in this proposal Terms of Proposal - 1000/9 due net 30 upon completion of project Cost Guarantee — Quotation is valid for 30 days from the date of submittal. Stategnent of Approval. I have read and agree to the definition and terms of this proposal. I have the authority to order the work requested I give Elite Electric the authority to carry out the terms of this proposal. Printed Name Signature Company Name PO Number OUR CONIM1TWIENT At Elite Electric, the customer's concerns are our responses. We offer years of combined in field service experience, engineered application and precision setup with each installation. We will treat you with courteous responsiveness and knowledgeable professionalism. It is our commitment to provide solutions for all industrial needs. Call with any questions. Thank You, Brian Wrobleski Elite Mechic Page 2 or2 .DATE 1/10/2019 City Of South Bend Venues, Parks and Arts Erskine Clubhouse Renovation Project No. 116-108 Ziolkowski Project # 17668 RCO # 024 1.10.2019 DESCRIPTION: Revise the lighting on the lower level per attached drawing based on the attached clarifications. (No change in price) Payment & Perf Bond TOTAL RCO AMOUNT"""""0 2021 N Merrifield Mishawaka, IN 46545 Fax (574) 855-3592 Cell (574) 334-0259 Quote #C10569-4 Ziolkowski Construction 4050 Ralph Jones Drive South Bend, Indiana 46628 Attn: Tim Morey January 2, 2018 Erskine Golf Course Club House- Lighting Changes Scopg of Work- Lighting Chan gg �t �lra chard on the devils fisted below Revise the lighting on the lower level per the attached sketch based on the below clarifications. o Track Lighting, change feed ends to eliminate the Current Limiters per track run and change to a standard type track feed end. We checked our lighting rep and he confirmed these are not needed and will not affect the operation of the lighting. o Change lighting layout, amount of feeds because of the changes in lay out per attached sketch that was provided o Utilize MC Cable were ever possible on the project. Price- N/C Not to Exceed $00.00 (Sales tax excluded) Terms and Conditions Warranties - Engineering — Elite Electric will guarantee its engineering from defects for a period of one year, - Hardware — Manufacturer's warranties will apply to all equipment covered in this proposal. - Warranty Exclusions — Elite Electric will not replace or warrant damage due to negligence, vandalism or acts of God Limits of Proposal Proposal considers the existence of system drawings to indicate current accurate configuration. This proposal considers work being done during normal working hours. O/T is not covered by this proposal. Delays by others are not considered by this proposal. This proposal does not consider the failure of existing hardware devices retained for reuse. Utility Costs of any sort are excluded from this proposal Cutting, patching, painting is not included in this proposal. Security, Speakers, not included in this proposal State Drawings, not included in this proposal CAD drawings not included in this proposal Elite Electric Page 1 of 2 Terms of Proposal - 100% due net 30 upon completion of project Cost Guarantee — Quotation is valid for 30 days from the date of submittal. Stgti,,rtentpf�prtavl I have read and agree to the definition and terms of this proposal. I have the authority to order the work requested. I give Elite Electric the authority to carry out the terms of this proposal. Printed Name Signature Company Name PO Number QUR COMMITMENT At Elite Electric, the customer's concerns are our responses. We offer years of combined in field service experience, engineered application and precision setup with each installation. We will treat you with courteous responsiveness and knowledgeable professionalism. It is our commitment to provide solutions for all industrial needs. Call with any questions. Thank You, Brian Wrobleski Elite Electric Page 2 of 2 ,. iY~ ems'_. , .,. ZE z Z....m,..in U)LLI D o Oz UZ9 Pip LL IX m W* 0 0-1 0 Lu d we "o MO DATE 1/23/2019 City Of South Bend Venues, Parks and Arts Erskine Clubhouse Renovation Project No. 116-108 Ziolkowski Project # 17668 RCO # 027 1.23.2019 DESCRIPTION: Provide labor, material and equipment to remove unforeseen plaster ceilings, suspened ceiling tile and grid located on ground floor level per RFI 002. Payment & Perf Bond 530 TOTAL RCO AMOUNT 06 Extra Work Order # 001 Project Name - E r'S k, h e- Gl,3 �eev Project Job # - 1764C ZIOLKOWSKI Construc*ion, General Construction & Design/Build Building Strong Relationships Since 1974 DATE: 1latl zol9 Task Code # - � / RCO #: Status of EWo?? Description of Work: O" o � *►• ,. �✓/s Started Ye �' r In Progress