HomeMy WebLinkAboutOpening of Bids - Liberty Tower Exterior Renovations Project No 118-086R - Mulder Waterproofing & Sealants Inc^ t z
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK `,1865
w ,
Project Name Liberty Tower Exterior Renovations
Project No. 118-086R __.._..."
For Bids Due January 22, 2019
�. ... _ _ ...............
�_
PART I
(Must be completed for all bids. Please type or print)
Date: Bidder (Firm):
Address: ��`
�:�
City/State/Zip: n� Telephone Number: 1�
Agent of Bidder (if Applicable): _
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to comp ...e
public works project of:
complete the
the Cityof South Bend Indiana,
accordance with plans and specifications prepared by:
and dated 1 W Q I for th Yrn: of (enter the Total Bid as shown on the Proposal)
Division A: Upper Level Roof Work
Enter su ... s m._.._.-w�.._.....—._._....�_ )
( m of Total Base Bid plus Alternates shown on Proposal) (Numerical)
Division B: Exterior Concrete Masonry Repair
(Enter sum of al Base Bid Alterrates shown on Pro )
u rical)
Division C: 5ih Floor Parking Garage Ceiling Insulation and EFIS Finish
(Enter sum of TotaBase Bid p
lus At(;rnae shown -on Pr
.o-`p)_._ .�mm
(Numerical)
Division D: Sidewalk and Curb Replacement Work on Washington Street
( um of Total Base Bid -plus -_-. �....... .
Enter s� .....�.�...._.�
p Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
Version 7/20/2018 Contractor's Bid for Public Works - 2
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be sho n on a separate attachment.
B
�nin
�.(signature) �.1 I.. —.. .. a
(PruntCd Horne of Person ,ic
ACCEPTANCE
The above bid is accepted this day of
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
James A. Mueller, Member
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
20
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the Pity of South Bend to
consider your bid„)
2, Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performedpart of the work) that you have used on public works
projects during the past five () years along with a brief description of the work done by each
subcontractor,
If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
Version 7/20/2018 Contractor's Bid for Public Works - 3
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 7/20/2018 Contractor's Bid for Public Works - 4
BID/PROPOSAL,,��ti
CITY OF SOUTH BEND"
Project Name: Liberty Tower Exterior Renovations,
Project Number: 118-086R
................ ............
For Bids Due: January 22, 2019 µ aw
Contractor Name:
BASE
......__
BID: DIVISION A: UPPER LEVEL ROOF
WORK
Item
No.
_—......_
Description
....
Quantity
Unit
Total Amount
1
New Membrane Roof — 20 Year TPO
1
Lump
Sum
%
2
Contingency Allowance for Unforseen
1 .._u
Each
__..........
Conditions _................
_.._..
$5,000
3
Contingency Allowance for North
1
Each
Property.
$5,000
DIVISION A: BASE BID TOTAL r) / N
BASE BID: DIVISION B: EXTERIOR CONCRETE MASONRY REPAIR AND COATING
Item Description Quantity Unit Total Amount
No.
1 Exterior Concrete Masonry Repair and 1 Lump,
Coatin _ Sum c3��J
__..M..............
2 Tuck -pointing 400 SF A 3
._........ ..... ._.... . ....... .......... .........
_
3 Soft Joint Backer Rod and Sealant 1500 LFT
__........ ..... .—...........
4 Cut Control Joints 350 LFT
.. ... . _........... _...._._
5 Contingency Allowance for Unforseen 1 EACH
Conditions $5,000
6 Contingency Allowance for North 1 EACH
e Pro rt
p_ y E $5,000
DIVISION B: BASE BID TOTAL
BASE BID: DIVISION C: MAIN FLOOR STOREFRONT AND VESTIBULE ENTRANCE
�............ ... .............. — .............M .._.
m Item Description Quantity Unit Total Amount
No.
1 Main floor storefront and vestibule 1 Lump
entrance Sum h
�ITITITITITm
Conditions wwwww......
2 Contingency Allowance for Unforseen 1 EACH
_u _ ITITmmmmmmmµnnn . $5,000
DIVISION C: BASE BID TOTAL nj PS,.
BASE BID: DIVISION D: SIDEWALK AND CURB REPLACEMENT WORK ON WASHINGTON ST
._....._ _ .. — _.._._ ....
F'.N.o
em Description Quantity Unit Total Amount
.
1 Pavement, Remove 424 SYS in j
_.._ ... _............ �.......__
2 Curb, Concrete, Remove 155 LFT /
Version 7/20/2018 Contractor's Bid for Public Works - 8
BIDIPROPOSAL
CITY OF SOUTH BEND°.,
Project Name: Liberty 1 y Tower Exterior
Renovations
= �°
Project
Number: 118-086R
For Bids Due: January 22, 2019
Contractor Name:
.. _ ..� ...... ....
BASE BID:DIVISION D: SIDEWALK AND CUR
... w _w
B REPLACEMENT WORK WA
WON SHINGTON
_ mm N . mmmmmmITIT
ST
.......
10
NO. 4 Wire
155
LFT
._�
11
NO. 6 Wire
__M
155
......
LFT
........... ... _
12
Conduit PVC 21N, Schedule 80
150
LFT
........
13
Construction Engineering
1
LS
14
Mobilization/Demobilization
1
LS
...............
_... _ ...... _
�.... __..
15
Maintaining Traffic (MOT)
1
LS
..... _.... _
..................
...
16
Concrete Overlay
26
SYS
_._
17
Repair of spalled/delaminated concrete
on bottom of Ma....St. Entrance slab
15
.............
SF
!.„_
18
HMA Base, Type B
9
TON
19
HMA Surface, Type B
11
TON
... --..
21
PCCP For Approach 6
92
SYS
22
Curb and Gutter Concrete
191
LFT
23
Line, Thermoplastic Solid, White, 4in
200
LFT
._....... ._ ........_
......-
24
Line, Thermoplastic, Solid, Yellow, 4in
34
LFT
25
Turn Arrow Thermoplastic, White
1
EACH
..... . _
...
__ --
/
26
Light Standard, Type A
2
EACH
27
Tree Grate
.......� _....
....... ..
EACH
_.........
rl�
28
Ornamental Tree,2" Caliper
3
._.....
EACH
® w
dd tional Common Excavation,�_..����.�.
Additional
Undistributed _...._
10
......
CYS
. _............._._._
....
30
Utility Allowance
.--..
1
.....
EACH
_M..
