HomeMy WebLinkAboutOpening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - Lochmueller Group"Itow i ' 11 MINOW Jim, Dear Members of the Selection Committee: Lochmueller Group (Lochmueller) is committed to being a partner you can trust to provide expert service that will deliver your project successfully and stay within your project budget. We have successfully delivered projects for you and look forward to working with you again. Our qualified Resident Project Representative will be 100% committed to this project We have over 30 Indiana -based Resident Project Representatives with extensive INDOT & LPA Federal Aid experience, who are available if needed We have one focus — YOU. Our team is currently working with the City of South Bend that has allowed us to develop a valuable relationship with your staff based on integrity, RESPONSIBLE OFFICE trust, and services. Lochmueller Group 130 S. Main Street, Suite 300 Sincerely, South Bend, Indiana 46601 Lochmueller Group, Inc. Office: 574.334.5460 CONTACT II RMATION 02- JW- J Susan AI -Abbas, PE Mobile: 574.386.3529 Susan AI -Abbas, PE sa'chrow-.-cam Branch Manager, Senior Associate knumommmmoomm PROVEN LEADERSHIP Lochmueller offers the City of South Bend the choice of Resident Project Representative (RPR). Myron and Dale have in-depth industry experience and completed the inspection for projects similar to this project (see page 3). CITY OF SOUTH BEND Scott Kreeger SERVICE Both Myron and Dale have one focus — OUR CLIENTS. With every project, their goal is to deliver your project by: » Being a member of your team keeping you informed » Looking ahead for possible conflicts, design issues, and resolving them so the project will not be delayed » Keeping everyone informed of the schedule » Addressing all concerns in a timely manner BENEFIT As a part of your community we will keep your costs down. Lochmueller does not charge expenses such as per diems, mileage, or lodging. chooseThe RPR you be 00 » On -Site Inspection » Utility Coordination » Erosion Control SiteManager » Pay Applications, Monitoring Responsibilities Estimates & Change » Public Notices » Material Records/ Orders » Final Construction Testing » As-Builts Records » Progress Meetings CAPACITY Lochmueller has over 30 Indiana -based RPRs on staff. We are prepared to provide local, available, and experienced professionals to meet your project's schedule. FINAL RECORDS In the past 7 years, Dale and Myron have successfully turned in 20 final records. CUSTOMER E I IE FOCUSED You know our Client Coordinator, WHITNEY PIERLE, and her commitment to the City of South Bend. She will make sure the lines of communication remain open, that the City's needs are met, and that the reconstruction of Bendix Drive is a success. SATISFIED1 Dale and Myron have received praise from both LPA and INDOT Project Managers. "You (Myron) were alwaysany complaints "Dale was the lead inspectors federal ;.3-span bridge or concernsi1 (which were few), kept us informed of rehabilitation project.e project wasI breeze for me as Dale developments on the project,and were on !I / things. / didn't `I I step ahead I the contractorand INOOT. / hope he I".... have o worry about whatwas I I^ I out because assigned to future projects. + knew you had it undercontrol. I I for a job well done!" MHZM2MM3MMEE= Gl1M WV OOD ROAD RECONSTRUCTION RUCTION SUCCESS STORY ORY Proactive management and issue mitigation related to tasks in the critical path is essential to completing projects on schedule. For the Gumwood Road project, utility relocations were the critical path element. When utilities relocations starting taking more than the allocated time early in the process, Dale and Myron worked to find solutions prior to the letting of Phase 2. Working with St. Joseph County to issue a change order for the tree clearing, they were able to complete utility relocation in Phase 1, which eliminated potential delays to construction. Dale and Myron provided careful project management, fluidly re -ordering tasks to make sure utility relocation work did not delay the project. DALE WILLS RESIDENT PROJECT REPRESENTA TII/ BS, Civil Engineering, Purdue University, 1982 1 INDOT PE/S I INDOT Final Construction Record INDOT