Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Award Bid - Sewer and Manhole Rehabilitation Project No 118-093 - Inland Waters Pollution Control Inc
1316 COUNTY —CITY BUILDING 227 W. JEFFERSON BOULEVARD SOI ITH BEND. 1NDIANA 46601-1 930 % a� r� 186::5 CITY OF • BEND PETE BUTTIGIEG, MAY BOARD OF PUBLIC WORKS December 20, 2018 Jamee Bedingfield Inland Waters Pollution Control, Inc. 4086 Michigan Ave. Detroit, MI 48210 RE: Award Bid — Sewer and Manhole Rehabilitation — Project No. 118-093 Dear Mr. Bedingfield: PHONE 574/235-9251 FAx 574/235-9171 The Board of Public Works, at its meeting held on December 20, 2018, awarded the above referenced project to you in the amount of $2,015,380.50 for the Base Bid plus Alternates A and B. Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal I)X,January 3 2019 to my attention for Board of Public Works approval: 1) One (1) original of the Public Works Contract (enclosed) 2) Labor & Material Payment Bond 3) Performance Bond (125% of Bid Amount) 4) Certificate of Insurance naming the City of South Bend as an additional insured 5) Item #4 for all subcontractors you use If you have any further questions regarding this matter, please call this office at (574) 235-9251, Sincerely, Linda M. Martin, Clerk Enclosures GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Clara McDaniels, Assistant City Attorney Public Works Linda M. Martin, Clerk FROM: Sue Ellen Doudrick, P.E., Assistant City Engineer SUBJECT: Project No. 118-093 Sewer & Manhole Rehabilitation DATE: December 20, 2018 On December 11 2018, the Board of Public Works opened and read bids for the above project. The Division of Engineering reviewed the documents and found each bidder failed to submit information required per the standard documents. I worked with each of the low bidders to obtain the required information. Separate from the award memorandum to the Board of Public Works dated December 18, 2018, 1 wanted to document the following information with the Board of Public Works to compile all data. Inland Waters Pollution Control — missing information (See attachment A): a. Contractor's Bid For Public Work, Part II i. Section II — If you intend to sublet any portion of the work, attach the name and address of each subcontractor. A listing must be provided prior to contract approval. The original bid stated that they are unable to provide a listing. I reached out to Inland on 12/14/2018 and requested this. On 12117, Inland Water provided a listing. b. Responsible Bidder— Checklist i. Part 11. a. (iii) Prequalification checklist (for bidders that are not pre -qualified) By checking this box, I hereby acknowledge that copies of applicable certificates or standards for training programs applicable to the work performed don the project may be requested at any time and shall be furnished upon request. The bid package from Inland Waters acknowledged this statement. ii. Part II. b. (vi) — Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. In their bid, they stated that: Inland Water Pollution control, Inc. does not currently employ apprenticeship programs or training programs registered with the United States Department of Labor's Office of Apprenticeship. On December 14,1 reached out to Sara Grogan (Inland Associate Estimator) informing her that it is critical for them to look closer into their training program as without this said evidence, then we will not be able to award the contract to them. On December 17, 1 spoke with Sara Grogan and Dwight Silva (Inland Business Representative) requesting this information again and to express the criticality. They indicated they would be getting this information submitted. On December 17th, I received an email from Jeremy Recklein (Inland General Manager) with their in-house training guidelines. On December 18th I replied asking if there is evidence of "participation in apprenticeship and training programs". Jeremy responded there is currently not an applicable labor category that is consistent with the type of scope of work we conduct in the field, he also indicated that they are members of various trade organizations all of which do not have an apprentice ship programs applicable to their work. 2. SAK Construction — missing information (see attachment B) a. Contractor's Bid for Public Work, Part II i. Section 1. 3. Attach information regarding any failure to complete work awarded to you and the location thereof. ii. Section 11.2. Attach a listing of the names and addresses that you have used on public works projects during past 5 years along with brief description of the work done by each subcontractor. iii. Section 11.3. If you intend to sublet any portion of work, attach the name and address of each sub, equipment to be used and whether you will require a bond. The missing information that was requested on December 14, 2018. The information was provided on December 1 Ph. b. Responsible Bidder— Checklist i. Bidder was considered pre -qualified during an un-project related submittal on 10/26/2018. However, upon review of the Insituform and Inland Water Pollution Control, Engineering looked closer at the initial submittal on 10/26/2018, and noticed the provided "Evidence of participation in apprenticeship and training programs" was noted to be from the state of Ohio. Furthermore, the memorandum states that the document does not certify any relationship the company has with the mentioned registered sponsors. 3. Insituform — missing information a. Responsible Bidder —Checklist i. Part 11. a. (iii) Prequalification checklist (for bidders that are not pre -qualified) By checking this box, I hereby acknowledge that copies of applicable certificates or standards for training programs applicable to the work performed don the project may be requested at any time and shall be furnished upon request. The bid package from Insituform acknowledged this statement. ii. Part 11. b. (vi) — Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. In their bid, they stated that. Insituform is full staffed and capable of meeting all of the project requirements to complete this job for the City of South Bend. Bidder pulls trained labor from Locals 120 and 103. Bidder does not have apprenticeships due to the specific skill set for our services. On December 171h, I reached out to Janet Hass, Contract Specialist, requesting that they take a closer look at their apprenticeship and training program. On December 17th, Janet indicated that their "apprentice employees come from Union Halls. They receive training through the Union and move through the apprenticeship program by working hours for a company. They will be paid a rate per each "worked hours" threshold". According to the Responsible Bidder Ordinance, Ordinance No. 10594-18, Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The Engineering Division understands that the challenge with this being more specialized construction and that the US Department of Labor of Apprenticeship may not have registered or approved specific training or apprenticeships for this type of work. However, since passing of the Responsible Bidder Ordinance, this will be the first time that we have not been able to award, if that be the case, to the lowest, responsible, responsive bidder due to this new ordinance. It is Engineering's recommendation that the Board of Public Works award to the lowest responsible, responsive bidder, Inland Waters Pollution Control by waiving the requirement of the Responsible Bidder Ordinance Section 11. Part b. Item vi. as there does not appear to be clear evidence that each of these contractors who splecial in Sewer and Manhole Rehabilitation are truly re- ualified and nor shall thpy be dis ualified from bidding due to this strict ordinance. Further research with the National Association Sewer Service Companies states that they are planning to establish an Apprenticeship Program through the US Department of Labor. Encl. Attachments A-D, A - INLAND WATERS POLLUTION CONTROL CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Sewer and Manhole Rehabilitation Project No. 118-093 For Bids Due December 11, 2018 Contractor Name: Inland Waters Pollution Control, Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing,on a form provided y y ("Responsible Bidder Checklist (1) Pre -Qualified p Aded b the City Bidders") by December 31"l for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/201 B General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractors)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/201 B General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) — By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) List of at least three (3) projects involving CIPP pipe lining of pipes with a diameter of 36 inches or greater, within the state of Indiana in the last three (3) years. Version 7/20/2018 General Conditions - 8 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) X By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) _X_ By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom 1 have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub- contractors have the necessary licenses to undertake the work called for in this bid. If a sub -contractor loses their license at any point, it is the responsibility of that sub -contractor to notify the City. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X List identifying all former business names. (iii) y Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) X Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) X Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) X Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) X Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 (ix) X Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (I) X List of at least three (3) projects involving CIPP pipe lining of pipes with a diameter of 36 inches or greater, within the state of Indiana in the last three (3) years. Date: December 10„ 2018 (n 'ere) ,�amee Bedingfield (Print Name Here) Inland Waters Pollution Control, Inc. (Name of Company) 4086 Michigan Avenue (Address of Company) Detroit (City) 821 (State) 313-899-3014 (Telephone Number) Version 7/20/2018 General Conditions - 10 Attachment vi — Apprenticeship / Training Programs Inland Waters Pollution Control, Inc. does not currently employ apprenticeship programs or training programs registered with -the United States Department of Labor's Office of Apprenticeship. f J� Illlllllll IPR Employment and Minimum Training Guidelines Minimum Requirements to qualify for employment/training with IPR: No previous experience is required IPR will provide the effective training to do specific task safely, correctly and effectively. New employees will be provided on-the-job training in the specific CIPP, Spin - Cast Lining, CCTV and Pipe Cleaning in which they are enrolled. Minimum education levels are required. Basic knowledge of materials, methods and the tools of construction is helpful but not necessary. Applicants are required to: 1. Sign a letter stating that they are physically capable of performing the work required; including working from scaffolds and in confined spaces. 2. Possess a valid Driver's License as trainees may be required to operate vehicles owned by IPR. 3. Provide their own reliable transportation to and from the specific IPR office, job site and to all related instruction. 4. As a condition of continued enrollment, pass a drug test and be subject to random drug testing and eVerify. 5. Willing to travel within the designated geographic region for the purpose of successfully completing on the job training through IPR work assignments. 