Loading...
HomeMy WebLinkAboutOpening of Bids - Airport Annexation Area Sanitary Sewer Extension Proj No 117-108 - Woodruff & Sons IncCITY OF SOUTH BEND, INDIANAEA`" CONTRACTOR'S BID FOR PUBLIC WORK'' ;i865 Project Name Airport Annexation Area Sanitary Sewer Extension .... _.............. _........ ...... Project No. 117-108 For Bids Due November 27, 2018 PART I (Must be completed for all bids. Please type or print) Date: November 27, 2018 Bidder (Firm): Woodruff & Sons, Inc. Address: 2151 E. US Hi hwa 12 City/State/Zip: Michigan Ci , IN 46360 Telephone Number: 219 872-8605 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: 117-108 Air ort Annexation Area Sanita Sewer Extension the City of South Bend, Indiana, in accordance with plans and specifications prepared by: A & Z Engineering, LLC. and dated November 27, 2018 for the sum of (enter the Total Bid as shown on the Proposal) Five Hundred Forty Eight Thousand Eight Hundred Eighty Eight Dollars and Eighty Eight Cents $ 548,888.88 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the ity of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be sho n a sep tea ch nt. By __A; _ (dV6 ire) Bruce R. Woodruff„ Vice P'resi (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Suzanna M. Fritzberg, Member Elizabeth A. Maradik, Member Therese J. Dorau, Member James A. Mueller, Member Attest: Linda M. Martin, Clerk Version 7/20/2018 Contractor's Bid for Public Works- 2 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Airport Annexation Area Sanitary Sewer Extension Project Number: 117-108 „ For Bids Due: November 27, 2018 + Contractor Name: Woodruff & Sons. Inc. BASE BID Item No. Description Quantity Unit Unit Price Total Amount 1 HMA Type B, Surface 37 Tons $131.14 $4,852.18 2 HMA Type B, Intermediate 61 Tons $125.91 $7,680.51 3 HMA Type B, Base 22 Tons $123.29 $2,712.38 4 Asphalt for Tack Coat 70 Sys $31.26 $2,188.20 5 Compacted Aggregate, No. 53 186 Tons $80.95 _I $15,056.70 6 Structure Backfill 400 Tons $17.68 $8,840.00 7 Plain Cement Concrete Pavement, 97 Sys $61.41 $5,956.77 Approach, 6 inches 8 Combination Curb and Gutter, Type A 30 Lft $45.49 $1,364.70 9 Concrete Median 9 Sys $102.35 $921.15 10 Mulched Seeding, Type R 6000 Sys $8.15 $48,900.00 11 Pipe, Sanitary Sewer, PVC SDR 35, 12" 2797 Lft $49.86 $139,458.42 12 Pipe, Sanitary Sewer, PVC SDR 21, 12" 1600 Lft $66.42 $106,272.00 13 Pipe, Type 3, Circular, 12" 162 Lft $173.24 $4,504.24 14 Abandon Existing Pipe 310 Lft $145.06 $23,499.72 15 Manhole, Remove 2 Each $14.28 $4,426.80 16 Modify Existing Manhole 1 Each $1,176.81 $2,353.62 17 Existing 48" Sanitary Manhole, Convert 1 Each $4,562.39 $4,562.39 to Drop Manhole 18 48" Sanitary Manhole w/Solid Casting 9 Each $5,607.15 $5,607.15 19 48" Sanitary Drop Manhole w/Solid 3 Each $5,031.73 $45,285.57 Casting 20 Temporary Silt Fence 4185 Lft $5,560.50 $16,681.50 21 Temporary Inlet Protection _ 2 Each $4.51 $18,874.35 22 Filter Sock 900 Lft $418.17 $836.34 23 Tree Removal, 48" and larger, ITITITITmmm ....._... 2 Each $6.32 $5,688.00 24 Tree Removal, 36" and larger 2 Each $170.59 $341.18 25 Tree Removal, 24" and larger 2 Each $170.59 $682.36 26 Tree Removal, 6" and larger 4 Each $4,336.44 $4,336.44 27 Clearing Right of Way 1 LSum $37,530.14 $37,530.14 Version 7/20/2018 Contractor's Bid for Public Works- 7 BID/PROPOSAL4,�„� CITY OF SOUTH BENDS Project Name: Airport Annexation Area Sanitary Sewer Extension Project Number: 117-108 For Bids Due: November 27, 2018 Contractor Name: Woodruff & Sons. Inc. BASE BID 28 Pot Hole for Utilities _ 2 Each $2,085.44 $4,170.88 29 Mobilization and Demobilization 1 LSum $24,427.39 $24,427.39 BASE BID TOTAL $548,888.88 Bidder (Firm): Woodruff & Sons, Inc. Address: 2125 E. US Highway 12 City/State/Zip: Michigan City, IN 46360 Telephone Number. 219 872-8605 J, _ .._.. .. ........ By (Si'gnatu Bruce R. Woodruff, Vice President (Printed Name of Person Signing) Version 7/20/2018 Contractor's Bid for Public Works- 8 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) SS: Laporte COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 7/20/2018 Contractor's Bid for Public Works- 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 7/20/2018 Contractor's Bid for Public Works- 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 27th day of November, 2018 Woodruff & Bons„ Inc. Co dder in' w r . are of Contractorll3irirler t-� " gnatus Agent Bruce R. Woodruff„ Vice President Printed Name and Title Subscribed and sworn to before me this _ 27th day of November , 20 18 My Commission Expires Au ust 30, 2025 gi Notary Public County of Residence Porter EINICOLE C. SPRINGER Public -Seal y - State of Indiana Number 704738 Expires Aug 30, 2025 Version 7/20/2018 Contractor's Bid for Public Works- 6 CONTRACTOR: ('dame, legal stalrry and aWm cs) Woodruff & Sons, Inc. 2125 E US Highway 12 Michigan City, IN 46361 OWNER: (,'Fame, legal stains nod address) Document A,310TM - 20° 0 Conforms with The American Institute of Architects AIA Document 310 SURETY: ('Xinne, legal stains and pifucipal place of brcrines y) Hartford Accident and Indemnity Company One Hartford Plaza Hartford, CT 06155 - 0001 Mailing Address for Notices City of South Bend, Indiana, Board of Public Works 227 West Jefferson Blvd South Bend, FL 46601 BOND AMOUNT: $ 5% Five Percent of Amount Bid This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. PROJECT: (,'Fame, location or addrun and Project number, if arty) Project No. 117-108 - Airport Annexation Area Sanitary Sewer Extension, South Bend, IN The Contractor and Surely arc bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond arc such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the tents of such bid, mid gives such bond or bonds as may be specified in the bidding or Contract Wcunients, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to ilia Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the deference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the 0%vaer may in good faith contract with another party to perlimn [lie work covered by wid bid, then this obligation shall be null and void, otherwise to remain in full lbrce and eilect. The :surety hereby waives any imlice al"an agreanwont between the Owner and Contractor to amend the time in which the Ownermay accept the bid, Waiver ol'notice by the Surety shill not apply to any extenwion exceeding sixty (60) days in the aggregate beyond ilia time for acceptance of"bidet sped lied in the bid ducuincnts, and the Owner and Contractor shall obtain the Surety's consent liir an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the toxin Contractor in this Bond shall be deemed to be Subcontractor and ilia term Owner shall be deemed to be Contractor. When this ilond has been lurnished to comply with a statutory or other legal requirement in ilia location ol'the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herellrom and provisions con1brniing to such statutory or other legal requirement shall be deemed incoiTmraled herein. When so liimished, tiie intent is [flat this llond shall be construed as a statutory bond and not as a common law bond. Signed and led this 16th day of November, (If i rres�, Kyle Weisman, Project Manager (11'llnexs) "054/AS 8/10 2018. Woodruff & Sons, Inc. (prirrcip "c alL 2 ,� �oe Z ) 1211, )B,A Mille) Bruce R. Woodruff, V .. sident Hartford Accident and Indemnity Company (Barely) (Seal) (Title) William Griffin ttorney--in- act Direct Inquiries/Claims to: THE HARTFORD BOND, T-12 W 1[-�' R 0" 1w 7 A P "Ir - 1 T " 0" R"INEY One Hartford Plaza Hartford, Connecticut 06155 llor'wtN, t"I�a)���;�1uo6fi�F,,i"ri ct�rlro call: 888-266-3488 orfax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: AMERICAN GLOBAL LLC A enc Code:21-212039 X Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of Unlimited : Theresa J. Foley of Jericho NY, Krystal L. Stravato, Kevin T. Walsh, Jr. of