Loading...
HomeMy WebLinkAboutOpening of Bids - Sewer and Manhole Rehabilitation Project No 118-093 - Inland Waters Pollution Control IncCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK , . 1865 Project Name Sewer and Manhole Rehabilitation ProjectNo. 118-093 __.__.......... w.ww....m............................�..�................................�_Y _.,,-........ For Bids Due December 11, 2018 .. ................. .......... PART I (Must be completed for all bids. Please type or print) Date: December 1 L IT2018 Bidder (Firm)° Inland Waters Pollution Control, Inc. Address: 4086 Michigan Avenue City/State/Zip: .Detroit MI 48210 Telephone Number: (313 ) 899-3014 Agent of Bidder (if Applicable) Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Sewer and Manhole Rehabilitation Project #118-093 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: VS Engineering, Inc. and dated November 2018 for the sum of (enter the Total Bid as shown on the Proposal) ( um of Totarbase Bid plus Alternates shownm�F�5Ziosa$�4,aj 4 on(Numerical) The undersigned further agrees to furnish a bond or certified check with this bid f'or a amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a tta hment. B unit basis, the itemization of the units shall be shown on a�epaale., tiga"natur 61 �ITJamee Bedingfield ss ant Secretary (Printed Name of Person Signing) The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member ACCEPTANCE day of Suzanna M. Fritzberg, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 7/20/2018 Contractor's Bid for Public Works - 2 20 BID/PROPOSAL CITY OF SOUTH BEND Project Name Sewer and Manhole Rehabilitation Project No. 118_w._.�. ._..�� ....�. 093 For Bids Due December 11`", 2018 Manhole Lining Method: Madewell Mainsta Corp vsite Liner Mainline Sewer Lining Method: Invert -A -Pi a CIPP Base Bid (CSO 018) Version 7/20/2018 Contractors Bid For Public Work — 8A Ni Y • 0 0 )0 Base Bid Total L , 90 ADDENDUM #3 12/06/2018 Alternate to A -CT (CSO 018 and Miscellaneous Areas) Alt. Description Quantity Unit Unit Price Total Amount Pipe Rehabilitation Pipe ID:005177 299 LFT B Manhole Rehabilitation MHO 0018C0002015 C T 72 Pipe Rehabilitation— Pipe 10 507LF 005178 " $ D $r Q D _.. ...._ . M D Manhole Rehabilitation MH ID: 001BC00015 7 ...""" VFT $ " habilitation Pipe 0 005270 285 LFT $ $ O 72 Pipe Re """. F 72 Pipe Rehabilitation Pipe ID 005179` __.m.. 247 V TIT $ 7 $ q 1 ' 0O G ManholeRehatil`wtatioii AID00rv18C000'10 $ P P ha lion — Pipe , 001 BC0 0...... ....— .�.. .16 � VFT $ � �'l S C $ H 72" Pipe RehabilitationLFT too I Manhole Rehabilitation —MH ID 0018C00005 207 „ J 72 Pipe Rehabilitation Pipe ID 005181 FT $ �A67 n .. Rehabilitation ID 0006C05020 15 VFT 67 L L 2Rehabilitation — Pipe ID1 Manhole Pipe : 0089m ._ e. 6 307 LFT $�-'�����,��"�.m.., O N 2 Phol Rehabilitation —Pipe HD.0 000 089 15 _...� 15 VFT " P_ 322 LFT $ !�1 A J— $� m39el- 0 P ., Manhole - .._ .__�1�� 15._......._ VFT $ � i< .2 3 O Manhole Rehabilitation MH D 00�0 03CO0900 13 VFT $ 5 $ Q" Manhole Rehabilitation MH IDw 0003CO0945 13 m„ VFT mm$mm f m 5 . " habilitation — Pipe ID 003337 376 LFT (� jad S.. Manhole Re �.,.�,," R Pipe Re �. � 3C00940 13 VFT $ � $ � � �. S m Rehabilitation MH ID: 0003CO0920 19 VFT T Manhole Rehabilitation MH ID: 000 U Pipe Rehabilitation Pipe ID: 004703 _ _...324 _ LFT $ • �t� V Manhole Rehabilitation — MH ID: 0003CO0065 13 VFT $ i $ ! S7` o W 12Pipe Rehabilitation Pipe ID 003492 340 LFT $ 00 $ L O X Manhole Rehabilitation — MH ID 0006S01700 11 VFT Y Manhole Rehabilitation MH ID 0006S01680 13 Z Manhole Rehabilitation — MH ID 00066C05840 13 VFT AA Manhole Rehabilitation MH ID: 0006C05835 14 —AB Manhole Rehabilitation ITmmMH ID: 0006C05830 15�m VFT mm VFT $ ` 1 $ YI O�` C $ AC....� 12p Pi a Rehabilitation Pipe ID0088510 U_ . _... 176� " LFTww $ " $ 0 AD P P AE 12 Pipe Rehabilitation Pie ID: 00885 194 LFT $ 1� $ $ P P 13 VFT $ �� YL4 7 Manhole Rehabilitation MH ID. 0011 BC00965 ."_ W� �IT . b AF Manhole Rehabilitation — MH ID: 6022CO1595 8 VFT $ Sa $ AH Manhole Rehabilitation MH ID 0022C01505 13 VFT $3� •S $ !O �� .. " nation Pipe ID 005525 Sty 7 Sb AG Al Manhole Rehabilitation — MH ID: 0018S09605 10 VFT. ...$ Ai 12" Pipe Rehabilitation Pi ID: 005282 AK Manhole Rehabilitation — MH ID. 0018S01600 11 VFT $,+?, P Pe 231 LFT I �. , 44 2 Version 7/20/2018 Contractors Bid for Public Work — 8B ADDENDUM #3 12/06/2018 16 P ..�..�.._.� � — 3VFT � 317•w5..- ® Pipe Rehabilitation — Pipe ID: 007632 38 LFT $ � AManholeRehabilitation — MH ID: 0006C07100 AN Manhole Rehabilitation — MH ID: 0006CO2125 11 VFT $� $ AM 10 AO Manhole Rehabilitation — MH ID: 13 VFT AP m w10" Pipe Rehabilitation on — Pipe ID: 007932 _ 43 LFT ...w$u 9-1 � A — YIO .. AQRManhole Rehabilitation 1D 0003S05755 13 VFT .... � � ' 12 Pipe Rehabilitation — Pipe ID 007842 169 LFT_ jq° q - � $q Sz AS *ipeRehabilitation —Pipe 1D 007841 185 LFT. AT Manhole Rehabilitation MH ID 0003S08370 13 SD AV Maole Rehabilitation — MH ID: 0003 0�6360 13 VFT $ L nh ... �......av AX Manhole Rehabilitation — MH ID: 0003SO6355 .. .mm .... 1 p _V $ ( t gl S AW 12" Pipe RehabilitationPipe ID: 007840 287 LFT $ $ Fr AY 12" Pipe Rehabilitation —Pipe ID: 007839 — 257 LFT $ �� $((� j s AZ Manhole Rehabilitation MH ID: 0003SO6350 10VFr$ 5 ww �_�" BA 12" Pipe Rehabilitation Pipe ID: 007838 185 LFT Manhole Rehabilitation l0S06315— ... LFr BC OPipe 41$ 57 $ 2 -7 BID _itat . — � 13 VFT � .. m �_ eW p Pipe ID: 007830 211 LFT $ BE Manhole Rehabilitation — MH ID: 0003SO6310 13w ..._ P $ 17 $ I,7 .,..M. 193 LFT ww$� $„ w � mm— BF 12 Pi a Rehabilitation — Pipe ID: 007829 BG Manhole Rehabilitation — MH ID: 0003SO6 305 9 VFT $3l Ju ..µ on — Pipe ID: 00782iF s� r i BH Manhole RehabilitFT ation on MH ID 0003S06300 192 WLVFT $ � � I , BJ 12 Pipe Rehabilitation -- Pe 0_0206 ..LFT $ PMHID::0.003S06295._— — BK Manhole Rehabilitation—VFT � iCi • o .... W�-..p .� w.M� ..w TM—m13 VFT $31']✓ 5 ....I�� BL 12 Pipe Rehabilitation — Pipe ID: 007826 195 LFT_ $ 003SO6292 5 17 ,--7 . P ._ Rehabilitation MH ID 007825 � BM Manhole e a � Rehabilitation Pipe ID ....... _... . w. a _.. . SV BO Manhole Rehabilitation — MH ID 0003SO6290 13 VFT BN 2 Pipe Rehabilit BP.._ _ 10" Pipe Rehabilitation — Pipe ID: 007776 208 LFT $ 3 $ BO Manhole Rehabilitation— MH ID: 0003806740 8 VFT $3 Q 01 —... _ —w _ _.__ . w�� BSIT Manhole Rehabilitation MH ID: 0003S06210 13 VFT $ �r � $� d10 BR Manhole Rehabilitation MH ID 0003S00335 12 VFTt m 17" $ I 291 LFT $ Al $� !.... BU Manhole Rehabilitation MH ID: 0003S06� — BTPipe Rehabilitation P ID 007816 BV Manhole Rehabilitation — MH ID: 0003S06175 15 VFT I ......... .. ... .... (� BX Manhole Rehabilitation iMH ID:IT0003S06170ri3 5 VFT $mti'5° Manhole Rehabilitation — MH ID: 0003SO5035 VFT $ BY __ ..... _.._ ADDENDUM #3 12/06/2018 Version 7/20/2018 Contractors Bid for Public Work — 8C BZ ..--.............................. W—W—.._ 10" Pipe Rehabilitation —Pipe ID: 009053 ... _ ........ 139 LIFT $ $ CA Manhole Rehabilitation — MH ID: 0003SO5010 11 VFT $ 17 $ * ° CB Manhole Rehabilitation— MH ID: 0003SO4990 9 VFT $ $ -M CC 10" Pipe Rehabilitation — Pipe ID: 009044 201 LFT $ y $ $ CD Manhole Rehabilitation — MH ID: 0003SO4970 10 VFT $ $ Jr CE Manhole Rehabilitation — MH ID: 0003SO4640 13 VFT $ / 2 S° $ CIF 12" Pipe Rehabilitation — Pipe ID: 018948 210 LIFT $ $OU CG Manhole Rehabilitation — MH ID: 13300 13 VFT $ CH 12" Pipe Rehabilitation — Pipe ID: 018949 322 LIFT $ $ �32 Cl 12" Pipe Rehabilitation — Pipe ID: 018950 289 LIFT $ °" $ S CJ Manhole Rehabilitation — MH ID: 13301 13 VFT $ 3/� $ ..2 CK Manhole Rehabilitation — MH ID: 0003SO4510 13 VFT $ '30 $ CL Manhole Rehabilitation — MH ID: 0006C07295 13 VFT ............. $ 313� CM Manhole Rehabilitation — MH ID: 0006C00717 10 VFT $_31 $ 31 xfo CN Manhole Rehabilitation — MH ID: 0006C00695 10 VFT $ 1 ? $ CO Point Repair 1 —Figure #12 1 LS $ 3 $ So CP Point Repair 2 — Figure #29 1 LS $ %3 $ 73S f • .................... CQ Point Repair 3 — Figure #41 1 LS $ S%S2 $ CR Invert Repair, Shotcrete 20 CYD $ z7g $ �9 CS Invert Repair, Reinforcement 10 TON CT Injection Grout 1000 GAL $ $ ppa Bidder: Inland Waters Pollution Control, Inc. Address: 4086 Michigan Avenue City/State/Zip: Detroit MI 48210 Alternate A -CT Bid Total Base Bid Total $ Total of all Alternates $ Base Bid + Alternates Total Telephone Number: 313 899-3014 By (Signa Jamee Bedwpgf ff!d / Assistant Secreta!y (Printed Name of Person Signing) ADDENDUM #3 12/06/2018 Version 7/20/2018 Contractors Bid for Public Work — 8D PART II (For projects of $100,000 or more - IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/20/2018 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Georgia ) ) SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 7/20/2018 Contractor's Bid for Public Works - 5 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify. Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that Version 7/20/2018 Contractor's Bid for Public Works - 6 violations hereunder may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. lOth December 18 Dated this day of , 20 Inland Waters Pollution C ontr�'ol„ 1 �tc. _ ......._ l rrr'liddor'l -rn) e of Contractor/ actor/ � r Its Agent Jamee Bedin field / Assistant Secretary Printed Name and Title Subscribed and sworn to before me this I oth da of Jgem 20 t My Commission Expires 2 d2 I Nota ublic County of Residence ` Q ypX',iNKMbYIN MIRES ®LOII/1 ON .10 21121 co Version 7/20/2018 Contractor's Bid for Public Works - 7 Document 1 310 TM - 2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: (Name, legal status and address) Inland Waters Pollution Control, Inc 4086 Michigan Avenue Detroit, MI 48210 OWNER: (Nance, legal stales and address) City of South Bend 227 West Jefferson Blvd South Bend, IN 46601 SURETY: (Name, legal status and pr fnciped place e f hueiness ) Arch Insurance Company Harborside 3, 210 Hudson Street Suite 300 Jersey City, NJ 07311-1107 Mailing Address for Notices 3 Parkway, Ste 1500 Philadelphia, PA 19102 BOND AMOUNT: 5% Five Percent of Amount Bid PROJECT: (,'Fame, location oraddress. aud)'rojecruumber, ifartw% Sewer and Manhole Rehabilitation - Project No. 118-093 This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are booed to Iltc Owner in the amount set fortis above, for (lie payancrlt of which tiro Contractor and Surety bind. themselves, their heirs, xccwilors, adrniaaislrators, successors and assigns, jointly and severally„ as provided licrc'ita. Ttae coaaditions of this Bond arc sliest that if the Owileraccepts the bid of the Contractor within the time spceiricd in the bid documents, or within such tittte period as ntny be agreed to by the Owwiwr and Contractor, and the Conlractorcillocr(1) enters into a contract with the Owner in accordance +wifh the terns of such bid, and gives such bond or bonds as ntay be specified in the bidding or Contract Documents„ with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful porl"ormance of such Contract and for the prompt payment of labor and material funtished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perlbrna the wort: covered by said bid, then this obligation shall be null and void, otherwise to remain in full liorce and ell'ect. The Surety hereby waives any notice ofatta agreement betwweela the Owner and Contractor to extend the time in which the Owner may accept the bird, Waiver col"nootice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the lime liar acceptance aof`bads speciled in the bid documents, and the Owvnerand Contractor shall obtain the Surety's consent liar an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the toms Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location ol'the Project. any provision in this Bond conflicting with.said statutory or legal requirement shall be deemed deleted herel'teona and provisions cloaalbrrloing to such statutory or other legal requirement shall be deemed incorporated herein. When so furnisbed, the intent is that this Bond shall be construed as a statutory bond and not as a connnon law bond. Signed and scaled this 3rd day of December, 2018. Arita Otur-ll r VIA aaaw.w;) lane oras i S•0054/AS 8/10 Inland Waters Pollution Control, Inc. a'lorirtclp (�ritrar!) By ' 17t('I (goArch Insurance Corn anyBy.(n11L)Vi dria P. Par<erson, Attorney -in -Fact SURPATH 2O17 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Not valid for Note, Loan, Letter of Credit, Currency Rate, Interest Rate or Residential Value Guarantees. POWER OF ATTORNEY Know All Persons By These Presents: That the Arch Insurance Company, a corporation organized and existing under the laws of the State of Missouri, having its principal administrative office in Jersey City, New Jersey (hereinafter referred to as the "Company") does hereby appoint: Victoria P. Parkerson its true and lawful Attorney- in -Fact, to make, execute, seal, and deliver from the date of issuance of this power for and on its behalf as surety, and as its act and deed: Any and all bonds, undertakings, recognizances and other surety obligations. Surety Bond Number: Bid Bond Principal: Inland Waters Pollution Control, Inc. Obligee: City of South Bend This authority does not permit the same obligation to be split into two or more bonds In order to bring each such bond within the dollar limit of authority as set forth herein. The execution of such bonds, undertakings, recognizances and other surety obligations in pursuance of these presents shall be as binding upon the said Company as fully and amply to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at its principal administrative office in Jersey City, New Jersey. This Power of Attorney is executed by authority of resolutions adopted by unanimous consent of the Board of Directors of the Company on September 15, 2011, true and accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned Secretary as being in full force and effect: "VOTED, That the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President, of the Surety Business Division, or their appointees designated in writing and filed with the Secretary, or the Secretary shall have the power and authority to appoint agents and attorneys -in -fact, and to authorize them subject to the limitations set forth in their respective powers of attorney, to execute on behalf of the Company, and attach the seal of the Company thereto, bonds, undertakings, recognizances and other surety obligations obligatory in the nature thereof, and any such officers of the Company may appoint agents for acceptance of process." This Power of Attorney is signed, sealed and certified by facsimile under and by authority of the following resolution adopted by the unanimous consent of the Board of Directors of the Company on September 15, 2011: VOTED, That the signature of the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President, of the Surety Business Division, or their appointees designated in writing and filed with the Secretary, and the signature of the Secretary, the seal of the Company, and certifications by the Secretary, may be affixed by