CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Small Drainage Design and Repair
ProjectNo. 118-063
For Bids Due December 11, 2018 before 9:30 AM Local Time
Date:
Address
City/State/Zip-,
PART I
(Must be completed for all bids. Please type or print)
12/11/18 Bidder (Firm): Selge Construction Co., Inc.
2833 S. 11th Street
._ . .... . ......... . .. .....
Niles, MI 49120 Telephone Number: ( 269� 684-0842
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Small Drainage Design and Repair
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
Danch, Harner & Associates
. . . .........
and dated for the sum of (enter the Total Bid as shown on the Proposal)
Six-iltuidred-Zi-ft-t Seven Thousand -Five -Hundred Seventy Six—($ 657,576.35)
(EntersumofTotall ase Bid plus Alternates showh_on_P J)
,,r000sal) (Nume0=
Dollars and Thirty Five Cents
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendurns attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment,
By
Robert.��s, Pr
__EpOLES t neer
(Printed Name �i Person S_i`6_nTn—g)" . .....
ACCEPTANCE
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
James A. Mueller, Member
day of
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
Version 7/20/2018 Contractor's Bid for Public Works - 2
101
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Small Drainage Design and Repair
Project Number: 118-063
For Bids Due: December 11, 2018 before 9:30 AM Local Time
Contractor Name: SQ-199 g_Qpg 1:11c
±Lipn Co.. Inc.
DIVISION A, HAWBAKER
Item
No.
1:
Description
Quantity
Unit
Unit Price
Total
Amount
1
Construction Engineering
I
LS
06)
2
Maintenance of Traffic
I
LS
o5, (x)
X)
3
Mobilization and Demobilization
1
LS
g 00
ow bo
� f
4
Clearing and Grubbing
1
LS
L016 ), 07)
-3 "R2 A)
5
Excavation, Common
590
CYS
06
f 1 )Joe), 6E
6
I Fence, Chain -Link, Reset
223
i LFT
#/ s —
*./�
7
Std. Inlet, Beehive Grate
I
EA
8
Std. Manhole, Shallow, Beehive
Grate
1
EA
Ito
9
Pipe, 12", RCP
117
LFT
10
Pipe, 15", RCP
7030
LFT
d 66
11
Pipe, 12", Ductile Iron
40
LFT
f /Coo, Oe�)
12
Pipe End Section, 12" Dia.
8
EA
06
1#3 Av 60
13
Core Connection, for, StFUStUF8,
15" Dia. Mpe
1
EA 1
—
30, e)u
1
S/ &3a foo
14
Remove/Replace Concrete
Approach
199
SYS
98" 0?)
. . . ............... .
f 5
f
15
Maflbox AssemNy, Reset
I
EA
16
Sodding
1576
SYS
14�14.
W,11_i 14
17
Erosion Control
. ....
1
.
LS
3 7co- o.
� . I I -)
"
� I IZZ)
Utility Allowance
I
LS
e
$21,000.00
$21,000.00
'16 3) 241 Z 3
HAWBAKER DIVISION A TOTAL d'
ALTERNATE #A1 (STREET PAVEMENT REMOVAL/REPLACEMENT)
Item
No.
I
Description
Quantity
Unit
Unit Price
Total Amount
1 9
Pavement Removal
1
LS
(XI
20
HMA Surface, 1 1/2"
175
T
2-1--
HMA, Intermediate, 2 %"
292
T
1)
01 -3, 31d), 0
22
HMA, Base, 4"
466
T
DO
00
23
6" Compacted Agg., #53, Base
353
CYS
$770, 0()
24 �
Pipe, 12", RCP
_�6
Version 7/20/2018 Contractor's Bid for Public Works - 7
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Small Drainage Design and Repair
Project Number: 118-063
For Bids Due: December 11, 2018 before 9:30 AM Local Time
Contractor Name: - J canstn Ict i on CO. Tnr-.
ALTERNATE #A1 (STREET PAVEMENT REMOVAL/REPLACEMENT)
25
Pipe End Section, 12" Dia.
42
##/0, 6U
. . ...........
0, -)E)
26
Remove/Replace Concrete AppEgach
6
1 tEA
i y
SYS
0o
"I on
27
Casfing, Adjust to Grade
t3
EA
L
#6", "oo
06
ALTERNATE #A1 TOTAL 0/
ALTERNATE
#A2 (ADDITIONAL SWALEISEWER
ON
NORTH
SIDE)
Item
No.
Description
I
. .. ..............
Quantity
-
Unit
Unit Price
Total Amount
28
Clearing and Grubbing
1
LS
$24 9-Ps"s-1
29
Remove/Replace Concrete
236
SYS
fqo,
Approach
30
Excavation, Common
215
CYS
f"TO,
'756 (11,
31
Fence, Chain Link, Reset
164
LFT
t4 Lq
32
Std Inlet, Beehive Grate
1
EA
7 70
33
Std MH, Shallow, Beehive Grate
2
EA
06
34
Pipe, 12", RCP
667
LFT
. . ............
-,L)
0,
35
Pipe End Section, 12" Dia.,
4
EA
4 (0 Zx)
Jr
4-L
36
. .. ........ .
Maftox AssemblV, Reset
2
EA
z) e?D
37 "i
Sodding
1273
SYS
4±j
38
Erosion Control--
1
LS
f#
4 &a5-, C)D
39
Utilitv Allowance
I
LS
$22,000.00
22,000.00
1147,
ALTERNATE #A2 TOTAL I
Version 7/20/2018 Contractor's Bid for Public Works - 8
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Small Drainage Design and Repair
Project Number: 118-063
IMS
For Bids Due: December 11, 2018 before 9:30 AM Local Time 14A
Contractor Name: Selge Construction Co., Inc.
DIVISION
B, OLIVIA CIRCLE
Item
No.
— ---- . .....
Description
. ...........
Quantity
Unit
Unit Price
Total Amount
1
Construction Engineering
1
LS
3, 1.1 cK 0 C,
L)
2
Maintenance of Traffic
1
LS
WEDC) 00
3
Mobilization and Demobilization
......... . . . . - . .
1
. . . . . ..........
LS
3
Clearing and Grubbing
1
LS
0� DM),Do
b U)
5
Excavation, Common
755
CYS
0 6 qJ&
6
HMA, Surface, 1 W
2
T
7
HMA, Intermediate, 2 W
2
T
8
. . ..................
HM& BaseL 4"
3
T
Flowable Fill
3
CyS
l
_31 S
10
Std Inlet, Sto rm, Rolled
2
EA
14
4-
RA
Remove/Replace Curb and Guie--r,
10
LFT
Roll Curb
12
Pipe, 12" RCP
26
LFT
1-1 -7,
13
Pipe, Ductile Iron, 12" Dia.
23
LFT
14
��e E�nid Section. 12" Dia.,
1
EA
t4i D C0
. D, W,
1 5
Topsoil 4 IN.
151
CyS
D
......
16
Wched Seeding Gra.�s 2.
361356
SYSL438
17
Erosion Control
1
LS
18
core, Concrete Structure,
1
EA
19
Reset River Rock
1
LS
ISM R_"
20
Riprap, Revetme t
13
T
21
Geotextile for River Rock, Rigrap
61
SY
22
CastingA�just tq rade
1
EA
b DO
23
Utility Allowance
1
LS
$18,000.00
$18,000.00
OLIVIA CIRCLE DIVISION B TOTAI_coq�,/
Version 7/20/2018 Contractor's Bid for Public Works - 9
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: Small Drainage Design and Repair
Project Number: 118-063
For Bids Due: December 11, 2018 before 9:30 AM Local Time
Contractor Name: q
.... . .............
DIVISION
C, CREEKWATER
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
I
Maintenance of Traffic
1
LS
2
Mobilization and Demobilization
...................... . . .
1
LS
f '2�
drl() 21Q100
4
3
Pavement Removal
62
SYS
:v 3f
6 Q, 17(3,06
4
HMA, Surface, 1.5 inches
5
T
t-'3
5m
5
HMA, Base, 6.5 inches
22
T
f A-o oo
3 0 00
6
Remove/Replace Curb and Gutter, Roll
Curb
36
LFT
7
Core-f Connecti;Trf 12" Dia. Mpe tG
1
EA
0
8
Pipe, 12" RCP
7410
IFT
,9
Pipe, 12" Ductiie 11ron . .............. . .
28
LFT
10
Manhole, Standard
I
EA
P4, 191P SAL)
$I-/-,
11
Drywall, 6' Dia., 3 sections
2
EA
-T
f [7, 0 6
12
Reset Sign and Post
1
EA
...............
.2
(,y
13
Utility Allowance
1
LS 1
$104000 00
$10000000
CREEK
WATER
DIVISION
C TOTAL
ALTERNATE
#C1 (STREET MILL/FILL & CURB
RAMPS)
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
14
Mobilization and Demobilization
1
LS
I.S
15
Remove/Replace Curb and Gutter, Roll
14
LFT
Curb, Depressed
16
Remove/Replace Concrete Sidewalk &
..........
22
YS
4 3,
3 4
Curb Ramp
LY)
0
17
Milling, Asphalt, 1.6 to 2.5 inches
268
SYS
N.)
(01Z
18
HMA, Surface, 1.5 to 2.5 inches
330
T
W'DO
-7()() CY-)
19
Utility Allowance
LS
$65,000.00
$65,000.00
.... . . .................... .......
ALTERNATE #C1 TOTAL"' n(- oc)
Version 7/20/2018 Contractors Bid for Public Works - 10
BIDIPROPOSAL
a,,WNW�,-
CITY OF SOUTH BEND
Project Name:
Small Drainage Design and Repair
Project Number:
1'1'8-0'63
For Bids Due:
December 11, 2018 before 9:30 AM Local Time
............
Contractor Name:
. ...... . .
DIVISION A + B + C TqT��L - taa-�-,,A44' 11
NOTE: CONTRACTORS ARE REQUIRED TO BID ON ALL DIVISIONS AND
ALTERNATES. UNIT PRICES SHALL BE PROVIDED FOR ALL ITEMS IN DIVISIONS
AND ALTERNATES.
Bidder (Firm): �el e qo
--qq InC . .....
Address: .��n S1�1�t
City/State/Zip: Niles, MI 491T26iphone Number. J-��6�84-Q�42
By
(Signature)
Robert -KuhnS L o
_�!� neer
(Printed Name of Person Signing)
When theprospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF MIC.H.IGAN
) SS:
BERRIEN COUNTY
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
I . Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 7/20/2018 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the perfon-nance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/N4BE. A finding of a
discriminatory practice by the City's N1BE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
perfon-nance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
1, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 7/20/2018 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 11 th dav of Dp�e�cmbe 18
go_
—Selge Construction Co., Inc.
Contractor/Bidder (Finn)
Signature of Contractor/Bidder or Its Agent
Robert Kuhns, Project Engineer
Printed Name and Title
Subscribed and sworn to before me this 11 th day of Decmeber 2018
ka
My Commission Expires 07/25/2020
L4:A, �--
Notary Public Vicki A. Priest
County of Residence Berrien
011111 It to I)
"0
my GcmwsstoN 1 Z Z4
F
0
rolfw ItW%%
Version 7/20/2018 Contractor's Bid for Public Works - 6
i A
MERCHANTS
BONDING COMPANY,.
