HomeMy WebLinkAbout11/15/1917 Board of Public Works Special Meeting Minutesv
v
v
Beard met ilia spee ie:l session at 4: 30 P.k. iar. A. H. R ice absent.
Mayor F. W. Keller and air. J. W. Toyne ,Supt., °of City Water Works present.
The Plans and specifications for the new centralpumping station
reservoir was.presented by kr. Toyae and the samo was discussed by the Board.
They plans were referred to the City Engineer to cheek and report to Mr. Payne,
j
Attorney Wia. A. Uelnerny °counsel for the White Construction Company
met with the Board in regard to decision of matter of us ink mortar cushion under tracks
brick in street car tracks of ,the Chico,go, ,°Sauth Bend & Northern Indiana Ry. _ Company
on Eddy Street and Uishwwaka Avenue pavement improvement. The Board adjourned into
executive sossion with Attorney ft. A Inerny on this matter ,and reported no action
taken on same.
The following plans and estimates were filed by the City Engineer.
on Track -Separation of the New York Central Ry. Co. Clity!. s est inaat0d on same.
° ESTIMATE `OP COST.'
°
Of that portion of the work to be done by,the City of South Bend,
Indiana., In Cennectsn' with Grade Is"aratien -as provided for in Modified Resolution
No. 2 for Track Separition, adepted°by the Board of Public Works of said City April
l7s 1917•
The work tube done in connection with the separation of grade is as
indicated an the attached plans, and the estimates cover the test of that part of the
work beneath the superstructure of the streets where the grades of hhe tracks and
streets are aepdrated including tho.approaeheu.en the streets to,said improvements as
well as the s idwalks, the paving and re" it ing, and. the changes in drainage, on that
part of t1lo streets crossed by sadd tracks, and on that part'of all streets, the grades of
which are changed by said improvement,
ESTIVATE OF THE COST OF CHAVGES IN STREET AND ALLEY
GRADES FOR THE ICY. -C. R.. R. GRADE SEPARATIONS.
HIGH STREETO
Embankment
cement curb °
cement walk
Planking ,
Brick pavement relaid-
Eng ineer ing and contingencies 10%
Marietta Street.
Embankment
Cement Wdlk
Cement curb
Wells
Planking
Railing,
Engineer' in - and contingeniedde
ALLEY SOUTH OF Ni. Y. C. R. R.
Embankment
Walls
Rail ing °
Eng ineer ing and Cent ingenc ies .
°67. °cu. yde. at 1.00 per cu. yd.
94 1 imi. feet at 1.30 per l in. ft.
440 sq. ft. at .15 per sq. ft.
6500 B.F. at 40.00
130. sq. yds. at 1.50 per sq. yd.
1406. cu. yds. at 1.00 per cu. yd.
2635. sq. ft. at .15 per sq. ft.
526 lin. ft. at .30 per 1 in. ft.
1825. cu. ft. at .40 per cu. ft.
6300 B. F. at 40.00 °
290 Ila. ft. at 1.50 per ft.
10%
67.00
28'. 20
66.00
260.00
195.00
4.00
.00, ---
68`0.00
1,406.00
393.75
157.s0
730.00
252.00
435.00
39374.55
���• 45
3.710.00
MARIETTA STREET WEST.
16. cu. yds. of 1.00 per cu. yd. 16.00
175 cu. ft. at .40 per cu. ft. 70.00
25. !in. ft. at 1.50 per lin ft. 32.59
12 0
16% ... _...-. s.. ----•
ALLEY SOUTH OF N. Y, C R. R.
Embankment .
Walla
Railing
Engineering and c ant ingenc ies
OH IO STREET.
1ARIETTA RST. EAST.
ail'. cu. yda at 1.00 per cu. yd.
231 cu. ft. at .40 per cu. ft.
50 lin ft. *at 1.50 per '1 i,c. ft.
Embankment
1232
Re it ing
195
Pl a►nk ing
945
Cement walk
cement curb
64
0 - inch sewer pipe
10
New inlets
2 manholes, reset
Walla
161
Engineering and contingencies le%
cu. yds. at 1.00 per cu. yd.
iin. ft. at 1.50 per tin ft.