6. Agree to attend related instruction provided in the geographic region in full compliance with IPR's policies. Classroom TrainingZRelated Instruction Classroom training or "related instruction" (RI), is based on OSHA recognized standards for safety. IPR has inhouse trainers who are certified under industry guidelines with various certifications in safety and construction quality management. All trainees must successfully complete a wide range of safety, trade and leadership training, including the OSHA 10 Hour Construction Safety course, standard first aid/CPR and other educational tasks geared toward underground utility repair and rehabilitation specific to pipe lining operations. Trainees must successfully complete both the prescribed "on the job training" and all "related instruction" to advance. i 1 f M a WN # 1. OUR COMMITMENT TO EQUAL EMPLOYMENT OPPORTUNITY & HARASSMENT PREVENTION IPR supports and is committed to the principles of equal employment opportunity. In order to provide equal employment and advancement opportunities to all individuals, employment decisions at IPR are based on merit, qualifications, abilities, and other legitimate, nondiscriminatory factors. IPR does not discriminate in employment and apprenticeship opportunities or practices on the basis of race, color, religion, creed, sex, national origin, age, disability, marital status, military status, veteran status, labor �..'or;n Pdi[t,� jr(: V1VV wf ..n n affi�t In dom is vn rite victim status sexual orientation genetic predisposition or carrier status or , ,g p p , any other characteristic protected by law. IPR firmly believes that all qualified persons shall have equal opportunity in effective training. IPR is committed to providing a learning environment in which all individuals are treated with respect and dignity. IPR is committed to promoting careers in construction through training and implement programs and policies, which include the strategic outreach and positive recruitment efforts that would reasonably be expected to increase minority and women's participation in apprenticeship. All trainee decisions shall be consistent with the principles of affirmative action and equal employment opportunity. IPR strives to maintain an environment free from discrimination and harassment, where people treat each other with respect, dignity and courtesy. This policy applies to all phases of trainee and related employment, including but not limited to recruitment, testing, hiring, promotion/demotion, transfer, lay-off, termination, pay, granting of benefits and training. This policy applies not only to the workplace during normal business hours, but also to all job and related instruction training areas, work -related social functions, whether on or off a company's premises and to business -related travel. Any incidents of discrimination or harassment of any type should be reported. Trainees can raise concerns and make reports without fear of retaliation. Anyone found to be engaging in any type of unlawful discrimination or harassment will be subject to disciplinary action, up to and including termination of employment and/or enrollment in the trainee program. d .. t D: 'I(1C)!T11'C1 U4'";�X [^� �U'B� � ter h4f4, .srn,"',r �`1��(tf k �"� �LiI (g, lI6I( a,��,1.UttP,� ull "c' (.ry°1''Yppr,c(," 1n°I From: l"r my-&QUI 113 To: Sara Gruan Cc' Dwight Silya; QdLd-Md)ni6- suuject' RE: South Bend, Im #z1*nosResponse mMissing Items Date: Tuesday, December 1o'2neom1srxw Attachments: vaamaawuna Good morning Sue Ellen, Sue Ellen, The requested attachment onpage9oftheGenera|[onddjororefeencesprogr msthatareapp|icable to the work to be performed on the project. We have referenced the United States Department of Labor's Office of Apprenticeship guidelines in the past and for this project; there is currently not an applicable labor category that is consistent with the type of scope of work we conduct in the field. Specifically, for the specialized construction and technology utilized to perform CIPP and Spin Cast Lining. On a regular basis wedodiscuss with this void with U.S. Department ofLabor representatives with regard tospecific apprenticeship programs affiliated with DOL. From their feedback, apparently there seems to benospecific category orprogram. |naddition tucommunicating with the DOLweare affiliated urare active members toavariety of industry trade organizations such as NUCA (National Utility Contractors Association), NASSCO (National Association of Sewer Service Companies), ABC (Association of Building Contractors), and AGC (Association of General Contractors) all of which do not have an apprenticeship programs applicable to our work or specific to the trenchless pipe industry that we service or the type of specialized construction services we provide atthis time. From speaking recently with the U�.Department ofLabor, the closest category would befor operators (excavation equipment operators) and pipe fitter (such as natural gas) which are not involved in lining operations. It was upon recognizing this absence of training within our specialized industry, that we began formulating a training program of our own, which has been submitted to you previously. Within this program, weaneab|etoteach&tmineagerindividua|sthetechno|ogyspecificdu1iesandtasks required to be safe & successful within our specialized line ofwork. If there is any specific information that you may have to assist us with compliance on this front and differ from the U.S. Department of Labor's guidelines, please let us know and we would welcome such information. Thank you, ]erennyRecWm|n General Manager Inland Pipe Rehabilitation | Great Lakes m:����3B�1��� � P: From: Sue Ellen Doudrick <sdoudric@southbendin.gov> Sent: Tuesday, December 18, 2018 6:59 AM To: Jeremy Recklein <jrecklein@TEAMIPR.COM>; Sara Grogan <sgrogan@TEAMIPR.COM> Cc: Dwight Silva <dsiIva @TEAMIPR.COM>; Clara McDaniels <cmcdanie@southbendin.gov> Subject: RE: South Bend, IN-#118-093 Response to Missing Items Hi Jeremy, thanks for sending this information. To confirm, is the training you provided: vi - Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. Please provide evidence that the training program meets this requirement for this pre -qualification (Item vi). In the originally submitted bid, a statement from Inland showed that there is no apprenticeship and training programs. Thank you, Sue Ellen From: Jeremy Recklein <irm),,,tlq(1,�RrIPt'�1fyl> Sent: Monday, December 17, 2018 8:50 PM To: Sue Ellen Doudrick Sara Grogan <ssrowan@'1EA 1lF)1R� �,�) > Cc: Dwight Silva <j aid14�tt 1(A11it„i1,?t>; Clara McDaniels �� ��jru.gy> Subject: Re: South Bend, IN - #118-093 Response to Missing Items Sue Ellen, Thank you for your message in regard to the South Bend Submittal Package that we provided. I wanted to speak with you in detail regarding the apprenticeship program prior to sending this email. I can make myself or any member of my team available if you would want a meeting to discuss in detail. I have attached for reference IPR's general employment/training guidelines that we have in house for your review. If you have any questions, please do not hesitate to contact me. Very Respectfully, Jeremy Recklein General Manager IPR-Great Lakes 313.498,0481 From: Sue Ellen Doudrick <i.a,J.rat{rl, Sent: Monday, December 17, 2018 3:35 PM To: Sara Grogan Cc: Jeremy Recklein; Dwight Silva; Clara McDaniels Subject: RE: South Bend, IN-#118-093 Response to Missing Items Hi Sara & Jeremy, I apologize, but I am not available this afternoon. I will be checking emails tonight. Please submit your information by EODtoday for review via email. Thanks. Sue Ellen From: Sara Grogan Sent: Monday, December17\ 20183:17 PM To: Sue Ellen Doudrick <,5 Cc: Jeremy RecWeinDwight Silva Subject: South Bend, IN - #118-093 Response to Missing Items -04111=1111111111 Please find the information below: Project: South Bend, IN: Sewer and Manhole Rehabilitation Project No.118'003 Contractor: Inland Waters Pollution Control, Inc. Response toMissing Items — Requested from Sue Ellen 0mudrickon12/14/1@ Part 11 — Section I - Item #4 — Attach references from private firms for which you have performed work. These were included in the project references sent with the original bid. Please find them listed separately below: Project: 0DOT485—Lucas [o|R-75 [ontractAmt: $237,710.00 C|PP Unin8Appmx. 1,340 LFof8-1O" Start: 5/15/15—Complete: 7/15/16 Owner: Kokosin#Construction Company 886McKinley Avenue Columbus, CH 43222 Contact: Gina Carter (614)228-1O29 Contrac1Amt: $13,284,916.00 Connection Repair Comp|e1e:S/20ll Owner: NTH Consultants, Ltd. 2000 Brush St #480 Detroit, MI 48226 Contact: Joseph Alberts, PE (313) 304-3616 Part U—Section U—Subcontractor List Please find the subcontractor list below! Contact Scope Name Person Address E-mail Contact No. FCompany Elite Pipeline John 5220 Edgewater Drive, (616)644- Clean/CCTV Services Compton Allendale, MI, 49401 5507 Culy 5 Industrial Park or, Sunbelt Rentals Pump & Power Joe 11220 Allisonville Rd. Bypass Services McIntosh Fishers, IN 46038 7206 HRP Construction Joseph 5777 Cleveland Rd (574)274- Dig Work Inc. Jonas South Bend, IN 46628 '571.6 Duke's Root Bob Hunn, 1020 Hiawatha Blvd. West (614)354- Root Control Control, Inc, Jr, Syracuse, NY 13204 3927 Part U—Section III — Attach Financial statement The Inland Waters Pollution Control, Inc. financial statement was included inthe initial bid package. It was resent via email to Sue Ellen Doudhckon December 14, 3018. Prequalification — Item vi: Evidence of participation in apprenticeship & training programs General Manager, Jeremy Recklein, will be following up with you via phone this afternoon. Sara Grogan Associate Estimator Inland Pipe Rehabilitation | Corporate p: 678'433'9171 CONFIDENTIALITY NOTE: The information transmitted, including attachments, is intended only for the person(s) or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you received this in error, please contact the sender and destroy any copies of this information. IMPORTANT NOTICE! This E-Mail transmission and any accompanying attachments may contain confidential information intended only for the use of the individual or entity named above. Any dissemination, distribution, copying or action taken in reliance on the contents of this E-Mail by anyone other than the intended recipient is strictly prohibited and is not intended to, in anyway, waive privilege or confidentiality. If you have received this E-Mail in error please immediately delete it and notify sender at the above E-Mail address. Please note that incoming e-mails are not routinely screened for response deadlines, and as such, please notify the sender separately by fax of any message containing deadlines. In addition, E-Mail information cannot be guaranteed to be secure or error -free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain virus. Therefore, the sender does not accept liability for any errors or omissions in the contents of this message which arise as a consequence of E-Mail transmission. If verification is required, please request a hard -copy version. CONFIDENTIALITY NOTE: The information transmitted, including attachments, is intended only for the person(s) or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you received this in error, please contact the sender and destroy any copies of this information. IMPORTANT NOTICE! This E-Mail transmission and any accompanying attachments may contain confidential information intended only for the use of the individual or entity named above. Any dissemination, distribution, copying or action taken in reliance on the contents of this E-Mail by anyone other than the intended recipient is strictly prohibited and is not intended to, in anyway, waive privilege or confidentiality. If you have received this E-Mail in error please immediately delete it and notify sender at the above E-Mail address. Please note that incoming e-mails are not routinely screened for response deadlines, and as such, please notify the sender separately by fax of any message containing deadlines. In addition, E-Mail information cannot be guaranteed to be secure or error -free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain virus. Therefore, the sender does not accept liability for any errors or omissions in the contents of this message which arise as a consequence of E-Mail transmission. If verification is required, please request a hard -copy version. CONFIDENTIALITY NOTE: The information transmitted, including attachments, is intended only for the person(s) or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you received this in error, please contact the sender and destroy any copies of this information. B - SAK CONSTRUCTION 1316 COUNTY-Crrr BUILDING 227 W.JEFFERsoN BOULEVARD SOUTH BEND, INDIANA46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS October 26, 2018 Ms. Christa Cope Business Development Coordinator SAK Construction, LLC 864 Hoff Road O'Fallon, MO 63366 RE: Pre -Qualification Verification Dear Ms. Cope: PHoNE 574/235-9251 FAX 574/235-9171 This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Rend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments, If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, Linda M. Martin, Clerk GARY A. GILOT DAVID P. RELOS ELIZADETH A. MARADIK JAMEs A. MUELLER THERESE J. DORAU submitted0n ua i ication 1._._._...__...._..-.....��_��_.._.. 