Loading...
HomeMy WebLinkAboutAward Bid - WWTP Admin Building Masonry Improvements Project No 118-087 - Ziolkowski Construction Inc1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND_ 1NDIANA 46601-1 930 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS December 20, 2018 Bill Favors Ziolkowski Construction, Inc. 4050 Ralph Jones Drive South Bend, IN 46628 PHONE 574/235-9251 FAx 574/235-9171 RE: Award Bid — Wastewater Treatment Plant Administration Building Masonry Improvements Project No. 118-087 Dear Mr. Favors: The Board of Public Works, at its meeting held on December 20, 2018, awarded the above referenced project to you in the amount of $463,380 for the Base Division A, Base Division B, Alternates Al, A3, A4, A5 and B1. Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal by J'anuaLy 3 2019 to my attention for Board of Public Works approval: 1) One (1) original of the Public Works Contract (enclosed) 2) Labor & Material Payment Bond 3) Performance Bond (125% of Bid Amount) 4) Certificate of Insurance naming the City of South Bend as an additional insured 5) Item #4 for all subcontractors you use If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, Linda M. Martin, Clerk Enclosures GARY A. G1LOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Eric Horvath, Director of Public Works Clara McDaniels, Assistant City Attorney Public Works Linda M. Martin, Clerk FROM: Al Greek, Director of Utilities Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: Project No. 118-087 WWTP Administration Building Masonry Improvements —Award Recommendation DATE: December 12, 2018 On December 11 2018, the Board of Public Works opened and read bids for the above project. The Division of Utilities and Division of Engineering reviewed the documents and finds the information correct and complete. The responsive bid(s) ranked as follows based on price: y . ............................................................... ............................................................................................._.._.. Bidder _. ......................... wwww Bid Total 1. Ziolkowski Construction, Inc. South Bend, Indiana) Award $463,380.00 ( Total Bid Price was $472,880.00. However, not all alternates are being accepted with the g Award Receommendation. The Division of UtiNities and Division of Engineering recommend the award of the contract for Project No. 118-087'4P 'itIPTP Administration Building Masonry Improvements to the lowest, responsive, responsible bidder, Ziolkowski Construction Inc. South Bend Indianal at the total bid price of $463,380.00 lump sum (with unit prices). This recommendation includes the acceptance of Base Division A, Base Division B, Alternates #A1, #A3, #A4, #A5, #B1. Alternate #A2 was not accepted and will not be a part of the construction scope. This recommendation is provided by the Division of Utilities and the Division of Engineering. WA 11VIM N�N .0 Repair and Maintenance Fund Account 641-0630-793-36-01 . The initial purchase order will be issued with 2018 funds and adjusted to the full amount in January 2019 when the remaining funding for this project is available. For questions regarding the above recommendation or the subject project, contact Al Greek (Ext. 4210) at the Division of Utilities or Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. CITY OF SOUTH BEND, INDIANA "t CONTRACTOR'S BID FOR PUBLIC WORK` Project Name WWTP ADMINISTRATION BUILDING MASONRY IMPROVEMENTS Project No. 118-087 For Bids Due DECEMBER 11, 2018 PART (Must be completed for all bids. Please type or print) Date: December 11, 2018 Bidder (Firm). Ziolkowski Construction, Inc. Address: 4050 Ralph Jones Drive City/State/Zip: South Bend, IN 46628 Telephone Number: ( 574 ) 287-1811 Agent of Bidder (if Applicable): n/a Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: VWVfP Administration Buildinq Masonry Improvements the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Kil Architecture/Planning and dated Nov. 15, 2018 for the sum of (enter the Total Bid as shown on the Proposal) Fgur Hundred-SeventyT o Tsand Ei lht l-lundred I hty ($ _ 472,880 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. By (Signature) Bill Favors, President (Printed Name of Person Signing) The above bid is accepted this Subject to the following conditions ACCEPTANCE Z day of20 / �t W. BOARD OF W ,7KS - iAt4A11' -Gar A. G1l`o President '°:w�u an a Fritz y berg, Me ber. �"eee J. D rau, Member ,:,es A est: Linda M. Martin, Clerk, E ' bath A. MZ-,dkie=n ber.