Loading...
HomeMy WebLinkAboutSupplemental Agreement No 2 - United Consulting - Coal Line Trail Phase I1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOI)TH BEND_ TNDIANA 46601-1930 Michael Rowe United Consulting 8440 Allison Pointe Blvd., Suite 200 Indianapolis, IN 46250 1865 December 20, 2018 RE: Supplemental Agreement No. 2 Dear Mr. Rowe: PHONE 574/235-9251 FAx 574/235-9171 The Board of Public Works, at its meeting held on December 20, 2018, approved the above referenced agreement regarding appraisal problem analysis and Phase II Environmental Assessment Activities for Coal Line Trail Phase I in the amount of $28,455. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure GARY A. GILOT SUZANNA . FRITZBERG EL1ZA13f°'i'i,i A. ARADIK JAMES A. MUELLER THERESE J. DORAU This SUPPLEMENTAL AGREEMENT ("Agreement's is made and entered into on this date -�X by and between the City of South Bend, acting by and through its proper officials, ("LOCAL PUBLIC AGENCY" or "LPA') and UNITED CONSULTING, an Indiana corporation ("CONSULTANT'. WHEREAS, the CONSULTANT did, on April 26, 2016 enter into an Agreement with the LOCAL PUBLIC AGENCY for Engineering Services and Documents in relation to the following described project: PhaseCoal Line Trail, fromr lnway West to Riverside euw' Drive in aliYM°, e District This supplement is required to add the following new services to the original scope of work: Phase II Environmental Site Assessment and Appraisal Problem Analysis (APA) WHEREAS, in order to provide for completion of the work it is necessary to amend and supplement the Engineering Agreement. NOW, THEREFORE, it is agreed by and between the parties as follows: L Appendix "A "is amended to read as follows; E.6. PHASE II ENVIRONMENTAL SITE ASSESSMENT The CONSULTANT shall complete a limited Phase II Environmental Site Assessment along the Coal Line Trail. The proposed locations and spacing of the borings are based on the results of the Phase I Environmental Site Assessment. The CONSULTANT shall complete a total of 14 soil borings to characterize the soils at the identified locations. The borings shall be advanced to depths ranging from five to eight feet below the existing ground surface. Soil samples shall be collected on a continuous basis at approximate 2-foot intervals throughout the depth of each boring. Each recovered soil sample shall be classified and screened in the field for the presence of volatile organic vapors using a portable photoionization detector (PID) and visually evaluated for obvious visible indications of potential impacts. A total of 24 soil samples shall be submitted for analysis. Supplemental Agreement version 6-2011 Groundwater is not expected to be encountered within the borings. If groundwater is encountered, temporary 0.75-inch diameter PVC piezometers equipped with five feet of slotted screen shall be installed in each boring in which groundwater is encountered during drilling or the conclusion of soil sampling activities. All groundwater samples shall be submitted for analysis of volatile organic compounds (VOC) including naphthalenes and lead scavengers per EPA Method 8260. If groundwater samples are collected near areas of concern with potential petroleum impacts, groundwater samples shall also be analyzed for lead per EPA Method 6010B. The CONSULTANT shall prepare a report summarizing the findings. This report shall include available background information, the results of laboratory testing, a discussion relative to the presence of detected constituents, conclusions, and if required, recommendations for further activities. The levels of detected constituents will be compared to IDEM's updated Remediation Closure Guide (RCG) screening levels to assess potential regulatory and/or handling/disposal implications. S. APPRAISAL PROBLEM ANALYSIS The CONSULTANT shall prepare a parcel -by -parcel examination of the project site to determine the extent of each taking and the appraisal approach to be utilized by the appraiser. The CONSULTANT shall provide Indiana Department of Transportation (INDOT) approved appraisers to complete the Appraisal Problem Analyses (APA's). The APA report