0 B. F. at 40.00 '
55 sq. ft. at .15 per sq. ft.
0 lin, ft. at .30 per lin. ft.
0 lin. ft. at .80 per lin ft.
5 at 10.00 each
9 lin. ft. at 5.00 per lin ft.
2 cu. ft. at .40 per cu. ft:
RUSH STREET.
.Mnbankment
1550
cu. yda.
at 1.00
per
cu.
yd.
cement walk
2960
sq. ft.
at .15 per sq. ft.
Cement curb
605.
iin, ft.
at .30
per
lin
ft.
Brick pavement relaid.
366
sq. yds.
at 1.50
per
sq.
ye.
l manhole reset
4
lin. ft.
at 5.00
per
lin
ft..
New Inlets
2
at 10.00
each
8 , inch pipe sewer
52.
1 in. ft.
at .80
per
1 in.
ft.
Wails
1568
eu..ft. at .40 per cu. ft.
Planking
6090
R. F. at
40.00
Railing
238
lin. ft.
at 1.50
per
1 in
ft.
A
Engineering and contingencies
ALLEY SOUTH OF SAIU'LE, RUSH STREET WEST.
Embankment
Walla
Railing
Bngineert g and centingencies
ALUM FAST OF RUSH STREET SAW
`Emb ent
Walks
sllg
glaser ing and c ont6agdne ies
SAW W. STREET.
36. cu. yds. at 1.00 per cu. -yd.
505 cu. ft. at .40 per cu. ft.
50' lin: ft'. at 1.50 per ft.
•10%
,
PLE STREET NORTH .
21,
cu. yda.
at
1.00 per cu. yd.
277�
cu. ft.
at
.40 per cu. ft.
50
lin. ft.
at
1.50 per lin ft.
10%
Embankment
1346
cu. yda.
at 1.00 per
cu. yd.
cement curb
780
lin. ft.
at .30 per
lin. ft.
Cement walk
3685.aq.
ft. at .15 per sq. ft.
Brick pavement relaid
1277
sq. yde.
at 1.50 per
sq. yd.
2 manholes reset
11
lin. ft.
at 5.0Oper
lin ft.
inlets
-1
at 10.00
Inlets reset
3
at 2.00 each
Walla
277:4 cu. ft.
at .40 per
cu. ft.
planking
7000
B.F. at
40.00
Railing
390
lin. ft.
at 1.50 per
1 i n ft.
Eng in eer ing and contingencies 10%
31. UQ
92.40
75.00
198.40
G
60o.Oo
$ly 232.00
292.so
378. 00
443.25
192.00
80.00
50.00
45.00
641.80
3, 357- 55
342.45,
39 700.00
1, 550.00
444.00,
181.50
549.00•
20.00
20.00
41.60
623.20
243i 60
357.00
4,029.90
400.1 ft
430 i 00
$ 36.-Oo
202.00
75.00
313.00
37.00
350.00
$ 21.00
111.00
207.00
23.00
230.00
1046. 00
234.00
552.75
1, 915. }5
55.00
10.00
6.00
10111. 00
280.00
585.00
6v122.go
617.10
.740.00
.27
I
iffl=WS STREET.
Etpban%ment
cement curb
Cement walk
Brick pavement relaid
manholes ,raised
Inlets reset_
New Inlets:
8 inch -pipe sewer
Planking'
Walls .
Ra 11 ink
Engineering and c ent ingenc ies 10%
TUTT STREET
Embankment
Cement curb
Cement walk,
Brick pavement relaid
Walls
Railing °
Engineering and a ent ingenc ies 10%
ANGLE STREET.
Embankment °
8 inch sewer Pipe .
Walls
Inlets new
Manholes, rebuilt
Inlets new
Railing
Eng ineer`ing and a entdngenc ies 16%
MICHIGAN STREET.
Ezcavat fen
Curb and gutter
Cement curb
Pavement
30" X 48 * brick sewer-
8 inch sewer pipe °
Square inlets.
New inlets °
Inlets reset
2 Manholes
Manhole reset
Lowering - water mains and services
Eng ineer ing and c ent ingenc ies 10%
BRONSON.STREET.