facsimile on any power of attorney or bond executed pursuant to the resolution adopted by the Board of Directors on September 15, 2011, and any such power so executed, sealed and certified with respect to any bond or undertaking to which it is attached, shall continue to be valid and binding upon the Company. OOML0013 00 03 03 Page 1 of 2 Printed in U.S.A. SURPATH 2O17 In Testimony Whereof, the Company has caused this instrument to be signed and its corporate seal to be affixed by their authorized officers, this 28th day of September 2017 Attested and Certified CORPORATE SEAL _76141�w 1 1971 Patrick K. Nails, Secretary Missouri STATE OF PENNSYLVANIA SS COUNTY OF PHILADELPHIA SS Arch Insurance Company PIA•-- -� y David M. Finkelstein, Executive Vice President I, Michele Tripodi, a Notary Public, do hereby certify that Patrick K. Nails and David M. Finkelstein personally known to me to be the same persons whose names are respectively as Secretary and Executive Vice President of the Arch Insurance Company, a Corporation organized and existing under the laws of the State of Missouri, subscribed to the foregoing instrument, appeared before me this day in person and severally acknowledged that they being thereunto duly authorized signed, sealed with the corporate seal and delivered the said instrument as the free and voluntary act of said corporation and as their own free and voluntary acts for the uses and purposes therein set forth. COMMONMALTH CF PENNSYLVANLAL NOTARIAL SEAL A11CHELE 7RIP0010 Not;uyPt"Ic CIty61Ph&tAde01z,Ph1tA.,. sty My ca=lulon EXPIfe1juty St, 242t CERTIFICATION w Michele Tripodi, Notary Public My commission expires 07/31/2021 I, Patrick K. Nails , Secretary of the Arch Insurance Company, do hereby certify that the attached Power of Attorney dated September 28, 2017 on behalf of the person(s) as listed above is a true and correct copy and that the same has been in full force and effect since the date thereof and is in full force and effect on the date of this certificate; and I do further certify that the said David M. Finkelstein, who executed the Power of Attorney as Executive Vice President, was on the date of execution of the attached Power of Attorney the duly elected Executive Vice President of the Arch Insurance Company. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the Arch Insurance Company on this 3rd day of, December , 2018 Patrick K. Nails, Secretary This Power of Attorney limits the acts of those named therein to the bonds and undertakings specifically named therein and they have no authority to bind the Company except in the manner and to the extent herein stated. PLEASE SEND ALL CLAIM INQUIRIES RELATING TO THIS BOND TO THE FOLLOWING ADDRESS: Arch Insurance —Surety Division 3 Parkway, Suite 1500 cMissourl Philadelphia, PA 19102 OOMLOO13 00 03 03 Page 2 of 2 Printed in U.S.A. 1.316 C01 NTY ('[*T N' EtUILIANG 227 W. JEFFERSON IBM I EVARD SOUTH BEND, INTXAN,, 46601..1 O 8 865 I't1ONF 574/235-9251 FAX 574/235-9171 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: December 71h, 2018 To: All Planholders ........................ ............ -............ From: Linda M. Martin, Clerk, Board of Public Works ..............__.... _ .._.._ Subject: Addendum Number: 4 Project Name: Sewer and Manhole Rehabilitation Project Number: 118-093 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received:. This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Compa Author Dater Version 4/2/2015 Sewer and Manhole Rehabilitation (118-093) Addendum Number: 4 — December 7th, 2018 1.:316Ccmirry-Crry Ci3LlaLc ING 127 WJSEIHLpsora BOULEVARD Sovrii11'3END, INIM, h,NA 0601-1I120 p' e I P L, PHONE 5741235-9251 FAX. 574/ 235-9171 1'DD 574/235-5567 CITY OF SOUTH BEND PETS BUTTIGIEG, MAYOR BOARD OF PUBLIC NOOKS Date: December 3rd, 2018 To: All Planholders From: Linda M. Martin, Clerk, Board of Public Works Sub 'ect: Addendum .-�-��.,...� , .... � .,..."... ��".".. m Number: 2 Project Name: Nuw......_ ._ .........., m _ �.. e: Sewer and Manhole Rehabilitation Project Number: 118-093 ACKNOWLEDGEMENrr OF RECEIPT OF ADDENDUM Date Received: _.2... ................ _ _ . ...,.......u. u.w. m ...m...., w mm .._A,,.-..... This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy 'OST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company:.. Authorized Sil Date: J- �s,,....... ..,...., Version 41212015 Sewer and Manhole Rehabilitation (1 18-093) e 1316 COUNTY -CITY RuILDINU PHONe 574I235 9251 227 W. JEFFERSON BOULEVARD .'..FAx 574I 235-917 i Sou'm BEND, INDIANA 46601-1830 � t8�5 TDD 5741235-5567 CrrY Or. SOUTH BEND PETE BUTTIG[EG, MAYOR PUBLICBOARD OF Date: November 215t, 2018 To: All Planholders .... ... From: Linda M Martin, µClerk, Board of Public Works Subject: Addendum Number: I .M.__. ..e�� ..._.. _____....._........ ..._ Project Name: Sewer and Manhole Rehabilitation Project Number: 118-093 ACKNOWLEDGEMENT OF RECEIPT OF AD I DENDUM Date Received: 1 (12-1 11li This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Si; n.9tP• I 1 /9.1 Version 4/2/2015 Scwer and Manhole Rehabilitation (l 18-093) Addendum Number: I —November 2 1 ", 2018 ,t14r ABC Grp S CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK190 ` .' CHECKLIST FOR BIDDERS Project Name Sewer and Manhole Rehabilitation Project No. 118-093 For Bids Due December 11, 2018 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and u Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted J_ Form [MWBE-2.1]. -V p Acknowledge Receipt of Addendum(s) included with the bide All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. V This checklist submitted with the Bid, This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Inland Waters Pollution Control, Inc. Date: December 11 2018 By Authorized Representative•" Signature: ...._._. Print Name &Title: mee Bedingfield / Assista retary Version 7/20/2018 Contractor's Bid for Public Works - 1 H w 0 w U) 2 a� w W H 0 mw0 a pzz NLL.ew 0m0 ww v00w M 0 z Q 1}— R 0 z 9 w to 20 mC — L wN Cm C C tm U c a= o > Q 5 M L H +' d r O Ea` Y W � d O C •N 7 C) L C ao a 3 CD O r •c o CS E oa o � r � c d •O L d aL 3 a1 U) > a o m � aL.+ •� N a c a aw a a) �L.ui N O d d N C .0N O ai a _ :2d C N L 3 O O N d - O O C ao� E Q O 0 a� v •� y ;E C_ H a2 m 0 0 w a)' CO C, CL c0 k C ',,.. a m m L � d L C c � C� CO c, E a Q c a m Q7 m m d, O m � m cS m z 0 U� a) C p 0 a v CM m 9 a0 a m a> m pm _a7 N 2 0 O U F CL y O :6 a m w0 o c n �E 0 0 E U Q W 0co ow in 2 U m CL m .s `° o-0 a0 CD y c o CL o a� a o a� a) V U N N n 0 U N L U Q 0 0 d o o L U d m a) 0 a) U (D Na7 a`z_ w m 0 w Q d E 0 z T E L cn a) N 0 a) E m z c 'a C) ao 0 N 0 N c O N CITY OF SOUTH BEND'"r�"'zj MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 118-093 Date: December 10, 2018 Project Name: Sewer and Manhole Rehabilitation Bidder: Inland Waters Pollution Control, Inc. Contact Person: Dwight Silva Telephone: 313-498-1142 Address: 4086 Michigan Avenue .-._.......... . .... City: Detroit State: MI Zip: 48210 Email: dwilva@teamipr.com .......... _. To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or co Missions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below* ........ .... ........ .... EVIDENCE OF GOOD FAITH EFFORTS MBEfWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ............... _ ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South BeVAttend uires that all perspective bidders complete no less than 2 of the following: all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. 2„ Advertise in general circulation and/or trade association publications concerning 03.subcontracting opportunities, and allow MBEM/BEs reasonable time to respond. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBEANBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. _........_ ......... ..._ ---- GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) / CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials nexf to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 7/20/2018 Contractor's Bid for Public Works - 10 From: Sherrie Sommerville To: M r v n; Sara Grogan Bcc: ; Joanne@abator.com": A l ��. �.��q6�s. �, II a9lYecl�o "`; "altus- ap@altusw_ orks com'; i ri g tom ` U wa �1 "r k fern ri" gIII""u luza Y A�";.�Sd tC cJrror�IrerarVt i ``7 �' �I; "hrstachel@hrvinc eom"; h r 23,J pan LtWL=1 '; t120 atacrun"; "swalker@sevensc.net" Subject: SUBCONTRACTOR INVITATION - IPR Great Lakes, LLC is requesting Subcontractor quotes for the South Bend, IN Sewer and Manhole Rehabilitation Date: Friday, November 30, 2018 10:20:00 AM IPR Great Lakes, LLC is requesting Subcontractor quotes for the South Bend, IN Sewer and Manhole Rehabilitation This project bids on i)(Kenriilbeir 1 1[t:k1, 20 8 Please review the plans, specifications, and addenda by clicking the link: https://www.dropbox.com/sh/m6plgb9hcz38nt5/AAD_e9gRAt9B- 1h7C3mhXLOxa?dl=0 We are soliciting subcontractor work for the specified selected item . - MAN N IHOLE lR IG i II A IB CC..i.. & Ca...EAID a G GIfs()U..i..i G OPEN 0..J..i... BY PASS However, if you are able to quote other portions of this project, please do so,. Qtjiotes mivit be received by Dec1 wailer 7"D m, COB ZSara Grogan IPR Great Lakes LLC is willing to review any responsible quote and will negotiate terms, if appropriate. We will notify your firm if your bid is accepted for the project. IPR Great Lakes LLC will not be interested in joint venturing or partnering for this particular project. The Subcontractor shall submit an itemized quality monthly invoice by the 25th of each month to ensure timely payment. IPR Great Lakes LLC is an Equal Opportunity Employer From: Sherrie Sommerville To: 'Rowe. Michael' Subject: RE: DBE/MBE PROJECT Date: Friday, November 30, 2018 11:27:00 AM Attachments: imaae003.12na imaae001.ona Thanks for your assistance and have a great weekend!!! Sherrie Sommerville Estimating Administrator (I"R FZ Inland Pipe Rehabilitation I Corporate P: Z:9-" w : w , tgWM1 ?rS:P 1 From: Rowe, Michael <MROWE@indot.IN.gov> Sent: Friday, November 30, 2018 8:38 AM To: Sherrie Sommerville <ssommerville@TEAMIPR.COM> Subject: RE: DBE/MBE PROJECT YOU can find our DB[. II._ocat.oii at entapps.iirndot.iin.gov/V V.: 6::::V....:.ncate.:nn.. From: Sherrie Sommerville ya,'tL�,y",I�] Sent: Thursday, November 29, 2018 4:03 PM To: Kaanthi Sundaravadanam <Wt].nr_??nfirnf�lu '�>; Sara Grogan < i.1+p1Ni9> Subject: DBE/MBE PROJECT This is u• iui IE IIMIIIr-IRNX- eirna ll. IEw eii-d se caiutlon. lDO Iq(,)11M open, attachnnents oir dick Ikinks froiirn unknown sendeirs, oir u,uiirue1pected enrlalilll. **** Good Afternoon, We, IPR are preparing to submit a bid that's located in South Bend, IN and we would like to meet out Good Faith Efforts. Is there a link and/or website that we can use to reach MBE/WBE businesses? Also Is there a DBE directory as we are encouraged to contact St. Joseph County, IN if possible? Your assistance will be greatly appreciated and please let me know if more information required. Sherrie Sommerville On Estimating Administrator Inland Pipe Rehabilitation I Corporate P:832--24-8A5-41 W: WSW trp CONFIDENTIALITY NOTE: The information transmitted, including attachments, is intended only for the person(s) or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you received this in error, please contact the sender and destroy any copies of this information. From: Sherrie Sommerville To: "Sons. Kim" Subject: RE: DBE/MBE PROJECT Date: Friday, November 30, 2018 11:27:00 AM Attachments: 1ma9e009--= image010.ong image011.g_ng image012im image013.gpg image014.g_ng image015.ona Thanks I really do appreciate your time......................have a great weekend!!! Sherrie Sommerville ot—v Estimating Administrator Inland Pipe Rehabilitation I Corporate p: U--. From: Sons, Kim <KSONS@indot.IN.gov> Sent: Friday, November 30, 2018 7:35 AM To: Sherrie Sommerville <ssommerville@TEAMIPR.COM>; Kaanthi Sundaravadanam <KSundaravadanam@TEAMIPR.COM>; Sara Grogan <sgrogan@TEAMIPR.COM> Subject: RE: DBE/MBE PROJECT Importance: High Please find attached the link for the DBE Directory and some instructions. Thank you, Kim Indiana Department of Transportation Economic Opportunity Division Mobile Phone: 317-416-6190 E-mail:.k ns� LuA:u ,—v Disadvantage Business Enterprises (DBE) Website 6I i�� ,mY� r g, / j am - I jtjjj, From: Sherrie Sommerville Sent: Thursday, November 29, 2018 4:03 PM To: Kaanthi Sundaravadanam Sara Grogan < Ec c' I > Subject: DBE/MBE PROJECT *'** -li,l 0s is ain III":i:X .i.Ilrii°:IIiklNAi... eirna 1. l''''':xeirdiise c: aUfion. IIC11X 1"40 F open n aii°ao°Ihirneiruits or cliic°:Ik. IHiniks froiirn uirnlrinowiri seir�cJ.,„im (:)r ujinexpectk.,d email. **** Good Afternoon, We, IPR are preparing to submit a bid that's located in South Bend, IN and we would like to meet out Good Faith Efforts. Is there a link and/or website that we can use to reach MBE/WBE businesses? Also Is there a DBE directory as we are encouraged to contact St. Joseph County, IN if possible? Your assistance will be greatly appreciated and please let me know if more information required. Sherrie Sommerville On WOWS Estimating Administrator Inland . Pipe Rehabilitation I Corporate :8- w : w-w -e a3-0-&-Q CONFIDENTIALITY NOTE: The information transmitted, including attachments, is intended only for the person(s) or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you received this in error, please contact the sender and destroy any copies of this information. No Subcontractor Responses received from DBE Solicitation, CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY14,1 r , DEVELOPMENT PROGRAM FORM MWBE-2.1.� MBE/WBE CONTACTED r This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidders sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE OF Project Number: 118-093MBE/WBE Participation Goal Project Name: Sewer and Manhole Rehabilitation Bidder:v") v«a, t"9 n l lt"► By: (Date) MBE/WBE Firm Owner or Contact at MBE/WBE Firm vr, �. Telephone: Email: ~' TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBENVBE FIRM: tA _... Owner or Contact at MBE/WBE Firm Telephone, Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Version 7/20/2018 Contractor's Bid for Public Works - 11 0IJ VIVO CITY OF SOUTH BEND., MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM4 FORM MWBE-2.1 MBE/WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE OF Project Number: 118-093 MBE/WBE Participation Goal Project Name: Sewer and Manhole Rehabilitation Bideier: 1_ V Rvw (Slgnatwar (Title....,.., _. (Date MBEMIBEFirm V '1^4-1-C f'vffdrlyd.— /I../" jam./A/1*����y Owner or Contact at MBElW6Elrm L 9 � � Telephone.�� .2 Fax:Z5�3 � ail: bQ TYPE OF WORK SOLICITED FOR THIS PROJECT: r fINMIUAWAR RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBE/WBE Firm1 r Owner or Contact at MBE/WBE FirmLa UALL,/ Telephon b Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: 1 , Version 7/20/2018 Contractor's Bid for Public Works - 11 an8- 9 ZeL1a 'litation � ..�.. �. ] 18- b Sewer and M let' PMt� timed _.. phone November 27 2018 1 00 ...