Loading...
HomeMy WebLinkAboutOpening of Bids - SBFD Training Center Classroom Building Proj No 117-127R - Brown & Brown General Contractorsr CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK,��'; Project Name South Bend Fire Department Training Center Classroom Building Project No. 117-127R For Bids Due November 27, 2018 at 9:30 AM Local Time PART I (Must be completed for all bids. Please type or print) Date: QV, �r�. T 201" 8 .. Bidder (Firm): ... 1& BrQ..Wn GenerECitr I Address: 124 S. Elkhart St., PO Box 487 City/State/Zip: Wakarusa IN 46573 Telephone Number: 574-862-2171 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: South Bend Fire Department Trainina Center Classroom Buildin the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Epoch Architecture + Plann and dated November 2 18 for the sum of eater the Total Bid as shown on the Proposal) " u (d kf44 r I�6� 3 1 � ) (En Mersu7f Tot I B s 4�,shWnon ro, 1) ( umerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a s arate chment. C- By (SiOnature) Eric Brown President (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member day of Suzanna M. Fritzberg, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk 20 Version 7/20/2018 Contractor's Bid for Public Works - 2 oGW [If BID/PROPOSAL CITY OF SOUTH BEND Project Name South Bend Fire Department Training Center Classroom Building Project No. 117-127R For Bids Due November 27, 2018 Contractor Name: Brown & Brn ?n Gert rB Co—n' r6'ctor Inc. BASE BID Item No. Description Total Amount .__._ BASE BID 1 covers construction of the Classroom Addition and two vehicle apparatus bay according to the intent of the Plans and Specifications BASE BID TOTAL $ 1� ALTERNATE #1 ADD Item No. Description Total Amount Provide costs for removal of existing stone and installation of turf in 1 area designated on Site Demolition Plan and Site Grading / Utility $ Plan. ALTERNATE #1 TOTAL $ V ALTERNATE #2 ADD Item No. Description Total Amount Provide metal roof panels in lieu of asphalt shingles. • Include addition of 30# synthetic roofing underlayment and 2 W exterior roofing sheathing in lieu of sheathing and $ 3z, underlayment shown. • Include snow guard rails at all roof overhangs. ALTERNATE #2 TOTAL $ ALTERNATE #3 ADD Item No. Description Total Amount Provide ground face CMU wainscot and cast stone sill shown, base 3 bid to include metal panel siding and associated furring and trims to $ the base of the wall. l ALTERNATE #3 TOTAL $ ALTERNATE #4 ADD Item No. Description Total Amount Provide movable partition between Classroom A and B. _ 4 Include steel beam, columns and footings shown along with the framing of the opening for the partition track. Soffit ) between classrooms to be part of the base bid. ALTERNATE #4 TOTAL $ Version 7/20/2018 Contractor's Bid for Public Works - 7 ALTERNATE #5 (ADD) Item No. Description Total Amount 5 Provide 10 floor outlet boxes and associated conduit, devices and wiring. ALTERNATE #5 TOTAL $ � Z� ALTERNATE #6 ADD' Item No. Description Total Amount 6 Provide Classroom casework, (tall storage cabinets, base cabinets and counter tops alongwith miscellaneous fillers and trim. $ I ALTERNATE #6 TOTAL $ ALTERNATE #7 (ADD Item No. Description Total Amount 7 Provide AV Projectors and sound system and Telecommunication $ head end and cablingin Classrooms A and B. J[9 ALTERNATE #7 TOTAL $i ALTERNATE #8 iADDI Item No. Description Total Amount 8 Provide proximity card readers at four (4) exterior doors and associated securitysystem, keypad and wiring. $ // r `CO ALTERNATE #8 TOTAL $ C ALTERNATE #9 ADD Item No. Description Total Amount 9 Provide acoustical panels attached to the gypsum board ceiling as $ 1� 1 shown on the drawings. ALTERNATE #9 TOTAL $^ TOTAL AMOUNT BASE BID + Ll ALTERNATE 1 ,2, 3, 4, 5, 6, 7, 8 & 9 $ ri Bidder (Firm): Brown & Brown General Contractors Inc. Address: 124 S. Elkhart St.. PO Box 487 City/State/Zip: Wakarusa IN 46573, Telephone Number: 574 862-2171 By (Signature) Eric