Excavation
Curb and gutter
Cement walk
Pavement
Square inlets
8 jach pipe sewer
12 inch.pipe sewer
1 manhole
Lowering water mains and services
-Engineering and cent ingenc ies 10%
'1456 cu. yds. at 1.00 per cu. yd. 1,456.00
651
tin. ft. at .30 per tin. ft.
195.50
°3160
sq. ft.
at .15 per sq. ft.
474.00
933
sq• yds.
at 1.50 per sq. yd.
1,399.50
111 lin. ft.
at 5.60 per lin ft.
57.50
4
at.2.00
each
8.00
1
at 10.00
10.00
28
lin. ft.
at .80 per lin ft.
22.40
6225
B.F. at
40.00
249.00
3888
cu. ft.
at .40 per ft.
1,555.20
394
lin. ft
at ' 1. 50 per lin ft.
"9
00
591.00
60017.90
602.IQ
,224.3 cu, yds. at 1.00 per cu. yd. $ 224.30
.175.
1 n. ft.
at .30 pr lin ft.
52.50
° 475.
sq-41 ft.
at .15 per sq. ft.
_ 71.25
° 285.
sq. yds.
at 1.50-per sq. yd.
427.50
909
cu. ft. at .40 per cu. ft.
363.60
75.
lin. ft.
at 1.50, per tin ft._�
112•.5,0
1, 251.65
I`, 380.00
243 cu. yds. at 1.00 per cu. yd. 243.00
135
lin.
ft.
at 1,00 per lin. ft.
135.00
1573
cu.
ft.
at .46 per cu. ft.
629.20
28
lin.
ft.
at .80 per lin ft.
22.40
6
lin.
feet
at 5.00 per lin ft.
.30.00 .
2
at 10.00
each
20.00
140
lin.
ft.-at
1.50 per lin ft.
210_4_9___
411, 209.
.
130.40
1, 420. 00
11650 cu. yds. at .75 per cu. yd. 8,737.50
1730 1 in. ft. at .60 per lin ft.
10600 sq. ft. at .15 per sq. ft. 19590.00
6000 sq. yds. at 2.50 per sq. yd. 15.000.00
250.1in ft. at 10.00 per jtn . 5,000.00
490 tin ft. at .80 per lin ft. 392.00
9 at 15.00_each 135.00
6 at 10.00 each 60.04
3 at 2.00 each 6.00
18 lin. ft. at 5.00 per lin. ft. 90.00
1 at 10.00 10.00
1.381.00
433* 439. 50 .r
1.3 0
036#780-00
'5513 cu. yde. at .75 per cu. yd. $4,134.75
1393
lin.
ft.
at .60 per lin ft.
835.80
8666
sq.
ft.
at .15 per sq. ft.
110299.90
2152
sq.
yds.
at 2.50 per sq. yd.
5,,380.00
6
at 15.00
each
90.00
120
lin.
ft
at .80 per lin ft.
96.00
250
lin.
ft.
at 1.50 per lin ft.
375.00
7
tin
ft.
at 1.50 per lin ft.
35.00
*13,176.20
1. 323, §8O
014,500.00
Thursaber 155th_ -19 17 cant i
3Uad
MAIN STREET
Excavation
2138 cu. yds. at .75 per cu. yd.
19603.50
;1
Pavement
1741 sib. yde at 2.50 per sq. yd.
'49352 50
Curb and gutter" °`
i060 lin. ft, at .60 per lin ft.
636.00
Cement walk' °
`
,11046 sq. ft. at .15 per sq. ft.
1,656.90
S'giare ineta : > °
6 at MOO each.
90.00
8 inch pipe ,sewer
200 lin. ft. at .80 per lin ft.
160.00
Inlets
2 at 10.00 each.
20.00
Yadh*leareset
2 at 10.00 each
20.00
Lowering water mains and serviced
°
407.00
8,945.90
Engineering and c oat ingenc ies 10%
8 p
LAFAYETTE STREET.
Excavation
1683 cu. yds. at .75 per cu. yd.
1, 262.25
Pavement
1670 sq. yds. at 2.50 per sq. yd.
40175,. 00
Curb and gutter
936 lin. ft. at .60 per lin. ft.