�. 61;nPany Name uo E. VS 'tom G N 2. lNs/�'''2av� �FFIeE7vS°N{� 11 Z k yle�► �N� p xR���.� x� xv M rv�. ��tRG �taizPN�% f.��.�..�.�. A y 7 27 lwl'c/ (i`3)98 �ily.Z rf AA4 r F2., CO M i /,,,�, �i, CITY OF SOUTH BEND t a �r MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY/ DEVELOPMENT PROGRAM' FORM MWBE-2.1 MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE Q ✓ OF Project Number: 118-093 Project Name: Sewer and Manhole Rehabilitation Bidder: r fir, /t rwr-i a' ki i, in i nature (Title) MBE/WBE Firm .l Owner or Contact at MBE/WBE Firm Telephone: 0 Al -1A TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBE/WBE Firm Owner or Contact at MBE/WBE Firm w Telephone: " - Fax -7 TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBE/WBE Participation Goal mail: (Date) �.m= Version 7/20/2018 Contractor's Bid for Public Works - 11 CITY OF SOUTH BEND A01 MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM„ FORM MWBE-2.1 MBE/WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE_OF_� Project Number: 118-093 Project Name: Sewer and Manhole Rehabilitation �_ Bidder: 4 [ M n1l VY) 4 ,P"""a I jr r By: (Signature MBE/WBE Firm (Title) MBE/WBE Participation Goal Owner or Contact at MBE/WBE Firm Tele hone 4' Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBE/WBE Firm _ Owner or Contact at MBE/WBE Firm Telephone: 942Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: I2....-...Iry .. (Date) Version 7/20/2018 Contractor's Bid for Public Works - 11 PEACE 1316 COUNTY-Crry BuiLD[N(i :- "-" " i; � I PHONE 574/235-9251 227 W. JEFFERSON BouLEVARD � � `% FAX 574/ 235-9171 SouTH BEND, INMANA 46601-1830 i TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDOF PUBLIC WORKS Date: November 21 ", 2018 To: All Planholders _... From: Linda M. Martin, Clerk, Board of Public Works Subject: Addendum Number: 1 ........- ............... ......... _..� Project Name: Sewer and Manhole Rehabilitation Project Number: 118-093 ACKNOWLEDGEMENT OF ;RECEIPT OF ADDENDUM Date Received: 1 1 /21 h e) This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Si, Date; I1/21,,., Version 4/2/2015 Sewer and Manhole Rehabilitation (118-093) Addendum Number: i —November 21", 2018 1316 COUNTY -CITY BUILDING�; , ,° -� r, �� ; PHONE 574/235-9251 227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171 SOUTH BEND, INDIANA46601-1830 11tr TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: December 3`d, 2018 ._.............................. .._.......... To: All Planholders From: Linda M. Martin, Clerk, Board of Public Works Subject: Addendum Number: 2 Project Name: Sewer and Manhole Rehabilitation Project Number: 118-093 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: -Q - I This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Si Date: 12 Version 4/2/2015 Sewer and Manhole Rehabilitation (118-093) v t _ v" . 0-� yyy a! r liV ANY , 1316 COUNTY-Cny BUILDING � `�` PHONE 574/235-9251 227 we JEFFERSON BOULEVARD FAX 574/ 235-9171 SOUTH BEND, INMANA 46601-1830 1865 � TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: December 6thA 2018 To: All Planholders From: Linda M. Martin, Clerk, Board of Public Works Subject: Addendum Number: 3 . .. — Project Name: Sewer and Manhole Rehabilitation Project Number: 118-093 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy M [SST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Comps Author Date: Version 4/2/2015 Sewer and Manhole Rehabilitation (118-093) Addendum Number: 3 — December 6th, 2018 SECTION I - EXPERIENCE QUESTIONNAIRE mmfflm�i /� i/ // N $186,616.00 $1,192,516.50 $261,635.00 P.O. Box 1518 Gaylord, MI 49734 4086 Michigan Ave, Detroit, MI 48206 THE SCIENCE OF UNDERGROUND SOLUTIONS PROJECT REFERENCES CUIIR.EIID 11114 PIII,,,,ACIE IIPXPE III,,,.MINING ...........................................�...... ...................... __ .�. Bill Mason 989-732-8318 bmason@jandnllc.com .m. .....-`- ColDrive O Coldwater Board of Public Thisdproject consists i is of CIPP lining ng of 3 0 LF of 8 , Utilities Start 1,948 LF of 12", and 4,544 LF of 15" diameter pipe. One Grand Street $96,075.00 09 ated Anticipated Coldwater, Michigan 49036 Completion 1112011 DOW Midland WWTP .� DOW Michigan .......... Operations .. This project consisted of CIPP lining of 100 LF of 24" 574 Building diameter pipe. Midland, MI 48667 Start GC —John E. Green Bryan Owczarzak 08 2018 John E. Green $36,000.00 Anticipated Completion 778 Bridgeview S Saginaw, MI 48604 09 2018 989-752-0424 scottgarrisonjr@johnegreen.com _ 2018 Sanitar Sewer Linin Pr�a"ect City of Ann Arbor Start This project consists of CIPP lining of 30,698 LF of 301 E. Huron St. 07 2018 8", 9,431 LF of 10", 2,704 LF of 12", 333 LF of 15", Ann Arbor, MI 48104 $1,399,976.50 Anticipated Completion 837 LF of 18", 402 LF of 21", and 391 LF of Igor V. Kotlyar 05 2019 ..... 24"diameter pipe. .. -eeee Red CedarR Interceptor a Rehab City of East Lansing 410 Abbot Rd. Starr t This p project consists CIPP lining, East Lansing, MI 48823 $888,620.00 06 2018 Anticipated Nicole McPherson Compietion (517) 319-6928 _ nmcpher@cityofeastlansing.com 08 Ct18 2018 Sanitary�Sewer Rehab Town of Monon, IN St rt The project consists of CIPP lining. 422 North Market S, 10 2018 Monon, IN $542,345.50 Antici ated Cramgletion 03 2019 m..� 2018-19C12018 SS Relining Publix Service and Safety This project consists of CIPP lining. City of Troy City Hall Start 100 S Market St. 07 2018 $74,712.60 Anticipated Troy, OH Cow Patrick E. Titterington 09 2018, 937-335-1725 Patrfck.titterington@troyohio.gov 4086 Michigan Ave. Detroit, MI 48206 ;r /%/////%%/,/////////%%/ ///%o/%/%%%%%%%////%%///%%%/ /% PROJECT REFERENCES CURED -IN -PLACE PIPE LININNG Sanitary Sewer Lin in Project This project consists of CIPP lining. p 1 g• m .8 Holland Board of Public Works 625 Hastin Ave. g Holland, MI 49423 Kevin Koing �...6 4 � $1,029,650.00 Start 07 2018 Antis� Completion J J 2019 Cltv of East Lansing 201 Sewer Rehabilitation .. City of East Lansing Project 410 Abbot Road CCTV, Cleaning and CIPP Lining of Approx. 1,200 LF East Lansing, MI 48823 $592,000.00 Ongoing of 36", 250 LF of 27" and 500 LF of 24" sewers Nicole McPherson ... - 517-319-6928 City of S run ueud mm O — " +016 /N�c�n�tar Sewer .....-. —...�. City of Springfield, OH � . . �.. ..-.. .....,m .. Lining 76 E. High Street CCTV, Cleaning and CIPP Lining of Approx. 5,114 LF Springfield, OH 45502 $619,748.00 Ongoing; of 8" to 36" sewers and Manhole Rehabilitation Leo Shanayda, City Engineer .�Y m.,,m�.......... 937-324-7312 ... ,, ,,, City....of Garden CitAi . � �... .. City of �Garden_City,MI .... _ .-.� .....r Cleaning approx 50,580 LF of 8" — 42" and Full Hennessey Engineers, Inc. Length CIPP of approx. 50,485 LF of 8 — 42" sewers 13500 Reeck Road Southgate, MI 48195 $1,784,304.75 Ongoing Ryan Kern, PE 734-759-1600 f Adrian. MI ..-�--.�__._._...... City of Adrian, y n, M I -- Approx. 918 LF of 30", 916 LF of 36", 400 LF of 12" Jones & Henry Engineers, LTD CIPP and 360 LF of 30" - 33" of cementitious liner 3103 Executive Parkway and 133 LF of 30" — 42" of cementitious liner Suite 300 $469,765.00 Ongoing Toledo, OH 43606 Michael Karafa, PE 567-661-0247 Cit of East ante Department of Public Works & Clean, CCTV & FCIPP & SCIPP Lining of 24,000 LF of Services-AEW Various Sanitary Sewer 17750 Ten Mile Rd Eastpointe, MI 46021 $814,485.00 Ongoing Attn: Patrick Marcus 586-726-1234 Ext 137 Cit of Grosse Pointe Farms- HRC _mm Cityof Grosse Point e Farms- HRC Clean, CCTV & CIPP Lining of 2,500 LF of 24", 27" & 555 Hulet Drive 15" Sanitary Sewers P.O. Box 824 Bloomfield Hills, MI $149,000.00 Ongoing Attn: Edward Zmich _ 248-454-6302 DWSP_Contract IDWS — 889 r...... ... - Owner: Detroit Water er & m. �. . City of Detroit Sewer Repairs Contract Cleaning, TV, Sewerage Dept. CIPP Lining of 8"-120" pipe 6425 Huber St. $4,225,950.00 Ongoing Detroit, MI 48211 4086 Michigan Ave, Detroit, MI 48206 b. . . . . . . . . . PROJECT REFERENCES CURED -IN -PLACE PIPE LININNG Attn: Mohammad Farhat, P.E. 313-267-1201 DWSD Contract DWS — 890 Owner: Detroit Water & City of Detroit Sewer Repairs Contract Cleaning, TV, Sewerage Dept. CIPP Lining of 8"-120" pipe 6425 Huber St. Detroit, MI 48211 $4,225,950.00 Oungoing Attn: Mohammad Farhat, P.E. 313-267-1201 Owner: Detroit Water & Sewerage Dept. IDWSID PO #2905755 — lnspqction and Clearing of 6425 Huber St. Two DWSD IntercgpLor Si hors Detroit, MI 48211 $478,183.33 Ongoin Attn: Mohammad Farhat, P.E. . .... — - — ------- - ----- . ..... 313-267-1201 City of Toledo Div. of Engineering One Lake Erie Center CIPP Lining of 8" to 39" Sewers consisting of 23,750 600 Jefferson Ave, Suite 600Toledo, $2,835,760.00 Ongoing LF of Sanitary and 19,150 LF of Storm OH 43604 Mike Elling 419-936-2276 DWSID Contract DES — 900 Owner: Detroit-­Wa—ter — - ---- ........ . City of Detroit Sewer Repairs Contract Cleaning, TV, Sewerage Dept. CIPP Lining of 8"-120" pipe 6425 Huber St. Detroit, MI 48211 $4,225,950.00 Ongoin Attn: Mohammad Farhat, P.E. 313-267-1201 DWSID Contract DWS - 901 Owner: Detroit Water & East Side City of Detroit Sewer Repairs Contract Sewerage Dept. Cleaning, TV, CIPP Lining of 8"-120" pipe 6425 Huber St. Detroit, MI 48211 $4,225,950.00 Ongoing Attn: Mohammad Farhat, P.E. 313-267-1201 City of Grosse Pointe Farms MI — SRF Sanitary .... . . .... . ..... . .... . . Hubbell , Roth & Clark, Inc. . ...... — . ..... Sewer -!mpr2mgmgn1s 555 Hulet Dr. CIPP Lining of 12" (350'), 15" (400% 18" (350') Bloomfield, MI 48302 $188,982.50 Ongoing Eddie Zmich, P.E. 248-454-6300 Washjngton _Sanitary Sewer pjs�� Owner. Washington Suburban C15192AI1 ESA Sanitary Commission Indefinite Delivery/Indefinite Quantity CIPP lining 14501 Sweitzer Lane $50,000,000 Ongoing project 8"-42" in diameter. Work is located in an Laurel, MD 20707 environmentally sensitive area Attn: Mark Coughlin 301-642-3092 4086 Michigan Ave, Detroit, MI 48206 THE SCIENCE OF ••UND SOLUTIONS PROJECT REFERENCES CURED -IN -PLACE PIPE LININNG Owner: Washington Suburban Washin ton Sanitar Sewer District ID1 Sanitary Commission C15183A11 Mainline CIPP 14501 Sweitzer Lane $20,000,000.00 Ongoing Indefinite Delivery/Indefinite Quantity CIPP lining Laurel, MD 20707 project of 8"-15" diameter pipe Attn: Mark Coughlin 301-642-3092 Owner/Engineer: Washington Sanitary Sewer District Start Washington Sanitar Sewer District lateral IDI 14501 Sweitzer Lane 00 $21,651,984.Co�io„n 2/1/2012 Lateral rehabilitation IDIQ Laurel, MD 20707 2/1/2017 Attn: Mark Coughlin 301-642-3092 Sanitar Sewer Rehabilitation- McComb NW Water and Sewer Dist. — This project consists of 2915 LF of 8" and 1407 LF of Bowling Green 10" diameter. GC — Edward Kelly & Sons, Inc. 12560 Middleton Park BG, OH 43402 Start Edward Kelly & Sons, Inc. $111,340.00 07 2019 5555 Woodville Rd. Completion Northwood, OH 43619 07 2.019 Jim Kelly 419-243-5108 jimk@edkellysons.com 4086 Michigan Ave. Detroit, MI 48206 / /i/ ,%// REFERENCESPROJECT PREVIOUS/CLOSED PROJECTS DOT 485 —Lucas CountyKokosing Construction Company Start IR-75 (Pt 1-2) 886 McKinley Avenue 6/15/2016 CIPP Lining approx. 1,340 Linear ft. of 8" —10" Columbus, OH 43222 $237,710.00 Com letion 7/15/2016 Gina L. Carter 614-228-1029 Cit of Dearborn MI —Sewer Rehabilitation 2014 City of Dearborn, MI Start Clean, CCTV & CIPP Lining approx. 31,396 linear ft, 16901 Michigan Ave. 7/01/2015 of 12" — 30" diameter pipe. Dearborn, MI 48126 $1,411,054.25 Completion 7/30/2016 Soud El-Jamaly, P.E. 313-943-2450 City of Mishawaka, Indiana Lawson -Fisher & Associates Start CIPP Sewer Rehabilitation — Various Locations 525 West Washington Ave. 7/01/2015 2015 South Bend, IN 46601 $678,930.00 Completion ' Attn: Peggy Biggs, P.E. 10/19/2015 (574) 234-3167 Owner/Engineer: District of Sewer Rehabilitation and Extension for DC WASC Columbia Water and Sewer Start CIPP liningof 10"(7,590'), 12" 7 590' 15" ( ), Authority y $337,095.90 8/17/2011 (7,590'), and 18" (7,590') diameter pipe. 5000 Overlook Ave, SW Completion 8/17/2015 Washington, DC 20032 Township of Summit, Mi. Townsfri of Summit DPW 2121 Ferguson Road Start Clean, CCTV & CIPP Lining of 1,809 LF of 24" Jackson, MI 49203 $235,109.00 09/01/2015 Sanitary Sewer Attn: Scott Bevier Completion 517-788-4113 10/15/15 City of Dearborn MI — Sewer Rehabilitation 2014 Owner/Engineer: City of Dearborn Start Clean, CCTV & CIPP lining approx. 9,111 linear ft of 10" —48" diameter pipe. 16901 Michigan Ave. $541,192.20 02/01/2014 Dearborn, MI 48126 Completion 06/30/2014 Soud El-Jamaly, P.E. 313-943-2450 Owner: City of Royal Oak 2014 Sewer Linin Contract No, 5-1402 211 Williams Street Start CIPP lining of approximately 10,000 linear feet 8"- Royal Oak, MI 48068 $351,750.50 11/01/2014 18 in diameter Merleo Seneres-Inspector Completion Completion 248-246-3260 014 4086 Michigan Ave. Detroit, MI 48206 PROJECT REFERENCES CURED -IN -PLACE PIPE LININNG North Side Sewer Improvements Project Division City of Auburn, Indiana ........................... A and B 210 East Ninth Street Start Project consists of CIPP lining of 8"-12" 9260' 1 g ( ) Auburn Indiana 46706 $319,652.00 3/22/2013 diameter pipe, 310VF of manhole lining, and point Cheryle Culler Completion e ompltio n 013 repairs on existing sewers 260-969-8837 City of Mishawaka CIPP Sewer Rehabiiitation Ed ewater Northside 600 E. Third Street Interceptor 'Room 100 CIPP lining of 3,700 linear feet 18" to 36" in Mishawaka, IN 46545 $695,641.00 Completed diameter Piper C. Tittle, P.E. 574-234-3167 Cit of Midland Trenchless Sewer Reconstruction City of Midland 333 t Ell wort Street Start 7/1/20 13 CIPP lining of 10" (577'), 21" (2,015'), and 36" (2,102') diameter sanitary sewer.$410 Midland, 649.00 Completion Steven Smith 8/13/2013 989-837-3504 Charter Township of Clinton, District "A" Sanitary Sewer CIPP.. Lfning Michigan Start CIPP lining of 24" 6 067' and 30" 1 712' 40700 Romeo Plank Road $96600 8/1/2013 diameter sanitary sewer. Clinton Township, MI 48038 Completion Scott Chabot 11/30/2013 586-781-8950 DWSD Contract DWS -876 Owner: Detroit Water & East Side City of Detroit Sewer Repairs Contract Sewerage Dept. Start Cleaning, TV, CIPP Lining of 8"-120" pipe 6425 Huber St. 04/21/10 Detroit, MI 48211 $44,000,000.00 Completion 04/20/14 Attn: Mohammad Farhat, P.E„ 313-267-1201 DWSD Contt ract DWS - 877 Owner: Detroit Water & West Side City of Detroit Sewer Repairs Contract Sewerage Dept. Start Cleaning, TV, CIPP Lining of 8"-120" pipe 6425 Huber St. $44,000,000.00 04/21/10 Detroit, MI 48211 Completion 04/20/14 Attn: Mohammad Farhat, P.E. 313-267-1201 FY2013 Sanitary Sewer Main Linin - Project # R City of Holland 61 270 South River Avenue Start CIPP lining of 8" (11,200'), 12"� (660'), 15" (4,858'), Holland, MI 49423 7/01/2013 18 (5,440'), 21 (13,100) 24 (263 ), and 36 David Cyrus $1,723,074.00 Completion (362') in addition to the reinstatement of over 400 616-355-1520 11/21/2013 laterals and heavy cleaning of sanitary sewer 2011 Sanitary Sewer Rehab Contract 1 CIPP Owner: Muhlenberg Township Start CIPP lining of 8" (11,935') 10" (2,515') 15" (3,685') Authority $1,184,572.00 4/22/2012 21" (465') and 24" 270') diameter pipe ( ....._.. 