HomeMy WebLinkAboutOpening of Proposals - INDOT School Zone Flashing Beacon Assemblies Project No 117-075R - VS EngineeringSchool Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) January 22, 2019 Board of Public Works 227 W. Jefferson Blvd., Ste 1316 South Bend, IN 46601 Re.: City of South Bend School Zone Flashing Beacons at 39 Schools Safety Improvements Dear Members of the Board of Public Works: The VS Engineering Team understands that this school zone flashing beacons installation project brings much needed safety measures for school children across South Bend. The school zone flashers are a necessary means to help protect children, teachers and other individuals from high -volume vehicular traffic and is a continuation of a multi -phased effort to provide school -related pedestrian safety. Our Project Manager, Mark Herald, PE, is already familiar with some of the City's pedestrian safety measures as he was the project manager on both the Lincoln Primary and Perley Fine Arts Academy Safe Routes to School (SRTS) design projects. Both projects improved sidewalks and curb ramps for neighborhood areas surrounding the schools. VS Engineering 10305-A Dawson's Creek Blvd. Fort Wayne, IN 46825 260.489.6635 Mark Herald, PE mherald@vsengineering.com 260.489.6635, ext. 401 Through our extensive design and construction inspection experience on similar school zone flashing beacon projects, VS is poised to provide the City of South Bend with the knowledge and superior skills necessary for your pedestrian safety project. ° RIN 'lf,"' i -I m. 'IA, E' Our Team has specific school zone flasher experience on over 500 installations including: ►► 4" & Rogers Street/Allen & Walnut Street Intersection/ Pedestrian Improvement Design & Inspection (City of Bloomington) ►► Meadow Elementary School Zone Flasher Installations (City of Indianapolis) ►► School Zone Flashers Phases I, II and III: 518 total 25mph flasher installations construction inspection (City of Indianapolis) ►► High -intensity activated crosswalk beacon (HAWK) Pedestrian Signal Design (City of Peru) At VS, we know that our work reflects on you and understand your need for a superior and worry -free project delivered on time, within budget, with as short of a disruption time to commuters and school schedules as possible. Our team, led by Mark Herald, PE, will communicate with you at every step of the way and work together to make sure that it happens. As with any project, engineering or otherwise, a good relationship amongst the team proves to be valuable at every step of the way. We have successful and relevant design experience and are excited for the opportunity to work with you and your team. We pledge our enthusiasm, complete customer satisfaction, and, most importantly, VS Commitment on this submission. Respectfully Submitted, Sanjay Patel, PE sbpatel@vsengineering.com 317.293.3542, ext.117 PROJECT' TEAM VS Engineering DBE 1 97% Work Types: 5.2, 6.1, 8.1, 11.1, 13.1 DB Engineering, Inc. DBE 1 3% Work Type: 8.1 Sanjay Patel, PE, President/CEO CLIENT FOCUSED. o TRUST. • WORK HARD. TOGETHER. o KNOWLEDGE. OTY OF SOUTH BEND -V School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) �Fw ,.. The VS Team is led by professionals who understand the purpose of this project is to improve pedestrian safety near schools across the City. When school is in session, accurate and clear school zone communication is critical in keeping pedestrians, bicyclists, and drivers safe. With new technologies, school zone flasher systems have become much more convenient to install, maintain and manage. Advancement in recent years have included: ►► LED Beacons - increase visibility, provide longer lasting "bulbs" and reduce power demand ►► Internal Cell Modems - maintain constant communication with a central system and local school ►► Battery and Solar Monitoring - provides status and health of batteries and solar panels to allow for proactive repair and replacement ►► Email and TextAlerts - provides the end user with real- time information on power, beacon or battery failure ►► Remote Updates - cloud based systems allow for remote updates with new features and functionality ►► Radar Speed Data - optional, providing reports from radar devices mounted to school speed zone sign Technology is constantly changing which will only enhance the reliability and end user interface of school zone flashers. The effectiveness of these devices is proven through multiple studies conducted by government organizations that have been found to reduce drivers' speed more than 5 to 7 mph on roads with speed limits of 30 to 40 mph when flashers were present versus school zone signs alone. City of South Bend Project Manager(s) conducted a thorough needs assessment in determining the 39 highest priority school locations of the 109 schools city-wide. The needs assessment identified road functional classification, posted speed limit and installation of existing school zone flashing beacons for all bordering streets of the school. This analysis provided an