Whippany NJ, Ricardo Davila, William Griffin, Michael Marino, Torre Taylor of MIAMI, Florida their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. rwtabrtws,�"any0(<11 tTa� //W e John Gray, Assistant Secretary STATE OF CONNECTICUT I SS, Hartford COUNTY OF HARTFORD M. Ross Fisher, Senior Vice President On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. aKathleen T, Maynard Notary Public CERTIFICATE My Commission Expires July 31, 2021 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of p Signed and sealed at the City of Hartford. G ot ;sac"+ I! rt4 $,glo � �MO.aar J 9 ta"f &N76iq�� .fit Kevin Heckman„ Assistant Vice President POA 2018 i G'i9hCA4 r+, �.0 1316 COUNTY -CITY BUILDING PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD^ FAx 574/ 235-9171 SOUTH BEND, INDIANA 46601-1830 �8 �': " TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 19, 2018 To: All Planholders ................................................. From Linda M. Martin, C.1__ erk, Board of Public Works Subject Addendum Number: 1 Project Name: Airport Annexation Area Sanitary Sewer Extension Project Number: 117-108 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: November 19. 2018 This addendum is being forwarded to you for the above referenced project. - Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUSS' also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes:. The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Authorized Signature: Date: November 21 2018 Version 4/2/2015 C. Weisman, Project ject Man r � 1316 COUNTY -CITY BUILDING t �d ` `x",� ' �PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD ��;r �w " �,, FAX 574/ 235-9171 SOUTH BEND, INDIANA 46601-1830 . , d'ia K+ ,:�" TDD 574/ 235-5567 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 20, 2018 To: All Planholders _. _.....__....... From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 2 Project Name: Airport Annexation Area Sanitary Sewer Extension Project Number: 117-108 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: November 21 , 2018 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: Woodruff & Authorized Signature: Date: November 21 2018 Version 4/2/2015 e C. Weisman„ protect Man Communication Result Report ( Nov.21. 2018 8;10AM) 2) Date/Time; Nov.21. 2018 8 09AM File Page No, Mode Destination Pg(s) Result Not Sent 7871 Memory TX 5742359171 P. 2 OK Reason 'for error E.. 1) Hang up or line fail E.2) Busyz E. 3) IVo arrswer E.4) No facsimile connection E.. 5) E x r. e e d e d m a . E: rn a i 7 s i z e E. 6) D e s t i na t i o n d o e s n o t s u p p o r t I P P a x �r a310(.'wm'C¢rawr�- ,My, �^* WOtmn; 5] 12757Uz35911 W.S HwtavAau kR'au 4f235A17I a�'rrdaeNgdouq WDa-1930 r ITV VV VJ5,1 0 CITY OF SOUTH BEND PM BUTTIOIFa, MAYOR ` BOARD OF PUBLIC WORKS bak: Aa�rrrntiti9a�tr i�6a,.2V91M..........._........._................ To: All PhathAa'tcmau --..,- .._ ,................. Prom .,_ lerk� Bmrtd oEPah7ic W Subject Addrtxhai�1�._...._..... ..._..__... ,...,n.n.�.,..,,,.,.. �µ .. �,�...... P-jout Nam.: Alrpwt Annautlon Atom ea.onay A rtmna�Rmr ProjectNumber: ,,.117-106._ .,_.._....... ............m�............................................................................. ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwended to you for the above refe¢need projwL . i'lease sign below and acknowledge rec ipt of this Addcenduat by taxing this sheet to the Board of Public Works of (5 74) 23�»9171 within 98 hours of receipt. A copy MUST also be included with your bid package upon submittal. TBIS ADDENDUM MAY AFFECT YOUR BID. NOresa,. The attached docutnents ate hereby added to the Specifications and Contract Domunents and beeme a part of erdn. P Y n RV 1R9 _ ....-.• RM G. 9Wa&vpana rV llaam d1kAPdha�'Ab.S•, Da1o: . i^cnav,AVJdaai I f } H Cl) w W G W Cl) ag a on a OZZ U) U) W 0mCL W W V0W Z a H 0 z E z 0 o d WU m� �a W m O LL LU 21 d.!n O C m Q. o m oL C. W m Lp LU � C m O C C O O ++ > — w y V •10 d 0 L a� O CD 3 E u N a7 7 � IL 'v, c � m �a O 0 oL N o O a+� L) c O 'E _C 'a '10 aC+ C. m !9 L (n t mr s 3 a1 > 0.0 C. 7 ++ U) 0.0 O O 0 C. U)r 0)U)L 0 O 0 N L C.