Loading...
HomeMy WebLinkAbout3. 815 Leland_COA 2019-0109B_PACKETSTAFF REPORT CONCERNING APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Date: January 9, 2019 Application Number: 2019-0109B Property Location: 815 Leland Avenue Architectural Style/Date/Architect or Builder: Gabled-ell / 1900 Property Owner: Julian and Emily Dean Landmark or District Designation: Chapin Park Local and National Historic District , Ordinance #9574-05 Rating: Contributing DESCRIPTION OF STRUCTURE/SITE: This 2 story irregular frame house sets upon a brick foundation facing east on Leland Avenue. The roof is pyramidal with gables, a simple cornice, and asphalt shingles. The porch is house-width with brick piers, railings, and a simple fascia. The windows are predominantly 1/1 vinyl double hung with molded entabulatures. An oval window with wedge-shaped brackets faces the street on the second story. ALTERATIONS: COA 2013-0924 called for repointing “brick with lime putty; replace brick in-kind and replace wood siding in the rear.” COA 2017-1002D allowed for the construction of a privacy fence around the side and rear yard. APPLICATION ITEMS: “Remove and replace front porch crown molding with similar product. Install double-4 vinyl siding over existing wood-lap siding on home and garage. See picture. Color TBD. Enclose all window and door trim with vinyl or aluminum. See picture. Enclose soffit and fascia, on home and garage, with aluminum soffit and fascia panel. See picture. Color TBD. Fully strip and repaint front entrance framing and jamb. Color TBD. Replace south facing entrance door and frame with a pre-hung half-lite steel door. See picture. Remove and replace window #5 with white vinyl double hung replacement window. Exterior trim to be wrapped in aluminum. See picture.” DESCRIPTION OF PROPOSED PROJECT: The applicant (Indiana Community Action Association) seeks approval for the following lead remediation projects, to be bid out to final contractor at a later date: 1. Installation of double-4 vinyl siding over the existing wood-lap siding with a vapor barrier beneath on both the garage and the house, a. Rear second story gable is clad in wood shingles, this section will be replaced with the same siding as the remainder of the house, 2. Removal of original wooden decorative crown molding elements and replacement with “similar product,” 3. “Enclose all lead painted trim with vinyl or aluminum ventilating soffit panels, coil stock, and field fabricated trim accessories in accordance with manufacturer’s specifications,” 4. “Enclose soffit and fascia with aluminum soffit / fascia panels,” 5. Enclose all window and door trim (unless specifically mentioned otherwise) with vinyl or aluminum products, 6. Remove and replace south-facing entrance door (referenced on side B) with “Energy Star Rated pre-hung metal, insulated, half-glass entrance door system with interior casing and trim as needed,” a. The exterior wood frame will be covered as above with aluminum, 7. Remove and replace window (referenced as ground floor window #5 on side C) with a “white, vinyl, double hung, replacement style, Energy Star Rated, Argon filled, Low E coated glass, one-over-one window,” 8. Remove and replace window components (including sills and casings), inside and out, with new wood material, a. Window 4 on side B, b. Window 11 and 16 on second story of side A, c. Window 12 and 13 on second story of side B, 9. Strip and repaint the following: a. Front entrance door, b. Oval second story window (referenced as window #16 in the application’s supporting documents), In addition to the above listed items, various internal remediation efforts will be initiated that are beyond the scope of the Historic Preservation Commission’s purview. All exterior surfaces were assessed by Amereco Engineering of Valparaiso, IN on August 14th, 2018. One hundred fifty-two (152) readings were collected from the exterior of the structure and one hundred twenty- one (121 -or approximately 80%) returned a ‘Positive’ test for Lead Based Paint (LBP). The highest readings of the entire site (both inside and out) were returned from the exterior of the garage, with the garage fascia returning a 23.5 mg/cm2 reading. PRESERVATION INSPECTOR REPORT: N/A STANDARDS AND GUIDELINES: CHAPIN PARK II. EXISTING STRUCTURES A. BUILDING MATERIALS Original exterior building materials in the district include brick, stucco, clapboard, wood shingles, and brick or stone masonry. In some instances, vinyl, composite and aluminum siding have been applied over the original material. Required Original exterior building materials shall be retained when possible. Deterioration of wood materials shall be prevented through repair, cleaning and painting. The existing architectural detail around windows, porches, doors and eaves shall be retained or replaced by replicas of the same design when deteriorated beyond repair. Masonry, including brick and stucco structures, shall be maintained, and properly cleaned only when necessary to halt deterioration or to remove stains and shall be done in a method acceptable for the preservation of the surface: i.e. low-pressure water and soft natural bristle brushes. Brick or masonry mortar joints should be repointed only when there is evidence of moisture problems, or when sufficient mortar is missing to allow water to stand in the mortar joint. Existing mortar shall be duplicated in composition, color, texture, joint size, method of application and joint profile. When repairing stucco, stucco mixture shall be used. A professional shall make a study of the old stucco, to determine the exact mixture and underlayment used in the original work. Some repair methods are not compatible with the original techniques and may cause early disintegration of the repair work and the original work. Ample ventilation must be afforded the structure when siding is installed, in order to prevent increased deterioration