Complete Quantity Material -Supplier & Invoice # Price Amount Tools and/or Equipment Hrs/Dal Rate fir"" Total Tools and/or Ettui rnent ' u contractors Sub -Total % Maria -up on Subcontractors Total Subcontractors Labor of ours Rate Amount And`Trade ST. i OIT Lwr ew ' Sub -Total % Mark-up on Materials Total Materials Work Ordered by- Total Labor Total Materials Signature- Total Tools and/or Equipment Total Subcontractors I hereby acknowledge that this work has been completed satisfactorily ." Superintendent- Grand Totaj White - Office Copy Yellow - Client's Copy Pink - Superintendent's Copy Extra Work Order # 00 2,..... Project Name - FrS k,he_ G�� tiarJst �� Project Job # - I '76 tt ZIOLKOWSKI Construction, Inc. General Construction a Design/Build Building Strong Relationships Since 1974 DATE:; I / S, za`q Task Code # - Z 0 Z RCO #: Status of EWO?? Description of Work: � o e P`` o f� a" Started In Progress Complete Quantity Material -Supplier &Invoice # Price Amount Tools and/or Equipment Hrs►Da Rate 0 Wry •r Z G Total Tools and/or Equi meet u coctors Sub -Total % Mark-up on Subcontractors Total Subcontractors tabor 9 of Hours Rate Amount And Trade ST. O fir74 o We - Sub -Total I % Mark-up on Materials l Total Materials + Work Ordered by- Total Labor Total Materials Signature- Total Tools and/or E ui ment Total Subcontractors hereby acknowledge that this work has been cornplat atistactorilly M .- Superintendent- �Grand Total F2a White - Office Cony Yellow - Client's Copy Pink - Superintendent's Copy kZIOLKOWSKI Al Construction, Inc. VGeneral Construction & Design/Build Building Strong Relationships since 1974 �j, REQUEST FOR INFORMATION Erskine Clubhouse Renovations Ziolkowski Construction Project No: 17668 City's Project No: 116-108 Submitted To: Date: RFI No. Eric Stalheim 10.2.2018 002 Subcontractor: Sec Section: Reference Attachments: ZC1 ISheet Dl.l See Attached Information Requested: There is suspended ceiling located within the Highlighted area. we are to remove suspended ceiling, and nothing was figured. this on a T&M Ticket or is there a note we missed? Possible Solution: There is nothing saying Do you want us to keep l.V3[)E)l1(Jed C(111flkIg Shoukl be reiTI(Pved, air�d rep1aced In desuginated IIIocatJon Ipeii,. .flect(,:�d ceflu�ng plan ,il-�eets A6,1, A6,,2, A6.3,,, Rease IKeep ttiis c)ln ,jTPMM lcket. Reguested Py: Tim More Answered Py: rResponse Needed By: ASAP Date Answered: CC: File RF1 Log Greg Kil - Architect Alicia Czarnecki - Owner Site Supervisor — Tim Koziel 4060 Re 11, Jones Wye d 11�,4 p (AZ4 _§�?A_J�qqn iLt,E ? 51 L 4 Committed o professionalism and excellence for the benefit of our clients, employees, and shareholders. MEN r- - - I DATE 1/23/2019 City Of South Bend Venues, Parks and Arts Erskine Clubhouse Renovation Project No. 116-108 Ziolkowski Project # 17668 RCO # 028 1.23.2019 DESCRIPTION: Provide labor and material to install R-13 foil faced insulation in west gable endwal. per RFI 037. Payment & Perf Sor C TOTAL RCO AMOUNT 1=9E ZIOKOWSKI C s` action, Inc. General Construction & Design/Bulld Building Strong Relationships Since 1974 REQUEST FOR INFORMATION Erskine Clubhouse Renovations Ziolkowski Construction Project No: 17668 City's Project No: 116-108 Submitted To: Date: RFI No. .._._..... _ Eric Stalheim 12.20.2018 037 IEStaVheirri a ,)Uarchitecc grexgm Subcontractor: Sec Section: Reference Attachments: ZCl General A3.2 Information Requested: The west wall in the pro -shop does not have insulation in the wall. Before we cover the wall, do we need to add insulation? Possible Solution: our It"c Ul�"�IU't'Wf. n � ., .n s l � � � ie ow� :i�.:a:�t��°: fu..� Ill�ir:��✓I:�i:°T Fl,i iii�:.�a�ui�.:ii::lirl ��m fr.1:t� west. �:ICi. 1 itm��t I��tt�wtlt� prce to conduct iahs work. uested By: Tim More Answered BY: �._......... Donse Needed Bv: ASAP Date Answered: CC: File RFI Log Greg Kil - Architect Alicia Czarnecki - Owner Site Supervisor — Tim Koziel on nnllted to professionalism and b Pqd 9t tf mITf hpetr (T 7.. &fBt I I eas r74 d_£ 1 1 --- ,__ excellence for the benefit of our clients, employees, and shareholders. DATE 1/25/2019 City Of South Bend Venues, Parks and Arts Erskine Clubhouse Renovation Project No. 116-108 Ziolkowski Project # 17668 RCO # 029 1.25.2019 DE§C Provide labor, material and equipment to remove stone for two (2) new openings per attached drawing. Base price is to use Tubeffte 14000 series Kynar White fixed windows. Glass to be 1 " clear insulated with muttons. (Window frames will match door 100 frame.) No. Estimates a— —- Item Scope of Work E Unit Subcontractor Material Total Labor Craft Labor Total Quantity Quote Unit Price Material Manhours Type Rate Labor 10 —Labor—"'— ­— . ........ —999L $0 -$56.47Qemo farm re 0 58 Mason nmn _,,larle 6 - — ---- -------- - —­----�6-6-o -'""-Cost '—o — -",— - L $0.00 $ r Interior 3SNAL��rs, reuse —58, Mlabo 80 $0-00 existing, sill and Inslallji!�o w $000 $0 0 $000 $ re . .. ......... - esO� STI(S. . .............. — = $0 throo (3) fl dw,ile-hun --2-- - - q —$o NZ $0 0 �qjqjr add $I'Ll �42q.00 plus 0 1-- - --- $000, weeks to ro(,b)Jvo 01 ................ . . Oi --o _.1 16 —$348 —0:..— $o 00 $0 $0.00 0 q $0.00 0 0 $0.00 so 0 $0 '--q i0.00 01 $0 0 $000 $21850�� 11b I - go—ontractor Madiup $285,1 14 % Labor Markup —77' Subcontract Total Labor Total 15% Material Markup $140 Material Total Payment & Perf Bond TOTAL RCO AMOUNT ri-ValleyGlassCo, Inc. 50820 State Road 933 North South Bond, IN 46637 Phone (74) 277-2650 Fax (574)277-2651 To: Ziolkowski Construction Attn: Tim Morey Re: Erskine Clubhouse: 3 new windows We are please to quote the following: Date: January 24, 2019 Install 3 Fixed Windows @ 42" x 66", Tubelite 14000 Series Kynar White, Glass to be 1" Clear Insulated with Muttons Credit on labor to install (1) window C. (Note: Window C could not be returned) Total Installed Price: $2,850.00 Tax not included Exclusions: Final cleaning, any work not listed above Add $2,200.00 Tax Included for Double -hung Wojan windows (12 week lead time) Thank you, Zac Kush zackushtvg@aol.com m .0 mj -0 0 M x m 7, C: U3O Z ws 24ou x 7: Z > na o m 5 C: z cn > M M 29 From: To: Subject: Erskine Clubhouse Renovations - Pricing for Changes Associated with RFI #038 - Exhaust Fan/Duct Modifications for 1st Floor Restrooms Date: Monday, January 07, 2019 12:57:21 PM Attachments: imaae001.ono Tim: Please see attached. This price is for modifying the two exhaust fans and associated ductwork per RFI #038. As previously discussed/sketched, this includes mounting the fans on the floor of the 2nd floor mechanical room to small, fabricated exhaust plenum boxes. The exhaust from the fan will run to the West out the sidewall. The exhaust from the restroom to the fan will go through the floor and will have a grille installed in the restroom ceiling. We could not use the grilles that came with the fans since it is plastic and will only work if attached directly to the fan. The total is $684.44. Breakdown is as follows: • Stalker's Sheet Metal: $616.00 • Subcontractor Mark -Up (+10% Gross): $68.44 Total: $684.44 Grilles have a lead time of approximately 4 weeks from date of order. Grille color is WHITE. Cut sheet is attached. Please advise. Thanks Jeffrey M. Bucher, Jr. Vice -President ,D 1011 South Michigan St., South Beud, IN 46601 Office: (574) 289-6351 Fax: (574) 289-3755 Cell: (574) 532-3488 Email: Web: '��1 w GALLOLOW INSTRUMENT ENERGY A MEMBER OF THE KENOALL GROUP 10 1>0c"TZ LA,)N4.L- CV 22T, galloup.com smithinstmmentoom medoenergy.com BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 2/4/19 Name Tour Villa/Alicia Czarnecki Department Engineering ...... . ............. BPW Date 2/12/2018 Phone Extension 9083 .................. ... . . . . ................. . . ................ . R uir�ed Prior to Submittal to Board Legal Attorney Name Clara McDaniels Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing [:] Michael Schmidt Check the "Agreement El Professional Services Bid Opening Quote Opening Change Order No. 8 Ease/Encroach. Other: FroItemTy rate Ite- _ Cp 0 ontract R Resolution El Bid Award El Quote Award F-1 C/O & PCA No. R Traffic Control for All Submissions FProposal 0 Addendum . F] Req. to Advertise [] Title Sheet ired Information 0 PCA Company or Vendor Name Ziolkowski Construction, Inc. New Vendor Ej Yes E No F] If Yes, Approved by Purchasing MBEIWBE Contractor Fj MBE [:] WBE MBENVBE Contractor Requested [:] No F-1 Yes Name of Company Project Name Erskine Clubhouse Renovation . .. . ............ .......... Project Number 116-108 Funding Source V FA AAC"'(A Account No. 201. it - I. if . .................. ..................... .... . .............. Amount $23,864.00 Terms of Contract Purpose/Description Porch Repairs due to unforeseen conditions, 0 Required Contractor's Certification Form Attached (Non- .......... Collusion, Non -Discrimination, Non -Debarment, E-Ved!y1ran, etc. Required For Change Orders Only ........... ......... Amount of increase " $23,864.00 . .......... ... ­­ ............................. . ................... F-1 Decrease Previous Amount $ 990,126.00 Current Percent of Change* 2.41% New Amount 1,013,990.00 Total Percent of Change: 11.57% . ... . . .................... Dispersal After Approval Copy Original z F-1 Kyle Silveus z F-1 Patrick Sherman R El