5,000
—
31
for Sidewalk Conditions
Allowance..
m_.
1
EACH
_...__..._w
$5,000
DIVISION
D: BASE BID TOTAL
0 / f-\
Version 7/20/2018 Contractor's Bid for Public Works - 9
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Liberty Tower Exterior Renovations
Project Number: 118-086R
For Bids Due: January 22
Contractor Name:�s�r��t
Bidder (Firm): ( �r ............................_.
Address:
Y p = : `19c,Tele hone Number: _w. ............
Cit /State/Zi
BY.:w _ ....._....._. ... _.
(Signature)
c5CSi
q,h fy\,1 r1
(Printed Name of Person Signing)
Version 7/20/2018 Contractor's Bid for Public Works - 10
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
MATTHEW BAKER
STATE OF iC. + ) NOTARY PUBLIC - STATE OF MICHIGAN
COUNTY OF KALAMAZOO
SS: My Commission Expires 03/05/2025
COUNTY ) Acting in the County of A zcx)
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor fiirther says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 7/20/2018 Contractor's Bid for Public Works - 5
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MIKEAVIIE; laowevcr, it may not unlawl`aaily discriminate against said WBE/MBE. A finding of a
discrinlinaatory practice by the (,`ivy's NIf31YW13E Utilization Board shall prohibit that person or entity from
hawing awarded a City contract for as period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 7/20/2018 Contractor's Bid for Public Works - 6
may result in forfeiture of contractual payments,
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this dayof`— ,201c�
:Con�tractoFimi) �
r/Bidder
Signature of C"ontr`ictor/B'idder or Its Agent
v/ze",- w)ae+ OtM®Y
Printed Name and Title
Subscribed and sworn to before me this day of :YkAugrl 20 17
g
My Commission Expires 5&s
Nota4V1,
County of Residence r414A-q z °®
MATTHEW BAKER
NOTARY PUBLIC - STATE OF MICHIGAN
COUNTY OF KALAMAZOO
My Commission Expires 03/0512025
Acting in the County of WAkA411ad
f9
b-
Version 7/20/2018 Contractor's Bid for Public Works - 7
1316 CouNTY-CITY BUILDING
PHONE 574/ 235-9251
227 W. JEFFERSON BOULEVARD s
, i FAX 574/ 235-9171
SOUTH BEND, INDIANA 46601-1830 ta,""
�'
; -' TDD 574/ 235-5567
+ P
CITY OF SOUTH BEND
PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
Date:
January 2019
To:
w18,
............... _ ......................
All Bidders
From
Linda M. Martin, Clerk, Board of Public Works
Subject
Addendum Number: 1
Project Name: LibertTower Exterior Renovations
Project
Number: 118-086R
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: - , , C3�, mmIT ITITITITITITIT
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171.
A copy MUST also be included with your bid package upon
submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Note:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Si;
Date: i - 1 IR - "
oc!umaent r 310TM 2010
Conforms with The American Institute of Architects AIA Document 310
Bid Bond
CONTRACTOR: SURETY:
(Name, legal status and ad*=) (Name, legal status and li incipal phice r f hm*w.w)
Western Surety Company
Mulder Waterproofing and Sealants, Inc. 151 N. Franklin Street This3420 Ravine Rd. Chicago IL 60606 legal
documenthasimportant
legal consequences. Consultation
Kalamazoo MI 49006 Mailing Address for Notices with an attorney is encouraged
with respect to Its completion or
OWNER: modification.
(Nance, legal status and adds uss)
City of South Bend
BOND AMOUNT: 5%
Five Percent of Amount Bid
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
PROJECT:
(Name. location or addmia mrdilroject number, (fang)
Liberty Tower Renovations - Elastomeric Coating - Painting, Caulking, Masonry Re -Pointing Exterior of Hotel
The Contractor and Sorcty arc bound to the Owner in tho amount set forth above,. for the payment of which the Contractor and Surety bind
themsclves, their hoirs, oxocutors, adanh istrators, successors and assigns. jointly aaad severally, as provided herein, The conditions of this
Bond are such that if tine Oavaer accepts the bid oftlac Contractor within the time specified in ilia bid documents, or within such time period
as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with
the terms of such bid, and Sivas such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in
the jurisdiction of the 11toject al'ld othenviso acceptable to the Omtcr, for the faithtinl performance of such Contract and for the prompt
payment of labor and material furnished in ilia prosecution thereof; or (2) pays to the Owner tine ditierence, not to exceed the amount of
this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another
party to perlbrm ilia work covered by said bid, then this obligation shall be null and void, otherwise to remain in full (brca and elrecl. The
Surely hereby wuives any notice of an agrccnicnt between [lie Owner and Contractor to extend (lie lime in which ilia Owner may accept die
bid. Waiver ornntice by the Surely shall not apply to any extension exceeding sixty (60) days in the aggregate beyond lice lime for
acceptance ol'bidx specified in the bid documents. and the Owner and. Contractor shall obtain the Surety s consent tier an extension beyond
sixty (60) days.
If this Bond is issued in connection nvith a subcontractors bid to a Contractor. the term Contractor in this Bond shall be deemed to be
Subcontractor and the term Owner shall be deemed to be Contractor.
When this Dond has been Inn nishod to comply with a statutory or other legal requirement in ilia location of the project any provision in
this Dond conflicting with amid stulauory or legal requirement shall be deemed deleted herelrom and provisions coortmrming to such
statutory or other legal requirement shall be deemed incorporated herein. When so rurnishrcd, (ho intent is that lhix Pond shall be construed
as a statutory bond and not as a common law bond.
Signed and scaled this 18th day of January, 2019.
lll�lrtrars.�t
(tl �ttrea'.r
S-0054/AS 8t10
Mulder Watergroofing and Sealants, Inc.
(lsr"rcip r) (Scii I)
B,
in c)
Western Surety Company
lSi►rety) (Sval)
PW
B"
anice tickles , Attorney -in -Fact
Western Surety Company
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT
Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation
having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby
make, constitute and appoint
Lori A King -Clyde, Janice Stickles, Tamara J Mohr, Wenda L Coleman, Malissa
J De Vormer, Kristie L Harris, Individually
of Caledonia, Ml, its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds,
undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said
Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By -Law printed on the reverse hereof, duly adopted, as indicated, by
the shareholders of the corporation.
In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be
hereto affixed on this 7th day of September, 2017.
r�cr WESTERN SURETY COMPANY
00 w°
41iB!Eit, Vic President
Slate of South Dakota 1
$s'
County of Minnehaha J?