MERCHANTS BONDING COMPANY (MUTUAL) P.O. BOX 14498, DES MOINES, lowA 50306-3498
Bid Bond PHONE: (800) 678-8171 FAX: (515) 243-3854
Bond Number:
CONTRACTOR: SURETY:
(Name, legal status and address) (Name, legal status andprincipal place
Selge Construction Co,, Inc, of business)
2833 S I I th Street Merchants Bonding Company (Mutual)
Niles, MI 49120 A Cor ioration
6700 Cstown Parkway, West Des Moines, IA 50266
OWNER:
(Name, legal status and address)
City of South Bend, Indiana
Board of Public Works
This document has important legal
County City Bldg, Room 1316, 227 W. Jefferson Blvd.
consequences. Consultation with
South Bend, IN 46601
an attorney is encouraged with
BOND AMOUNT: Five Percent (5%) of the Accompanying Bid
respect to its completion or
modification.
PROJECT:
Any singular reference to
(7Vame, location or address, and Project number, if any)
Contractor, Surety, Owner or
Small Drainage Design and Repair No. 118-063
other party shall be considered
City Streets, South Bend, Indiana
plural where applicable.
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Pro9ect and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof-, or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perforrn the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so
famished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this I Ith day of December, 2018
Selge Construction Co , Inc,
1--4
(Principal) (Seal)
(111MIess) Robert Kuhns, Project Engineer
(Title)
0--- / I Merchants Bonding Cornpan)� (Mutual)
k4kl "'U-
(Sure1j) (Seal)
'Iness) &122� <,3/7/�94�17DP
(Title) J'. 11 ufvin Hughes, Afforney-in-rlyet
CON 0657 (2/15) Printed in cooperation with Aniericv6,46s"titutc of Architects (AIA). Th/languagc in this
document conforms exactly to the language used in AIA Document A310-Bid Bond-2010
A, A
NVERCHANTS
BONDING COMPANY,.
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually,
Connie J Messer; Dawn M Pequignot; Elaine K Miller; Harold E Everett; J Kevin Hughes; Jada M Karst; Jessica K Callahan; Marie E Comparet;
Melinda Jagger; Thomas J VanDyck; Tom McGovern
their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity
of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any
actions or proceedings allowed by law.
This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board
of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors
of Merchants National Bonding, Inc., on October 16, 2015.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority
to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the
Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attorney-i n -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 1 4th day of July 2017
%P 0#
:k
lik
MERCHANTS BONDING COMPANY (MUTUAL)
MERCHANT NATIONAL BONDING, INC.
*Qr %
A% .4
—0— 0'.
ox -
2003
fm
1933
By
STATE OF IOWA too$$
COUNTY OF DALLAS ss.
On this this 14th day of July 2017 before me appeared Larry Taylor, to me personally known, who being by me duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and
MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instrument are the Corporate Seals of the Companies;
and that the said instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards
of Directors.
ALICIA K. GRAM
10
Commission Number 767430
My Commission Expires
April 1, 2020
Notary Public
(Expiration of notary's commission
does not invalidate this instrument)
1, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby
certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full
force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this I 1th day of December 12018
�OG Co
2003 lo
1933
Secretary
POA 00 18 (3/17)
1316 CouNTY-CiTy BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
. ............. .. . . . .... . ... . ..... .
PHONE 574/235-9251
FAx 574/ 235-9171
TDD 574/ 235-5567
CITY OF SouTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
Date:
December 3, 2018
To:
All Planholders
From
Linda M. Martin, Clerk, Board of Public Works
Subject
Addendum Number: I
Project Name: Small Drainage Design and Repair
ProjectNumber: 118-063
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
1'f
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Signature:
Date: 14,
Version 4/2/2015
Y"
1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
PHONE 574/235-9251
FAx 574/ 235-9171
TDD 574/ 235-5567
CITY OF SouTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
Date: December 7, 2018
To: All Planholders
From Linda M. Martin, Clerk, Board of Public Works
Subject Addendum Number: 2
Project Name: Small Drainage Design and Repair
Project Number: 118-063
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
Now
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company:
Authorized Signature:
Date:
Version 4/2/2015
1316 COUNTY -CITY BUILDING
227 W, JEff-ERSON BOULLVARD
SouTH BEm. INDIANA 46601-1830
CITY OF SOUTH BFND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
October 2, 2018
Mr. Robert: Kuhns
Selge Construction Co., Inc.
2833 S. 11" St.
Niles, MI 49120
RE: Pre-QUalifiCati011 Verification
Dear Mr. Kuhns:
PHoNLP 574/235-9251
FAX 374/ 235-9171
This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South
Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you
are required to re -submit a complete applicationfor continuation of prc-qualification status prior to December 31
forthe upcoming calendar year.
A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of
South Bend Board of Public Works, along, with your Pre -Qualified Bidder Checklist and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-925 1.
Sincerely,
Linda, Martin, Clerk
GARY A. GILOT DAvID P. RELOS ELIZABUH A. MARADIK JAMEs A. MLJr-U,FR THERESE J. DORAU
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Small Drainage Design and Repair
ProjectNo. 118-063
For Bids Due December 11, 2018 before 9:30 AM Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
X or Bid Bond.
• Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
• with Iran, Employment Eligibility Verification, Non-Discrim i nation Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
X met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBENVBE Contacted
Form [MWBE-2.1].
X Acknowledge Receipt of 1,F2 Addendum(s) included with the bid.
.. X All required additional information is included with the bid.
X Proposal statements and other affidavits all signed by the proper party with name either
— printed or typed underneath signature.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Selge Construction Co., Inc. Date: 12111/18
By Authorized Representative:
Signature:
Print Name & Title: Robertr Kuhn�g, Prgjpat_Zngineer_
Version 7/20/2018 Contractor's Bid for Public Works - I
PART 11
(For projects of $100,000 or more - IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid,
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
I . Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid. See attached.
2. Attach a listing of public works projects currently in process of construction by your
organization. See attached.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof. Wehave never failed to complete.a. project.
4. Attach references from private firms for which you have performed work.
SE�%AWEWAND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.) Work will be completed in an orderly manner, according to
specifications and as best suits the owner and its engineer.
2. Attach a listing of 'the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor. See attached.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
See attached- subs h ve al�l ece'
vga
agg�oneceps Bond pot reauired.
4. Aftach a listing o(equipmeni you ave use or% �ropose projecr
See attached.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
Yes.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
See attached.
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 7/20/2018 Contractor's Bid for Public Works - 3
",V"
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-11.0 Pl,��
MBEIWBE PARTICIPATION
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBE/MBE participation.
It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's
owned business,
Project Number: 118-063
Project Name:
Smail Drain
_Mag& Design and Repair
Bidder: Selge
Con_aU_(;ti_Q_n_QQ,j
TotalBidAmount: $ 657,576.35
MBE/WBE Goal:
7.1%
...........
Inc.
Page 1
of 1
Name & Address of MBEMBE
Primary Contact Person
(Namerrelephone)
Scope of Work to be Performed
(Attach scope/schedule if you need additional space)
. ........
Dollar Amount Of
IMBENVIBE Component
Percentage
of Total
i t e rrica ing
.
. . . ........... .... .......... . .
Pi ropasal
Box 3751
James
0. Bend, IN 46628
Michalski
Traffic Control
$ 5,255.00
1%
574-287-2078
Slusers Green Thurro
PO Box 33
John
L09anSPOrt, IN 46947
Seeding & Sod
$15,972.00
2 to
..... . . .....
57 .4=722=31-02-
Submitted by:
......... . .
. . ............... ... ........
P--�
. ........... . . .... .........
12/11/18
Prkit Name Engineer
Signature
Date
Version 7/20/2018 Contractor's Bid for Public Works - 12
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY d14,,';PW
ift s')
DEVELOPMENT PROGRAM
FORM MWBE-2.0
;Z,;
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: - Small Drainage Design and Repair Date: 12/11 Z1 8
Project Name: 118-063
Bidder: ___SeJgP . ..... fC9M.tructixm_jCb_, Tnr-
Contact Person: Robert Kuhns. Prolect Encrineer Telephone: q-6R4_nR49
Address: 2833 S. 11th Stret
City: Niles State'. MI Zip: -------- 4MD—
Email: bkuhns@selgeconstruction.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBENVBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (hftp://www.in.gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
1 . Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and
�7 subcontracting opportunities.
20 Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and aliow MBEANBEs reasonable time to respond.
Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBEANBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
4. Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBENVBE firms.
"Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs,
including providing such MBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by I
MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBEANBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 7/20/2018 Contractor's Bid for Public Works - 13
s1v , � I I;,- � � rf , ,
I I OUT" 462�1
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBE/WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE 1 OF 1
Small Drainage Design and
Project Number: Repair MBEANBE Participation Goal 7.1%
Project Name: 118-063
Bidder: Selge Construction Co., Inc.
// - 12/11/18
L -- _ Robert Kuhns eqt_g�29ineer
(Signatur (Title) (Date)
MBEANBE Firm SlussL-x's Green Thumb
Owner or Contact at MBE/WBE Firm john
Telephone: 574-722-3102 Fax: 574-722-2993 Email: JES@slussers.com
. . .......... .
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBEANBE FIRW
nl---- ---- ed
MBE/WBE Firm State— arricacUnq,-1ac--
Owner or Contact at MBE/WBE Firm johr, Michalski
Telepho'!',N-287-2078 Fax: -U4--2B3--1-7.4A- Email: StatebarricadelQaol.corn
TYPE OF WORK SOLICITED FOR THIS PROJECT:
. .... ,,,,,TTTr ffig Control...... . ..... . . . . ..................... . . ........