SiteManager I INDOT Certified Technician I INDOT Stormwater Inspection Manager Dale leads our Transportation Team's construction inspection services in the South Bend office. He performs and coordinates all aspects of field inspection for LPA and INDOT projects. He has over 35 years of experience estimating, scheduling, managing, surveying, and inspecting construction projects related to water, wastewater, stormwater drainage, buildings, dams, and transportation projects. Dale has successfully turned in 14 final records on -time in the last 7 years. Dale's experience also includes the contractor side of actually planning, estimating, bidding, and implementing a project. This experience has been valuable in reconciling disputes and addressing discrepancies in the plans and specifications before construction rather than after the fact. He has been involved with numerous federal aid and LPA projects in both design assistance and construction inspection since 1982. Cleveland Road Reconstruction - St. Joseph County » RPR for the roadway reconstruction of the 4-lane section from Riverside Drive to SR 933. This project consists of a total reconstruction of 5,500 feet of roadway, including replacement of the deteriorated concrete pavement and curb, addition of a multi- use path, & a pedestrian -activated crossing signal and lighting, please see page 7 for more information » Construction Cost: $8,287,000 (Federal -Aid LPA) (2019) Two -Way Street Conversion - City of South en » Project Inspector for this 4-mile project that included asphalt paving, three new roundabouts equipped with pedestrian -friendly crossways & flashing lights, 28 traffic signal upgrades, installation of 120 street lights, drainage improvements including new structures & pipe installation, new concrete curbs & sidewalks, & landscaping, please see page 7 for more information » Construction Cost: $20 million (2016) Gurnwood RoadReconstruction, Phases I & II - St. Joseph County » RPR for 2-mile-long LPA project that included construction of added travel lanes, asphalt pavement & curb -and -gutter, please see page 8 for more information » Construction Cost: $7.6 million (2016) CIR 400S, Phase J. - Cass County Project Inspector for the road reconstruction from SR 25 to 500 feet east of CR 400 West, please see page 9 for more information » Construction Cost: $1.8 million (2017) CR 300 S for Cass County, Indiana Project Inspector for road re -alignment & intersection improvements for this industrial corridor roadway, please see page 8 for more information » Construction Cost: $1.6 million (2011) CLIENT REFERENCES FOR DALE Jessica Clark I St. Joseph County 1574.235.9626 Andrew Hayes I St. Joseph County 1574.235.9626 Rick Gaul I City of Plymouth 1 574.936.3614 Jeff Smith I Cass County 1 574.753.3749 Duane Alverson I Lake County 1219.663.0525 r rra%iro/ � RESIDENT T PROJECT REPRESENTATIVE AS, Applied Science Architectural Engineering, ITT Fort Wayne, 1991 INDOT PE/S INDOT SiteManager I INDOT Certified Technician I INDOT Stormwater Inspection Manager Myron serves as a Chief Inspector on projects in Northern Indiana. His responsibilities include construction inspection, soils and concrete testing, project documentation, and completing final construction records utilizing INDOT SiteManager. Myron has 27 years of experience working on numerous INDOT and federal -aid LPA construction projects involving road reconstruction, new roadway construction, resurfacing projects, new bridge construction, bridge replacements, bridge rehabilitations, small structures, drainage projects, storm sewer/sanitary installations, water lines, and trail installations. Prior to joining Lochmueller, Myron was employed by INDOT's LaPorte District for 17 years. REPRESENTATIVE INSPECTION X I Howard Park Redevelopment - Cityof South Bend » RPR for the redevelopment of 12 acres in Howard Park, please see page 9 for more information » Construction Cost: $18.8 million (2016) Two-WayTwo-Way Street Conversion - City of South Bend » Project Supervisor for this 4-mile project, please see page 7 for more information » Construction Cost: $20 million (2016) East Bank Sewere ara °Phase IV - City of South Bend » Project Supervisor for a sewer separation & road