0/26/18 for pre- q u� BUIL IN FUTURES 939 Goodale Boulevard, Suite 202, Columbus, OH 43212 OFFICE: (614) 221-7171 CELL: (614) 361-2114 dhager@columbusconstruction.org DATE: September 14, 2018 Steve Hirtz SAK Construction, LLC 864 Hoff Road O'Fallon, MO 63366 Re: Apprenticeship Program Dear Mr. Steve Hirtz: This letter serves notice that SAK Construction, LLC has met the requirements of the City of Columbus prequalification Criteria 19- Socially Responsible (Chapter 329 .211 (c)(10). SAK Construction, LLC is a joint sponsor of the Laborers' District Council of Ohio -Apprenticeship Program. SAK Construction, Construction, LLC has a formal agreement between it Laborers' District Council of Ohio and CBCTC Building Futures program. As you are aware, CBCT Building Futures is a one -of -a -kind workforce development organization with the primary goal of introducing potential participants to careers in the organized construction industry, enhance the technical skills of the participants, and help them gain life, employability and career skills to become competitive candidates to qualify for building trades registered apprenticeship opportunity with SAK Construction, LLC. In addition to partnership with contractors, CBCT Building Futures has partnered with Impact Community Action and Franklin County to recruit, underrepresented populations for the CBCT Building Futures pre - apprenticeship to registered apprenticeship pathway. The model, which combines a combination of social services, community support, job training and education that positions the participants for entry and success in the building and construction workforce. By utilizing this innovate pre -apprenticeship model, it is the express intention of the CBCTC and its labor and apprenticeship program partners to provide career opportunities for displaced workers and restored citizens in the City of Columbus and Central Ohio region. Thank you for your participation and continued involved with the CBCT Building Futures program and providing displaced workers and restored citizens in our community and an opportunity for a career in the construction Industry. Sincerely, Dorsey Hager, Jr. Chairman, CBCT Building Futures � Department of U10' hi o Job and Farnily Services John R, Kasich, Govei nor Cynthia C. Dungey, Directoi September 12, 2018 SAK Construction, LLC 864 Hoff 11_,a., .-... °- Fallon, MO 63366 '-.. . r To Whom It May Concern, Please accept this correspondence as evidence that all corresponding local unions of t� Ohio Laborers International Union of North America do participate in their respective Registered Apprentl�8hip programs recognized by the state of Ohio and the U.S. Department of Labor's Office of Apprenticeship under the guidelines of the Fitzgerald Act of 1937 (50 Stat. 664; U.S.C. 50), 29 code of federal regulation parts 29 and 30, as well as Ohio Administrative Code 5101:11. Program Name Construction Craft Laborers Heavy Highway Program ID OH008060010 Occupational Name / Code Construction Craft Laborer / RAPIDS #0661 Graduation Year RAPIDS ID / Indenture Date 2017 OH 14NO59746 04/24/2014 2016 OH13NO54246 04/11/2013 2015 OH 12NO52250 10/04/2012 2014 OH 1 1 N045866 08/01 /2011 2013 OH09NO38889 06/19/2009 ra Information Data S)slcm This document does not certify any relationship your company has with the above mentioned Registered . pl?renticeship sponsors. If you have additional questions or concerns, please feel free to contact me directly at 614-644-0863 or lltitrick.Reai�doti@,jfs.oiiio.gov 'iincerely, 474Q— Patrick Reardon, Program Administrator ApprenticeOhio Office of Workforce Development ApprenticeOhio P.O. Box 1618 4020 East Fifth Avenue Columbus, OH 43216-1618 submitted on 10/26/18 for pre - qualification SECTION 26 Affirmative Action Plan Affirmative Action Plan, Goals and Timetables Our commitment: The joint apprenticeship and training committee (JATC) for the Construction Craft Laborers of Ohio confirms its commitment to equal employment opportunity in the recruitment, selection, employment, and training of apprentices in our craft. This affirmative action plan is one means of satisfying this commitment. We recognize that affirmative action is not mere passive nondiscrimination, but involves action directed toward equalizing opportunity in apprenticeship to allow full utilization of minority and female (minority and non -minority) workers' potential. We have adopted the equal opportunity pledge in our apprenticeship standards. The JATC will make a determined effort to disseminate this policy internally in the union and among the participating employers. The recruitment, selection, employment, and training of apprentices shall be without discrimination because of race, color, religion, national origin, age, or sex. The JATC shall take Affirmative Action to provide equal opportunity in apprenticeship and will operate the apprenticeship program as required under Title 29of the Code of Federal Regulations, Part 30; Ohio Administrative Code 5101:11; and the equal employment opportunity regulations of the State of Ohio. We have conducted an employment analysis of minority and women Construction Craft Laborers' in the geographic area of coverage of our apprenticeship program, and compared the results to data supplied us by the registration agency for our program. The data shown in the attachment to this plan indicates a significant underutilization of women and a very moderate underutilization of minority group persons. We recognize that ours is a traditionally male occupation, in part because of the conditions of employment in heat, cold, wet and physically demanding conditions, and in part, because of the general public perception of the status of our craft among those of the construction industry. To generate a movement for change in composition and perception of our craft, the JATC will enter into partnerships with work force development entities serving the targeted populations, such as "Youth Build" programs. A. Targeted d4s4mutati of ir 'on about the lnatum of our craft and its evolution over the past twenty (20) years, nationally, and #wmed and registered apprenticeship program to train Construction Craft Laborers.AF will give: anphasis to reaching various women's groups and institutions at the local level such as women in co�,gug iM M91y, ]yCA- .etc.., in addition to general information provided in releases for newspapers, newsletters, and local publications, we will provide target groups with specific program information as to anticipated apprentice openings, basic qualification requirements, and where and when to obtain applications. B. Providing similar information to the state employment service, AILS, Outreach and School -to -Work project managers, both Federal and state registration agencies, school counselors, and minority service organizations, C 4ATC and/or sub -committee members will participate in work -shops of various government and 'private organizations. -to flrmiliarize officials, leaders, and the particular constituency of each with both the generat information as indicated above and the additional specific information where. appropriate, D. The JATC and/or sub -committee members will disseminate its policy and affirmative action committal internally in the union and through meetings with employer sponsors to explain the intent of the program and the individual responsibility shared by all parties in 20 submitted on 10/26/18 for pre- JIIIIIIII qualification its implementation. E. Cooperation with local school boards and vocational education systems to develop programs for preparing students to meet the standards and criteria required to qualify for entry into apprenticeship programs. F. Utilization of journeypersons to assist in the implementation of the sponsor's affirmative action program. The JATC will conduct an annual review of this Affirmative Action Plan and its effectiveness, and subject to approval by the Registration Agency, will institute any revisions or modifications warranted to achieve the purposes of the Plan as stated above. The review will include both an internal assessment by the JATC and consultation with other informed parties, and will analyze each activity under this plan, to gauge the nature and degree of its impact on outreach, recruitment, selection, employment, and training. The JATC will continually monitor the rates of female and minority participation in the program, in order to assess progress toward achieving the purposes of this Plan, the reasons for such performance, and the need for starting, ending, or changing specific affirmative action efforts. All changes to this Plan must be submitted to the Registration Agency for approval. The JATC's workforce goals also will be reviewed periodically as determined by the Registration Agency, and will be updated where necessary. 21 James A. Mueller, Member Attest: Linda M. Martin, Clerk PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. Please see attachment labeled "Completed Project List" 2. Attach a listing of public works projects currently in process of construction by your organization. Please see attachment labeled "Current Project List" 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. SAK has never failed to complete any work awarded to them. 4. Attach references from private firms for which you have performed work. Please see attachment labeled "Completed Project List" SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) Please see attachment labeled "Plan for Proposed Work", it will include .SAK"s "CIPP Installation Outline" as well as a statement regrading staffing. 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. In the past five years, SAK has utilized 10,000+ subcontractors and suppliers. Additional information/references can be provided upon request. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. Currently, SAK intends to sublet portions of the work and will have a list of subcontractors ready to submit prior to contract approval. 4. Attach a listing of equipp� meat ou have available to use for the proposed project. Please see attachment lalael'ed °"l'+ ajor CIPP Equipment" 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SAK has received offers and proposals for materials and work to be subcontracted, but has not entered into contracts prior to bid opening. The offers and proposals have an expiration elate after bid opening which will allow SAK to enter into contracts with appropriate subcontractors after award of the project to SAK. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the Version 7/20/2018 Contractor's Bid for Public Works - 3 TM S A Untended Subcontractor Utilization South Bend, IN — Sewer and Manhole Rehabilitation, Project No. 118-093 Subcontractor: David Mason & Associates Scope: Cleaning & CCTV Inspection Address: 800 S Vandeventer Ave. St. Louis, MO 63110 Phone: 314-534-1030 Equipment: TV Truck and Jetter, Combo Unit if necessary Bond Required: No Subcontractor: Culy Contracting LLC Scope: Manhole Rehabilitation Address: 5 Industrial Park Drive Winchester, IN 47394 Phone: 765-584-8509 Equipment: Standard Cementitious/Epoxy Spraying Rig(s) Bond Required: No Subcontractor: HRP Construction Inc Scope: Excavations Address: 5777 Cleveland Road South Bend, IN 46628-9418 Phone: 574-271-7800 Equipment: Excavator(s), Dump Truck(s) Bond Required:.. No NEW 864 Hoff Road 0°Fallon, MO 63366 www.sakcon.corn C - INSITUFORM CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Sewer and Manhole Rehabilitation Project No. 118-093 For Bids Due December 11, 2018 Contractor Name: Insituform Technologies USA, LLC The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 " for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/2012018 General Conditions - 6 POST BID SUBMISSIONS. Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. I Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/2018 General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) List of at least three (3) projects involving CIPP pipe lining of pipes with a diameter of 36 inches or greater, within the state of Indiana in the last three (3) years. Version 7/20/2018 General Conditions - 8 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) x By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) x By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) X By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, acknowledge my understanding that it is my responsibility to ensure that all sub- contractors have the necessary licenses to undertake the work called for in this bid. If a sub -contractor loses their license at any point, it is the responsibility of that sub -contractor to notify the City. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) ex List identifying all former business names. (iii) x Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) x Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) x Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 (ix) x Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) XX List of at least three (3) projects involving CIPP pipe lining of pipes with a diameter of 36 inches or greater, within the state of Indiana in the last three (3) years. Date: December 11, 2018 va Here) Hass, Contracting & Attesting Officer (Print Name Here) Insituform Technologies USA, LLC (Name of Company) 17988 Edison Avenue (Address of Company) Chesterfield (City) Missouri (State) 636-530-8000 (Telephone Number) Version 7/20/2018 General Conditions - 10 * * r a * aI MOUNUMIM11911 (b) Attachments (iv) Insituform is fully staffed and capable of meeting all of the project requirements to complete this job for the City of South Bend. Bidder pulls trained labor from Locals 120 and 103. Bidder does not have apprenticeships due to the specific skill set required for our services. (v) Individuals who perform work on the public work project of behalf of Bidder will be properly classified as either an employee or an independent contractor under all applicable state and federal laws and local ordinances. (vi) Bidder's services do not require professional or trade licenses. Individuals who perform work on the public work project of behalf of Bidder will be properly classified as either an employee or an independent contractor under all applicable state and federal laws and local ordinances. Bidder pulls trained labor from Locals 120 and 103. Bidder does not have apprenticeships due to the specific skill set required for our services. D - RESEARCH Alr fExc. atlon - CII Grouters - Pllpelllne ReMnln � µ rGo t , Cutters - Sewer Inspection IE auIpment ,a •,e nT N Editorial Trenchless Initiatives for the New Year Ti renc less initiatives for the New Year NASSCO's strategic plan Buttines training, advocacy and operational efficiency initiatives. Appeared in print as "Planningfor2016" G� By Ted DeBoda, P.E. O December 2015 W* NASSCO Corner NASSCO will soon celebrate 40 years of setting industry standards for the assessment and rehabilitation of underground infrastructure, ensuring the continued acceptance and growth of trenchless technologies. As we enter 2016, we also enter a time when industry professionals demand and deserve the highest levels of education and training possible, with exposure to the latest technologies available. NASSCO's vision — to improve the success rate of everyone involved in the pipeline rehabilitation industry through education, technical resources and industry advocacy — will be supported by our 2016 strategic plan, which focuses on quality training and technical resources, industry advocacy and growth, and operational efficiency. Training and resources Goal: Create and promote industry standards, to include training and other technical resources, with cooperation from like-minded associations to improve the success and growth of trenchless technologies. • •Improve the quality and accessibility of training materials for the Pipeline Assessment Certification Program and the Inspector Training Certification Program. • *Develop relevant and high -quality online training courses. • •Update existing and complete new technical manuals and standards to raise the bar for the industry. •*Build relationships with academia to include TTC (Louisiana Tech), CUIRE (University of Texas, Arlington), and others. Advocacy and growth Subscribe: If youdon'twantigbring.your iPad into the bathroom, e can send you a magazine subscri . n a eN Goal: Promote the use of trenchless technologies, and improve their success rate through education and advocacy. • •Maintain and build productive relationships with WEF, ASCE Pipelines and other professional associations to unite and strengthen the industry. • •Provide members with an awareness of issues relating to government funding or buried infrastructure and facilitate member involvement in issues that impact industry growth. • *Provide educational opportunities through webinars, Education Day at WWETT, technical workshops, Technical Day at NASSCO's Annual Conference and other opportunities. an apprenticeship program through U.S. Department of Labor R th hiring new employees with no experience. • •Execute an aggressive marketing plan (to include case studies, articles, etc.) to reach municipalities, engineers and others who would benefit from standards to improve and increase the use of trenchless technologies. Operational efficiency Goal: Establish tools and processes to efficiently disseminate information and offer the best service possible to the industry. • •Improve NASSCO's data management and website tools to facilitate better service and resources for the membership, the individuals that we train and to the industry in general. • •Evaluate NASSCO staffing and board structure to better serve our clients and grow the organization. Get the EDge Training and Cuntinuing Educatiun Cuurses PACP TRAINING December 8 Marriottsville, MD PACP User Recertification Trainer: Ted DeBoda Contact Dawn Jaworski for more information or to register: 410-442-7473 or email dawn@nassco.org December 8-10 Cambridge, MA Includes Manhole and Laterals! Recertifications Welcome Contact Laurie Perkins for more information or to register: 603-606-4420 or email laurie.perkins@wright-pierce.com December 8-10 Conyers, GA Includes Manhole and Laterals! Recertifications Welcome Contact John Jones for more information or to register: 404-431-5584 or email plumblineconsultant@gmail.com December 8-10 La Porte, TX Includes Manholes and Laterals! Recertifications Welcome Trainer: Brandon Conley Contact the Camera Department for more information or to register: 248-349-0904 or email pacp@dohenycompanies.com December 8-10 Sacramento, CA Includes Manholes and Laterals! A limited number of PACP Re -Certification seats available. Contact Marilyn Shepard for more information or to register: 916-899-8961 or email mshepardl @hotmail.com December 9-11 Seattle, WA Includes Manholes and Laterals! PACP Re -Certification seats available. Contact John Jurgens for more information or to register: 425-487-3325 or email nodig@aol.com December 15-17 NASSCC Facility in Marriuttsville, MD Includes Manholes and Laterals! Recertifications Welcome! Contact Rizwan Siddiqi, PE for more information or to register: 443-739-9234 or email rasiddigi@gmail.com m + - Study December 15-17 Wichita, KS Includes Manholes and Laterals! PACP Re -Certification seats available. Contact Paul Booth for more information or to register: 304-647-0757 or email woodsidescheduling@gmail.com January 5-7 Antioch, CA Includes Manholes and Laterals! Recertifications Welcome Trainer: Eric Sullivan Contact Ashley Groves for more information or to register: 248-349-0904 or email pacp@dohenycompanies.com January I Northville, MI 1 Day Recertification Course Trainer: Brandon Conley Contact Ashley Groves for more information or to register: 248-349-0904 or email pacp@dohenycompanies.com January 12-14 Nortliville, MI Includes Manholes and Laterals! Trainer: Brandon Conley Contact Ashley Groves for more information or to register: 248-349-0904 or email pacp@dohenycompanies.com ITCP TRAINING (CIPP and Manhule) December 1-3 Sioux Falls, SD Cured In Place Pipe 8:00 am - 5:00 pm Day 1 • 8:00 am - 1:00 pm Day 2 Morning Contact Gerry Muenchmeyer for more information: 252-626-9930 or email gerry@muenchmeyerassoc.com Related: NASSCO Names New Executive Director Manhole Rehabilitation 1:00 pm - S :00 pm Day 2 Afternoon . 8:00 am - S :00 pm Day 3 Contact Tim Back for more information: 513-253-8461 or email timbacktwo.com Courses can be taken individually. FeUruary 1-2 Atlanta, GA (UC ) Cured In Place Pipe 8:00 am - S :00 pm Day 1 8:00 am - 1:00 pm Day 2 Trainer: Gerry Muenchmeyer Contact Gerry Muenchmeyer for more information: 252-626-9930 or email gerry@muenchmeyerassoc.com P Popular Stories Gen -Eye Flash in a �ii t y�yll�"fir i f/uu��l�i�rr�oia4�� J��,r, Uati I �ryT� � Jl7/�ifl� 7 t INK Air AddubkL hWmbVd,.,w,,eRla, 0-4 Discussion Comments on this site are submitted by users and are not endorsed by nor do they reflect the views or opinions of COLE Publishing, Inc. Comments are moderated before being posted. 0 Comments Municipal Sewer & Water Login Sort by Best G) Start the discussion.... LOG IN WITH OR SIGN UP WITH DISQUS 0 Name ® Subscribe Q Add Disqus to your siteAdd DisqusAdd A Disqus' Privacy PolicyPrivacy PolicyPrivacy r,,..F:_F FHE COLS �,i © 2018 Municipal Sewer & Water'" All Rights Reserved I Privacy Policy, https://www.mswmag,comleditoria1/2015/12/trenchless_initiatives_for_the_new_year 7/7 '� 1111 4INw Registation Now Available on nassco.org! Plan now to attend NASSCO's 39th Annual Conference scheduled for February 11-13, 2015 at The Westin Savannah Harbor/Savannah International Trade & Convention Center in Savannah, GA. You don't want to miss this one! Why, you ask? Read on. This year's Annual Conference is slated to be the best one ever! Not only do we have plenty of networking opportunities, we have two full afternoons of sessions planned for Committees to work on their objectives and this year's Technical Day includes two tracks! Technical Day Tracks Gerry Muenchmeyer, NASSCO's Technical Director, has planned a very imformative Technical Day including the following tracks: • Track A: Safety, Risk Assessment and Municipal Issues Track B: Collection System Inspection, Maintenance and Rehabilitation • Track A/B: Keynote address by Rod Lovett with Miami -Dade Water and Sewer Department. This will be followed by a Municpal Panel consisting of representatives from the City ofAugusta, the City of Virginia Beach, the City of Savannah, Miami -Dade and Sandy Suburban Sanitary. "For more detailed Technical Day Agenda go here: http://www.nassco.org/secure/Files/2015_annualconference/2015 techday.pdf � ,iw President's Corner ..............................2 Executive Director's Message.............3 Technical Director's Forum.................4 From the Committees .........................6 Industry Events ... ..._........ ...�...�......�..10 Training Calendar .............................12 Annual Grout School-___........, .... 13 Mourning the Loss o1 Members... .... 14 Industry News..................................16 Test Your PACP Knowledge..............18 Media Partners.................................19 From the Divisions..... ................. __20 A Special Thank You ........................22 Jane Bayer, joined our team on September 8th as our Engineering Technician. Jane started her career as a Mechanical Designer, designing mechanical components for pumping stations and treatment plants. She is PACP, MACP, and LACP certified, and logged many hours providing quality control for pipeline and manhole inspections. Her excellent written communication skills earned her the position ofAssistant Marketing Director at URS Corporation, where she ultimately progressed to a Project Management role, assisting in implementing policies & procedures, project administration duties, and daily project controls. Jane is Past Chair of the Chesapeake American Water Works Association and Past President of the Chesapeake Chapter of the Society for Marketing Professional Services. She currently serves as Treasurer of the Chesapeake Water Environment Association (CWEA) and is active in the Collection Systems Committee. At a National level, Jane has won the prestigious Carl John Lauter and the George Warren Fuller Awards from American Water Works Association for her distinguished service to the industry. Jane has almost 30 years in the water and wastewater industry. She graduated from Trinity College with a BS in General Engineering with a concentration in Mechanical Engineering. Please help us in welcoming her! She can be reached at 410-442-7473 or by email atjane@nassco.org BY STUART TILLERY NASSCO held its Semi - Annual Meeting in New Orleans, LA during WEFTEC and it was another record crowd. It seems the venues are becoming larger every year due to the increase in membership participation. We began by remembering several NASSCO members that we lost in 2014 and I'd like to mention them here. David Magill, Norm Sirna, Rod Sutliff and Dick Schantz were all good men who dedicated a great deal to the industry and to NASSCO. They will be missed. The meetings covered what we have been focusing on and working toward since the Annual Conference in February. Some items to note include the update to the Pipeline Assessment Certification Program (PACP), the development of the Inspector Training Certification Program (ITCP), the NASSCO Manual of Practice update and the continuing work on the development of a new user-friendly website which includes back end functionality that will help, not only the staff, but you as member. In the near future, NASSCO Members will also have access to Online Health and Safety Training at a discounted rate. We are always working on ways to help our members save time and money so we hope some of these things will be beneficial to