RESULTS OF CONTACT WITH THE MBE/WBE FIRW
Quote Accepted
Version 7/20/2018 Contractor's Bid for Public Works - 14
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.11
MBEfWBE CONTACTED
Version 7/20/2018 Contractor's Bid for Public Works - 15
;& 0 K ()l -V -N > �� 00 5' 0) -0 -0 CD U) CD 0) 0 0 0 CD -0 M 5' �2. K -0
Q W '0-0 co 0) 0- :0 0 X D 0 - - CD -(c 0 -,m
13 cp Cl) r) =t
ZT 0 — 3-0 H 0 c 0- co 0 0 0-:5 0- (0 co 0 cD pr in
x 3 w 0 77 0 ;��. a COD w 2 q -3- w - - 7— :T -1 T
w * E x (a - :3 o co 5 (o �2. 0 o w Cr =3 G) r- zT a 0
w = K a :� o 5 0 a 0 c = C-D ZF Rw, 0 0- 0 0 0 4T 0
CD X, 0 C -W CD X M w cn Or
(D 0 0 5* 0 - �R
0 0 - o c- :3 -0 IV =ft
C CD 0 Cl) 0 0 0) ), :=h
. zr
70 0- cn -- 3 g� o 3 =T 0 3 :3 0 (D n =
Cn Q- (a co CD -- CD -5- (D 0 -0 @ 0
D-1 w 0 �3 3 87 CL 0) c
a =, CD (D �T -
CD W -- CD R CL,< ;=r 0
0 0) m 0 -D =5 w ca -- 0 3 — =1
;v cri M w - CD r E3 CD M CD CC -0
3- :2 - ::r w OF 0 CD 3
0 � n =F - 0) c
0 0 ED
w --.0 'a 0 OL CD ry w
w 3 > _0 cn (D @ - W > (D gl
D CD =) (D ::T 0 D = li 3
0- Z) 0 LD� 03 3 & -�O C:
;:p �� 0 3
CD CD 3 :03 %< 0 0- (D
OL - a - 3
w N. =3 -0 w 0
3 3 C: D 0 w 0." CD c,'
(0 CO CD FD' CC5) c: C,p 5" c - 4? -5, ff CD
0 co
3 --< 3 m--u zT — 5-- C/) w cp cn Q — --i
0 CD CD W :3- - < �- = S"R
C: (D -n m a
< (D (c
m :3 0
ki --0.510 C: CO
3 -- 3 cD w 0 OKS� (a K -Ow CD r &Fj'
0 5D 5 C
77 3 0
0 ;:P (D eM
0 w - :T -.4 R o w
CR. e 9 CD CD CO - 0 CD '< . '0
CD 0 CO Z CD - -0
M (D 3 w - cy"< m- 8- m < =h
3 5-' - 0 =r C).
zT 0 p 0 0 =3 0 0
Cf) 0 CD cD 0 3 a c: Er 6- =3
�D 0_ CD CD CD M. :3 --- - kD - CD CD () 5- Er W
-0 S D- -c 3 cy :3 — CD Z3 - 0
3 Cc
0 (=Dr CW-D I (D - X 0 z 0
0, 0 cc w
D D) (D Z3 z
CD -P, 0
CD co CD 0) Q- =3
CD
z -p 0 C, W
c 0 0 5 CL C)
C) , �� ��r — r,-) >
CD -MR
�� C� � 00 < 0
SD :W:, ::r -LT 3 CD CD -6 v 5D
L c
0 Z) . -) 0 ID,5' — 71
0 <W CD
PL 0 Z=Mzo
0 z 3 (6 2L , K :3
. _0 !2� (n 0 0 0 w
lJt � FJ 0 0 W zy- -n cn C 7 cr ce
CD �o LT 0 zt _0 -
m m 0) 5-- -R ro 0
F)- 5D (D 0
0,10, !� . . K K z) CD cp p :3
0 CD -0 -0 -0 :3 M Cy. CD Z3 0 M 0 W 07 CD
0� > a
D CD 54
0 ZT
D CD =3- C 0 CD 0 :3 Z) W CD
Ep I
0 < CD CD 0) CD w
C: 0 CD 0)
-0 CD S� �� OL 3 0) CD
CD 0 0 (D 0 ZF C) Fj - C) -'0 W 0 C.) co 5 (a 0
5- c- 0 CD - _j I C: CD 0 (D CO ;:W 0- :03 � @ 3 (0 K-0 o 0 :3 2-0
I CD M ' M .0 (n E. CL c '< -- cl) 5-3-6 0 =2 5' CD =3 0) 0) 0
6' =� 0 -,?a@ o 0- C CT -0 @ 0- ff CD 0 LI: CM. W --o - 5-C, C) CD
3 CD 0 ZT r- a 0 < '�l cn 0 — C/) :3 0 - w =3 5' cD =F Eft 9.
W CD 0 0 --(o - -
1) 3 <D 2 CD 6� :E --o 0 0 60 COO 0
=h 0 Cl - - 0 MD 0
'06 M 9 0 cm, 6 9� :m:r 3 m
-.0 0 = 3 UT Z3 2- C-1- 0='oW :770 3,- 0- cl 0 0
co In cz" 5 . 0 zy 50 0
L-- 9� :3 (=I
5 0
Z 1'D:r 6 W 5 @
16D co
3 0 in 9 9� :3 o o
CC 00 Zr =1 CD 1. 5' - CD 0 CO (D 0, < 0 3
C = CD -0 Cl 0) 0 (n :3 00 M C, _. =)
S;. CD E� cL c. . Ic Z 3 0 a 0
D j� p
C- - M. CD M- 0 0
W RIO CD asucYR(D -.3 CT zy ct :3
05-- �CD 5 cy - 0 -
C') Z) a z C: '0 0
N3 3 00 q
2 OL 3 (n 0 CD Ln. 0 00 Cq D 0 0
0 m 0 r- go Z3 3 -3 3 ?1 CD
c m o 0 0, a Q_-O D 3 ;z zr 0 07 0
cl 0 CD CD C: E5, 0 co
0 M W 0 �D- 5w, E; 0
(D . 0- Cl) :03 CD CD (D CD Z) 73
(Iij)) m (:Q:l (Coo
0 G) ID > 0) 00 FD7 - -0 r-
CD @ CD (D
(0 0 CD
C_ - 2 D - Cl 0 0 0 C()
< �� W�
3 a CD (2. 0- x- 0). 0 0 C()
w < -- Z) . = CD M
-1 c 3 c) cD (D
z 0 --�,< 3
Q CD -3 CO :�� m m
5 0 w
C CD Z) j Z aj M
Q 0
4Ph
co: 2 (D OxQO-n
C,) 0 (n - * mo(::K
co =a 2- o r\).z
�� cm:
I
"I
0
9� C) ccn:
�� 0 0 z
rS w a C, m m
55 CD Z
a �D CD
5 (D D rb
CD - -0 z
Cl) K
4� 0
CD m >
K CD C- I Z
ET 5" > (D (D
L
w c)
0 0 gm m G)
QD ZT
:D N M8>
(D
1p ID 5 t< _
0 w CD l< > Z
(4) 1? fn
4 ,
CD
24
(D
0.
W,
(TDu—T3umw—cO—�a
�q a 0 E m K 5� o a -8 ?5
0 -, 5- -- -u > b �� 3
0 0 -,:3 E� 53
0 a
'P w co @ g -0, 9 C,
(n T r
0 CD :-W 0 23 0
w Di 0
-0 > -n ID
00 -
CD Z c) Z) c
0 ID > a Cl) cr 0
G) 0 -co: oc)
Z) 0) CD C: CE
N) O-O'S9 CO m -t-9 Q a
0 0 C, a: C (D
x CD 0) 0, �; *R
i;8 -R OD CD 6
.. 4 a) &-�O - -M63 M
C) c 0 (D D Z
F8 co 3 cn
CD z 0 11) c 9 C)
6 al
it 9 (n Cl)
- Q -7 7 a --
=r 0
S�k- 0 — x
M 6� ID
CD -
W -u
=01 0
E�
3
cyl o 0)
(00 c- 0
CA) :3
CD C: c
m
CD
0
,:ji zr C')
--i PT ---i
CD
> zo
N) A --q
(P 0 m
0 - �O
(D
(P
co
c)
cn
=7
6u a �3 @ 6XETXWXX
IN :1 a 0) c (C) < 0 Raw 5--:!s.-T*O*Qz
C') '7 P, co w Ep R o cri �l =k = � :=h ='z
!� 3 c --' -0
0 CO (D �o I'D CD q, , � 0 -
0 0 S'o ID (D z
CD 0 1 (OD 0
<
Z) 0 CD 0( o
! 0 77 :D �T W ;'� 4 R -
0 C) (D -a D5 o 0) 0 Q 0 , * - =' - - �� --
TSIt 1-cl t i " 0 5- C- Z) - DJ C')
D IS amoo:D60 M --T
:3
p ol 0 1 CO CI)o 91' Z7 5
Al M 0- CD (D 6 - M 0 0
Q- 0 PI Ef 2 a y c: !;, 3
ET S, 10 C) 5, r- 3 0
F,' (.D 0 X
0 W'W
-0
'<
0 3 0 cD
--s (D
n a 5 0 02
0 - 9 od C'-
Z) . CD w -n 0 5 5 47 0 07 (<D
4� 0 Co- lo > o Z3
o 0 -- -D
-n
(D o
=r A
co
9, 0 r
CD -0< D C, 0 0 FD'* C
C: 0 D (D
E P a,<
5'?,3' -u 0 cl) Q) :E -n
:E m E: co N)
W o L-
X (D >0'
M
> 0
z c
z
-0 CO >
2 9 - 3 :T
3 @ cD (D
W ID
:7 0 (=Dr 0_ CD
- -0 '0 0 -n - 0- -0-
WW v '157 W--1 xW 11 coo MM
=a;< �T - 0 101
W 0 (
<D W 151)110
0 '< ZT - (� Iq !��
0 0 CD - (D
IS M Cl) (D CD Q
0 9" K - g RDI-
:03 O'D P CD
ZT CO
R @,,
l) CD �� C:) 0
5 CID "a' -- �'
CD �=o - a -0 -1 p
-a 5� c: (T = 0, 2 .
0-
(D 0 :D 6
Cp 7 CD (D 0 -0
fI � I — C) P 0, �4)' 5 CL g - -- - w -(')-6z--o U)cz-n5r-
U' C'D 0 (D CD a) 3 ',1) 0 > CD
3 .-0 �
- C) X' Z) W (D - () .7 W 0 CD
> > o S. -s. ax) z CD c ro (D 3 Z7 0 0) W 0 0 OC CD
�' j, ID ID - -n"* ��FP3
rQ -Z. ;;l :-D (a - _t :� _ 8 � 4 W - 8 (D 5,j r-
-a 11-1 - 3 T - 0
0 (aD 0) :on 0 - - , 9. - q Us (D
(_D CD W 0 C: 0
-n (D 5501 _W Z'
D Cc.) -0 > ID
c.)_ � 8- — a
0 W I ID 0 CD - D M ?zz,- CCL �' (D
Ti x 0 3 -0) > ID Di 0 CD
C)- OM, W -0-
3 30 ':' g �a
3 (D rb Cog R— :7 0 C±
0 rl' ::; (D M
3' M C) -.,< 'W -0 'R -n co o Cl) -g -j
4 0 Q (r.0 KD 4% 1- CD CD 0 1; 0
3 M ::: 3- - (D (D
a M 0) CD ID W --3 :0 0 0 5-
15 -,;3
z
ri j;� (D Cp C? P'j CL
31 'rz� (D 0. (D w -0 CD
E (6 0) Cn -P, ::, En 6000- M
6, <0 �: 5 = P, —0-6 2) CD ;�
co -0) C) - 3 5 co
:I co :- 9, F 50 FT
M W a , < �� co M (D
D 5, cl o a 2?' CD CD <= FD'
< > P3 C- Z:3 (D 0
-0 3 -C (D
In
00) (5i W 12o I. cn 0 OL
CT (D 'o ;t T CL D- co ;:W 0 CD
4�, am �3 CID 0 Cf) D 0- CL <
to E\ =� X- -0 0
� - g I a co M r" LD.
