Loading...
HomeMy WebLinkAboutOpening of Bids - Main & Colfax Parking Structure Repairs 2019 Project No 115-143A - RAM Construction Services of Michigan IncCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Main & Colfax Parking Structure Repairs 2019 Project No. 115-143a -...� _ ._...._...._ . W ..__ ........._ __ _ For Bids Due December 11, 2018 PART (Must be completed for all bids. Please type or print) Date: 12/11/18 Bidder (Firm): RAM Construction Services of Michigan, Inc,. Address: 13800 Eckles Road City/State/Zip: Livonia, MI 48150 Telephone Number: 734 ) 464-3800� Agent of Bidder (if Applicable): Tom Szabo Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Main and Colfax Parking Structure Repairs 2019 the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Wantman Group, Inc. (WGI) American Structurepoint, Inc. Byce & Associates, Inc., and dated November 21..'............1..8m.....................w. for the sum of (enter the Total Bids as shown on the Proposal) , Nine Hu red Seventy Eight apd, Zero One Million Three Hundred EightyOne Thousand (Enter sum of Total Base Bids plus Alternates shown on Proposal) $1, 381, 978. ddumerical) Cents The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the cpatfflet eeded, the cost of units must be the same as that shown in the original contract if accepted by the City of oath Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on eparate atta ment, By (S'u�ynekur'e) Robert T. Mazur, President ....._.. ............ ._................................. (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this 11th Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member day of December 20 18 Suzanna M. Fritzberg, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 7/20/2018 Contractor's Bid For Public Works - 2 BID/PROPOSAL rrb^ ._..._................ � CITY OF SOUTHBEN a �. �,...... Project Name: Main &Colfax Parking Structure Repairs 2019 Project Number: 115-143a��--�rA �� _--___--� �- For Bids Due: December 11, 2018 �.___.......... �_ .. �.. ....... _................._.—.__ ....... _ Contractor Name: RAM Construction Services of Michicran, Inc.. BASE BID PART #1 Item Description Quantity Unit Unit Price Total Amount 1 Contractor Mobilization 1 LS N/A � $96, 500.00 2 Contractor General Requirements mm q 1 _ LS N/A $96,m500.00 3 ....... _ _...... Slab -on -Grade Repair 300 ._ SF $26.00 $7, 800.00 4 Floor S all Repair ��400 SF $34 00 $13 , 600 . 00 5 Full Depth Slab Repair 2,600 SF $71.00 $184, 600.00 6 Ceiling Repair �..... 2,200 �200...... SF ,..._ �SF $72.00 $158,m400.00µWW m_$15.,. .. 7 _ Wall Repair $79. 00.—... 800.00 8 m.. ........._ Exterior Wall Repair _........ .......... 100 SF $122 . 00 _ ................ .. $12 , 200 . 00 ........... ......_ 9 ...._ _ . Beam Repair _ 80 SF . w� $94.00 $7,520.00 10 Curb Repair 50......... SF $48.00 $2,400.00 11 Stair Tread Repair —...... 200 _ ...�..... ...... SF _ $90.00 $18, 000.00 12 1 Stair Landing Repair 100 .—.. .....................-__..._,— SF 1 $42 .00 .................. ....... ____ $4 , 200.00 13 Stair Ceiling Repair 50 SF �_��_........_ $94.00 .......... .__ . $4, 700.00 _.�.. 14 — Temperature Post -Tensioning Repair - — Type 10 EA $2,44e.00 ...., .. $24480.00 15 Temperature Post -Tensioning Repair — 10 _ EA $2,000.00 $20,000.00 T PeZ..ITITITIT._. .. _.....................__ ...._.v..... �..........._ W..... _.... ....... .._._....... ._ 16 Remove & Replace Control Joint 350 LF $5 . oo $1, 750.00 Sealants 17 . ........ .._.._-. Remove and Replace Cove Joint 700 LF $5.00 $3,500.00 Sealant 18 Coating @ Exterior Walls 200 .. �.....1 SF $8.40 � $1, 680.00 19 Repair Storm Drain System Allowance "�. N/A �--�_........_��. ... ..... $3,000 20 Clean & Flush Floor Drain System 1 LS N/A $6, 500.00 —.. — 21 _. .. Install Dehumidifier �. �. ....� ���....—....._ ................. _..... .... w 2 EA . $-.. , 6 0 0 . 0 0 , ......__........... � $9, 200.00 BASE BID PART #1 TOTAL S692,330.00 Version 7/20/2018 Contractor's Bid for Public Works - 7 Addendum #1 BID/PROPOSALarz°raa CITY OF SOUTH BENDr t Project Name: Main & Colfax Parking Structure Repairs 2019 Project Number: 43 115-1a ;e _...._-...ww..._............A-,............� .._ .................... For Bids Due: December 11, 2018 Contractor Name: RAM Construction Services of Michiqan, Inc. BASE BID PART#2 Item N11 p. ............. ..�.�......... Description � �w_.. . � � �.............__ ..... ....... Quantity Unit Unit Price _ �- Total Amount 1 i Contractor Mobilization n 1 LS N/A $10,000.00 2 Contractor General Requirements 1 LS N/A _ $10, 000.00 3 Center Curb, Concrete Remove _......... 27 SYS $146.00 $3, 942.00 4 Sidewalk Concrete, Remove 9 ...�m.$ SYS 126.00 _uwu.------- _....__............_. $1, 134 .00 5 L... Trench Drain, Remove _ 31 LF $164.00 $5, 084.00 ........_ 6 �_._..� ..._.. ........ ...... Smooth Surface at Sidewalk Removal ,. .......��........... 25 �__ �. SYS .............� $145.00 $3 , 625.00 7 Sidewalk Concrete 9 SYS $ 2_0.1..�. 0 0._. $1, 809.00 8 _ Curb Island, Concrete 6 Inch �......... __ ............�__ 24 . SYS $299. 00 $7, 176 .00 9 �..... ..... Clean and Paint _....._........... _ ........_ 1 LS N/A _..... $3, 623 .00 10 Storm, Ci rc Pipe, ular, 8 Inch 5 ........... LF $4, 200.00 $21, 000.00 11 ......... _..... w._ Trench Drain, Retrofit _ 37 LF $765.00 $28, 305.�0-0 12 .__... Inlet, Type R with Casting 1 � .._.._ EACH ...__...... $3 , 400 .00 $3 , 400.00 13 Bollard, Relocate .-....� 12 E...ACH .' $626.00 $7,512.00 14 Sign, Si n, Sheet, Remove 24 EACH � $13 6 . 0 0 $ 3 , 2 64 0 0......__._ _... 15 _W.................... � Sign, Sheet, Relocate 83 ...... E � � EACH _.. $253. 00 $20, 999 . 00 16 Sign, Sheet, with Legend, 0,080 Inch 36 SF $323 .00 $11, 628mm.m00 ...... 17 _......._....w Parking Exit Equipment, Remove & Salvage 1 EACH _. $ll,zoo.00 $11,200.00 18 Parking Exit Equipment, Relocate 1 EACH $11, 625 .00 $11, 625 . 00 19 Parking Entry Equipment, Relocate 1 EACH $11, 625.00 $11, 625 .00 20 Illuminated Sign 4 EACH $7, 100.00 $28,400.00 21 Pavement Message Marking, Remove 29� SYS $62 . 00 $1m,m798 moo 22 Line, Paint, Yellow, 8 Inch �... . . 180 LF $ 5.4 5 $ 9 81. 0 0 23 Line, Paint, Yellow, 4 Inch .mm_....__ 21,320 .... __­p..... LF $0 .30 $6, 396.00 24 1 Line, Remove 21,500 LF $0.60 $12, 900.00 25 ....._......_ _ ..� Pavement Marking, Paint, Handicap 8 EACH $293 Symbol .�...�.. .... .00 .........._...............� $ ......._�. 26 Bollard 2 EACH $939.00 $1,878.00 BASE BID PART #2 TOTAL _ 231. 648 . omo Version 7/20/2018 Contractor's Bid for Public Works - 8 Addendum #1 BID/PROPOSALw,oh� r CITY OF SOUTH BEND Project Name: Main & Colfax Parking Structure Repairs 2019 aw -.... -..._ ........-..------- - �...__..�.............._ Project Number: 115-143a =` `1 �. For Bids Due: December 11, 2018 " _.. Contractor Name: Construction Services of Michigan Inc. �.m�M .. e_,yr.._ _,. ........... ..... BASE BID PART land BASE BID PART #2 TOTAL = $923, 978.00 ALTERNATES Alternate No. ........._ _ _.._ _.._.... ... ... ...... ... _ ..... Description Quantity Unit ... ..... — — Unit Price .. .... ....... - ......... Total Amount 1 - - Remove & Replace p e Doors and Frames _. 1 m _ L S .._. A ...... 10 IK— o 0 2 Install Electric Heaters 4 EA $4, 800.00 $19, 200.00 3 ... .............. .... .............. .. ............. ......... .. .. .. ..... .. .. .. .. Remove Ceiling Coating 100,000 SF ........ $1.68 $168, 000.00 4 _ ding.. _...xisting Pre &Paint Ceiling Over Existing 100,000 SF _ � . ..... 2 08 . _...0 $208, 000.00 Coating 5 Top of Slab Repair - Partial 500 SF $34.00 $17 ,IT000.00 6 Top of Slab Repair- Full Depth 500 SF $71.00 $35, 500.00 Bidder (Firm): Address: City/State/Zip: ALTERNATES TOTAL $458,000.00 BASE BID PART # 1, BASE BID PART #2 & ALTERNATES TOTAL = $1, 381, 978.00 RAM Construction Services of Michigan, Inc„ 13800 Eckles Road Livonia, MI 48150 Telephone Number: - 34 464- 0 f nature) Robert T. Mazur (Printed Name of Person Signing) Version 7/20/2018 Contractor's Bid for Public Works - 9 Addendum #1 When the prospective Contractor is unable to certify to any of the statements below, it shall attach air explanation to this Affidavit '1111IN &I'M ,32,W)II III 111EIIIIA WA7fA71[T,—,nTV-rr1 f DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS A (Must be completed for all quotes and bids. Please type or print) STATE OF Michigan SS: Wayne CO'LNTY The undersigned Contractor, being duty sworn upon his/her/its oath, affirms under the penalties of perjury that: I . Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce an one to refrain from biddin and that this bid is made without reference to an other bid and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals ay_e_�=P_Wly twm participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind, Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran-, and (it) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4, Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently teams is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C, 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bidlquote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently foams is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the to of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bond through its agencies, boards, or commissions shall riot discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual. orientation or disability that does riot affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City"s MBE BB Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such detennination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains, 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C, 5-16-8-1). 1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products triade in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 7/2012018 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. �a* I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this . Zlt,h day ofnecember, 20 is Subscribed and sworn to before me this 11th My Commission Expires June 8, 2020 County of Residence vPw_uw i .rr e i .es of i h q n, Inc. ronsta �4-�C��n ,�r�ra ��a of Miaha, a.w_... Comrac Bidder ( i. Signature o _ � ig f t �oattraaet ri idaler or Its Agent Robert T. Mazur, President Printed Name and Title day* Decembe.r........ 20 18 Notary Publ ic BRENDA S. JAYNES NOTARY PUBLIC, STATE OF MI COUNTY OF WAYNE MY COMMISSION EXPIRES Jun 8, 2020 ACTING IN COUNTY OF q Version 7/20/2018 Contractor's Bid for Public Works - 6 THE AMERICAN INSTITUTE OF ARCHITECTS 11 AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we RAM Construction Services of Michigan, Inc. 13800 Eckles Road,Livonia, MI 48150 as Principal, hereinafter called Principal, and Travelers Casualty and Surety Company of America One Tower Square, Hartford, CT 06183 a corporation duly organized under the laws of the State of Connecticut as Surety, hereinafter called Surety, are held and firmly bound unto City of South Bend, Indiana Board of Public Works 227 West Jefferson Street,South Bend, IN 46601 as Obligee, hereinafter called Obligee, in the sum of Five Percent of Accompanying Bid Dollars (5% of Bid for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for (Here insert full name, address and description of project) Main & Colfax Parking Structure Repairs 2019 - Project No. 115-143a NOW'', THEREFORE, if the Obllgee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and ,give such band or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 11th day of December „ 2018 RAM. truction Services of Michigan, Inc. Robert T. Azur, Presid t . .. /,W4 � (Princ (Seal ) Brenda Jaynes (plosel (Witness) Travelers Casualty and Surety Company of America (Surety) (Seal) s Holly Nichols (Title)Attorney in Fact AIA DOCUMENT A310 — BID BOND — AIA ® - FEBRUARY 1970 ED— THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006 �TRAVELERS'j Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Holly Nichols of TROY Michigan , their true and lawful Attorney -in -Fact to sign, execute, seal and acknowledge any and all bonds, reco,gniizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 3rd day of February, 2017. *w A —won. �� V w�. State of Connecticut City of Hartford ss. Robert L. Raney, Se t-&r Vice President On this the 3rd day of February, 2017, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. In Witness Whereof, I hereunto set my hand and official seal. f My Commission expires the 30th day of June, 2021 �_� .,,C ................. a C. Tetreault, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St, Paul Fire and Marine Insurance Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. 1, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this 11th day of December , 2018 w' <�e0, owt cow y4 tw�arvwryw « �I n�« IV C..+ _ Kevin E. Hughes, Ascretary _. To verify the autften dty of this Power ofAttormey, please call us at 1,000-421 3000. Please refer to the above named Attomerin-Fact and the details of the bond to which the power is atteahed, u is rpm!).' 1316 COUNTY -CITY Bua Dwo , Y l PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD � FAx 574/235-9171 SOUTH BEND, INDIANA 46601-1830b5 TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: December 7, 2018 To: All Planholders From -Linda M. Martin, _ rd Works � Boaof Public ks .. ._._�..ww...�.�..... ......� .� ..,� ..�_�w.�....��... Subject Addendum Numberlerk� .__w�.. �.. . ..... Project Name: Main and Colfax Parking Structure Repairs 2019 Project Number: 115-143A Date Received: 12/7/18 This addendum is being forwarded to you for the above referenced project. Please sign below 1 acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 8 hours of receipt.• copo be included with your bid package uponsubmittal. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: FA saga ServicMi. Authorized Signature: Date: 12/7/18 Version 4/2/2015 .an Inc CITY OF SOUTH BEND, INDIANA,, CONTRACTOR'S BID FOR PUBLIC WORK g kk r.i P� W , CHECKLIST FOR BIDDERS'" Project Name Main & Colfax Parking Structure Repairs 2019 ProjectNo. 115-143a...................................................................�_.._...._..,........................w�...................-------- __.-..._..... For Bids Due December 11, 2018 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check x or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely X executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X� Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted X Form [MWBE-2.1]. X....... Acknowledge Receipt of 1 Addendum(s) included with the bid, X All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: RAM Construe' rvices of Michigan, Inc. Date: 12/11/18 By Authorized Rep Signature: Print Name & Title: Version 7/20/201 B Robert T. Mazur, President Contractor's Bid for Public Works - 1 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID P PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Main & Colfax Parking Structure Repairs 2019 Project No. 115-143a For Bids Due December 11, 2018 Contractor Name: RAM Construction Services of Michigan, Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/2018 General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/201 S General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST - N/A (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships), Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. Version 7/20/2018 General Conditions - 8 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) x By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior ' customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) X By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) X By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X List identifying all former business names. (iii) X Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) X Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) X...mm Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) mX .,. Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) X....... Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 (ix) x._w Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) X....... List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. 734-464-3800 (Telephone Number) Version 7/20/2018 General Conditions - 10 General Conditions Pg 9 & 10 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE - QUALIFIED) (b) Attachments: (i): Please see attached. (ii): Please see attached. (iii): Please see attached, (iv): RAM Construction is a union contractor employing approximately 600 field personnel. We will be utilizing our existing field personnel and supplement any personnel needs with the local labor unions. (v): The personnel working on this project will be fully employed by RAM Construction Services. If any Sub -Contractors are to be employed, they will be classified as such with all proper paperwork. (vi): I have attached one of our Apprenticeship Certificates as proof that we are infact involved in this program. (vii): Please see attached. (viii): Please see attached. (ix): RAM Construction Services does not have any Federal, State, or Local tax liens or tax delinquencies owed any Federal, State or local taxing bodies. (x): List projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. 