shall include a summary sheet setting out the following: 1. Parcel Number 2. Owner's Name 3. Size of Property 4. Amount of R/W to be acquired 5. Types of R/W to be acquired 6. Recommended appraisal form III. Appendix "C"is amended to read as follows; E.6. PHASE II ENVIRONMENTAL SITE ASSESSMENT The CONSULTANT shall notify INDOT and the LOCAL PUBLIC AGENCY at least one week in advance of mobilizing to the site to initiate sampling. Drilling and sampling activities shall be completed within 2 calendar days following notice to proceed from the LOCAL PUBLIC AGENCY. Laboratory analysis will be completed within 14 calendar days following the completion of sampling. A draft report shall be provided within 14 calendar days after completion of the laboratory analyses. A final report shall be provided to INDOT within 3 calendar days following receipt of the draft report comments from the LOCAL PUBLIC AGENCY. Supplemental Agreement version 6-2011 S. APPRAISAL PROBLEM ANALYSIS All parcels complete within 45 calendar days after completion of right-of-way engineering. A.1. The total not to exceed fee in Section A.1 shall be changed from $544,425 to $572,880 representing an increase of $28,455. A.2. The CONSULTANT will be paid for the work performed under this Agreement on a lump sum basis in accordance with the following schedule: e. Environmental Services 6. Phase II Environmental Site Assessment $ 16,000 A.3. The CONSULTANT will be paid Unit Rates for the work performed under this Agreement in accordance with the following schedule: Quantfty Unit Price Total d. Appraisal Problem Analysis (APA) 53 parcels $235/parcel $12,455 The remainder of this page is intentionally left blank Supplemental Agreement version 6-2011 ExceptV. / f'changed and supplemented, all termsof the ori r nj engineering agreement dated April 26, 2016 and Supplement No. 1 date March 14 2017 shafl continue/ r' / / r BY: , Gary ent�..... _ ... ..� � �.__ ......................... Dave RI er, PrA� ry A. Gilot, oard President BY: BY: Michael Rowe, Vice President dare Er i, Member _,.. �.............. L'W DATE: , me - lam; McF5 r lc-L7 BY: Elizabeth A. Maradik, Member BY: Therese I Dor u, Member DATE: /� /� J�� (Y ATTEST, d w � l:i M Martin � da ~ , lark Supplemental Agreement version 6-2011 ENGINEERING ENVIRONMENTAL INSPECTION LAND SURVEYING LAND ACQUISITION PLANNING WATER & WASTEWATER SINCE 1965 OFT:VCEIRS William E., Hall, PE Dave Richter, PE, PtS Steven WW, Jones Christopher R. Pope, P.F. B Keith Bryant, PE Michael Rouge, PE PROIFIESSIIONAL STAFF Andrew T VWolka, PE Devin I... Stettler, AICP Michael S. Oliphant., AICP E. Rachelle Pemberton, P.F. Timothy J. Coomes, PI..S Jon E. Clocifelter, PE Steven R Passey, PE Brian J. Pierson, PE Christopher L. Hammond, PE. Paul D. Gobbach, PE Brian S. Frederick PE Jay R Ridens PE Christopher J. Dyer, PE. Matthew R. Lee, P.F.. William R. Curtis, P.F. Jeremy A. Richardson, FIE Heaher E. Kilgour, PE Adam J. Greulich, PLS Caleb C. Ross, PE Dann G Barrett, PE Scott G. Minnich, RE Michael R Farrell, CPA Jim R. Lesh, PE {Nicholas J. Kocher, PE Kelton S Cunningham, PE Braun S. Rodgers, PE. Chris J. Andrzejewski, PF Greg J. Broz, PE. Joshua D. Gonya, PE Brian S. Haefliger, PE. Amanda Stevens, PE December 10, 2018 Mr. Kyle Silveus, PE Assistant City Engineer City of South Bend 1316 County -City Building 227 W. Jefferson Blvd. South Bend, IN 46601 RE: Supplemental Agreement No. 2 Coal Line Trail Phase I Des. No. 1401810 Dear Mr. Silveus: Transmitted herewith is our request for a supplement to our original engineering agreement dated April 26, 2016 for the referenced project. A summary of Professional Fees has been provided for your use. This supplemental request consists of the following scope items: 1. Phase II Environmental Site Assessment 2. Appraisal Problem Analysis (APA) Also enclosed are two copies of Supplemental Agreement No. 2 executed by our office. Please review the agreements, execute both copies and return one for our files along with a written notice to proceed. If you have any questions or comments, please contact me at your convenience. Sincerely, UNITED NII C G William R. Curtis, PE Project Team Leader