0
-) M r- 0 5 -- W a Q. 0 -- W Co ct (D � ' W - -
6 'R -3- =
k 71 zuc),<
Ig Co, Do (D COO (Wo CO CD C(P
(j) CD Cl M W
Z 0- M 0 > CZD
3 5 (n C-
(D
0 C) a 0
0 0- M W -0
> c 5-
C- -I' (V -a - -3 co L Off (D -U< Z) :T
0) 0 CD = CD CD 0 (D
Q o a ci W C) (D 0 ID :D CD �
0
co CT W W * M CL 0 C: IM,
5 , f- 0 :p- W LI). -3 C)- 300 0 m
co IR 0 M F� a(-) 0- 9� W-. o 3 C) z 10 r- 0
0 0 o 0) _0 MD 6� C - �5 S
3 0
C) ZI
-0 CD OC) ;C:lr' 3 0 2 (cnn =r 3
c M (D -0 0 11
0- cn 0- 0 c
> W C) 5, r.
0 0 (a 0) M - 0 0
0 (n - ?- -- -5 C@O CaD O'j 0 CD 0 X;:' z3 z
�: -2 '5 P c -L (D a �� 0 C) 3 0 0 0'
�n. u o CD o (D
!4 CD 3 -0 -1 W 0
5 (D
0 0
0- 0 0 (D CD 5 z
CD =3 (D (D - (D (0 D D U)
I
JOIN
CD
01)
< CID
o o
ID
r,j cn
0!�
(D CD 0
Cn -CD
-4 W
0 0
(D
SID
c
0 0
x
Ti
C
-00
= a
ri) (D
W
x 6
-u 0
3
Cl)
x
T>KO020wwK
E3 m>o op>�u
6 c c --i c
0 W M = z
�l A
M
o M M --�
-<
0-
0!� o
Zc' -n
21 T
ZO
0 --j C- C/)
=3 a: 0 --1
cc,:))
> 0)
2. m CO
M -Mu o
Z G)
>
z CO
0 M
�3 -d
0
g
0 0 c
X. CD :D
Eys 33 Co 5 C: c)
M �: CD 0
A) S' >
x >
CD r-
0 5-0 r-
C3W@('D*OA
33 0
=3 -0 -n W
ZF CO Z D
0) 1 > Co 0- ri)
0
ID 0) G) 0 �C-
0 W M C q-a
0 u 1 2
T 0
i�8 M x
0) E� Co M (D
,@-,) a E) M �;
0 nzz 3
(D 0
CL po I
M -n ---I ET -u r- .' >
3 ow Z(FD C- >
0). LD -0 0 > W W 0 0o)- 0 0 (D P) CL
3- z 6 (D -3 cn
r- 3 .5 --v -4. �� 3 0' OD
0 W 0 rn Cc: -0 -No 3 -6 C)
-M< z' -0 3 -.5t, (0 In
CD 4�, CD
I'D
CZD' zr CO =1 (0 M 0 0 0-0
4� .0 >M CD
(D Q 10 CD (C' S:
Q) C i -n (D
3 �:� * (D (B M 0=) CD :D
(D aZo Fn-,< - * -P�-
(p ND C) ;5l Q 0
0
D 4 a C) a 0
CD cn ? (" (D M R -,OD :6, fn cw�
0) Ol co o !LD w;e
cri (D o C,
W 50 a-
3 C,) W 0. (D co 00
W 52 -1�3 �' 5 , , 8
> <0 0) 0 OL W =,4 R CD
@ C) , -i;-� -3 -'a 10
n �D
cyl CD I.,;! a =3
(D 0':�� (D CCOD cl P (D W 0 W
=3 5-3
07 5 CD
=3 CD
(D 0- a �� T ff �-- 5- T
0-0 < 0
U 0 (D CL
CL
5D CD
<0, 0 0
C,
co
<
6' 3
ch
CD -n zro
(D
4�,
5RD co
M
I -�' � 0) P7
* ; � 0
-600
'1 .1 D
J� C/) (D
00 =or 3
5D
W cc
o
0
(D 3
P- CD
63
C)
a,
-n
lot
8'
0 Z) CL
@
D
ID
lvci
C,)
N)- -0
653 2 o
4
a
6) �-� c) e
OC) 0
:3
FD' W
Oft s
� �
0 q C
0 W
(D
cs
00 (A
(D Co
3 �T CD -C
Wfjrj'� ID
M
9 " , ;_ 6 ) c
6 -Y r- , 'g CD -0
(n 69 Z Ulf WW --1 (j) 'P t-
o) M (D
-5i Clmoo� � �F '< 6 0 1 cs 0,3
0 c & �u '.3) M (D �- - vi
=3 -0 0 0 *1 C" E3, eL
0--u U) (C) IS v
Z�'
6o (D C -2,
co -0 0 LIL (D -U 2. Y 0
FQ) 0 -0 CD
51) 0 --j
C.0 0 'o' 9. -n
-3
qL 3 (D ,�M 0
cn >
cn
OD (D (D
2 - 3
Cl) co c: 4�j -r, 90)
L Z) 3 �14 a
00 0 -4 C: "t
-69 co 'Ll Z)
(D
CID > 3 -4 W 0 C
cn CD - '7 6 Z'
2L C) a- (D r v C.7
6�ak cWn I
P CD at, - .
6 0
0 3 1, fl,' '<\D:l ��
(o 0 E<
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Small Drainage Design and Repair
Project No. 118-063
For Bids Due December 11, 2018 before 9:30 AM Local Time
Contractor Name: Selge Construction Co., Inc.
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section,11 only.
Section 11 acts as an application for pre -qualification. Submission of Section 11 will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31 sl for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 7/20/2018 General Conditions - 6
POST BID.SUBMISSION§:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1 . All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the'
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 7/20/2018 General Conditions - 7
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
W y By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments:
W x Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
X proprietors or partnerships).
Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
Y Evidence that I am utilizing a surety company which is on the United States
Department of Treasury's Listing of Approved Sureties as required in the bid
specifications or contract.
(iv) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
Version 7/20/2018 General Conditions - 8
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) — By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) — By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
W
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business �ntity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any deten-ninations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv)
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
M
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee! or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi)
Evidence of participation in apprenticeship and'training programs, applicable to the
work to be performed on the project, which are approved by and registered with
the United States Department of Labor's Office of Apprenticeship, or its successor
organization.
(vii)
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii)
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service 'Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract,
Version 7/20/2018 General Conditions - 9
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date: December 11, 2018
P
(Sign Here)
Robert Kuhns, P�Oject Engineer
(Print Name Here)
Selge Construction Co., Inc.
(Name of Company)
2833 S. 11th Street
(Address of Company)
Niles
(City)
Michigan 49120
(State)
269-684-0842
(Telephone Number)
Version 7/20/2018 General Conditions - 10
State of Indiana
Office of the Secretary of State
Certified Copies
To Whom These Presents Come, Greeting:
1, CONNIE LAWSON, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws
of the State of Indiana, the custodian of the corporate records and the proper official to execute
this certificate.
I further certify that this is a true and complete copy of this 1 page document consisting of the
following records filed in this office:
Certification Date:
Business Name:
Business ID:
Transaction
Miscellaneous
November 26, 2018
SELGE CONSTRUCTION CO INC
197203-307
Date Filed No . of pages
07/24/2018 1
Total No. of pages 1
In Witness Whereof, I have caused to be affixed my
signature and the seal of the State of Indiana, at the
City of Indianapolis, November 26, 2018
CONNIE LAWSON
SECRETARY OF STATE
197203-307 / 10676817
All certificates should be validated here: https://bsd.sos.in.gov/ValidateCertificate
Expires on December 26, 2018.
Page I Of 2 CertificatelD: 10676817
Approved and Filed
197203-30717971578
Filing Date; 0712412018
Effective V1231201 8 11:00
CONNIE LAWSON
Indiana Secretary ofState
A-
S'U. CO. INC.
2833 S. 11"'Street
Niles, Michigan 49120
P: 269.684.0842 F: 269.684.0846
www.selp&conLtrug�ilpn.com
July 17, 2018
Office of the Indiana Secretary of State
302 W. Washington Street, Room E108
Indianapolis, IN 46204
To Whom It May Concern,
SELGE CONSTRUCTION CO INC. and Its employees will comply with Ind. Code chapter 8-1-26.
Thank you I
Sincerely,
Leonard dv�lngston
Safety and Resources Manager
a!
t W!
��' S
ft
OF STATE
JUL 19 1018
dxto-v %-.0
141111*WN
Page 2 Of 2 CertificateID: 10676817
Selge Construction Staffing Capabilities and Employee Statement
At ScIge Construction we are proud to be part of the Christian Labor Association (CLA) Local Union 10.
Being part of the CLA provides in organized workforce that has gone through rigorous training and provides
premium pay and benefits to everyone on staff. Our team is comprised of 75 individuals (15 office members
and 60 field personnel). The team is made up of male, female, and minority members. ne average employee
at Selge Construction has been with the company for 14 years.
Each person on your project will be properly classified as an employee under all applicable state and federal
laws and local ordinances. There will not be any temporary laborers on this project. Selge has never defaulted
on a contract and we do not bid any work that we cannot complete.
Based on our current schedule and capabilities, we will utilize 100% Selge employees and equipment for your
project. We do not foresee any issues being able to complete the project within the designated schedule.
Let there be no doubt that Selge Construction has sufficient employees and resources to complete the work
we are bidding.
0 DEPARTMENT OF THE TREASURY
BUREAU OF THE FISCAL SERVICE
WASHINGTON, DC 20227
Lawrence B. Taylor, President
Merchants Bonding Company (Mutual)
P.O. Box 14498
Des Moines, IA 50306 - 3498
Dear Lawrence B. Taylor:
Your Company's Certificate of Authority to qualify as an acceptable surety and/or reinsurer on Federal
bonds is hereby renewed and will remain in effect until June 30, 2019, unless revoked prior to that date.
On the basis of our review of the Company's Annual Financial Statement as of the close of the last calendar
year, the following underwriting limitation has been established, effective July 1, 2018, under the renewed
Certificate:
POLICYHOLDERS'SURPLUS at December 31, 2017 ............. $121,193,842
DEDUCTIONS (See Attached) .................................................... V- &k6 .0 51
ADJUSTED POLICYHOLDERS'SURPLUS ............................. $112,1272787
UNDERWRITING LIMITATION ............................................... $11,213,000
We are following the practice of making no deductions from policyholders' surplus reported where the
amount of adjustment (e.g., for unauthorized reinsurance, inadequate loss reserves, etc.) would have a
nominal effect on the surplus and where it has been determined that the Company is solvent per Treasury's
guidelines. This practice facilitates the review work and should not be interpreted as changing or nullifying
applicable Treasury requirements.
The list of approved sureties (Circular 570) is available on our website at
btjps://www,fiscal.treasurv,govtfsLQgrt,.V-rsfl�gre!yBnd/c5lO a-z.htm. Please disseminate this information
to your associates, agents, reinsurers and even Government agencies whenever possible.
If you have any questions regarding the above information, please contact Bobbi Sue Liston at 304-480-
7098, immediately.