2840 Kutztown Road .-...........�....... _ _.... �.., plin Completion a�. ......-- -- 4086 Michigan Ave. Detroit, MI 48206 THE SCIENCE OF UNDERGROUND SOLUTIONS REFERENCESPROJECT CURED -IN -PLACE PIPE w .�. .... �� ..m_. Reading, PA 19605 2 24/2013 Engineer: Great Valley Consultants Nick Johnson ............ ._... 610-375-8822 ............. mA.. ................ Owner: Western Virginia Water 6 ._._...... . .-. , Authority 2011 Sewage Collection S stem Im rovements 601 S. Jefferson St Start CIPP lining of 5,200 linear feet of 8" diameter pipe 3d Floor Suite 300 $579,376.40 9/1/2012 and pipe bursting of 75 laterals Roanoke, VA 24011 Coffin. 8/15/2013 Earl Smith, P.E. 540-853-5700 2013 SS Rehab Pro'ect - Phase I ..................................... Township pp Macungie, PA Joint sanitary sewer rehabilitation project under 8330 Schantz Rod Start four munici municipalities for the CIPP lining of p g Breinigsville, PA 10831 $207,977.55 4/15/2013 approximately 8,059 linear feet of 8" and 530 Engineer: Keystone Engineers Completion 9/30/2013 linear feet of 10" sanitary sewer Tim Miller 610-395-0971 Owner: Allegheny County [#1477-Interceptor Sanitary Authority Lining & Cleaning 3300 Preble Ave. Start CIPP liningof 10' 219' 15" 791' 18" 334' and Pittsburgh, PA 15233 00 5/ 13 2012 30" (5,220') diameter pipe 412-732-1232 Coition 10/21/2012 Engineer: AMEC E&C Services Jim McCarthy, P.E. 724-940-4200 ,City of Uniontown, PA 20 North Gallatin Ave Redstone Interceptor Upgrade -Uniontown PA Uniontown, PA 15401 CIPP lining of 5,500 linear feet of 21"-30" sanitary 724-430-2910 1,796,165.00 Completed Engineer: sewer K2 Engineering, Inc. Aaron Wigfield, PE 724-439-3440 West Homestead 2012 Sewer Repair Pro"ect 456 West Eighth Ave CIPP lining of 9,985 If of 8" and 600 If of 12" West Homestead PA 15120 sanitary sewer. 99 CIPP point repairs and grouting 412-461-1844 1,610,740.00 Completed of laterals. Engineer: Seig and Associates, Inc Karl P. Seig, P.E. 724-935-2040 Sty°,'MTV - Phase IImRe lac... Replacement Project 'Tri State Pipeline 418 2nd Street $510,000.00 Completed CIPP lining of 6" (600') 8" (3,300') 10" (1,700') and 18" (2,000') diameter pipe St. Marys, WV 26170 4086 Michigan Ave. Detroit, MI 48206 PROJECT REFERENCES CURED-IN-PLACELININNG �m�.. ...... ... -N_ 304-684-240�........ 1 �_...._... ...�. �..........._.. _�.r�_ Eng: S&S Engineers 304-342-7168 s stem Rehabilitation CIPP Lininmmm Owner:District 1...�.... Contractorl 045EatonlDrry Start CIPP lining 6" (500'), 8" (31,000'), 10" (1,450'), 12" Ft. Wright, KY 41017 $ 2,392,042.50 3/22/2013 (2,500'), 15" (1,250'), 18" (5,000'), 21" (1,250'), Kyle BoyleP.E. Completion, 24" (30'), and 36" (655') diameter sanitary sewer. . _.. .... 859-547-1644 _ �_� .. .....�u 7/12/2013 _..m..... m. Owner: Independence Hill _. .. Conservancy District 2012 Trenchlless Reconstruction of Sanitary Sewers 7507 Taft Street Phase 4 Merrillville, IN 46410 Start CIPP lining project involving 8" (17,101') and 12" Engineer: North-West $566,565.00 7/22/2012 (4,780') diameter sanitary sewer Engineering Co Inc Completion Gary, IN 46402 4/28/2013 Aravind Muzumdar 219-0769-3996 Owner: Borough of Middleburg 13 North Main Street Sanitar Sewer Rehabiiikation Proms Middleburg, PA Start CIPP liningof approximately 8 900 linear feet of 8" pp Y Engineer: Larson Design Group 9/30/2012 diameter pipe. Rehabilitation and lining of 8 p p g 1000 Commerce Park Drive $827,135.00 Completion manholes in addition to 6 spot repairs Suite 201 11/11/2012 Williamsport, PA 17701 Attn: Chris Beidler P.E. 570-323-6603 Owner: City of Royal Oak 2012 Sewer Linin Contract No. 5-1201 211 Williams Street CIPP lining of approximately 10,000 linear feet 8"- Royal Oak, MI 48068 $297,237.50 Completed 18" in diameter William P. Heil, P.E. �... 248-246-3260 .. `^^n^^ ^ of Dayton Ohio Wagner Ford Sanitar Liner ilnst Nation Phase 2 3Owner Monument 20 tDr. Start CIPP liningof 10,129 linear feet of 42" diameter Dayton, OH 45402 y $3,197,794.00 6/17/2012 pipe Donald Kinnison n Com letio � 9/9/2012 - � 937-333-3739 ... �_.... City of Novi City o _.... ........___ _.._ SanitarySewer Rehabilitation Areas R C1 & W. Ten Mile Road Novi, Michigan 48375 $596,490.75 Start 10/14/2012 CIPP lining of 17,460 linear feet 6" —15" in diameter Maria Sedki, P.E. Completion 11/25/2012 248-844-5400 East Frankfort Interceptor Rehab Phase I Owner: Start CIPP lining of 18" (66') 21" (360') 24" (606') 27" City of Frankfort, KY $535,976.40 10/14/2012 (637') 30" (877') and 36" (222') diameter pipe. Dig Bob Peterson Completion 4086 Michigan Ave. Detroit, MI 48206 THE SCIENCE OF R•UND SOLUTIONS PROJECT REFERENCES CURED -IN -PLACE PIPE f sections include replacement of 1741f of 21" and 1200 Kentucky Ave. 3/24/2013 1581f of 27" diameter pipe Frankfort, KY 40601 (502) 875-2448 Engineer: Hazen & Sawyer Amanda Mikuski 444 Lewis Hargett Circle#260 Lexington, KY 40503 (859)219-1126 Royal Oak Michi an Owner/Engineer: 2012 Sewer Lining City of Royal Oak CIPP lining of 8" (5,450'), 10" (1,500'), 12" (1,600% Merleo Seneras Start 15" 950' and 18" 500' . 211 Williams 11/1/2012 P.O. Box 64 Completion 1/4/2013 Royal Oak, MI 48068 (248) 246-3266 Owner: City of Farmington 33720 West Nine Mile Rd Farmington, MI 48335 Floral Park Swgbdivision Sewer Rehabilitation Engineer: Orchard, Hiltz & Start CIPP liningof 16 000 linear feet of 8" . 15" McCliment Inc. $566,500.00 /20/12 3mplet diameter pipe 3400 Plymouth Rd Completed Livonia, MI 48150 10/30/12 Matthew Parks, P.E. 734-552-6711 (North Huron Valley/Rouge Valley — Short Terra Owner: Charter County of Corrective Action Plan Wayne, Michigan Rehabilitation of 1,013 manholes, sewer lining of Engineer: Hubbell, Roth & Clark, 10,113 linear feet of sanitary interceptors, 17 spot Inc. Start repairs and 167 joint repairs of the interceptors, 200 Bagley, Suite 420 $17,167,477.89 02/10/10 cleaning of six siphons (1,616 linear feet, ranging in Detroit, MI 48226 Completion size from 8" to 42" in diameter). CIPP lining of 48" Attn: William Davis, P.E. 6/1/2012 (643') 60" (2834') 66" (806') and 78" (2,582' Over 313-965-3330 the Hole Wet Out) and slip lining of 72" (1,695') and 90" (582') diameter interceptor Tri-State Pipeline — St, Ma 's WV — Phase II Owner: City of St. Marys Re l'acement Pro'ect 418 2"d Street Start „ Subcontracted CIPP lining of 6 (600 ), 8 (3,300 ), St. Marys, WV 26170 $510,100.00 4/1/2012 10" (1,700% and 18" (2,000') diameter pipe. Prime: Tri State Pipeline Com�let_ion 5/1/2012 Lateral replacement and top hats Eric Taylor 304-733-6801 #3399-Trenchless Sewer Lining Owner: City of Midland Start CIPP lining of 8" (540') 10" (1,223') 21" (375') and 333 W. Ellsworth St. $231,960.00 2/20/2012 24" 1 878') diameter ( r pipe Midland... .m..� Mi 48640 ............ � ... ...... Comn pletio __-m-.._.-... 4086 Michigan Ave. Detroit, MI 48206 • 1 ' '• 1 • • PROJECT REFERENCES CURED -IN -PLACE PIPE LININNG Steve Smith, P.E. 6/30/2012 989-837-3504 Owner: City of Tiffin 51 EastMarket Street Gleason Construction — Tiffin OH Rock Creek Tiffin, OH 44883 Start Interceptor Attn: Debra Reamer $98,325.00 2/1/2012 CIPP lining of 2,700 linear feet of 12" diameter pipe 419-448-5402 Compl Completion 012 Engineer: Jones & Henry 419-473-9611 Owner/Engineer: Metropolitan 2011 Trenchless Technolo Sewer Rehabilitation Sewer District of Greater Cincinnati Start CIPP lining of 8" (16,246'), 10" (852'), 12" (33,586'), 15" (7,759'), 18" (5,293'), 20" (97'), 21" 225 W. Galbraith Road $5,221,027.00 9/26/2011 (1,110'), 22"(681'), 24" (2,515'), 30" (778'), Cincinnati, OH 45215 Com letion 33"(325'), and 36" (1,098') diameter pipe Attn: Mike Stevens 9/15/2012 513-353-4900 Ford Provin Grounds Owner: Ford Proving Grounds CIPP lining of 30" (400 linear feet) and 48" (91 74240 Fisher Road Start linear feet) and EcoCast lining of 290 linear feet of Romeo, MI 48065 9/26/2011 60" diameter pipe Engineer: Roncelli, Inc $226,381.50 Completion 10/14/2011 Attn: Ken West 586-752-3495 Owner: Charter Township of Charter To ins,hip of Redford Redford Start CIPP Lining of 10" (463') 12" (1,200') 15" (374') and 15145 Beech Daly Rd $113 680.00 2/1/2012 18" (376') diameter pipe Redford, MI 48239 Completion 6/6/2012 Attn: John Selmi 313-387-2670 Owner: Rich Creek, Virginia Rich. Creek Virgin let — Sanitary Sewer S stem 140 North & Spruce Road Start Improvements Rich Creek, VA 24147 $299,793.00 9/26/2011 CIPP lining and pipe bursting of 8", 10", and 12" Engineer: Olver, Inc. Completion diameter pipe. Attn: J.S. Brown P.E. 1/29/2012 540-552-5548 Owner: Lake County Board of Board of Lake Count Comm -Cedar Gin Commissioners Start CIPP lining of 6,460 linear feet of 8" and 440 linear 105 Main Street, 41h floor $229,420.00 10/17/2011 feet of 10" diameter pipe Painesville OH 44077 Completion 2/15/2012 Attn: Denis Yurkovich 440-350-2652 Williams ort Sanita Authorit Owner: Williamsport Sanitary Start CIPP lining of 8" (450') and 10" (700'). Manhole Authority $148,435.00 9/21/2011 lining of 45 vertical feet 253 West Fourth Street Completion 4086 Michigan Ave. Detroit, MI 48206 PROJECT REFERENCES CURED -IN -PLACE PIPE LININNG Williamsport, PA 17701 1/18/2012 Engineer: Larson Design Group Matt Peleskak, P.E. 570-323-6603 Citv of Battle Creek — Interceptor Sewer Linin Owner: City of Battle Creek Prot 150 S. Kendall St Street CIPP lining of 4,296 linear feet of 54" diameter pipe Battle Creek, MI 49037 Start and 420 linear feet of 42" siphon. Engineer: Jones & Henry/12/2011 y $1,675,660.00 Engineers, Ltd Completion Attn: Steven L. Wordelman, P.E. 12/30/2011 419-473-9611 Owner: Borough of Bellevue Tri State Grouting —Bellevue PA 537 Bayne Avenue Start 9/6/2011 "I CIPP lining of 2,000 linear feet of 8 diameter pipe Bulle Bullevue PA 15202 $61,000.00 Comm l tion Mark Schneider Attn:302-286-0701 9/30'/2011 Owner: Pigeon Creek Sanitary Sewer Authority _Pl eoln Creek Sanitar Authorlt 508 Main Street Start CIPP lining of 12" (381') 15" (2,609') and 18" Bentleyville, PA 15314 $968,321.00 8/15/2011 (8,518) Engineer: Chester Engineers Completion Attn: Carl DeiCas, P.E. 2/11/2012 724-483-8041 Owner: Castanea Township Supervisors 347 Nittany Road Castanea, PA 17745 Start Castaneal Townsh�, Attn: Paul Conklin 7/21/2011 CIPP lining of 6,080 linear feet of 8" diameter pipe 570-748-2415 $458,170. 00 Completion Engineer: McTish, Kunkel, & 11/21/2011 Associates Steve Gibson, P.E. 570-368-3040 I' J0 Contracting.,r 2009 Hancock Sanitary Sewer Owner: City of Hancock CIPP lining of 8" (27,275 linear feet), 10" (1,360 399 Quincy Street Start linear feet), 12" (2,830 linear feet), 15"(1,195 linear Hancock, MI 49930 6/20/2011 feet), and 18" 275 linear feet diameter pipe ) ( ) p p Engineer: OHM g $1,128,175.00 Com letion Attn: Lou Meyette, P.E. 9/30/2011 906-482-0535 �J er I" lacun ie Townshi Authorlt Owner: Upper Macungie Start CIPP lining of 8"(4,860') and 10" (3,696') diameter Township Authority 6/6/2011 $277,529.00 pipe 8330 Schantz Road Completion Breiningsville, PA 18031 7/21/2011 4086 Michigan Ave, Detroit, MI 48206 Is, "„ , / , MEN i%/i %i PROJECT 11REFIEREINCIIES Engineer: Keystone Consulting Engineers Attn: Joseph Santilli 610-395-0971 Owner: West Mifflin Sanitary Sewer Municipal Authority West Mifflin Sewer Rehabilitation 1302 Lower Bull Run Road Start CIPP lining of 20,240 linear feet of 8" diameter pipe West Mifflin, PA 15122 5/7/2011 and over 30,000 linear feet of internal televised 412-466-6070 $775,621.00 Com letion inspection Engineer: Chester Engineers 11/5/2011 John Balewski, P.E. 412-809-6624 Owner: Municipal Sanitary Authority of the City of New Kensington City Kensington 120 Logans Ferry Road Start CIPP lining of 18" (622') 20" (622') 24" (1,233') and New Kensington, PA 15068 $372,654.00 5/4/2011 30" (371') diameter pipe Attn: Dan Rowe Completion 10/31/2011 724-335-9813 Engineer: Hatch Mott MacDonald Harry Cox, P.E. 412-497-2900 DWSD CS-1372' Task 4S 15 Mile Road Owner/ Engineer: NTH Macomb Sewer System Supplemental Repairs Consultants, Ltd. Connection Repair, Area 2 and Area 1 Xypex, Area 1 2000 Brush St # 480 Completion Sewpercoat and Slipling with either HOBAS or ADS Detroit, MI 48226-2251 $13,284,916.00 05/11 Pipe Attn: Joseph Alberts, P.E. 313-304-3616 Villa a of Canal Winchester OH Owner: Village of Canal CIPP lining of 11,500' of 8" 1,125' of 15" and 211' Winchester of 30" diameter pipe including grouting 310 laterals 36 South High Street Canal Winchester, OH 43110 Start Bill Sims $619,690.00 2/28/11 614-834-5109 Completion 6/19/2011 Engineer: Evans, Mechwart, Hambleton, & Tilton, Inc Marci Bland 614-775-4237 Wy&ne, Fold Road SanitaU Sewer Liner Owner: City of Dayton CIPP lining of 5,936 linear feet of 42" diameter pipe 320 West Monument Ave Start Dayton, OH 45402 $1,403,266.00 11 Attn: Chris Holmes Completion ` 937-333-3736 5/18/2012 4086 Michigan Ave, Detroit, MI 48206 PROJECT REFERENCES CURE1 ',7 Owner: Clearfield Municipal Authority Clearfield Municijgal Authori 107 East Market Street Start CIPP lining of 15" (1,962'), 18" (2,939'), and 24" Clearfield, PA 16830 $307,321.00 12/28/2010 (457') diameter sewer 814-943-5214 Completion Engineer — Gwin Dobson 5/28/2011 Attn: Jim Potopa 814-943-5214 Cit of Port Clinton OlH Owner: City of Port Clinton CIPP lining and point repairs of 8" (7,170'), 10" 1868 East Perry Street (2,780'), 15" (2,020), and 24" (990') diameter pipe Port Clinton, OH 43452 Start 419-734-5522 $634,825.00 12/21/2010 Engineer: Arcadis U.S., Inc Com letion 8/14/2011 Attn: Ken Arnold 419-473-1121 City of brand Ra ids CIPP 2010 Owner: City of Grand Rapids CIPP lining of 8" (6,047'), 9" (1,563'), 10" (2,492'), 300 Monroe Ave. N.W. Mart 12" (500'), 15" (350'), 18" (800'), 24" (500'), 27" Grand Rapids, MI 49503 $581,275.00 0101 12/1/2t (500') and 26"X36" (650') diameter pipe Attn: John Brom Completion °o'rt 6/1,/2011 616-456-3076 ity of Toledo Wa odsdale Area Sewer Li!ji na Owner/Engineer: City of Toledo CIPP lining of 8" (11,700% 10" (4,500'), 12" 600 Jefferson Ave Start (2,000') 15" (2,150') and 18" (1,650') diameter pipe Suite 300 12/2010 Toledo, OH 43604 $834,270.00 Com letion 1/25/2012 Mike Elling 419-936-2275 basted lnterce for Service A reement Contract Owner/Engineer: Northeast Ohio (ELSAC), Contract'1000250u Regional Sewer District Start Manhole & Sewer Rehabilitation of 8'-0" to 12'-6" 3900 Euclid Avenue 11/ 88/10 Combined Sewer Cleveland, OH 44115 $4,347,299.55 Com letion 11/17/11 Attn: Mr. Marc Kritzer, P.E. 216-214-7017 City of Salem Owner: City of Salem Virginia CIPP lining of 8" (25,500% 10" (330'), 12" (400'), Caleb Taylor and 18" (300') diameter pipe 114 North Broad Street Salem, Virginia 24153 Start Attn: Caleb Taylor $1,229,510.00 10/4/2010 540-375-3029 Com .letion 4/25/2011 Engineer: Olver Inc J.S. Brown, P.E. 540-552-5548 Carroll Tow iship Authorit Owner: Carroll Twp Authority Start P.O. Box 661 $800,917.00 7/26/ 10 4086 Michigan Ave, Detroit, MI 48206 „ - ,/ //. // J/o rr/ PROJECT REFEIRIENCES CIPP lining of 8” (5,008'), 10" (5,538), and 12" Donora, PA 15033 Completion (2,329') diameter