�.._..W,�.ame wueer Version 7/20/2018 Contractor's Bid for Public Works - 2 BID/PROPOSAL�aG��� . CITY OF SOUTH BEND Project Name: WWTP ADMINISTRATION BUILDING MASONRY IMPROVEMENTS g Project Number: 118-087 For Bids Due: DECEMBER 11, 2018 Contractor Name: Ziolkowski Construction, Inc. BASE BID DIVISION A: ADMINISTRATIVE BUILDING #15 Item No. Description Quantity Unit w_ Unit Price Total Amount 1 Exterior and Interior Renovations to 1 LS 332,270 332,270 Administrative Building #15 2 Provide an allowance of $16,000.00 for 1 LS $16,000.00 $16,000.00 a construction contingency. Provide an allowance of $3.00 per 3 square foot, for material and installation 460 SF $3.00 $1,380.00 of 12"x12" vinyl composition the Provide an allowance of $30.00 per 4 square yard, for material and installation 440 SY $30.00 $13,200.00 for 24"x24" commercial rade car et tile. BASE BID DIVISION A: ADMINISTRATIVE BUILDING #15 TOTAL 362,850 DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A1 Item No. ........ Description Quantity Unit Unit Price Total Amount Replace 100% of existing suspended acoustical ceiling tile in rooms listed on 1 Room Finish Schedule with new tile 1 LS 7,900 7,900 panels per Sheet A5.1. (Base Bid to include replacement of 25% of ceiling the anels. DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A1 TOTAL 7.900 DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A2 ............................................................................. Item ..__ ... _� No. Description Quantity Unit Unit Price Total Amount Replace 100% of existing window blinds 1 with new vertical blinds as listed on 1 LS 9,500 9,500 Window Blind Schedule on Sheet A5.1 DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A2 TOTAL 9500 DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A3 Item No. _........... Description Quantity Unit Unit Price Total Amount Provide one coat primer and two coats paint in rooms listed on Room Finish 12,500 12,500 1 Schedule, at all remaining interior walls, 1 LS per Sheet A5.1 (Base bid to include interior side of exterior walls , DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A3 TOTAL 1_?,500 Version 7/20/2018 Contractor's Bid for Public Works - 7 BIDIPROPOSAL��� CITY OF SOUTH BEND' Project Name: WWTP ADMINISTRATION BUILDING MASONRY IMPROVEMENTS Project Number: 118-087 ...-.-.............. ... For Bids Due: DECEMBER 11, 2018 Contractor Name: Ziolkowski Construction, Inc. DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A4 Item Description Quantity Unit Unit Price No. Total Amount ...........a Provide alternate price to include the 1 additional cost of cleaning all brick 1 LS 4,660 4,660 masonry. (Base bid to include cleaning of limestone mason onl DIVISION A: ADMINISTRATION BUILDING #15 ALTERNATE #A4 TOTAL 41660 DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A5 Item Description Quantity Unit Unit Price No.. Total Amount 1 Provide cost to install water repellant on 1 LS 3,500 3,500 brick and stone masonry, all 4 elevations DIVISION A: ADMINISTRATIVE BUILDING #15 ALTERNATE #A5 TOTAL 3,500 BASE BID DIVISION B: CLARIFIER BUILDING #3 Item No. Description Quantity Unit Unit Price Total Amount 1 Exterior and Interior Renovations to 1 LS 62,570 62,570 Clarifier Building#3 2 Provide an allowance of $4,0000.00 for 1 LS $4,000.00 $4,000.00 construction contingency. DIVISION B: CLARIFIER BUILDING #3 BASE BID TOTAL 66.570 DIVISON B: CLARIFIER BUILDING #3 ALTERNATE #131 Item No. Description Quantity Unit Unit Price Total Amount 1 Provide price to install .060 TPO 20 year 1 LS 5,400 5,400 warrant roof at buildin #3 DIVISION B: CLARIFIER BUILDING #3 ALTERNATE #131 TOTAL 5,400 UNIT PRICES Item No. Description DEDUCT/SF ADD/SF _ ......... ...... 1 Masonry Brick Tuck -pointing perSF13.75 14.25 2 Soft Joint Repointing per LF 7.00 7.25 3 Masonry Brick Re-building/Replacement 58.00 60.00 er SF 4 Brick and Limestone Cleaning per SF 0.70 0.75 Version 7/20/2018 Contractor's Bid for Public Works - 8 BID/PROPOSAL CITY OF SOUTH BEND Project Name: WWTP ADMINISTRATION BUILDING MASONRY IMPROVEMENTS Project Number: 118-087 _._._._.....