rehabilitation project that included 2.5 miles of pipe work & road work » Construction Cost: $2,616,070 (2013) CR 400S, Phase 1 & 2 - Cass County » Project Supervisor for the road reconstruction from SR 25 to 1000 feet east of CR 300 West, please see page 9 for more information » Construction Cost: $1.8 million (Phase 1- 2017) & $2.7 million (Phase 2 - 2018) US 1 Kokomo By-pass, Howard County - INDOT, Greenfield District » Project Supervisor for new road & bridge construction that included 3 miles of concrete pavement, US 35 & US 31 interchange, 10 bridges, & 2.0 miles of US 35 reconstructed » Construction Cost: $39 million US 31 & 7ch Road Interchanges Marshall County - INDOT, LaPorte District » Project Supervisor for new pavement & bridge installation that included 3 miles of concrete pavement & 520,000 cy of earth work » Construction Cost: $9.9 million CLIENT REFERENCES FOR MYRON14 Jeff Smith I Cass County 1 574.753.3749 Don Leonard I INDOT LaPorte District 1219.851.2140 Rick Furnish 1 INDOT Fort Wayne 1 260.205.3183 Mike Koch 1 INDOT Fort Wayne 1260.969.8253 SUSAN AL.-ABBAS CONTRACT OVERSIGHT BS, Civil Engineering, Purdue University, 1996 Professional Engineer: IN Susan's 32 years of consulting and public sector experience includes administration, project development, project management, design, survey, and construction inspection for a vast array of roadway and bridge projects. This includes a wide range of projects employed in the public and private sector. Susan has also been directly involved with the development, design, and construction of over $100 million of local federal -aid projects. REPRESENTATIVE MANAGEMENT EXPERIENCE » Cleveland Road Reconstruction - St. Joseph County Construction Cost: $8.3 million (2019) CR 400S, Phase 1 & 2 - Cass County Construction Cost: $1.8 million (Phase 1- 2017) & $2.7 million (Phase 2 - 2018) Gumwood Road Reconstruction, Phase I & 2 - St. Joseph County Construction Cost: $7.6 million (2016) » CR 300 South - Cass County Construction Cost: $1.6 million (2011) CONSTRUCTION INSPECTOR ME BS, Civil Engineering, Purdue University, 1993 Professional Engineer: IN I INDOT Certified SiteManager I INDOT Certified Technician Tracy is a skilled engineer with 25 years of experience in the planning, design, and construction observation of engineering projects. She is co-founder of McCormick Engineering, a local WBE and DBE firm. Tracy has successfully worked with our team on numerous inspection projects. REPRESENTATIVE INSPECTION EXPERIENCE » Kercher Road from the Railroad to Dierdorff Road- City of GoshenConstruction Cost: $4.7 million (2019) » live Street & Sample Street - St. Joseph County City of South BendConstruction Cost: $8.7 million (2017) Gurnwood Roadeco s r c io , Phase I & 2 - St. Joseph County Construction Cost: $7.6 million (2016) »Edison Road- City of South Bend Construction Cost: $375,000 »169th Street Reconstruction - City f Hammond Construction Cost: $6.6 million TECHNICAL ADVISOR 3S, Civil Engineering, Purdue University, 1996 Professional Engineer: IN Ryan has over 20 years of transportation design, traffic, safety, and project management experience. He offers a strong technical knowledge with a public sector perspective. Prior to joining the private sector, Ryan spent over 10 years with St. Joseph County Highway Department and served as Chief Design Engineer for three years. REPRESENTATIVE IEXPERIENCE » Cleveland Reconstruction - St. Joseph Construction Cost: $8.3 million (2019) »Edison Road & Ironwood rive Corridor Rehabilitation - City of South BendConstruction Cost: $1.4 million (2017) » LincolnRedesign - City Construction Cost: $1.4 million (2015) »Western Avenue Road Redesign- City of South Construction Cost: $950,000 (2015) » CR 300 South - Cass County Construction Cost: $1.6 million (2011) l7�(N CONSTRUCTION INSPECTOR INDOT Certified SiteManager I INDOT Certified Technician Scott serves as a Construction Inspector for northern Indiana projects. He has worked on a variety of road projects where he has gained knowledge of road and concrete construction practices and inspection. Construction Cost: $8.3 million (2019) » CR 400S, Phase 2 - Cass County Construction Cost: $2.7 million (2018) » live Street & Sample Street - St. Joseph County City of Southen Construction Cost: $8.7 million (2017) » Two -Way Street Conversion - City of South Bend Construction Cost: $20 million (2016) CLEVELAND ROAD RECONSTRUCTION ST. JOS PH COUNTY Lochmueller provided design and ROW acquisition services and is currently providing construction inspection services for the roadway reconstruction of the 4-lane section from Riverside Drivi to SR 933. PROJECT ELEMENTS This project consists of a total reconstruction of 5,500 feet of roadway and includes: » New concrete pavement with curb -and -gutter section (two 12-foot-wide lanes in each direction) » Horizontal & vertical alignment corrections » Replacement of the concrete center curb & median barrier » Modification of the traffic signal to account for new detectio loops » New multi -use path & a pedestrian -activated signal » New storm sewers & inlets » Utility relocations » Block retaining wall » Pavement marking & signing » New roadway & bridge lighting » Rehabilitation of two bridges (over St. Joseph River & Juday Creek) I 2-WAY STREET °T SOUTH CONVERSION I hmueller provided construction inspection services for the one- to two-way conversion of Main and Michigan/St. Joseph ?ets, from Angela Boulevard to Chippewa Avenue- reestablishing act access to downtown and Memorial Hospital. IE FAST-PACEDPROJECT INCLUDED: Project length: 4 miles Asphalt paving Three new roundabouts at Michigan & Bartlett, Michigan & Marion, & Michigan & Chippewa equipped with pedestrian - friendly crossways & flashing lights to alert cars to stop 28 traffic signal upgrades Installation of 120 street lights Drainage improvements including new structures & pipe installation New concrete curbs & sidewalks from Western Avenue to Bartlett Street Bike lanes the entire length of the corridor Landscaping including trees GUMWOOD RECONSTRUCTION, ST: JOSEPH COUNTY Gumwood Road was a large-scale reconstruction project with several challenges. Despite the complexities, our team was able t, work with the contractor, the County, and other stakeholders to foresee potential problems and adjust schedules and the order of work to eliminate or mitigate them. Ouir tearn completed the Project on time and under (budget. PROJECTINCLUDED » 2 miles of added travel lanes » Converting 2 conventional intersections to roundabouts » New storm sewers, retention basins, & sanitary sewer lines » Lighting, sidewalks, & landscaping » Upgrading driveways & curb ramps to meet ADA standards » Adding a multi -use path R 300 SOU rl,,,I CASS COUNTY ?mbers of our team managed, designed, and performed nstruction engineering for this federal -aid LPA project to ;onstruct CR 300 S from 1,590 feet west of SR 25 to the railroad )ssing. The project started as a result of the Hoosier Heartland iustrial Corridor Improvement project, which changed access to 300 S and CR 325 W where Indiana's largest Ethanol Plant is sated. INSTRUCTION ELEMENTS e improvements included construction on a new alignment that ).35 miles in length, two 12-foot lanes in each direction with a -foot-wide north outside shoulder, and a 6-foot-wide south side oulder. CR 300 S and CR 325 W pavement areas include 9 inches of urete pavement over Type I subgrade treatment. !AINAGE & UTILITYRELOCATION L T vrior to construction, poor soils were encountered along 1300 feet of CR 300 S, so the project was surcharged to consolidate the existing soils. The drainage along CR 300 S and CR 325 W outlets to roadside ditches that drain to a new detention basin at the southeast corner of CR 300 S and CR 325 W. The basin has a release rate that drains into a ditch along CR 325 W. A new active rail warning device was also installed at the railroad crossing. ,.. 111 SIP.." - 0A S COUNV,. embers of our team secured funding, worked on the design and 1W acquisition, and are providing inspection services for CR 4005,. gether, all phases consist of 19,000 feet of roadway ;onstruction from an existing 2-lane section with shoulders to an proved 2-lane section with curb -and -gutter (Phase 1) and 2-lane :lion with improved shoulders, ditches, and updated clear zone lases 2 - 4). roughout the project, we ensured Cass County was well ormed of the project status. Our team worked with adjacent )perty owners, adding pipes and structures to reduce impacts on ighboring farms. When changes occurred, we worked with the unty and INDOT to minimize the overall impact to the schedule, Iget, and funding. an and her team successfully partnered with Cass County to: Scope & design the corridor project Provide extensive funding support f" Phase 1 Phaa Phase :3 Phase » Coordination with NS » Partial ROW from » Partial ROW from » Partial ROW from & Winamac Southern 11 parcels 6 parcels 15 parcels Railroads » Construction Cost: » Estimated » Estimated » Partial ROW from 20 $2,750,500 (2018) Construction Cost: Construction Cose parcels $3,300,000 (2019) $2,700,000 (2020) » Construction Cost: $1,758,000 (2017) Lochmueller is currently providing construction inspection services for 12 acres in Howard Park. IMPROVEMENTS INCLUDE UDE » 14,300 SF, 1-story community center » 4,300 SF, 1-story support facility » Outdoor ice skating pond/trail » Outdoor playground » Interactive water fountain » Riverfront trail improvements including event lawn with trai lighted connections to St. Louis Boulevard » New curb, sidewalk, HMA pavement, watermain, storm sew and lighting on St. Louis Boulevard UI' 'I< ER FANDIING YOUR IPR JE ,,,r Lochmueller reviewed the plans, visited the site, and met with the City of South Bend to discuss the project. In addition, we are the designer for the Bendix Road Bridge over the Indiana Toll Roac and coordinated with DLZ throughout the design. This c or I a io Ives our team a unique knowledge of your project. There are several project elements that are important to the success of your project. Dale and Myron have in-depth knowledge of these types of project elements, such as utility relocation, phase maintenance of traffic, concrete paving and coordinating with several entities, and keeping everyone informed and on the same page. Currently your project is on an August 2019 letting. The last quarterly sent into MACOG shows a letting date of March 2020. Our team is prepared to be on your project for either letting date. The County's bridge project includes the rehabilitation of the southbound bridge. This will need to be constructed during phase 1 of your project so the southbound bridge can be open and used during your phase 2. PROFESSIONAL, PCTF L, & HONEST Public opinion is important on a construction project. This project directly impacts the public, making it important to build strong relationships. These relationships will ensure the public is knowledgeable of the schedule, enabling them to understand the impact to their businesses and neighborhoods. Further, our team will ensure that the public retains a favorable view of the project and the City, even after construction. Dale and Myron understand issues dealing with personal property and livelihoods are very personal and emotional matters. Our priority is to represent the City of South Bend respectfully and professionally, responding to any question, issue, or concern in a timely manner. TIMELY I TI Both Dale and Myron go above & beyond what is required to ensure public satisfaction by » Addressing owner's concerns & questions quickly » Holding regular project meetings to keep everyone informed INDOT Specifications allow contractors to ask for additional payment for unexpected delays. A proactive approach and communication will be instrumental to avoid this situation. MANAGING THE MAINTENANCE OF TRAFFIC (MOT) TO MINIMIZE DISRUPTIONS FOR RESIDENTS & BUSINESSES Our RPRs understand the traffic control needed and upcoming phasing. This will » Provide a safer working environment while keeping the public proactively informed of potential inconveniences » Head off any conflicts or waste of money between the closure on phase 1 & phasing to maintain traffic on phase 2 » Provide through southbound traffic at all times to ensure safe mobility for emergency vehicles » Affect construction schedule of the southbound bridge over the Indiana Toll Road & MOT on the Indiana Toll Road PROACTIVE UTILITY COORDINATION » Work with utilities to ensure smooth relocations » Mitigate delays to the overall project schedule NIPSCO will be relocating a 12-inch gas line along the existing east curb line. » Our team