of the structure from moisture and insects. Recommended Whenever possible, the original building materials should be restored. When maintaining or repairing original siding is not feasible, aluminum, vinyl or composite siding may be used. When used over wood surfaces, this siding should be the same size and style as the original wood. Every effort should be made to retain the original trim around windows, doors, cornices gables, eaves and other architectural features. […] B. ROOFS AND ROOFING Roof shapes in the district encompass all the various designs found in residential structures: hipped, gabled, gambrel, flat and combinations of these. Roofs are covered with a variety of materials such as asphalt, asbestos, wood and slate shingles as well as clay tiles. Residences in most cases have wood fascias with gutters and downspouts. The fascias of some vinyl- and aluminum-sided houses are covered with the same materials. Required The existing shape and type of materials of the roof shall be retained. All architectural features, which give the roof its essential character, shall be retained, including dormer windows, cupolas, cornices, brackets, chimneys, cresting and weather vanes. Recommended The original shape and materials of the roof should be restored. Particular effort should be made to retain materials such as slate, tile and other unique materials not commonly found in new construction. Roof covering which is deteriorated beyond repair should be replaced with new material that matches as closely as possible the original in composition, size, shape, color and texture. Gutters and downspouts are often a necessary adjunct in order to prevent deterioration of the structure; they should be maintained whenever possible or replaced with a style comparable and suitable to the architectural period. Prohibited Nothing shall be done to change the essential character of the roof as viewed from a street by adding architectural features or large unsightly fixtures, or by using materials inappropriate to the style of the house. The roof shall not be stripped of architectural features important to its character. Not Recommended Overhanging eaves, soffit, brackets and gables should not be covered or enclosed when adding siding to a building. C. WINDOWS AND DOORS Window and door frames are in most cases wood and vary depending upon the style of the home. Many are double-hung windows with wood trim and sills. Brick structures have stone sills and brick lintels. In some cases where aluminum siding has been applied, the window and door trim has been covered. About half of the structures in the district have aluminum storm windows; the other half have wood storm windows. Required Original windows and doors shall be retained including sashes, lintels, sills, shutters, decorative glass, pediments, hoods and hardware. When deteriorated beyond repair, they shall be replaced with units and trim resembling the original. Recommended Wood storm windows and doors painted or finished to match the original should be used but should not damage existing frames. If new sashes or doors are installed, the existing or original materials, design and hardware should be used. When metal storm doors are used, they should be painted, anodized or coated to match the existing. When awnings are used, they should be of canvas material. D. ENTRANCES, PORCHES AND STEPS Most houses in the district have either an open or enclosed porch across the front. Most porches have either hip or gabled roofs or are covered by the main roof of the house. Required When deteriorated beyond repair, existing or original porches, stoops, patios and steps, including handrails, balusters, columns, brackets, tiles and roof decorations, shall be retained or replaced by replicas of the same design or by a design more in keeping with the historic period of the structure. Porches and additions reflecting later architectural styles and which are important to the building’s historical integrity shall be retained. Recommended When enclosing porches for heat conservation or for other reasons, it should be done in a manner that does not alter the architectural or historical character of the building. Not Recommended Original porch details should not be replaced with materials representing a different period or style from the original. […] VI. ENFORCEMENT PROCEDURES […] This ordinance, however, does not prevent the ordinary maintenance and repair of any building or structure which does not involve a change in any exterior feature, nor does it prevent the reconstruction, alteration, demolition or moving of any building or structure which the Building Commissioner or other official has determined to be a hazard to public safety. […] In making its determination, the Historic Preservation Commission shall consider three factors: first, the appropriateness of the proposed work to the preservation of the building and district; second, the detriment to the public welfare if the proposed work is permitted even though it is not deemed appropriate; third, the potential hardship that the denial of the Certificate of Appropriateness would cause the applicant. STAFF RECOMMENDATION: The Chapin Park Standards and Guidelines allow for the installation of vinyl siding over original siding material when the latter has been determined to be deteriorated beyond repair. The exterior cladding of the house – although recently painted – returned evidence of elevated levels of Lead Based Paint in 80% of the tested areas. Bearing this in mind, encapsulation is an accepted form of remediation for Lead Based Paint hazards, and will afford the homeowner (at least) twenty-five years of safe environment to raise their children in. Based upon the willingness of the contractor (and the homeowner) to retain and remediate specific character- defining features of the house, as well as the overwhelming majority of the windows having already