561.60
Cement walk, °
9922.• sq. ft. at .15 per sq. ft.
19488.30
8 inch sewer pipe
128 .lin. ft. at .80 per lin ft.
102.40
-Square ix is
6 ,at 15.00 eaeh
90.00
nii� s "
-at 10.00 each
20.00
Manhole reset °
1 at 10.00
10.00
..Lowering water mains and service&
Engineering and c ont ingenc ies 10%
1,209.55
82A. 45
9*030.00
4
TAYLOR STREET AND PRAIRIE AVENUE.
Excavat ion a
Curb .and gutter ,
Cement walk
Pavement
Square inlets
Inlets
8 _ inch pipe sewer .
vanheles reset
Inlets - reset
Lowering water mains and services
Engineering and cent ingenc ies 10%
SOUTH°STREET AND TAYLOR STREET.
-,Excavation
Curb and gutter °
Cement walk
Pavement
Square inlets
8 inch pipe sewer
Engineering and cent ingenc ies 10%
SOUTH'STREET AND TAYLOR STREET EAST.
P�xeavet ion
Cement walk
Curb and gutter
Pavement
Square inlets °
8 inch pipe sewer
Loweringwater mains and services
Engineering: and a ent ingenc ies le%
5580
cu.
yda.
at .75
per cu.
yd.
$ 40185.00
1108
lin.
ft.
at .60
per lin
ft.
664.80
9462.
sq.
ft.
at .15
pr sq. ft.
1,419.30
2100
sq.
yds:
at 2.50 per sq.
yd.
5,250.00
5
at.
15.00
each.
75.00
• 3
at 10.00
each
30.00
180
lin
ft.
at .80
per lin.
ft.
144.00
4
at
10.00
each
40.00
2
at 2.00 each
4.0p
,1._
12. 37#45�
° 1 282 ,55
149120.00.
120 eu.. yda. at .75 per cu. yd. $ 90.00
150
lin.
ft.
at .60 per lin ft.
90.00
375
sq.
ft.
at .15 per sq. ft.
56 .25
100
sq.
yda._at.2.50
paver sq. yd.
250.00
2
s4t
MOS
bae- ,t
30.00
20
lin.
ft.
at .80 per lin ft.
_-16, oo
532.25
5
590.00 -
220* cu* yds. at .75 per cu. yd. $ '165.00
600 sq. ft. at .15 per sq. ft. 90.00
100 lin. ft. at .60 per tin ft. 60.00
260. Sq. yds. at 2.50 per sq. yd.' 650.00
2 at 15.00 each 30.QO
30. at .60 per lin ft. 24.00
4 1, 366. OD
334. oe
$ 1,500.00
Thar-eiaa N-eyembAM-155-thi • 1917. Cs_nt inued
CHAPIN STREET
Exeavat ien ° :
7700. ' eu. yds. at .75 . per cu. yd. ,
S 5.775. 00
Pavement
3079 sq. yds. at 2.50 per sq. yd.
7..698.00
Curband gutter °
•1562 •lin.° ft. at .60 per Zia ft.
937.20
Cement walk- ° :10930 ,.. seq. ft. at .15 per sq. ft.
19639.50
Square inlets
11 at 1500 eahh
165.00
8 inch pipe sewer
260 lin. feet at .80 , per lin ft.
208.00
Uanholes,'reset -
2 at 10.00 each
20.00
Lowering tad water mains and services
1.550.00
$17 992.70
Biig ineer ing and cont ingeenies 10%
1,807.30
19.900.00
SCOTT STREET. °
Bement walk
8554. sq. ft. at .15 per sq. ft.
1,281.60
Excavationf
1860. cu. yds.. at .75 ,per cu. yd.
19'395.00
Curb and gutter,
1092 lin. ft. at .80 per lin ft.
655.20
Pavement
1857 sq. yds. at 2.50 per 4sq. ,yt.`
4*642.50
Square inlets
7 at 15.00 each
105.eo
Manholes reset
2 at 10.00-eaeh
20.00
8 inch pipe sewer
165 lit ft at -ft *er lin ft.