� 7 E 0 t � N N C H = 0 m U) m m 0 o 0 a 0� m c a oD c 0 a 0 0 Q W �m o 0 �m g o Ln LO m U m a m c a) 0 0 :- E� a) a) d a) � c -0, o0 0 a) �75 0 0 �t ` U 0 U N N0 U) 0 N 0 4) c Uca U c Q c m C C a� c aL a m a) ) ow c aD O m L p U CN L,E 2 m m Ez y cD m Lo IL m Lo m m 0 u) ti N N C (p (0 Q C > Z od ' p — U 04 a) c z m Z) m a) (mp L U) N U) co O N N N E CD O Z it rn co O N O CN C 0 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITYr:T, DEVELOPMENT PROGRAM�' FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 117-108 Date: November 27, 2018 Project Name: —Airport Annexation Area Sanita Sewer Extension Bidder: Woodruff & Sons, Inc. Contact Person: Bruce R. Woodruff _ Telephone: 219-872-8605 Address: 2125 E. US Highway 12 City: Michigan City State: IN Zip: 46360 Email: brucew@woodruffandsons.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below': EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. ""Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. *Proper dem monstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 7/20/2018 Contractor's Bid for Public Works- 10 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAMN `G FORM MWBE-2.1. MBE/WBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. Project Number: Project Name: Bidder: , By: re) PAGE 1 OF 1 117-108 MBE/WBE Participation Goal Airport Annexation Area Sanitary Sewer Extension Woeidruff & Sons4Inc. Bruce R. Woodruff, Vice President November 27, 2018 (Title) (Date) MBE/WBE Firm State Barricading Owner or Contact at MBE/WBE Firm James Michalski Telephone: 574-287-2078 Fax: 574-287-1744 Email: statebarricade1 a aol.com TYPE OF WORK SOLICITED FOR THIS PROJECT: Maintenance of Traffice RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Quote received and is part of our bid MBE/WBE Firm Slussers Green Thumb Owner or Contact at MBE/WBE Firm John Williams Telephone: 574-722-3102 Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: Seeding, Erosion Control, and Silt Fence RESULTS OF CONTACT WITH THE MBE/WBE FIRM: n Email JDW �. slussers.com ..@e. Contacted and rovided a uote but the were not com etitive Version 7/20/2018 Contractor's Bid for Public Works- 11 00 City of South Bend Pubic Worla Phone. 574.235-9251 Emal- dhansonQsou1hbend)n.gov AW W, JEffemon, covr4y City 130drs 1216 Zamih E-mnd. M 46601-ISW EXCAVA77ON FEWWrWOUEST Date Submitted. November 27,2018 Instructions- 1) Print Clecuiy 2) Complete Al Sections Submit 11 It* Form In Person 2� Or Email To- %3) Upon Permit approval. Sign issued permit and Retum 6W*M.mgwzwwmmmsus��� Ez� �- Applicant Woodruff & Sons, Inc. (Contratiot/Company Narne) Contact Name Emal brucew@woodruffandsons.com Phone Number 219-872-8605 Street Addrew I Location of j%fork 2125 E. US Highway 12, Michigan City, IN 46360 Type of Work Ca b;e Eilecl6c Feber Gas Manhoile repair Sanitary Sewer Water Other TypS pf Cy 0 cuts Bonng Trenching (open) # Feet Cut tocation In Street Outside curb, but in treelawn/ddewdk, Right of W13y Comments I Description of Work Date I Dtffation of ptojec-4 (eg::2/1 Ila. 2 M) Excavation! in ROW without a peirn-di, virill result fn stop w<•mk ordej and/of delays in pefmithing. Applicant S$qnatiAe R •F -4 1 EXCELLENCE —' ACCOUNTABILITY —1 INNOVATION + INCLUSION + EMPOWERMENT Version 7/20/2018 Contractor's Bid for Public Works- 12 „o, City of South Rend Pubic Works Phone. 