been replaced with vinyl windows, Staff recommends approval of this project with the condition that – upon the bid being awarded by Indiana Community Action Association – the contractor executing the work return to the Historic Preservation Staff with specific product information for the installed products. Written by Adam Toering Historic Preservation Specialist Approved by Elicia Feasel Historic Preservation Administrator Sanborn and Satellite Imagery Diagram 1 - Sanborn imagery from 1917, 1945, 1960, and satellite imagery from 2017 815 Leland, Front / Side AW16W11W1 815 Leland - South Side / Side BW12W13W2W3W4 815 Leland - West Side / Side C.Window #5 at right.W5W18W12W6W14 Sent from my iPad 815 Leland - North Side / Side DW7W8 815 Leland - North Side / Side DW15W7W8W9W10 From:Steve SzadayTo:Adam ToeringSubject:815 LelandDate:Tuesday, January 15, 2019 1:27:17 PM Close-up of oval window (#12), side AW16815 Leland - Side A, second story, Window 16 Garage at rear of property 817 Leland - Clad in vinyl siding and exhibiting compromised exterior details around oval window. Windows White, vinyl, double hung, replacement style, Energy Star Rated, Argon filled, Low E coated glass, one-over-one window. This will include a insect screen, interior stop and exterior trim wrapped with aluminum. Product to be used- Pella 250 series OR similar product Doors White Energy Star Rated pre-hung metal, insulated, half-glass, entrance door system with interior casing and trim as needed. Supply and install one entrance and one mortised deadbolt - keyed alike and a wide angle peep sight. Provide an appropriate finish for all new material, wrap exterior wood frame with aluminum. Product to be used- Therma-Tru Benchmark Doors Half Lite Simulated Divided Light OR similar product Siding Apply a nonwoven vapor barrier with taped seams and opening flashing to enclose the lead paint or apply 1/4" permeable rigid or fanfold insulation as a paint barrier and substrate for siding materials. Install double-4 vinyl siding, owner selection of standard colors. Enclose all lead painted trim with vinyl or aluminum ventilating soffit panels, coil stock and field-fabricated trim accessories in accordance with manufacturer's specifications. Caulk all joints and seams of lead painted trim with 25-year caulk. Product to be used- Georgia Pacific Vision Double 4’ Siding OR similar product Soffit, Fascia, and trim Enclose soffit and fascia with aluminum soffit / fascia panels, color selected by owner. Back caulk all seams with siliconized acrylic to create a weathertight seal. Product to be used- Durabuilt Triple 4” Aluminum Soffit and Smooth Fascia and trim Trim Coil OR similar product East Elevation (Side A) South West Elevation (Side B) West Elevation (Side C) North East Elevation (Side D) Garage Dear Historic Preservation Commission,1/13/2019 Please accept this brief letter to accompany the application you are currently considering for several projects at my home at 815 Leland Avenue. My husband and I are raising our two sons, Finn age 4, Declan age 2, here, and we feel so fortunate to have landed in a charming neighborhood. This past August a Lead Risk Assessment performed at our home revealed that we had a substantial amount of lead hazards both on the interior and exterior of our home. This was very alarming. My children are currently within the age range where exposure to lead, even at very low levels, can have a profound effect on their physical, emotional, and intellectual development which will inturn have a profound impact on the course of their lives. Naturally, we sought help in dealing with this issue. Due to the pervasiveness of lead in our home, we were so grateful to qualify for funds through the Lead Protection Program grants. The funds offered through this grant would be transformative for the way my family can interact with our home. It would allow us to address hazardous areas in and around our home all at one time, and alleviate worries of lead exposure while our children are still at these vulnerable ages. Otherwise, the scale of this project would take us years to afford by doing piecemeal projects and would increase our children’s exposure to this toxic chemical. We love our historic home; we love our neighborhood, but we need to make it safe for our children. Unfortunately, our beautiful home was built at a time in our nation’s past when toxic materials were routinely used to decorate the interior and exterior of people’s most personal spaces. Our home was built in 1901 to be beautiful and unwittingly toxic. So here we are, in 2019, learning how to adapt what is precious about our homes to safety standards current research recommends. I understand that some aspects of the project proposal seem to be pushing the boundaries of what are customarily approved by the Commission, and I hope you will take our children’s safety and our financial limitations into consideration. I look forward to discussing how we can find common ground between preserving an aesthetic and ensuring the safety of my children and any children who live in this house in years to come and ultimately, how we can take another step towards making this a safe, historic district. Best Regards, Emily Dean 815 Leland Avanue South Bend, IN 46616 P - 856.904.4485 M - emily.k.holloway@gmail.com SPECS BY LOCATION/TRADE with Costs 12/17/2018 Bidding Open Date: Bidding Close Date: Project Manager: Initial: Case Number: Phone: Pre-Bid Site Visit: 815 Leland AvenueAddress:Unit 01Unit: General RequirementsLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 1 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPGC01 1.00 ALCONSTRUCTION PERFORMANCE STANDARDS n/a n/a It is the Bidding Contractor's responsibility to have all bids comply with the Programs Residential Construction Performance Standards and to include in every bid all items associated with the written scope item (i.e. Scope written