132,00
Inlets reset
2.00
Lowering water, staina and services °
,46,4.00
e9697.30
Eng in,e er ing and c ont ingenc ies 10%
�._..
°
.
9,570.00
SOUTH STREET, SCOTT STREETEAST.
°
Excavation
80 cu. yds. at .75 per cu. yd.
60.00
Cement walk
° 370 sq. ft.-at .15 per sq. ft.
55.50
Curb and getter
120 tin t. at .60 per lin ft.
72.00
Pavement" °
80 sq. yds. at.2.50 per sq. yd.
200.00
Square inlets
2 at 15.00 each
30.00
8 inch. pipe sewer
20 lin. ft.. at .80 per lin ft.
16.Oo
Lowering water mains and services
172.00
605.50
Eng sneer in° and c ont ingenc ies 10%
'6 •50
e 670. tea
DUNN STREET CHAPIN STREET EAST. ,
Excavation°
400 cu. yds. at .75 per cu. yd.
300.00
Curb and gutter
440 lin ft. at .80 per tin ft.
264.o0
Cement walk
1030 sq. ft. at .15 per sq. ft.
154.50
Lowering water mains and services.
32150
°
$19-040.00
Eng ine e r fng ° and c ont ingenc ies 10%
110.00
l,150.00
ALLEY NORTH°OF FORD STREET CHAPIN
STREET EAST.
Excavation
100 cu, yds. at .75 per cu. yd.
75.00
.Engineering and- cont ingenc ies 10%
15. 00
°
90.00
ALLEY NORTH OF DUNN STREET.
'
Excavation.
15 cu. yds. at .80 per cu. yd.
12.00
Engineering snd contingencies-10%
00'
•15.
EAR'
ARNOLD STREET.
Embankment
3543 cu. yds, at 1.00 per sq. yd.
3�0545.0
Brick pavemeat.relaid'
1344. sq'. yde. at 1.50 per sq. yd.-,
2 016.00
Curb
1173 tin. ft. at .30 per tin ft.
351.90
Cement walk
5600 sq. ft. at .15 per sq. ft.
840.00
Walls
5220 cu. ft. at .40 per cu. ft.
20088.00
Plankleg
10800. B�F. at 40.00
432.00
Inlets "sett°
Tat 2.00 each
14.00
2 Manholes raised
8 lin. ft. at 5.00 per lin ft.
40.00
Railing
475 lin. ft. at 1.50 per lin ft.
�- 7122, 50..__..
°
109037.40
Eng in eer iug and cont ingenc ies 10
1 002. 60'
11:040600
40
HURON STREET.
Embankment
178
cu. yds.
at 1.00 per cu. yd.
$ 178.00
Curb
Cement walk
160
400
tin. ft-
sq.�ft.
at .30 per tin ft.
at
48.00
yall:s
364
cu., ft.
.15 per sq. ft.
at .40 per cu. ft.
6o.o0
145.6o
Railing
65
1 iA. ft.
at 1.50 per tin ft.
97.50
Eng ineer ing and
c vnt ingeen ies 10
_
529.10
- . nA
.
$
580.00
HANGOCK STREET.
Embankment
270
cu. yds.
at 1,00 per cu. yd.
$
270.00
Cement curb
260
lin ft.
at .30 per l in ft..
78.00
Cement walk
MaYlp
• 1170.sq.
ft.
at .15 per sq. ft.
175.50
fail ing
2206
110
cu, ft. at .40 per cu. ft.
linear feet at 1.50 per tin
ft.
880.00
.165.'00
.Engineering and
a ont fngenc ies 1�0%
$'1,568
50
161.50
$ 1,730:00
DIVISION STREET. °
Esnbs nkment
1774
cu,
yds.
at 1.00 p r cu. yd.
Brick pavement relaid
1574
sq.
yds.
at 1.50 per sq. yd.
Cemment _ curb
744
1 in.
ft.
at .30 pr lin ft.
Bement walk
3279
sq.
ft.
at .15 p-r wq. ft.
Walla
Planking
2621
21000
cu.
B.F.
ft.
at
at AD per nuu uft.
40.00 •
8 inch pipe sewer
• 5{ .
lln
ft.
at .80 per lin ft.