�._...._.. ................ For Bids Due: DECEMBER 11, 2018 1N65 ContractorName: _.:ZIQ1kQW,5.kl.Co '5t.[.I�: ti III. Bidder (Firm): Ziolkowski Construction, Inc. Address: 4050 Ralph Jones Drive City/State/Zip: South Bend, IN 46628 Telephone Number: 574 287-1811 By (Signature) Bill Favors, President (Printed Name of Person Signing) Version 7/20/2018 Contractor's Bid for Public Works - 9 BOARD OF PUBLIC WORKS CITY OF SOUTI-I BEND INDIANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 20th day of December, 2018, by and between, Ziolkowski Construction, Inc., 4050 Ralph Jones Drive, South Bend, IN 46628, HEREINAFTER called the "Contractor", and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid Proposal, all of which are set forth as a part of this Contract, for: PROJECT NO.: 118-087 DESCRIPTION: WWTP ADMINISTRATION BUILDING MASONRY IMPROVEMENTS COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $463,380; BASE BID DIVISION A, BASE BID DIVISION B, ALTERNATES Al, A3, A4, A5 AND B1 FUNDING: SEWAGE WORKS OPERATIONS/BUILDING REPAIRS & MAINTENANCE The total bid for this improvement were those prices as received and accepted by the Board on the December 11, 2018. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC WORKS ZIOLKOWSKI CONSTRUCTION, INC. a Gary Niflot, President EIi ,,*eth A, ��: i� iM °Member Printed Name : �, ,...... signature_ SuaKun,Fntzberg, J n .M e Member �..: ).." Therese J. aau,'enber Attest: Linda- M. Martin, Clerk CERTIFICATION (To be completed if Contractor is a Corporation) 1, , certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then ... enm.. �... ......... of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary __..__. ._. Corporate Seal BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date Name December 12„ 2018 Jacob M. Klosinski Department Utilities - Wastewater BPW Date December 20, 2018 Phone Extension .1574 -9496 ,. Reauired Prio.r..to..Submit............_.....................tal.._.t........ o Boa..a_.ad rd Legal Attorney Name Clara McDaniels Assistant City Attorney Controller review is required for all Contracts $5,000.00 or more Controller Z and greater than one year in length per the City Purchasing Policy Purchasing Z All Green Director of Utilities Check the Appropriate Item Type — Required for All ITSubmissions ❑ Agreement Contract Proposal ❑ Addendum ❑ Professional Services F1 Amendment El Bid Opening Z Bid Award ❑ Req. to Advertise ❑ Title Sheet Quote Opening ❑ Quote Award ❑ Chg Order No. ❑ C/O & PCA No, ❑ PCA D Ease./Encroach. Traffic Control ❑ Resolution F� Other.. Claim _ ...._.W... . mm mmmmmmmmmm Rewired Information Company or VendorNameZiolkowski Construction, Inc. Yes If es, Approved by Purchasing New Vendor No MBE/WBE Contractor ❑ WBE Completed E-Verify Form Attached ❑Nos Project Name WWTP Administration Building Masonry Imp rovements�m Project Number mmmmmmmmmmmmmm........ 118-087 _ 2018 and 2019 Sewage Works Operations, mmmBmuildmingmmRepairs &............. Funding Source g Maintenance (See Memorandum) .Ma..�.._........................�6...�66 ��A..�,,�,........... ��_ Account No. 641-0630-793-36-01 Amount W W$463,380.00 _��.�.......��........_ Terms of Contract Lump Sum, Unit Prices (Base A & B, all alternates exceptµ.A2 Purpose/Description The Division of Utilities recommends the Board of Public Works award the subject project to Ziolkowski Construction as the lowest responsive, responsible bidder See Inter -office Memorandum for project descri Lion .....................���........_ ........ �����..__ ..___.._� For Change Orders Only Amount of �j Increase $ mm Decrease $ Previous Amount $ Current Percent of Change: ....o New Amount $ Total Percent of Change: ............................ .----.....W Time Extension: ...___. ..............%°... ............. After Dispersal �� �����.....�_.�.........ww....�w��w p Approval Copy Original ® ❑ Al Greek, Director of Utilities Jacob_M. Klosinski, Assistan ® ❑ t City Engineer ��...���.....�. ® ❑ Susan Zee.b.'.....D..r.. w ........._....w mm .....__......._ Director of Wastewater Financial Services