HomeMy WebLinkAboutOpening of Quotes - Century Center Storage Mezzanine Project No 118-036E - Majority Builders IncPROJECT NAME: Centu Center Stora a Mezzanine
PROJECT NO. 118-036E
�... ........... ___ ------- _.......... _ ......_
QUOTES DUE January 22, 2019 by 9:30 am
(Must be completed for all quotes. Please type or print)
Date: January 22, 2019 Firm: Maajority Builders, Inc
Address: 62900 US 31 South
City/State/Zip: South Blind IN Telephone Number: 291-2091
Agent of Bidder (if Applicable):
4 614
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
City of South Bend.Centruy Center Storage Mezzanine Projedt # 118-036E
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
The City of South Bend Department of Public Works
and dated 1 15,E 2rQ 19 ] for the sum of (enter the Total Quote as shown on the Proposal)
v
(. l �-9
Enter Sum of Total Quote shown on Proposal) (Numerical)
If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the
itemization of the units shall be shown on a separate attachment.
By
nature
Ri k 1 P r-
(rinte Name of Person Signing)
ACCEPTANCE
The above quote is accepted this day of
Subject to the following conditions. -
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Laura O'Sullivan, Member
Version 10/31/2017
20
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member____._
Attest: Linda M. Martin, Clerk
Page - 6 Public Works Quote
QUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME Century Center Storage Mezzanine
PROJECT NO. 118-036E
QUOTES DUE January 22, 2019 by 9:30 am
Item
No. Description QuantitV Unit Total Amount
1 Supply and install storage mezzanine as 1 LS $
shown in specifications and drawings
$ 13 9, ( 00 ��-
Firm: Majority Builders Inc.
Address: 62900 US 31 South
City/State/Zip: South Bend, IN Telephone Number: _ 574) 291-2091
46614
Fax Number: 574 291-7472
By (Z4z�
(Signature)
ic'k Sl,a le President
(Printed Name of Person Signing)
Version 10/31/2017 Page - 10 Public Works Quote
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT,
CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY
VERIFICATION, NON-DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE
OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF Indiana )
)SS.
St. Jose h COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that:
1. Contractor has not, nor has any other member, representative, or agent of the firm,
company, corporation or partnership represented by him, entered into any combination, collusion
or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent
any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made
without reference to any other bid and without any agreement, understanding or combination with
any other person in reference to such bidding. Contractor further says that no person or persons,
firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift,
commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment
activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency or
instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from
time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is
engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty million
dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty
million dollars ($20,000,000) or more in credit to another person for forty-five (45)
days or more, if that person will (i) use the credit to provides goods and services in
the energy sector in Iran; and (ii) at the time the financial institution extends credit, is
a person identified on list published by the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the Contractor subsequently learns is an unauthorized
alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of
Version 10/31/2017 Page - 7 Public Works Quote
Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3.
Contractor's documentation of enrollment and participation in the E-Verify Program is included
and attached as part of this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public
contract to certify that the subcontractors do not knowingly employ or contract with an
unauthorized alien, nor retain any employee or contract with a person that the subcontractor
subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is
participating in the E-Verify Program. The Contractor agrees to maintain this certification
throughout the term of the contract with the City of South Bend, and understands that the City
may terminate the contract for default if the Contractor fails to cure a breach of this provision no
later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by
the City of South Bend through its agencies, boards, or commissions shall not discriminate against
any employee or applicant for employment in the performance of a City contract with respect to
hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly
related to employment because of race, sex, religion, color, national origin, ancestry, age, gender
expression, gender identity, sexual orientation or disability that does not affect that person's ability
to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or
any combination of the foregoing including, but not limited to, public works contracts awarded
under public bidding laws or other contracts in which public bids are not required by law, the City,
its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain
participation by those Contractors certified by the State of Indiana as a Minority Business
("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest,
responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a
subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said
WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board
shall prohibit that person or entity from being awarded a City contract for a period of one (1) year
from the date of such determination, and such determination may also be grounds for terminating
the contact for which the discriminatory practice or noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall
be made a part of any contract which it may henceforth enter into with the City of South Bend,
Indiana or any of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for
employment in the performance of this contract with privileges of employment, or any matter
directly or indirectly related to employment, because of race, religion, color, sex, gender
expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of
this provision may be regarded as material breach of contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-
8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel
products or foundry products made in the United States on this project if awarded. I understand I
Version 10/31/2017 Page - 8 Public Works Quote
have an affirmative duty to notify the City in my bid that my proposal does not include the use of
steel products or foundry products made in the United States. I understand it is my sole obligation
and responsibility to provide a justification to the City, subject to review and approval, why the
cost of United States made steel or foundry products is unreasonable. Prior to award and upon
submission of bid which does not use steel products or foundry products made in the United States,
the City, through its director of public works, shall make a determination if the price of United
States made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public
works are true and correct.
Dated this 22nd day olartQ�ary, 20 19
Majority Builders, Inc.