574.235,9251 -d son0southbendin-gov Email ham 4227 W. Jeffn, County City &Adw�g 11316 e S*ulh behd, IN 46601 -TaN TRAFFIC CONTROL AND� OCCUPANCYREQUEST "SUBMIT 5 WOW DAYS MINNUM PRIOR TO IFROJECT START DATE PLAN YOUR START DATE ACCORDINGLY TO AVOID DELAYS Complefe I - 5 Mcomplefe Submiffals �Cannot Be Processed Parking Lane Travel Lane Full Road Ckxsure Alley Sidewalk Closure 2 Excavation/Boring? > Requires Excavaflon Form Conshucffon? > Requires Curb Cut alpplicafion or sidewalk permit Submission Date: November 27, 2018 Applicant/Comparly- Woodruff & Sons, Inc. Name, Bruce R, Woodruff Eploill Address: brucew@woodruffandsons.com Phone #, 219-872-8605 C."Ca co$ Conlraclor PerfcIming Work, Woodruff & Sons, Inc. Ed Byers 219-898-6831 On -Site Contact Phone #1, Project STREET ADDRFM [ego 1 10 W_ Smilh RDJ- Project Location (Block limits/Streels From and To): Requested Start & End 1)qtes: Requested Start & End Times; Reason for Closure: 4 Affected Customers. - ujt 1,::, f(;)- J w0h ATTACH 1HE F(MOWING TIEMS., 1. Traffic Control Non 2. Detour Plan 3. Barricades, Signs, or flasher. Placement (Ref"Jo141UTC0 for Traffic ConktA Elevke Requkements) See reverse for Checkhil FaSure to use traffic COntIM f0F *Gffit FestricSom or closuses will iresuff in stop work orders anal jor delay fn pern-iffing. 5 THIS OCCUPANCY PERMIT REQUEST IS NON-TRANSFERAKE AND A SIGNATURE SUILIECTS THE NAMED CONIRACTOWERMITTtE TO All APPLICABLE RULE&. DUFIES AND ORUGATIONS WA?03ED BY THE CITY Of SOUTH BEND MUNtCAPALCODE AND TO ALL REGULATIONS IMPOSED BY THE SGUTH BEND BOARD Of PUBLIC WOR113. Appricanf Signature Dole Aploroved Approved as Noted Revise Not Approve,10 ISTOM =1 City of South BendlEngineering Division Authorized Signature Dole- vonhon U ls/2110141 Version 7120/2018 Contractor's Bid for Public Works- 13 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Airport Annexation Area Sanitary Sewer Extension Project No. 117-108 .................. For Bids Due November 27, 2018 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check x or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely x executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and x Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted x Form [MWBE-2.1]. x Acknowledge Receipt of 1,2 Addendum(s) included with the bid, x All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either x printed or typed underneath signature. x This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Woodruff & Sons, Inc. By Authorized Rep Signature: Print Name & Title: Bruce R. Woodruff, Vice Presiden Date: November 27,2018 Version 7/20/2018 Contractor's Bid for Public Works- 1 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/20/2018 Contractor's Bid for Public Works- 3 4��oPeaa Er 448f'CAN R U S' " $ CE1946SIN Woodruff, Inc. "• Box 10127 Bradenton, �.:2.0 A ► S .0 WaVEWWRIM • Equal Opportunity Employer November 27, 2018 City of South Bend Board of Public Works South Bend, Indiana RE: Bid Airport Annexation Area Sanitary Sewer Extension Section II: Plan and Equipment Questionnaire 1. Explain your plan or layout for performing proposed work. ** Woodruff & Sons, Inc. will construct the work of the project in accordance with Contract Documents as issued by the Owner and as prepared by the Engineer. 2. List the names and addresses of all subcontractors that we have used on public works projects during the last five years with a brief description of the work they completed. **Rieth-Riley Construction — Asphalt/Concrete —2454W CR450 N Laporte, IN 46350 **Walsh & Kelly Construction — Asphalt/Concrete — 2418 W CR 450 N Laporte, IN 46350 **Slussers — Silt Fence/Sod/Seed —125 Montgomery St Logansport, IN 46947 **UMC Union Mills Construction —Concrete — 7271S 700 W Union Mills, IN 46382 **John A. Doyle & Associates — Field Engineering & Surveying — 2322 E. Michigan Blvd. Michigan City, IN 46360 3. If you intend to sublet any portion of the work, state the name and address of each Subcontractor, equipment to be used by the Subcontractor, and whether you expect to require a Bond. **State Barricading -Maintenance of Traffic-34963 US 20 W., South Bend, IN **UMC-Concrete-7271 S. 700 W., Union Mills, IN "Acorn -Seeding, Topsoil, Silt Fence-3680 W. Sample Street, South Bend, IN **Kachur-Tree Removal, Clearing, and Grubbing-316 Fulkerson Rd., Niles, MI **Wild West