objective decision making matrix to maximize the available $750,000 construction funding. The project will result in installation of 150 solar powered school zone speed flashers at specified locations, increasing the safety of students, staff, other pedestrians, as well as motorists on the nearby streets. In the rare event where a solar powered flasher is not feasible, Project Manager Mark Herald, PE and his staff will coordinate with City and NIPSCO officials in determine the best access to electric power. Mark and his team are well versed in design and inspection of these types of pedestrian safety improvement projects as he has completed similar projects for the City of Fort Wayne, City of Indianapolis, City of Bloomington and other communities across Indiana. PROJECT UNDERSTANDING & APPROACH • 2 CITY OF SOUTH BEND V School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) F , !!i Mark's experience on pedestrian safety projects allows him to be proactive in addressing key design features and coordination requirements to avoid conflicts in the field during construction. This was evident on the two Safe Routes to Schools projects he completed for the City of South Bend (Perley Fine Arts Academy and Lincoln Elementary School). In addition to following the INDOT project development process, key areas of consideration for school zone speed limit flashers is design and specification of critical system components, coordination with school officials to determine the placement of the signs as well as programming of the flasher schedule. The lights are generally activated for two hours around the opening and closing of school, which will allow motorist to drive through school zones at normal speeds for most of the day. They will be tailored to individual schools to account for different starting and ending times. They will also be programmed for holidays, spring and fall breaks and summer vacation. Education and training of personnel in each school for remote programming of the modems will be required during the construction phase to minimize calls to the City for errant flasher schedules. The flashers may be established on the roadway that intersects with the school's main entrances/exits, or on intersecting roadways in the immediate vicinity of the school, if it is determined that a "special warning to motorists" is necessary because of the presence of children traveling to or from school on that intersecting road. Per The Manual on Uniform Traffic Control Devices (MUTCD), placement of school zone flasher assemblies must be at least 200 feet in advance of the school grounds, a school crossing, or other school - related activities. In addition, the location of the beginning and end of a school speed limit should be based on engineering judgement rather than the exact location of the school property line. Our extensive experience with school zone flashers will guarantee that placement of the flashers will take into consideration individual property characteristics, sight lines and visibility and solar panel effectiveness to maximize the benefit of each installation. Locations of the school zone flasher assemblies may be adjusted from these guidelines where necessary for line of sight issues and to ensure minimal impact to adjacent property owners (placement of flashers near property lines versus directly in front of residences or immediately adjacent to driveways). As such, we are already well aware of some of the challenges faced during flasher installations and will "hit the ground running" immediately upon NTP. Our knowledge of these items will ensure that this project is completed as efficiently and cost-effectively as possible. PROJECT UNDERSTANDING & APPROACH • 3 CITY OF SOUTH BEND School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) aik ww u� w Jl The manner and style in which a project is managed, both internally and externally, is the cornerstone of a successful project. A strong project manager must have the technical expertise to deliver the project, but must also understand the community for which the project is being delivered, and; have strong relationships with resource agencies, MPO and INDOT that have input in a federally -funded project. Mark Herald, PE meets all the above criteria. He has a proven track -record of successfully delivering projects on time and within budget. He has extensive experience in working with INDOT and other regulatory agencies on local projects. (III"S S ll" A N "'I""j C t I IIIIIII: II°^„i llli COIIPA 1" i iU II^ i C A IIL II0YN &. II5 S I�YIIIIIII'� GI''tS;S III°�'O II'��IIIS IIII This will enable Mark to respond with the appropriate team members, to any issue "On a Moment's Notice." Mark will provide electronic progress reports on a monthly or bi- weekly basis as directed by City officials. These will apprise City officials of past, current and future design activities as well as upcoming issues to be resolved. This project will stay on -track. Guaranteed. PR I1 'A LJ 1`4 11i C Al'i 0 t,l IIalL.AJ,4 The counterpart to Client Communication is the Project Communication Plan. On a project of this type, in a built-up environment, a well -thought-out project communication plan is a necessity. This plan will ensure that the City receives information to be disseminated to stakeholders, schools, property owners and the community at large in a timely manner. Mark will work with City officials to ensure that project information is delivered in the format and frequency as needed to all stakeholders. p°e�I��a,illlwPIIIi!II1ltII4t;41,.,�II Powfi1U�IL1'.