enclosures c: file (pending) 0— Coal Line Trail, Phase 1 from Lincolway West to Riverside Drive Des. No.1401810 Description Original Supplement Supplement Total Agreement No.1 No.2 Fee Lump Sum A.2.a Project Management and Coordination $ 58,700 $ $ _ $ 58,700 A,2.b Topographic Survey $ 57,400 $ 5,500 $ $ 62,900 A.2.c Alignment Assessment $ 19,900 $ - $ $ 19,900 A.2.d Landscape Architecture Assessment $ 27,200 $ $ $ 27,200 A.2.e.1 US Waters Report with Determination and Delineation $ 4,900 $ 3,500 $ $ 8,400 A.2.e.2 National Historic Preservation Act, Section 106 $ 6,000 $ 2,700 $ $ 8,700 A.2.e.3 Section 106, Historic Properties Report $ 19,425 $ $ $ 19,425 A.2.e.4 Phase I Environmental Assessment $ 12,500 $ $ $ 12,500 A.2.e.5 Categorical Exclusion, Level 4 $ 20,800 $ $ $ 20,800 A.2.e,6 Phase II Environmental Site Assessment $ - $ $ 16,000 $ 16,000 A.2.f Public Hearing $ 3,800 $ $ - $ 3,800 A.2.g Regulatory Permits (IDEM Rule 5) $ 6,500 $ $ $ 6,500 A.2.h Trail Design and Plans $ 73,800 $ 17,000 $ $ 90,800 A.2,i Utility Coordination $ 18,100 $ $ $ 18,100 A.2.j Pavement Design $ 1,900 $ $ $ 1,900 A.2.k Public Outreach $ 21,100 $ $ $ 21,100 A.2.1 Landscape Architecture Design and Plans $ $ 45,600 $ $ 45,600 A.2.m Mitigation Plan Development and Monitoring Services $ $ $ $ A.2.n Lighting Design and Plans $ $ 9,600 $ $ 9,600 A.2.o Construction Phase Design Services $ - $ $ $ - Unit Price Quantity Unit Price A.3.a Title Searches 31 $ 500 $ - $ 15,500 $ 15,500 A.3.b Right -of -Way Engineering 31 $ 2,500 $ $ 77,500 $ 77,500 A.3.c Right -of -Way Staking 31 $ 500 $ - $ 15,500 $ 15,500 A.3.d Appraisal Problem Analysis (APA)i 53 $ 235 $ _ $ $ 12,455 $ 12,455 Totals: $ 352,025 $ 1,00 2, $ 572,880 UNITE. IIIIIIII 12/10/2018 Item 1— Phase H Environmental Site Assessment The Phase I Environmental Site Assessment (ESA) for the project was performed in 2016 and updated in 2017 and was conducted as a preliminary assessment to identify the potential presence of hazardous materials within the limits of the project. The findings of the Phase I ESA identified multiple recognized environmental concerns (RECs) with potential to impact the subsurface conditions. Following the approval of the Phase I ESA findings by INDOT, it was determined that a Phase II ESA is required to further evaluate the RECs identified in the Phase I ESA which may pose a threat to worker safety or require waste handling. A conference call between UNITED, INDOT and Civil & Environmental Consultants, Inc. (CEC) on November 1, 2017, concluded the additional assessment was necessary to prepare a site -specific Phase II ESA work plan. The need for a Phase II ESA is listed as a firm commitment in the environmental document and is required to be completed prior to the project letting. CEC's proposal has been enclosed for reference. The following is a summary of the requested fee supplement for this item. Description Supplemental Fee A.2.e.6 Phase II Environmental Site Assessment ....................................... .... ............ $16,000 March 16, 2018 Mr. Devin Stettler United Consulting Engineers, Inc. 1625 North Post Road Indianapolis, Indiana 46219 Dear Mr. Stettler: Ar Civil & Environmental Consultants, Inc. Via email at: DevinS@ucindy.com Subject: Proposal for Limited Phase II Environmental Site Assessment Proposed Coal Line Trail South Bend, St. Joseph County, Indiana DES Nos. 140810 and 1401811 CEC Project 161-618 — Phase 11 ESA Civil & Environmental Consultants, Inc. (CEC) is pleased to present to United Consulting Engineers, Inc. (UCE) this proposal to provide environmental consulting services associated with the Coal Line Trail Project in South Bend, St. Joseph County, Indiana. Our preparation of this proposal was based on the following: • The electronic mail Request for Proposal (RFP) and information sent by Devin Stettler of UCE to Luella Beth Hillen of CEC on October 17, 2017; • The findings of CEC's Report of Phase I Environmental Site Assessment (ESA) dated October 9, 2017; • The conference call on November 1, 2017, between UCE, CEC and the Indiana Department of Transportation (INDOT); • INDOT's approval of CEC's Potential Hazardous Material Concerns and Phase II ESA Scope of Work Planning spreadsheet (the Work Plan) and Proposed Soil Boring Locations Sketch on February 15, 2018; and, • CEC's previous experience on similar projects. 