you. The meeting also included a vote, which passed, on proposed By -Law revisions which include making our Professional Member Category a voting category. We also moved Public Municipal Works Employees into this category so they could potentially have a seat on the Board, but he or she must be a Professional Engineer. Since NASSCO is a contractor association, the contractor members must always maintain a majority plus one position on the Board. The Committees continue to do amazing things. They all reported their initiatives, goals and accomplishments to the members. NASSCO appreciates all the committees do for the industry. It is great to see our industry leaders working together to make their areas of expertise even better. If you are not a member of a committee and would be interested in participating, a list is available on our website. The NASSCO staff has done an excellent job this year making sure the members needs are met and exceeded. I would personally like to welcome Jane Bayer, our newest addition to the NASSCO Staff. Don't forget to register for our 2015 Annual Conference in Savannah, GA February 11-13. We have a great program in store for you. You can find all the information on nassco.org. I hope to see you there! Regards, Stuart Tillery NASSCO President NASSCO TIMES EXECUTIVE DIRECTOR'S MESSAGE BY TED DEBODA, P.E. I couldn't have been more excited to see a packed house at our Semi -Annual Meeting at WEFTEC. Thank you to those who participated in the September 29th meeting and also to those who attended the networking reception afterwards. For those of you who missed it, I'm happy to report that our committees are fully engaged and NASSCO continues to produce great things for the industry! I'm sure you sometimes wonder, "What is NASSCO Doing?" The following items are currently hot topics at NASSCO and we hope that you can get involved in them! 1. PACP Update, Version 7.0 — This continues to be our highest priority. We are currently undergoing a series of peer reviews, both home and abroad (WRc), to ensure a quality revision. This is an important program, and it is extremely important that we get it right. We are developing training materials and plan to hold a few Beta Classes with trainers over the next several months in order to fine tune the changes. We have high hopes to release the program for training in late spring of 2015. 2. ITCP — Gerry Muenchmeyer, NASSCO Technical Director, has been working hard to successfully grow the inspector training programs for both CIPP and Manhole Rehabilitation. He is also working with the International Pipe Bursting Association (IPBA) in the development of a Pipe Bursting Program for inspectors. 3. Technical Support—NASSCO continues to be a reliable source of technical support to the industry for trenchless rehabilitation and assessment. 4. Annual Conferences — Did you know that the costs of NASSCO Annual Conferences are almost twice the amount that we collect from registration fees? Those that come to our events almost always come back because of the great value we offer with respect to the information provided, the committee participation and the networking opportunities. 5. NASSCO MOP Update — Our Manual of Practice is extremely valuable to the industry and is unfortunately out of date. With the help of staff, consultants and volunteers like you, a focused effort is underway to revise and revitalize this valuable reference. apprenticeship Program In cooperation with the U.S.. Department of Labor, NASSCO is undertaking the development of an apprenticeship program for a "Trenchless Assessment and Rehab Laborer". This will be extremely valuable to trenchless contractors working in areas where revailing wages require them to pay new laborers at t same rate as those with many years of experiem 7. te/lDatabase Update —Anew( oat r has been enga�'tn,-makc our 1, b r cient and user-friendly, as well as update the way our services are delivered. Stay tuned. 8. Health and Safety Program — Working with Drake International, NASSCO is planning to offer a suite of online Health and Safety Training to support the industry. It will be available in the very near future. In the meantime, they will be speaking at our Annual Conference during'lechnical Day. 9. Scholarships — In addition to the Jeffrey Ralston and PACP Scholarships, we have recently added the David Magill Scholarship for students at Virginia Tech (Mr. Magill's alma mater). 10. More... On another note, we recently had a void in our full- time staff so we interviewed several candidates for the position of Engineering Technician. We are happy to say that we filled the position with Jane Bayer. Jane has over 25 years of experience in the industry, and while her main responsibility will be updating PACP, she will also be working closer with our committees to facilitate some of the great work they are doing and keep them engaged. We are excited to have her as a part of our team! I hope you all have a great holiday season, and we look forward to seeing you at the Annual Conference in Savannah, GA! Regards, Ted DeBoda, P.E. Executive Director NOVEMBER `14 EDITION 3 The following is a brief summary and update of the ongoing technical programs at NASSCO. !Allcfifiber Service ` o hnic YAl lrmjulri -; If you are inspecting a CIPP or manhole rehabilitation project and have a question regarding the quality of the installation or have a technical question regarding pipeline rehabilitation it can be directed to director@ nassco.org, jane@nassco.org. or gerry@nassco.org The NASSCO Technical staff will review the request and provide a written recommendation. , I 1_1 r.� To date, nearly 1500 inspectors have been trained as CIPP inspectors in the U.S and Canada. To assure that the delivered product has both the design life and service life expected a certified inspector should be required on the job site, during CIPP installation. This program is not highly technical, but is a common sense approach from the field perspective. It covers field issues directly affecting the installed quality of the product. The inspector is trained on the key inspection requirements during construction that will ensure that a quality product has been installed. The program is intense, interactive and gives the inspector and engineer the knowledge and confidence to perform an effective inspection program for a Cured - In -Place pipe installation project. Inspector training programs can be held your office. A minimum of 8 registered students are required whether they are from your company or not. Typically, the maximum is 25 students to ensure a quality traiining experience for all attendees. Contact Gerry@nassco.org for more information All CIPP training programs are listed on www.nassco, org together with trainer of the program. � p ca d r for Nlanl ole Rc hnbill'iaiion Effective manhole rehabilitation may include a variety of different technologies. The expected life and effectiveness of the applied product is directly related to correct product selection by the owner/ engineer and inspection of the host structure before, during and after application by a trained inspector. NASSCO's Inspector Training & Certification Program for Manhole Rehabilitation (ITCP-MR) includes detailed information on things such as, Manhole Defects - Rehabilitation Requirements, Manhole Preparation, Quality Assurance and Testing Methods, Replacement and Rehabilitation Technologies and a chapter on specifications entitled "The Inspector's Project Instructions". The program is intended to provide an owner, engineer or inspector with sufficient knowledge to inspect and verify when a product has been applied correctly. There are a number of excellent products available for manhole rehabilitation. Scheduled courses are listed on www.nasseo.org. �,J' This program is still in the development stages. With several other programs having a priority, this program is scheduled to be completed in late 2014 or early 2015. We are looking for some additional pipe bursting professionals that would be available to become trainers after the program is launched. Once the draft program is complete, a peer review group will be selected, consisting of IPBA members and any other NASSCO members who wish to participate in the review process. After peer review, a BETA class will be scheduled before the program is launched. Send ass an F`na� Gerry - gerry@nassco.org Jane- jane@nassco.org 4 NASSCO TIMES NOVEMBER `14 EDITION 5 Lateral Rehab Committee Dean Monk, Chair Person The committee published three articles in Trenchless Technology Magazine this year with the draft of the fourth finalized in October. We've also had several conference calls to discuss not only articles, but updates to the Lateral Overview document. We still need updated photos, so if you have any, please forward them to administrator@ nassco.org. Industry Standards Committee Marilyn Shepard, Chair Person Sub -Committees were formed to address the two specifications that the committee was tasked with completeing this year; the CCTV Spec and the Cleaning Spec. Both specifications have been compiled and are being reviewed. They should be ready for a full committee review in Janary 2015 for release to the industry shortly after. The next task to be completed is a Cleaning Specification for Large Diameter Pipe. if you would like to help with this initiative or help with the review of the final Cleaning and CCTV specifications mentioned above, please contact the NASSCO Office. Annual Confeente Committee Kay Doherty, Co -Chair Person The 39th Annual Conference will be held in Savannah, GA, February 11-13, 2015. For more details, see page one. Scholarships and Awards Committee Brad Dutruch, Chair Person NASSCO has three scholarships available to those in the industry or showing interest in joining the industry. They include : • Jeffrey D. Ralston Scholarship: $2,000 scholarship is awarded based on certain criteria including seeking a career in the sewer service industry. • PACP Scholarship: A free registration to a PACP class ($750 value) is awarded based on merit. • David Magill Scholarship: $5,000 will be given to a VA Tech Student studying Wastewater /Trenchlees Technology and will be chosen by the University. David Magill was an Alumi of VA Tech and was a staunch supporter of both the University and NASSCO. Additional information can be found on nassco.org under Member Services. Thank you to all our sponsors! Health & Safety Committee Ted DeBoda, on behalf of Steve Henning, Chair Person A track at the 2015 Annual Conference's Technical Day will focus on safety including a presentation from Drake Health & Safety Academy. Government Relations Committee Jon Sickels, Chair Person There are three items to discuss as they pertain to our industry: • Water Resources Reform and Development Act (WRRDA): This act streamlines permitting for US Army Corp of Engineers port and maritime infrastructure projects by setting cost and time deadlines for studies and streamlining the environmental review. • Water Infrastructure Finance & Innovation Authority (WIFIA): This provision would establish a five-year WIFIA pilot program for low interest loan programs administered by the EPA to fund water and wastewater related infrastructure projects. • New Legislation: Clean Water Affordability Act: This would authorize $1.8 billion in grants to help communities tackle combined sewer and separate sanitary sewer overflows over the next five years. Software Vendor Committee Mike Russin, Chair Person The software committee should be recieving the PACP 7.0 update files for their own review in December 2014. If all goes well, software certification for version 7.0 will commence in the Summer of 2015. (continued on page 8) 6 NASSCO TIMES 3 V%` I S xL,�, , , rv» , I u h f�Q I f y, j I I 10 11 j 1 f J 1A, 1� j j P L R J! 1a 1 1 la I11�1" v 4 1 ..,J i "1°lli It lr,h I j f ol+� a I 7a 11 j 1 1,1 j 11 9 I I f 1:L'r111 1j WirI I'Al, my, 5chedWe a fiver oii dviino and fifid mit ojilmift meant lci igo dill 0m, E ,,wrosight ("oln , 97 1,� N4) If, NOVEMBEll EDITION 7 (continued from page 6) Nominating Committee Joan Stone Chair Person Elections for the Board will be conducted at the 2015 Annnual Conference in Savannah, GA in February. This year we have the following positions available: • Four Contractor positions • One Associate position (Manufacturer/Supplier) If you are intrested in getting involved with the Board, please contact the NASSCO office. Membership/Marketing Committee Sheila Joy, on behalf of Dan Coley, Chair Person NASSCO's marketing objectives include increasing municipal and professional (engineering) by 20%, increasing contractor membership by 5% and increasing NASSCO's exposure