��"II4f��Ilroul&VI:li0L1L.AR R AV IP�`l t;�°� Foremost among objectives will be to ensure safe and effective maintenance of pedestrian and vehicular traffic throughout construction. This project will take place in the vicinity of schools, parks and other public facilities; therefore VS will ensure that proper temporary lane closures are in place. This includes advance warning signs and requirements for flaggers during installations on 2-lane roadways and advance warning signs in combination with a flashing arrow board on any 4-lane streets. Additionally, VS will ensure, through special provisions, that the Contractor is aware of school start and dismissal times so that safety and site security checks can be completed prior to peak pedestrian and vehicular times. Although installation of school zone flashers is not a complex operation, safety of pedestrians and motorists in high volume traffic areas around the schools will not be taken for granted as all applicable maintenance of traffic standards will be designed. I':��nlll S1G1"14 °u Il Illµl°III Ui 1! Developing a well thought out design schedule, and maintaining that schedule is key to the successful delivery of any project. This is key for a federal -aid project where various components (other than design) drive the schedule of the project. In the case of the school zone flasher and RRFB installation projects, one must account for the environmental process, utility coordination process and, if required, land acquisition. We understand this project has FY 2020 which requires the latest bid letting to be in March 2020. Given our experience with school zone flasher design and in particular the environmental requirements, we will coordinate early and plan accordingly to meet all requisite funding milestones. We will facilitate discussions with MPO/INDOT and regulatory agencies to keep this project on track. We will surpass the schedule. wa`A CO3 II 14'C`T 1 1,„1 & SIIl,"CEY The VS Team has already reviewed the existing site. Mark has visited several of the school locations and has reviewed the location map provided by the City to become personally familiar with potential installation locations. Although a full topographic survey will not be required, VS survey and right-of-way staff will review property records to ensure that valid right of way is available. t.l a II1,II' 'Y 04, Il"I' IID1II1,1iA'"II IPO1'1111 The VS Team is highly experienced in INDOT's "new paradigm" for utility coordination, having served as utility coordinator for major INDOT and LPA projects including segments of the 1-69 Extension from Indianapolis to Evansville, $13.2M Dupont Road widening and reconstruction in Fort Wayne and many others across Indiana. VS understands that the intent is not to relocate utilities as part of the school zone flasher installation project. The VS Team includes certified INDOT utility coordinator, Ben Bruss. Ben's experience with 3D utility modeling and "in -contract" utility relocation procedures will make the utility coordination and relocation process as seamless as possible while protecting the City's interests and keeping the project on schedule. We will work with all utilities to ensure that avoidance is practiced as much as possible. Although typically a concrete foundation is used as a base for school zone flasher installations, we have utilized an auger type base to reduce the footprint to avoid utility conflicts. PROJECT UNDERSTANDING & APPROACH a 4 School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) at The VS Team understands that environmental analysis is on the "critical path" to moving this project through the design phase and into construction. Having completed the environmental work for previous infrastructure projects, our understanding of the environmental process and relationships with environmental review agencies is second -to -none. We will leverage these relationships early -on, to avoid costly environmental "discoveries" during design and construction. Based upon preliminary analysis completed by Alan Ball (VS Environmental Specialist), we expect that a Programmatic Categorical Exclusion will be required due to the minimal disturbance required for installation of the speed zone flashers. A project qualifies for a Programmatic CE when the following criteria are met: 1. There is no right-of-way acquisition, either temporary or permanent 2. The project falls within the guidelines of the MPPA 3. No wetland or waterways are impacted 4. No permits are required