1.0 PROJECT UNDERSTANDING CEC understands UCE has been selected to prepare the National Environmental Policy Act document and design for the Coal Line Trail Project (the Project) for the City of South Bend, Indiana. The Project involves the proposed route of a pedestrian trail located along the former right-of-way (ROW) of the abandoned railroad, beginning west of N. Michigan Street and extending southwest approximately 2.7 miles to the intersection of Lincoln Way W. (U.S. 20) and 530 E. Ohio Street, Suite G I Indianapolis, IN 46204 1 p: 317-655-7777 f: 317-655-7778 1 www.cecinc.com Mr. Devin Stettler CEC Proposal 161-618 — Phase II ESA Page 2 March 16, 2018 Wilber Street (the Project Area). The Project proposes to redevelop the abandoned railroad line for use as a recreational public pathway, including construction of an approximately 10 to 12-foot wide paved walkway, light poles and other amenities. CEC understands that the environmental services requested are based on the findings of CEC's Phase I ESA performed in 2016 and updated in 2017, which was conducted as a preliminary assessment to identify the potential presence of hazardous materials within the Project Area. The findings of the Phase I ESA identified multiple recognized environmental concerns (RECs) with potential to impact the subsurface conditions of the Project Area. Following approval of the Phase I ESA findings by INDOT, it was determined that a Phase II ESA is required to further evaluate the RECs identified in the Phase I ESA which may pose a threat to worker safety or require waste handling. A conference call between representatives of UCE, INDOT and CEC on November 1, 2017, concluded that additional assessment was necessary to prepare a site -specific Phase II ESA work plan. CEC, in coordination with UCE, conducted the assessment of the identified RECs via a review of available documents found on the IDEM's Virtual File Cabinet (VFC) to better understand the nature and extent of known contamination and current status of the investigation and remediation efforts at the these facilities, along with their potential to adversely affect the Project Area as it relates to potential exposure risks during construction activities. CEC summarized the findings in the attached Work Plan spreadsheet, which, along with an accompanying proposed sampling locations sketch, was submitted to INDOT for review and approval prior to preparation of this proposal. INDOT approved CEC's site -specific Work Plan on February 15, 2018. 2.0 PURPOSE The purpose of our proposed services is to perform soil sampling and associated laboratory analyses to help understand existing Site conditions and, if needed, to support the preparation of a potential site -specific Soil Management Plan (SMP) for the area of the proposed trail construction activities. If encountered, groundwater samples will also be collected for analysis and used to support preparation of appropriate management strategies, if needed, that will be provided within the SMP in the event that groundwater is encountered during construction and excavation activities. 3.0 SCOPE OF SERVICES CEC will perform the following scope of services: 3.1 Task l -- Project Management & Work Plan Develo ment This task includes the project management services provided to -date, including consultation with UCE and INDOT personnel, review of historical records for surrounding sites identified as RECs Civil & Environmental Consultants, Inc. Mr. Devin Stettler CEC Proposal 161-618 — Phase II ESA Page 3 March 16, 2018 during the Phase I ESA, and preparation of the INDOT-approved site -specific Work Plan spreadsheet, which summarized our findings of each potential concern in relation to the Project Area and provided reasoning for proposed sampling activities. Copies of the INDOT-approved Work Plan spreadsheet and the accompanying map showing the proposed soil boring locations are attached. 