1) Leighton Deck Coatings — Phase II 2017 (Project 117-092) 109 West Jefferson Blvd South Bend, IN 46601 $201,078.00 Scope: Deck Coating, Joint Repair, Crack Repairs, Concrete Repairs, Striping 2) U of M Fletcher Street Parking Structure 2017 201 Fletcher Street Ann Arbor, MI 48109 $764,572.10 Scope: Concrete Repairs, Urethane & Epoxy Coating, Crack Repair, Joint Repair, Drain Repair, Striping. 3) Wayne Street Parking Structure Repairs 2017 (Project: R1-2016-149) 121 E. Wayne Street South Bend, IN 46601 $1,724,830.00 Scope: Concrete Repairs, Post Tension, Coating, Crack Repairs, Jt. Sealant Repair, Drain Repair, Striping. State of Indiana Office of the Secretary of State CERTIFICATE OF EXISTENCE To Whom These Presents Come, Greeting: I, CONNIE LAWSON, Secretary of State of Indiana, do hereby certify that I am, by virtue of the laws of the State of Indiana, the custodian of the corporate records and the proper official to execute this certificate. I further certify that records of this office disclose that RAM CONSTRUCTION SERVICES OF MICHIGAN, INC. duly filed the requisite documents to commence business activities under the laws of the State of Indiana on February 28, 2005, and was in existence or authorized to transact business in the State of Indiana on December 06, 2018. I further certifiy this Foreign For -Profit Corporation has filed its most recent report required by Indiana law with the Secretary of State, or is not yet required to file such report, and that no notice of withdrawal, dissolution, or expiration has been filed or taken place. All fees, taxes, interest, and penalties owed to Indiana by the domestic or foreign entity and collected by the Secretary of State have been paid. In Witness Whereof, I have caused to be affixed my signature and the seal of the State of Indiana, at the City of Indianapolis, December 06, 2018 CONNIE LAWSON SECRETARY OF STATE 2005030700071 / 2018810885 All certificates should be validated here: https:Hbsd.sos.in.gov/ValidateCertificate Expires on January 05, 2019. INBiz: Your one -stop source for your business. Page 1 of I (http://www.INBiz.IN.gov) flame History Business Details Business Name: RAM CONSTRUCTION SERVICES OF MICHIGAN, INC. Entity Type: Foreign For -Profit Corporation Creation Date: 02/28/2005 Principal Office 13800 ECKLES RD, LIVONIA, MI, Address: 48150, USA Jurisdiction of Michigan Formation: Original Formation Date: 11/01/1918 Name History Details Filing Date Effective Date Filing Number 02/08/2008 02/08/2008 0003655051 Page 1 of 1, records 1 to 1 of 1 Back Return to Search Name Business ID: 2005030700071 Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity 02/28/2019 Report Due Date: Years Due: 2019/2020 WESTERN WATERPROOFING COMPANY OF MICHIGAN https://bsd.sos.in.gov/PublicBusinessSearch/BusinessNameHistory 12/06/2018 U c o a i+ m +� c c c > ro 3 E E u as E E E m a, v aai v v v c c v v v v a, v v ar y Y 0 MN o 0 o cn o vwi vwi' No cn o' o' m cn u v u v> u m F'u F v u o E E L E E E 0 N 0 0 V) m O O 0! _ ro a LL U- f0 '',,, U-LL LL +„;' N E LI u w lD ` O .O LL a N ....... .......... .... ., ., .............. .- . ., ..... ... a1 Ln L 0 �+ O >' a aJ aJ O N E rOo O 0 > w DO ++ > Q >; Q a1 vi y cu l c c ` (U 00 LQ. N N m c �..ro c a 3 N N C to .y Q oIU 3 a a a a 'LIE o c,Y `�° u c s O- ra N V7 0 n m 0 7 O m H� J a1 � � �: W,m 3: O 0 u O O 0) O N r-i ri O! m O O Z Ln 17 � O Vl cn Ln l0 lD � N Ol in O Ln O V1 O l0 N -4 m,., ul O ''.lD 1-1 -1 0 0 C - i -.._ .....a..,..� If1 ,�.,,,, .,. _ ------- --- eee,........, 0 a > C _ O _T O f0 _0 N ` G N aJ N M ai f0 — a) m �I _ — C C_ u 3 L p,� �' c>o M. 0 N c vOi E O two - +' 0 0 ,...... a a 0 a O V +' N _� a J o a u o o C7 C7 H CL o 0 m Y a ----- - M O t 7 y-0 *j Q ri ri ri N ri N ri N ', N ri n r-I ''... —1 3 LL O 0 p CL ak a°J, x 0 c w co m m c ^^ u C aJ a/ M Q (DO,0000 0 .E L O 000000o _aka M H m F- a) t 0 x Q a v Q E � m a)Ln ri E M 300000 O C)a000OO L) co ° cco.c c m 2 s U m a`, n; .. .,,, . .0 .............. a c E >.> 0 Y N V LU w ri 0 0 0 0 rr O O O O rr O O W _ V " 0 ai 0 00 0 0 v v OC a +J u c as OLU N p a) O O W O m — p > .� O a O N r-I I r-1 N r-I m r-I N N I ri DD .--I ri u Q a0 �� O M ++ ai a 4— cn v O c 3 N H m E Z `1 t V ai a a a a a c _ a W a a s w — ala a s n aai > c a c c c c a c c c� c c c c °� E fa fa ca cG 0 fD 16 la la fa fa f0 O w aaaau a a- awaaaa �cn� a (u � L — — ` ^ r\ t.D 0 ii iL m -0m ` rr a, O 000000O > aOOOOo >• N N N N N N N N N N N N N 0 3 c fa •r a) > •� H a) �`+ U.S. DEPARTMENT OF LABOR - OFFICE OF APPRENTICESHIP APPRENTICESHIP CERTIFICATION RAM CONSTRUCTION SERVICES 13800 ECKLES RD LIVONIA , MI 48150 The following individuals areapprentices registered with the U.S. Department of Labor, Office of Apprenticeship, under the sponsorship of pro8rarn M1007970001- MICHI AN LARD 11S' JAC: MIC141G N LABOR A(" 1`1155 S. BEARDSLEE R: . PERRY, MI 48872 Date Date Apprentice Apprentice c _ III ! SSA Nam Occupation App�r mice l�iip I Ike are Cancelled Completed "ONSTRI..iCTIO. LOVELAND(:RAFT M108N02086 , LABORER 7/23/2.008 - * _ 473 ERNESTO (0 61 V 1) Tithe -Based T op Certified by the U.S. Department of Labor Date Issued: It02012018 ****VOID 90 DAYS IMI OM ISSUE :DATE**** RAM Construction Services ZERO TOLERANCE Drug & Alcohol Policy Revised 12/13/2017 Ram Construction Services is committed to a drug -free workplace. Our workplace must be free from drug and alcohol abuse. Employees cannot work safely and productively if they report for work or work while impaired by alcohol or drugs. Therefore, RAM has a ZERO TOLERANCE policy. No policy violation will be ignored or tolerated. All policy violations will be reviewed with appropriate action taken in response to the violation. Actions taken in response to policy violations are at the discretion of Ram Construction Services, up to and including termination of employment. We want to help an employee solve his/her substance abuse problem before substance abuse jeopardizes his/her job. We will help obtain counseling or treatment for any employee who voluntarily seeks our assistance before the alcohol or drug problem has had a detrimental effect on the employee's job performance or attendance. Pre -Employment Ram Construction Services will test, at the employee's expense, job applicants for drugs. A qualification for employment is to pass the pre -employment drug (urine) test. The company will not hire any job applicant who tests "positive" in a pre -employment drug test, tests non -negative, refuses to take a pre -employment drug test, or refuses to sign a drug test consent form. Random Ram Construction Services reserves the right to periodically perform random drug testing, which means that any employee from the company is subject to being selected for testing at any time while employed with the company. Reasonable Suspicion Ram Construction Services will require an employee reasonably suspected of being impaired by alcohol (defines as .02% blood alcohol concentration or above as per MDOT specifications), drugs (illegal, prescription, or over-the-counter), or both to be drug tested at the Company's expense by qualified medical personnel. The Company requires reasonable suspicion testing when, in the Company's opinion, an employee may be impaired by alcohol, drugs, or both or may have alcohol or drug metabolites in the body during work time, based on observations about the appearance, behavior, speech, breath odor, or job performance of the employee, based on the attendance or tardiness of the employee, or based on any other evidence of alcohol or drug use or possession, including third party observations and reports. Post -Accident An employee, who is involved in an on-the-job accident/injury/near miss /theft including an accident in a Company vehicle, will be drug tested for alcohol and drugs at the Company's expense by qualified medical personnel as part of the Company's investigation into the cause of the accident, injury, near miss or theft. Discipline A refusal to take an alcohol or drug test required by the Company is considered insubordination and will be cause for disciplinary action including termination of employment. The use, possession, sale, transfer, purchase, or being under the influence of alcoholic beverages, illegal drugs, or other intoxicants by an employee at any time on Company premises, or while on Company Page I of 3 _.. ........ .................. Drug and Alcohol Program REVISED: December 131h, 2017 RAM Construction Services ZERO TOLERANCE Drug & Alcohol Policy Revised 12/13/2017 business, representing the Company or driving a Company vehicle is prohibited. The illegal use of any narcotic or controlled substance is prohibited. Employees must not report for duty or be on Company property while under the influence of, or have in their possession while on Company property, any alcoholic beverages, marijuana or illegally obtained drug, narcotic or other illegal substance. ON -SITE WORK While working "on location" at a customer's facility or while on a sales or service call, you are expected to observe not only the policies of RAM Construction Services but also that of the applicable safety, security and working policies of the location that may apply. Confidential Records The Company maintains drug and alcohol test results and related information, including, but not limited to interviews, reports, statements, memoranda and medical records, as confidential records, separate from personnel files. Changes or Amendments The Company reserves the right to, at any time or from time -to -time, amend, modify, change, or otherwise withdraw any and all statements, policies and procedures to meet the changing need of associates, customers, and the Company. The most updated, written and signed copy of these policies will be maintained by the Safety Department. Page 2 of 3 Drug and Alcohol Program REVISED: December 13'", 2017 RAM Construction Services ZERO TOLERANCE Drug & Alcohol Policy Revised 12/13/2017 ACKNOWLEDGMENT OF RECEIPT I, have received, read and understand the RAM Construction Services Revised Drug & Alcohol Policy as revised December 13tn, 2017. Furthermore, I agree to abide by all of the conditions and guidelines provided therein. Signature of Employee Date Signature of Safety Director Date Page 3 of 3 Drug and Alcohol Program REVISED: December 13'", 2017 C41 Guy HURLEY October 24. 2018 10 \% I IMI I I MAY CONCERN,- ItF:: RANI Construction Services of Ntichigan, Inc. and Subsidiaries RANI Construction Services of Michigan. Inc. and Subsidiaries is a valued surety client of'Tra%clers Casualty and Surcly Company of America. 'I ravelers Casualty and Surety Company of America has a high regard for the managencut of the company and its management systems and controls. RAVI Construction Services of Michigan. Inc. and Subsidiaries is well financed and enjoys an excellent reputation in its industry. Travelers Casualty and Surety Company of America has a $30,000,000 single project and S 100.000.000 aggregate backlog line of credit in place. Individual projects or work programs in excess of these amounts would be favorable considered subject to current and satistactory underwriting information at the time of such request. If awarded it project it is the present intention of 1Fravelers Casualty and Surety Company of America to provide the required bonds in the full amount of the contract. Travelers C'asualt) and Surety Company of America reserves the right to perlonn normal underwriting at the time of any bond request, including, without limitation, prior review and approNal of relevant contract documents. bond lorms, and project financing. We assume no liability to you or your affiliates if for any reason we do not execute such bonds. Travelers Casualty and Surct� Conlpan) of America has a Best Rating ol`A+ F Financial Sire Category XV. A�*ry wMI4W1NdMl p, "Travelers Casualty and Surety Company of America •"' qND u,14,�.. w T ' � 1 - 4 I Nichols. Attuntcy-ut-lacl o. �,,..�.... inn ) IRE ("I .i 7 j l CAIX 11 1 1 + 11 1 1. TRAVELERS) Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company St. Paul Fire and Marine insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St, Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the Slate of Connecticut (herein collectively called the "Companies"). and that the Companies do hereby make, constitute and appoint Holly Nichols ofTROY Michigan , their true and lawful Attorney -in -Fact to sign. execute, seal and acknowledge any and all bonds, recognizences, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 3rd day of Fabruary, 2017. e�� e cc'0a covaiu>s State of Connecticut 4 ey City of Hartford ss Robert L, Raney. Se lbr Vice President. On this the 3rd day of February, 2017, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and that he, as such, being authorized so to do, executed the foregoing Instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer In Witness Whereof, I hereunto set my hand and official seal 1 My Commission expires the 30th day of June, 2021 1i 's r� Mane C. Tetreault, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company. and St Paul Fire and Marine Insurance Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman. the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, arty Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her. and lt is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary. and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary, or (b) duly executed (under seal, if required) by one or more Attomeys-in-Facl and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority: and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attomeys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding an the Company in the future with respect to any bond or understanding to which R is attached I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this 24th day of October , 2018 UAL ee +krxir tru ro vialfy die amdrentld& of d* Pbwter afAamrrer, pibane cuff err at J,#W.421 Ff►ease ndder Air the above-miredAUmmy-ln~and Eire deb/b ofi hEl a bard to wNCh Ede powerbr a PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/20/2018 Contractor's Bid for Public Works - 3 ,, .i'�M�,C�[�Nr4s►;N H m m W G w N rx IL z LU w W Z04 mw00 �a Hma my �w�IX NUZ ) fa 0ma �w m � ww �� t�0w m O Q Q z Q H O z ci fn O E ao m`O Q w m O 2 c W m� 24. O C W C 10 C C1 U) 0) c Q O O ar � 01 O CD 3'. E 2 N d d 3 C d N m L E 3 o� m O 0� c3 c O E C_ r.+ C la 10 L � tq L m L L 3 3 a° a� 4 U) d B O 0a O U) L O N V E w H •' d C a'o U) E � V L N C .LA •- 3 H - 0 QC) E m z U .o a. M {C) N L E Z) z U� O � a. m D U J m c D_) I ll U 0 U) O U_ O m U3 ti 0 f0 c 0 U 00 O N 0 N O a� CITY OF SOUTH BEND'�ir MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM Oro FORM MWBE-2.0" EVIDENCE OF GOOD FAITH EFFORTS " 6 This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 115-143a Date: 12 11 18 Project Name: Main & Colfax Parking StrucLtge R alrs 201'S Bidder: RAM Construction Services of Michigan, Inc. Contact Person. Tom Szabo ........�..._............�......._...................._. Telephone: 734 464.-.3...8..00.... Address: 13800 Eckles Road City: Livonia State: MI Zip: 48150 Email: tszabo@ramservices.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBEIWBE LIST : The bidder reviewed the � �(S City y of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (hUp://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBEfWBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively, 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. "Bidder must circle or otherwise notate which of the two (2) required actions were performed. -GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. ..m. , SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) �m W CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. 'Proper demonstration of Good Faith Effort requires your Initials next to all of the above boxes, Any, omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 7/20/2018 Contractor's Bid for Public Works - 11 CITY OF SOUTH BEND �ou�"r, MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITYr,� DEVELOPMENT PROGRAM.' FORM MWBE-2.1" H N MBEIWBE CONTACTED " This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 1 OF 1 Project Number: 115-143a MBEIWBE Participation Goal Project Name: Main & Colfax I�!u�tructureITeITlr 2019 Bidde ...... Construction of Michigan, Inc S Robert 1'. s da,w llL t3 ....... . (SirJnat�are (Title) (Date) MBEIWBE Firm NLA **RAM is "�e11.1 Pwe fora irjcj A11 Work** Owner or Contact at MBENVBE Firm - .......- . ................................................... Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: ..................... — RESULTS OF CONTACT WITH THE MBENVBE FIRM: MBEIWBE Firm Owner or Contact at MBENVBE Firm Telephone: Fax: Email. m, TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Version 7/20/2018 Contractor's Bid for Public Works - 12 PART II: Section I Experience Questionnaire #1 Completed proiects one 1 car rior to the date of the current bid 1) Leighton Deck Coatings — Phase II 2017 (Project 117-092) 109 West Jefferson Blvd South Bend, IN 46601 $201,078.00 Scope: Deck Coating, Joint Repair, Crack Repairs, Concrete Repairs, Striping Contact: Linda Martin (lmartin@southbendin.gov) 2) U of M Fletcher Street Parking Structure 2017 201 Fletcher Street Ann Arbor, MI 48109 $764,572.10 Scope: Concrete Repairs, Urethane & Epoxy Coating, Crack Repair, Joint Repair, Drain Repair, Striping. Contact: Dharmesh Joshi (shivdhar@umich.edu) 3) Wayne Street Parking Structure Repairs 2017 (Project: R 1-2016-149) 121 E. Wayne Street South Bend, IN 46601 $1,724,830.00 Scope: Concrete Repairs, Post Tension, Coating, Crack Repairs, Jt. Sealant Repair, Drain Repair, Striping. Contact: Gregg Linder (glinder@bradleyco.com) PART II: Section I Experience Questionnaire #2 Public Works Proiects Currently in Process 1. Citty of Lansing Decks (206722) 221 Townsend Lansing, MI Project Scope: Concrete Repairs, Post Tension Repairs, Shot Crete Value: $924,000 Contact: Stephanie Robinson— Ste llanie.robinson &lansir yini. Gov (City of Lansing) 2. St. John Hospital Parking Structure 22101 Moross Detroit, MI Project Scope: Concrete Repairs, Expansion Joints, Joint Sealants, Value: $507,350 Contact: Marie Przepiora — 248-476-1310 (Aim Construction) 3. Buhl Parking Garage Structure Repairs 2018 535 Griswold Detroit, MI Project Scope: Concrete Repairs, Post Tensioning, Caulking Value: $1,134,357 Contact: Malek Eljizi — 313-373-8700 (Bedrock) PART II: Section I Experience Questionnaire #3 & #4 3. Attach information regarding any failure to complete any work awarded to you and the location thereof: N/A 4. Attached references from private firms for which you have performed work: Wayne Street University 5454 Cass Ave Detroit, MI 48226 Contact: Robert Jacobs: 313-577-8703 Contract Price: $2,710,000.00 Ann Arbor Downtown Development Authority City of Ann Arbor 150 S. Fifth Avenue Ann Arbor, MI 48104 Contact: Joe Morehouse: 734-997-1309 Contract Price: $400,000.00 - $3.OM • St. Vincent Mercy Hospital 2213 Cherry Street Toledo, OH Contact: David J. Milhouse: 419-251-5440 Contract Price: $ 538,005.00 PART II: Section II Plan and Equipment Questionnaire 1. We will be completing the scheduled work as outlined in the project documents. 2. N/A — Self Performing 3. N/A 4. See Attached — Equipment List 5. Yes Section III Contractor's Financial Statement *See Attached Air uomprgssw i iuu Uornpactcr I amper Jumping Jack tjas Air Compressor 185 Tamper Hand Held Air Compressor 185 High Output Concrete Hoisting / Crane Bucket Air Compressor 250 Concrete Grout Scoop Air Compressor 375 Concrete Insulated Blanket Air Compressor 375 High Output Concrete Chute Air Compressor 600 Concrete Dumper Ride On Air Compressor Accessory / Attachment Concrete Dumper Stand On Air Compressor Electric Concrete Power Screed Gas Air Compressor Electric Pancake Concrete Finishing Broom Air Compressor Gas Concrete Finishing Bull Float Air Compressor Gas Pancake Concrete Finishing Darby Air Monitor Concrete Finishing Come A Long / Rake Air Monitor Calibration Kit Concrete Finishing Edger Air Monitor Pump Type Concrete Finishing Date Stamp Air Scrubbers Concrete Finishing Extension Handles Ratchet 3/8 Concrete Finishing Fresno Ratchet 1/2 Concrete Finishing Jointer Ratchet Chuck Concrete Finishing Knee Boards Air Tank 5 Gallon Concrete Vibrator Electric Air Zip Gun Concrete Vibrator Gas Air Tree/Manifold Concrete Power Screed Manifold Drum Deheader Air Tree/Manifold 6 port Drum Crusher Air Tree/Manifold 8 Port Fully Automatic External Defibullator Air Tree/Manifold 10 Port Drill 1/2" Air/Water Seperator Drill 3/4" & 3/8" Wood Planner Drill Cordless Plasma Cutter Drill Core Bolt Cutter Hand Operated Drill Right Angle (2 speed) 1/2" Aluminum Break 10' Drill Right Angle 3/8" Banding Cart for Metal Banding Strap Drill Portamag Banding Tool for Metal Banding Drill Press Blower Back Pack Gas Drill Climber Confined Space Blower / Fan Edger Stick Gas Blower Hand Held Electric Electrical Panel Blower Hand Held Gas Confined Space Evacuation Tripod/ Davit Blower Walk Behind Gas Confined Space Evacuation Hoist BoomLift 40' Straight 2 WD Evacuation Man Basket BoomLift 40' Straight 4 WD Diesel Trencher Ditch Witch BoomLift 45' Art. w/ JIB Dual Leg Mini Excavator BoomLift 60' Straight Fan Electric BoomLift 65' Straight Fan Air Mover Electric BoomLift 80' Straight Fan Jet Air Actuated BoomLift 85' Straight Fan Gas Actuated Bridle Fan Electric Misc Concrete Chute Fuel Tank Containment Tray Caulk Cutter Electric Flammable Materials Storage Cabinet Caulk Cutter Air Actuated 5gal Diesel Can Confined Space 30gal Diesel Caddy Tank Conex Jobsite Storage Box 20' 50gal Diesel Tank Fuel Cell Conex Box Lock and Hasp 100gal Diesel Fuel Tank Compactor Walk Behind Gas 150gal Diesel Tank Compactor Tamper Jumping Jack Gas 300gal Gas Tank with Containment Tray Tamper Hand Held 2gal Gas Can Concrete Hoisting / Crane Bucket 5gal Gas Can Concrete Grout Scoop 10gal Fuel Caddy Tank Concrete Insulated Blanket 30gal Gas Caddy Tank Concrete Chute 50gal Gas Tank Fuel Cell Concrete Dumper Ride On 100gal Gas Tank Fuel Cell Concrete Dumper Stand On Floor Grinder/Polisher Accessories Concrete Power Screed Gas Propane Tank Storage and Transport Rack Concrete Finishing Broom 201b Propane Tank Concrete Finishing Bull Float 30LB Propane Tank Concrete Finishing Darby 331b Propane Tank for Equipment Concrete Finishing Come A Long / Rake 1001b Propane Tank Vapor Concrete Finishing Edger 1001b Propane Tank Liquid Concrete Finishing Date Stamp Floor Scrubber, Walk Behind Concrete Finishing Extension Handles Fall Protection Tie Off Cart Concrete Finishing Fresno Fall Protection Reber Climbing Harness Concrete Finishing Jointer Fall Protection Dual Leg Lanyard Concrete Finishing Knee Boards Fall Protection Roof Warning Line Post and Base Concrete Vibrator Electric Safety Rope Termination Plate 5/8" Concrete Vibrator Gas Fall Protection Beam Clamp Concrete Power Screed Fall Protection Cross Arm Strap Drum Deheader Safety Railing Portable Drum Crusher Safety Railing Base Fully Automatic External Defibullator Safety Railing Dolly/Cart Drill 1/2" Fall Protection Bolt Down Anchor Point Drill 3/4" & 3/8" Fall Protection Reusable Anchor Point Drill Cordless FP Standing Seam Roof Anchor Drill Core Fall Protection Retractable Lanyard 100 FT Drill Right Angle (2 speed) 1/2" Retractable Lanyard Unknown Length Drill Right Angle 3/8" Fall Protection Retractable Lanyard 7 FT Drill Portamag Fall Protection Retractable Lanyard 9 FT Drill Press Fall Protection Retractable Lanyard 11 FT Drill Climber Fall Protection Retractable Lanyard 16 FT Edger Stick Gas Fall Protection Retractable Lanyard 20 FT Electrical Panel Fall Protection Retractable Lanyard 25 FT Confined Space Evacuation Tripod/ Davit Retractable Lanyard 30' Confined Space Evacuation Hoist Retractable Lanyard 50' Evacuation Man Basket Fall Protection Retractable Lanyard 60 FT Trencher Ditch Witch Fall Protection 5/8" Safety Rope/Life Line Mini Excavator Forklift Extended Reach Telehandler Fan Electric Forklift Extended Reach Accessory Man Basket Fan Air Mover Electric Forklift Extended Reach Accessory Hoist and Jib Fan Jet Air Actuated Forklift Extended Reach Accessory Bucket Fan Gas Actuated Forklift Extended Reach Accessory Forks Fan Electric Misc Forklift Towmotor Warehouse Type Fuel Tank Containment Tray Forklift Towmotor Low Profile Warehouse Type Flammable Materials Storage Cabinet Forklift Towmotor Warehouse Type Accessory Fork Extensions 5gal Diesel Can Forklift Towmotor Accessory Barrel Grabber 30gal Diesel Caddy Tank Fire Extinguisher 101b 50gal Diesel Tank Fuel Cell Fire Extinguisher 201b ABC 100gal Diesel Fuel Tank Axe Long Handle 150gal Diesel Tank Battery Charger 300gal Gas Tank with Containment Tray Bench Vise 2gal Gas Can Gang Box Pick Up Truck Mounted 5gal Gas Can Gang Box Small 10gal Fuel Caddy Tank Gang Box Medium Gang Box Stand Up Gang Box Large Gang Box Tow Behind Caulk Gun 10oz Cartridge Small Crow Bar Caulk Gun 