as stabilize paint, it is the contractor's responsibility to include needed items such as plastic, tape, HEPA vacuum, scrapers, paint, etc.). LBPGC02 1.00 GRLEAD-SPECIFIC LAWS, RULES, REGULATIONS & GUIDELINES n/a n/a The execution of this work shall comply with all applicable federal, state and local laws, rules, regulations and guidelines for lead dust environments, including but not limited to: 29 CFR 1926.62 - Lead Construction Standard; 29 CFR1910.1200 - Hazard Communication Standard; 40 CFR Part 745 - Lead-Based Paint Poisoning Prevention in Certain Residential Structures (EPA Regulations); 24 CFR Part 35 - HUD's Lead Safe Housing Rule. LBPGC03 1.00 ALPAINT COLOR n/a n/a Owner's choice of color or match existing paint color as close as possible when applicable. LBPGC04 1.00 EANOTIFICATION REQUIREMENTS $100.00 $100.00 Make applicable notifications to state or local agencies, create occupant protection plan, post job signs and secure lead hazard reduction sites. If project includes Lead Abatement, Contractor will be responsible for ISDH Notification and applicable fees. LBPGC05 1.00 ALWORKER TRAINING AND SUPERVISION - ABATEMENT n/a n/a All workers conducting "abatement" lead hazard reduction activities must be trained and certified as lead abatement workers and provide proof of valid state or EPA-approved licenses or certificates. All persons acting as supervisors during "abatement" lead hazard reduction activities must be trained and certified as lead abatement supervisors and provide proof of valid state or EPA-approved licenses or certificates. LBPGC06 1.00 EAOCCUPANT PROTECTION $500.00 $500.00 Unit is occupied. Treatment of the dwelling unit interior is to be completed within 5 calendar days, the work site will be contained as to prevent the release of leaded dust and debris into nonwork areas, treatment will not create other safety, health or environmental hazards; and, at the end of the work on each day, the work site and the area within at least 10 feet of the containment area will be cleaned to remove any visible dust and debris, and occupants will have safe access to sleeping areas, Page 1 of 20 815 Leland AvenueAddress:Unit 01Unit: General RequirementsLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 1 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program a bathroom and kitchen facilities. Occupants will not be permitted to enter the work site during the lead hazard reduction activities until after the lead abatement project has been completed and clearance is achieved. Contractor is responsible for ensuring occupant protection is completed in accordance with HUD rules and regulations. LBPGC07 1.00 ALQUANTITY VERIFICATION n/a n/a The quantities herein expressed within the specification are for informational purposes only. Contractors shall be responsible for obtaining their own quantity schedule. INCAA shall not be held liable for any difference in estimated and actual quantities; therefore, change orders will not be approved for differences in quantities. Contractors shall immediately notify the INCAA during the bidding process if field measurements vary significantly from those estimated within this specification. Contractor's bid shall be reflective of completing specified work to eliminate lead hazards at the project site. LBPGC08 1.00 RMCLEAN TO CLEARANCE $110.00 $110.00 After completion of all lead hazard reduction activities, all work areas shall be cleaned for clearance. Typical work practices include, but are not limited to: wet mist, fold and remove all containment polyethylene sheeting; HEPA vacuum all visible surfaces including walls, floors, ceilings and window troughs from the top down; detergent scrub all horizontal surfaces in small sections using a 3-bucket system, changing rinse water every 250 SF; completely rinse with clean water and new equipment. After surfaces are dry, HEPA vacuum all visible surfaces except ceiling. LBPGC09 1.00 EAWALL NAMING PROTOCOLS n/a n/a Walls and attached components shall be identified with the letters A, B, C & D. Wall A is always the wall that is closest to the address elevation or the "street side" of the house. Moving clockwise, the walls are then B, C, D. Windows are provided a numerical number, which is reflected on the site plans included in the Lead Inspection & Risk Assessment Report. LBPGC10 1.00 EABUILDING PERMIT REQUIRED $250.00 $250.00 The contractor is responsible for submitting this owner-prepared work write up to the building department, applying for, paying for and receiving a building permit(s) prior to starting any work. LBPGC11 1.00 DUOWNER RESPONIBILITIES n/a n/a The owner shall provide: 1. Utilities and sanitary facilities. 2. Remove all personnel items from work area. 3. All full and complete access to work areas. 4. Allow site access during normal work areas. Location Total:$960.00 Page 2 of 20 815 Leland AvenueAddress:Unit 01Unit: ExteriorLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 2 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 9 Environmental Rehab LBPPR01 20.00 SFREMOVE PAINT- CHEMICAL $25.80 $516.00 Prepare area and protect adjacent areas not being stripped in accordance with manufacturer's directions. Provide adequate worker protection. Apply chemical stripper and any recommended cover sheet in accordance with manufacturer's specifications. Neutralize and rinse surface in accordance with manufacturer's directions. Collect residue and rinse water in 55 gal drums. Provide disposal of drums. Chemical must be pre-approved by Project Manager. Following paint removal, the Project Manager must inspect to verify completion. Upon approval by Project Manager, prime and apply coat of paint to owner's selection of standard paint colors. If repainting occurs prior to Project Manager approval, Contractor shall remove all paint again. Door Jamb & Casing - Side A Trade: 219 Lead Abatement - INCAA Program LBPDUST 1.00 EACLEAN