3.2 Task 2 — Limited Phase II ESA To assess subsurface conditions at the Project Area via implementation of the INDOT-approved Work Plan, the following Phase II ESA activities are proposed: • CEC will advise INDOT of the proposed field schedule at least one week in advance of mobilizing to the site to initiate sampling. • CEC will mobilize to the site prior to beginning the invasive activities to mark the proposed boring locations for utility clearance purposes. • CEC will contact the Indiana Underground Plant Protection Service (IUPPS) to locate underground utilities prior to performing invasive activities. If deemed necessary, a third - party underground utility in the public ROW locating firm can be subcontracted by CEC for an additional fee to screen the proposed boring locations for possible private subgrade utilities. CEC assumes no liability for damage to private utilities at the site. • A site specific Health and Safety Plan will be prepared. • A pre -qualified subcontractor will be retained to advance the borings at the site under the direction of CEC. • CEC has proposed a total of 14 soil borings to characterize the soils at the Project Area. The proposed locations and spacing of the borings are based on the finalized INDOT- approved Work Plan prepared as part of Task 1 and are illustrated on the attached figure. Based on CEC's understanding of the proposed project construction disturbances, the borings will be advanced to depths ranging from five to eight feet below ground surface (bgs). o CEC will provide a qualified environmental professional to conduct the field screening and sampling, including observation and documentation of the field conditions. Sampling equipment, including the direct -push rig, the sampling tools, and other down - hole equipment will be decontaminated prior to arrival on -site and prior to each soil boring advancement. The sampling tools in direct contact with environmental media will be washed in laboratory -grade detergent and rinsed with distilled water before and between sampling intervals. Disposable sampling materials will be used while handling soil samples. New, disposable plastic liners will be used in the soil sampler for each sample interval. Civil & Environmental Consultants, Inc. Mr. Devin Stettler CEC Proposal 161-618 — Phase II ESA Page 4 March 16, 2018 Soil samples will be collected on a continuous basis at approximate 2-foot intervals throughout the depth of each boring. Each recovered soil sample will be classified and screened in the field for the presence of volatile organic vapors using a portable photo - ionization detector (PID) and visually evaluated for obvious visible indications of potential impact. At borings advanced to eight feet bgs, soil samples will be collected for laboratory analysis from two depth intervals as requested by INDOT. One shallow soil sample will be selected from the shallow interval which exhibits the greatest potential for contamination (based on PID readings, visual and olfactory observations), or approximately two to four feet bgs in the absence of field indicators of potential impact. One soil sample will also be collected from the terminus of each boring (approximately six to eight feet bgs). a At borings advanced to five feet bgs, one soil sample will be selected for analysis from the interval most likely to be contaminated. In the absence of observable indicators of potential contamination, the soil sample from approximately three to five feet bgs will be selected for analysis. CEC assumes a total of 24 soil samples will be submitted for analysis. Based on the contaminants of concern (COCs) associated with the sites identified in the in the attached Work Plan, soil samples selected for analysis will be logged on a chain -of - custody form and submitted to the laboratory for analysis that will include volatile organic compounds (VOCs, including naphthalenes and lead scavengers) per United States Environmental Protection Agency (EPA) Method 8260 and lead per EPA Method 6010B. Furthermore, as requested by INDOT, if laboratory results indicate that concentrations of lead in soil exceed 100 milligram per kilograms (mg/Kg) in any soil sample, analysis for Toxicity Characteristic Leaching Procedure (TCLP) lead will be requested for that sample in order to assess the Resource Conservation and Recovery Act (RCRA) waste classification requirements. Based on the review of groundwater data at nearby sites conducted as part of Task 1, groundwater is not expected to be encountered within the borings. However, as noted on the attached INDOT-approved Work Plan spreadsheet, temporary 0.75-inch diameter polyvinyl chloride (PVC) piezometers equipped with five feet of slotted screen will be installed in each of the borings in which groundwater is encountered during drilling or the conclusion of soil sampling activities. If sufficient groundwater is observed, "grab" groundwater samples will be collected from the piezometers using disposable tubing equipped with a check valve. After groundwater sampling activities, the temporary piezometers will be removed and discarded. The groundwater samples will be placed in laboratory glassware, preserved, placed on ice and submitted for laboratory analysis of VOCs (including naphthalenes and lead scavengers) per EPA Method 8260. Additionally, if samples are collected from the borings located near areas of concern with potential petroleum impacts (see the attached Work Plan spreadsheet), groundwater samples will be also be analyzed for lead per EPA Method 6010B. Because the proposed groundwater Civil & Environmental Consultants, Inc. Mr. Devin Stettler CEC Proposal 161-618 — Phase II ESA Page 5 March 16, 2018 sampling method involves temporary piezometers, formal well development is not proposed. As such, the obtained samples may exhibit greater turbidity that could result in biased high metals concentrations as compared to results if conventional monitoring well installation, development and sampling methods were used. Therefore, CEC also proposes the collection of groundwater samples in unpreserved containers to be filtered by the laboratory prior to analysis to yield dissolved lead levels. • For quality assurance/quality control (QA/QC) measures, soil samples will be accompanied by a laboratory -provided trip blank for submittal and analysis of VOCs. • Soil samples will be submitted to Pace Analytical Services of Indianapolis, Indiana, for analysis under standard turnaround protocols (10 business days). If an expedited turnaround is desired, additional laboratory fees will apply. • Following sample collection, the borings will be abandoned by backfilling with native soil and bentonite. • Due to the small diameter and limited depth of the proposed soil borings, it is anticipated that investigative -derived waste accumulated during drilling activities will be minimal. Therefore, CEC proposes backfilling the boreholes with the soil cuttings. 3.4 Task 3 — lac pc)rting After the field activities and receipt of laboratory results, CEC will prepare a draft report summarizing our environmental findings. The report will include available background information, the results of laboratory testing, a discussion relative to the presence of detected constituents, conclusions, and if required, recommendations for further activities. Maps, data tables and attachments to support our assessment will be included in the report. The levels of detected constituents will be compared to IDEM's updated Remediation Closure Guide (RCG) screening levels to assess potential regulatory and/or handling/disposal implications. In the event constituents are detected in soil exceeding the screening levels for the direct contact pathway, it is anticipated that excavation spoils meeting this criteria will need to be segregated and transported off site for proper disposal at an appropriate landfill facility. The draft report will be provided to UCE in PDF format via email. Upon receipt of mutually - acceptable comments, the report will be issued to UCE and INDOT in final electronic PDF format. If requested, hard copies will be prepared and invoiced on a time and materials basis in accordance with the proposed fees presented in Section 4.0 of this proposal. Civil & Environmental Consultants, Inc.. Mr. Devin Stettler CEC Proposal 161-618 — Phase II