Media-Jobsite Video Pre & Post Construction Video-P.O. Box 222, Laramie, WY **JPR-Construction Engineering-325 S. Lafayette Blvd., South Bend, IN No bonds required of any subcontractor 4. What equipment do you intend to use for the proposed project? **Woodruff & Sons, Inc. has available to use for the proposed project: Loaders, Backhoes, Mobile Mixer, Dump Trucks and Trailers, Pavers, Dozers, Compactors, Vertical Drill, Rollers, Boring Machines, Concrete Breakers, Pumps, Trench Protection Equipment, Conveyors, Graders, Scrapers, Wellpoint Systems, Cranes, and Compressors S. Have you made Contracts or received offers for all materials within prices used in preparing your proposal? PO. Box 10127 Bradenton, FL 34282-0127 PO. Box 450 Equal Opportunity Employer opEpare® A C 1C'AN BUW" 0_ SINCE 1946 •! Box 10127 Bradenton, '! .'r; 450 Equal Opportunity Employer November 27, 2018 City of South Bend Board of Public Works South Bend, Indiana RE: Bid Airport Annexation Area Sanitary Sewer Extension Section I: Experience Questionnaire Information regarding projects your organization has completed for the period of one year prior to the date of the current bid. ** Elm Street Water Main Improvements — Water Main — Valparaiso City Utilities; contract amount $506,653.28; completed November 2017 **Franciscan St. Anthony Health — Sanitary Sewer, Storm Sewer, Water Main —Tonn & Blank Construction; contract amount $1,761,886.00; completed August 2018 **Hobart Water Main — Water Main — Indiana American Water Company; contract amount $1,633,888.88 A list of public works projects currently in process of construction by our organization: **Elston's Legacy Apartments — Sanitary Sewer, Storm Sewer, Water Main — Michigan City Redevelopment Commission; contract amount $1,251,634.45; expected completion May 2018 **NWI Gary Bid Package 1 Water Main Improvements — Water Main — Indiana American Water Company; contract amount $897,448.88; expected completion January 2018 **Hupp Road Box Culvert — Storm Sewer— INDOT; contract amount $416,801.55; expected completion December 2018 **Lafayette St., Brown St., Campbell St. Water Main Improvements — Water Main — Valparaiso City Utilities; contract amount $395,858.88; completion date December 2018 3. Information regarding any failure to complete any work awarded to you and the location thereof. **This is not applicable; Woodruff & Sons, Inc. has never failed to complete any work awarded to us. 4. References from private firms for which we have performed work: **Blue Chip Casino, Michigan City, IN — Butch Shreve **Criterion Catalyst, Michigan City, IN —Steve Krentz **John A. Doyle & Associates, Michigan City, IN — John A. Doyle **Haas & Associates, Michigan City, IN — TimothyJ. Haas **Larson -Danielson, Laporte, IN —Timothy C. Larson CONTRACT DOCUMENTS AND SPECWICATION3 FOR AIRPORT ANNEXATION AREA SANITARY SEWER ENSI N Project No.117-108 Odobor31,2018 Prepared far CITY OF SOUTH BEND, INDIANA BOARD OF PUBIC WORKS By Enalneedup, LLC Min V. TIrble Registered Professional Engineer State of Indiana No,- J071 7587 FORBIDS DUE-- NoVember27, 2018 Version 7/20/2018 Contractor's Bid for Public Works- 1 City of South Bend, Indiana Department of Public Works AIRPORT ANNEXATION AREA SANITARY SEWER EXTENSION Project No. 117-108 Notice to Bidders General Conditions Special Provisions Geotechnical Investigations Report City of South Bend Contractor's Bid for Public Work Form 1 Page 10 Pages 12 Pages 38 Pages, 13 Pages Version 1/11/2017 Table of Contents CITY OF SOUTH BEND STATEMENT OF POLICY The Board of Public Works of the City of South Bend has adopted the following policy regarding the receipt of sealed bids: All sealed bids submitted to the Board of Public Works must be received in the Board of Public Works Office, 1316 County -City Building, South Bend, Indiana, no later than the advertised time on the advertised date of the bid opening. It shall be the responsibility of