pipe Attn: Ray Colosimo 10/31/2010 724-489-4493 Engineer: Gannett Fleming Dave Maclntyre 412-922-5575 City of Ann_Arbor Owner: City of Ann Arbor CIPP lining of 5,708 linear feet of 12" diameter pipe 100 N. Fifth Ave. Start Ann Arbor, MI 48104 $369,892.55 7/26/2010 Attn: Nick Hutchinson Completion 734-794-6000 Ext. 43633 10/08/2010 Oxbow Sanitary SewerRehabilitation Owner: Washington County CIPP lining and joint repairs of 8" (6,580') and 10" Commissioners (1,365') diameter pipe 223 Putnam Street Start Marietta, OH 45750 $445,605.00 7/26/2010 740-373-6623 Completion 11/1/2010 Engineer: Stantec Consulting John Grosse 614-486-4383 Charter "fownshi of Medford,. Owner: Charter Township of CIPP lining of 12" (2132') and 15" (783') diameter Redford Start pipe 15145 Beech Daly Rd. $125,568.00 7/5/2010 Redford, MI 48239 Completion John Selmi 7/21/2010 313-387-2640 State Pipe Services Inc Owner: Munhall Sanitary Sewer CIPP lining of 8" (11,829')�10" (1,426') 12" (2,291') Municipal Authority 15 (3,122) 16 (236) 18 (604) 21 (100) 24 1900 West Street Start (651') and 36" (466') Munhall, PA 15120 $1,125,000 7 Engineer: Chester Engineers on Completion Attn: Fred Abraham 10/30/2010 412-809-6600 City of Cambrid a Sanitary Brewer Im rovements Owner: City of Cambridge Manhole repair and CIPP lining of 10" (521'), 12" 1131 Steubenville Ave. Start (227'), 15" (6,025'), 18" (359'), 24" (1,442) Cambridge, OH 43725 $730,612.50 4/27/2010 diameter pipe Engineer: Burgess & Niple, Inc. Completion 9/1/2010 Attn: John Swartzbaugh 614-451-1385 Morehead Kentuc iv Utilitv Plant Owner: Morehead Utility Plant CIPP Lining Board Start 135 South Wilson Ave $1,142,150.00 010 Morehead, KY 40351 Completion n Engineer: NC2,LLC. 8/01/2010 4086 Michigan Ave. Detroit, MI 48206 111 IIII // / i REFERENCESPROJECT CURED -IN -PLACE II Attn: Philips Keyes 606-831-2288 Contract #1— Pump Station and Outfall Owner: City of Center Line, MI Sewer Modification c/o Anderson, Eckstein, and Approximately 8,000 LF of 24" CIPP fiber reinforced Westrick Start lining, transforming existing gravity outfall sewer 51301 Schoenherr Road $3,578,505.95 04/15/09 into a forcemain outfall sewer. Shelby Township, MI 48315-2733 Com letion05/15/10 Attn: Paul Guinnane 586-726-1234 DWSD Contract. DWS— CS 1368 Owner/Engineer: Detroit Water City of Detroit Sewer Repairs Contract 300,000 LF & Sewerage Dept. Cleaning, TV, CIPP Lining (15 Mile Sinkhole) 6425 Huber St. Com ion let Detroit, MI 48211 $138,000,000 July 2006 Attn: Bharat Doshi, P.E. 313 224-4735 4086 Michigan Ave, Detroit, MI 48206 Inland Waters Pollution Control, Inc. (IWPC) has not failed to complete any work awarded to IWPC. SECTION II - PLAN & EQUIPMENT QUESTIONNAIRE 1. We will begin working within 30 days of receiving a Notice to Proceed. Inland Waters Pollution Control has two crews of 6-12 personnel that are available to work on the project. Once the work is started, our crews will not mobilize home until after completing the project. 2. Subcontractors a. Advanced Underground Inspection, LLC — 38657 Webb Dr., Westland, MI 48185 — CCTV & Cleaning b. Culy Contracting — 5 Industrial Park Drive, Winchester, IN 47394 — CCTV, Cleaning & Manhole c. Rehab Pipe Tek — 2250 Industrial St, Burlington, ON 1-713 1A1 Canada — CCTV & Cleaning 3. Unable to currently provide a listing 4. See attached equipment list 5. Yes Inland Waters Pollution Control, Inc. — CIPP Lining Equipment ... 2003 2003 ........ KENWORTH KENWORTH .. JETTER VAC JETTER VAC 2001 STERLING JETTER VAC 19E .............. FORD JETTER VAC 2007 ��.�......2006 INTERNATIONAL .............JETTER JETTER...VAC.................................................................� STERLIN.G . � VAC 2014 FRIGHTLINER .._ .............. _. JETTER VAC 2014 FRIGHTLINER JETTER VAC 2003 FREIGHTLINER TV TRUCK 2003 FREIGHTLINER TV TRUCK ...... ...—�. 2000 FORD TV TRUCK 2003 FORD ITV TRUCK _......... FORD ......... 1996 ECONOLINE TV TRUCK 2011 FORD TV TRUCK 2011 FORD TV TRUCK 2011 FORD TV GROUTTRUCK 2012 FORD TV TRUCK 2005 FORD TV TRUCK 2016 FORD TV CUTTER TRUCK F550 ...... ....- _. 2006 .. _ MACK BOILER TRUCK WATER............. �www�w 2005 STOUGHTON BOILER TRAILER STEAM & WATER 2015 WESTERN STAR BOILER STEAM 2005 PETERBILT BOILER STEAM OR WATER 2009 UNTILITY ........_.w.__..__.___._ BOILER TRAILER STEAM WATER OR STEAM ...............................��.......... _...m..m.................................. .� m� 2007 ........... UTILITY ............................._....REFER REFER TRAILER ._._...m��.............................................................................................................................�aaa 1993.. TRL.M......� TRAILER 2001 Great Dane REFER TRAILER 1997 UTILITY REFER TRAILER 2000 WABASH ........ ......... REFER TRAILER 2006 UTILITY ......_. ............... .._ ._............ �m REFER TRAILER -NEW 2004 FREIGHTLINER ..... _. REFER TRUCK ... 2005 PETERBILT .- .............. REEFER TRUCK 2005 PETERBILT REEFER TRUCK 2005 FREIGHTLINER I REEFER TRUCK 2007 FREIGHTLINER REEFER TRUCK 9/26/17 SECTION III - CONTRACTOR'S FINANCIAL STAT E M E N T CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Sewer and Manhole Rehabilitation Project No. 118-093 For Bids Due December 11, 2018 Contractor Name: Inland Waters Pollution Control, Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31" for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/201 B General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/2018 General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) List of at least three (3) projects involving CIPP pipe lining of pipes with a diameter of 36 inches or greater, within the state of Indiana in the last three (3) years. Version 7/20/2018 General Conditions - 8 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) X By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) x By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub- contractors have the necessary licenses to undertake the work called for in this bid. If a sub -contractor loses their license at any point, it is the responsibility of that sub -contractor to notify the City. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) X Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) X Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) X Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) X Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 (ix) X Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) X List of at least three (3) projects involving CIPP pipe lining of pipes with a diameter of 36 inches or greater, within the state of Indiana in the last three (3) years. Date: D cember 10, 2018 (n ere) Jamee Bedingfield (Print Name Here) Inland Waters Pollution Control„ Inc. (Name of Company) 4086 Michigan Avenue (Address of Company) Detroit (City) 148210 (State) 313-899-3014 (Telephone Number) Version 7/20/2018 General Conditions - 10 1 BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE 12/05/2018 10:22 AM n ) INLAND WATERS POLLUTION Business Name: CONTROL, INC. Business ID: 1989060285 Entity Type: Foreign For -Profit Corporation Business Status: Active Creation Date: 06/05/1989 Inactive Date: Principal Office Address: 4086 MICHIGAN AVE, DETROIT, MI, p 48210 USA Expiration date: Perpetual Jurisdiction of Formation: Michigan Business Entity Report Due g 06/30/2019 Date: Original Formation Date: 10/18/1973 Years Due: Title Name CEO Robert Steinberg Vice President Robert McCrae McCrae Secretary DAVID HIEMSTRA Secretary Steven Labarre President Wendy Wilkes 1510 Klondike Rd SW, Suite 103, Conyers, GA, 30094, USA 1510 Klondike Rd SW, Ste 103, Conyers, GA, 30094, USA 4086 MICHIGAN AVE, DETOIT, MI, 48210, USA 2002 Timberloch Place, Suite 550, The Woodlands, TX, 77380, USA 1510 Klondike Rd SW, Ste 103, Conyers, GA, 30094, USA �, �r'�i1�rfi111 lay rIN ,i/ ' / � �, i = � r M101"1""�' r% it rr Type: Business Commercial Registered Agent Name: C T CORPORATION SYSTEM Address: 150 West Market Street, Suite 800, Indianapolis, IN, 46204, USA MUMPMmAk Attachment ii — List identifying all former business names N/A alk Attachment iii — Determinations by a court / governmental agency N/A aA m m4k Attachment iv — Staffing Capabilites Inland Waters Pollution Control, Inc. ensures that we have sufficient employees on staff to complete the work that we are bidding. co O O '.. O O O o N - 00 O f- Ip J O O O 0 0 O O O 00 O O F O 3 ,o .O ..0 .o., �o O o 0 O 0 o o.,. O o a o O m e Oco N w N 0 w .. �.e .. ,,,.a .. x Z o 0 0 0 0 0 0 0 ... 0 „ .. o .... 0 . ...... 0 z W W �+ O .. Z � _� N cA -- .,.._. � .. .. ..... .......-.,w.... _ ......,.... _.,.,....._.. .... U) W .� (n O O O O O O O O O O O Z Co F Z w Zaf ....._ o 0 0 0 0 0 0 0 0 0 O o z z N o " � f v, ... ..... . ....__ .,... .....,_. __ . ,...... .,_... ... ,. . V � q p n O O O 0 O M O 0 0 0 M N � a} OW O F- u '.. 0 0 0 CD CD 0 O O O O 0 N LLJ F- ;r' Z F O 2 O O O O O O O O O O O O a F w Y r X 0. p LLJ J Z µ r F z= d O w ,..... . . ..... ...M O O O_ ...O . O _........ O ,.... 'O CDM .,,,.e LG 0: 5 �Z a' of 00 ONE z y. w Q wQ ai Z — o 0. w o'0 0 0 0 0 0 0 0 0 o o u w a 2 J z- UW -" w w Q LLI 0 ZQ0 of Q d r — J 00 W _,m ..m.. .... N" N 0 0 0 0 O O M O M V r4 to pn a� 3i O O O .- 't O LO 0 00 ^,,..: Iw N M M . _ ........ ,.._.......--- - O ® o O O O 0... O, 0,.. O O O O U cj O LO LID u, 0 a C w Q O � _ o w io. W W Cl) ❑ U d ZO O d co d C) CO M U J Z Y W } u A Q U z Z UO r .". F o w 4V Attachment v — Classification of employees Individuals who will perform work will be classified as employees under all applicable state and federal laws and local ordinances. Ry S Attachment vi — Apprenticeship / Training Programs Inland Waters Pollution Control, Inc. does not currently employ apprenticeship programs or training programs registered with the United States Department of Labor's Office of Apprenticeship. Attachment vii — Drug Testing Please find attached a copy of Inland Waters Pollution Control, Inc. Drug Testing Policy. NOBODY GETS HURT 4 i Section 6.1 L Rev. 0 Substance Abuse Policy VIRFR March 2017 _._a. ....._......._ — Page 1 of 8 1. Purpose The purpose of the Substance Abuse Program is to provide a safe, healthy, and productive work environment in a workplace that is free from the hazards and effects of drugs and alcohol abuse. The intent is to protect employees, customers, customer's property and assets and to provide safe and efficient operations. This policy applies to all IPR employees in accordance with applicable law. 2. Policy IPR strictly enforces its drug and alcohol abuse policy. Employees found to be in violation of the drug and alcohol abuse policy shall be subject to the disciplinary actions stated in this policy. The health and safety of other employees, subcontractors, customers and the general public will not be jeopardized or tolerated by any violation of this policy. Business entertainment is often essential for Corporate, senior management and Business Development functions to carry out the mission of IPR. Responsible, reasonable and discretionary consumption of alcoholic beverages during business entertainment, meals and functions is permissible as long as it is carried out responsibly. 3. Definitions Employee — shall mean a person, including a contract worker, a leased worker, part-time or full-time, who is paid by IPR to perform duties, tasks or services for the company. Illegal or Illicit -- drugs/substances shall include, but not be limited to all forms of alcohol, narcotics, depressants, amphetamines, hallucinogens and marijuana or any controlled substances in which the use, possession or sale is prohibited by law. Reasonable SuggIcion — a belief on objective facts sufficient to lead to a reasonable suspicion of use of prohibited substances. Under the h1luence -. (1) the presence of a prohibited substance in body fluids above the cut-off level established by this policy or by our client's policy (2) the presence of a prohibited substance that affects an individual in any detectable manner. The symptoms of influence may be, but not limited to, slurred speech or difficulty in maintaining balance. #fir Wr I te,, Paraphernalia — is any unauthorized material or equipment or items used or designed for use in testing, packaging, storing, injecting, ingesting, inhaling, or otherwise introducing into the human body substances covered by this policy. Phvsi i n- ra rjb d Medications tions — shall mean legal mood altering substances that shall include, but not limited to narcotics, depressants, amphetamines, or other controlled substances that can adversely affect work behavior, job performance, and the ability to safely operate a motor vehicle. SAFETYN EVERYONES BUSINESS 2187209,1 NOBODY GETS HURT Section 6.1 1 Rev. 0 Substance Abuse Policy March 2017 IR Page 2 of 8 4. General Requirements IPR strives to maintain a safe work environment conducive to effective business administration and operations. The presence of drugs and alcohol in the workplace and the influence of these substances on employees during working hours are inconsistent with effective business operations and may be unlawful. The unlawful manufacture, distribution, dispensation, possession, or use of drugs or controlled substances while on IPR property or while executing IPR job functions in violation of this policy is prohibited. Employees may not be under the influence of illegal drugs or abuse alcohol while on IPR property or performing services for IPR. Discipline Employees who violate this Policy will be subject to discipline, up to and including discharge. Employees who are under the influence of drugs or abuse alcohol on IPR premises or while performing IPR job functions may be disciplined, Employees who plead guilty to or are convicted of driving while under the influence of alcohol or drugs in the course of IPR job duties will be subject to discharge. B. Searches IPR reserves the right to conduct reasonable searches of employees' lockers, desks, work areas, computer(s), vehicles, purses, bags, containers, or personal effects. An employee who refuses to submit immediately to such a search will be subject to discipline, up to and including discharge. r Employees are prohibited from bringing drug paraphernalia onto IPR property or worksite on IPR business. Employees who possess or distribute drug paraphernalia while on IPR property or on IPR business will be subject to discipline, up to and including discharge. D. Civer-the-o nt r or PrescribgdNedicatiQn, Cr w M, w - .