There are other stipulations too, but the above 4 are most often the ones that keep projects within the Programmatic CE category. One area of concern for the pedestrian safety installations within the City is that there are numerous historic resources identified on the Indiana State Historic Architectural and Archaeological Research Database. LegendSI National Register Sites,. Historic Districts �G N '9d J r" V� l b Some of these structures (about 50) and districts (10) are already included in the National Register of Historic Places (N RH P). A graphical representation is provided below. These locations may impact the school zone flasher installations near Good Shepard Montessori School (7), Jefferson Intermediate Center (12), Madison Primary Center (16), St. Anthony de Padua (28), St. Joseph Grade School (29), and Veritas Academy (38). In addition to the resources already on the NRHP, there are over 150 structures with an "Outstanding" rating scattered around South Bend. Outstanding resources are eligible for inclusion in the NRHP, but have not yet been nominated or accepted into the NRHP. There are another 200 or more "Notable" historic resources mapped within the project area. Notable resources may or may not be individually eligible for inclusion in the NRHP. Each Notable resource would need to be evaluated to determine its eligibility. Each school location will need to be evaluated to determine potential for impacts to historic resources. The placement of the school zone flashers will be such as to avoid any impacts to NRHP eligible properties, thus avoiding full Section 106 consultation. The goal is to keep this project within the guidelines of the MPPA, and thus a Programmatic CE. PROJECT UNDERSTANDING & APPROACH * 5 CITY OF SOUTH BENDV... School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) .. C III i5..i'Ruc IrIV ; II R iIV�is II wItl c III itoII"',i VS understands the critical system components and design implications that go hand -in -hand during successful installation of school zone and pedestrian crossing flashers. Project Supervisor Nikki Graham, El will review the design plans and work with the contractor to make certain the following items are properly addressed: ►► School zone flasher assemblies are placed no less than 200 feet in advance of the nearest school property line or school crossing. ►► Locations of the school zone flasher assemblies will be adjusted as necessary for line of sight issues in the field and to ensure minimal impact to adjacent property owners (placement of flashers near property lines versus directly in front of residences or immediately adjacent to driveways). ►► Any concerns of residents near flasher installations are properly addressed prior to foundations being set. N Modems are installed on all new setups as desired by the City of South Bend to allow for remote programming of time sets for flashers. ►► Flasher timing programs are installed with beacons operating properly during appropriate time periods determined by each individual school. ►► Each school zone flasher assembly includes two beacons that are properly aligned with direction of travel. In the event that any concerns arise with the items above, VS inspection staff will notify all applicable parties immediately. VS will work with City Officials, INDOT Staff and the Contractor to resolve potential issues before they have a chance to impact construction schedules. 5 1 A N U[ 64 ) IU II3 Iki��� R 5 The most important stakeholders are the school communities that the school zone flasher systems will help protect. VS inspection staff will maintain constant communication between all parties to ensure that: Contractor is aware of upcoming school schedules, including off days and special events. ►► School Officials are aware of upcoming construction sequencing, including sidewalk and lane closures as warranted. ►► School Officials are aware of how many Construction personnel will be on -site during a given day and where they will be working. Communication between the Project Supervisor, contractor, school officials and the public will be vital to this project. Constant communication between the Project Supervisor and City staff will serve to improve the public's knowledge of the construction activity. The primary method of communicating the construction activities will be through regular progress meetings between the project supervisor, contractor and City staff. These progress meetings will allow the contractor to state the construction schedule, address any recent concerns, and to give input where needed. Progress meetings also allow City officials to give their input based on their intimate knowledge and local experience. PROJECT UNDERSTANDING & APPROACH * 6 CITY OF SOUTH BEND School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) TEAM ORGANIZATION * 7 CITY OF SOUTH BEND School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) Ail . �y��' pppq� nlLi ' '!1 df! B.S.