On this 7th day of September, 2017, before me personally came Paul T, Bruflat, to me known, who, being by me duly sworn, did depose and say: that
he resides in the City of Sioux Falls, State of South Dakota; that he is the Vice President of WESTERN SURETY COMPANY described in and which
executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so
affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and
acknowledges same to be the act and deed of said corporation.
My commission expires J. - O I
Juno 23, 2021 n roc
64�
J. Mohr, Notary P'rtblic
CERTIFICATE
1, L, Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hercinabove set forth is still in
force, and further certi that the By -Law of the co ^ %� I have hereunto subscribed
my name and affixed the seal of the said corporation this
printed on day ofrse hereof is still in force. In testimony whereof
41
4�� 01 WESTERN SURETY COMPANY
4PP�r
°r"►i�+w
w
44LNon, Assistant Secretary
Form Fazaoa-2otz
Authorizing By -Law
ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY
This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the shareholders
of the Company.
Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the
corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other
officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer
may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company.
The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the
corporation. The signature of any such officer and the corporate seal may be printed by facsimile.
f-
w
W
_N
a�
owa
z
V
mw0
0zz
ULL.Nw
0m0
_H w W
Vpw O
0
z
Q
NH
I.I.
0
z_
J
N
E
m
z
U
m
O
n
i
w
co
O
Irl
aD
fim
C
am
co
2
ll
3
6
7
00
CITY OF SOUTH BENDtikar""
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM'
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS,
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 118-086R Date:
Project Name: Libertv TowerExterior Renovations_.............._.....................�,.___..._��..._�...��
Bidder: ...s,
Contact Person: Telephone
Address:
City: K
Email:
To determine whether a bidder � _
has demonstrated good faith e its to reach he MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
....... ......- ........ ..... .......................
_
EVIDENCE OF GOOD FAITH EFFORTS
MBEfWBE nA Enterprise Diversity bidder e City of South Bend's Minority and Women Business
Development Program, am, which uses the IDO
(S)mmmm.. A approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISE/CON .. _ �.M ......—
TACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
d1/ subcontracting opportunities.
1 , 2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE/WBEs reasonable time to respond.
3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
4. Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBE/WBE firms.
*"Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs,
hI\ including providing such MBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL �! ONY ._.0 ............. __................. EBTRAT(S): The bidder selected specific portions of the work to be performed by
n order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
...................... ........ _ ..__... _ _..w _ ... .....
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
Pro er demonstration of d ..'od �_....._. _ .t _r..... a _..__._....A—n .....
_.....
_...
* p Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 7/20/2018 Contractor's Bid for Public Works - 12
CITY OF SOUTH BEND,`'4"�"
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBE/WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
Project Number: 118-086R
Project�.m ._..................... �
Name: Libert Tower Exterior Renovations
Bidder:
PAGE OF
MBE/WBE Participation Goal _mmmw� 0�.
Y (� __......_..........._ ........
Title) (Date)
MBE/WBE Firm
Owner or Contact at MBE/WBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
MBE/WBE Firm
Owner or Contact at MBE/WBE Firm
Telephone: Fax: - Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
Version 7/20/2018 Contractor's Bid for Public Works - 13
1
> rrry City of South Bend Public Works
o Engineering Division
4227 W. Jefferson, County City Building 1316
South Bend, IN 46601-1830
Phone: 574.235.9251
Email: dhanson@southbendin.gov
TRAFFIC CONTROL AND OCCUR' C "'RE'QUEST
*SUBMIT 5 WORKING DAYS MINIMUM PRIOR T PROJECT START DATE
PLAN YOUR START DATE ACCORDINGLY TO VOID DELAYS
CaM Iete 1 - 5 Incomplete Submittals C nnot Be Processed
Parking Lane \Q Travel Lane 1:1 Full Road Closur Alley Sidewalk Closure
2 1:1 Excavation/Boring?
K
Ell
Requires Excavation Form
Construction? > Requires Curb Cut
application or sidewalk permit
Submission Date; . IT_._.. .........._.. Applicant/Com any:
Name: Email Address:
_.......
Office
Phone #:._.____............ ............... cell Contractor erforming Work:
Office
On -Site Contact: Phone #: �. _........_ ...._ Cell
Project STREET ADDRESS (eg: 110 W. SmutRD.):
Project Location (Block limits/Streets From To):
Requested Start & End Dates: Requested Start & End Times:
Reason for Closure:
Affected Customers: �..,, .,. ... .... ... -_— ...
-- Contractors are responsible for resol dng safety issues c . c ess concerns with affected customers
ATTACH THE FOLLOWING ITEMS: 1. Traf c Control Plan 2. DetoursNan 3. Barricades, Signs, or Flashers Placement
(Refer to MUTCD for Traffic Control Device Requirements) See rev�r e for Checklist
Failure to use traffic control for traff restrictions or closures will result in%Jeo'�S
work orders and/or delay in permitting..
THIS OCCUPANCY PERMIT REQUEST IS ON -TRANSFERABLE AND A SIGNATURE SUBTHE NAMED CONTRACTOR PERMITTEE
5 TO ALL APPLICABLE RULES, DUTIES AN OBLIGATIONS IMPOSED BY THE CITY OF SOUTH B D MUNICIPAL CODE AND TO ALL
REGULATIONS IMPOSED BY THE SO H BEND BOARD OF PUBLIC WORKS.
Applicant Signa
ENGINEERING OFFI E USE ONLY.
0 Approved Approved as Noted � Revise
Comments:
City of South Bend/Engineering) Division Authorized Signature
/
Date
Not Xpproved
Date:
Version 3.2 i5/2/20181
Addendum #1
Date: January 17, 2019
To: All Bidders and others to whom Plans & Specifications have been issued
From: Kil Architecture/ Planning
Gregory A. Kil, AIA, NCARB
Architect
RE: Liberty Tower Exterior Renovations, Project 118-086R
For City of South Bend, Board of Public Works
227 W. Jefferson Blvd, Room 1316
South Bend, IN 46601
This addendum forms part of the Contract Documents and modifies the original Bidding Documents only
as noted below. The remainder of the drawings and Specifications are to remain in their entirety.
Acknowledge receipt of this addendum in the space provided on the Bid Form. This addendum consists
of the following changes identified in bold:
PR+ JJ E T MANUAL:
A. Special Provisions, Art. XIII. Prosecution and Progress:
1. After subparagraph B.1.a, add a sub paragraph as follows:
a. "BA.A.1) Division A Roof Work shall follow the completion of Division B
Masonry Wall Repair."