Contractor/Bidder (Firm)
a— re,,Z'
Signature of Co-ttr ct r-Odder or Its Agent
Rick Slagle / President
Printed Name and Title
Subscribed and swornto before me this 22nd day of January 20 19
My Commission Expires 11 /8/24
Notary Public Shane Blotkamp
County of Residence Elkhart Count
Version 10/31/2017 Page - 9 Public Works Quote
Section I Experience Questionnaire
Response -to Question I.
Project Name/Owner Amount Date
St. Pius X Renovations
52553 Fir Road
Granger, IN 46530
Bill Schlatterback
Clubhouse of St. Joe Cnty
1153 Northside Boulevard
South Bend, IN 46615
Nelson Vogel
Argos Spec Building
Marshall County EDC
2864 Miller Drive
Plymouth, IN 46563
Jerry Chavez
Boys & Girls Club of Marshall County
PO Box 232
Plymouth, IN 46563
ArtJacobs
CTDI Building
Great Lakes Portage Prairie II, LLC
122 South Michigan Street
South Bend, IN 46601
Jeff Smoke
Courtyard by Marriott
Southhold, LLC
247 North Dixieway
South Bend, IN 46637
A.J. Patel
12,412,544.00
710,000.00
1,871,517.00
2,120,602.00
16,579,445.00
9,560,541.00
2017
2017
2018
2018
2018
2018
RM Distributors Addition 1,527,844.00 2018
4004 Technology Drive
South Bend, IN 46628
Scott Carrico
Section 1 E Lei ience Questionnaire
Response to Question d.
Pro"ect Name/Owner Amount Date
Walnut Hill Center
1201 South I Ith Street
Goshen Day Care, Inc.
Goshen, IN 46526
Bill Coughlin
LionsHead Warehouse
827 East Lincoln Avenue
Goshen, IN 46526
Gary Graham
LionsHead New Corporate Offices
305 Steury Street
Goshen, IN 46526
Gary Graham
760,351.00
1,486,00.00
4,144,080.00
2018
2018
2018
Lippert Corp Office 2,145,808.00 2018
4100 Edison Lakes Parkway
Mishawaka, IN 46545
Jami Schnur
Section I Experience Questionnaire
Response to Question #2
Public Works Projects under Construction
None at this time
Non -Applicable
Ancilla Domini Sisters, Inc.
9601 Union Road
Donaldson, IN 46513
Susan Black
Elkhart General Hospital
600 East Boulevard
Elkhart, IN 46514
Tom Johnson
Cross Aluminum
Mayflower Road
Niles, Michigan 49120
Jackie Leets
South Bend, Indiana 46614
Section I Experience Questionnaire
Response to Question #3
Section I Experience Questionnaire
Response to Question #4
Private References
Ryan Rans
Great Lakes Capital, LLC
112 West Jefferson Blvd.
South Bend, IN 46601
Steve Garatoni
SGD, LLC
2043 South Bend Avenue
South Bend, IN
Stanley Clark School
3123 Miami Street
South Bend, Indiana 46614
Section II Plan and Equipment Questionnaire
Question #1 Response
Majority Builders, Inc. intends to start work upon receipt of "Notice to Proceed". A Gantt
project schedule will be generated highlighting the sequencing of work, the trades involved,
and benchmark dates. Subcontractors, suppliers as well as Majority Builders' employees will
coordinate under the direction of a fulltime jobsite superintendent and office project manager
to complete construction of the project on time.
Section II Plan and Equipment Questionnaire
Question #2 Response
Name
BC Mechanical, Inc.
882 Anderson Road
Niles, MI 49120
North Central Mechanical, Inc.
1721 North Cedar Street
Mishawaka, IN 46545
Ross Masonry, Inc.
2414 Autumn Trails Drive
Mishawaka, IN 46544
Shambaugh & Son, LP
56575 Twin Branch Drive
Mishawaka, IN
Pritchard Mechanical, Inc.
23598 State Road 2
South Bend, IN 46619
Brief Description
Mechanical Contractor
Mechanical Contractor
Masonry Contractor
Fire Protection Contractor
Mechanical Contractor
Section II Plan and Equipment Questionnaire
Question #3 Response
List of project subcontractors will be provided upon request within 48 hours.
Section II Plan and Equipment Questionnaire
Question #4 Response
450 Dozer
9030 Excavator
650 Dozer
821 Loader
850 Dozer
644 J.D. Front End Loader
(2) 1845-c Skid Loader
Moxy Haul Truck
Volvo Artic Dump Truck
(2) Komatsu Artic Truck
(2) 580E Extended Case Backhoe
9050B Excavator
Int. Dump Trucks
Mac Flatbed Truck
(2) Erection Cranes
Forklifts
Compactors
792 Excavator
Grader
Landscape Grader
Semi Storage Trailers
Concrete Wall Forms
Concrete Equipment
(6) Hand Held Compactors
Concrete Breakers for Equipment
Drilling Rig
Semi with Drop Neck Trailers
(4) Tag Trailers
Air Compressors
Air Gun tools for framing Scaffolding and
Scaffolding Wagons
Many types of drills & hand tools
Concrete Saws
Over 15 Company trucks
Misc. Steel Concrete Forms
Trenchers
Transits with digital read outs
Lasers for grading and Acoustical
Wood shapers, table saws, radial
ceilings
saws for woodworking
Landscape Tractor
NOTE: This is by no means a complete list of our Company resources, but it does indicate our
capabilities.