Inlets reset
4
at 2.00
each
1 manhole reset
2
1in.
ft.
at 5.00 per lin ft.
Inlets
1
at 10.00
Railing
.
375
tin.
e
ft.
at 1.50 per lin ft.
Eng ineer ing and c ont ingenc ies
10%
WALNUT STREET DIVISION STREET NORTH.
Embankment
Brick pavement relaid
Cement curb °
Cement walk
Walls
1 manhole reset
Railing
. Engineering and Conti ingenc ies lO%
CHERRY STREET.
.Embankment
'Cement walk
Planking
Cement curb
174 cud. yds. at 1.00° per sq. yd.
254 sq. yds. at 1.50 per sq. yd.
`190 lin. ft. at .30 per lin ft.
950 sq. ft. at .15 per sq. ft.
894 cu. ft. at .40 per cu. ft.
2 lin. ft. at 5.00 per lin ft.
120 lin. ft at 1.50 per lin ft.
61 cu. yds.-at A.00 per cu. yd.
420 sq. ft. at .15 per sq. ft.
5600 B.F. at 40.00
100 lin. ft. at .30 per lin. ft.
Eng ineer ing and c ont ingenc iesg 10%
ALLEY SOUTH OF S012 STREET kICHIGAN STREET EAST
Excavation 58 cu: yds. at .75 per cu. yd.
Engineering and c ont ingenc iess 10%
ALL SY SOUTH OF SOUTH STREET UICH
Eccava,t ion
Eng ineer ing and contingencies 16%
ALLEY EAST OF UICHIGAN STREET' BRO
Bxe &vat ion
Engineering and c ont ingenc ies 10%
IGAN STREET WEST.
47 eu, yfs. at .75 per cu. yd.
NSON STREET NORTH.
117 cp, yds. at .75 per cu. yd.
$ 1,774.0o
2, 361.00
223.20
491.85
1048.40
840.0o
40.00
8.00
10.00
10.00
7068.95
---- MI. 15
89100.10
174.00
381.00
57.00
142.5.0
273. 00
10.00
180.00
flv217-50
122.50
41,340.00
61.00
0.00
224.00
-_ 30.00
9 378.00
-- . 42.00
420.00
43.50
6.5
0 50.00
35.25
$ 40.00
87.75
12.25
1 100.00
41
ESTIMATE OF COST OF CHANGES IN,STREET AND ALLEY GRADES ACROSS
GRAIM `TRUNK VESTERN
RAILWAY FOR YORK CENTRAL RAILROAD
COMPANY
GRADE 'SRPARAT10i- ° o .. ,
D TV IS ION STREET.
Railing .
52'0 1In `ft.' at '1.'50 per ^ti1.n eft.
780.00
Embankment,
955 ocu. iiv. at i.00 per cu. yd.
985.00
Brick pavement relaid . , , .
,1e24.. sq. yda. at 1.50 per sq. yd.
2,7%.00
Planking. •... ,,...,
10500�B.F. at-40.00
420.00
Cement curb
917 lin. ft . t .50 per tin ft.
275.10
Cement b�N s,
4470 sq. ft. at .15 per sq. ft.
670.50
Malls
2405.cu. ft. at .40 per cu. ft.
962.00
Inlets reset
9 at 2.00 each
18.00
New Inlets-
2 at 10.•00 'each,
20.00
2 Manholes °reset'
• °4 °tin.° ft. �at 5.�00 per 'lin �ft.
20,00
` 8 inch pipe sewer „
" 140,11n ft. at .80 per lin 'ft.
32.00
6s,918.60
Engineering and c ont ingenc ies
10%
el s 4o
10.00
LAUREL STREET DVISION STREET
NORTH AND SOUTH.
Embankment
215 cu. °yds. at 1.00 per cu., yet.
21.5.04.
Brick pavement relaid
158. sq. do at 1.50 per sq. yd.
237.00
Cement curb
320 lino ft. at .30 per lin ft.
96.00
Cement walk
1600. sq.-ft. at .15 pe sq. ft.
240.00:
Walls
1100 cu. ft. at .40 per cu. ft.
440.00
Inlets reset
4 aaxxft. at 2.00 each.