B. Special Provisions, Art XIV, Change of Contract Time:
1. After subparagraph B.4 add a subparagraph as follows:
a. "B.5 The Department of Public Works will consider requests for extensions
of contract time if reasonable justification is provided.
C. Special Provisions, Art XX, Description of Work:
1. Subparagraph B.1, Division A: Base Bid: Upper Level Roof Work:
a. Delete subparagraphs B.1.1 and B.1.2.
D. Special Provisions, Art XXI, Contract Allowances:
1. Subparagraph B.5: Add the following subparaphs:
a. B.5.a Division A Allowances:
1. Contingency for Unforseen Conditions: $5,000
2. Allowance for reimbursement to owner of property north of project
to allow access to north wall: $5,000
b. B.5.b Division B Allowances:
1. Contingency for Unforseen Conditions: $5,000
K I L Addendum #1
ARCHITECTURE page 1
PLANNING
www.kilarchitecture.com
1126 LINCOLNWAY EAST SOUTH BEND I N 46601 (574) 288,2654 VOICE 289. 2420 FA X
2. Allowance for reimbursement to owner of property north of project
to allow access to north wall: $5,000
c. B.5.c Division C Allowances:
1. Contingency for Unforseen Conditions: $5,000
d. B.5.d Division D Allowances:
1. Utility Relocation Allowance: $5,000
2. Allowance for Sidewalk Conditions over Vault: $5,000
E. Special Provisions, Art XXXII, Hot Mix Asphalt Pavement:
1. Subparagraph B.5: Clarification: Omit polymer from the binder in the 70-22 HMA
surface mix.
F. Bid Form:
1. Replace Bid Form with attached "Bid Form-Rev.1"
G. Section 01 5000, Temporary Facilities and Controls
1. After Article 1.10 add new article as follows:
1.11 Use of Elevator
Contractor may use the existing service elevator at the south end of the
east bank of elevators to transport material to upper levels. Materials
must fit into cab without damaging cab, and must not exceed load limits
for elevator.
H. Specification Section 05 5000, Metal Fabrications:
1. Article 1.1, Section Includes:
a. Omit Paragraph B, Rooftop Bridge with Steps in its entirety.
2. Part 2, Products:
a. Omit Paragraph 2.1, Materials -Aluminum In Its entirety.
b. Omit Paragraph 2.3 Fabricated Items in its entirety.
I. Specification Section 07 5423 Thermoplastic-Polyolefin Roofing (TPO)
1. Article 1.8, Warranty
a. Clarification: Existing warranties on roofs at 7t' floor, 27th floor and 281h
floor are held by Slatile Roofing and Sheet Metal, Inc. for the first two years.
2. Article 2.2, Roofing System Description
a. Paragraph B.2.b.: Change the number "32" to the number "20".
3. Article 2.4, Vapor Retarder Materials
a. Paragraph 2.4.A: Clarification: The Manufacturer's self -adhering vapor
barrier will be allowed if meeting the Manufacturer's requirements for the
specified warranty.
K I L
ARCHITECTURE
PLANNING
www.kilarchitecture.com
Addendum #1
page 2
1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288.2654 VOICE 289, 2420 FAX
DRAWINGS:
A. Drawing A2.1, Roof Details
a. Details 1 and 7: Change the thickness of all pre -finished aluminum copings
and cleats to 0.050 inches. Add dimensions in accordance with attached
drawing ADD-01.
B. Drawing D2.1, Site Details:
1. Detail 1, Typical Sidewalk Section:
a. Revise detail in accordance with attached drawing ADD-03.
2. Detail 2, Section @ Lobby Entrance:
a. Revise detail in accordance with attached drawing ADD-04.
3. Detail 3, Driveway Paving Section:
a. Revise detail in accordance with attached drawing ADD-03.
4. Detail 3, Light Pole Foundation:
a. Change detail number to "Detail 4" and revise in accordance with attached
drawing ADD-02
! w ! 910malillivini
ATTACHMENTS:
Bid Form-Rev.1
Drawing ADD-01 dated January 16, 2019
Drawing ADD-02 dated January 16, 2019
Drawing ADD-03 dated January 16, 2019
Drawing ADD-04 dated January 16, 2019
K 1 L
ARCHITECTURE
PLANNING
y w.kJ10frMLg rLrc+err
Addendum #1
page 3
1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288.2654 VOICE 289. 2420 FAX
CITY OF SOUTH BEND
STATEMENT OF POLICY
The Board of Public Works of the City of South Bend has adopted the following policy regarding
the receipt of sealed bids:
All sealed bids submitted to the Board of Public Works must be
received in the Board of Public Works Office, 1316 County -City
Building, South Bend, Indiana, no later than the advertised time on
the advertised date of the bid opening.
It shall be the responsibility of the bidder to see that his/her bid is
received prior to the deadline stipulated in the bid advertisement.
Bids submitted by mail and received after the advertised time
deadline will not be considered by the Board.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
Linda M. Martin, Clerk
NOTE: Incoming mail does not reach the Board of Public Works until after 9:30 a.m. Local
Time. If you are sending your bid via Federal Express or another overnight source, please
confirm that your package will arrive before the bid opening date and time.
Version 7/20/2018 General Conditions - 1
CITY OF SOUTH BEND
EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING
PROVISIONS DIVERSITY UTILIZATION
It is the policy of the City of South Bend to provide equal employment and business opportunity
for all persons, partnerships, companies, and corporations in accordance with the rules, regulations
and guidelines of the applicable federal, state and local laws. This policy of equal employment and
business opportunity shall apply to every contractor or subcontractor bidding or holding a public
contract with the City of South Bend.
In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part
of every construction contract entered into by the City of South Bend and all subcontractors
entered into pursuant to any such contract and the bidder hereby certifies that it/he/she will abide
by these provisions.
The contractor will not discriminate against any applicant or employee because of
race, color, religion, sex, national origin, or handicap. The contractor will take
affirmative action to ensure that all applicants or employees are treated fairly and
equitably. Such action shall include but not be limited to the following: hiring, up-
grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates
of pay or other forms of compensation and selection for training including
apprenticeship programs.
The contractor shall agree to post in conspicuous places available to employees and
applicants, notices to be provided setting forth the provisions of the Non -Discrimination
Clause.