------------------------------ impair theiw. to w• their job, IPR will work with the employee to determine reasonable accommodations 2187209 1 SAFETYIS EVERYONE S BUSINESS NOBODYGETSHURT Section 6.1 Rev. 0 Substance Abuse Policy Ma11 rch 2017 Page 3 of 8 An employee who voluntarily seeks treatment for an illicit substance and/or alcohol use problem, which requires a leave of absence for treatment, shall be granted such leave of absence, and furthermore shall be eligible for benefits under the specifications of the existing IPR insurance policy. Employees that have been on leave for self -disclosure of substance abuse shall be required to be tested before returning to work and randomly thereafter under formal written conditional employment agreement. Note: Some client and governmental regulations do not allow continued employment of persons whose substance abuse is discovered by the Company through testing or other means when the person'sjob is of a certain critical nature (e„g., DOT work), Therefore, employees that do not self -identify and seek help for substance abuse problems prior to being discovered may not be employable by lPRl Criminal Q1g Activit Any employee who is involved in off -the -job illegal drug use/or activity will be deemed as violating this policy. Records and information obtained by the IPR regarding alcohol and drug testing, test results, employee substance use, and the treatment of employees for substance abuse will be maintained confidentially. Ordinarily, access to such records and information will be limited to IPR employees who have a need to know the information in the course of performing their jobs or other individuals consistent with applicable law. In appropriate circumstances, employees may be required, as a condition of continued employment, to consent to the release of records obtained under this Policy to select customer personnel or government officials responsible for monitoring compliance with reasonable and lawful alcohol and drug policies. 5. Drug and Alcohol Testing Employees and prospective employees will be subject to drug and/or alcohol testing in the following circumstances and in accordance with procedures established by this policy, consistent with all applicable laws. Reasonable measures will be undertaken to respect individual privacy when samples are taken. Drug test results will be released only to the IPR- designated Medical Review Officer ("MRO") or the MRO"s designee. A written copy of this Policy shall be provided to all employees at the point of hire and all job applicants subject to testing. Written notice of the existence of this Policy and of where a. copy of this Policy may be obtained shall be conspicuously posted at all facilities where testing may take place. 2157209,1 SAFETYIS EVERYONE S BUSINESS NOBODY GETS HURT 0 Section 6.1 Rev. 0 Substance Abuse Policy March 2017 Page 4 of 8 �' • 11 ,• w s � w All job offers (including offers to individuals previously employed by IPR) must be contingent upon satisfactory results of a drug test. The test must occur no more than thirty (0) business days before the individual's starting date and only after an employment offer is made. IPR prefers to have test results prior to individual starting work„ however, in cases where this is impractical„ testing will be conducted as soon as practical, but no longer than one week after the individuals start date. A positive test or refusal to submit to testing will result in the withdrawal of the employment offer. Employees working in positions in which drug testing is mandated or regulated by law -- such as regulations of the U. S. Department of Transportation (DOT), will be subject to testing in accordance with the applicable laws and regulations. Employees subject to regulated testing may also be required to undergo non -regulated reasonable suspicion or post- accident/incident iccident/incident testing in accordance with this Policy; employment actions resulting from such non -regulated tests will be governed by this Policy. Employees assigned to work at customer sites or on specific customer -related projects will be subject to any additional drug and alcohol abuse policies and testing programs required by the customer„ provided that the policies and programs are consistent with all applicable federal, state„ and local laws. Before any testing occurs, employees who are subject to customer -required testing must sign the Employee Consent to Customer -Required Drug and/or Alcohol Testing (Appendix I). A drug and/or alcohol test may be required where there is a reasonable suspicion that an employee is under the influence of alcohol or drugs while on IPR property or on IPR business and where there is the reasonable prospect of impaired job performance. Reasonable suspicion testing must be based on the observation of an impaired condition or other circumstances by a member of management or a Human Resources representative who has been trained to make such observations reliably. The referring manager or Human Resources representative must promptly make documentary record of specific observations concerning the appearance, behavior, speech, or odors of the employee constituting grounds for reasonable suspicion. This record shall be maintained and made a part of the employee's personnel file. A copy of this record shall be provided to the employee upon request. Employees who have been referred for reasonable suspicion testing should ordinarily be provided transportation to the testing facility, Employees who appear to be under the influence should not be permitted to drive. 2187209, l SAFETYISEVERYONE& BUSINESS NOBODY GETS HURT Section 6.1 Rev. 0 Substance Abuse Policy6 L'V March 2017 Pa4e 5 of 8 E. PostAcricigntlIncident Testln After a serious, work -related accident or incident, the Safety Manager will ordinarily refer the employees involved for an alcohol and drug test, regardless of any suspicion of alcohol or drug use. For example, post-accident/incident testing should be conducted as soon as practicable following: i. Any personal injury in a IPR workplace or jobsite resulting in a death or immediate hospitalization or immediate referral to a physician; ii. Any casualty loss or damage of IPR property with an estimated value of at least $500; iii. Any environmental release that results in a report to a government agency; iv. Any accident or incident that is reasonably suspected to be the result of a violation of IPR safety standards and practices and results in personal injury or property damage; v. Any accident or incident that results from a violation of a IPR work rule or disciplinary rule and results in personal injury or property damage. If, in addition to the accident/incident, there is also a reasonable suspicion of that the employee is under the influence of drugs or alcohol, the employee should ordinarily be provided transportation to the testing facility and should not be permitted to drive. Note: It is a condition of employment for an employee to refrain from reporting to work or working with the presence of drugs or alcohol in his or her body. Any injured employee who refuses to submit to a test for drugs or alcohol in accordance with this Policy is grounds for immediate termination and may forfeit eligibility for workers' compensation medical and indemnity benefits under the law of the state in which they work. F. Random A percentage of the total IPR employee population will be subject to random drug and alcohol abuse testing; provided, however, random testing will be not be utilized in any jurisdiction or location where it is prohibited such as the State of California once a supervisor is notified that an employee has been selected for random testing, the supervisor shall notify the employee within 24 hours. Once the employee is notified they have been selected for random testing, that employee must report to the IPR-designated testing site within 4 hours. Note: Employees refusing to submit to a random test or fail to meet the 4 hour requirement shall be viewed as non -compliant with this policy and will be terminated. SAFETYIS EVERYONES BUSINESS 2187209A NOBODYOETSHURT Substance Abuse Policy G. Return to Duty Section 6.1 J Rev. 0 March 2017 Paqe 6 of 6 Employees who have been away from work (leave of absence, etc.) for 30 days or more and where they were not in the random drug and alcohol testing pool, must be tested prior to returning to work. 6. Positive Test Results A. Drua Tests All positive tests shall be verified promptly by retesting the sample using gas chromatography -mass spectrometry or other equally reliable procedure. For prospective employees, a confirmed positive drug test of a job applicant will result in the withdrawal of the employment offer. Employees with a confirmed positive drug test will be subject to termination. All testing will be conducted by certified laboratories and/or licensed physicians or other qualified medical personnel. Copies of positive laboratory tests and other pertinent information will be provided when required by state law or otherwise required or appropriate. B. Alcohol Test A confirmed breath alcohol level of .02 or greater will be considered a positive test result. If the initial test indicates an alcohol concentration of 0.02 or greater, a second test will be performed to confirm the results of the initial test. The confirmatory test will be observed and performed between fifteen minutes and no more than 30 minutes from the completion of the original test. Employees with a confirmed positive alcohol test will be subject to termination. C. Failure or Refusal to Submit a S ecimen Applicants who fail or refuse to test will be disqualified from employment and employees who fail or refuse to test will be subject to discharge, unless the MRO determines that there is a valid medical reason for failing to submit a specimen. Applicants who submit adulterated, substituted, or diluted specimens for drug tests will be disqualified from employment with IPR. Employees who submit adulterated or substituted specimens drug tests will be terminated. .. 4 UNI. r N6 * a NrVEMM r • « 1Y Prior to test administration, a tested person shall be provided the opportunity to submit medical information, such as the identification of medications taken, including over-the- counter and prescription drugs. For drug tests, the MRO will provide tested persons written notice of any confirmed positive test results, together with a written copy of the test results, within three (3) days following the IPR's receipt of results. Depending on the circumstances and performance record, management may at its sole discretion, consider a former employee for rehire after meeting all the following conditions: • After 90 days from termination. • Case reviewed and approved by Corporate VP of Human Resources. • Individual is not otherwise coded as "ineligible" for rehire. • Written conditional employment agreement is executed and signed by the employee. SAFETYIS EVERYONE'S BUSINESS 2187209.1 NOBODYGETSHURT "'" ' Section 6.1 Rev. 0 Substance Abuse Policy March 2017 Page 7 of 8 7. Responsibility of the Medical Review Officer (MRO) The MRO shall be a physician designated by IPR. The MRO must review all tests for which there is a laboratory report other than negative and shall be the final decision maker as to whether a test result is positive. In addition, the MRO must review 10% of all negative tests. The MRO is responsible for reporting findings to the appropriate management or Human Resources contact within 24 hours of making the final determination as to the test result. The MRO shall be available to all persons subject to testing to provide technical information regarding prescription and nonprescription medication. The MRO shall have a duty of confidentiality and shall not disclose to IPR any information obtained about an employee that is not relevant to the enforcement of this Policy. B. Consultation with Human Resources There shall be no discipline or termination of employment resulting from a violation of this policy without the advance approval of IPR's VP of of Human Resources. SAFETYIS EVERYONE S BUSINESS 2187209 1 NOBODYOETSHURT Section 6.1 Rev. 0 Substance Abuse Policy March 2017 IRFR Page 8 of 8 Appendix 1 - Drug and/or Alcohol Testing Consent Form Employee Agreement and Consent to Drug and/or Alcohol Testing I hereby agree, upon a request made under the drug/alcohol testing policy of Inland Pipe Rehabilitation LLC and / or Subsidiary Business Unit further referred to as the "IPR," to submit to a drug or alcohol test and to furnish a sample of my urine, breath, hair follicle and/or blood for analysis. I understand and agree that if I at any time refuse to submit to a drug or alcohol test under IPR policy, or if I otherwise fail to cooperate with the testing procedures, I will be subject to immediate termination. I further authorize and give full permission to have IPR and/or its IPR physician send the specimen or specimens so collected to a laboratory for a screening test for the presence of any prohibited substances under the policy, and for the laboratory or other testing facility to release any and all documentation relating to such test to IPR and/or its designated employee or employees, as appropriate, and/or to any governmental entity involved in a legal proceeding or investigation connected with the test. I waive any right to privacy regarding the screening test, its results, and related documentation. Finally, I authorize the IPR to disclose any documentation relating to such test to any governmental entity involved in a legal proceeding or investigation connected with the test. will hold harmless the IPR, its IPR physician, and any testing laboratory the IPR might use, meaning that I will not sue or hold responsible such parties for any alleged harm to me that might result from such testing, including loss of employment or any other kind of adverse job action that might arise as a result of the drug or alcohol test, even if a IPR or laboratory representative makes an error in the administration or analysis of the test or the reporting of the results. I will further hold harmless the IPR, its IPR physician, and any testing laboratory the IPR might use for any alleged harm to me that might result from the release or use of information or documentation relating to the drug or alcohol test, as long as the release or use of the information is within the scope of this policy and the procedures as explained in the paragraph above. This policy and authorization have been explained to me in a language I understand, and I have been told that if I have any questions about the test or the policy, they will be answered. I UNDERSTAND THAT THE IPR WILL REQUIRE A DRUG SCREEN TEST UNDER THIS POLICY WHENEVER I AM INVOLVED IN AN ON-THE-JOB ACCIDENT OR INJURY UNDER CIRCUMSTANCES THAT SUGGEST POSSIBLE INVOLVEMENT OR INFLUENCE OF DRUGS OR ALCOHOL IN THE ACCIDENT OR INJURY EVENT. Signature of Employee Date Employee's Name — Printed Date IPR Representative Date SAFETY IS EVERYONE S BUSINESS 2187209.1 NOBODYGETSHURT Section 6.2 Rev. 0 Testing Panel March 2017 Page 1 of 1 IPR utilizes 10-panel drug test regimen. The 10-panel regimen is as follows: Drugs Screening Level Confirmation Level Amp hetami nes/Methamphetamines 300 (ng/ml) 250 (ng/ml) Ecstasy — MDMA. MDA, MDEA Barbiturates._.._... 300 (ng/ml) ___ _....._....._.. 