32oz Cartridge Large Cable Come A Long Mortar Gun Electric Chalk Line Reel 150' Glue Gun Electric Caulk Mixing Paddle 28" Sprayer Hopper Mixing Paddle Through Bung with Dual Elements Dual Component Air Actuated Cartridge Gun Epoxy Neogard Mixing Paddle 40 X 1/2" Jiffy PS-2 Propoxy 100 Dual Component Applicator Gun Hand Operated Generator Small 1850 Watt to 4300 Watt HY 150 Cordless Dual Component Applicator Gun Generator Medium 4300 Watt to 6500 Watt HY 150 Applicator Gun Generator Large 6500 Watt to 9000 Watt HY 200 Dual Component Applicator Gun Hand Operated Generator Welder Propoxy 300 Dual Component Applicator Gun Hand Operated Generator DOT Truck Mounted Propoxy $00 Dual Component Applicator Gun Hand Operated Generator Tow Behind 20K Watt HY 500 Applicator Gun Generator 32kw Air Hopper Gun Generator Tow Behind 40K Watt Caulk Gun Manual Trigger Generator 50kw/60Hz Epoxy Gun Generator Tow Behind 85K Heat Gun Electric Grease Gun Hand Operated Air Hammer 15LB Metal Banding Bander Crimper Air Hammer 30LB Extension Handle For Painting 8' Air Hammer 35LB Extension Handle For Painting 16' Air Hammer 60LB Extension Handle For Painting 25' Air Hammer 90LB Sledge Hammer 201b Air Hammer Chipper Snow Blower Electric Demo Hammer 601b Hedge Trimmer Electric Hammer 60LB Lawn Roller Air Hammer Rivetbuster Lawn Mower Walk Behind Air Hammer Rock Drill Lawn Mower Ride On Air Hammer Clay Spade Salt Spreader Truck Mounted Hammer Drill Accessory Adapter SDS Max to SIDS Plus Salt Spreader Walk Behind Hammer Drill Accessory Adapter Right Angle 90 Degree Snow Plow Truck Mounted Hammer Drill Accessory Dustless Attachment Retractable 50' Electrical Cord Reel Hammer Drill Keyed Chuck Post Hole Digger Hammer Drill Keyed Chuck Cordless GPS Navigation Unit Hammer Drill Large SDS Max Paint Striping Cart Hammer Drill Small SDS Plus Grinder Bench Hammer Drill Splined Shank Die Grinder Dremel Rotozip Hot Material Heater Table Electric Die Grinder Dremel Rotozip Cordless Hot Asphalt Kettle Propane Grinder Large 7" to 12" Hot Pavement Joint Kettle Diesel Grinder Large 7" to 12" Air Actuated Hot Rubber Kettle Propane Grinder Large 7" to 12" Dustless Hot Melter 5 Gal Propane Walk Behind Floor Grinder Polisher Hot Material Cart Grinder Small 4" to 6" Hot Material Drag Pot Grinder Small 4" to 6" Air Actuated Hot Material Kettle Skimmer Grinder Small 4" to 6" Dustless Air Hose 3/4" 2 Lug Qty. Straight Grinder 2-1/2" (65mm) Air Hose 1 1/2" 4 Lug Qty. Waterproofing Seam Roller Hose Accessory Hose Reel Cordless Screwdriver Backflow Preventer Portable Saw Horse Set Fire Hydrant Wrench Sand Spreader Chest Mount Hand Operated 2-4 Lug Air Hose Bander Tool Engraver Air Actuated Gunite Shotcrete Hose 1 1/4" Qty. Tool Engraver Electric Gunite Shotcrete Hose 1 1/2" Qty. Floor Roller Extendable Gunite Shotcrete Hose 2" Qty. Tire Air Gauge Power Washer Pressure Hose Qty, Caulk Gun Bulk 10K NLB High Pressure Hose Qty. Caulk Gun Bulk Air Actuated 40K NLB High Pressure Hose Qty, Caulk Gun Bulk Cordless Sand Blasting Material Hose Qty. Magnetic Engine Block Heater 110 Volt Electric Water Garden Hose 3/4" Qty. Vehicle Mounted Material Heat Exchanger Air Jack 14 Ton Heating Material Tote Heater Hydraulic Bottle Jack Heating Blanket Electric 110Volt Floor Jack 3 Ton Cap. Heating Drum 55gal Drum Heater Hydraulic Jack 60 Ton cap. Pail Heater Electric 5gal Jack Stand 10 Ton Heater Portable Electric 110 Volt Fiberglass Step Ladder 4' Heater 480 Volt Electric Fiberglass Step Ladder 6' Heater Forced Air Portable Kerosene Step Ladder Fiberglass 8' Heater Forced Air Portable Propane Vapor Fiberglass Step Ladder 10' Material Heating Box Fiberglass Step Ladder 12' Heater Electric Baseboard Type 110 Volt Fiberglass Step Ladder 14' Heater/Oven Box for Welding Rod Fiberglass Extension Ladder 10' Expansion Joint Splicing Pencil Electric Fiberglass Extension Ladder 12' Expansion Joint Splicing Plate Electric Fiberglass Extension Ladder 16' Volcano Rod Water Heater for Masonry 110 volt Fiberglass Extension Ladder 20' Water Heater Propane Instant Hot Fiberglass Extension Ladder 24' Impact Drill 1/2" / Drill Driver / Cordless / Fiberglass Extension Ladder 28' Impact Wrench, 1/2" Corded Fiberglass Extension Ladder 30' Steel Slide Jack Bar Fiberglass Extension Ladder 32' Fiberglass Extension Ladder 40' Fiberglass Extension Ladder 36' Aluminum Extension Ladder 12' Mud Tub With Wheels Aluminum Extension Ladder 24' Mud Tub Hoistable Aluminum Extension Ladder 40' Mud Tub Aluminum Extension Ladder 60' Rolling Mud Pan for Suspended Scaffolding 4' Rolling Work Platform Metal Nu Wave Paver Slab Handler 2 person Aluminum Step Ladder 6' Vacuum Operated Stone Lifter Man Basket for Boom Truck Stone Strap Bender/Punch Lifting Maeda Mini Crawler Crane Mimic Matrix Patch Sample Kit Cherry Picker Monopod Attachment, Air Hammer Hoist Motor 110 Volt 2 ton cap Paver Splitter Hand Operated Lifting HS2000 Roof Hoist Measuring Wheel Lifting Monorail Support System Range Finder Distance Measurer Lifting Roof Hoist Electrical Voltage Meter Hand Derrick 3001b Electrical Multimeter Hydraulic Power Unit For HS2000 Roof Hoist Gas DUO Meter Rigging Electrical Tester Drum Sling Strap for 55gal Drum Gas Leak Detector Lifting Strap Sling Rotary Laser With Tripod Lifting Chain Fall Hand Operated Laser Level Lifting Pallet Lifting Device Standard Level Well Wheel Light Meter Well Wheel Swing Arm Magnet Level Lifting Stone Clamp Metal Detector Reber Conduit Locator Lewis Pin 1 1/2 ton set 3/4" Moisture Meter Load Binding Chain Binders Wind Speed Meter Load Binding Ratchet Strap PH Testing Meter Adjustable Load Securement Bars Pull Tester Amber Flashing Light Battery Operated Decibel Sound Meter Lighted Directional Arrow Board Tow Behind Diesel Spotting Scope DOT Balloon Light Magnetic Towing Lights Halogen Work Light on Stand Light Tower Tow Behind Wobble Work Light Light Bar Dot Metal Bender 10' Magnetic Floor Sweeper Trash Gondola Office Type Drum Crusher 55 Gal Gas Cylinder Dolly 2 Wheel 2 Wheel Material Hand Cart Drum Clamp 55gal Attaches to Forklift Dump Hopper Attaches to Forklift Large Dump Hopper Attaches to Forklift Small Dump Hopper Hoistable Large Gravel Dumper Hoistable Hydraulic Dump Box Hoistable Material Container Hoistable 4 wheel Flat Material Cart Material Dispensing Drum Cart 2 Wheel Material Dispensing Drum Cradle Drum Rotator Drywall Cart 4 Wheel Pallet Pulling Clamp Tool Pallet Jack Electric Pallet Jack Manual Narrow Forks Service Cart 4 Wheel 4 Wheel Roof Cart Wheel Barrel Pallet Jack Manual Masonry Brick Tong Masonry Paver Tong 24" Lewis Pin Set 1/2" Lewis Pin Set 5/8" Brick Cart Wheel Barrel Greco 833 Replacement Pump Head Only Co Sprayer Greco 833 Accessory Greco Heavy Duty Blue Texture Gun Acid Pump Ambient Air Pump for Full Face Respirator (Spray Foam) Caulk Pump Air Actuated Mud Jack Cemtrius Grout Pump Gas Diaphragm Pump Air Actuated Epoxy Pump DOT Lily CD 150 Epoxy Pump DOT Lily CD 250 Epoxy Injection Pump Lily CD3A Epoxy Injection Pump Lily CD15 Epoxy Injection Pump Small Electric Epoxy Injection Pump Seal Boss Fogger Pump Smoke Pump Spray Foam Parts Box Fuel Pump 12 Volt Fuel Tank Pump Fuel Transfer Pump Spray Foam Pump Graco E 10 Reactor Cementitous Grout Pump Sprayer Electric Chemical Grout Pump Manual Operation Chemical Grout Pump Electric Expansion Joint Air Pump Jeene Joint Air Pump Foot Manual Neogard Pump Polyurea Pump AST GMP075 Polyurea Pump AST GMP025 Procor Perma Barrier Pump Sprayer Graco XP35 Greco Stick Drum Pump Air Actuated Electric Sealer Pump Electric Sealer Pump Wand and Gun Gas Sealer Pump Duro Flo Transfer Pump Greco (DOT??) Vacuum Pump Dewatering Pump Trash Gas Water Pressure Step Up Pump Sump Pump Electric 3/4" Hose Sump Pump 2" Electric 2" Outlet Laser Temperature Gauge Weight Scale for Crane Boom Truck Weight Scale Digital Compaction Tester Penetrometer Metal Shears Electric Small Electric Barrel Type Mixer Concrete Mortar Barrel Type Mixer Gas Continuous Repair Mortar Mixer 440 Volt Electric Continuous Repair Mortar Mixer Accessory 2' Mixing Tube Continuous Repair Mortar Mixer Accessory 5' Mixing Tube 55gal Drum Mixer for Coatings Air Actuated Hand Held Pail Drum Mixer Electric Mortar Mixer Paddle Type Electric 220 Volt Mortar Mixer Gas Mixer Mortar Hand Held Gas Nail Gun Air Actuated Brad Nail Gun Air Actuated Power Actuated Nail Gu Nail Gun Powder Actuated Rivet Gun Hand Operated Staple Gun Air Actuated Staple Gun Hand Operated Rebar Tier Cordless Pistol Type Needle Scaler