in Trade Magazines. To date, we've increased municipal membership by 15%, lost about 3.2% on the professional membership and increased contractor growth by 2.6%. We have more work to do on this front! Exposure in trade magazines has grown substantially over the past three years! From media values of $575k in 2012, $615k in 2013 and an estimated $660k in 2014. Wow! Thank you to our media partners, Municipal Sewer & Water, Trenchless Technology Magazine and Underground Construction Magazine. ehabZone Committee Guy Leslie, Chair Person The RehabZone, an education zone at UCT, includes a Sewer History Exhibit and other hands on displays with expert volunteers to speak to attendees about different technologies in a no -sales environment. This year, we'd like to add more hands-on displays and we also need those expert volunteers to help educate those touring the zone. Please consider helping. Also, we are currently collecting sponsorships to bring things like the Sewer History to the exhibit as well as to cover other expenses associated with the event. Please donate! Chap Lining Committee Steve Hirtz on behalf of Dave Kozman, Chair Person A new manual of practice (MOP) is under development by an ASCE task group that addresses a new CIPP design approach for gravity flow applications. A second draft is being finalized, with a target publication date of 2015. NASSCO is looking at developing a CIPP design certification course that would reflect the new ASCE MOP. NASSCO will be discussing co -authorship of the MOP with ASCE. NASSCO is performing due diligence on industry demand, pricing structure and delivery of this course (classroom, online or both). Once approved, it will take about 5-6 months to roll out. A Pipe Rehabilitation Standards Subcommittee has been formed to define structural classifications for pressure pipe lining technologies (Class I, II, III and IV) in M28. The subcommittee had its first meeting at ACE in Boston in June and another at WEFTEC on 9/28/14. The committee has developed initial framework for each classification for industry feedback. Final recommendations will be published through AW WA as a white paper. Industry Relations Committee Brandon Conley, Chair Person This committee is currently helping to facilitate NASSCO presentations at local conferences. If you have a local conference that you participate in and would like to speak about NASSCO, we can provide a presentation to you. We are also looking for more people to get involved in the committee. If you are interested, please contact the NASSCO office. Pressure Pipe Committee John Schroeder, Chair Person The Pressure Pipe Committee's mission is to develop reliable technical information, guidelines and other references for capabilities, limitations and costs of pressure pipe assessment and rehabilitation technologies that will help owners and engineers with the inspection, maintenance and rehabilitation of their pressure pipelines. (continued on page 10) 8 NASSCO TIMES' NOVEMBER `14 EDITION 9 (continued from page 8) In 2014 we developed the first version of the inspection technology matrix, sponsored a track at UCT, held three conference calls as a committee to delegate roles and tasks, began summarizing the list of rehabilitation technologies, collected technical specifications and began reviewing them to draft a NASSCO Guideline Spec and collaborated with other association committees. Our goals for 2015 currently include developing a draft NASSCO Guideline Specification for Pressure Pipe Rehabiliation, updating the inspection technology matrix, sponsoring and coordinating another track at UCT, continuing quarterly conference calls, completing the list of rehabiliation technologies for comment, completing a list of pressure pipe rehab projects and presenting case studies and continuing to collaborate with other assocations. Asset Management Committee Ted DeBoda, on behalf of Grant Whittle Chair Person PACP Version 7.0 will include an Asset Management appendix that was developed with the help of the EPA and WERF. Currently, we are developing a presentation to introduce it to the industry. Latin America Committee Luis Leon, Chair Person The Latin America Committee has been very busy these last few months. First, we completed the transition of Committee Chair from Diego Calderon to Luis Leon from CDM Smith, Inc. In addition, Ted DeBoda and Luis Leon gave presentations at the ICTIS congress in Medellin, Colombia: Ted presented on NASSCO and the state of the trenchless industry, the collaboration agreement with ICTIS, and the important of PACP in the industry. Luis gave presentations on How to Utilize Risk Analysis to Plan and Prioritize Cleaning, Inspection and Rehabilitation of a Sewer System, and one on the Importance of Sealing Sewer Laterals when Rehabilitating Main Sewer Lines. Finally, the LAC started the translation of ITCP for CIPP. Seven committee members are participating in the translation, which is a large undertaking, we expect to have the first draft done by the end of October and will be forming a third party group who will review it and provide comments by the end of 2014. The goal is to have the final document ready to print in the first quarter of 2015. Manhole Kebab Committee Tim Back, Chair Person This is the newest NASSCO committee and we currently have 50 members. We typically have monthly conference calls that last roughly 30 minutes. Recently we completed the MACP Condition Grades and Scoring for the PACP Version 7.0 update. Currently, we are working on a series of articles. For example, a Manhole Rehab Overview as well as an article on the oldest cementitious rehab in the U.S. We are exploring the possibility of an ASTM for thickness of cement, epoxy and CIPM. January 2015 UCT: January 25-30 Houston, TX www.uctonline.com February 2015 NASSCO Annual Conference: February 11-13 Savannah, GA www.nassco.org WWETT: February 23-26 Indianapolis, IN www.wwettshow.com March 2015 No -Dig Show: March 15-19 Denver, CO www.nodigshow.com April 2015 WEF Collections Systems Conference: April 19-22 Cincinnati, OH www.wef.org/collectionsystems 10 NASSCO TIMES' jug& / ` ° � }. � % Smoke Candles Smoke Flul4d Systems Blowers 10 NOVEMBER'14 EDITION November 2014 r � ITCP Class: November 18-19 Dallas/Fort Worth TX g� Cured In Place Pipe Contact Gerry Muenchmeyer 252-626-9930 or email gerry@muenchmeyerassoc.com PACP Class: November 24-26 Morgan Hill, CA Includes Manholes and Laterals! Contact Marilyn Shepard 916-899-8961 or email mshepardl@hotmail.com December 2014 ITCP Class: November 18-19 Cincinnati, OH Cured In Place Pipe Contact Gerry Muenchmeyer 252-626-9930 or email gerry@muenchmeyerassoc.com PACP Class: December 2-3 Toronto, ON (CANADA) PACP Only (MACP/LACP available on 12/4 if interested) Registration Deadline: November 17th Contact Tanya Stephens 416-616-5521 or email tdsconsulting@rogers.com PACP Class: December 2-4 Normal, IL Includes Manholes and Laterals! Contact Paul Booth 704-681-3989 or email woodsidescheduling@gmail.com PACP Class: December 2-4, 2014 Pittsburgh, PA Includes Manholes and Laterals! PA DEP Credits available. Contact Michael Kerr 412-605-9000 or email mikerr54@hotmail.com PACP Class: December 3 Oakland, CA Contact Marilyn Shepard 916-899-8961 or email mshepardl@hotmail.com ITCP Class: December 3-4 Cincinnati, OH Manhole Rehabilitation Contact Tim Back 513-253-8461 email tback@cinci.rr.com ITCP Class: December 8-9 Fort Wayne, IN Manhole Rehabilitation Contact Tim Back 513-253-8461 email tback@cinci.rr.com PACP Class: December 9-11 Marriottsville, MD Includes Manholes and Laterals! Contact Rizwan Siddiqi, PE 443-739-9234 or email rizwan.siddigi@ebaengineering.com PACP Class: December 9-11, 2014 Smyrna, GA Includes Manholes and Laterals! Contact Jeff Tinlin 770-435-8991 or email jefftinlin@cobratec.com ITCP Class: December 10-I1, 2014 Evansville, IN Manhole Rehabilitation Contact Tim Back 513-253-8461 email tback@cinci.rr.com 12 NASSCQ TIMES (continued from previous page) PACP Class: December 10-12, 2014 Seattle, WA Includes Manhole and Laterals! Contact John Jurgens 425-487-3325 or email nodig@aol.com PACP Class: December 16-18, 2015 Goldsboro, NC Includes Manholes and Laterals! Contact Paul Booth 704-681-3989 or email woodsidescheduling@gmail.com ITCP Class: December 18-19, 2014 Las Vegas, NV Cured In Place Pipe Contact Rocky Capehart 916-834-2712 or email rcapehart@sprayroq.com • The Annual Grout School January 14-15, 2015 Avanti HQ Aries, Avanti and Logiball are teaming up to bring you The Annual Grout School at Avanti's home offices near Houston, TX. Join us January 14-15, 2015 for this two-day course which outlines the application detail review ofASTM and ICGA/ NASSCO specifications, and brings hands-on workshops for chemical grout mixing, testing, and equipment operation and maintenance. Learn life-long skills that will advance your organization's value to customer with the tools, techniques and technologies needed to build a permanent defense against infiltration. Earn 10 Professional Development Hours after completion of this. For more information, visit www.avantigrout.com or call 800.877.2570. DRAICUTTE6L EUME DISTRIBUTOR FOR FORTH AMERICA SANS & SERVICE NOVEMBER `14 EDITION 13 Rod Sutliff, R.S. `rechnical Services On August 29, 2014 Rod Sutliff, owner and CEO of R. S. Technical Services passed from this world. He leaves a legacy of innovation, and many firsts that helped shape the trenchless technology industry. Reliable single -conductor technology was one of many of the contributions Rod gave to the industry. He considered himself a "tinkerer", and his tinkering frequently produced excellent and innovative results in equipment performance and durability. Often, Rod took an idea and made it better, and more applicable for the industry. As the "RS" in the company name, Rod spent more than thirty years pioneering technology in his chosen specialty, leading his firm to become known as "a company of firsts." Under his leadership, the firm was the first to manufacture a mainline camera with internal lights, a true pan -and -tilt camera with tracking lights, and the first single -conductor panomorphic camera system, among many other pioneering products. Rod leaves behind his loving and devoted wife of 60 years, seven children, 22 grandchildren and 8 great- grandchildren. His legacy lives on in the children and grandchildren who are very much a part of the RST family in Petaluma, CA. Richard N Schantz lost ➢uis battle to cancer on September 6, 2014. The pipeline rehabilitation industry lost a dedicated member. Dick, a civil engineer, began his journey in 1990 with Aries Industries, Inc. His interest in pipeline televising and underground rehabilitation quickly grew to a desire to learn about and educate others in the processes of chemical grouting and underground rehabilitation systems. Dick was a strong advocate for chemical grouting and was an active participant in the development of ASTM standards related to chemical grouting in municipal sewers. Dick was recently inducted as The RST family, however, extends far beyond Petaluma. Rod touched the lives of every person who worked for RST. Each was and is a part of the extended RST family. Perhaps best known for his kind, friendly demeanor, Rod was famous for championing those less fortunate, providing help for people he knew were down on their luck. Over the years, he helped many individuals get their lives back together by providing assistance with housing, money, and/or employment. Rod's outlook on life was contagious. For those of us who knew him well, he will be remembered as a wane, highly intelligent and gentle man with a great sense of humor, and who was a loyal friend. He will be remembered by our industry as a brilliant innovator with an amazing and creative mind who contributed mightily to our industry. R. S. Technical Services, Inc. is a long-time member of NASSCO. Our industry was blessed to have Rod Sutliff as part of it. His innovation and creative mind will be missed. His friends and family will remember his loving warmth, loyal friendship, and kindness to all he knew. a member of the Select Society of Sanitary Sewer Sleuths. He was also the chair of ICGA and was instrumental in the writing of the NASSCO grouting standards. Dick was convinced that integrity, education and training were the best ways to give the grouting industry the tools to succeed. In 2006, Dick started the annual Aries Grout Boot Camp to educate operators, inspectors and engineers on procedures of successful chemical grout mixing, testing and equipment operation. Since then more than 300 people have attended boot camp. Dick was always available and eager to give advice to customers. His analytic approach was appreciated by all. Dick will be remembered for his contributions to the industry, his integrity, dedication and passion. He was a friend to many and an all around great person! He will be missed. 