—Civil Engineering, Indiana Institute of Technology INDOT CertiPed Technician; INDOT Field Proficiency; INDOT Utility Coordinator Certification; INDOT Roundabout Design Certification; INDOT Employee of Responsible Charge (ERC) Certification; ACEC Engineering Leadership Program Mark Herald has over 15 years of professional engineering experience and serves as Project Manager for the firm's transportation and environmental projects. His experience includes design and inspection of transportation projects —including INDOT and locally funded, traffic impact studies, traffic signal design, pavement rehabilitation and widening with curbs, gutters and sidewalks, storm sewers with storm water retention and drainage. Mark also has a vast amount of experience in many transportation, storm, and sanitary sewer projects. Mark excels in managing projects in which the schedules and time lines can fluctuate. He understands that shifting staff efforts toward the project at -hand is paramount to its success. He is skilled in managing staff during periods of schedule tightening to complete multiple tasks concurrently, with a keen eye to thoroughness and efficiency. He will keep Owner staff apprised of project progress and will report on budget regularly. PEDESTRIAN SAFETY DESIGN EXPERIENCE INCLUDES: ►► City of South Bend —Safe Routes to School, Perley (98 curb ramps) ►► City of South Bend —Safe Routes to School, Lincoln (123 curb ramps) ►► Fortville School System —School Zone Flasher Installations ►► City of Fort Wayne —Bluffton Road Trail, Sidewalk (48 curb ramps), Pedestrian Traffic Signal ►► Town of Culver —Safe Routes to School (28 curb ramps) ►► City of Butler —Safe Routes to School Comprehensive Plan ►► City of Butler —Safe Routes to School Infrastructure Plan CONSTRUCTION PROJECT MANAGEMENT EXPERIENCE: ►► INDOT—US 224 Reconstruction in Decatur ►► INDOT—SR 1 HMA Preventative Maintenance Overlay ►► City of Fort Wayne —Hobson Road Rehabilitation ►► City Fort Wayne —Lake Ave. Roadway Diet ►► City of Warsaw —Argonne Road/Parker Street Corridor ►► City of Fort Wayne —Ardmore Ave. & Taylor St. Intersection PROJECT MANAGER * 8 CITY OF SOUTH BEND V School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240)�. fnf For over 15 years experience designing and managing a variety of projects consisting of street scape enhancements, infrastructure evaluation for short and long term planning, flood control, sanitary sewers, pump stations, water distribution systems, roadway reconstruction, traffic signals, civil/site design and drainage improvements. Nick holds certifications from the International Municipal Signal Association (IMSA) as a Work Zone Safety Specialist; Traffic Signal Technician Level 1, and Traffic Signal Technician Level 2. Experience Includes: ►► Meadows Elementary School Zone Flasher ►► Indianapolis Cultural Trail —Traffic Signal Design for over 30 Intersections Fletcher Avenue & 1-65/70 Collector Distributor Off Ramp Traffic Signal ►► Washington Street and (New) On/Off Ramps of 1-65/70 Traffic Signal ►► Washington Street & Southeastern Avenue ►► Emerson Corridor Improvements —Traffic Signal Design for 3 Intersections AI A III"'a11111 BAII L. Alan is a NEPA practitioner and wetland scientist with over 17 years of experience in the planning of aviation and surface transportation projects. His responsibilities include preparing all elements of CE and EA -level NEPA documentation, GIS data analysis and mapping, and wetland delineations. He also prepares USACE 404 and IDEM 401 wetland and stream permits, scope and fee proposals for merit -based project selections. Alan has demonstrated success in all elements of wetland and stream mitigation from site selection to design and construction. Alan's broad range of project experience allows him to establish and manage project budgets and timelines tailored to the challenges of each unique project. He is excellent at balancing the needs of the client with the competing interests of resource agencies like the U.S. Army Corps of Engineers, the U.S. Fish and Wildlife Service, the Indiana Department of Natural Resources, and the Indiana Department of Environmental Management. MA IIII I Illl�� IIII IIII�u�' IIII' Matt serves as project engineer on roadway and transportation projects. Matt is certified in all INDOT categories and is adept in record documentation �u and inspection of many types of transportation projects. His design experience includes Traffic Data Collection, Preliminary Design of Emergency Vehicle Preemption, Preliminary Engineer's Reports, Roadway Maintenance Improvement Plans, ADA Transition Plans and ADA Sidewalks and Curb Ramp Replacements. Experience Includes: ►► Traffic data collection at Ronald Reagan Parkway/ Monarch Crossing in Brownsburg ►► Yeager Road PER in West Lafayette ►► Roadway MIP in Greenfield ►► Roadway Maintenance Improvement Plan in Daleville ►► ADA Sidewalks and Curb Ramp Replacement in Aurora N ADA Transition Plan in Seymour IIII �I IIII III'°''^III IIII u�''° 1�4 ua�u, � (Iw']14 Sswl ' Ben is leader in utility coordination with uniquely deep experience in the process. He