TO CLEARANCE $950.00 $950.00 After completion of all lead hazard reduction activities, wet mist, fold and remove all containment polyethylene sheeting. HEPA vacuum all visible surfaces including walls, floors, ceilings and window troughs from the top down. Detergent scrub all horizontal surfaces in small sections using a 3-bucket system, changing rinse water every 250 SF. Completely rinse with clean water and new equipment. After surfaces are dry, HEPA vacuum all visible surfaces except ceiling. Clean All Window Troughs Clean Front Porch - Elevated Lead Dust Levels LBPE01 1.00 EADISPOSE & REPLACE EXT. COMPONENT $300.00 $300.00 After establishing any required ground containment with polyethylene sheeting, wet mist, remove, package in polyethylene and dispose of lead-painted exterior component. Install new exterior component of similar design and nature. Install product must be properly designed and rated for exterior use. Building materials must be installed in accordance with manufacturer requirements, and in accordance with local, state and federal rules and regulations. Front Porch - Side A - Crown Molding Remove and Replace. If damage to paint of surrounding components occur, replace components damaged. LBPSID01 27.00 SQEXTERIOR-- INSTALL VAPOR BARRIOR &VINYL SIDING $450.00 $12,150.00 After establishing any required ground containment with polyethylene sheeting, mark or stencil lead painted siding with "Lead Paint" 4' in all directions. Apply a nonwoven vapor barrier with taped seams and opening flashing to enclose the lead paint or apply 1/4" permeable rigid or fanfold insulation as a paint barrier and substrate for siding materials. Install double-4 vinyl siding, owner selection of standard colors. Wrap all windows with aluminum. All LBP components must be adequately enclosed with siding or trim. Caulk all joints and seams of lead painted trim with 25 year caulk. HEPA vacuum any visible paint chips, dust and debris. (Owner's choice of siding pattern, color Page 3 of 20 815 Leland AvenueAddress:Unit 01Unit: ExteriorLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 2 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program and embossing.) All Sides. Siding, trim and window casings. LBPSOF2 190.00 LFENCLOSE SOFFIT/FASCIA-- ALUM $10.35 $1,966.50 After establishing any required ground contaiment with polyethylene sheeting, mark "Lead Paint" every 10 linear feet. Enclose soffit and fasica with aluminum soffit / fascia panels, color selected by owner. Back caulk all seams with siliconized acrylic to create a weathertight seal. HEPA vacuum all visible paint chips, dust and debris. Soffit and Fascia has deteriorated lead-based paint. Containment Required per 24 CFR 35.1345 All Sides & Elevations Location Total:$15,882.50 Page 4 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 01 - EntryLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 3 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPD02 2.00 EAINTERIOR DOOR - REPLACE HOLLOW CORE $350.00 $700.00 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of all LBP containing door components, including jamb and trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Install a like-in-kind door to match remaining doors in residence. Provide brass finish lockset. Spot prime bare wood and top coat entire assembly with premium acrylic latex or stain to match. Side C LBPENCA 20.00 SFELASTOMERIC - SMALL COMPONENTS $20.25 $405.00 After establishing any required floor containment with polyethylene sheeting, prepare surface by degreasing and deglossing. Apply any recommended primer and roll out a liquid, polymer, elastomeric encapsulant to create a continuous seal over the surface in accordance with manufacturer's specifications. Product must be pre-approved prior to installation. Use the required number of coats and coverage rate of elastomeric to guarantee a minimum 20-year manufacturer's warranty. Side A & B Door Casing Location Total:$1,105.00 Page 5 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 03 - Living RoomLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 4 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPD01 1.00 EAEXTERIOR DOOR--REPLACE WITH METAL PREHUNG $654.61 $654.61 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of existing door and frame. Install an Energy Star Rated pre-hung metal, insulated, half-glass entrance door system with interior casing and trim as needed. Supply and install one entrance and one mortised deadbolt - keyed alike and a wide angle peep sight. Provide an appropriate finish for all new material, wrap exterior wood frame with aluminum Exterior Door and components contain deteriorated lead-based paint. Containment Required per 24 CFR 35.1345 Side B Location Total:$654.61 Page 6 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 04 - OfficeLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 5 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 9 Environmental Rehab LBPWT01 1.00 EAWINDOW-- REMOVE / REPLACE COMPONENTS $231.67 $231.67 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of window components as described below. Wash with detergent solution, rinse, allow to dry and HEPA vacuum all visible paint chips, dust, and debris. Install new window components to match existing. Prime bare wood. Top coat with premium acrylic latex. Window Casing & Sill Window 4 - Wall B Trade: 219 Lead Abatement - INCAA Program LBPT01 50.00 LFTRIM-- REPLACE WITH NEAREST SIMILAR STOCK $4.11 $205.50 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Replace with nearest available/similar stock trim components. Fully prime and apply a single top coat of premium acrylic latex paint (color choice of owner). Baseboard LBPW01 1.00 EAWINDOW ABATEMENT $630.00 $630.00 Field measure, order and install a white, vinyl, double hung, replacement style, Energy Star Rated, Argon filled, Low E coated glass, one-over-one window. This will