has constructed and inspected INDOT & LPA projects for over 35 years, giving them a high level of knowledge & familiarity of INDOT's policies, procedures, & expectations. » We are well respected by INDOT's LaPorte District which leads to an effective liaison with INDOT for the City of South Bend. » Both RPRs have worked with the City of South Bend & the INDOT LaPorte District. » Both entities have expectations for the RPR on the project. Our team will make sure that all INDOT requirements are met whilestill meeting the City's expectations; this is your project & we strive to be an extension of your team. STAYING ON TACK ® MAINTAINING THE SCHEDULE ITI TI POTENTIAL ISSUES » Anticipate potential delays & offer solutions to mitigate impacts » Remain ready & willing to address any & all issues quickly & efficiently » Have the right staff available to provide the right solution the first time Our proposed RPRs have worked for INDOT (Myron) and contractors (Dale) giving them the ability to look ahead, ensuring materials are ordered in advance to keep the project moving forward without delays. rN4°°IE CITY'CITY'S UIINNPE"'TI NNE 13UDGE°"r uIIm a°°ili[,W III CIS 4 DS PHASE: 2 IN CASS COUNTY TY' The existing poor soils types on CR 400 S led to an expensive special subgrade treatment as part of the pavement design. This treatment include #2 stone enveloped in a special fabric. Placement of this material posed several issues since there was only one access point between the ends of this mile long reconstruction project. The construction method required heavy equipment to access the newly placed stone in order to continue placement of the materials. During the placement of the first 11000 feet, the heavy loads caused the treatment to fail with mud pumping up through the fabric and stone. Before this situation got out of hand, Myron shut down the project and worked with the geotechnical engineer, INDOT soils, and the designer to come up with an alternative subgrade treatment that worked as well or even better. The solution required the contractor to remove the placed special subgrade, bring the roadway earth back onto the site, and double treat the soil with cement. This process delayed the project for three months; however, the project still finished on schedule and under budget. This was due to Myron's persistence to find a solution that would work and meet the project schedule and budget. T YC ;ENHAM BRIDGE REHABILITATION IN S7r. JOSE! H COUNTY' Susan and Dale provided an alternative on a change order for the Twyckenham Drive Bridge over the St. Joseph River that saved St. Joseph County over $100,000. Our RPRs understand the City's expectations for construction inspection services, so Bendix Drive is built in accordance with contract documents and utilizing quality materials, and top-level workmanship. We understand the value of public involvement, maintaining excellent communication, looking ahead to uncover issues, and providing expedient solutions. RESIDENT MEETING & NOTIFICATION Prior to construction, we will inform the residents of the start date, schedule, and contact information. Our team understands the impact projects have on the public and ensures the utmost respect is given to the property owners. Our RPRs have learned the value and benefit of keeping all stakeholders informed. We proactively send out updates and letters informing all involved parties of the project status, schedule, and upcoming changes. Property owners appreciate knowing what to expect. COMMUNICATION THROUGHOUT THE PROJECT Communicating serves to maintain schedule, anticipate and foresee obstacles, address concerns, and provide timely updates to stakeholders. Key targets for successful and comprehensive communication include: THE PUBLIC » Inform schools, businesses, & property owners » Neighborhood letters & media releases THE PROJECT » Personal communication with property owners » Bi-weekly progress meetings » Finalize utility coordination items PLANS T WORK Our experience has shown us that a complete understanding of the contract documents dPlivPrs the best possible project. We accomplish this by completing the following reviews prior to construction: Compare plan documents, special provisions