has 10 years' in consulting engineering with recent years as a Certified Coordinator working in all 6 INDOT Districts. His abilities are informed by years as a field project manager on Road, Bridge, Drainage, and Traffic Designs for INDOT, LPA, County, City, and Town projects across Indiana. Ben has effectively coordinated utilities on a wide range of projects: Indy Go FTA - DPW 13 mile 46 M primarily in dense urban environment, INDOT-LPA Brownsburg 0.5 mi burying of all utilities on during multiple adjoining developments affecting utility planning, numerous INDOT bridge and road projects. He also maintains regular contact with IUPPS Damage Prevention Committee and Public Works Coordinating Committee. KEY STAFF * 9 CITY OF SOUTH BEND V School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) IIMA I Illf °°°°IIIC IIII IIII�� IIII °` IIIII Matt has over 13 years of experience in all aspects of survey work including numerous construction surveys on route, topography, boundary and recorded easement surveys for both the public and private sector. His experience consists of deed research, field work adjustments, preparation of engineering drawings for route surveys, and construction staking. As Survey Department Manager, Matt manages field survey crews and in-house survey technicians. Additionally, Matt has prepared ALTA/ACSM land title surveys, survey recording plats, assisted with FEMA flood elevation certificates as well as surveyors location reports, construction surveying calculations, and numerous topographic surveys. Matt is well versed in use of the RIEGL VZ-400 3D Terrestrial Laser Scanner and accompanying acquisition and processing software packages. He is directly responsible for all of the firm's laser scanning and mobile LiDAR projects from planning to final deliverables. Nikki has over 18 years of experience in the engineering field, including project design and management, and Uf construction supervision/inspection. She is an INDOT-Certified Technician and 10 hour OSHA certified professional, and is thoroughly experienced in the supervision of construction work, compliance review with contract documents, preparation of construction related reports, testing of materials, and serving as a liaison between the client and contractors. Construction Inspection Experience Includes: ►► Traffic Signal Preemption in Angola (Project Supervisor) N Traffic Signal Preemption in Marion (Project Supervisor) Maplecrest Road Reconstruction and Widening in Fort Wayne (Asst. Project Supervisor) N Dupont Road Reconstruction and Widening in Fort Wayne (Asst. Project Supervisor) ►► Columbia Park Trail in Hammond (Project Supervisor) ..'. IIII Vince has over 25 years of experience in a variety of engineering disciplines, including numerous surveys for design, construction and right-of-way projects in the civil, environmental and transportation fields. Vince is responsible for Right -of -Way activities, management and oversight, including verification of existing and proposed rights -of - way; verification of property descriptions and plotting of same; drafting oversight and preparation of parcel buying packets; peer review of buying packets prepared by sub - consultants or others. His experience in Right -of -Way Engineering also includes research of deeds, maps, plats, road records and existing right-of-way plans and grants (INDOT title research standards); proposed right-of-way plan design (INDOT right-of-way plan standards); right-of-way computations; right-of-way legal descriptions, right-of-way parcel plats, closure checks, and all supporting documentation and calculations required by INDOT. :J. 1I4 KEY STAFF a 10 CITY OF SOUTH BEND School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) C!�Y���SO8J ��������~NU�J COU0,1 ����)�RIMARY & ��������������������� ' _.~��~ ~ ..~�~..~~�~~_~���.-.. ~~~. ~~~~_~`~��~° ��� ��'HOGU This project included the complete design services for retro'fitdng sidewalks and curb ramps into abuilt-up environment. The existing sidewalks and curb ramps were deteriorated and not incompliance with AOAstandards. Design services included topographic survey, environmental document, and the design ofsidewalk and 123curb ramps for Lincoln Primary and 98 curb ramps for Pedey Fine Arts Academy. Many ofthe sidewalk and curb ramp design locations required unique design solutions toallow the ramp tobedesigned within the AOAguidelines, while negating the need for additional dght-of-vvay or any utility relocations. Both locations were ultimately constructed under budget. Construction Cost Lincoln Primary '$O18.000 c�"Nry, a�',:­, GN IS ~ S("'11-100i Wlt���� & I�A�'q CROSSMG��LAS�� 11 1 s c nia�q �IA���� NN ������ ����������� �� � n "~~=~� �� «"���. �����=�p� = 1,0~°°�� ~~"� For Phase U. V3 provided construction inspection services for the installation of240School Zone 2SMPH Flashers installed atvarious locations throughout the City ofIndianapolis. For Phase ||i V5 is provided construction inspection services for the installation ofapproximately 112School Zone 