14 NASSCO TIMES ' IS w,tr ' equipmentprofiling condition ,i ,," X" 11,,., support o's for ', and storm sewers, partner.return on 'investment as a trusted business 800.327."91 www.cue*c.com saieAnf*wesinc com Contact CUES for a dlscusslon & demonstrations NOVEMBER `14 EDITION 15 New 4I itScari Mini °" Video Nozzle C; p uitm Ki') Vlikleo froin� 1I ines als , IrT4111 ws, 6 v. Randolph, New Jersey —October 1, 2014Deployed in pipes 6-10 inches in diameter, the new JetScan MiniTM video nozzle gives sewer cleaning crews the visual feedback they need to select the proper tools, troubleshoot backups, identify buried safety hazards, and document successful cleaning. This simple, rugged device is affordable enough to put on every cleaning truck, yet captures valuable HD video footage from underground pipes for offline tablet viewing. "When we launched the 8-inch JetScanTM last year, it represented a new paradigm for our market — rapid, cost-effective HD video without the need for a CCTV truck," says Richard Lindner, President of Envirosight. "The response was overwhelming. And now with JetScan Mir is prevalent, can achie and efficiency." As with the standard. MiniTM records up to video to an onboard 3 The card is easily retr iPad or other SDHC-compatible device. Twin high - output LED lamps ensure bright, vivid footage, and rechargeable lithium -ion batteries provide up to 4 hours of continuous operation. The JetScan MiniTM is available as a complete system, or the standalone 6-inch nozzle can be purchased separately for use with a camera from an existing JetScanTM Visit Envirosight online at www.envirosight.com 3-in-1 System: - La -seer profiling - Joint & crack meosurement Highly accurah-: Arguably the most accurate system currently on the market, Easy 4Compact, built-in Rousch cameraobtrusive attachment. 16 NASSCO'TIMES w Greveener fortl"'ie Planet CG) SpYs and Your Bottom Lime sm mom 0 a mpmomw vwp pwum MW wN yowwwv Nm"j QnQ UWWVMW wouvoM MP5 WIM im"WMAW %my w wind 11,0e(pla"O'c s, U4,�Ihiviq �(o,, ii�o �ml no f1'41,a «�vmo pmynii,w o;u';i'(�Ig appinpid im Immv 6 pqqQw"omejw to Mix nov "M ng a pmvw WMA01 n Waite Mm pmwoQom wox qWN MM "Wid OciublFl C QO rX6',,LSSW1q, SUPIRINIC."! v'noq "rd Nwle�r flexa,ZO pmj-+,nes E' wilqN AV M F Q M mommmom a MAHMS om 0 m-" nwomig ann Walkage Mmm -immimm, 'j 111,1 - 1/1111111PIPP11111 1800 735 549`7 INTERPLASTIC 'Al'A'AN C0111 NOVEMBER'14 EDITION 17 1. True/False If more than one rat or other large animals are observed, the quantity should be detailed in the Value -Inches -1st column. 2. True/False If an intermediate access point is discovered during the survey, use the Miscellaneous Survey Abandoned or MSA code along with the Remarks column to record it. 3. One of the conditions of a Defective Tap is when: a) Vermin is observed coming into the sewer from the tap b) The tap is installed at 12 o'clock c) The tap is installed against the flow d) The tap is capped 4. The camera should be moved through the pipe at a steady pace not to exceed m mmmmmmmmm mmmmm ? a) 30 ft/sec or 10 m/sec b) 30 ft/min or IOm/min c) 60 ft/min or 20 m/min d) 30 in/hr or 750mm/hr 5. Select the correct code for the defect/observation shown in the following image a) SSS (Surface Damage Spalling) b) RMJ (Roots Medium at Barrel) c) FM (Fracture Multiple) d) IG (Infiltration Gusher) 18 NASSCO TIMES NOVEMBER `14 EDITION 19 inl rinational Pipe Bursting Association George Mallakis, Chair The NASSCO semi-annual �k meeting was held on Monday September 29th at WEFTEC •� �,.�in New Orleans. All of the NASSCO committees and divisions updated the membership on the work inside of their respective groups. Matt Timberlake, Vice -Chair presented an update on behalf of the IPBA. Current IPBA work underway: Education Committee 1. 2015 UCT in Houston, Texas with a dedicated "pipe bursting — a view from the field track". 2. December 1 Oth 1:OOpm — 3:OOpm EST WEF webinar "Pipe Bursting - A Mature and Diverse Trenchless Technology". People can register at WEF.org and will receive 2.0 PDHs. John Nelson, Chair Over the past few years the ICGA has developed many tools to educate individuals about cost effective solutions provided by Chemical Grout. Unfortunately, many times these tools end up forgotten or lost amongst a pile of other papers on our respective desks. Fortunately, there is a one -stop shop for these items - the ICGA web site. In the coming months we are looking to undertake an update to the website. However, this by no means reduces the vast amount of information that is currently available at www. sewergrouting.com. Should you have a need for some good technical data, specifications, case histories or even a reliable contractor to complete a chemical grouting project, be sure to visit sewergrouting.com In addition to the website update, we are in the process of building a task list for future ICGA projects. One item which we are currently looking to complete is a before and after case study on infiltration control 3. Developing a joint presentation and technical workshop, with NASSCO, for the 2015 WEF Collections System Conference that will be held April 2015 in Ohio. 4. IPBA Lateral Committee is still looking for volunteers to help and is planning to meet in 2015 at the WWETT conference (formerly Pumper Cleaner). It is the goal of the lateral committee to have a written guideline for lateral pipe bursting for the IPBA Leadership team to review and approve prior to the 2015 WWETT show. The IPBA's annual meeting will again be held at UCT in January 2015 with a semi-annual meeting at No -Dig in Denver. We are continuing to run technical articles and case studies through the major trenchless media outlets like Trenchless Technologies and Underground Construction magazines. when grouting lateral connections of CIPP lined sanitary sewer pipe. Should you have a project on which such a study may be developed or a suggestion for a new ICGA task, please contact John Nelson at john@visu-sewer. com. On a more somber note, we lost two of the most influential "grouters" in the industry this year - Dick Schantz and Norm Sirna. They were staunch supporters of NASSCO, members of the original Grout Task Force and their creative thinking laid the foundation of our industry. We were blessed to have their leadership and council for the past 20+ years. They will be truly missed. Tell Your PACP Knowledge Answer Key L true 3. c 5. c 2. false 4. b 20 NASSCO TIMES ,00.,.) NozzTeqn www.flozzleQlacol, NOVEMBER `14 EDITION 21 We want to thank all of the members who contributed to the 2014 Semi -Annual Meeting! Advanced Drainage Systems, Inc. Applied Felts Avanti International BLD Services, LLC CDM Smith Compliance EnviroSystems CUES Doetsch Environmental Douglas Products & Packaging/Vaporooter Duke's Root Control InfoSense, Inc. Jack Doheny Companies LMK Technologies Maxliner Muenchmeyer Associates, LLC Nozzteq, Inc. Pipeline Renewal Technologies Pipelogix, Inc. ProPipe Reline America SAK Construction Sunbelt Rentals Pump & Power Visu-Sewer The following sponsors went above and beyond to make the event a huge success and we'd like to recognize them accordingly. We appreciate your continuted support! Applied F -,A1s A pioneer in CIPP technology nearly 40 years ago, Applied Felts is the world's largest independent manufacturer of 100% vertically integrated, quality liners. Every phase of manufacturing — including a 28-stage testing system — is done in one location, ensuring confidence that Applied Felts' quality liners will stand the test of time. Applied Felts now offers its latest innovations in CIPP liner technology: AquaCure RPR — a breakthrough liner that combines fiberglass reinforcement with Applied Felts' existing, best -in - class felt liner design and construction; and AquaCure PSR — specially designed for pressure sewer pipes and other non -potable water applications. www. appliedfelts.com / 276.656.1904. Avanti International Avanti International is the only full service provider and most experienced producer of high -quality chemical and cementitious grouts in the United States. AvantiGrout is used world-wide to stop leaks, stabilize soil, and control groundwater —permanently. For municipal, industrial and geotechnical applications, our contracting partners improve operations and restore underground infrastructure including pipe joints, manholes, service connections, laterals, and before/ after lining. Avanti is 110% behind all that NAASCO stands for. Visit www.AvantiGrout.com for case studies, literature, animations, and a wealth of industry information, or call 800-877-2570. Available 24/7, Avanti is here to help you move forward. Compliance Compliance EnviroSystems, LLC (CES) was incorporated in 1995 as a full service professional storm water and sanitary sewer collection system evaluation company. CES is the largest provider of these kinds of services in the Southeast United States. Our core mission is to provide a complete range of sanitary and storm water system evaluation services. These services aid our clients in complying with large scale EPA mandated rehabilitation programs, annual maintenance and asset management programs, routine and emergency cleaning, GIS data collection and much more. www.ces-sses.com Hoffman Southwest Corp., a California Corporation headquartered in Mission Viejo, California was established in 1946 and incorporated in 1972. Hoffman Southwest launched Professional Pipe Services (Pro -Pipe) as a division of Hoffman Southwest in 1992, which today services 12-states throughout the Western United States and operates one of the largest fleets in the U.S. Pro -Pipe's services include GIS integrated pipeline digital scanning, CCTV inspections, sonar/laser profiling, ultra -violet light cure lateral seals, cured in place pipe and gas - utility cross bore inspection. Pro -Pipe is a leader in utilizing innovative methods to collect assessment data and assist facility owners with rehabilitating critical infrastructure. (continued on the next page) 22 NASSCO TIMES, (continued from previous page) InfoSense InfoSense manufactures the Sewer Line Rapid Assessment Tool or SL-RAT®. The SL-RAT uses acoustics to assess gravity -fed sewer lines for blockage in 3 minutes or less allowing wastewater collection system operators to better prioritize and focus their CCTV and cleaning resources on the pipes that need the most attention. Highly portable, GPS enabled, and U.S. EPA validated http://nepis.epa. gov/Adobe/PDF/P 100IY 1 P.pdf. A two person crew can screen 10-20,000 feet of pipe per day at 1/10th to 1/20th the cost of alternative methods. Over 8.0 million feet inspected. WINNER WEF Innovative Technology Award. Phone: 877-PIPECHK ext 1 Website: www.infosenseinc.com AssociatesMuenchmeyer • Tel 252 626-9930 Email: gerry@muenchmeyerassoc.com Trenchless Technology Technical Services and Training to Municipalities and Consulting Engineers. Services provided: Over 50 years of pipeline evaluation, design, construction and inspection • Expert advice to municipalities on specific technology application, alternatives and selection • Provide forensic inspection, evaluation resulting in recommendations for the resolution of improperly installed trenchless products • Provide Trenchless Technology expertise to Consulting Engineers • Education and training on all aspects of Trenchless Technologies pipelogix The PIPELOGIXTM software program has been helping municipalities around the world to collect and store survey detail about their underground assets for over fourteen years. With the addition of the bi-directional GIS Module supervisors can view all surveys performed on an asset including movies, pictures and reports from the map by selecting the asset or condition so you see the problem before making rehab evaluations. This integrated solution creates surveys in the office from ArcMap or on the truck from the imported flexidata map with accurate asset information saving the CCTV operator valuable entry time and reducing the chance of data input errors. PACP, LACP and MACP certified by NASSCO. ESRI Silver Business Partner. For more information contact joan.stone@pipelogix.com. 866.299.3150 ext.102 Pipeline Renewal Technologies Pipeline Renewal Technologies is an Envirosight company focused exclusively on the pipeline rehabilitation market. The company offers technologies for no -dig structural lateral connection, lateral and lateral reinstatement cutting, durable point repair, and process measurement. A strong emphasis on support makes Pipeline Renewal Technologies the partner of choice for municipal contractors looking to gain a competitive edge with innovative technologies. Pipeline Renewal Technologies is a member of NASTT and NASSCO. Sunbelt Rentals Sunbelt Rentals Pump & Power Services, one of the company's fastest growing divisions, specializes in innovative solutions for fluid handling, rental power and compressed air needs. Boasting a wide selection of pumps, including diesel and electric driven models from 4" to 24" with flow rates up to 16,000 GPM, Pump & Power Services has all of the bypass and dewatering equipment you need. With 40 Pump & Power locations throughout the United States, you can be sure that there is a branch convenient to you. Call 800-736-2504 for 24/7 service and support. 