Air Orbital Polisher/Sander PAM Pipe Breaker Cast Iron Pipe Breaker Pipe Threader 1500 WATT INVERTER TRANSFORMER 2000 WATT INVERTER TRANSFORMER 5000 WATT INVERTER TRANSFORMER Portable Wood Planer Liquid Boot Dual Component Pump Sprayer Greco 733 Waterproofing Pump Sprayer Greco 833 Waterproofing Pump Sprayer Graco 833 Immersion Kit Power Washer Unknown PSI Power Washer 3500psi Cold Water 2-Way Radio Reber Cutter Bender Hand Operated Reber Cutter Electric Mobil Eqpt Securty Device Rigging Bosun Chair Rigging Bosun Chair Descending Rack Bosun Chair Descension Rope 7/16" Boom Stanchion 16' Adjustable Boom Stanchion 16' 2 Wheel Alturna Mats Ground Protection Rigging Electrical Booster Box Transformer 110 Volt Rigging Electrical Booster Box Transformer 208 to 240Volt Rigging Electrical Step Down Transformer 220Volt to 110Volt Rigging Electrical Splitter Yoke For Power Cord 220 Volt Rigging Electrical Spider Type Remote Control Rigging Electrical Spider Type Remote Control Adapter Rigging Electrical Tirak Type Remote control 5/16" Fist Grips Crosby Clamp Rigging Suspension Hook Rigging Davit (Fifth Avenue) Inhouse Fab. Rigging Davit (David Whitney Bldg.) Inhouse Fab. Rigging Cable Guide Inhouse Fab. Bolt Down Anchorage Device Inhouse Fab. Hi-Lo Climber Drill Climber and Stirrup Hi-Lo Climber Motor and Stirrup 220 Volt Power Climber Rigging Motor 220 Volt Traction Type 110 Volt Rigging Motor Basket Type 220 Volt Rigging Motor Basket Type SC1000 220 Volt Rigging Motor 10001b Traction Type Spider SC1500 220 Volt Rigging Motor 15001b Traction Type Spider Zmac Rigging Motor 220 Volt 10001b Traction Type SkyClimber Rigging Motor 220 Volt 10001b Traction Type Tirak Rigging Motor 110 Volt Traction Type Tractel Tirak Rigging Motor 220 Volt 10001b Traction Type Parapet Clamp Small Airless Paint Sprayer Eye Wash Station Post Tension Seating Tool With #3429 Post Tension Seating Tool With #4613 Post Tension Button Head Machine in Gang Box Post Tension Hydraulic Jack Post Tension Hydraulic Pump 1/2" Post Tension Machine in Gang Box 6/10" Post Tension Machine in Gang Box Power Washer Turbo Tip Power Washer Gun And Wand Power Washer Slurry Blasting Attachment Power Washer Extendable Wand And Gun Power Washer Gun and Wand 60" Power Washer Floor Scrubber Attachment Power Washer Trailer with 1000gal Water Tank and 3 Pumps Power Washer 1350psi 1.9GPM Power Washer Hot Water Power Washer Hot Water Electric Power Washer 2500psi Cold Water Power Washer 3000psi Cold Water Power Washer 4200psi Cold Water Power Washer 3700psi Cold Water Power Washer 3800psi Cold Water Power Washer 4000psi Cold Water Power Washer 5000psi Cold Water Power Washer Electric 6' 6" SkyClimber Knockdown Ultra Stage Complete 24' Round Boom Front Section 8' 24' Round Boom Middle Section 8' 24' Round Boom Back Section 8' 24' Round Boom Complete 24' 24' Round Boom Rolling Stanchion A Frame Down Under Boom Assembly 24" SkyClimber Bolt Together Boom Back Piece 24' SkyClimber Bolt Together Boom Middle Piece 24" Skyclimber Bolt Together Boom Front Piece 24' SkyClimber Bolt Together Boom With Cable Stiffner Complete 24' 5 X 5 Boom Complete With Connecting Sleeve and Pins 16' 4 X 6 Boom Complete With Connecting Sleeve 16' 4 X 6 Boom Front Piece 16' 4 X 6 Boom Back Piece 16' 4 X 6 Connecting Sleeve and Pins Rigging Counter Weights Steel 501b 16' 5 X 5 Boom Complete With Connecting Sleeve 8' 5 X 5 Boom Section Front and Back are the Same 3' 5 X 5 Connecting Sleeve and Pins (makes lea 16' Boom) 9' 5 X 5 Connecting Sleeve and Pins (makes lea 24' Boom) 5 X 5 Boom Counter Weight Beam Counter Weight Beam Sling Chain 551b Counter Weights Rolling Boom Assembly for Bosun Chair Rigging Suction Cup Gantry Head 5" x 5" (Head Only), Spider 702192-1 Spider Type Walk Thru Stirrup Assy. Full Height Spider Type Walk Thru Stirrup Assy. Short Pass By Spider End Stirrup For Traction Hoist Motor Fits Spider Plat Spider Stirrup For Basket Type Motor Fits Spider Platforms Tractel End Stirrup For Traction Hoist Motor Fits Tractel PI Tractel Stirrup For Basket Type Motor Fits Tractel Platforms Spider Walk Thru Stirrup Adapter 20 Degree Tractel Type Walk Thru Stirrup Assy. Full Height Tractel Type Walk Thru Stirrup Assy. Short Pass By Router Electric Epoxy Wrap Saturator Sandblasting Accessory Air Purifier Sandblasting Accessory Air Purifier Hood w/Filter Box and l/ Sandblasting Accessory Whip With Nozzle Sandblasting Accessory Whip Only Sandblasting Accessory Nozzle Only Sandblasting Accessory Protective Hood Only Sandblasting Accessory Sand Tote Holder DOT Sandblasting Accessory Water Ring Attachment Shotblasting Accessory Walk Behind Rolling Magnet Parapet Clamp Large Flat Roof Parapet Tie Off Hook Small Inhouse Fab. Flat Roof Parapet Tie Off Hook Large Inhouse Fab. Stage Platform 2' X 16' With No Rails (picks) Stage Platform 2' X 20' Without Rails Stage Platform 2' X 24' Without Rails Stage Back Rails No Numbers Spider Platform 3' Spider Platform 5' Spider Platform 10' Spider End Gate Fits Spider Platforms Spider Adjustable Comer Fits Spider Platforms Only Flydeck 3' Fits Basket Type Motors Only Flydeck 2' Fits Basket Type Motors Only Tractel Platform 3' Tractel Platform 6' Tractel Platform 10' Tractel 15 Degree Corner Piece Fits Tractel Platforms Only Tractel 45 Degree Corner Piece Fits Tractel Platforms Only Tractel End Gate FitsTractel Platforms Tractel 90 Degree Corner Piece Fits Tractel Platforms Only 3' SkyClimber Knockdown Platform Side Panels tea 3' SkyClimber Knockdown Platform Floor Panel 6' SkyClimber Knockdown Platform Side Panels tea 6' SkyClimber Knockdown Platform Floor Panel 9' SkyClimber Knockdown Platform Side Panels 2ea 9' Skyclimber Knockdown Platform Floor Panel 3' 6" SkyClimber Knockdown Ultra Stage Complete 16" Shotblasting Head for Ride On Shot Blaster (BH-16) 16" Ride On Shotblaster Scarifier Head Attachment (SC-16) 18" Shotblasting Head for Ride On Shot Blaster (BH-18) Shotcrete, Attachment, Bulk Bag Adaptor Lova Shotcrete Machine Sova Shotcrete Machine Aliva Shotcrete Machine AIIenTown Wet Shotcrete Machine Pump AIIenTown Water Booster Pump Air Actuated Gunite Nozzle Riley Gunite Machine Scaffold 29" Wide X 2' Ladder Mason Frame Scaffold 29" Wide X 3' Ladder Mason Frame Scaffold 29" Wide X 4' Ladder Mason Frame Scaffold 29" Wide X 5' Ladder Mason Frame Scaffold 29" Wide X 6' 6" Ladder Mason Frame Scaffold 3' Wide X 3' Box Frame Scaffold 3' Wide X 4' Box Frame Scaffold 3' Wide X 5' Box Frame Scaffold 3' Wide X 6' Box Frame Scaffold 5' Wide X 'I'Mason Frame Scaffold 5' Wide X 2' Mason Frame Scaffold 5' Wide X 3' Mason Frame Scaffold 5' Wide X4' Mason Frame * Scaffold 5' Wide X 5' Mason Frame * Scaffold 5' Wide X 6' 6" Walk Through Frame Scaffold Cross Brace 5' Spacing Scaffold Cross Brace 6' Spacing * Scaffold Cross Brace 7' Spacing Scaffold Cross Brace 8' Spacing Scaffold Cross Brace 10' Spacing Scaffold 8" Caster/ Wheel Scaffold Adjusting Screw / Jack Scaffold Adjusting Screw with Plate / Jack Scaffold Base Plate Scaffold Base Plate Swivel Scaffold Guard Rail Post Scaffold Guard Rail Corner Post Scaffold 29" Mid / Upper Guard / Safety Rail Scaffold 3' Mid / Upper Guard / Safety Rail * Scaffold 5' Mid / Upper Guard / Safety Rail * Scaffold 7' Mid / Upper Guard / Safety Rail Scaffold Bottom Outrigger / Stabilizer Scaffold 6' Pro Deck * Scaffold 7' Pro Deck Scaffold 8' Pro Deck Sand Blasting Gun w/Hopper SandBlasting Pot 6 Ton Capacity DOT SandBlasting Pot 8 Ton Capacity DOT Sand Blasting Pot Large 6001b Sand Blasting Pot Medium 3001b Sand Blasting Pot Small 1001b Rotec Vortex Abrasive Blaster Complete with all Components Rotec Vortex Abrasive Media Pot Rotec Vortex Cooler Fan Rotec Vortex Pressure Pump Walk Behind Shotblaster 110 Volt Walk Behind Shotblaster 220 Volt Complete(Head,Panel,Vacuum) Walk Behind Shotblaster Head 220 Volt Walk Behind Shotblaster 220 Volt Electrical Panel Walk Behind Shotblaster 220 Volt Vacuum Walk Behind Shotblaster Vacuum 110 volt Shotblasting Vacuum Dustless Ride On Shotblaster (SCB-1600) Scaffold Rustgo Mobile Work Platform RAM Magnetic Truck Door Logo Air Spud Scraper Air Actuated Floor Scraper Manual Twister Ride On Scraper for Coatings and Tile SDS Max Scraper Bit without Blades (blades in AccPac) Scaler Pistol Type Air Actuated Scarifier Walk Behind Gas Scarifier Ride On Gas Scarifier Scrabbler Walk Behind Air Belt Sander Electric Orbital Sander Electric Caulk Sander Palm Sander Air Palm Sander Electric Small 50 Pump Screw Gun Post Shore 50ea Per