include a insect screen, interior stop and exterior trim wrapped with aluminum. Weight wall cavities, if applicable, are to be insulated with expanding foam or blown-in cellulose. Interior window components to be stabilized and encapsulated utilizing a lead encapsulant. Owner to be supplied with 5-year warranty. Windows and components have deteriorated lead-based paint. Containment Required per 24 CFR 35.1345 Wall C - Window 5 Includes replacement of casing and sill. Location Total:$1,067.17 Page 7 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 06 - KitchenLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 6 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPD02 2.00 EAINTERIOR DOOR - REPLACE HOLLOW CORE $350.00 $700.00 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of all LBP containing door components, including jamb and trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Install a like-in-kind door to match remaining doors in residence. Provide brass finish lockset. Spot prime bare wood and top coat entire assembly with premium acrylic latex or stain to match. Side B & C (to Room 18 only) Replace with similar stock door and trim. All casework to be replaced. LBPT01 100.00 LFTRIM-- REPLACE WITH NEAREST SIMILAR STOCK $5.11 $511.00 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Replace with nearest available/similar stock trim components. Fully prime and apply a single top coat of premium acrylic latex paint (color choice of owner). Baseboard Door Jamb - Wall A (If casing paint is disturbed, replace casing as well) Door Casing on Room 7 Side of Doorway is detiorated and must be replaced. Location Total:$1,211.00 Page 8 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 07 - Dining RoomLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 7 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program Custom 1.00 EADOOR REPLACEMENT - CUSTOM $250.00 $250.00 Remove and Replace "closet" doors on side A. Doors shall be primed and painted, with appropriate hardware to ensure operation. If casing paint is disturbed replace casing and paint to match. LBPT01 20.00 LFTRIM-- REPLACE WITH NEAREST SIMILAR STOCK $4.11 $82.20 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Replace with nearest available/similar stock trim components. Fully prime and apply a single top coat of premium acrylic latex paint (color choice of owner). Door Casing - Side B - Stain or Paint per homeowner request. LBPVSG 25.00 SFFLOOR ENCLOSURE - UNDERLAYMENT& VINYL SHEETGOODS $9.33 $233.25 Mark "Lead Paint" at 4' intervals. HEPA vacuum any visible paint chips, dust and debris. Install 5/16" underlayment grade plywood, using adhesive and 7d crew shank or cement coated nails, 6" on center in all directions. Install .07" thick, backed vinyl sheet goods, with minimum seams, per manufacturer's recommendations. Install metal edge strips in openings, and shoe molding or vinyl base around perimeter. (Owner's choice of in stock color/pattern.) Closet Floor - Side A of Room Location Total:$565.45 Page 9 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 08 - 2nd Floor StairwellLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 8 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 9 Environmental Rehab LBPPR01 50.00 SFREMOVE PAINT- CHEMICAL $23.50 $1,175.00 Prepare area and protect adjacent areas not being stripped in accordance with manufacturer's directions. Provide adequate worker protection. Apply chemical stripper and any recommended cover sheet in accordance with manufacturer's specifications. Neutralize and rinse surface in accordance with manufacturer's directions. Collect residue and rinse water in 55 gal drums. Provide disposal of drums. Chemical must be pre-approved by Project Manager. Following paint removal, the Project Manager must inspect to verify completion. Upon approval by Project Manager, prime and apply coat of paint to owner's selection of standard paint colors. If repainting occurs prior to Project Manager approval, Contractor shall remove all paint again. Stair Stringers Trade: 219 Lead Abatement - INCAA Program LBPST03 12.00 LFREPLACE RAIL AND BALUSTERS $43.00 $516.00 Wet mist, remove, wrap in polyethylene sheeting and dispose of the lead-painted railing system. HEPA vacuum any paint chips, dust and debris. Construct stairway railing system using stock morgan newel posts, handrails and birch balusters to match existing as closely as possible. Prime and top coat with premium acrylic latex or stain and apply 2 coats of polyurethane. (Owner's choice of in-stock colors.) Rail and Newel Post may remain, be re-used. LBPT01 8.00 LFTRIM-- REPLACE WITH NEAREST SIMILAR STOCK $4.11 $32.88 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Replace with nearest available/similar stock trim components. Fully prime and apply a single top coat of premium acrylic latex paint (color choice of owner). Ceiling - Molding - Side A Location Total:$1,723.88 Page 10 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 09 - Basement StairwellLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 9 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPWB02 10.00 SFINSTALL PLYWOOD WAINSCOT $4.07 $40.70 After establishing any required floor containment with polythylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of lead-containing ranch or ogee base molding. Mark "Lead Paint" at 4' intervals. Hang 1/4" BCX plywood with finish screws and adhesive beans 16" on center. Run continuous 1/4" beads of adhesive at perimeter. Trim all top edges with chair rail, bottom with ogee and exterior corners with 1" corner. HEPA vacuum any visible chips, dust and debris. Paint (owner to choose color). Wrap Floor Joist Side D Location Total:$40.70 Page 11 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 10 - Bedroom 1Location: 0Approx. Wall SF: 0Ceiling/Floor SF: 10 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 9 Environmental Rehab LBPWT01 