The contractor will, in all solicitations or advertisements for employees placed by or
on behalf of the contractor, state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex, or national
origin.
The contractor will send to each labor union or representative of workers with
which it/ he/she has a bargaining agreement or other contract or understanding, a
notice to be provided, advising the labor union or worker's representatives of the
contractor's commitment under this section, and shall post copies of the notices
in conspicuous places available to applicants and employees.
The contractor will comply with all provisions of Executive Order 11246 (as amended
by 11375) and of the rules, regulations and relevant orders of the Department of Labor.
Subpart B --Contractors' Agreements
Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government
contracting agencies shall include in every Government contract hereinafter entered into the following
provisions:
"During the performance of this contract, the contractor agrees as follows:"
"(1) The contractor will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, or national origin. The contractor
will take affirmative action to ensure that applicants are employed, and that
employees are treated equally during employment, without regard to their race,
color, religion, sex or national origin. Such action will include, but not be limited to
the following: employment, upgrading, demotion, or transfer; recruitment or
Version 7/20/2018 General Conditions - 2
recruitment advertising; layoff or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship. The contractor
agrees to post in conspicuous places, available to employees and applicants for
employment, notices to be provided by the contracting officer setting forth the
provisions of this nondiscrimination clause."
"(2) The contractor will, in all solicitations or advertisements for employees placed by
or on behalf of the contractor, state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex or national
origin."
"(3) The contractor will send to each labor union or representative of workers with
which it/ he/she has a collective bargaining agreement or other contract of
understanding, a notice, to be provided by the agency contracting officer, advising
the labor union or workers' representative of the contractor's commitments under
Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post
copies of the notice in conspicuous places available to employees and applicants for
employment."
"(4) The contractor will comply with all provisions of Executive Order No. 11246 of
September 24, 1965, and of the rules and regulations, and relevant orders of the
Secretary of Labor."
"(5) The contractor will furnish all information and reports required by Executive Order
No. 11246 of September 24, 1965, and by the rules, regulations, and orders of
the Secretary of Labor, or pursuant thereto, and will permit access to his books,
records, and accounts by the contracting agency and the Secretary of Labor for
purposes of investigation to ascertain compliance with such rules, regulations, and
orders."
"(6) In the event of the contractor's noncompliance with the nondiscrimination
clauses of this contract or with any of such rules, regulations, or orders, in this
contract may be cancelled, terminated or suspended in whole or in part and the
contractor may be declared ineligible for further Government contracts in accordance
with procedures authorized in Executive Order No. 11246 of September 24, 1965, and
such other sanctions may be imposed and remedies invoked as provided in
Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of
the Secretary of Labor, or as otherwise provided by law."
"(7) The contractor will include the portion of the sentence immediately preceding
paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract
or purchase order unless exempted by rules, regulations, or orders of the Secretary
of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24,
1965, so that such provisions will be binding upon each subcontractor or vendor.
The contractor will take such action with respect to any subcontract or purchase
order as the administering agency may direct as a means of enforcing such
provisions including sanctions for noncompliance: Provided, however, that in the
event a contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency
the contractor may request the United States to enter into such litigation to protect
the interests of the United States."
The applicant further agrees that it will be bound by the above equal opportunity
clause with respect to its own employment practices when it participates in federally
assisted construction work: Provided, that if the applicant so participating is a State
or local government, the above equal opportunity clause is not applicable to any
agency, instrumentality or subdivision of such government which does not participate
Version 7/20/2018 General Conditions - 3
in work on or under the contract.
The applicant agrees that it will assist and cooperate actively with the administering
agency and the Secretary of Labor in obtaining the compliance of contractors and
subcontractors with the equal opportunity clause and the rules, regulations, and
relevant orders of the Secretary of Labor, that it will furnish the administering
agency and the Secretary of Labor such information as they may require for the
supervision of such compliance, and that it will otherwise assist the administering
agency in the discharge of the agency's primary responsibility for securing compliance.
The applicant further agrees that it will refrain from entering into any contract or
contract modification subject to Executive Order 11246 of September 24, 1965, with
a contractor debarred from, or who has not demonstrated eligibility for, Government
contracts and federally assisted construction contracts pursuant to the Executive
Order and will carry out such sanctions and penalties for violation of the equal
opportunity clause as may be imposed upon contractors and subcontractors by the
administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the
Executive Order. In addition, the applicant agrees that if it fails or refuses to comply
with these undertakings, the administering agency may take any or all of the following
actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan,
insurance, guarantee); refrain from extending any further assistance to the applicant
under the program with respect to which the failure or refund occurred until satisfactory
assurance of future compliance has been received from such applicant; and refer the
case to the Department of Justice for appropriate legal proceedings.
Version 7/20/2018 General Conditions - 4
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM
The City of South Bend, Indiana has shown its commitment to addressing Minority Business ("MBE") and
Women's Business Enterprise ("WBE") participation in public contracting through the adoption of the City
of South Bend Ordinance No. 10081-11. Persons, partnerships, corporations, associations, or joint
ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall
not discriminate against any employee or applicant for employment in the performance of a City contract
with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or
indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age or
disability that does not affect that person's ability to perform work.
Minority and Women's Businesses are described on the Indiana Department of Administration website:
http://www.in._qov/idoa/. It is the bidder's sole responsibility to verify whether any listed minority or woman
business meets the qualifications of a Minority or Women's owned business. Documentation shall be
provided with the bid that states the MBE/WBE that will be contracted, the dollar amount of the work that
will be performed on the project and the percentage of the dollar amount as it relates to the total bid amount
by using Form MWBE-1.0, MBE/WBE Participation Form.
The City, its agencies, boards, or commissions requires the Contractor's good faith efforts to obtain
participation by those Contractors classified as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE").
Failure to provide ALL the required evidence of good faith efforts with the bid will be grounds for
rejecting a bid as non -responsive.
The requirements that bidders shall supply as good faith efforts to have active participation from MBEs
and/or WBEs on this Project is written documentation evidencing the efforts by using Form MWBE-2.0,
Evidence of Good Faith Efforts and Form MWBE-2.1, MBE/WBE Contacted. Such documentation shall
include but is not limited to the following items:
a. A listing of all MBE/WBEs contacted including: (1) the name and address of the MBE/WBE; (2) the
date of contact; (3) the type of contact (i.e. phone call, written solicitation, etc.); (4) the nature or
type services or goods requested; and (5) the result of the contact.
b. Written evidence of outreach and copies of email exchanges inviting and receiving quotes or other
responses from MBE/WBE businesses or other documentations of efforts to encourage and
secure competitive quotes from MBE/WBE and local businesses to be included in the benefits of
building this Project.
c. Written documentation of letters of introduction, invitations to forging majority/minority strategic
alliances for capacity building including but not limited to mentoring, extensions of assistance on
payroll, insurance, bonding, line of credit, technical skills or business skills.