vs. item list, & plans vs. field conditions » Review project commitments » Check quantity calculations vs. pay item list » Understand ROW documents, specifically cost -to -cure items to avoid misunderstandings » Know utility agreements vs. special provision time -line requirements » Understand permits & environmental requirements Our construction inspection activities include oversight of construction to monitor compliance with plans, specifications, and tracking quantities to verify and prepare the contractor pay estimate. Our inspection team will verify materials meet required specifications, and monitor traffic control activities so access is clearly identified and maintained. Our RPRs will set the pre - construction meeting and confirm completion dates, milestones, and reporting methods required by INDOT LaPorte District and Federal Highway. In addition, the following items will be completed: » Expedite resolution of potential issues or problems » Monitor closely the contractor schedule » Verify utility relocations, drive coordination, & monitor schedule » Ensure subcontractor approvals » Identify all paperwork required to meet LaPorte District requirements » Confirm sampling & testing requirements » Understand all unique requirements » Track documents through SiteManager » Complete the final construction record in accordance with INDOT requirements & within INDOT's required timeline of 45 days after contractor's last day of work Standard RFP Form Ver. 8-22-18 (Rev. 06/27/18) Des. #: 1400634 Affirmative Action Certification (AAC) for Disadvantaged Business Enterprises (DBE) I hereby certify that my company intends to affirmatively seek out and consider Disadvantaged Business Enterprises (DBEs) certified by the State of Indiana's DBE Program and the Kentucky Transportation Cabinet (KYTC) DBE Program to participate as part of this proposal. An Agreement between INDOT and KYTC established reciprocal acceptance of certification of DBE firms in their respective states under the Unified Certification Program (UCP) pursuant to 49 CFR §26.81(e) and (f). I acknowledge that this certification is to be made an integral part of this proposal. I understand and agree that the submission of a blank certification may cause the proposal to be rejected. I certify that I have consulted the following DBE websites to confirm that the firths listed below are currently certified DBEs: INDOT: Li�tljsl gntgi t .�mrtclot n. ll:Illl�Locato KYTC: hltp sltt r t4t�o�r y:.g�av +�a 1 rt tcl _ mt zllm 11 asl� css t a 1pl n� i�t/i g r� ctt� im 1; 13F Llirc to .1? , I certify that I have contacted the certified DBE's listed below, and if my company becomes the CONSULTANT, these DBEs have tentatively agreed to perform the services as indicated. I understand that neither my company nor I will be penalized for DBE utilization that exceeds the goal. After contract award, any change to the firms listed in this Affirmative Action Certification to be applied toward the DBE goal must have prior approval by INDOT's Economic Opportunity Division. I. DBE Subconsultants to be Certified DBE Name McCormick Engineering, LLC toward DBE coal for the RFP item: Service Planned 13.1 II. DBE Subconsultants to be utilized beyond the advertised DBE goal for the RFP item: Certified DBE Name Service Planned Estimated Total Percentage Credited toward DBE Goal: 5% Estimated Percentage of Voluntary DBE Work Anticipated over DBE Goal: Company Name: Lochmueller Group, Inc. Signature: Date: 12/10/2018 Estimated Percentage to be Paid* 5 % Estimated Percentage to be Paid* * It is understood that these individual firm percentages are estimates only and that percentages paid maybe greater or less as a result of negotiation of contract scope of work. My firm will use good faith efforts to meet the overall DBE goal through the use of these or other certified and approved DBE firms. I ^W^ i O O O N L � rn 4 a� O O O N C cu rL N (n C O C ~ m co a) N a) M Cc a- w N U- ❑ O d' t U C (6 A ciol c.> U C `-J J � J cu 0 C: O �L N CO • }'S1 i_ C W w U � .E O U U cn 0 N N O N O Cl) N CD r-W 0 U N 6o L '> �O U � r 0 d a Y O L .Q C N W W O O U O v N CO N _v a wm m � fn C C O O O E 0,0 N .0 L L O U E E a) ca a 0,0 c � L cc � a j U CD Lai fl. L