3.00 EAWINDOW-- REMOVE / REPLACE COMPONENTS $231.67 $695.01 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of window components as described below. Wash with detergent solution, rinse, allow to dry and HEPA vacuum all visible paint chips, dust, and debris. Install new window components to match existing. Prime bare wood. Top coat with premium acrylic latex. Windows 11, 12 & 16 Replacement of Sills and Casings Trade: 219 Lead Abatement - INCAA Program LBPD02 2.00 EAINTERIOR DOOR - REPLACE HOLLOW CORE $350.00 $700.00 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of all LBP containing door components, including jamb and trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Install a like-in-kind door to match remaining doors in residence. Provide brass finish lockset. Spot prime bare wood and top coat entire assembly with premium acrylic latex or stain to match. Side D Closet & to Rm 14. Replace Casing too. LBPP01 50.00 SFLAMINATE WITH 1/2" GYPSUM $2.56 $128.00 After establishing any required floor containment with polythylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of any lead-based paint moldings. Mark "Lead Paint" at 4' intervals on wall/ceiling. Hang, tape and three coat finish 1/2" gypsum over surface using screws 8" on center and adhesive beads 16" on center. Run gypsum horizontally. Caulk all penetrations and butt seams at casing and base molding with siliconized acrylic, as applicable. Install 3/8" ogee at baseboard. Prime with gypsum primer and apply a premium acrylic latex top coat. HEPA vacuum any visible paint chips, dust and debris. Wall B LBPT01 160.00 LFTRIM-- REPLACE WITH NEAREST SIMILAR STOCK $4.11 $657.60 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Replace with nearest available/similar stock trim components. Fully prime and apply a single top coat of premium acrylic latex paint (color choice of owner). Baseboard Location Total:$2,180.61 Page 12 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 11 - Bedroom 2 (Child)Location: 0Approx. Wall SF: 0Ceiling/Floor SF: 11 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 9 Environmental Rehab LBPWT01 1.00 EAWINDOW-- REMOVE / REPLACE COMPONENTS $231.67 $231.67 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of window components as described below. Wash with detergent solution, rinse, allow to dry and HEPA vacuum all visible paint chips, dust, and debris. Install new window components to match existing. Prime bare wood. Top coat with premium acrylic latex. Window 13 - Sill & Casing Trade: 219 Lead Abatement - INCAA Program LBPD02 1.00 EAINTERIOR DOOR - REPLACE HOLLOW CORE $350.00 $350.00 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of all LBP containing door components, including jamb and trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Install a like-in-kind door to match remaining doors in residence. Provide brass finish lockset. Spot prime bare wood and top coat entire assembly with premium acrylic latex or stain to match. Side D. Replacement any damaged or removed casing. LBPT01 70.00 LFTRIM-- REPLACE WITH NEAREST SIMILAR STOCK $4.11 $287.70 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Replace with nearest available/similar stock trim components. Fully prime and apply a single top coat of premium acrylic latex paint (color choice of owner). Baseboard LBPVSG 20.00 SFFLOOR ENCLOSURE - UNDERLAYMENT& VINYL SHEETGOODS $9.33 $186.60 Mark "Lead Paint" at 4' intervals. HEPA vacuum any visible paint chips, dust and debris. Install 5/16" underlayment grade plywood, using adhesive and 7d crew shank or cement coated nails, 6" on center in all directions. Install .07" thick, backed vinyl sheet goods, with minimum seams, per manufacturer's recommendations. Install metal edge strips in openings, and shoe molding or vinyl base around perimeter. (Owner's choice of in stock color/pattern.) Closet Floor Location Total:$1,055.97 Page 13 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 13 - Bedroom 3 (Child)Location: 0Approx. Wall SF: 0Ceiling/Floor SF: 12 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPD02 2.00 EAINTERIOR DOOR - REPLACE HOLLOW CORE $350.00 $700.00 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of all LBP containing door components, including jamb and trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Install a like-in-kind door to match remaining doors in residence. Provide brass finish lockset. Spot prime bare wood and top coat entire assembly with premium acrylic latex or stain to match. Side B & C. Replace trim if removed or paint damaged. Location Total:$700.00 Page 14 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 14 - HallwayLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 13 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPD02 1.00 EAINTERIOR DOOR - REPLACE HOLLOW CORE $350.00 $350.00 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of all LBP containing door components, including jamb and trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Install a like-in-kind door to match remaining doors in residence. Provide brass finish lockset. Spot prime bare wood and top coat entire assembly with premium acrylic latex or stain to match. Side C - to Room 12. Replace trim if removed or paint damaged on either side. LBPD04 1.00 EAAttic Door - REPLACE $275.00 $275.00 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of door unit. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Install a new attic hatch in like kind. Provide in like kind hardware (if present). Spot prime bare wood and top coat entire assembly with premium acrylic latex. Door and Casing LBPT01 150.00 LFTRIM-- REPLACE WITH NEAREST SIMILAR STOCK $4.11 $616.50 After establishing any required floor containment with polyethylene sheeting, wet mist, remove, wrap in polyethylene sheeting and dispose of trim. Detergent wash, rinse, allow to dry and HEPA vacuum any paint chips, dust and debris. Replace with nearest available/similar stock trim components. Fully prime and apply a single top coat of premium acrylic latex paint (color choice of owner). Baseboard Location Total:$1,241.50 Page 15 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 15 - Laundry RoomLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 14 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPDUST 1.00 RMCLEAN TO CLEARANCE $150.00 $150.00 After completion of all lead hazard reduction activities, wet mist, fold and remove all containment polyethylene sheeting. HEPA vacuum all visible surfaces including walls, floors, ceilings and window troughs from the top down. Detergent scrub all horizontal surfaces in small sections using a 3-bucket system, changing rinse water every 250 SF. Completely rinse with clean water and new equipment. After surfaces are dry, HEPA vacuum all visible surfaces except ceiling. Elevated Lead Dust on Floor Location Total:$150.00 Page 16 of 20 815 Leland AvenueAddress:Unit 01Unit: Room 18 - Rear PorchLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 15 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPDUST 1.00 RMCLEAN TO CLEARANCE $150.00 $150.00 After completion of all lead hazard reduction activities, wet mist, fold and remove all containment polyethylene sheeting. HEPA vacuum all visible surfaces including walls, floors, ceilings and window troughs from the top down. Detergent scrub all horizontal surfaces in small sections using a 3-bucket system, changing rinse water every 250 SF. Completely rinse with clean water and new equipment. After surfaces are dry, HEPA vacuum all visible surfaces except ceiling. Dust on Floor LBPSID01 2.00 SQEXTERIOR-- INSTALL VAPOR BARRIOR &VINYL SIDING $450.00 $900.00 After establishing any required ground containment with polyethylene sheeting, mark or stencil lead painted siding with "Lead Paint" 4' in all directions. Apply a nonwoven vapor barrier with taped seams and opening flashing to enclose the lead paint or apply 1/4" permeable rigid or fanfold insulation as a paint barrier and substrate for siding materials. Install double-4 vinyl siding, owner selection of standard colors. Enclose all lead painted trim with vinyl or aluminum ventilating soffit panels, coil stock and field-fabricated trim accessories in accordance with manufacturer's specifications. Caulk all joints and seams of lead painted trim with 25 year caulk. HEPA vacuum any visible paint chips, dust and debris. (Owner's choice of siding pattern, color and embossing.) Side A & D Location Total:$1,050.00 Page 17 of 20 815 Leland AvenueAddress:Unit 01Unit: Exterior GarageLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 16 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 219 Lead Abatement - INCAA Program LBPSID01 5.00 SQEXTERIOR-- INSTALL VAPOR BARRIOR &VINYL SIDING $450.00 $2,250.00 After establishing any required ground containment with polyethylene sheeting, mark or stencil lead painted siding with "Lead Paint" 4' in all directions. Apply a nonwoven vapor barrier with taped seams and opening flashing to enclose the lead paint or apply 1/4" permeable rigid or fanfold insulation as a paint barrier and substrate for siding materials. Install double-4 vinyl siding, owner selection of standard colors. Enclose all lead painted trim with vinyl or aluminum ventilating soffit panels, coil stock and field-fabricated trim accessories in accordance with manufacturer's specifications. Caulk all joints and seams of lead painted trim with 25 year caulk. HEPA vacuum any visible paint chips, dust and debris. (Owner's choice of siding pattern, color and embossing.) Sides A, C & D Side Over Former Widow Openings - Unused. Ensure Windows are sealed with plywood on inside and inaccessible. LBPSOF2 100.00 LFENCLOSE SOFFIT/FASCIA-- ALUM $10.35 $1,035.00 After establishing any required ground contaiment with polyethylene sheeting, mark "Lead Paint" every 10 linear feet. Enclose soffit and fasica with aluminum soffit / fascia panels, color selected by owner. Back caulk all seams with siliconized acrylic to create a weathertight seal. HEPA vacuum all visible paint chips, dust and debris. Soffit and Fascia has deteriorated lead-based paint. Containment Required per 24 CFR 35.1345 All sides Location Total:$3,285.00 Page 18 of 20 815 Leland AvenueAddress:Unit 01Unit: Health & SafetyLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 17 - Spec Quantity Units Unit Price Total PriceSpec # Trade: 23 Electric LBPSMOK 3.00 EASMOKE DETECTOR - 10 YEAR BATTERY POWERED $35.00 $105.00 Install a ceiling mounted 10 year battery Smoke Detector such as the First Alert Smoke Alarm SA305CN3.Install smoke alarms inside each bedroom, outside each sleeping area and on every level of the home, including the basement. On levels without bedrooms, install alarms in the living room (or den or family room) or near the stairway to the upper level, or in both locations. Smoke alarms installed in the basement should be installed on the ceiling at the bottom of the stairs leading to the next level. Mount smoke alarms high on walls or ceilings . Wall-mounted alarms should be installed not more than 12 inches away from the ceiling (to the top of the alarm). Don't install smoke alarms near windows, doors, or ducts where drafts might interfere with their operation. Provide Owner with manufacturer’s instructions. Trade: 27 Fire Protection LBPCARB 3.00 EACARBON MONOXIDE DETECTOR $75.00 $225.00 Install a hard wired or plug-in carbon monoxide detector with battery back up and with a digital display capable of showing both peak CO level recorded by the alarm since it was last reset or unplugged, and the present level of carbon monoxide the unit is sensing. Location Total:$330.00 Page 19 of 20 Unit Total for 815 Leland Avenue, Unit Unit 01:$33,203.39 $33,203.39Address Grand Total for 815 Leland Avenue: _________________________________________________Bidder: Page 20 of 20