Rack Skidsteer Bobcat S130 Skidsteer Bobcat S185 Skidsteer Bobcat 463 Skidsteer Bobcat S570 Skidsteer Bobcat 742 Skidsteer Bobcat 751 Skidsteer Bobcat 753 Skidsteer Bobcat 763 Skidsteer Bobcat 853 Skidsteer Bobcat 863 Skidsteer Bobcat 873 Skidsteer Caterpillar Skidsteer Case 1840 Skidsteer Ramrod BobCat 900T-G Skidsteer Skidsteer Track Loader Skidsteer Track Loader ASV Skidsteer Track Loader Bobcat T650 Skidsteer Track Loader Caterpillar Ring Saw with Diamond Chain Concrete Cutting Chain Saw Hydraulic 20" Circular Saw 7 1/4" Circular Saw Cordless Hydraulic Saw Jig Saw Miter Saw Electric Sweeper Ride On Sweeper Ride On Diesel Sweeper Ride On Gas Sweeper Ride On LP Propane Sweeper Walk Behind Gas Sweeper Walk Behind Push Manual Scrubber Sweeper Ride On Quickie Saw Accessory Cart Quickie Saw Gas Quickie Saw Electric Reciprocating Saw Sawzall Electric Reciprocating Saw Sawzall Cordless Scaffold 10' Pro Deck Scaffold 8' OSHA Plank Scaffold 10' OSHA Plank Scaffold 12' OSHA Plank Scaffold 16' OSHA Plank Scaffold Stacking Pin Scaffold Toggle / Lock / Gravity Pin Scaffold Side / End Bracket / Brace Scaffold 3' Ladder Scaffold 6' Ladder Scaffold Ladder Clamp / Bracket Scaffold Hoist For Well Wheel Scaffold Well Wheel For Scaffold Hoist Scaffold Diagonal Brace 2' X 7' Spacing * Scaffold Diagonal Brace 5' X 7' Spacing Scaffold Horizontal Brace 5' Spacing * Scaffold Horizontal Brace 7' Spacing Scaffold Horizontal Brace 10' Spacing Scaffold Baker 2 Frames 1 Platform 4 Wheels Skidsteer Track Loader Caterpillar 236B3 Scissor Lift 33' Diesel Wide RT Scissor Lift 15' Electric Narrow Scissor Lift 19' Electric Narrow Scissor Lift 20' Electric Narrow Scissor Lift 32' Electric Narrow Scissor Lift 26' Electric Narrow Scissor Lift 26' Electric Wide Scissor Lift 27' Gas Wide Scissor Lift 33' Gas Wide RT Airless Line Laser Striper Soda Blasting Machine Complete (Pot,Cooler) Soldering Gun Bobcat Mill Skidsteer Cove Cutting Tool (Inhouse Fab) Skidsteer Caulk Cutter (Inhouse Fab) Skidsteer Concrete Demo Hammer Skidsteer Coating Scraper/Twister Attachment (Inhouse Fab) Skidsteer Grapple Attachment Schebeci Planer Skidsteer RamRod Brush Attachment Skidsteer Lock Skidsteer Material Bucket Skidsteer Material Bucket with Shotblast Pan Skidsteer Material Forks Skidsteer Demo Forks Demo Only Skidsteer CAT Material Forks Skidsteer Sweeper Attachment Styrofoam Cutter Electric Air Saw 12" to 14" Air Saw 14" Walk Behind Band Saw Electric Band Saw Upright Electric Brick Saw Table Type Gas Brick Saw Table Type 220volt Electric Chain Saw 14" Electric Chain Saw Gas Enclosed Procor Pump Trailer 20' Enclosed Shotblaster Trailer Enclosed Shot Blaster Trailer Acetylene Tank Oxygen Tank Argon Tank Honda 4 Wheeler ATV with Hitch Golf Cart Gas Golf Cart Electric John Deere Gator Taylor Dunn Utility Cart 55gal Drum Vacuum Attachment Dust Collector Vacuum Carpet Vacuum Floor Vac House Vac Shop Vac Vacuum Shop Vac Cordless Dustless Vacuum HEPA Vacuum Abatement Ring Saw Shotblaster Vacuum Walk Behind Quickie Type Ring Blade Saw Box Truck Table Saw Electric Box Truck With Lift Gate Tile Saw Table Type Electric Spray Foam Box Truck Walk Behind Saw Gas Procor Pump Box Truck Walk Behind Saw Gas Self Propelled Office Fleet Cars Walk Behind Crack Chaser Gas Dump Truck Tarp Pick Up Truck Dually Dual Wheel RAM Blue Metal Barricade Legs (In house fab) IFTA Day Cab Tractor DOT RAM Wooden Barricades 2" X 6" X 10' White With Logo (In-hous IFTA Boom Truck Traffic Control Barrels With Base IFTA Box Truck Traffic Control Barrel With Lights IFTA Dump Truck Traffic Control Barrel Lights IFTA Stake Truck Traffic Jersey Barrier Plastic Water Fill IFTA Pick Up Truck Extended Cab AWD Traffic Control Cones Small Low IFTA Pick Up Truck Single Cab Traffic Control Cones Tall Grabber Cones IFTA Spray Foam Box Truck RAM Blue Rail Fence 4' X 10' (In-house Fab) Ford Econolin Full Size Van RAM Orange Snow Fence on Frame Orange Pick Up Truck Single Cab RAM Traffic Control Fence Legs Stands Interchangeable (In-ho Pick Up Single Cab AWD Cyclone Fence Panel 6' X 10' (In-house Fab) Pick Up Truck Extended Cab Traffic Control Signal Lights Stop Go Pick Up Extended Cab AWD Lighted Directional Arrow Board Tow Behind Diesel Pick Up Truck Crew Cab Radiator Pressure Tester Pick Up Crew Cab AWD Tool Lanyard 4' Pickup Quad Cab 4 Door 2012 Tool Lanyard Carabeaner Fuel Truck Pick Up Single Cab Cutting Torch Set Tanks Torch and Cart 65' PickUp Truck Bed Cap Cutting Torch Only Stake Bed Truck Weed Burner Stake Bed Truck With Lift Gate Rosebud Tractor Day Cab - Semi Dump Trailer Hydraulic Utility Truck Single Cab Ditch Witch Trailer SUV Office Vehicle 53' Open Drop Deck Trailer DOT Bus Work Platform (In-house Fab) Enclosed Trailer Bus 14 Passenger 14' Enclosed Trailer Sand Broadcaster 16' Enclosed Trailer 10K psi NLB Lance Gun 20' Enclosed Trailer 40K psi NLB Bi Mode Attachment 32' Enclosed Trailer Goose Neck 40K psi NLB Lance Gun Enclosed Spray Foam Trailer 40K psi Spin Jet Pintle Hitch 10K psi NLB Water Blaster Pintle Hitch With 2" Ball 40K psi NLB Water Blaster Pintle Hitch With 2 5/16' Ball Welder Generator Stick Welder Hitch Receiver Lock AC DC Arc Welder Stick Trailer Tongue Lock Arc Welder 220Volt Stick Trailer Hitch 3 way Mig Welder Open Trailer With Ramps Pin Welder Electric Trailer Unknown Type Welding Helmet Small Utility Trailer Welding Jacket Open Tilt Trailer Welding Gloves 10 Ton Trailer Plasma Cutter 15 Ton Trailer 55gal Barrel Bung Cap Wrench Office Trailer Pipe Wrench 20' Office Trailer Pipe Wrench 24" Torque Wrench Tire Lug Wrench 4 Way Water Cooler Electric for 5gal Bottle 5gal Water Cooler Jug 10gal Water Cooler Jug 250gal Water Tote 250gal Water Tank 300gal Water Tank 325gal Water Tank 500gal Water Tank 550gal Water Tank RAM CONSTRUCTION SERVICES OF MICHIGAN, INC. AND SUBSIDIARIES CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2017 (With Independent Auditor's Report Thereon) N� / 11 %,, Doe"t-07,1J, A, f,, J � � , I/ To the.Board of Directors and Shareholders of RAM Construction Services of Michigan,ine. and Subsidiaries Report on the Consolidated Financial Statements 1vfldik1:: 461r)84 �'1 n 2 �4 214,3 iD 1,11' 0 doeii eiii,i c i n We have audited the accompanying consolidated financial statements of RAM Construction Services of Michigan, Inc. and Subsidiaries, which comprise the consolidated balance sheets as of December 3 i, 2017 and 201.6, and the related consolidated statements of earnings, shareholders' equity and cash flows for the years then ended, and the related notes to the consolidated financial statements. Management's Responsibility for the Consolidated Financial Statements Management is responsible for the preparation and fair presentation of these consolidated financial statements in accordance with accounting principles generally accepted in the United States of Arnerica; this includes the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of consolidated Financial statements that are free from material misstatement, whether due to fraud or error. Auditoir'sResponsibility Our responsibifity is to express an opinion on these consolidated financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America, Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the consolidated financial statements arefree from material misstatement, An audit involves pertbi-ming procedures to obtain audit evidence about the amounts and disclosures in the consolidated financial statements. The procedures selected depend on the auditors judgment, including the assessment of' the risks of material misstatement of the consolidated financial statements, whether due to fraud or error. in making those risk assessments, the auditor considers internal control relevant to the entity's preparation and fair presentation of the consolidated financial statements in order to design audit procedures that are appropriate in the circurnstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation. of (he consolidated financiaf statements, Docrc,n,1VLc,,,hew Auditor's Responsibility (Continued) We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. �21 In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the consolidated financial position of RAM Construction Services of Michigan, Inc. and Subsidiaries as of December 31, 2017 and 2016, and the results of their operations and their cash flows for the years then ended, in conformity with accounting principles generally accepted in the United States of America. W