All bidders are actively encouraged to reach out to the MBE/WBE businesses in St. Joseph County, Indiana
and other local Indiana counties to utilize a good faith effort to forge constructive and lasting business
partnerships.
Notwithstanding the foregoing, the award and performance of all City contracts shall comply with applicable
federal, state, and local laws.
Version 7/20/2018 General Conditions - 5
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Liberty Tower Exterior Renovations
Project No. 118-086R
For Bids Due January 22, 2019
Contractor Name:
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section 11 only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified, contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in'automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 7/20/2018 General Conditions - 6
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 7/20/2018 General Conditions - 7
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) 11/IA_ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
(i) CI Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
Evidence that I am utilizing a surety company which is on the United States
Department of Treasury's Listing of Approved Sureties as required in the bid
specifications or contract.
(iv) y, ® List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
Version 7/20/2018 General Conditions - 8
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowleldd ments:
(i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attach►n n
(i)
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
%n
1/!7
proprietors or partnerships).
(ii)
List identifying all former business names.
(iii) A11A
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv) �
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) _
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
�I
I
under all applicable state and federal laws and local ordinances.
(vi)
Evidence of participation in apprenticeship and training programs, applicable to the
work to be performed on the project, which are approved by and registered with
/
the United States Department of Labor's Office of Apprenticeship, or its successor
organization.
(vii)
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(vii.)
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 7/20/2018 General Conditions - 9
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) �"" List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date:
fi
P
( 4gn I" -I re)
C
(Print, Name Here)
611r, 611A, (, yr`
(Name of Company)
904At Rd
(Address of Company)
LNo
(city)
(State)
(Telephone Number)
Version 7/20/2018 General Conditions - 10
Staffing, Capabilities
Mulder Waterproofing Employs aprox. 25 workers. We will be able to staff this job completely in house without
the help of any staffing agencies.
All individuals who work the public works project will be an employee of Mulder Waterproofing.
Drug Testing policy is attached behind these statements.
3420 Ravine Rd. Kalamazoo, MI 49006 Phone: (269) 381-8100 Fax:
(269) 381-2943
zmulder@mulderwaterproofing.com
www.mulderwaterproofing.com
Mulder Waterproofing & Sealants, Inc.
MWS Employee Handbook
714 Drug Testing
Date Approved: 3/24/2003
MWS is committed to providing a safe, efficient, and productive work environment for all
employees. Using or being under the influence of drugs or alcohol on the job may pose serious
safety and health risks. To help ensure a safe and healthful working environment, job applicants
and employees may be asked to provide body substance samples (such as urine and/or blood) to
determine the illicit or illegal use of drugs and alcohol. Refusal to submit to drug testing may
result in disciplinary action, up to and including termination of employment. As noted in the
Mulder Waterproofing Drug and Alcohol Policy, the following employees are subject to random
and for cause drug testing:
* All employees drawing a salary or wage from MWS
* All MWS employees on personal, medical or family leave
* All MWS employees on layoff status that are currently drawing unemployment benefits
Copies of the drug testing policy will be provided to all employees. Employees will be asked to
sign an acknowledgement form indicating that they have received a copy of the drug testing
policy. Questions concerning this policy or its administration should be directed to the Personnel
Manager.
54
Contractor's Bid For Public Work
Part TT
Section II
I . Mulder Waterproofing would gladly start this project as soon as the weather permits. We would plan on having
a 6 to 8 man crew to complete this project. We would be complete 60 to 90 days after starting date. We would
plan on having 3 men per swing stage for a total of 2 swing stages. Also we would plan on 2 men doing parapet
and ground work. One stage would be on the towers and one stage on the lower walls.
2. N/A
3. N/A
4. Mulder Waterproofing has 2 swing stages that will be used on this job along with the proper rigging equipment.
We also have elastomeric pumps and pressure washers that will be used.
5. No. Mulder Waterproofing has contacted vendors for pricing on all materials. It depends when the job starts and
the current market pricing.
3420 Ravine Rd. Kalamazoo, MI 49006 Phone: (269) 381-8100 Fax:
(269) 381-2943
zmulder@mulderwaterproofing.com
www.mulderwaterproofing.com
Contractor's Bid For Public Work
Part II
Section I
1. See attached job list for the last year
2. N/A
3. N/A
4. References:
Hazelhoff Builders: 269-276-0236
Earley and Associates: 269-383-1555
AVB Inc: 269-323-2022
Glas Associates: 269-353-7737
3420 Ravine Rd. Kalamazoo, MI 49006 Phone: (269) 381-8100 Fax:
(269) 381-2943
zmulder@mulderwaterproofing.com
www.mulderwaterproofing.com
Jobs completed in the last year
WHITMAN & ASSOC VAPOR BLAST
BRIARWOOD FLEX UNIT 7590-A3
Schuitmaker WP
DAVID BARTELS HOUSE
NATIONAL FLAVORS EARLEY
GAURDIAN GLASS FLEX PIT
CONAGRA FLOOR REPAIR
Ministry Bathroom
North Point Polish
AVB Flex
SKYRISE PARKING RAMP FLEX
WHIGHTMAN CEILING AND WALLS
MI MILK LOAD OUT FLOOR
BRONSON TUNNEL FLEX
GLAS @ ASSOC GARAGE WP
BUCKHAM FLEX
BERGHUIS FLEX
OMEGA BUILDING RESTORATION
HICKORY CORNER FLOOR CJ
Essenmacher Epo
Midwest Fasteners
Stahr Properties
CSM BLDG 600 DRAIN CAULKING
KNAPPEN MILLING FLEX
6330 Saybrook Dr
Trillium Windows
IBM Building Sidewalk
St. Julian Fastop
GEPHARDT INSURANCE ROOF LEAK
Maxwell WP
WYNDAM WAY FLEX
SHORES VACATION RENTAL BLDG
WATER TOWN CONDO'S
SOUTH HAVEN SIDEWALK CAULKING
CITY CENTER CHURCH
TOWN FLEX
Arcadia South
Woodsmith Flex
NHA Leaks
Paramount Leak
Canterbury Park 201
Ramsey WP�
The River Church
St. Julian Caulk
BRIARGATE UNIT 352 BLDG 432
W Main Animal Hospital
GENTRY FLEX
WMU KOHRMAN HALL PHASE II
AVB CAULK CENTRE STREET
Con Agra Extras
ANDREWS BEACHWOOD DECK COAT
KENSINGTON COURT WP
DR SCHURMUR GARAGE EPO
RICK MAURER BARN WALL AND VAPOR BLAST
Stull Epo
D&O Harbor Dr
Pinto Chimney
Bronson BC Dome
Abbott Chemical
Perregrine 100 Marble
Olivet Steps Caulk
Marlbourogh Bldg Leak
Lakeland Health 4th Floor
General Mills Saw Cuts
Pestoor EPO Repair
Bronson BC Bldg C
Greenspire 5B
Consumers Concrete
Lakeland Health COPS
North Point Tank
Gospel Mission
Bronson John St
SPCA Epoxy FI Repairs
Wolf Deck Coating
ConAgra Hallway
Washington Square
Flowserve Block
MI MILK DRYER ROOM
JOHN BYHOLT EPO
BORGESS PIPP WALL REPAIR
Fresenius
GREAT CLIPS RESTORATION
HEAT TREAT FLOOR JOINTS
SEEYLE RAMP DECK COAT
Casrsten Res
HemenwayEpo
KVD House
Schultz Epo
ANDREWS SEMINARY HALL
CARLTON CENTER CAULK
ANDREWS UNIV POWER WASHING LIMESTONE.
