December 20, 2018
Joe Johnson
Stantec Consulting Services, Inc.
350 N. Orleans Street, Suite 1301
Chicago, IL 60654
RE: Task Order No. 05
Dear Mr. Johnson:
PHONE 574/235-9251
FAx 574/235-9171
The Board of Public Works, at its meeting held on December 20, 2018, approved the above
referenced consent decree on Long Term Control Plan post construction monitoring
reporting obligations in the amount not to exceed $69,995.
Enclosed please find the original of the agreement for your signature. Please sign and return
the original agreement to our office and retain a copy for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU
Attachment A
TASK ORDER 05
CSO LTCP PHASE 1 POST CONSTRUCTION WATER
QUALITY MONITORING PROGRAM DEVELOPMENT
This Task Order is made this thek day of , 2018, by and between the Board of Public
Works, City of South Bend, Indiana ("CLIENT") and Stantec Consulting Services Inc.
("CONSULTANT") pursuant to the terms and conditions set forth in the Master Services Agreement
executed between the parties on the 11 th day of April, 2017, ("Agreement"), which incorporated this
Task Order by reference.
1. The CONSULTANT Job Number for this Task Order i s The
CONSULTANT Contract Number and Job Number shall be referenced in each invoice submitted itt ed by
CONSULTANT to CLIENT under this Task Order.
CLIENT is conducting a program of Phase 1 Post Construction Monitoring as required under its
current Consent Decree for combined sewer overflow (CSO) management. Appendix A: Section 2 of
the City's CSO Long-term Control Plan (LTCP) referenced in the Consent Decree requires that during
each precipitation event that occurs during the 12-month post -construction monitoring period
following completion of the Phase 1 CSO Collection System Controls, CLIENT shall collect, at a
minimum, the following data:
15-minute rainfall data for each event;
CSO discharge volumes, frequency, and duration at each CSO outfall; and
Water quality samples from the St. Joseph River at predefined frequencies and locations.
The purpose of this Task Order is for the CONSULTANT to review the data gathered in this post
construction monitoring program and write a report interpreting the trends in data observed, the report
will be the Phase 1 Post Construction Monitoring Report.
CONSULTANT will receive water related data from CLIENT. The following parameters will be
provided.
• Location of sample
• Date of sample
• Time of sample collection
• E. coli concentration
• Dissolved oxygen concentration
• Total suspended solids concentration
• Sample temperature
• Weather and other comments will also be provided
• Others if necessary
Five years worth of data, spanning the period before completion of the Long-term control plan Phase 1
to the end of the 2019 recreational water season will be provided and the parties will agree on the
timeframe within those years to be used.
CLIENT will also provide to CONSULTANT rainfall and CSO activation data, including duration, and
volume data.
This task order defines the activities to be performed by the CONSULTANT TEAM to implement
this plan. Individual members of the CONSULTANT TEAM and their responsibilities include:
Stantec Consulting Services, Inc. (CONSULTANT) - Stantec is the prime consultant for this
task order and will be responsible for overall management and direction of project activities
and delivery of required deliverables to the CLIENT.
LimnoTech (LT) — LimnoTech will be responsible for aspects of compilation and review of
water quality analysis results and project reporting.
Interim and Final Monitoring Program Reports
Subtask 5. 1: Interim Monitor gJ!1Rfrgr g ,,,pt1q — Before the end of the 71 month of the 12-month
monitoring program, CONSULTANT shall prepare and submit to the CLIENT an interim report on the
progress of the Phase 1 Post Construction Monitoring Program. The report will present a summary of
the gathered rainfall and CSO monitoring data. Early observations regarding the successes of the LTCP
phase 1 will be presented.
Deliverable: Interim Monitoring Program Report (5 printed copies; 1 electronic copy in
pdf format)
Subtask 5 2: 1, inal M nitorapg_jrogi�aq1 � ppg Within 6 weeks following the end of the 12-month
monitoring program, CONSULTANT shall prepare and submit to the CLIENT a final report
documenting the results of the Phase 1 Post Construction Monitoring Program. The report will present
a summary of rainfall, CSO monitoring, and river water quality data for the 12-month monitoring
period. Observations regarding the monitoring program procedures and/or results will presented.
CONSULTANT will submit a draft of the final report to the CLIENT for review. Upon receipt of
written comments from the CLIENT, CONSULTANT will prepare and submit a final version of the
monitoring program report.
Deliverable
- Final Monitoring Program Report - DRAFT (5 printed copies; 1 electronic copy in pdf format)
Final Monitoring Program Report (5 printed copies, 1 electronic copy in pdf format)
The Project Schedule is as follows:
Services under this Task Order 05 will begin upon receipt of authorization to proceed from the
CLIENT.
STANTEC CONSULTING SERVICES, INC.
ti;��a����� :........................ _...