Brgwn, Prg5ident (Printed Name of Person Signing) Version 7/20/2018 Contractor's Bid for Public Works - 8 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) SS Elkhart COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from -bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 7/20/2018 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 7/20/2018 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 26th day of Nov , 20 18 Subscribed and sworn to before me this My Commission Expires 3/1 /201 Brown & Brown General Contractors Inc. Contractor/ idcler t C Signature of Contractor/Fodder or Its Agent Brown.Eric r Printed Name and Title 26th day of Nov. , 20 18 County of Residence St. Joseph Co. Indiana Bradley Allen Romine Notary Public SEAL St. Joseph County, State of Indiana My Commission Expires March 01, 2019 Commission Numben 62464 Version 7/20/2018 Contractor's Bid for Public Works - 6 vl.-AIA Document A31 -20OTM CONTRACTOR: (Name, legal status and address) Brown & Brown General Contractors, Inc. P. O. Box 487 Wakarusa, IN 46573-0487 SURETY: (Name, legal status and principal place of business) Philadelphia Indemnity Insurance Company Bala Cynwyd, PA OWNER: (Name, legal status and address) City of South Bend, Indiana, Board of Public Works County City Building Room 1316, 227 West Jefferson Street South Bend, IN 46601 BOND AMOUNT: Five Percent of the Total Bid ( 5% of Total Bid PROJECT: (Name, location or address, and Project number, if any) South Bend Fire Department Training Center Classroom Building; Project No. I I7-127R This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 16th day of November 2018 Brown & 1J own G enert Contractors„ Inc. (Principal) (Seal) (Title) Eric -Brown, Pr6s`i'2 f .... ........... ,�._�_�....................... n.... ., , Indemnity Insurance Company Seal CY11 _-- � �C �. -- (Surety) Philadelphia Indem .. — (Seal) .. (Witness) �. (Title,) ,i nrtil'erL as:t tI i � firm nwa, At ney in Fact III"'Ifth'N�°� tfa�u should si n aum a�mii glillnm�alll AIA t�� oint:oract� III'aaacinneint, a�am�m Ihlch this text rap . e aortlt IUlln ED, Alin tmlaittinal aat°msuires that a:;,lllmaanges will unot It e olbsammmur°saint.. AIA Document A3101111— 2010. Copyright __..... .... Init. AtA ttuxcwmen�is8s, 1 gT'0 and 2tI°40 by The American Institute otArota4taots. All rtgNats reserved. IVAIti�tt� lrlltie AgAiu"""""". Document ps l.wrotected by U , Colpyrilght I-aaw and Illntertumatilovwat 'rra:atiles , dnauithoirkedl ms:pirodmucUon ass° distufllwtknu of HAs AIA" r.&ar ornent, or any poirthon of it, may iresullt in s,aeivei e civii and crilirnniftwaall penaltlles, and unlit Ih e pi oaaecutwl to tllYnua mmnaxhinuunv extent twass!iilie uum dear the Illaaw,. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@ala.org. 061110 409 PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004-0950 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS: That PHILADELPHIA INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and existing under the laws of the Commonwealth of Pennsylvania, does hereby constitute and appoint Bambara Pearson Jordan Schelber, Jennifer 'l(asxnia Mark WobbeMegan Riesenberg. Nicole Bicknell Sandra Junk. Therm Ru s Wes esr oaatl k�'l l"I nrl C e l A14t1re of Clubs r anc Aat�m its taue and lawful Attorney -in -fain with Nil authority to execute on its behalf" bonds, undertakings, recognizances And other contracts of indemnity and writings obligatory in the nature thereof, issued in the course of its business and to bind the Company thereby, in an amount not to exceed 10 , 0 0 000.00. This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELP141A INDEMNITY INSURANCE COMPANY on the 14"" ofNovember, 2016, RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company: (1) Appoint Attomey(s) in Fact and authorize the Attorney(s) in Fact to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney -in -Fact and revoke the authority given. And, be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile, and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 27T" DAY OF OCTOBER, 2017. 