25MPH Flashers installed and 518modem retrofits, including Phase |'atvarious locations. Key components nfthe installations included field adjustments as necessary to avoid utilities, existing driveways and line of sight issues, all while ensuring the flashers were placed in accordance with City standards. Additionally, impacts to adjacent properties and/or concerns of residents nearby were coordinated with the Contractor and Indianapolis DPW staff to make certain the final location of each flasher was satisfactory to all stakeholders. VS Project Supervisor also enforced standard maintenance of traffic procedures acthe safety ofpedestrians and motorists in high traffic volume areas around each school was critical. Construction Cost SIMILAR PROJECTS # 11 CITY OF SOUTH BEND T-w School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240) _... �� i4 "'� � f I ' di« �S V C P ip� I ^" �m�, i Uhl I 91 � � " I' �fi �� 1 I� ,�� ��z, ��� l�q PAC IUl .� ,a ;� III , Rr 61 III I! 6� Pr �n�l� U I� �����Il II VnE 6� ��.r ��� 6������ a I�d�C� �IN'� "IIII IIII IIII ; �u Ilf R I A III"",,, 4 1 IIII"�iA{ IIF "' IIII�l E I1N�4 III 1"^4 F 1) G VS served as design consultant for the pedestrian upgrades at the intersection of 4" Street and Rogers Street, as well as the intersection of Allen Street and Walnut Street in Bloomington, IN. VS design staff worked with the City to solicit public input on the project, including a public information meeting with all stakeholders. The project included PROWAG compliant pedestrian and bicycle crossings, new curb & gutter, new sidewalk, upgraded pavement markings, and installation of Rectangular Rapid Flashing Beacons (RRFB) with push buttons to provide safer crossings for pedestrians and bicyclists. The intersections also included separate push buttons adjacent to the roadway so that bicyclists could trigger the RRFB without encroaching on the sidewalk. The 4th Street and Rogers Street intersection was also updated to narrow the lanes and reduce the crossing distance. The Allen Street and Walnut Street intersection had push buttons installed in the median to provide a 2 stage crossing to improve pedestrian safety while only impacting one direction of traffic. Construction Cost $255,000 .ism„ ���, li' o! i� W.. I. „ p �. P, it A�' fv.,, iy r. ��, v, ,,,,, u. «' ,P ww �. ,, "„ �w, .., ,poi �w., N,� «.. „ „��„ ,n�� w,µ n:, u. �,P V� �i. � � I. ,�, l i �li I� �� � hf , I� r� � .,+G l� I, �, Ili w W z l �� „ f� III R I� ail- "I' ' -` IGI ,' a 413'11� 111tll��� � � U� I���� �,q U ,S � I�R �i,�� IJ ��» III � ar, III",�i��� III ��tl,,,)J' ��, �� ��'(,.��u �`�,� As Design Engineering consultant, VS provided comprehensive design and construction inspection services for the mid - block, pedestrian hybrid traffic beacon, located on West Main Street at the Nickel Plate Trail Crossing in Peru, Indiana. The Nickel Plate Trail committee commissioned VS to design and inspect a pedestrian traffic signal to provide for the safe crossing of Nickel Plate Trail users, while providing minimum impact on vehicular traffic on West Main Street. Additionally, optimal access for adjacent commercial businesses was a requirement for design. Services provided by the firm included Comprehensive design; Construction inspection; Traffic signal timing; Preparation of complete contract bid documents, and; Preparation of technical specifications. Construction Cost: $83,700 SIMILAR PROJECTS • 12 (Rev.06/27/2018) Request for Proposal Number Des1801240 RFP Item Description: Schools Safety Improvements within t School Zone Flashing Beacons at 39 S he City of South Bend Indiana - Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana's DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firms listed below are currently certified DBEs: INDOT: hjtp /entar)osJndot.in.gov E ocator KYTC: htt s: trcns _artattlol. k . ov Oivil-Ri hts and- mall Business-Deveip ment Pa es Certified-DIBE-Directory.e p—x I certify that I have contacted the certified DBEs listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT's Economic Opportunity Division. DBE Subconsultants to be applied toward DBE goal for the RFP item: II. DBE Subconsultants to be utilized be, d the advertised DBE goal for the RFP item: 0 Estimated Total Percentage Credited toward DBE Goal. 3 0 Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: Company Name: VS Engineering, Inc. p January 22, 2019 Signature: _...•,, _._........ Date: _. __ January *It is understood that these individual firm percentages are estimates only and that percentages paid may be greater or less as a result of negotiation of the contract scope of work. My company will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. ca c cu L— W W •CD m W Q U N N O T— O N O M 0) O N N O cu O Z O N O N _O U) 4) -1- m w c 0 � U t L L O U U � a w a m CD oa) c� c 0 �-_� O M L L 0 0 Q c 4- 0 U L m a) Q= Do c E ca C � N C-0 � N U 0) C � N •- a 0 C Q c 0 m U LL ca m O U c Ln Z O) W m m O) o � U) c 0 m- E L O LO Q Lc r L 0 U L m Q 00 c E ca � c � N N > U � C � (D4.1 '— Q L we