MIKE BROADHURST BASEMENT CARBON FIBER
Eastpoint Culvers
PERRIGRINE SQUARE WATERPROOF BRICK
ABAI WP
LEVI GUY
Vanburen County Jail
Bangor Plastics
Mcdonalds CFH
McGlynn 3627 Woodcliff
,9ordan Epo
ANDREWS MAPLE WOOD APT
BENNIPAL ST JOE ROOF PATCHING
MIDLINK PRECAST CONTROL JOINTS
Kal County Showers
Kal County Leak
Firestone Block
West Rock Plant 4
Arbor Credit Union
DR STEPHEN PECK WOOD DECKS
ABBOTT LANSING WINDOWS
Mcglynn 106 Brighton Park
Wilbur Epo
Iverson Flex
TWIN LAKES CHRUCH CAULK & WP
OLD PENNESULA BLDG CAULK
PEREGRINE TOWER PARKING DECK COAT
PEREGRINE TOWER LOADING DOCK
HERM SCHRADER CHIMNEY REPOINT
ABBOTT LINE 3 & GOWNING ROOMS
PEREGRINE TOWER BRICK REPAIR
UNITED WAY SKYLITES BATTLE CREEK
Peregrine 100 Holes
Hoeksma Caulk
CFH Mcdonalds Bridgeman
BIGBEECOFFEE SIDEWALK CRACK
SUSAN DELEUW EPO REPAIR
BRANDA DEYOUNG POWERWASH DRIVE WAY & HOUSE
MIKE AND GAY MCORMICK FLEX
ConAgra Shutdown
MUNSON HOSP ELEV PIT FLEX
WMU SPIDLER HALL DECK COATING
WMU PARKING DECK REPAIRS
Seiler Driveway
WHIRLPOOL EXP JTS
WMU EWB WATERPROOFING
Crookston Res
CROSSROADS MALL EFIS REPAIR
RON OOSTINDE DRIVEWAY CAULK
DALE MAY DRIVEWAY CRACKS AND SEALER
DALE MAY EPDXY FLOOR
AVB Corner Shops
Eldred Caulk
Mall City Mechanical
CHAPEL HILL UNITED METH CHURCH WP
WATER TOWNE COURTYARD CAULK
YMCA Caulk
Farmer St Caulk
Kalamazoo Waste Water Clarifier Pits
AVB 650 Trade Center
City of Portage Fountian Blasting
City of Portage Fountian Caulking
Stryker Caulk
WATERTOWNE EFIS COATING
WATER TOWNE BASEMENT PENETRATIONS
FACTORY CONDO'S MASONRY
FACTORY CONDO'S MASONRY
KAL-SEC OFFICE CAULK
KAL-SEC OFFICE VAPOR BLAST
AMY VAIL FLOOR POLISH
Larry Bell Fountain
Jim VanTuinen Flex
WILBUR HALL WP
Clapp Pool Caulking
McDonalds Indiana
VDK Lucas Rd Epo
Galilee Caulk
Weiner House
dunham sports caulk
JBS KILL FLOOR
Long Res Flex
Mcglynn 207 Canterbury Park
Schrock Epo�
Davids Bridal Sidewalk
BLESSED SACREMENT CHURCH RESTORATION
KEISER BLDG COPING STONES
WEST ROC ISLEWAY FLOOR PAPER ROLLER
Lakeland Health Bee Caulk
WMU KOHRMAN HALL WINDOW PERIMETER
WATER FRONT CHIMNEY COATING REPAIR
COSTA BUILDING SOUTH ELEV
McGlynn 3747 Ceadar Ridge
KCMS Caulk
KVCC MUSEAUM SIDEWALK NORTH ELEV
CITY OF KAL SKATE PARK CAULK
Alpha Phi Exterior
CONDENCE BROWN HEARING
OLECH DOOR FRAMES
STAN LEEP DECK PATCHES
LYLE LAPINE DECK
Butts Res
HOLLAND HOME 2 CAULK
FAIRFIELD INN CAULK
'UtiNer�dt Flex
Broekhuizen Driveway
Conagra Equipment
Ivens Garage Epo
WALSH HOUSE NEW SUMP PUMP
COVENANTHOSP MACKINAW
Westbrookrs Epo
BRONSON PT TUNNEL WP
Antoniotki Skylight
West Main Pad Extra
533 Group Flex
Kal Co Animal Shelter
WATERTOWNE BRICK AND SILL REPAIR
MU'NGER APARTMENTS FIRE SEALANT
K&M SHOOTING PRODUCTS ROOF REPAIR
LMC WINE CENTER
LAPORTE FEDERAL CREDIT UNION
Kai County Alcott Sealer
Kai County Alcott Caulk
C'iadella Chimney
WEST ROC VAPOR BLAST
COVENANT 800 ABC
TOT BRUSSE CLUBHOUSE REMOVE GLUE
Galilee Bus
GALESBURG MIDDLE SCHOOL DOOR FRAMES
WATERTOWNE CONDO'S SAFETY WALKWAY
POKAGON HEALTH WP
BROADHURST BASEMENT REPAIRS
COMSTOCK HIGH SCH MAIN ENTRANCE
DOLLAR GENERAL CAULK AT BUILDING
PARKER VANOOSTEN EPDXY FLOO
GARY SQUIRES SEWER PIPE FLEX
LAKELAND HOSP 3 & 4 FLOOR MASONRY
JBS PPA FLOOR
KNOUSE FOODS BREAKROOM EPO
Meyle Flex
PNC Leak Bldg B
Nagel Epo
Hartford Township Hall
Betz Flex
Allenx Caulk
HOWARDSVILLE GOSPEL CHAPEL EPO