8.00
New Inlets
4 at 10.00 each °'
40.00
8 inch pipe sewer.
40 lin. ft. at .80 per lin ft.
32.00
Railing _
200 lin. ft. at .1.50 per lin ft.
�00.00._.._�
0 19608.00
Engineering and c ont ingenc ies
1019
162.00
1.770.00
WALNUT .STREET. _
Etimabnkment •
184 cu, yds. at 1.00 per cu. yd*
$ 184.00
Planking
14000. B.I. at 40.00
560.00
Cement curb
92. lin. ft. at .30 per lin ft.
2 7.66
Cement walk
525 sq. ft. at .15 per sq. ft.
76...25
'
0 850. 35
Eng in eer ing snd c ont ingenc ies
10
940.00
GRIDDE SEPARATION N. Y. C. R. R.
HighStreet............................................................ 680.00
Marietta Street........................................................3,710.80
Alley south of N.Y. C . R.R. Marietta Street West ......
..............._ 140.00
Alley south of N.Y. C.R.R. Marietta Street east ........................
220.00
Ohio Street ................... .........................................3,70Q.00
Rush Street ................... .........................................4,430-.00_
Alley south of Sample Street .........................................
350.00
Alley east of Rush Street ...............................................
230.00
Sample Street......................................................•...6,740.00
Umpts Fellows Street..................................................6,620:00
Putt Street..................................... ........................1,380:00
Angle Street...........................................................1:420.00
Michigan Street........................................................3f,78C.00
Bronson Street.........................................................14.500.00
Mein Street............................................................
99840.00
Lafayette Street .......................................................
% 030.00
Taylor & Prairie Avenue................................................14.120.00
SouthStreet -- Taylor Street east ......................................
1.500.00
South Street-- Taylor Street West............. .........................
590.00
Chapin Street..........................................................19.800.00
Scott Street............................................................9,570.00
South Street -- Scott Street east.. .....................................
670.0.0
Dunn •.•..•••
00•66••0•10150.00
.Alley north of Forst Street.... ...
90.00
0 over )
4
Alley north of Dunn Street ................» ...,..:,............... 15.00
Arnold Street.....»...., .:...,....» ............................ 11,040.00
Huron Street .......................,......:..........:. 580,00
Hancock Street ..:....................... ...........,............... 10730*00
Division Street ..................................................... 82,100.00
Walnut Street and. Division Street..uarth............................. 19340.00
Cherry Street.......... ............:.. ..:....•.....:...........:..... 420.00
Alleysouth of South Street Michigan Street east ..................... 50,00'
Alley south of South Street Michigan Street west....» :...........:... 40.00
Alley east Of Michigan Street Bronson St. actftth..'............... 100.00
170. 75.00
GRADE SEPARATION GRAND .TRUNK WESTERN R. R.
Division Street ..................................................... 7,61o.00
Laurel.Street ............................ 1*770.00
Walzznt Street ........................... ....'......................... 0.00
100320.00 _........
This estimate is for the work upon the streets affected by the grade
separationT and includes the quantities between the property lines of the Streets
and across the right of way of the railroads. The quantities for Arnold Street and
Walnut Street at the Grand Trunk Western R.R. have not been separated for the
several railroads affected.
Tot-1 estimated cost of the work to be done at Arnold Street by the
C it.v of South Bend, to ,b a divided between the New York Central Railroad Co.,, Trunk
Grand Trunk Western Railway Co., Indiana Northern Railway Co. OliveR Chiiled Blow
Co ,, 'as may be decided upon. '
$11,040.00
Total estimated eost'of the work to be done by the City of South
Bend', at the street intersections with the New York Central Railroad Co.
Chargeable to the New York Central Railroad Co. 75% 119.726.25
Chargeable to the City of South Bend, Indiana 25% 39,208.75
159. 35.00
Tote,l estimated cost of thw work to be done by the City of South Bend, Indiana
at the street intersections with the Grand 'Trunk Western Railway Co.,
Char''geable to the -Grand -Trunk Western Railway Co. 75y6 79740.00
Chargeable to the City of South Bend, Indiana. 25% 26580000
$10,320.00
Pres i�l'•
I
Y