100 (ng/ml) Benzodiaze Ines P 300 n /ml� (9 ) 100 n (g/ml) Cocaine 150 (ng/ml) 100 (ng/ml) _ ..,.,., ._._ ..............._..... Methadone ...... .......... ... ------------- ........................................._....._ 300 (ng/ml) 100 (ng/ml) Opiates — 2000 (ng/ml)-������ 2000 (ng/ml) Morphine 2000 (ng/ml) Codeine 6-Acetylmorphine (6-AM) 10 (ng/ml) 10 (ng/ml) Heroin Cannabinoids 20 (ng/ml) 10 (ng/ml) PCP ............... 25 (ng/ml) wW_ 25 (ng/ml) Propoxyphene 300 (ng/ml) 200 (ng/ml) �__ .................. Methaqualone ............ . .- 300 (ng/ml) 200 (ng/ml) Alcohol -.........._ ........ _ 0.02% (BAC) _ 0.04% (BAC) NOTE: Alcohol screening and confirmation methods are conducted according to DOT protocol. Substances and levels may be modified when applicable. SAFETY IS EVER YONE'S B USINESS Attachment viii — Surety Company Please find attached a screenshot of the Department of Treasury's Listing of Approved Sureties. sl , N," &doRmbv9.Mli""J." f3'Furnlb Bonds -list of Cedifi_ , FedEs mR nut i e'AEOIX'�t r.,, w�7Offlw mnWWo 4) ar NVD0TbmrunBsjCHcrs..rytogin " . 0 ,.A d*. Page — Safi ..... XMa11d6UKAIt4J1JV:6"I;jerl't"JYv#ww'u'h:. __. ....... ... .._. _... .._. Arch Insurance Company (NAIC #11150) BUSINESS ADDRESS: Harborside 3, 210 Hudson Street, Suite 300, JERSEY CITY, NJ 07311 - 1107. PHONE: (201) 743-4000. UNDERWRITING LIMITATION bl: $92,978,000. SURETY LICENSES c,f/: AL, AK, AZ, AR, CA, CO, CT, DE, DC, FL, GA, GU, HI, ID, IL, IN, IA, KS, KY, LA, ME, MD, MA, MI, MN, MS, MO, MP, MT, NE, NV, NH, NJ, NM, NY, NC, NO, OH, OK, OR, PA, PR, RI, SC, SO, TN, TX, UT, VT, VA, VI, WA, WV, WI, WY. INCORPORATED IN: Missouri. Inland Waters Pollution Control, Inc. has no federal, state or local tax liens or delinquencies owed to any federal, state or local taxing boding the preceding three years. r IWPC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Ongoiing Great Lakes Water Authorit GLWA-CON -149 Project --- . ...... Great Lak��������������������������...........������������������� es Water Authority 735 Randolph Street 0 � Professional Engineering Services for Emergency Sewer Repairs consisting of CCTV, Inspections, Detroit, MI 48226 $26,800,000.00 Ongoing Cleaning, CIPP, Grouting, Backwater Gate Repairs Attn: Mini Panicker and Manhole Rehabilitation and ECO Cast 313-267-8996 Great Lakes Water Authority GLWA-CON-183.... eat m-m� Great Lakes Water Authority ......... ........... Detroit River Interceptor Repairs consisting of 735 Randolph Street chemical grouting, roof repair, work platform Detroit, MI 48226 $1,903,718.00 Ongoing installation, concrete joint repairs, epoxy grouting, Attn: Mini Panicker manhole rehabilitation, CCTV and cleaning. 313-267-8996 DWSD Contract — 903 Owner: Detroit Water & City of Detroit Sewer Repairs Contract - Cleaning, Sewerage Dept. CCTV, CIPP Lining of 8" —120" pipe 6425 Huber St. $60,000,000.00 Ongoing Detroit, MI 48211 Attn: Mohammad Farhat, P.E. w 313-267-1201 --- ----------- ...................... City of Garden City,MI City of Garden City, MI _,_.... _.... __ .... Cleaning Approx 50,580 LF of 8" — 42" and Full Hennessey Engineers, Inc. Length CIPP of approx. 50,485 LF of 8 — 42" sewers 13500 Reeck Road $1,784,304.75 Ongoing Southgate, MI 48195 Ryan Kern, PE .... 734-759-1600 Cit of Adrian MI .... ......... .................................N..w City of Adrian,MI _ � _ Approx. 918 LF of 30", 916 LF of 36", 400 LF of 12" Jones & Henry Engineers, LTD CIPP and 360 LF of 30" - 33" of cementitious liner 3103 Executive Parkway and 133 LF of 30" — 42" of cementitious liner Suite 300 $469,765.00 Ongoing Toledo, OH 43606 Michael Karafa, PE 567-661-0247 Cit of East p ointe Department of Public Works & Clean, CCTV & FCIPP & SCIPP Lining of 24,000 LF of Services-AEW Various Sanitary Sewer 17750 Ten Mile Rd $814,485.00 Ongoing Eastpointe, MI 46021 Attn: Patrick Marcus 586-726-1234 Ext 137 "Fl PC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS linland Watersll I ,' c Reference _..........._..............._........_.............................................................................................--._ — of Grosse Pointe Farms- HRC Clean, CCTV & CIPP Lining of 5,500 LF of 24", 27" & 15" Sanitary Sewers .... .....................................................-- ..... .. ..........._ DWSD PO #2905755 — Inspection and Cleaning of l ubl ilrm Contiroll,, ;lilac , Ill,,,,iii ,,,, II III �................................................................. .............w.....� ... City of Grosse Pointe Farms- HRC 555 Hulet Drive P.O. Box 824 Bloomfield Hills, MI Attn: Edward Zmich 248-454-6302 .............................................. Owner: Detroit Water & Sewerage Dept. 6425 Huber St. Detroit, MI 48211 ............—..._.........._.............._....__.........._......ww....................w_....._..................... $778,125.61 ............... $478,183.33 Ongoing Ongoing Two DWSD Interceptor Siphons Attn: Mohammad Farhat, P.E. 313-267-1201 City of Toledo Div. of Engineering City of Toledo — 2014 Sewer Lining One Lake Erie Center CIPP Liningof 8" to 39" Sewers consisting of 23 750 g 600 Jefferson Ave, Suite 600 $2,835,760.00 Ongoing LF of Sanitary and 19,150 LF of Storm Toledo, OH 43604 Mike Elling 419-936-2276 DWSD Contract DWS — 900 Owner: Detroit Water & City of Detroit Sewer Repairs Contract Cleaning, TV, Sewerage Dept. CIPP Lining of 8"-120" pipe 6425 Huber St. $4,225,950.00 Ongoing Detroit, MI 48211 Attn: Mohammad Farhat, P.E. 313-267-1201 City of Grosse Pointe Farms, MI — SRF Hubbell , Roth & Clark, Inc. 555 Hulet Dr. Sewer Innprovennents CIPP Lining of 12" (350'), 15" (400'), 18" (350') Bloomfield, MI 48302 $188,982.50 Ongoing Eddie Zmich, P.E. 248-454-6300 Washington anlitary, Sewer District IDIQ Owner:Washington Suburban C15192A11 ESA Sanitary Commission Indefinite Delivery/Indefinite Quantity CIPP lining 14501 Sweitzer Lane $50,000,000 Ongoing project 8"-42" in diameter. Work is located in an Laurel, MD 20707 environmentally sensitive area AttnCough Mark Coughlin 301- 301-642-3092 Owner: Washington Suburban Washington Sanitary Sewer District IDI Sanitary Commission C15183A11 Mainline CIPP 14501 Sweitzer Lane $20,000,000.00 Ongoing Indefinite Delivery/Indefinite Quantity CIPP lining Laurel, MD 20707 project of 8"-15" diameter pipe Attn: Mark Coughlin 301-642-3092 IWPC AN IPR CUMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Inlandire Pollution Cointroll,, Inc. r'. Reference List— CTIPP Completed / Past Proiects Citv of S rin field OH — 2016 Misc. Sanitary Sewer City of Springfield, OH 76 E. High Street Start Linin CCTV, Cleaning and CIPP Lining of Approx. 5,114 LF Springfield, OH 45502 $661,424.00 07/01/2016 of 8" to 36" sewers and Manhole Rehabilitation Leo Shanayda, City Engineer Completion 06/30/2017 937-324-7312 .. ... �__. __.�...,.� Cityof East Lansing— 2016 Sewer Reba 1iIIItat1on City of East Lansing Pro ect�___ � 410 Abbot Road Start 03/01/2017 CCTV, Cleaning and CIPP Lining of Approx. 1,200 LF East Lansing, MI 48823 $671,825.10 of 36", 250 LF of 27" and 500 LF of 24" sewers Nicole McPherson Completion 10/31/2017 517-319-6928 Owner/Engineer: Washington Sanitary Sewer District Start Washington Sanitary Sewer District Lateral ID1 14501 Sweitzer Lane $21,651,984.00 2/1/2012 Lateral rehabilitation IDIQ Laurel, MD 20707 Completion Attn: Mark Coughlin 2/1/2017 301-642-3092 DWSD Contract DWS — 889 Owner: Detroit Water & City of Detroit Sewer Repairs Contract Cleaning, TV, Sewerage Dept. Start CIPP Lining of 8"-120" pipe 6425 Huber St. $4,225,950.00 05/15/2015 Detroit, MI 48211 Completion Attn: Mohammad Farhat, P.E. 02/28/2018 313-267-1201 DWSD Contract DWS — 890 Owner: Detroit Water & City of Detroit Sewer Repairs Contract Cleaning, TV, Sewerage Dept. Start CIPP Lining of 8"-120" pipe 6425 Huber St. $4,225,950.00 05/15/2015 Detroit, MI 48211 Completion 02/28/2018 Attn: Mohammad Farhat, P.E. _ 313-267-1201 DWSD Contract DWS - 901............_. - � �................................_m.,,...........�.......m.... Owner: Detroit Water & East Side City of Detroit Sewer Repairs Contract Sewerage Dept. Start Cleaning, TV, CIPP Lining of 8"-120" pipe 6425 Huber St. $4,225,950.00 05/15/2015 Detroit, MI 48211 Completion 02/28/2018 Attn: Mohammad Farhat, P.E. 313-267-1201 .... ._........... ........ ......� . i' OD' 4—1.uc..Count - ...�,,...�...........................�........ .,...�... Kokosing Construction Company _ .... ......... ... Start I11-75 1Pt 1-21 886 McKinley Avenue 6/15/2016 CIPP Lining approx. 1,340 Linear ft of 8" —10" Columbus, OH 43222 $237,710.00 Completion 7/15/2016 Gina L. Carter 614-228-1029 MWR0 AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS .Inlll nd Waters Pollution Controlllinc, IProiect ReferenceIII ist II II City of Dearborn MI — Sewer Rehabilitation 2014 City of Dearborn, MI 16901 Michigan Ave. Start 7/01/2015 Clean, CCTV & CIPP Lining approx. 31,396 linear ft of 12" — 30" diameter pipe. Dearborn, MI 48126 $1,411,054.25 Completion Soud EI-Jamaly, P.E. 7/30/2016 313-943-2450 City of Mishawaka, Indiana Lawson -Fisher & Associates Start CIPP Sewer Rehabilitation — Various Locations 525 West Washington Ave. $678,930.00 7/01/2015 2015 South Bend, IN 46601 Completion Attn: Peggy Biggs, P.E. 10/19/2015 (574) 234-3167 Owner/Engineer: District of Sewer Rehabilitation and Extension for DC WASC Columbia Water and Sewer Start 8/17/2011 CIPP lining of 10" (7,590'), 12" (7,590'), 15" Authority $337,095.90 (7,590'), and 18" (7,590') diameter pipe. 5000 Overlook Ave, SW Completion 8/17/2015 Washington, DC 20032 Township of Summit, Mi, Township of Summit DPW 2121 Ferguson Road Start Clean, CCTV & CIPP Lining of 1,809 LF of 24" Jackson, MI 49203 $235,109.00 09/01/2015 Sanitary Sewer Attn: Scott Bevier Com letion 10/15/15 517-788-4113 City of Dearborn, MI — Sewer Rehabilitation 2014 Owner/Engineer: City of Dearborn Start Clean, CCTV & CIPP lining approx. 9,111 linear ft of 10" —48" diameter pipe. 16901 Michigan Ave. $541,192.20 02/01/2014 Dearborn, MI 48126 Completion 06/30/2014 Soud EI-Jamaly, P.E. 313-943-2450 Owner: City of Royal Oak 2014 Sewer Limn - Contract Not . S-1402 211 Williams Street Start 11/01/2014 CIPP lining of approximately 10,000 linear feet 8"- Royal Oak, MI 48068 $351,750.50 Completion 18" in diameter Merleo Seneres-Inspector 12/31/2014 248-246-3260 North Side Sewer Improvements Project Division City of Auburn, Indiana A and B 210 East Ninth Street Start 3/22/2013 Project consists of CIPP lining of 8"-12" (9260') Auburn, Indiana 46706 $319,652.00 diameter pipe, 310VF of manhole lining, and point Cheryle Culler Completion 7/12/2013 repairs on existing sewers 260-969-8837 law PC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Inland Watire Pollution Controll, Inc. D"ect IRefeireinceis ,- CIPP City of Mishawaka CIPP Sewer Rehabilitation Edgewater Northside 600 E. Third Street Interceptor Room 100 $695,641.00 Completed CIPP liningof 3 700 linear feet 18 to 36 in Mishawaka IN 46545 , diameter Piper C. Tittle, P.E. 574-234-3167 City of Midland Trenchless Sewer Reconstruction Cityand Start, 333 West Ellsworth worth Street CIPP lining of 10 (577 ), 21 (2,015 ), and 36 7/1/2013 (2,102') diameter sanitary sewer. Midland, MI 48640 $410,649.00 Completion Steven Smith 8/13/2013 989-837-3504 Charter Township of Clinton, District "A" Sanitary Sewer CIPP Linin Michigan Start CIPP lining of 24" (6,067') and 30" (1,712') 40700 Romeo Plank Road $966,260.00 8/1/2013 Clinton Township, MI 48038 diameter sanitary sewer. Completion 11/30/2013 Scott Chabot 586-781-8950 DWSD Contract DWS -876 Owner: Detroit Water & East Side City of Detroit Sewer Repairs Contract Sewerage Dept. Start Cleaning, TV, CIPP Lining of 8"-120" pipe 6425 Huber St. $44,000,000.00 04/21/10 Detroit, MI 48211 Completion 04/20/14 Attn: Mohammad Farhat, P.E. 313-267-1201 DWSD Contract DWS - 877 Owner: Detroit Water & West Side City of Detroit Sewer Repairs Contract Sewerage Dept. Start Cleaning, TV, CIPP Lining of 8"-120" pipe 6425 Huber St. $44,000,000.00 04/21/10 Detroit, MI 48211 Completion 04/20/14 Attn: Mohammad Farhat, P.E. 313-267-1201 FY2013 SanitarV Sewer Main Lining, - Project #SWR City of Holland 61 270 South River Avenue Start CIPP lining of 8" (11,200% 12" (660'), 15" (4,858'), Holland, MI 49423 $1,723,074.00 7/01/2013 18" (5,440'), 21" (13,100') 24" (263'), and 36" David Cyrus Completion 11/21/2013 (362') in addition to the reinstatement of over 400 616-355-1520 laterals and heavy cleaning of sanitary sewer Owner: Muhlenberg Township Authority 2011 SanitarySewer Rehab Contract 1 CIPP 2840 Kutztown Road Start CIPP lining" 11 935' 10" 2 515' 15" 3 685' Reading, PA 19605 of 8( ) (' ) (' ) $1,184,572.00 4/22/2012 Engineer: Great Valley 21" (465') and 24" (270') diameter pipe Completion Consultants 2/24/2013 Nick Johnson 610-375-8822 IWPC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS iin III ink Waters Pollution Cointiroll, Linc. Project Reference List ,,,,CIPP ........ ........ ......- ........ .._-.... Owner: Western Virginia Water _ � .....__. _._._.. Authority 2011 SewMe Collection System Improvements n 601 S. Jefferson St Start 9/1/2012 CIPP lining of 5,200 linear feet of 8" diameter pipe p p 3�d Floor Suite 300 $579,376.40 and pipe bursting of 75 laterals Roanoke, VA 24011 Completion Earl Smith, P.E. 8/15/2013 540-853-5700 2013 SS Rehab Pro ect _ Phase I Township of Macungie, P Joint sanitary sewer rehabilitation project under 8330 Schantz Road Start four g of for the CIPP lining municipalities p Breinigsville, PA 10831 $207,977.55 4/15/2013 approximately 8,059 linear feet of 8" and 530 Engineer: Keystone Engineers Completion linear feet of 10" sanitary sewer Tim Miller 9/30/2013 610-395-0971 Owner: Allegheny County Sanitary Authority #1477-interceptor Lining & Cleanin 3300 Preble Ave. Start CIPP lining of 10' (219') 15" (791') 18" (334') and Pittsburgh, PA 15233 $2,071,009.00 5/13/2012 30" (5,220') diameter pipe 412-732-1232 Completion Engineer: AMEC E&C Services 10/21/2012 Jim McCarthy, P.E. 724-940-4200 City of Uniontown, PA 20 North Gallatin Ave Redstone Interceptor Upgrade -_Uniontown, PA Uniontown, PA 15401 724.430-2910 1,796,165.00 Completed CIPP lining of 5,500 linear feet of 21"-30" sanitary Engineer: sewer K2 Engineering, Inc. Aaron Wigfield, PE 724-439-3440 West Homestead 2012 Sewer Re air Project 456 West Eighth Ave CIPP lining of 9,985 If of 8" and 600 If of 12" West Homestead, PA 15120 sanitary sewer. 99 CIPP point repairs and grouting 412-461-1844 1,610,740.00 Completed of laterals. Engineer: Seig and Associates, Inc Karl P. Seig, P.E. 724-935-2040 Tri State Pipeline St. l'Vlar °s WV�� Phase IIRe lacement 'roiec 418 2nd Street St. Marys, WV 26170 $510,000.00 Completed CIPP lining of 6 (600) 8"(3,300) 10 (1,700') and 18" (2,000') diameter pipe 304-684-2401 Eng: S&S Engineers 304-342-7168 (tiPC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Collection System Rehabilitation CIPP Lining Owner: Sanitary District 1 1045 Eaton Dr. Start 013 Contractor CIPP lining 6" (500'), 8" (31,000'), 10" (1,450'), 12" Ft. Wright, KY 41017 $ 2,392,042.50 (2,500'), 15" (1,250'), 18" (5,000'), 21" (1,250'), Kyle Boyle, P.E. n Completion 24" (30'), and 36" (655') diameter sanitary sewer. .....