Enclosure
Sincerely,
Digita lly signed by Melvin H.
Melvin H. Saunders,�Iaunders
,( /' 107ae: 2018,06,14 08:22:45 -04'00'
Melvin Saunders
Manager
Surety Bond Branch
SURETY BOND BRANCH — 650S BELCREST RD — RM. 345
HYATTSVILLE. MD 20782 — FAX: (202) 874-9978
INTERNET ADDRESS
ENCLOSURE
Common Stocks I'l
INFO: Merchants Bonding Group, Inc. owns 100% Merchants 19,066.05
National Bonding, Inc., a T-listed subsidiary ............................................
TotalDeductions ........................................................................................ $9,066,055
WThe common stock of insurance subsidiaries certified by the Treasury, if held by other certified companies, will be considered
a non -admitted asset when determining the parent company's Treasury underwriting limitation. This valuation method is effective
for certifications dated after December 31, 1988, and will be applied to new subsidiary relationships created by reorganization or
by changes iri the organization structure of the group due to new acquisitions or combinations. (See Instruction III of Treasury's
Annual Letter dated December 31, 2017.)
SELGE CONSTRUCTION CO., INC.
COMPLETED PROJECT DESCRIPTIONS
Description:
Mishawaka Bodine Valve #2 Replacement — Owner: Indiana Department of Natural
Resources. Remove asphalt surface, install 10 each 4" gate valves with boxes & 4" SCH 80 PVC
riser pipes, Install 10" SCH 80 PVC between tanks #5 & #6 on east & west ponds, excavate &
replace yard hydrant, backfill full depth trench, restore surface areas with 6" concrete pavement.
$115,135 Year Completed: 2017
Description:
New Buffalo Lighthouse Creek Drain #298 — Owner: Berrien County Drain Commission.
Open channel cleano'ut/channel clearing and shaping, plain & heavy slope & scour protection,
boulder revetment, ledge Stone access Stairs, 12" ductile water main, 10" sanitary sewer main
replacement, 16' RCP box culvert & wingwall/headwall. $1,273,288 Year Completed: 2017
Description:
South Bend Western Avenue Corridor Improvements — Owner: City of South Bend Board of
Public Works. Construction of a streetscape project including earthwork, pavement milling,
concrete overlay, concrete pavement, asphalt pavement, permeable pavers, concrete curb, and
sidewalks, landscaping, storm sewer, lighting, and pavement markings and other appurtenant
work. $2,860,242 Year Completed: 2017
Description:
Elkhart CR26 Biopad Force Main — Owner: City of Elkhart Board of Public Works. Install
approximately 974 feet of 4" HDPE Force Main and restoration along County road 26. $62,785
Year Completed: 2017
Description:
Mishawaka Linden Area LTCP Division A Phase II — Owner: City of Mishawaka Board of
Public Works. Repair damaged section of sanitary sewer, CIPP lining in Brykit Ave, install
storm sewer, manhole rehabilitation and sanitary laterals. $981,453 Year Completed: 2017
Description:
Niles 2017 Water main Replacement Sassafras Ln Section A — Owner: City of Niles.
Installation of a PC 3 50 DI/C900 PVC water main, multiple. connections to existing water mains,
reconnection of existing water services, install valves & hydrants, relocate existing storm and
sanitary sewers, disinfection and pressure testing of water main, landscape and pavement
restoration. $319,218 Year Completed: 2017
Description:
Cassopolis Wastewater Collection System Improvements — Owner: Village of Cassopolis.
Lift Station #3, Spencer St Lift Station, Second St Lift Station, Sherman Ln Lift Station, Depot
St Lift Station, Reed St. Lift Station, Rowland St Lift Station Rehabilitations and Grinder Station
Rehabilitation. In Place Generator for Lift Station #3 and Reed St Lift Station. Remove and
replace fencing and gates. Replace all control panels, outdoor lighting. 60 linear feet of 8"
sanitary sewer and manholes, 165 linear feet of 2" forcemain'. 230 square yards concrete
pavement & sidewalk replacement. $1,316,160 Year Completed: 2017
Description:
Elkhart ADA RR Depot Parking Lot Improvements — Owner: City of Elkhart. Creating
section of the parking areas around the RR Depot to be accessible and ADA compliant by
installing (1) curb ramp and 125 square yards of stamped concrete and 20 feet of retaining wall.
$23,865 Year Completed: 2017
Description:
Warsaw Osborn Stormwater Pump Station — Owner: City of Warsaw Board of Public
Works/Safety. Perform upgrades to pump station per engineer's specifications. $197,240 Year
Completed: 2017
Description:
Lansing MSU/Spartan PV 1/ Inovateus Solar Array Project — Owner: Spartan PV 1. Develop
an approximately 13.8 MW-DC electric power generating facility using solar photovoltaic
modules on five (5) parking lots located on the campus. $8,434,889 Year Completed: 2017
Description:
Mishawaka Bodine Fish Hatchery — Owner: Indiana Department of Natural Resources.
Installation of a small valve and inlet piping replacement on rearing ponds west 1, 2, 7 and 8 and
east 2 and 7 ponds. $115,135 Year Completed: 2016
Description:
Middlebury 2016 WTP Backwash Pump Station — Owner: Town of Middlebury. Installation
of new backwash holding tank influent lift station, various modifications to the existing
backwash holding tank effluent pump station; installation of a new control panel to service both
the existing backwash effluent pump station and new backwash influent lift station. $363,165
Year Completed: 2017 1
Description:
New Carlisle Development Area I Sanitary and Water Improvements — Owner: St. Joseph
County Board of Commissioners. Installation of approximately 14,000 linear feet of 16" and 12"
water main extension and 12,000 linear feet Sanitary Sewer Extensions, 15"-30" along Walnut
Rd., Smilax Rd., and US 20. Install new Water Main & Sanitary Sewer includes: approximately
1, 100 feet of trenchless installation under railroad crossing and US 20, Roadway reconstruction,
construction of a water pressure reducing valve vault, installation of approximately 20,000 linear
feet fiber optic conduit and hand -holds, and other work. $4,655,327 Year Completed: 2017
Descri'p tion:
Village of Paw Paw 2016 SRF Lift Station & Force Main Contract #3 — Owner: Village of
Paw Paw, Michigan. Rehabilitation and replacement of 4 Sanitary Lift Stations located within
the Village of Paw Paw including installation of new grinder/debris auger, building
improvements, and force main directional boring. $1,652,481 Year Completed: 2017
Description:
North Webster Lakeland RSD Wastewater Collection "B" — Owner: Lakeland Regional
Sewer District. Installed 988 each grinder pump stations, 390 each grinder pump flood protection
kits, 74 each extended grinder pump stations 2 feet with rail, 25 each traffic rated grinder pump
station covers, 988 each control/alarm panel installed, 69,980 linear feet force main, 29,300
linear feet service line, 90 linear feet casing pipe, 50 linear feet gravity sewer, 72 each flushing
connection, 21 each air release valve & structure, 990 each curb stop assembly, 69 each isolation
valves. $6,163,664.31 Year Completed: 2016
Description:
Mishawaka Brick & Fir Road Water Main Improvements — Owner: City of Mishawaka. (7)
trees removed, removed curb gutter and structures, temporary erosion and sediment control, 4
cubic yards river rocks, 1,050 cubic yards common excavation, 1,186 ton #53 compacted
aggregate, 210 ton HMA type b for patching, 19 square yards for approaches, 3,606 square yards
milling asphalt, 1,361 ton HMA type b, 6 ton asphalt for tack coat, 265 linear feet combined
concrete for curb & gutter, 585 square yards PCCP approaches, 27 square yards concrete
sidewalk, 11,850 square yards hydromulch, 8,238 linear feet ductile iron pipe, 27 each ductile
iron tee, 15 each 45/90 degree ductile iron 12 each ductile iron MJ plug, 39 each gate valve with
valve box, 86 linear feet water service piping, 16 fire hydrant assembly, 132 linear feet pipe,
landscaping, $1,490,854.00 Year Completed: 2016
Description:
Syracuse Turkey Creek RSD Buttermilk Force Main Improvements No. 2 — Owner: Turkey
Creek Regional Sewer District. Cleanout (13) manholes, 15,540 linear feet of force main, 1,5 00
linear feet directional drill force main, (28) plug valves installed, 1,300 cubic yards special
backfill, 2,200 square yards aggregate base for pavement, 200 cubic yards #53 aggregate base,
570 ton bituminous materials, 180 square yards concrete drive, Buttermilk, Marineland, Willow
Grove pump station improvements, 25,000 square yards seed & mulch area. $1,218.351.00 Year
Completed: 2016
Description:
Goshen Wastewater Lift Station Controls Upgrade Ph I — Owner: City of Goshen. Brookside
lift station, Showalter lift station, Clinton lift station, Berkey lift station, Carter lift station,
Kercher lift station, Starcraft lift station, Parmley lift station, Maplecrest lift station, and CR 28
lift station control panel improvements. $641,406.00 Year Completed: 2016
Description:
South Bend Noble Americas Ethanol Plant — Owner: Noble Americas. Clearing and
obstruction removal, relocate 6" fire protection water line, 18" WWR cross under 48" RCP. 8"
water main crossover, 13, 800 cubic yards corrunon excavation for detention basin, 100 cubic
yards structure backfill, 320 tons HMA Type b surface, 420 ton HMA iyp-e b intermediate, f680
ton HMA type b base, bypass pumping for storm sewer improvements, cast in place concrete
diversion structure, detention basin liner, 3005 linear feet of storm sewer piping, 14 manhole
structures, pump station modifications, mulched seeding & topsoil. $1,818,027.95 Year
Completed: 2016
Description:
Dowagiac Pokagon Band of Indians Rodgers Lake Wastewater Treatment Lagoon —
Owner: Pokagon Band of Indians. Removal of debris, Erosion control, 300 cubic yards of
earthwork, install (2) recirculation tanks & equipment, install (1) lift station & meter pit, install
influent tank & equipment, install (5) treatment pods, install 430 linear feet of 3" force main, 350
linear feet 4" force main, directional drill 1, 150 linear feet 1.5" water main, 150 cubic yards
clean pond #3, 420 tons pea gravel in pond #3, restoration. $510,690.00 Year Completed: 2016
Description:
Goshen Colonial Manor ADA — Owner: City of Goshen. 60 ton #53 compacted aggregate for
base, 80 square yards concrete curb ramp, 120 square yards 4" concrete sidewalk, 50 linear feet
roll curb & gutter, 100 square yards erosion control blanket, 200 square yards mulched seeding.
$64,000.00 Year Completed: 2016
Description:
South Bend UPV Noble Americas Ethanol Plant — Owner: Noble Americas. (1) Sanitary
manhole, 125 linear feet 15" sanitary sewer, (1) 15" end section, 320 linear feet 10" underdrain,
3000 cubic yards common excavation, (1) manhole repair, pond liner. $161,100.00 Year
Completed: 2016
Description:
South Bend Noble Americas Ethanol Plant Sanitary Sewer Improvements — Owner: Noble
Americas. Clearing and obstruction removal, septic tank removal, temp erosion & sediment
control, 50 cubic yards structural backfill, #53 compacted aggregate for base, #73 compacted
aggregate for surface, asphalt for pavement restoration, concrete pavement patching, 519 linear
feet HDPE DRI I service laterals, 1,133 linear feet HDPE DRI I I V4force main, 1,589 linear
feet HDPE DR1 12" force main, (6) grinder pump stations, (10) vacuum excavation for utility
$365,881.00 Year Completed:
Description:
South Bend & Mishawaka Meijer Store Snow Plowing — Owner: DJ Landscaping, Inc.
Provide snow removal to (2) South Bend Meijer stores and (1) Mishawaka store. $80,000.00
Year Completed: 2016
Description:
LaGrange Dometic III North Area Improvements — Owner: Dornetic. 216 square feet
pavement with sealing, 960 square feet pavement. $96,694.00 Year Completed: 2016
Description:
Niles 2016 Sewer Improvements — Owner: City of Niles. 15" sewer repair, 8" sewer repair,
remove (7) 12" cross connection pipes, 12" flowable cross connection, replace manhole cover.
$92,815.00 Year Completed: 2016
Description:
Niles Township Manhole Repairs — Owner: Niles Township. Casting adjustments on 93
various manholes throughout the township. $62,590.00 Year Completed: 2016
Description:
South Bend INfl7ek IN/Kote Sanitary Sewer Improvements — Owner: City of South Bend.
Install 12" thick concrete base slab for storage tank & feed pumps, provide and install HD cross -
linked polyethylene chemical storage tanks, install dual bellows type chemical metering pumps,
suction pipes, discharge PVC piping to lift station wet well, install fill station & piping, provide
115 VAC electric service to each pump with 20 amp breaker within lift station, 8 hours training
to staff. $167,850.00 Year Completed: 2016
Description:
Elkhart Downtown Parking ADA Improvements — Owner: City of Elkhart. 28 square yards
ADA curb ramp, 25 square yards ADA sidewalk, 7 square yards 9" concrete, 40 linear feet
concrete curb and gutter. $14,435.00 Year Completed: 2016
Description:
Elkhart Indiana Flight Center Apron Upgrades — Owner: Elkhart Municipal Airport. 539
cubic yards common excavation, 465 tons #53 recycled concrete, 1382 square yards 8" concrete
pavement, restored area. $143,730.00 Year Completed: 2016
Description:
Middlebury East Warren St. Sidewalk Improvements — Owner: Town of Middlebury. Clear
area to be improved, 20 ton HMA for pavement patching, 2,010 square yards 4" sidewalk, 60
linear feet concrete curb & gutter, 134 square yards concrete ramps, 1,850 square yards mulched
seeding on topsoil, site grading, accent lighting. $299,880.29 Year Completed: 2016
Description:
South Bend St. Paul's Senior Center Parking Lot Improvements — Owner: Trinity
Continuing Care Center. Slope reconstruction with 1200 square feet of erosion protection system
with 160 cubic yards of structural backfill, 50 square yards of sod, 112 linear feet 15" ADS HP
storm sewer, 195 linear feet 18" ADS HP storm sewer, (4) storm manholes, riprap on geotextile
at pipe discharge, 90 linear feet of 6" concrete curb. $166,333.00 Year Completed., 2016
Description:
Mishawaka Bodine Fish Hatchery — Owner: Bodine State Fish Hatchery. Remove existing
asphalt surface, excavate pits for valve insertion and water main taps, install (2) 12" gate valves,
install (6) 4" gate valves with box, install 40 ton 6" #53 aggregate base, restore surface areas
with 100 square yards 6" concrete pavement. S 100,970.00 Year Completed: 2016
Description:
Precision Wall Systems Storm Sewer & Lot Upgrades. Owner: Precision Wall Systems. 825
linear feet of storm sewer, 6 each 30" catch basins, remove 40 linear feet of retaining wall,
remove 3 5 0 square yards of pavement, 1,000 cubic yards of retention pond, 3 5 0 square yards
concrete drive 6", 160 linear feet concrete curb, 80 linear feet concrete retaining wall, 1890
square yards grading for HAC and concrete areas, 1,540 square yards HAC pavement.
$137,694.74 Year Completed: 2015
Description:
South Bend Edison Rd LS Access Road Construction. Owner: City of South Bend Board of
Public Works. 174 square yards aggregate #53 6" base depth, 175 square yards geosynthetic
fabric, 175 square yards B borrow 12" depth, adjust casting to grade. $15,659.25 Year
Completed: 2015
Description:
South Bend Geyer Ditch LS Access Road Construction. Owner: City of South Bend Board of
Public Works. Adjust casting to grade, concrete collar, 4,700 square yards compacted aggregate
#53 at 6", 4,700 square yards Geosynthetic fabric. $72,410.00 Year Completed: 2015
Description:
Cassopolis Lift Station #1 Renovation. Owner: Village of Cassopolis. Lift station #1
rehabilitation, restoration, masonry and concrete structure rem, charnfer removal, concrete
surfacing 2", standby generator LS #1. $131,550.00 Year Completed: 2015
Description:
Goshen 321 South 3rd Street Parking Lot. Owner: City of Goshen. Remove 270 square yards
full depth concrete, remove 18 square yards concrete sidewalk, remove existing storm sewer
structure, I IS ton #53 recycled concrete base, 40 linear feet 4" concrete sidewalk, 315 square
yards 6" concrete, landscape restoration. $53,525.53 Year Completed: 2015
Description:
Warsaw Central Park Storm Sewer Cleaning project. Owner City of Warsaw. Install &
remove inflatable plug, clean & video 36" diameter storm sewer, install manhole over existing
storm sewer. $42,050.00 Year Completed: 2015
Description:
South Bend 2015 Curb/Sidewalk Construction Div. B. Owner: City of South Bend Board of
Public Works, IN. Remove 3,000 linear feet curb & 395 square yard sidewalk, 3,000 linear feet
new curb & 395 square yards new sidewalk, remove & replace 11 trees, grade/sod 998 square
yards. $257,718 Year Completed: 2015
Description:
Mishawaka Front St Roundabout Reconstruction. Owner: City of Mishawaka Board of
Public Works, IN. 826 square yards QC/QA PCCP, 581 linear feet concrete curb, 14 square
yards topsoil. S105,701.04 Year Completed: 2015
Description:
LaGrange Dometic Corp Site Improvements Ph II. Owner: Dometic Corporation LaGrange,
IN. 3,739 square feet asphalt repairs, 4,029 square feet asphalt, 3,281 #53 gravel, 38,425 square
feet concrete pavement. $29,218 Year Completed: 2015
Description:
South Bend Chase Plastics Facility. Owner: City of South Bend Board of Public Works, IN.
2,043 linear feet of sanitary sewer, 200 cubic yards "B" borrow, 621 linear feet of storm sewer,
75 ton #53 compact aggregate, 188 square yards concrete sidewalk and approaches. $118,817.40
Year Completed: 2015
Description:
Mishawaka 2015 CDBG ADA Infrastructure Improvements. Owner: City of Mishawaka, IN
Clearning right of way, 3,240 square yards concrete sidewalk, ramp approaches, 2,000 linear feet
concrete curb, 1,253 cubic yards excavation, borrow, topsoil, 88 ton HMA patching, 100 ton #53
compacted aggregate.
Description:
MDOT #123212A Cass County Gumwood Rd to Stateline. Owner: Michigan Department of
Transportation / Cass County, MI. 40 feet Culv, CIA 12", 240 ton aggregate for shared path,
1,23 1 square yards concrete for shared path, 1, 100 feet grading, 1,500 square yards slope
restoration. $74,889.41 Year Completed: 2015
Description:
Goshen Theatre Sewer Repair. Owner: City of Goshen, IN. Clearing of right of way, 20 linear
feet sanitary sewer pipe, 620 ton "B" borrow, 350 cubic yards soil stockpile, 175 square yards
polyethylene sheeting, 30 linear feet concrete curb, 28 ton #53 compacted aggregate, 20 ton
HMA base/surface, 17 ton #73 compacted aggregate, landscape. $30,339.21 Year Completed:
2015
Description:
South Bend Demolition of Abandoned & Vacant Houses Division A. Owner: City of South
Bend, IN. Demolition of 21 houses/garages/sheds/fences, including proper disposal of all
asbestos materials. $396,064.00 Year Completed: 2015
Description:
New Buffalo US 12 Booster Station Reconstruction. Owner: New Buffalo Twp, MI. Pumping,
chlorine equipment, meter valves and piping, building structure, electrical, control system, entry
drive & site work, (2) 4' dia leaching basin, spare chlorination equipment, HMA drive & parking
$470,682.00 Year Completed: 2015
Description:
Elkhart 2014 ADA Curb & Sidewalk Replacement program. Owner: City of Elkhart
Engineering Department, IN. 2917 square yards concrete sidewalk & driveway improvements.
$150,048.51 Year Completed: 2015
Description:
Buchanan Bertrand Twp Foundation Dr. Owner: Saratore Co., Inc. Excavation, CIP Basin
32,000 cubic yards, excavation CIP building pad topsoil strip for embankment areas 5,500 cubic
yards, Excavation, CIP, building pad drive & parking 2,000 cubic yards, excavation CIP road
2,540 cubic yards, berm & swale 625 linear feet, 2,837 ton #22A gravel base, 735 ton #23A
compact aggregate, 2 10 ton #23A gravel for approaches, 4,570 linear feet sewer pipe, 3,650
linear feet concrete curb, gutter, and driveway; 2,082 linear feet water main, 2,865 cubic yards
topsoil and subgrade treatment. $695,238.00 Year Completed: 2015
Description:
Middlebury Water Treatment Plant Upgrades. Owner: Town of Middlebury, IN. 72 linear
feet of 8" ductile iron pipe, Valve & flow meter relocation, 8", 12" butterfly valves $112,681.00
Year Completed: 2015
Description:
Lagrange Dometic Corp Improvements Ph I. Owner: Dometic, Corp, Lagrange, IN. Remove
4,3 25 square yards of asphalt, remove 1,03 5 square yards of concrete, 3 00 . ton of #53 aggregate
base, 225 ton asphalt patching, 3,428 square yards 8" PCCP, 3,715 square yards 10" PCCP.
$29,218.70 Year Completed: 2015
Description:
Mishawaka Ave Improvements Phase I. Owner: City of Mishawaka, IN, Board of Public
Works. Clearing right of way, 6,239 ton hot mix asphalt, 5,266 linear feet concrete curb & gutter,
4,608 square yards concrete sidewalk, 3,273 linear feet storm sewer pipe, 780 linear feet water
main pipe, 7,483 linear feet CIPP sanitary sewer pipe, 710 linear feet 8" SDR 35 sanitary sewer.
$4,128,388.84 Year Completed 2015
Description:
Winona Main Wastewater Pumping Station Replacement. Owner: Town of Winona, IN.