1927 (Seal) Robert D. O'Leary Jr., President & CEO Philadelphia Indemnity Insurance Company On this 27' day of October, 2017, before me came the individual who executed the preceding instrument, to me personally known, and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY; that the seal affixed to said instrument is the Corporate seal of said Company; that the said Corporate Seal and his signature were duly affixed. " M.a -01T11 w r v t rrr anpaui�rtna Notary Public: a ma wa+�amr a ron,,,.�rra,+�„i ry %4y CrMdnmr ;xr '@�pW�.x 9pGt 75 allil residing at: (Notary Seal) My commission expires: Bala Cynwyd, PA Se temper25,,2021 ..............— I, Edward Sayago, Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY, do hereby certify that the foregoing resolution of the Board of Directors and the Power of Attorney issued pursuant thereto on the 271h day of October, 2017 are true and correct and are still in full force and effect. I do further certify that Robert D. O'Leary Jr., who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY. In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this & I day of _ w C �' t , 20 1927 Edward Sayago, Corporate Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY 1316 COUNTY -CITY BUILDING I PHO 227 W. JEFFERSON BOULEVARD � � FAx 574/ 235-9251 FAx 574/ 235-9171 Soum BEND, INDIANA 46601-1830 TI7[i 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 21, 2018 To: All Planholders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: I Project Name: South Bend Fire Department Training Center Classroom Building Project Number: 117-127R ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: November 21, 2018 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Brown & Brown General Contractors, Inc. Authorized Signature: Wa/tG� Date: November 21, 2018 Version 4/2/2015 1316 COUNTY -CITY BUILDING 227 W. JEFFERsoN BOULEVARD SOUTH BEND. INDIANA 46601-1830 CITY OF • ** BOARD i September 5, 2018 Mr. Eric Brown Brown & Brown General Contractors, Inc. 124 S. Elkhart St., PO Box 487 Wakarusa, IN 46573 RE: Pre -Qualification Verification -Dear Mr. Brown: PHONE 574/235-9251 FAx 574/235-9171 This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, Linda M. Martin, Clerk GMY A, 01,01" D, VID P. l..t,NZA131711I A. MARAINK J,I4' Es A. MM1.,LER "I"1i1.KEst." J. DORM) CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name South Bend Fire Department Training Center Classroom Building Project No. 117-127R For Bids Due November 27, 2018 at 9:30 AM Local Time From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted Form [MWBE-2.1]. Acknowledge Receipt of 1 Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. This checklist submitted with the Bid, This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Brown & Brown General Contractors, Inc. Date: Nov. 27 2018 By Authorized Representative". Signature: gow� Print Name & Title: Eric Brown, President Version 7/20/2018 Contractor's Bid for Public Works - 1 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/20/2018 Contractor's Bid for Public Works - 3 The above bid is accepted this following conditions: Contracting Authority Members: ACCEPTANCE day of PART II (For projects of $150,000 or more — lC 36-1-12-4) Governmental Unit: City of South Bend, IN Bidder (Firm) Brown & Brown General Contractors, Inc. Date (month, day, year): November 27, 2018 subject to the These statements to be submitted under oath by each bidder with and as a part of his bid, Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? Contract Amount Class of Work Completion Date Name and Address of Owner 3,481,450.00 renovation 2017 Indiana University, Bloomington, IN 226,429.00 1,141,066.00 renov/addition new 2018 2018 Elkhart Comm Schools, Elkhart, IN Walkerton Lincoln Twp Library, Walkerton, IN 6,109,490.00 new 2018 WaNee Comm Schools, Nappanee, IN 2. What public works projects are now in process of construction by your organization? Contract Amount Class of Work Expected Completion Date Name and Address of Owner 1,213,300.00 renovation 2019 Concord Comm Schools, Elkhart, IN 2,985,000.00 new 2019 Elkhart Comm Schools, Elkhart, IN 7,550,000.00 new 2019 Elkhart Co Bd of Comm, Goshen, IN 359,400.00 renovation 2018 Mishawaka Penn Harris Pub Lib, Mishawaka IN 3. Have you ever failed to complete any work awarded to you? no 4. List references from private firms for which you have performed work. Dick Belcher, First Federal Savings Bank, Rochester, IN John Metzger, Culver Duck Farm, Middlebury, IN Jeff Ewing, 2nd AP Company L.P., Woburn, MA Samantha Hale, Holladay Properties, South Bend, IN Patti Toering, Matthews LLC, Notre Dame, IN SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE If so, where and why? "I . Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the governmental unit to consider your bid.) All work to be completed in a professional, workmanlike manner according to applicable plans, specifications and addendum. 2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. Art Mosaic & Tile, South Bend, IN - specialized floor finishes Interior Finishes, South Bend, IN - floor finishes Edward J. White, South Bend, IN - mechanical DeMuyt Masonry, Rome City, IN - masonry Martell Electric, South Bend, IN - electrical If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor on the proposed project. Names and addresses of subcontractors to be furnished as specifications require. Equipment to be used by them is unknown to us.. Bonds from subcontractors to be determined 4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors may also be required to be listed by the governmental unit. Trucks, skid loaders; anything else we do not have will be rented. 5, Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, please explain the rationale used which would corroborate the prices listed. Yes SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the governing body awarding the contract must be specific enough in detail so that said governing body can make a proper determination of the bidder's capability for completing the project if awarded. w'ro�)1 H w 0 W U) 2 a� w w Lu o� Cow O Lu OZZ U)mw Om0 v0W �O 0 Z Q O z 9 C N O 0 Q• o ^m o ii �j,• w .` m 0 w� �w 0 = C 0 > c w V � d Q •O y CL od 3: E c2 N M C •E a N m � w o 0 o� N O 0 t� •cc E C 'o •M w _N d CL A A N CD mt 3 � •d m > a° N = a� � •N O 0. O N t N � O 0 m � m 0 VA Q' -0 7 E:.a V t d H = O i ti CV ti f0 O w zm C w m 0 Q v m m 0 H U C m c o 0 Ewa a0p CD C w N O 0 O_ EU Q W m oW �ca C CL N m c - .O a� a� o T U) ON N o" o c 0 in a U U U O CL a> C O L uD c aL "p f` La � O C 00 c� Cc I� U� C) O� c—aoi U �� c.� c� Ch �E co c ti o� Cyr a o � � i/) co �LO W in 2 o V N U) Z Z a m c N wZ E M C c Co C � c O Z N� 2 0 O U) :3 CO 20 Y C O m U W U U) m rn m 0) N z c co 0 N O N C O CITY OF SOUTH BEND'"fir'"y�. MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY till 11 DEVELOPMENT PROGRAM irt, FORM MWBE-2.0 m�$5 EVIDENCE OF GOOD FAITH EFFORTS s This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: Project Name Bidder: 117-127R Date: Nov. 26, 2018 South Bend Fire De artment Training Center Classroom Building Brown & Brown General Contractors, Inc. Contact Person: Eric Brown Address: 124 S. Elkhart St. PO Box 487 City: AN3kawaa State: I N Email: eric bb ..us Telephone: 574-862-2171 Zip: 46573 To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. "Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. "Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 7/20/2018 Contractor's Bid for Public Works - 10 CITY OF SOUTH BEND��`a,ra.0 MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM°-' FORM MWBE-2.1„ MBEIWBE CONTACTED °,g6'" This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 1 OF 2 Project Number: 117-127R MBE/WBE Participation Goal Project Name: South Bend Fire De artment Trainin Center Classroom Buildin Bidder: Brown & Brown General Contractors Inc, By: President 11 /26/2018 (Signature) (Title) (Date) MBE/WBE Firm Ritschard Bros Owner or Contact at MBE/WBE Firm Don Ritschard Jr. or Rachelle Dolzniak Telephone: 574-288-4777 Fax: Email: ritl204@datacruz.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Excavation RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBEMBE Firm Sue -Win Inc. Owner or Contact at MBE/WBE Firm Sue Wincel Telephone: 317-791-4000 Fax: Email: suewininc@att.net TYPE OF WORK SOLICITED FOR THIS PROJECT: projection screens RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Version 7/20/2018 Contractor's Bid for Public Works - 11 CITY OF SOUTH BEND " MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY r DEVELOPMENT PROGRAM�� FORM MWBE-2.1 , MBEIWBE CONTACTED " This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. Project Number: 117-127R PAGE 2 OF�2 MBE/WBE Participation Goal Project Name: South Bend Fire Department Training,Center Classroom Building Bidder: Brown & Brown General Contractors lnc. By: President 11 /26/2018 (Signature) (Title) (Date) MBE/WBE Firm McMann Electric Owner or Contact at MBE/WBE Firm Terri MCMann Telephone: 574-674-5748 Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: electrical Email: terrimcmann@mcmannelectric.com RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBE/WBE Firm Owner or Contact at MBE/WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Version 7/20/2018 Contractor's Bid for Public Works - 11 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) X Indiana Secretary of State's on-line records (i.e. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) X Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) X List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. Version 7/20/2018 General Conditions - 8 i Entity Type: Domestic For -Profit Corporation Business Status: Active Creation Date: 06/02/1960 Inactive Date: Principal Office Address: 124 S. Elkhart St., Wakarusa, IN, 46573 - Expiration Date: Perpetual 0487, USA Jurisdiction of Formatioa: Indiana Business Entity Report Due 06/30/2020 Date: Title Name Secretary Hannah M Aitken President Eric Brown Type: Individual Name: MARITA KREPS Years Due: Address PO Box 487, WAKARUSA, IN, 46573, USA PO Box 487, WAKARUSA, IN, 46573, USA Address: 124 S. ELKHART ST., WAKARUSA, IN, 46573 - 0487, USA ti11YGE 9939 I rown and I rown EMERAL 1,1T UO 1N . 124 S. ELKHART ST. P.O. BOX 487 WAKARUSA, INDIANA 46573.0487 PHONE: (574) 862.2171 FAX: (574) 862.3930 Statement of staffing capabilities: In-house Eric Brown, President Marita Kreps, Vice -President Bradley Romine, Project Manager Todd Marek, Project Manager On -site Eric Romine, Site Superintendent Adam Loucks, Site Superintendent Matthew Hilty, Site Superintendent James Downing, Site Superintendent Rob Reinhold, Site Superintendent Labor sources: Carpenter's local 413 Cement finishers local 101 Painters local 91 October 3, 2018 RE: Brown & Brown General Contractors, Inc. To Whom It May Concern: IMII Mllur r , In compliance with the United States Department of Treasury's Listing of Certified Companies, this letter will serve to confirm that at this time the surety company Philadelphia Indemnity Insurance Company is listed with the United States Department of Treasury's Listing of Approved Sureties according to Department Circular 570. PHILADELPHIA INDEMNITY INSURANCE COMPANY Jennifer L. Kasznia Attorney in Fact ]lk/ r® 4 www.Gibsonlns.com t (800) 814-2122 f(800)836-2122 In South Bend, IN Plymouth, IN Indianapolis, IN Fort Wayne, IN Elkhart, IN Kalamazoo, MI 395 PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004-0950 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS: That PHILADELPHIA INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and existing tinder the laws of the Commonwealth of Pennsylvania, does hereby constitute and appoint Barbara Pearson Jordan Sc elbar Jennifer Kasznla or' Wobbe Megan Rlese a Nlcole Bicknell Sondra ,Inrr Theresa Bu ns Wesley Willla Carney 111111 and Cheryl Alkire of Gibson Insurance ,t ene Ir�c. its true and lawful Anome,y-in-fact with full authority to execute on its behalf bonds; undertakings, mcognizances and other contracts of indemnity and writings obligatory in the nature thereof, issued in the course of its business and to bind the Company thereby„ in an amount not to exceed 119LO00,000.gg. This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY on the le of November, 2016. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company: (I) Appoint Attomey(s) in Fact and authorize the Attomey(s) in Fact to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney -in -Fact and revoke the authority given. And, be it FURTHER RESOLVED: That the signatures of such officers and the seat of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile, and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seat shall be valid .and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 27" DAY OF OCTOBER, 2017. ti y, "^ (Seal) Robert D. O'Leary Jr., President & CEO Philadelphia Indemnity Insurance Company On this 27'h day of October, 2017, before me came the individual who executed the preceding instrument, to me personally known„ and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY; that the seal affixed to said instrument is the Corporate seal of said Company; that the said Corporate Seal and his signature were duly affixed. 10 TRN4k4'FLR' i Note Public: rorww�rw,r�r=.mrccw"wx Notary �w/ C'Ir�MW4"%Onlr 4�tiCai6. �n64'�"�.rdY,iN residing at: (Notary Seal) My commission expires: 4130.11221 Scatember 7, 1, Edward Sayago, Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY, do hereby certify that the foregoing resolution of the Board of Directors and the Power of Attorney issued pursuant thereto on the 27`" day of October, 2017 are true and correct and are still in full farce and effect. I do farther certify that Robert D. O'Leary Jr., who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY. In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this day of dole U� .20 LW—. „n �T M 1t T ti 127 Edward Sayago, Corporate Secretary 1° PHILADELPHIA INDEMNITY INSURANCE COMPANY 91NGE 9939 rown and i rown 2 1: 111 E a A L......!C 111...' R A,. 91».. T WCI R 8, 1 1U d",:,... 124 S. ELKHART ST. P.O. BOX 487 WAKARUSA, INDIANA 46573.0487 PHONE (5741 862-2171 FAX: (574)862-3930 List of Projects in past three years Description Amount Walkerton Library, Walkerton, IN ............................. $1,143,906 . . IUSB Riverside Hall, South Bend, IN ......... . .................... 3,254,451 IUSB Northside Hall, South Bend, IN .............. . .............. 3,482,671 Elkhart Memorial High School Commissary, Elkhart, IN .............. 1,164,280 Howard Ellis Elementary, Niles, MI ........... . . . ......... . .. . „ .. 935,100 Ring Lardner Middle School, Niles, MI ........................ . . . ... , . , 765,272 Northwood High School Athletic Center, Nappanee, IN , ............ , . $6,104,700 Woodlawn Hospital Pharmacy, Rochester, IN .......... . ... : .... . .... 286,229 Watervliet Middle & High Schools, Watervliet, MI ................... 557,494 Elkhart Public Library, Elkhart, IN ...... . ........................ . . 979,298 Culver Duck Farm, Middlebury, IN , ........... . ... . ................... 112,316 Peru Housing Authority, Peru, IN ...... , ...... . ...................... 342,533 Pennway Alternative School, Osceola, IN .............................. 119,299 Stratford Commons, Elkhart, IN ................................. 1,014,298 Buchanan Middle School, Buchanan, MI ................... . .... . . . .. 1,025,471 Gurley Leep Kia, Mishawaka, IN .. . ....................... , . M ........ 358,939 St. Joseph County PSAP, Mishawaka, IN .............................. 587,494 Success Academy, South Bend, IN ................................... 209,905 Knox Elementary School, Knox, IN .. . .. ,............................. 1,523,524