Section II Plan and Equipment Questionnaire
Question #5 Response
We have received material pricing.
Init.
Bid Bond
CONTRACTOR:
(Name, legal status and address)
Majority Builders, Inc.
62900 U.S. 31 South
South Bend, IN 46614
OWNER:
(Name, legal status and address)
City of South Bend Board of Public Works
SURETY:
(Name, legal status and principal place
of business)
Hartford Accident and Indemnity Company
Hartford, CT
County -City Building Room 1316, 227 West Jefferson Blvd
South Bend, IN 46601
BOND AMOUNT:
Five Percent of the Total Bid ( 5% of Total Bid
PROJECT:
(Name, location or address, and Project number, if any)
Century Center Storage Mezzanine
This document has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so
furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this 16th y of January 2019
.. ,. (W��tttnss,
__ - _ ... _at�pt�
:rs. Inc.
(Printp...
(Seal) l)�_..
nes%) .� ....
.
(Title) Rick
g"
Hartford Accident ad Indemnity Company
—__.............. (Surety) 1 (Seal)69
lmiferL. mia, Atrtey .._
in Fact
t�AIJ"I"'Ittftl'II A You �mlltm��ulki slguriu art oidgliiurmall AIA Ca�intracill1 Docw. imermt, cup ywrhIch this text aip�peaurs in IIIRII' D. Ail ��uritpllolailll lissuuires that:
:
clltiaa[in rr,a w'I'IIII not beobsr°.uulursrt,
.................
AtA Documsnt A3107m — 2010 Copyright 010631970 and 2010 by, The Americaan Insillule of
Architects. All rights preserved. b>IkfAftl'ICNtG; 1"ipza AtA
i'tocunvent is protected by U.S. Capydglht Law and Ilntemnadonall Treadles, Unau.uthoidzed nalpiroductton cr Osirlhiuutpoo of this AtAr Docuarrnetml, or
any poirlion of lit, may result in severe cpsil and crilunlnal poinalt:lles, a nd wpli be pirosecuait:ed to the nnaxhnunrn exteint: possllllale underthe 'law.
Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail
The American Institute of Architects' legal counsel, copyrlght@ala.org. 061110
Direct Inquiries/Claims to:
THE HARTFORD
BOND, T-12
One PE R u" F �.T'TU` RNE� Hartfo d Connecticut Hartford aZa W 06155
5 nd,C m ha or , pg
nx
call: 888-2663488 or fax: 860-757-5835
KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: GIBSON INSURANCE AGENCY, INC
A enc Code: 36-212563
Hartford Fire insurance Company, a corporation duly organized under the laws of the State of Connecticut
0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana
Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut
Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut
Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana
Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois
Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana
Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida
having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint,
up to the amount of Unlimited :
Nicole L. Bicknell, Cheryl E. Alkire, Theresa M. Burns, William J. Cerney III,
Sandra Junk, Jennifer Kasznia, Wesley Mantooth, Barbara E. Pearson, Megan E.
Riesenberg, Jordan Scheiber, Mark E. Wobbe of SOUTH BEND, Indiana
their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as
delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the
nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and
executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have
caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant
Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are
and will be bound by any mechanically applied signatures applied to this Power of Attorney.
.a«.rn.rra Tm a 4Lp M t► h r aw,V"
���,Cmrpyrmtl«l rMr1r► tp 1w 079
w
''� w�,_�¢c'f�1• y "�1r�,�^ad*',�;j�b � �"^.�"+ka+4maWW«. •dhu�.wNm"` �"• a
Ik e
John Gray, Assistant Secretary
STATE OF CONNECTICUT
ss. Hartford
COUNTY OF HARTFORD
4P
M. Ross Fisher, Senior Vice President
On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and
say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations
described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said
instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his
name thereto by like authority..
0 Kathleen T. Maynard
Notary Public
CERTIFICATE My Commission Expires July 31, 2021
I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the alcove and foregoing is a true and correct
copy of the Power of Attorney executed by said Companies, which is still in full force effective as of r
Signed and sealed at the City of Hartford.
s�rr rr ,, 94 "*%
OVA*D-�
� �a"�ta74 �D7sZ
w.
Kevin Heckman, Assistant Vice President
POA 2018
1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
Date: January 17, 2019
To: All Planholders
From Rebecca Plantz, Project Manager
Subject Addendum Number: 1
Project Name: CentuKy Center Storage Mezzanine
Project No.: 118-036E
ACKNOWLEDGE ENT OF RECEIPT OF ADDENDUM
Date Received: d 17 12D
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
N
Company:
Authorized Si
Date: l