ESA Page 6 March 16, 2018 4.0 PROPOSED FEES CEC proposes to provide the above -outlined scope of services on a time and material basis with actual project costs invoiced on an hours -worked basis in accordance with CEC's labor rates for INDOT in effect at the time of the project, as listed below: Classification Bill Rate Senior Principal__ $ 203.21 Principal $ 158.59 Sr. Project Mana er .................... $ 148.11 Project Manager III $ 135.11 Project Manager er 11 $ 116.20 w- Project Manager I ..... $ 98.36 Assistant Project Mana er ..........._.............................. _......... $ _ _ 83.08 Pro j ect Scientist $ 65.94 Staff Scientist/Staff Consultant $ 55.56 Project Consultant $ 88.24 Field Technician _................ ...... ....... $ 52.40 Office Mana er $ 73.23 CADD $ 98.60 Reimbursable expenses, including subcontracted services, will be invoiced at cost, plus an administrative fee for INDOT projects in effect at the time of the project. Based on our understanding of the project, our estimated fee to provide our proposed services is $16,000. A breakdown of this estimated fee is provided below: Task 1: Project Management & Work Plan Development................................$3,250 Task 2: Limited Phase II ESA Field Sampling (incl. disposables)................................................$2,900 +� Drilling Subcontractor..................................................................$3,050 0 Analytical Laboratory...................................................................$2,100 Task3: Reporting .............. ......... ... .......... ........ ........ ......... ......... ..........$4,700 TOTAL ESTIMATED FEE........................................................$16,000 Civil & Environmental Consultants, Inc. Mr. Devin Stettler CEC Proposal 161-618 — Phase II ESA Page 7 March 16, 2018 Our proposed fee is based on the following assumptions: • Preparation of a Quality Assurance Project Plan (QAPP) and/or Sampling and Analysis Plan (SAP) are not required by IDEM. If these items are requested, additional fees will apply. • CEC will be granted access to all sampling locations. • No clearing or grubbing will be necessary to access the boring locations. o Drilling and sampling activities can be conducted in two business days, with observation, sampling and documentation provided by one CEC professional. • Laboratory analysis of up to 24 soil samples for VOCs and 14 soil samples for lead, along with analysis of two trip blank water samples for VOCs. • Standard laboratory turnaround time (i.e. 10 business days) is sufficient. • All deliverables are provided in electronic format. • The estimated fees described above do not include the costs for the potential laboratory analysis for TCLP Lead for waste characterization of soil. If this analysis is deemed necessary based on the soil laboratory results, an additional laboratory fee of $75 per sample will apply. m Because it is unlikely that groundwater will be encountered, the estimated fees described above do not include the associated costs for collection and analysis of groundwater samples. If groundwater is encountered, groundwater sampling will be necessary; therefore, additional fees will be accrued per the following rates: • Temporary piezometers (groundwater sampling point): $60 each • Laboratory fees: fib, $70 per sample for VOCs analysis; and, $20 per sample for lead (total and dissolved) analysis. • Additional labor hours necessary to perform the groundwater sampling activities will be charged in accordance with the INDOT labor rates described above. CEC understands UCE has negotiated a prime agreement with the City of South Bend for this contract. CEC will serve as a sub -consultant to UCE for the scope of services described above. CEC understands that the INDOT standard sub -consulting agreement will be the basis for agreements between CEC and UCE. UCE will provide CEC with a sub -consultant agreement for review and signature. Until the sub -consultant agreement is signed, neither party is under obligation. Civil & Environmental Consultants, Inc. Mr. Devin Stettler CEC Proposal 161-618 — Phase II ESA Page 8 March 16, 2018 5.0 