1-Hour Emergency Response GUARANTEED. NOVEMBER `14 EDITION 23 2470 Longstone Lane Suite M Marriottsville, MD 21104 Phone: 410-4442-PIPE (7473) Fax: 410-4442-7788 E-mail: director@nassco.org Website: www.nassco.org PRSRT STD U.S. POSTAGE PAID Mercersburg, PA Permit #15 � v No Dig Trenchless Pipe Repair 1,vn fi"` /o l au q Applications: Cracks and hales Root intrusion Water infiltration Looking joints Abandon laterals Restage structural integrity of pipe Cris be instofle i'grith flowpre_5entt www. rausc ,usa.com 1011 x xa " , � r CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Sewer and Manhole Rehabilitation Project No. 118-093 For Bids Due December 11, 2018 Date Address: City/State/Zip: PART (Must be completed for all bids. Please type or print) December 11 2018 Bidder (Firm): Inland Waters Pollution Control„ Inc. 4086 Michigan Avenue Telephone Number: 313 899-3014 Detroit,.....................4................................................ p -_ .) Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Sewer and Manhole Rehabilitation Proiect #118-093 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: VS Engineering, Inc. and dat@d November 2018 for the sum of (enter the Total Bid as shown on the Proposal) Enter su �f T t N BaseBid d plus Alternates sh�tno� P�-bpos b 4( p � (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid fox a mount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on eparate etta hment. By� . . „a lSignatcar Jamee Bedingfield ssi ant Secretary (Printed Name of Person Signing) ACCEPTANCE r�u The above bid is accepted this v� O day of 111 � ,,�e k-,J 20 %g x�Subject to the following conditions � 6 _� - �' �� � - � � /„ S ,?Q , S� B �RDPU19LI W IGS Gary A, Gilot, President _mm ................................. Eli t" h A. Mar dikI e.1ber x s l r, mber L fluRA ULG(V4 N Suzann r zb g„ emb r Th, r, se J. orau, Member • c , ,' � �r ..w- _a. t st: Linda M. Martirt, Clerk .. Version 7/20/2018 Contractor's Bid for Public Works - 2 BID/PROPOSAL CITY OF SOUTH BEND Project Name Sewer and Manhole Rehabilitation Project No. 118-093 For Bids Due December 11`°, 2018 Manhole Lining Method: IMadewell Mainstay Composite Liner Mainline Sewer Lining Method: Invert -A -Pi a CIPP Base Bid (CSO 018) Version 7/20/2018 Contractors Bid for Public Work — 8A Base Bid Total ADDENDUM #3 12/06/2018 NY • • 0 )V 00 10 0d AiteArl�P ate-Descri tionl8 andMiscellaneousAreas) A 72" Pipe Rehabilitation Pipe ID 005177 Manhole Rehabilitation MH HY 0018C00020 C 72" Pipe Rehabilitation -Pipe ID: 005178 D Manhole Rehabilitation MH ID: 0018C00015 E 72" Pipe Rehabilitation-PipelD: 005270 F 72" Pipe Rehabilitation Pipe ID: 005179 HManhole Rehabilitation MH ID 0018C00010 Z a. ....._ _ . Pipe Rehabilitation Pipe ID: 005180 Manhole Rehabilitation -MH ID 0018C00005 J 72" Pipe Rehabilitation - Pipe ID: 005181 _ M K Manhole n op le Rehabilitation tion M 0006CO5020 L 12 Pipe Rehabilitat ion - Pipe ID: 008916 mm M Manhole Rehabilitation -MH V.0008CO5015 12 Pi a Rehabilitation Pipe ID 008915 O Manhole Rehabilitation -MH ID: 0008C04865 ManholeRehabilitation - MH ID: -_ 0003C0_.0900 Q Manhole Rehabilitation - MH ID: 0003CO0945 R 15" Pipe Rehabilitation Pipe ID 003337 S Manhole Rehabilit ation ID:0003C00940 T I Manhole Rehabilitation - MH ID: 0003CO0920 U15" Pipe Rehabilitation - Pipe ID: 004703FA� V Manhole Rehabilitation MH ID: 0003CO0065 ___ W 12" Pipe Rehabilitation - Pipe ID: 003492 X Ma. .__.. .�...... ...._ ....� ..... — __ ,, ....,..,��. Whole Rehabilitation MH ID. 0006SO1700 Y Manhole Rehabilitation MH ID: 0006S01680 Z Manhole Rehabilitation - MH ID: 0006C05840 AA Manhole Rehabilitation - MH ID: 0006C05835 AB Manhole H ID _0006C05830 AC 12 Pipe Rehabilitation Pipe ID008851 , AD 12" Pipe Rehabilitation -Pipe ID: 008850 AE Manhole Rehabilitation - MH ID. 0011 BC00965 AF Manhole Rehabilitation - MH ID: 595 AG 0" Pipe Rehabilitation - Pipe ID:005525 AH Manhole Rehabilitation - MH ID: 0022C01505 m Al Manhole Rehabilitation- MH ID: 0018SO1605 Ai mm 12" Pipe Rehabilitation - Pipe ID: 005282 - AK Manhole Rehabilitation - MH ID: 0018SO1600 Quantity Unit Unit Price Total Amount b� 299 LFT $ o$ - 15 VFT 507 .. .._ LFT.... $ ' cc $ 4� 7 . VFT ��.w,.$a $ 285 LFT $ •° " ,22-00 427 LI FT $� ° $ W21'�, 24 VFT d 207 LFT $.,�.� 16� VFT 67 LIFT $ 15, . VFT.. $ /. � J7 $. �...... o .� �., 307 LFT $ 0 $90 15 VFT $ $ 4-2421 322 LFT $ i. .... - 15 VFT $ 5 $ ° ° b .13 VFT _& ._ 13 VFT 376 LFT 13 VFT 19 VFT $v. S C $ j 324 LFT $ °0 _ 2:� , 13 VFT $$ S-Z 140 Oc}�...L, 1.3 VFT 13 VFT 14 VFT $ $ S. 15 VFT 176 LFT $ .,_ .$.! %' 1 C _.µ _., . 0 13 VFT $ ro $ ... 13 LFT 8 VFT $ .Sa $ 236 LFT $ ..� $ a/r t " ....... ._! .w 13 VFT $,3�) $ 231 LFT .. $ 111 VFT ..$317, w $ _3. 49J _ S Version 7/20/2018 Contractors Bid for Public Work - 8B, ADDENDUM #3 12/06/2018 AL Manhole Rehabilitation — MH ID: 0006C07100 16 VFT $ 317 $ - DAM ..�, on — Pi ID: 007632 10" Pipe Rehabilitation Pipe 3 38 ,— . LFT $ 2` � AN .� Manhole Rehabilitation — MH ID: OOO6CO2125 •,,,.�,, •. _.� �_� _ �.� 11 �...,._..._� VFT . i.�� .ice $� AO Manhole Rehabilitation MP ID: 0003507090 13 VFT '� AP 10 Pipe Rehabilitation — Pipe ID: 007932 143 LIFT $� $� AQ Manhole Rehabilitation — MH ID: 0003S05755 —• 13 VFT $ AR 12"Pipe Rehabilitation —Pipe ID: 007842 189 LIFT ..1 15D $� SV AS _ Pipe Rehabilitation Pi ID 007841 1 AT •.. Manhole Rehabilitation .. MH ID: 0003SO6370 ^... 35 FT.gip AVM hole Rehabilitation MH ID: 0003SO6365 _.r.. 13 „VFT $ $ Ste Manhole Rehabilitation MH ID: 0003SO6360 13 VFT AW 12" Pipe Rehabilitation - Pipe ID 007840wwwww wmm 287 m LIFT $m $ I qIS AX Manhole Rehabilitation MH ID 0003SO6355 _.... 10 VFT ua AY 12" Pipe Rehabilitation —Pipe ID: 007839 257 LFT $ AZ Manhole Rehabilitation -MH ID: 0003S08350 10 VFT I dv $ 3�� BA 12 Pipe Rehabilitation —Pipe ID: 007838 185 LIFT Whole Rehabilitation MH ID 0003SO6315 ....... 9 VFT $ 7 $2 )� -1 . ��% BC pa.......... Pipe Rehabilitation — Pipe ID: 007831 12"Pipe Rehabilitation —Pipe ID: 007830 41 _ .... LFT ,w $ 57 t� .. $ 2 7 t' � 211 LIFT $ $ �11 BE Manhole Rehabilitation MH ID 0003806310 12 13 VFT $ i sue.. $ ' I Z7�5° �7' BF Pipe Rehabilitation Pipe ID: 007829 .�, u.w�_�• .......Pip _ 193 LIFT $ S7 BG Manhole Rehabilitation MH ID " 0003SO6305 „m�mm 9 VFT $3i $ 2� � BH _ 12 Pipe Rehabilitation Pipe ID 007828 192 LFT $ .a. B1 BI Manhole Rehabilitation MH ID 0003S06300 Man...... ..... a...„. •.•.w�...m 9 .._.....� VFT ..e $ �" _. gym. $� S !� _.. BJ BK 12 Pipe Rehabilitation�Pip ID. 007827 �.. Manhole Rehabilitation — MH ID: 0003SO0295 206 �. LFT $ . .. . $ � 9 VFT $ ........ 12" Pipe Rehabilitation - Pipe ID: 007828 ..� �...._..—..�_ .•••_..._ 195 LFT $t � w. $_ ��BL _BM Manhole Rehabilitation — MH I 12" — IT208� I BN Pipe Rehabilitation P _ peD00078206292 P LIFT 1 ?)( BO Rehabilitation MH ID 0003S06290 Manhole R.. _. _ .. 13 • .. _ _••.._ �...,. $ _� . $ / BP " 10 Pipe Rehabilitation Pipe a ID: 007776 208 LIFT $ $ $ i qq 4 _ .BR._ _w �.12 BB Manhole Rehabilitation MH ID: 000 SSO0335 Manhole Rehabilitation MH ID. VFT 10 — 0003SO6210 13 VFT ' BT ... 12' PipePHID 007816 291 LFT F BU Manhole Rehabilitation ID 0003SO6205 13 � _ VFT $ BV Manhole Rehabilitation — MH ID : 0003SO6175 15 VFT $ ("1 $ BW 10 Pi Rehabnitafion Pi e I Pipe ._•p D: 007812 279 LFT M $ 3 $ k _ MH ID: 0003SO 170 H 15 _ VFT � $ 3I T •• $ %(D2' BManholeRehabilitation..., Y io Manhole Rehabilitation MH ID 0003S06 .. ... a.�uu 5035 .13. VFT $ ( 5 $ ADDENDUM O 12/06/2018 Version 7/20/2018 Contractors Bid for Public Work — 8C BZ 10" Pipe Rehabilitation — Pipe ID: 009053 139 ........ _ LIFT ..... 17 $ $ J�yG3 f CA Manhole Rehabilitation — MH ID: 0003SO5010 11 VFT $1.33 1, $ 31 yV i CB Manhole Rehabilitation— MH ID: 0003SO4990 9 VFT $ 3 ?z $ �� CC 10" Pipe Rehabilitation — Pipe ID: 009044 201 LIFT $ y $ $ 3 CD Manhole Rehabilitation — MH ID: 0003SO4970 10 VFT $ $ CE Manhole Rehabilitation — MH ID: 0003SO4640 13 VFT $ 31 �° $ CIF 12" Pipe Rehabilitation —Pipe ID: 018948 210 LIFT $ W $ CG Manhole Rehabilitation — MH ID: 13300 13 VFT $ f-7 $ CH 12" Pipe Rehabilitation — Pipe ID: 018949 322 $ `� 6 $ �32 Cl 12" Pipe Rehabilitation — Pipe ID: 018950 289 [LFT LFT $ ° $ / S CJ Manhole Rehabilitation — MH ID: 13301 13 VFT $ 3a , $ l? CK Manhole Rehabilitation — MH ID: 0003SO4510 13 VFT $ 3�� $ CL —_.— __........................ .._.._ _.....___ Manhole Rehabilitation — MH ID: 0006C07295 13 VFT $ 31? $ ll 7So CM Manhole Rehabilitation — MH ID: 0006C00717 10 VFT $ 3/ $ 31,?rO CN Manhole Rehabilitation — MH ID: 0006C00695 10 VFT $ $ CO Point Repair 1 — Figure #12 1 LS $ Y30 i $ 3Y305 Cp Point Repair 2 — Figure #29 1 LS $ 93 $ 73S j r...... Cq Point Repair 3 — Figure #41 1 LS $ 3S%S2 $ 356k CR Invert Repair, Shotcrete 20 CYD $ 2,7f $ CS Invert Repair, Reinforcement 10 TON 1 $ ,Z SS14 bu $ CT Injection Grout 1000 GAL 1 $ 1$ $ ZION Bidder: Inland Waters Pollution Control Inc. Address: 4086 Michigan Avenue City/State/Zip: Detroit MI48210 Alternate A -CT Bid Total Base Bid Total Total of all Alternates $ Base Bid + Alternates Total $ Telephone Number: ( 313 ) 899-3014 By� (Signs Jamee Bedin field / Assistant Secrets (Printed Name of Person Signing) ADDENDUM #3 12/06/2018 Version 7/20/2018 Contractors Bid for Public Work — 8D BOARD OF PUBLIC WORKS CITY OF SOUTH BEND INS PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 20th day of December, 2018, by and between, Inland Waters Pollution Control, Inc., 4086 Michigan Ave., Detroit, MI 48210, HEREINAFTER called the "Contractor", and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid Proposal, all of which are set forth as a part of this Contract, for: PROJECT NO.: 118-093 DESCRIPTION: SEWER AND MANHOLE REHABILITATION �. _- .................. COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $2,015,380.50; BASE BID PLUS ALTERNATES A AND B FUNDING: UTILITY EXPENSE/CONTRACTUAL SERVICE The total bid for this improvement were those prices as received and accepted by the Board on the December 11, 2018. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC WORKS Gary A. Gilot, President Suzanna M. Fritzberg, Member Therese J. Dorau, Member Elizabeth A. Maradik, Member James A. Mueller, Member Attest: Linda M. Martin, Clerk Inland Waters Pollution Control, Inc., Printed Name Signature CERTIFICATION (To be completed if Contractor is a Corporation) I, ....... certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary .... Corporate Seal 1316 COUNTY —CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND_ INDIANA 46601-1 930 CITY OF O BEND PETE BUTTIGIEG, MAY 'BOARD I OF PUBLICWORKS December 20, 2018 Boyd Hirtz SAK Construction, LLC 864 Hoff Road O'Fallon, MO 63366 PHONE 574/235-9251 FAx 574/235-9t71 RE: Bid Award — Sewer and Manhole Rehabilitation — Project No. 118-093 Dear Mr. Hirtz: The Board of Public Works, at its meeting held on December 20, 2018, awarded the above referenced project to Inland Waters Pollution Control, Inc., in the amount of $2,015,380.50 for the Base Bid plus Alternates A and B. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, U6da M. Martin, Clerk Enclosure GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU 1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD ,;Of ITH BEND. INDIANA 46601-1 930 oe yr x 180 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD PUBLIC WORKS December 20, 2018 Janet Hass Insituform Technologies USA, LLC 17988 Edison Avenue Chesterfield, MO 63005 PHONE 574/235-9251 FAx 574/235-9171 RE: Bid Award — Sewer and Manhole Rehabilitation — Project No. 118-093 Dear Ms. Hass: The Board of Public Works, at its meeting held on December 20, 2018, awarded the above referenced project to Inland Waters Pollution Control, Inc., in the amount of $2,015,380.50 for the Base Bid plus Alternates A and B. Enclosed please find your bid bond. Thank you for bidding, and we hope you bid with us in the future. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, M. Ma rtin, artm, Clerk Enclosure GARY A. GILOT SUZANNAM. FRITZBERG ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAU