HomeMy WebLinkAboutOpening of Bids - Fat Daddy's Building Demolition Proj No 118-066 - Indiana Earth IncCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Fat Daddy's Building Demolition
... _ .....
Project No. 118-066
For Bids Due November 27, 2018
PART
(Must be completed for all bids. Please type or print)
Date: ��— --/ ._' Bidder (Firm):
Address: to,
City/State/Zip: '� I Telephone Number: '
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of: r/ )) y Af [
the City of South Bend, Indiana, in ocordance with plans and specifications prepared by:
and dated f #tok for the sum of (enter the Total Bid as shown on the Proposal)
V1'vc A,
(Enter sufn of
Base Bid tlus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South end, If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on s t attac e
By.
Signal e•�
(Printed Warne of Person Signing)
ACCEPTANCE
The above bid is accepted this day of 20
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
James A. Mueller, Member
Version 7/20/2018
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
Contractor's Bid for Public Works - 2 (Revised, Addendum No. 1)
BID/PROPOSAL—REVISED
CITY OF SOUTH BEND
Project Name: Fat Daddy's Building Demolition
Project Number: 118-066_,„
For Bids Due: November 27, 2018t^;,
Contractor Name: �a A' Q.1._
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
MOBILIZATION/DEMOLITION
1
LSUM7,
36ri
2
ASBESTOS ABATEMENT
1
LSUM
4�
3
MAINTENANCE OF TRAFFIC
1
LSUM
ao
4
BELOW -GRADE DEMOLITION
1
LSUM
a7 Sw
5
BUILDING MATERIAL REMOVAL AND
1
LSUM
DISPOSAL
1 w
ew.
6
..__
BACKFILL AND COMPACTION
...............
1
LSUM
7
SITE RESTORATION
1
LSUM
8
FLOWABLE FILL
60
CYS
l 5
/S fo
9
ENVIRONMENTAL ALLOWANCE
1
ALL
$30,000.00
$30,000.00
BASE BID TOTAL-t
ENVIRONMENTAL ALLOWANCE UNIT PRICFS
Item No.
Description
Unit
Unit Price
1
CONTAMINATED SOIL REMOVAL
TON
�;��00
AND DISPOSAL
..._.._._._._..W
ASBESTSOS CONTAINING THERMAL
_ .......... .
2
SYSTEM PIPE INSULATION
LFT
,
REMOVAL AND DIPOSAL
ALTERNATE #1
Item Description Quantity Unit Unit Price Total Amount
No,.
EXTERIOR MEDALLIOM SALVAGE
1 ITEMS (MANDATORY) 1 LSUM ��,�,_, �� �� (0
........... _._....._
ALTERNATE NO. 1 TOTAL 0
DESCRIBE ,,QI.�IIPMENT MATE 'IALS ND I0139R PLANNFD TO �MPI;ETE AI,.TERNATE #1;
Version 7/20/2018 Contractor's Bid for Public Works - 7 (Revised, Addendum No. 1)
BID/PROPOSAL—REVISED
CITY OF SOUTH BEND
Project Name: Fat Daddy's Building Demolition
Project Number:
For Bids Due:
118-066
November 27, 2018
Contractor Name: 1 E;CK N
ALTERNATE #2
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
505 SOUTH MICHIGAN STREET
�I
1
BUILDINFG - MONROE STREET
1
LSUM
3 ,(_9c)a V
DECORATIVE FLOOR FRAME
SALVAGE ITEMS (MANDATORY)
ALTERNATE NO. 2 TOTAL <7
DESCRf E EQUIPMENT MATERIALS AND LABOR PLANNED TO COMPLETE ALTERNATE #2:
ALTERNATE #3
Item Description Quantity Unit Unit Price Total Amount
No.
--
EXTERIOR FACADE SALVAGE ITEMS
1 —YELLOW HIGHLIGHTED ITEMS 1 LSUM sn�
MANDATORY
ALTERNATE NO.3 TOTAL
DESCRIf E EQUIPMENT MATERIALS AND LABOR PLANNED TO COMPLETE ALTERNATE #3:
ALTERNATE #4
Item Description Quantity Unit Unit Price Total Amount
No.
EXTERIOR FACADE SALVAGE ITEMS
1 —GREEN HIGHLIGHTED ITEMS 1 LSUM
MANDATORY
ALTERNATE NO.4 TOTAL
DESCRIPE EQUIPMENT MATERIALS AND LABOR PLANNED TO COMPLETE ALTERNATE #4:
J Q nn
Version 7/20/2018 Contractor's Bid for Public Works - 8 (Revised, Addendum No. 1)
BID/PROPOSAL—REVISED zoo, I,
CITY OF SOUTH BEND
Project Name: Fat Daddy's Building DemolitionKM
Project Number: 118-066
For Bids Due: November 27, 2018
a
Contractor Name:
Bidder (Firm): w • �
Address: to „"„ c
y p <. l Telephone Cit /State/ZI � �p p Number:
By
ig,n turn)
(Printed Name of Person Signing)
Version 7/20/2018 Contractor's Bid for Public Works - 9 (Revised, Addendum No. 1)
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation
to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NOW
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF
) SS:
C)'T; COUNTY
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm,
company, corporation or partnership represented by him, entered into any combination, collusion
or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent
any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made
without reference to any other bid and without any agreement, understanding or combination with
any other person in reference to such bidding. Contractor further says that no person or persons,
firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission
or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any Federal department or agency;
and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the Contractor subsequently learns is an unauthorized
alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of
Version 7/20/2018 Contractor's Bid for Public Works - 4 (Revised, Addendum No. 1)
Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3.
Contractor's documentation of enrollment and participation in the E-Verify Program is included and
attached as part of this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public
contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized
alien, nor retain any employee or contract with a person that the subcontractor subsequently learns
is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-
Verify Program. The Contractor agrees to maintain this certification throughout the term of the
contract with the City of South Bend, and understands that the City may terminate the contract for
default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after
being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by
the City of South Bend through its agencies, boards, or commissions shall not discriminate against
any employee or applicant for employment in the performance of a City contract with respect to
hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly
related to employment because of race, sex, religion, color, national origin, ancestry, age, gender
expression, gender identity, sexual orientation or disability that does not affect that person's ability
to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or
any combination of the foregoing including, but not limited to, public works contracts awarded under
public bidding laws or other contracts in which public bids are not required by law, the City, its
agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain
participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE")
or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible,
responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a
subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE.
A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that
person or entity from being awarded a City contract for a period of one (1) year from the date of
such determination, and such determination may also be grounds for terminating the contact for
which the discriminatory practice or noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall
be made a part of any contract which it may henceforth enter into with the City of South Bend,
Indiana or any of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for
employment in the performance of this contract with privileges of employment, or any matter
directly or indirectly related to employment, because of race, religion, color, sex, gender
expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of
this provision may be regarded as material breach of contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-
8-1). 1 hereby certify that I and all subcontractors employed by me for this project will use steel
products or foundry products made in the United States on this project if awarded. I understand I
have an affirmative duty to notify the City in my bid that my proposal does not include the use of
steel products or foundry products made in the United States. I understand it is my sole obligation
and responsibility to provide a justification to the City, subject to review and approval, why the cost
of United States made steel or foundry products is unreasonable. Prior to award and upon
submission of bid which does not use steel products or foundry products made in the United States,
the City, through its director of public works, shall make a determination if the price of United States
Version 7/20/2018 Contractor's Bid for Public Works - 5 (Revised, Addendum No. 1)
made steel or foundry is unreasonable. I understand that violations hereunder may result in
forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this OL (a� day of �ytl- , 201_S'
" SJw
.. h �„
Contrac
ignature of Contractor/Bidder or Agent
Printed Name and Title
Subscribed and sworn to before me this day of 20
My Commission Expires
Not
County of Residence Sah-a-,(zwk
Version 7/20/2018 Contractor's Bid for Public Works - 6 (Revised, Addendum No. 1)
*AIA
Document A310TM -2010
CONTRACTOR: SURETY:
(Name, legal status and address) (Name, legal status and principal place
Indiana Earth, Inc. of business)
North American Specialty Insurance Compan
10343 McKinley Highway 650 Elm Street �fl�is document has irllptar°tarp legal
Osceola, IN 46561 ManchesterNH 03101 conseguemes, Consultalion with
,
OWNER', an attorney is encouraged with
(•Name, legal status and address)
respect to its completion or
City of South Bend modification.
227 West Jefferson Boulevard Any singular reference to
South Bend, IN 46601 Contractor, Surety, Owner or
BOND AMOUNT: ***FIVE PERCENT OF AMOUNT BID*** other party shall be considered
plural where applicable.
PROJECT:
(Name, location or address. and Project number, if any)
Building Demolition - Monroe & Michigan Street
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflii;t llg with said statutory or legal requirement shall be deemed deleted herefrom and
provisions co forming to such s f tutory or other legal requirement shall be deemed incorporated herein. When so
furnished, t intent is that thi and shall be construed as a statutory bond anuj*nol a&jr cornmomt law bond"
Signed, d sealed thi,� 27th day of Novdbe r $�
>� d
4 t fk:"b.&
(Title)
y once Ctam
North Ame can ialt Insurance
fltlle homas O. Chambers Attornev-in-Fa ct
AIA Document A310- - 2010. Copyright ® 1963, 1970 and 2010 by The American Institute of Architects. All rights reserved. WARNING: This AIA"
Init. Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA°' Document, or
any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
1 Purchasers are permitted to reproduce ten (10) copies of this document when completed To report copyright violations of AIA Contract Documents, e-mail
The American Institute of Architects' legal counsel, copyright@aia.org 061110
SWISS RE CORPORATE SOLUTIONS
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under
laws of the State of New Hampshire, and having its principal office in the City of Overland Park, Kansas, and Washington International Insurance
Company, a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Overland
Park, Kansas, each does hereby make, constitute and appoint:
THOMAS O. CHAMBERS, TODD SCHAAP
and KIMBERLY S. RASCH
JOINTLY OR SEVERALLY
Its true and lawful Attorney(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by
law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of: FIFTY MILLION ($50,000,000.00) DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held
on the 9 A of May, 2012:
"RESOLVED, that any two of the Presidents, any Managing Director, any Senior Vice President, any Vice President, any Assistant Vice President,
the Secretary or any Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named
in the given Power of Attorney to execute on behalf of the Company bonds, undertakings and all contracts of surety, and that each or any of them
hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is
FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached."
Inolwa�a
.YrP Z'
pcoaa
� Flyr
MCI? -
SEAL ntl iaamarP. Aecr#mu, SemkrVra Prsdxnt er WPaarNmdennarnmwtnma9 PmrmmreC
SEAL %
n�I 1073 Senior Vice ProWral ofNm lb Amerkan Spreaiitrnnrmce Cmrpmmy
�ie11tNIIIa1�+" 8y, ..".�^� N
Michael A. Ito,, sauOipi ire P'rl'iglPfi 0410A' mpiusauglpro nia°riunE imp naraua�na4 npmppny* var
& Senior Vice President of Nurih American Specialty Insurance Company
IN WITNESS WHEREOF, North American Specialty Insurance Company and Washington International Insurance Company have caused their
official seals to be hereunto affixed, and these presents to be signed by their authorized officers this 1 Ith day of April , 2018
North American Specialty Insurance Company
Washington International Insurance Company
State of Illinois
County of Cook ss:
On this l lth day of„ APril_ _, 2018 before me, a Notary Public personally appeared Sievgji P„ etnderson , Senior Vice President of
Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and N chacl A Ito ,
Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance
Company, personally known to me, who being by me duly sworn, acknowledged that they signed the above Power of Attorney as officers of and
acknowledged said instrument to be the voluntary act and deed of their respective companies.
OFFICIAL SEAL
Mi KENNY
Now Prut�flc - Sur wi PW,uh
oi�,�sP,, �°7r` M. Kenny, Notary Public
I, Jeffrey Goldbern . the duly elected siS oln „''e f o'"North American Specialty Insurance Company and Washington
International Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North
American Specialty Insurance Company and Washington International Insurance Company, which is still in full force and effect.
IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this 27th day of November , 2018
Jelreey Goldberg, Vice President R Assismnl Seaeinryof
Washing. International lumnance Company & Noith American Specially Insurance Company
STATE OF WISCONSIN )
COUNTY OF Racine )
ON THIS 27th day of November 2018
before me, a notary public, within and for said County and State, personally appeared
Thomas O. Chambers to me personally known, who being duly sworn,
upon oath did say that he is the Attorney -in -Fact of and for the
North American 4ecialty insurance Company , a corporation
of New Hampshire , created, organized and existing under and
by virtue of the laws of the State of New Hampshire ; that the corporate seal
affixed to the foregoing within instrument is the seal of the said Company; that the seal
was affixed and the said instrument was executed by authority of its Board of Directors;
and the said Thomas O. Chambers did acknowledge that he/she
executed the said instrument as the free act and deed of said Company.
,ta PSheidVI
Notary Public, Racine County, Wisconsin
My Commission Expires 4/13/2019
rSHEL
ME
DON
�... OF Wad '`
BoLTLEvAi
1.
µ OUT11 4
d
n
Y
PVA
kin
P I-IONT: 5 74/ 235-9251
F-Ax 574/235-9171
TDD 574/ 235-5567
CITYOFSouTHBEND PETE BumGwci, MAYOR
BOARD `1 fPUBLIC
Date: November 21 2018
To: All Planholders
From Linda M. Martin Clerk Board of Public Works
Subject Addendum Number: 1
Project Name: Fat Daddy's Building Demolition
Project Number: 118-066
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: - d 6-
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company: Z C<
Authorized Signature:
Date: I/'- , -
Version 4/2/2015
1316 COUNTY-CUY B01-DING
227W-Junm5oNBoLq,rvARD
Wji FND: INDIANA 46:60:1-1830
CITY OFSOUTH BEND -PETE BUTrIGIEG, MAYOR
BOARD OF PUBLIC WORKS
October 2, 2018
Mr. Keith Stevens
Indiana Earth, Inc.
10343 McKinley Hwy.
Osceola, IN 46561
RE: Pre -Qualification Verification
Dear Mr. Stevens:
This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South
Bend, This Pre -Qualification status is effective for twelve (12) months from the date: of this letter. Thereafter you
are required to re -submit a complete application for continuation of pre -qualification status prior to December 31
for the upcoming calendar year.
A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of
South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments.
If you have any further questions regarding this matter, please call this office at (574) 235-9251
Sincerely,
Linda A Martin, Clerk
GARY A. GILOT DAVID P. RELos ELIZABETH A. MARADIK JAMES A. MUELLER THERESE J. DORAu
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Fat Daddy's Building Demolition
Project No. 118-066
For Bids Due November 27, 2018
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
__v/Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted
Form [MWBE-2.1].
Acknowledge Receipt of Addendum(s) included with the bid.
t✓ All required additional information is included with the bid.
/ Proposal statements and other affidavits all signed by the proper party with name either
i printed or typed underneath signature.
VThis checklist submitted with the Bids
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Date: Gl— -
By Authorized Representative:
Signature: �._.
Print Name & Title:
Version 7/20/2018 Contractor's Bid for Public Works - 1 (Revised, Addendum No. 1)
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one (1) year
prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your organization.
3. Attach information regarding any failure to complete any work awarded to you and the location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a
narrative of when you could begin work, complete the project, number of workers, etc. and any other
information which you believe would enable the City of South Bend to consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your
own firm who have performed part of the work) that you have used on public works projects during the
past five (5) years along with a brief description of the work done by each subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the City of South Bend in the event that you subsequently determine that you will
use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the prices used
in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate
the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided
hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said
City of South Bend can make a proper determination of the bidder's capability for completing the project if
awarded.
Version 7/20/2018 Contractor's Bid for Public Works - 3 (Revised, Addendum No. 1)
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name Fat Daddy's Building Demolition
Project No. 118-066
For Bids Due November 27, 2018
Contractor Name:
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 315t for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 7/20/2018 General Conditions - 6
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 7/20/2018 General Conditions - 7
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowled ments:
(i)
By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
the last twelve (12) months. A copy of my Pre -Qualification verification letter
is attached.
(ii)
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments;
(i) t/'
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
(iii) ✓
Evidence that I am utilizing a surety company which is on the United States
Department of Treasury's Listing of Approved Sureties as required in the bid
specifications or contract.
(iv)
List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
Version 7/20/2018 General Conditions - 8
PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
with the City of South Bend.
(ii) _ By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally, I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) _ By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) _ By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding .that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments:
(i) _
Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
List identifying all former business names.
Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
years.
(iv)
Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v)
Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) ,,,,,,,
Evidence of participation in apprenticeship and training programs, applicable to the
work to be performed on the project, which are approved by and registered with
the United States Department of Labor's Office of Apprenticeship, or its successor
organization.
(vii)
Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-13-18-5 or IC 4-13-18-6.
(viii)
Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 7/20/2018 General Conditions - 9
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bid is due.
Date:-k-dG
l�
( g ere) I - /
(Siin 1114'1-a-{� V) 111t�sS
(Print Name Here)
z
(Name of Company)
(Address of Company)
z
(City)
L
(State)
44
(Telephone Number)
Version 7/20/2018 General Conditions - 10
r
4�
• Indiana Earth has the crew and staff to complete this project
• Those that work on this project will be employees of Indiana Earth or of a hired subcontractor
which are under all applicable state and federal laws and local ordinances.
• Apprentice programs are managed through operator and labor unions that we are signatory
with.
• Drug testing Is accomplished through the unions of operators, laborers and teamsters, for our
employees.
• Indiana Earths surety company is approved.
• Projects similar to this one.
o Indiana Department of Corrections
o County Road 38
o Nappanee Waste Water Treatment Plant
o St Marys College
o Northwood High School
o Warsaw High School
o Laporte Intermediate School
o Concord High school
o Penn High School
o Portage, IN Police Station
o Discount Tire of Warsaw
o Pierston School
o Bell Tire of South Bend
o Bell Tire of Mishawaka
o B and B manufacturing
o Central Park in Mishawaka
10343 McKinley Hwy. ® Osceola, IN 46561 e (574) 674-6488 m FAX (574) 674-6480
Business Name: INDIANA EARTH, INC.
Entity Type: Domestic For-Proilt Corporation
Creation Date: 03/22/1990
Principal Office Address: 10343 MCKINLEY HWY., OSCEOLA, IN,
46561 - 9756, USA
Jurisdiction of Formation: Indiana
BUSINFSS 1nORtvwaoN .
CONNJ Ex .LAWS%
LNDIANA SECRETARY OF STATE
09126/201 07:33 AM
Business ID: 1990031137
Business Status: Active
inactive Date:
Expiration Date: Perpetual
Business Entity Report Due
03/31/2020
Date:
Years Due:
Title Name Address
President MARK L OSLER 10343 McKinley Hwy., Osceola, IN, 46561, USA
Type: Individual
Name: MARK OSLER
Address: 10343 MCKINLEY HWY., OSCEOLA, IN, 46561- 9756, USA
CITY OF SOUTH BEND
MINORITY AND WOMEN
PROGRAM RISE DIVERSITY
DEVELOPMENT�r A
FORM MWBE-2.0 °
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 118-066 Date: /I-
���_
Project Name: Fat Daddy's Buildi ig Demolition
Bidder:
Contact Person: CCUTelephone: J
Address:
City:State: �" Zip: /
Email: �r / `1 ,�� �.
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below":
EVIDENCE OF GOOD FAITH EFFORTS
MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend quires that all perspective bidders complete no less than 2 of the following:
iAttend all pre -bad meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE/WBEs reasonable time to respond.
J L 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBENVBE firms.
"*Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs,
--7-� including providing such MBE/WBE's with adequate information about the plans, specifications and other
V requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
I —I SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBENVBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
"Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Anv
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 7/20/2018 Contractor's Bid for Public Works - 11 (Revised, Addendum No. 1)
w
w
G
w
N
2 Z
ow� O
wz0 QQ
m w 0 �a
�ma m�
�w�
OZZ
mmw �a
Om0. °Cm
O�
v2> w
O m Q
0
Z
Q
0
Z
d.!h
O C
�+ m
C E
Q- O
Q. O
m
c
w�
m 0
c w
> c
_ o
o�
> �a
c U
A Or
om
a�
� d
O 0
E
v N
(D
7
IL v)
'o O
c
mm
r c
' 3
O `
U o
c
Uc
0 .E
C �
V A
a >,
� R
t �
a+ �
N t
m L
t 3
2 >
a°
a >,
U)
G) .0
O
0a
o
r a)
U)
E
`0
40 0
mom
a OID
U) C
r D
I--= 0
c
O
r
O
E
d
0
0 O
0
0 c
m 0
0
E
� Q
0 m
LL H
N
E
m
Z
U
N
O
IL
a�
E
7
Z
U
N o 0 a
a
a m
O
N
>0
U
7
d
0
v
m
0
t
c
0
U
00
CITY OF SOUTH BEND�ayrrr+�w°
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY,
DEVELOPMENT PROGRAMf
FORM MWBE-2.1 ;
MBE/WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE 4- OF d
Project Number: 118-066
Project Name: Fat
Bidder: - /
By:
e Bulldlnq Demolition
,�C-o , Ecr)tk
MBE/WBE Participation Goal O
(Date)
MBE/WBE Firm F Owner or Contact at MBE/WBE _r
irm
Telephone: ,s -.13 _ Fax:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
MBE/WBE Firm i- , G'
Owner or Contact at MBE/WBE Firm
Email:
5 �/, l
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
�r -
Version 7/20/2018 Contractor's Bid for Public Works - 12 (Revised, Addendum No. 1)
INDIANA EARTH, INC.
10343 MCKINLEY HWY
OSCEOLA, IN 46561
Section 1
Public Projects completed:
1) Excavation & Utility — St Marys College, South Bend, IN
2) Northwood High School Phase B — Nappanee, IN
3) Excavation & Utility CR 38 — City of Goshen, IN
4) Utility— Nappanee WWTP, Nappanee, IN
Public Works in Process:
1) Northwood High School Athletic Center, Nappanee, IN
2) Excavation and Utility — Laporte Intermediate School
3) Excavation and Utility —Concord High School
4) Excavation and Utility —Warsaw High School
5) Excavation and Utility — Penn High School
Completed all work awarded to our firm.
References of Private Firms
1)
Rieth Riley Construction
574-288-8321
2)
Gibson Lewis LLC
574-259-8581
3)
Larson Danielson
219-362-2127
4)
Holladay Group
574-234-2073
5)
Robert Henry Const.
574-232-2091
Section 2
Plan of proposed work
1) Pre -construction meeting
2) Mobilization
3) Traffic signs and barricades
4) Temporary fencing
5) Abatement
6) Removals and backfill basements
7) Site restoration
$900,000 Fall2017
$168,900 Fall2017
$2,491,277 Spring 2018
$519,020 Summer 2017
$1,233,500 Fall 2018
$1,531,400 Fall2017
$451,100 Summer 2018
$612,400 Summer 2018
$219,400 Summer 2018
Subcontractors Utilized on Past Projects
1) Hydroseed —Osceola, IN, Hydro seeding
2) HydroTek — Nappanee, IN, Hydro seeding
3) Weaver Boos —South Bend, IN, Compaction Testing
4) Bob's Landscaping — Granger, IN, Sodding
5) JPR —South Bend, IN, Surveying
6) Rieth Riley —Goshen, IN, Paving
Subcontractors to Utilize on this Project — Possible subs listed, will determine prior to contract approval
1) Hydro -seed
List of our Equipment Owned:
1)
13 Excavators
2)
4 Dozers
3)
3 Dump Trucks
4)
2 Semi Trucks with dump trailers
5)
2 Rollers
6)
5 Loaders
7)
2 Skidsteers