SCHEDULE Upon authorization to proceed, utilities can be notified and field activities scheduled to begin within five to 10 business days, depending on subcontractor availability. The field activities are expected to take two business days to conduct. Laboratory results should be obtained within 10 business days after receipt of the samples by the laboratory. Findings from the assessment will be compiled into a draft Limited Phase II ESA report which can be provided to UCE within approximately two weeks after the receipt of the laboratory results. Upon receipt of mutually -agreeable comments, the final draft document can be issued within two to three business days to INDOT for review. Upon receipt of mutually -agreeable comments from INDOT, the Limited Phase II ESA report will be finalized and submitted to UCE within approximately two to three business days. 6.0 CLOSING We appreciate the opportunity to provide this proposal to you and look forward to assisting you on this project. Please contact us at (317) 655-7777 or nhyde(CDcecinc.com if you have any questions or require any additional information. Sincerely, CIVIL & ENVIRONMENTAL CONSULTANTS, INC. Nathan W. Hyde Project Manager Cc: Mr. Aaron Hurt — CEC Attachments: INDOT-approved Work Plan Spreadsheet Proposed Phase II Sampling Locations Map E 161-618 2018 03-15 United Consulting — Coal Line Trail — Phase II ESA James E. Zentmeyer, P.E. Senior Principal Civil & Environmental Consultants, Inc. 1130 ' f W S kW. W Z P p�5 W d R L d 14 U b g ag r 6 � x a �• a ma a afi It u , :t 3u�w a®° TRR a �s tlp Vj tw � AW The original preliminary engineering contract did not include Appraisal Problem Analysis (APA) services pending the completion of the alignment assessment phase and discussions regarding ownership of the rail corridor with Norfolk Southern Railroad. Now that the project has been designed through Stage 2 and a determination of which parcels are needed for the development of the project, APA's are necessary to determine the extent of each acquisition and the appraisal approach to be utilized by the appraiser. Phase I has 29 parcels of which 7 parcels are within the limits of Norfolk and Southern property. Phase II has 24 parcels. The per parcel cost of the APA's is determined from the current Real Estate Services Fee Schedule, as found on INDOT's website. The following is a summary of the supplemental fees for this item: Description Parcels Unit Price Supplemental Fee A.3.d Appraisal Problem Analysis ....... 53..................$235 ............................................. $12,455 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date December 18, 2018 Name Kyle Silveus Department Division/Bureau Public Works Engineering BPW Date December 20, 2018 Phone Extension 9083 wwrmmssmma r�® uuuuuuuuwuwwuwuwwim �rwarww,wmwro�iwv�wmmnu�m�.w wwwimu wwartm My �mPmuwMM99PR aerrvimm:rmfMprvrc ae ur:�ma�mnruva� Required Prior to Submittal to Board ......m........ �..... . .......... _ _._.�...._ ........ ... . . Legal ® Attorney Name: Clara McDaniels Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing El Michael Schmidt Check the LJ Agreement El Professional Services Bid Opening Quote Opening [] Change Order No. Ease/Encroach. Other: Contract Suoolement iro riate Item Type — Required for All Submissions El Contract Proposal ❑ Resolution ❑ Bid Award ❑ Req. to Advertise Quote Award C/O & PCA No. ❑ PCA n Traffic Control: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Required Information United Consulting_._. ENG: 115-063 DES No: 1401810 RiverwestTIF ..._................................................_�.... 324.1050.460.42.02 mm Phase I: Increase of $28.45.5.............. Addendum ❑ Title Sheet Purchasi Terms of Contract Total fee not to exceed i Scope additions include. Appra.���������. Purpose/Description sal Problem Analysis (APA) costs and Phase II Environmental assessment_ activities El Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) ie�le For Change Orders Qal....._ ._.._..__ ..... Amount of ❑ Increase $ EI Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Charge: % Disoersal After Copy Original ®n Kyle Silveus ® [l Chris Dressel