Clearing right of way, 17 linear feet of 8" D.I. force main, 10 1 linear feet 18" PVC sanitary
sewer, 900 GPM Triplex lift station, 210 cubic yards structural backfill. $546,689.00 Year
Completed: 2015
Description
Cassopolis Peavine St. Lift Station Improvement., Owner Village of Cassopolis, Cassopolis,
MI. Renovation of the Peavine Street lift Station, 12" extension for 72" wet well, plugging leaks,
Chamfer removal, new floor in wet well. $45,815.00 Year Completed: 2015
Description:
INDOT R36481A Twin Branch/Vistula Dr. Sidewalk Improvements. Owner IN Dept of
Transportation,, Mishawaka, IN. Sidewalk improvements along Vistula Rd and Elder Street at
the Twin Branch Elementary School. $285,393.12 Year Completed: 2015
Description:
INDOT R33572A, Gumwood Ph II Added Travel Lanes, Bike, and Pedestrian Facilities.
Owner IN Dept of Transportation., Mishawaka, IN. Added travel lanes, bike, and pedestrian
facilities on Gurnwood Rd from Brick Rd to Michigan State Line. Concrete curb, driveways, and
sidewalk/bike paths, retention pond basin, storm sewer, I round about at Gurnwood & Adams
Rds, streetscapes and landscaping. $4,463,899.63 Year Completed: 2015
Description:
INDOT R3029 ' 1A, Gumwood Ph I Added Travel Lanes. Owner IN Dept of Transportation.,
Mishawaka IN. Added travel lanes from Mishawaka Corp limits to Candy Lane, Completed
clearing of right of way, 39,203 cubic yards. 31,996 square yards of subgrade treatment, 1,686
ton of compacted aggregate no. 73, 27,572 ton QC/QA HMA, 260 square yards PCCP, 10,153
square yards concrete sidewalk, 15,207 linear feet concrete curb & gutter, 726 square yards -
PCCP, 25,391 linear feet of sanitary/water main pipe, retention pond basin, water main, I round-
about at Gurnwood & Brick Rds, streetscapes and landscaping $3,819,947.67 Year Completed:
2015
Description:
INDOT R34218A, 12t' St. Added Travel Lanes. Owner IN Dept of Transportation,
Mishawaka, IN. Added travel lanes on 12'h St from Capital Avenue to Blackberry Road.
Completed clearing of right away, 23,366 cubic yards, 4,001 tons of compacted aggregate no. 53,
4,389 square yards of concrete sidewalk, 197 square yards of concrete curb ramp, 11,115 linear
feet of concrete curb & gutter, 1,174 square yards of PCCP for approaches, 16,938 linear feet of
storm pipe $3,707,799.63 Year Completed: 2015
Description:
Fort Wayne Leo Cedarville I'D" RSD. Owner Leo Cedarville Regional Sewer District, Fort
Wayne, IN. Replacement of the existing pump station with new wet wells, valve vaults, pumps,
piping and control panels. $360,,427.69 Year Completed: 2015
Description:
Howard Township Lift Station Upgrade Project. Owner: Howard Township, Niles, MI.
Installed 6 Lift Stations, 10 Arborvitae and various appurtances. $130,415.00 Year Completed:
2014.
Description:
Jefferson Boulevard Streetscape / Main to Eddy Streets. Owner: City of South Bend,
Indiana Department of Public Works. Construction of streetscape project, including
approximately 5500 SY of asphalt, 2300 LF concrete curb, 2650 SY concrete sidewalk, 470 SY
pervious pavers,, Storm sewer structures and 2250 LF storm sewer. Install and replace light pole
assemblies, trees and various plants and signage. $1,603,688.00. Year Completed: 2014.
PART 11 — SECTION I — EXPERIENCE QUESTIONNAIRE
2. Attach a listing of public works projects currently in process of construction by your organization.
. ............... . . .....
Contract Amount Class of Work Expected Name and Address of Owner
Completion Date
k
1EA101rA
Fall 2018 Ci!y of Elkhart (56
Winter 2018 Citv of Elkhart (58
8 Citv of South Bend (590
Fall 201
WIN
. ............... $650.468
Water Main .....
Sp* 2019
...... "n ...... . ........
Indiana -American Water (604)
$158,500
Lift Station
Svrin2 2019
LaGrange CRUD (607)
____$9,�A41.000
WW/Force Main
Fall 2019 ..-.—.—..Steuben
—
Lakes RSD (6 10)
$ . 1,836.231
WW Collection System
Fall 2019 -
LaPot-te County RSC (611)
SECTION 11 - PLAN AND EQUIPMENT QUESTIONNAIRE
2. JSUBCONTRAcTORS LIST WORK PERFORMED:
Bailey Aggregates Aggregate Trucking
12609 Indianapolis Rd
Yoder, IN 46798-9733
Brusky Construction Aggregate Trucking
70569 Elizabeth St
Niles, MI 49120
V & R Trucking Aggregate Trucking
1845 Elmer St
South Bend, IN46628
Niblock Excavating, Inc. Asphalt Construction
PO Box 211
Bristol, IN 46507
Rieth-Riley Construction Co., Inc. Asphalt Construction
PO Box 477
Goshen, IN 46527-0477
Walsh & Kelly, Inc. Asphalt Construction
1700 E. Main St.
Griffith, IN 46319-2999
Michigan Paving & Materials Co. Asphalt Construction
2300 Gendenning
Kalamazoo, MI 49003
Baker Corporation ByPass Pump Rental
2205 E. Lincoln Hwy
Chicago, IL 60411
Concrete Sawing & Coring, LLC Concrete Coring Cutting
PO Box 907
Niles, MI 49120
Abonmarche Consultants, LLC. Construction Engineering
750 Lincolnway East
South Bend, IN 46601
SUBCONTRACTOR LIST WORK PERFORMED
Acorn Landscaping, LLC Landscape/Restoration
24930 Kern Rd.
South Bend, IN 46614-9787
Fuerbringer Landscaping & Design, Inc. Landscape/Restoration
25530 Brick Road
South Bend, IN 46628
Slussers Green Thumb, Inc. Landscape/Restoration
PO Box 33
Logansport, IN 46947-0033
Turf Services Landscape/Restoration
57780 Sink Road
Dowagiac, MI 49047
Ferguson Waterworks # 1934 Lift Station Installation
1077 Oliver Plow Ct
South Bend, IN 46601
Best Sweeping Specialists, Inc. Road Sweeping/Dust Control
632 S. Sixth Street
Goshen IN 46526
A-1 Striping Service, Inc. Road Striping
56825 Spirea Rd.
New Carlisle, IN 46552
The Airmarking Co., Inc. Road Striping
1544 North State Road 25
Rochester, IN 46975
Michiana Contracting, Inc. Traffic Signal Work
PO Box 929
Plymouth, IN 46563
Rathco Traffic Control
6742 Lovers Lane
Portage, MI 49002
Give 'Em A Brake Traffic Control
2610 Sanford Ave
Grandville, MI 49418
3
"Attachment
4. List references of private firms for which you have performed work.
Environmental Restoration
1668 Fabrick Drive
St. Louis, MO 63026
Siemens Medical Solutions Diagnostics
Mr. Tom Lienczewski
3400 Middlebury Street
Elkhart, IN 46516
South Bend Orthopedics
Elm Road Medical Campus
53880 Carmichael Drive
South Bend, IN 46635
Brandywine Community Schools
John H. Jarpe, Ed. D., Superintendent
1830 S. Third Street
Niles, MI 49120
Gateway Development
Mr. Dan Brekke
56199 Parkway Ave., Suite I
Elkhart, IN 46516
Palisades Park Country Club
79336 Ravine Way
Covert, MI 49043
Jimmerson Shores Cooperative
4508 Denali Cove
Ft. Wayne, IN 46845
Remington Park Subdivision
Wagner Land Development
3325 Middlebury
Elkhart, IN 46516
Augustine Lakes Subdivision
c/o Miller Builders
PO Box 229
Granger, IN 41530
Geocel Holding Corporation
PO Box 398
Elkhart, IN 46516
AM General
Rolland Miller
13200 McKinley Highway
Mishawaka, IN 46545
Noble Americas South Bend Ethanol
3201 W. Calvert Street
South Bend, IN 46613
Dometic Corporation
Glenn Kimmerly
509 S. Poplar Street
LaGrange, IN 46761
Notre Dame Federal Credit Union
Bob Green
PO Box 7818
Notre Dame, IN 46556
Arbor Lakes Apartments
Edward Rose Development
6100 Newport Rd
Kalamazoo, ml 49003
Chicago Trail Farms
Robert L. Runkle
27551 US 12
Edwarclsburg, MI 49112
Flaherty & Collins
Art Smith
One Indiana Square, Suite 3000
Indianapolis, IN 46204
Aeroplex
FM Stone Real Estate
421 S. Second St.
Elkhart, IN 46516
ENGINEERING REFERENCES
Selge Construction
Rich Zielinski
317-547-5580
American Structurepoint
7260 Shadeland Station, Suite 100
Indianapolis, IN 46256
Jeremy Roschyk
574-288-4580
Donahue & Associates
100 N. Michigan, Ste 510
South Bend, IN 46601
Andy Lemberis
574-236-4400
DLZ Indiana, LLC
2211 East Jefferson Blvd.
South Bend, IN 46615
Paul Hummel
574-234-3167
Lawson Fisher Associates, P.C.
525 West Washington Avenue
South Bend, IN 46601
John Olsen
269-428-4424
Merritt Engineering, Inc.
4568 Red Arrow Highway
Stevensville, MI 49127
Rick Keller
574-272-3525
Keller Engineering, Inc.
54365 30th Street
South Bend, IN 46635
Kenneth Jones
574-293-7762
Jones, Petrie, Rafinski, Inc.
200 Nibco Parkway Dr
Elkhart, IN 46516
Matt Davis
269-927-0100
Wightman and Associates, Inc,
2303 Pipestone Road
Benton Harbor, Ml 49022
Jason Durr
574-282-8001
Christopher B. Burke Engineering, LLC
220 West Colfax Avenue, Suite 500
South Bend, IN 46601
John Linn
574-232-8700
Abonmarche Consultants of IN, Inc.
750 Lincolnway East
South Bend, IN 46601
David Harvey
Fleis & Vanderbrink Engineering, Inc.
2960 Lucerne Drive, S.E.
Grand Rapids, MI 49546
Selge Construction Co., Inc.