ANN WHITTEN HALL CAULK & TUCKPOINT
MI MILK FLOOR CRACKS
MARTZ BUILDERS TULLYMOORE
MINGES CREEK MALL CAULK
DRUG AND LAB TANK FARM #4
Galilee Church Bathrooms
YOUNGS TUCKPOINTING
BOB BROWN DRIVEWAY
Eaton Epo Repairs
Vette WP
RUZZO EPO
ken schieldel driveway
DOWAGIAC HIGH SCHOOL FIRE DAM SPRAY
DRUG AND LAB DIDPOSAL LOAD BAY
DRUG AND LAB HERCULES TANK
WH'IGHTMAN CAULK POINT
WEST ROC EPO BACK SIDE ROLLER
TWO DUCK CONCRETE SAW CUTS
YMCA Zip
ABOSLUTE EPO
MARSHALL BEACHLER DECK COAT
BENNIPALST JOE CAULK CANOPY
SUSAN KISER HOUSE
Trey Star Marble
Schauer Water Test
Flowserve Block continued
Greenspire 5C
GREYDANUS FLEX
MI MILK GROUT, CAULK EPO REPAIRS
Sunrise Apts
Balmer Caulk
Ray Flex
REX WATKINSfire lane 9
PERRIGINE LOADING PHASE 2
DEPAUW HOUSE COATING AND EPDXY
DEPUAW HOUSE DECK COAT
NORTH POINT WATER TANK
Winos Ect
ERRIGRINE 100 WATERPROOFING
6875 HUNTERS RIDGE CONO FLEX
KALAMAZOO COLLEGE CAULK CRACKS IN WALL
COVENANT COOPER 700 8C 17A 15A 7A 14A 13A 6A
KLINGMANS RESTORATION
Trillium Rochester Hills
Farmer St Flex
Ozmun Flex
Pathfinder Prep
Galilee Gutters
CFH South Bend
SKYRISE COURTYARD DOORS
MCCAMLEY POOL MMA
Bells Tower Caulk
Cleveland WP
PERRIGRINE 100 WP VAULT
HERM VISKER
TJ MAXX
MAUDE'S VAPOR BLAST
CANCER CENTER LIMESTONE FACE
OVERBEEK BARN FLOOR PIC AND COATING
Midwest Glass Lasalle Elementary
POST CEREAL BLDG 8
Flowserve Concrete WP
SPCA Gazebo
FIRESTONE BRICK REPAIR
POCH HOUSE PRIVACY FENCE CAULK
KNAPPEN MILLING CONCRETE REPAIR
KLINGMAN GRAFFITI REMOVAL
PRO COATING ROOF
WYNDAM LEAKS IN FLASHINGS
KAL AIRPORT TRENCH DRAINS
Briargate Sills
Briargate 432-350 Water test
Bouman Flex
Roberts Epo
Bowers Epo
WMU SPIDLER HALL DECK COATING
Miller Flex
Locey Pool
400 ROSE ST WP
SCOTT SULLIVAN HOUSE
Aldi Caulk
CENTERPOINT CHURCH WP
Kal Sec Horse Barn
BATTLE CREEK DRIVEWAY DUCKWORTH
CO-12 ELEV PITS
WESTROCK BACK SIDE ROLLER.2.18
A&G Galesburg Middle School
AVB Chow Hound
Wolverine Culvers
CORVETTE CENTRAL LEAK REPAIRS
Arbor Therapy
DEMING CRAWL SPACE DRAIN
McGlynn Pence
McGlynn 114 Bridgewood
Locey Caulk
Mi Milk Patch
Office Depot Caulk
MI MILK SEPORATOR ROOM FAST TOP
Advia Credit Union
Dixon Caulk
PERRIGRI'N'E LOADING DOCK MEMBRANE
14144 VERONA ROAD SAW CUTS
Herder Flex
Aitken Caulk
Watsons Eifs
Krinock Res
FRED STATLER COTTAGE CAULK
AVB Office Caulk
KNOUSE FOODS PEELER RM FLEX
PARNEL SMITH WATERPROOF
MENDON SCH SIDEWALK ZIP CAPS
KAISER PIT VAPOR BLAST
TERRACE PLAZA PRECAST LEAKS
VERN KUIPERS HOUSE REPOINT CHIM AND CAULK
Conagra November Patches
COMMERCE PARK FLOOR REPAIR
WEST ROCK PAPER DRY END
FRESENIOUS MEDICAL LEAK
CSM Fence Post
BONSON LAB WATERPROOF
Heathrow Ave Flex
WMU Computer Center
Simple Treaures
Putman Flex
Jacobs Caulk
Wayland Training Center Caulk
VDK Zimmer Res
ITHICA SPY BEAN FLEX
FULTON OFFICE CAULK
PERRIGRINE MARBLE 100 CAULK OR FLEX WEST ELEV
MI MILK MISC REPAIRS
MHS Friendship Village
Conagra Patch's
Plainwell Window Caulk
KALAMAZOO COLLEGE CAULK CRACKS IN WALL
AVB 400 ROSE HANG PLASTIC
WEST MI CANCER CJ IN MASONRY
CHRIS BRADFORD FLEX
BRONSON WALNUT ST RAMP LEAK
WMU BC Atrium
JBS FLOOR PATCHES
MINISRTY W/ COMMUNITY BATHROOMS
Living Well Church
STEWERT SUTHERLAND EPO
FIRST CONG CHRUCH CAULK
JBS KILL FLOOR TRIPE AREA EPO
MIKE CARL WP
Bells Trench Drain
Earley Peregrine 100
Camp Critter
Kal Co Alcott Cracks
Covenant Harrison