.
ArirttedWNae card Title
l:; at'e:
_.... ,,. .........._..... �����..�........
1.0. Br; ..�
City, State Zip
Telephone Fax�
Engineer License or Firm's Certificate number:
Stale of`
Consultant Designated Representative
Name: Joe Johnson
Address: 350 N. Orleans Street, Suite 1301
Chicago, Illinois, 60654.
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Gary ",°lot, P crxt
r°� Member
_'/44.J a `5,jLLAV,4A
Elizabeth Maradik, Member
Therese Dorau, Member
Suzanna Fritzberg, Member
ATTEST:
0
Linda Marrytmn, Clerk
o
Dat 2ol
City (Client) Designated Representative:
Name: Kieran Fahey
Title: Director, Long-term Control Plan
�......m..................���� Milestone ........... Completion Target
..�............._..... ............. ........._._..._.._
Interim Monitoring Program Report July 2019
...._......����......_.........._...
Final Monitoring Program Report - DRAFT December 2019
�.....�_..��..........Final MonitoringProgram Report Two weeks after receipt of
comments from CLIENT
2. The Compensation to be paid to CONSULTANT for the performance of the Services under
this Task Order is set forth in Appendix I (Compensation), attached hereto and incorporated herein by
reference.
[Signature Page Following]
Appendix I (Compensation)
TASK ORDER 05 COMPENSATION
1.1 CLIENT shall pay the CONSULTANT on an hourly basis in accordance with the hourly rates
shown in the attached tables for CONSULTANT and SUBCONSULTANT staff.
Reimbursable direct expenses (materials, travel, lodging, communications, etc.) will be
billed and paid for at cost. An administrative charge of 5% will be billed and paid on
SUBCONSULTANT costs. CONSULTANT'S- total compensation for services requested
in this Task Order shall not exceed $69,995 without prior written approval from the
CLIENT.
1.3 Electronic payment may be made to the following address:
BANK NAME:
Bank of America
BANK ADDRESS:
100 North Tryon Street
Charlotte, NC 28202
ACCOUNT #:
3752096026
ACCOUNT NAME:
Stantec Consulting Services, Inc.
ROUTING/TRANSFER # FOR ACH:
111000012
ROUTING/TRANSFER # FOR WIRES:
026009593
1.4 Mail / Lock Box
Stantec Consulting Services Inc.
13890 Collections Center Drive
Chicago, IL 60693
Attn: Accounts Payable
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date 1 2/18/2018
Name Kieran Fah Department Public Works
......_
BPW Date 12/20/2018 Phone Extension 59m93mm
��muuuuuumummuwmmwuumwwwwwwwwwwwwuuw�.wmuvw�vxx�nn � r�uuw;w wwomomommrvrwm�wmmu�urmmmmm.��wuux , mr�ama,�.... v�
-.....
_......_
......_ _
Required Prior to Submittal to Board
Legal
_
Attorney Name
Controller ❑
Controller review is required for all Contracts $5,000.00 or more anc
greater than one year in length per the City Purchasing Policy
Purchasing ❑
.� Check the A
ro ria t Item Type -- leqyir�d° for All Submissions
Agreement❑Contract
(❑ Proposal E I Addendum
® Professional Services
❑ Resolution
❑ Bid Opening
❑
Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening
El
Quote Award
❑ Change Order No.
[l
C/O & PCA No. ❑ PCA
❑ Ease/Encroach.
E Traffic Control
[❑ Other:
_.......
Required Information
__.............._... _ _...... .... _ ..._
Company or Vendor Name: Stantec Consulting Services
New Vendor
❑ Yes ® No ❑ If Yes, Approved by Purchasing
MBE/WBE Contractor
❑ MBE [❑
WBE
MBE/WBE Contractor Requested ❑ No❑ Yes Name of Company
Project Name
LTCP oConstruction reporting obligations
� �... truw ,. � ....n Monit.m._����
Project Number
117-056�tmmCons
Funding Source
m�...._..,.
Wastewater Professionalo_................ ....�
Services En ic,�'neering (LTCP)
Account No.
641�-0630-793-31-02
Amount
...�................�w � ... .... ....._.�_r m�..... __.
69,995 Not to exceed
Terms of Contract
Purpose/Description
onser t Decree "eporting on Post Construction.
[� Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination Non -Debarment, E-Verify, Iran, etc.
Required For Change Orders Only....
. ...... .
Amount of 0 Increase $
❑ Decrease $
Previous Amount
$
Current Percent of Change:
�- � � .�.�.�. �_ ...... �
%
New Amount
...............__�.............................. __�..� .............. ..................................................aaaada.a................................�.�..��_.
$
Total Percent of Change:
....................... _....
Dispersal After Approval
Copy Original
0 El