SECTION 11 - PLAN AND EQUIPMENT QUESTIONNAIRE
4. What equipment do you have available to use for the proposed project?
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YEAR
1
CATERPILLAR HYD. EXCAVATOR MODEL 325L
1994
1
CATERPILLAR HYD EXCAVATOR MODEL 330L 3CY
1994
1
KOEHRING 6644 HYD. EXCAVATOR 3 1/2 YD,
1988
1
KOEHRING 866 HYD. BACK HOE 4 YD,
1979
2
KOEHRING 505 HYD. BACK HOE 2 1/2 YD�
1969&70
1
BANTAM TRUCK CRANE
1
JOHN DEERE 455G CRAWLER LOADER
1989
3
RUBBER TIRE LOADERS 2 1/2 TO 5 YD. MACHINES
1
JOHN DEERE 544 RUBBER TIRE LOADERS
1990
1
JOHN DEERE 624G LOADER 3 1/2 YD,
1994
1
JOHN DEERE 570A ROAD GRADER
1980
1
INTERNATIONAL T.D. DOZER
1972
1
CATERPILLAR D5C DOZER
1992
1
CATERPILLAR D4C DOZER SERIES 3
1979
1
FORD F800 UTILITY TRAILER WITH HI RANGER
1985
1
MACK CL713 DUMP TRUCK
1996
1
MACK CL713 TRACTOR
1997
1
FERGUSON TANDEM DRUM VIBRATOR ROLLER
1979
1
FORD TRACTOR MODEL LN 8000
1993
1
MACK RD68 TRACTOR
1996
1
FORD F800 DUMP TRUCK
1998
1
MACK DUMP TRUCK MODEL GU813
2015
PAGE 3 - SECTION 11, PLAN AND EQUIPMENT QUESTIONNAIRE
QUANTITY
DESCRIPTION AND CAPACITY OF ITEMS
YEAR
1
NPK 8XA HYDRAULIC HAMMER
1998
1
EX750 - HITACHI EXCAVATOR
1998
1
FELCO VIBRATORY COMPACTOR BUCKET
1998
1
JCB 411 TOOL CARRIER, WITH FORKS
1998
1
DITCH WITCH JET TRAC MODEL 920L W/ MUD MIXER, SUBSI
1999
1
ROSCO RB48 SWEEPER, WITH SNOW PLOW
1999
1
STERLING L8513 DUMP TRUCK
1999
1
920L DITCH WITCH DIRECTION BORE SYSTEM
1999
1
FREIGHTLINER FL80 DUMP TRUCK
2000
1
FREIGHTLINER FL1 12 DUMP TRUCK
2000
1
PMD 800 VAC-TRON VACUUM
2000
1
VERMEER T-555 TRACK TRENCHER
2000
1
DITCH WITCH JT7020 BORING UNIT
2000
1
MCS-325 PORTABLE BENTONITE MIXING & RECYCLING SYS-
2000
1
VOLVO L70D WHEEL LOADER
2000
1
CATERPILLAR 930 WHEEL LOADER
2000
1
KOMATSU WA250-3 WHEEL LOADER
2001
1
KOMATSU WA120-3 WHEEL LOADER
2001
1
EASI-POUR COMPACT 880 SLIPFORM TRIMMER/PAVER
2001
INCLUDES FORMS AND CONCRETE TOOLS
1
KOMATSU PC128US -2 006487 EXCAVATOR
2001
1
KOMATSU PC228US LC-3 020533 EXCAVATOR
2001
1
BLAW-KNOX RW 195 ROAD WIDNER
1970
1
CHAMPION 730A VHP MOTOR GRADER
1999
1
BOBCAT SKID STEER LOADER, MODEL 773K
2001
1
TREMIX COMPACTOR MODEL MV80
2001
PAGE 5 - SECTION 11, PLAN AND EQUIPMENT QUESTIONNAIRE
QUANTITY DESCRIPTION AND CAPACITY OF ITEMS YEAR
2 DITCH WITCH VAC SYSTEM WfTRAILER
2006
1 ROADTEC RX700-4 MILLING MACHINE
2006
1 IHI IC30-2 CRAWLER CARRIER
2006
1 JOHN DEERE 450D EXCAVATOR
2006
1 INTERNATIONAL 4900 6 X 6 WATER TRUCK
1998
1 CATERPILLAR 328D EXCAVATOR
2007
1 CATERPILLAR 321CLCR EXCAVATOR
2007
1 CATERPILLAR 314 CLCR EXCAVATOR
2007
1 YANMAR V1075 EXCAVATOR
2008
1 MR MANHOLE CUTTER EXTRACTOR & AUGER
2008
1 INGERSOLL RAND VIBRATORY COMPACTOR SD100D
2008
1 12" - 36" BUTT FUSION MACHINE
2009
1 VERMEER D100 X 120 NAVIGATOR W. ATTACHMENTS
2009
1 CATERPILLAR CH 85E TRACTOR
2010
2 ROME SCRAPER PANS
2010
1 KOMATSU PC49OLC-10 EXCAVATOR
2012
1 KOMATSU PC39OLC-10 EXCAVATOR
2012
1 JOHN DEERE 700K DOZER
2012
1 JOHN DEERE 650K DOZER
2012
3 JOHN DEERE 544K LOADERS
2012
2 MOVAX-SP60 HAMMERS
2013
1 ISCO FUSION MACHINE
2014
2 JOHN DEERE 245 LC EXCAVATOR
2014
1 JOHN DEERE 544K 4WD LOADER
2014
3
1. What public works projects has your organization completed for the period of five (5) years prior to the date of the current bid?
CONTRACT
WHEN
NAME AND ADDRESS
AMOUNT
CLASS OF WORK
COMPLETED
. . ................. . . .. OF OWNER
$1,490,854,00
WATER MAIN
2016
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618
$257,71800
CURB & SIDEWALK RENOVATIONS
2016
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD, SOUTH BEND, IN 46601 -574-235-9216
$257,718.00
SEWER CLEANOUT
2016
CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581 - 574-372-9545+
$1,218,351,00
FORCE MAIN IMPROVEMENTS
2016
SYRACUSE TURKEY CREEK RSD FORCE MAIN
$611,106.00
WASTEWATER LIFT STATION
2016
CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN, IN
$53,525.00
PARKING LOT IMPROVEMENTS
2016
CITY OF GOSHEN, 220 S. MAIN ST., GOSHEN, IN
$1,818,027.95
STORM SEWER SYSTEM IMPROVEMENTS
2016
SOUTH BEND NOBLE AMERICAS ETHANOL PLANT
$131,55000
LIFT STATION RENOVATION
2016
VILLAGE OF CASSOPOLIS 1 117 S, BROADWAY, CASSOPOLIS. MI 49031
$510,690,00
WASTEWATER TREATMENT LAGOON
2016
DOWAGIAC POKAGON BAND RODGERS LAKE
$64,000,00
ADA RAMP INSTALLATION
2016
CITY OF GOSHEN, 220 S MAIN ST., GOSHEN, IN
$72,410.00
ACCESS ROADWAY IMPROVEMENTS
2016
CITY OF SOUTH BEND 227 W. JEFFERSON BLVD., SOUTH BEND. IN 46601 -574-235-9216
$15,660.00
ACCESS ROADWAY IMPROVEMENTS
2016
CITY OF SOUTH BEND 227 W JEFFERSON BLVD, SOUTH BEND, IN 46601 -574-235-9216
$161,100,00
SANITARY SEWER POND REPAIR
2016
SOUTH BEND NOBLE AMERICAS ETHANOL PLANT - UPV
$137,695.00
STORM SEWER IMPROVEMENTS
2016
SOUTH BEND PRECISION WALL SYSTEMS STORM SEWER & LOT
$365,881.00
SANITARY SEWER IMPROVEMENTS
2016
SOUTH BEND ETHANOL SANITARY SEWER
$80,000.00
SNOW PLOWING
2016
SOUTH BEND / MISHAWAKA MEIJER STORE SNOW PLOWING
$96.694.00
NORTH AREA SITE IMPROVEMENTS
2016
LAGRANGE DOMETIC III
$92,81500
SEWER IMPROVEMENTS
2016
NILES 2016 SEWER IMPROVEMENTS
$62.590.00
MANHOLE REPAIRS
2016
NILES TWP MANHOLE REPAIRS, BELL ROAD, NILES MI 49120
$167,850,00
SANITARY SEWER IMPROVEMENTS
2016
SOUTH BEND I/N TEK I/N KOTE SANITARY SEWER
$14,435.00
ADA PARKING LOT IMPROVEMENTS
2016
CITY OF SOUTH BEND / 227 W, JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216
$143,73000
CONCRETE APRON EXPANSION
2016
ELKHART INDIANA FLIGHT CENTER
$299,880.29
SIDEWALK PROJECT
2016
TOWN OF MIDDLEBURY / 418N MAIN, MIDDLEBURY, IN /574-825-1499
$166,333.00
LOT DRAINAGE/EROSION PROTECTION
2016
SOUTH BEND ST. PAUL'S ASSISTED LIVING CENTER PARKING LOT
$100,970.00
WATER VALVE REPLACEMENT
2016
MISHAWAKA BODINE STATE PARK FISH HATCHERY
$55,000.00
PARKING LOT IMPROVEMENTS
2017
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD,, SOUTH BEND, IN 46601 -574-235-9216
$2,071.944,00
WASTEWATER COLLECTION SYSTEM
2017
TOWN OF NORTH WEBSTER, PO BOX 95, NO. WEBSTER, IN 46555
$635.773,00
ROAD AND SIDEWALK
2017
CITY OF STURGIS, 130 N. NOTTAWA ST,, STURGIS, MI 49091
$362,165.00
WTP BACKWASH PUMP STATION
2017
TOWN OF MIDDLEBURY, 418 N. MAIN ST., MIDDLEBURY, IN 46540
$126,000.00
SEWER AND PARKING LOT REPAIR
2017
SOUTH BEND CLINIC, 211 N, EDDY ST., SOUTH BEND, IN
$1.652,481.00
LIFT STATION & FORCEMAIN
2017
VILLAGE OF PAW PAW, 111 E MICHIGAN, PAW PAW, MI 49079
$4,655,327.00
SANITARY & WATER IMPROVEMENTS
2017
TOWN OF NEW CARLISLE/ PO BOX 6, NEW CARLISLE, IN 46552 / 574-654-3733
$981.453.00
LINDEN LTCP PHASE 11
2017
CITY OF MISHAWAKA / 600 E 3RD ST., MISHAWAKA, IN 46545 - 574-258-1618
$62,785.00
FORCEMAiN
2017
CITY OF ELKHART / 229 S, 2ND ST-, ELKHART, IN 46516 574-294-5471
$8,434,889 00
SOLAR POWER INSTALLATION
2017
SPARVAN PVVINOVATEUS SOLAR / MICHIGAN STATE UNIVERSITY
$197.24000
OSBORNE STORM WATER PUMP STATION
2017
CITY OF WARSAW / PO BOX 817, WARSAW, IN 46581 - 574-372-9545+
$2,860,242 00
WESTERN AVE STREET/SIDEWALK
2017
CITY OF SOUTH BEND / 227 W. JEFFERSON BLVD., SOUTH BEND, IN 46601 -574-235-9216
$23,865.00
ADA RR PARKING LOT AND WALKS
2017
CITY OF ELKHART / 229 S. 2ND ST., ELKHART, IN 46516 574-294-5471
$1,316,160.00
WW COLLECTION SYSTEM
2017
VILLAGE OF CASSOPOLIS / 117 S BROADWAY, CASSOPOLIS, MI 49031
$1,273,288,00
DRAIN / CREEK
2017
NEW BUFFALO TWP/ 17655 CLAY ST.. NEW BUFFALO. MI 49117