�.— �......._.. 859-547-1644 7/12/2013 Owner: Independence Hi.......�....... ...-...... Hill �...m. ,_. Conservancy District 22012 Trenchless Reconstruction of Sanitary sewers 7507 Taft Street Phase 4 Merrillville, IN 46410 Start CIPP lining project involving 8" (17,101') and 12" Engineer: North-West $566,565.00 7/22/2012 (4,780') diameter sanitary sewer Engineering Co Inc Completion Gary, IN 46402 4/28/2013 Aravind Muzumdar 219-0769-3996 Owner: Borough of Middleburg 13 North Main Street SanitaryMiddleburg, Sewer Rehabilitation Project PA Start CIPP lining of approximately 8,900 linear feet of 8" Engineer: Larson Design Group 9/30/2012 diameter pipe. Rehabilitation and lining of 8 1000 Commerce Park Drive $827,135.00 Completion manholes in addition to 6 spot repairs Suite 201 11/11/2012 Williamsport, PA 17701 Attn: Chris Beidler P.E. 570-323-6603 Owner: City of Royal Oak 2012 Sewer Lining- Contract lido, S-1201 211 Williams Street 0tart 06/01/2012 CIPP lining of approximately 10,000 linear feet 8"- Royal Oak, MI 48068 $297,237.50 18"in diameter William P. Heil, P.E. Completed 01/31/2013 248-246-3260 Owner: Cityof Dayton o Wagner Ford Sanitary Li Liner Installation Phase 2 320 W. Monument Dr. Start 6/17/2012 CIPP lining of 10,129 linear feet of 42" diameter Dayton, OH 45402 $3,197,794.00 Donald Kinnison Completion 9/9/2012 937-333-3739 -�������� City of Novi Sanitar Sewer Rehabilitation Areas B C1 & G 45175 W. Ten Mile Road Novi Michigan 48375 g $596,490.75 Start 012 CIPP liningof 17 460 linear feet 6" —15" in diameter Maria Sedki, P.E. Completion Completion 11/25/2012 248-844-5400 (tiWRC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Linlaind WatersPollution Control,, Linc. P,roiect Reference List CIPIP Owner: City of Frankfort, KY Bob Peterson East Frankfort Interceptor Rehab Phase I 1200 Kentucky Ave. CIPP lining of 18 (66,) 21 (360) 24 (606,) 27 Frankfort KY 40601 Start (637') 30" (877') and36" (222') diameter pipe. Dig (502) 875-2448 $535,976.40 10/14/2012 sections include replacement of 1741f of 21" and Engineer: Completion 1581f of 27" diameter pipe Hazen & Sawyer 3/24/2013 Amanda Mikuski 444 Lewis Hargett Circle#260 Lexington, KY 40503 (859) 219-1126 Royal Oak Michigan Owner/Engineer: 2012 Sewer Lining City of Royal Oak CIPP lining of 8" (5,450'), 10" (1,500'), 12" (1,600% Merleo Seneras Start 15" (950'), and 18" (500'). 211 Williams $297,000.00 11/1/2012 P.O. Box 64 Completion 1/4/2013 Royal Oak, MI 48068 (248) 246-3266 Owner: City of Farmington 33720 West Nine Mile Rd Farmington, MI 48335 Start Floral Park Subdivision Sewer Rehabilitation Engineer: Orchard, Hiltz & 3/20/12 CIPP lining of 16,000 linear feet of 8" —15" McCliment, Inc. $566,500.00 diameter pipe 3400 Plymouth Rd Completed Livonia, MI 48150 10/30/12 Matthew Parks, P.E. 734-552-6711 North Huron Valley/Rouge Valle — Short Term Owner: Charter County of Corrective Action Plan Wayne, Michigan Rehabilitation of 1,013 manholes, sewer lining of Engineer: Hubbell, Roth & Clark, 10,113 linear feet of sanitary interceptors, 17 spot Inc. Start repairs and 167 joint repairs of the interceptors, 200 Bagley, Suite 420 $17,167,477.89 02/10/10 cleaning of six siphons (1,616 linear feet, ranging in Detroit, MI 48226 Completion size from 8" to 42" in diameter). CIPP lining of 48" Attn: William Davis, P.E. 6/1/2012 (643') 60" (2834') 66" (806') and 78" (2,582' Over 313-965-3330 the Hole Wet Out) and slip lining of 72" (1,695') and 90" (582') diameter interceptor law PC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Inland ire Pollution Controll, ; in u ReferenceI ii ,- C11PP Tri-State Pipeline — St. Ma 's WV — Phase II Owner: City of St. Marys 418 2"d Street Start Replacement Proiect St. Marys, WV 26170 4/1/2012 Subcontracted CIPP lining of 6„ (600 ), 8 (3,300 ), $510,100.00 Prime: Tri State Pipeline Completion 10" (1,700'), and 18" (2,000') diameter pipe. Eric Taylor 5/1/2012 Lateral replacement and top hats 304-733-6801 Owner: City of Midland Start #13399-Trenchless Sewer Linin 333 W. Ellsworth St. 2/20/2012 CIPP lining of 8" (540') 10" (1,223') 21" (375') and Midland, Mi 48640 $231,960.00 24" (1,878') diameter pipe Steve Smith, P.E. Completion 989-837-3504 6/30/2012 Owner: City of Tiffin 51 EastMarket Street Gleason Construction —Tiffin OH Rock Creep Tiffin, OH 44883 Attn: Debra Reamer $98,325.00 Start 2/1/2012 Interceptor CIPP lining of 2,700 linear feet of 12" diameter pipe 419-448-5402 Completion Engineer: Jones & Henry 2/15/2012 419-473-9611 Owner/Engineer: Metropolitan 2011 Trenchless Technology Sewer Rehabilitation Sewer District of Greater CIPP lining of 8" (16,246');�10" (852'), 12" Cincinnati Start 9/26/2011 (33,586 ), 15 (7,759 ), 18 (5,293 ), 20 (97 ), 21 225 W. Galbraith Road $5,221,027.00 (1,110'), 22"(681'), 24" (2,515'), 30" (778'), Cincinnati, OH 45215 Completion 33"(325'), and 36" (1,098') diameter pipe Attn: Mike Stevens 9/15/2012 513-353-4900 Ford Proving Grounds Owner: Ford Proving Grounds CIPP lining of 30" (400 linear feet) and 48" (91 74240 Fisher Road Start linear feet) and EcoCast lining of 290 linear feet of Romeo, MI 48065 $226,381.50 9/26/2011 60" diameter pipe Engineer: Roncelli, Inc Completion 10/14/2011 Attn: Ken West 586-752-3495 Owner: Charter Township of Charter Township of Redford Redford Start CIPP Lining" 463' 12" 1 200' 15" 374' and of 10( ) (' ) ( ) 15145 Beech Daly Rd $113,680.00 2/1/2012 18" (376') diameter pipe Redford M148239 Completion Attn: John Selmi 6/6/2012 313-387-2670 Owner: Rich Creek, Virginia Rich Creek Virginia — Sanitary Sewer S stem 140 North & Spruce Road Rich Creek, VA 24147 $299,793.00 Start 9/26/2011 Improvements CIPP lining and pipe bursting of 8", 10", and 12" Engineer: Olver, Inc. Completion 1/29/2012 diameter pipe. I Attn: J.S. Brown P.E. 540-552-5548 WPC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS ;Linland WatersIllpu in Control, Inc , IProiect Reference III i1st CIIIPIIP Owner: Lake County Board of Board of Lake Count Comm -Cedar Gin Commissioners Start CIPP lining of 6,460 linear feet of 8" and 440 linear 105 Main Street, 4th floor $229420 10/17/2011 feet of 10" diameter pipe Painesville OH 44077 ,.00 Completion Attn: Denis Yurkovich 2/15/2012 440-350-2652 Owner: Williamsport Sanitary Authority Williamsport Sanitary Authority 253 West Fourth Street Start CIPP liningof 8" 450' and 10" 700' . Manhole ( ) ( ) Williamsport, PA 17701 p $148,435.00 9/mpleti 1 lining of 45 vertical feet Engineer: Larson Design Group Completion Matt Peleskak, P.E. 1/18/2012 570-323-6603 City of Battle Creek Interceptor Sewer Linin Owner: City of Battle Creek Proiect 150 S. Kendall St Street CIPP lining of 4,296 linear feet of 54" diameter pipe Battle Creek, MI 49037 Start and 420 linear feet of 42" siphon. Engineer: Jones & Henry $1,675,660.00 9/12/2011 Engineers, Ltd Coffin Attn: Steven L. Wordelman, P.E. 12/30/2011 419-473-9611 Owner: Borough of Bellevue Tri State Groutin —Bellevue PA 537 Bayne Avenue Start 9 6/ 2011 / CIPP lining of 2,000 linear feet of 8" diameter pipe Bullevue PA 15202 $61,000.00 Completion, Attn: Mark Schneider 9/30/2011 302-286-0701 Owner: Pigeon Creek Sanitary Sewer Authority Pigeon Creek Sanitary Authgrit 508 Main Street Start CIPP lining of 12" (381') 15" (2 609') and 18" Bentleyville, PA 15314 $968,321.00 8/1 (8,518) Engineer: Chester Engineers Commpletipleti on Attn: Carl DeiCas, P.E. 2/11/2012 724-483-8041 Owner: Castanea Township Supervisors 347 Nittany Road Castanea, PA 17745 Start Castanea Township, PA Attn: Paul Conklin $458,170.00 7/21/2011 CIPP lining of 6,080 linear feet of 8" diameter pipe 570-748-2415 Completion 11/21/2011 Engineer: McTish, Kunkel, & Associates Steve Gibson, P.E. 570-368-3040 law PC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Inland Waters Pollution , MJO Contracting 2009 Hancock Sanitary Sewer Owner: City of Hancock CIPP lining of 8" (27,275 linear feet), 10" (1,360 399 Quincy Street Start linear feet), 12" (2,830 linear feet), 15"(1,195 linear Hancock, MI 49930 $1,128,175.00 6/20/2011 feet), and 18" (275 linear feet) diameter pipe Engineer: OHM Completion Attn: Lou Meyette, P.E. 9/30/2011 906-482-0535 Owner: Upper Macungie Township Authority Upper Macungie Township Authori 8330 Schantz Road Start " 860' and 10" 3 696' diameter CIPP lining of 8 (4, ) ( ) Breiningsville, PA 18031 $277,529.00 6/6/2011 Engineer: Keystone Consulting Completion pipe Engineers 7/21/2011 Attn: Joseph Santilli 610-395-0971 Owner: West Mifflin Sanitary Sewer Municipal Authority West Mifflin Sewer Rehabilitation 1302 Lower Bull Run Road Start CIPP lining 240 linear feet of 8 diameter pipe West Mifflin PA 15122 $775,621.00 5/7/20 1 and over 30,000 linear feet of internal televised 412-466-6070 Complet ion inspection Engineer: Chester Engineers 11/5/2011 John Balewski, P.E. 412-809-6624 Owner: Municipal Sanitary Authority of the City of New Kensington City of New Kensington 120 Logans Ferry Road Start CIPP lining of 18„622 20622 241 233 and New Kensington, PA 15068 372 65 4. 00 5/4/2011 30" (371') diameter pipe Attn: Dan Rowe Completion 724-335-9813 10/31/2011 Engineer: Hatch Mott MacDonald Harry Cox, P.E. 412-497-2900 DWSO CSM1372; Task 45 15 Mile Road Owner/ Engineer: NTH Macomb Sewer System Supplemental Repairs Consultants, Ltd. Connection Repair, Area 2 and Area 1 Xypex, Area 1 2000 Brush St # 480 $13,284,916.00 Completion Sewpercoat and Slipling with either HOBAS or ADS Detroit, MI 48226-2251 05/11 Pipe I Attn: Joseph Alberts, P.E. 313-304-3616 "RAIC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Inland Water IPollution ContiirW, ;l in , Project Reference Ill,,,,iii .1 P II VillaRe of Canal Winchester OH Owner: Village of Canal CIPP lining of 11,500' of 8" 1,125' of 15" and 211' Winchester of 30" diameter pipe including grouting 310 laterals 36 South High Street Canal Winchester, OH 43110 Start Bill Sims $619,690.00 2/28/11 614-834-5109 Completion 6/19/2011 Engineer: Evans, Mechwart, Hambleton, & Tilton, Inc Marci Bland 614-775-4237 Wagner Ford Road Sanitary Sewer Liner Owner: City of Dayton CIPP lining of 5,936 linear feet of 42" diameter pipe 320 West Monument Ave Start 1/3/2011 Dayton, OH 45402 $1,403,266.00 Completion Attn: Chris Holmes 5/18/2012 937-333-3736 Owner: Clearfield Municipal Authority Clearfield Municipal Aothorit 107 East Market Street Start CIPP lining of 15" (1,962'), 18" (2,939'), and 24" Clearfield, PA 16830 $307,321.00 12/28/2010 (457') diameter sewer 814-943-5214 Completion 5/28/2011 Engineer — Gwin Dobson Attn: Jim Potopa 814-943-5214 City of Port Clinton OH Owner: City of Port Clinton CIPP lining and point repairs of 8" (7,170'), 10" 1868 East Perry Street (2,780'), 15" (2,020), and 24" (990') diameter pipe Port Clinton, OH 43452 Start 419-734-5522 $634,825.00 12/21/2010 Engineer: Arcadis U.S., Inc Completion Attn: Ken Arnold 8/14/2011 419-473-1121 City of Grand Rapids — CIPP 2010 Owner: City of Grand Rapids CIPP lining of 8" (6,047'),�9" (1,563')//10" (2,4921), 300 Monroe Ave. N.W. Start 12/1/2010 12 (500 ), 15 ), (350 18 (800 ), 24 (500 ), 27 Grand Rapids, MI 49503 $581,275.00 (500') and 26"X36" (650') diameter pipe Attn: John Brom C l/2011 616-456-3076 6/1 11 City of Toledo — Woodsdale Area Sewer .inun Owner/Engineer: City of Toledo CIPP lining of 8" (11,700'), 10" (4,500'), 12" 600 Jefferson Ave Start (2,000') 15" (2,150') and 18" (1,650') diameter pipe Suite 300 $834,270.00 12/2010 Toledo, OH 43604 Completion 1/25/2012 Mike Elling 419-936-2275 AIW P AN IPR 0I7MPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Inland Waters Poillution Control, Inc. Project Reference List- CIPIP Easterly Interceptor Service Agreement Contract Owner/Engineer: Northeast Ohio EISAC Contract 1000250 Regional Sewer District Start Manhole & Sewer Rehabilitation of 8'-0" to 12'-6" 3900 Euclid Avenue $4,347,299.55 11/18/10 Combined Sewer Cleveland, OH 44115 Completion Attn: Mr. Marc Kritzer, P.E. 11/17/11 216-214-7017 City of Salem Owner: City of Salem Virginia CIPP lining of 8" (25,500'), 10" (330'), 12" (400'), Caleb Taylor and 18" (300) diameter pipe 114 North Broad Street Salem, Virginia 24153 Start Attn: Caleb Taylor $1,229,510.00 010 540-375-3029 Completion n Engineer: Olver Inc 4/25/2011 J.S. Brown, P.E. 540-552-5548 Carroll Tow 25hip Authority Owner: Carroll Twp Authority CIPP lining of 8" (5,008'), 10" (5,538), and 12" P.O. Box 661 (2,329') diameter pipe Donora, PA 15033 Start Attn: Ray Colosimo $800,917.00 7/26/2010 724-489-4493 Completion 10/31/2010 Engineer: Gannett Fleming Dave Maclntyre 412-922-5575 City of Ann Arbor Owner: City of Ann Arbor CIPP lining of 5,708 linear feet of 12" diameter pipe 100 N. Fifth Ave. Start 7/26/2010 Ann Arbor, MI 48104 $369,892.55 Attn: Nick Hutchinson Completion 10/08/2010 734-794-6000 Ext. 43633 Oxbow Sanitary Sewer Rehabilitation Owner: Washington County CIPP lining and joint repairs of 8" (6,580') and 10" Commissioners (1,365') diameter pipe 223 Putnam Street Start Marietta, OH 45750 $445,605.00 7/26/2010 740-373-6623 Completion Engineer: Stantec Consulting 11/1/2010 John Grosse 614-486-4383 Charter Township of Redford Owner: Charter Township of CIPP lining of 12" (2132') and 15" (783') diameter Redford Start pipe 15145 Beech Daly Rd. $125,568.00 7/5/2010 Redford, MI 48239 Coon 7/21/2010 John Selmi 313-387-2640 ................................................................ IWPC AN IPR COMPANY THE SCIENCE OF UNDERGROUND SOLUTIONS Inland tur Pollution Control, ;fin , State Pipe Services, Inc Owner: Munhall Sanitary Sewer CIPP lining of 8" (11,829') 10" (1,426') 12" (2,291') Municipal Authority 15" (3,122') 16" (236') 18" (604') 21" (100') 24" 1900 West Street Start 12 (651') and 36" (466') Munhall, PA 15120 $1,125,000 Engineer: Chester Engineers Completion Attn: Fred Abraham 10/30/2010 412-809-6600 Cite of Cambridge — Sanitary Sewer Improvements Owner: City of Cambridge 1131 Steubenville Ave. Start Manhole repair and CIPP lining of 10" (521'), 12" (227'), 15" (6,025'), 18" (359'), 24" (1,442) Cambridge, OH 43725 $730,612.50 4/27/2010 diameter pipe Engineer: Burgess & Niple, Inc. Completion 9/1/2010 Attn: John Swartzbaugh 614-451-1385 Morehead Kentucky Utility Plant Owner: Morehead Utility Plant CIPP Lining Board 135 South Wilson Ave Start Morehead, KY 40351 $1,142,150.00 2/10/2010 Engineer: NC2,LLC. Coffin Attn: Philips Keyes 8/01/2010 606-831-2288 Contract #1— Pump ;Station and Outf'all Owner: City of Center Line, MI Sewer Modification c/o Anderson, Eckstein, and Approximately 8,000 LF of 24" CIPP fiber reinforced Westrick Start 04/15/09 lining, transforming existing gravity outfall sewer 51301 Schoenherr Road $3,578,505.95 into a forcemain outfall sewer. Shelby Township, MI 48315-2733 Completion Attn: Paul Guinnane 05/15/10 586-726-1234 DWSD Contract DWS — CS 1368 Owner/Engineer: Detroit Water City of Detroit Sewer Repairs Contract 300,000 LF & Sewerage Dept. Cleaning, TV, CIPP Lining (15 Mile Sinkhole) 6425 Huber St. $138,000,000 Completion Detroit, MI 48211 July 2006 Attn: Bharat Doshi, P.E. 313 224-4735