the bidder to see that his/her bid is received prior to the deadline stipulated in the bid advertisement. Bids submitted by mail and received after the advertised time deadline will not be considered by the Board. CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Linda M. Martin, Clerk NOTE: Incoming mail does not reach the Board of Public Works until after 9:30 a.m. Local Time. If you are sending your bid via Federal Express or another overnight source, please confirm that your package will arrive before the bid opening date and time. Version 7/20/2018 General Conditions -1 NOTICE TO BIDDERS Notice is hereby given that the City of South Bend, Indiana, Board of Public Works will receive sealed bids at the Office of the Board of Public Works, County -City Building Room 1316, 227 West Jefferson Blvd, South Bend, Indiana, 46601 until the hour of 9:30 a.m., Local Time, on November 27, 2018 for the following: AIRPORT ANNEXATION AREA SANITARY SEWER EXTENSION Project No. 117-108 Work includes construction of a sanitary sewer at the Airport in South Bend, all more particularly described in plans and specifications prepared by A&Z Engineering, LLC, phone 260-485-7077. The Contract Documents are on file and available for public inspection commencing on the first advertise date during regular working hours at the Department of Public Works (1316 County -City Building, South Bend, Indiana), and at MACIAF 3215-A Sugar Maple Court, South Bend, IN 46628. Additionally, the Contract Documents will be available that same day for inspection or purchase at American Reprographics Company ("ARC", located at 1303 Northside Blvd., South Bend, Indiana, 46615), http://www.e-arc.com, (574) 287-2944, toll free at (800) 783-7231. There will be a non-refundable charge for reproduction as set by ARC for every set of documents for all bidders. Bids must be on the City of South Bend Contractor's Bid for Public Work Form, accompanied by a Certified Check or Bid Bond in the amount of not less than five percent (5%) of the base bid plus any alternates, in a sealed envelope noting the project name, number and your company's information on the front. Each bidder or contractor (hereinafter the contractor) must comply with "City of South Bend EEO Contracting Provision Diversity Utilization" included in the specifications as to each construction trade it intends to use on this construction contract and all other construction work (both federal and non-federal) in the St. Joseph County area during the performance of this contract or subcontract. The contractor commits itself to the goals for minority manpower and all other requirements, terms and conditions of these bid conditions by submitting a properly sealed bid. Woman and Minority -Owned Business Enterprises (W/MBE) are encouraged to respond to this notification. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidder Ordinance no later than the date of the public bid opening. Please note: The City reserves the right to request supplemental information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified status. A Pre -Bid Conference will be held' on November 13 2018 at 3:30 m LocalTime at Board of Public Works meeting room. Any questions about bidding conditions must be addressed to the Owner in writing no later than November 20, 2018. The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award the base bid plus an alternate(s), the Board will look at the totality of the cost when determining the lowest, responsive and responsible bid. BOARD OF PUBLIC WORKS Linda M. Martin, Clerk Publish two (2) times: November 2, 2018 November 9, 2018 Version 7/20/2018 Notice to Bidders CITY OF SOUTH BEND STATEMENT OF POLICY The Board of Public Works of the City of South Bend has adopted the following policy regarding the receipt of sealed bids: All sealed bids submitted to the Board of Public Works must be received in the Board of Public Works Office, 1316 County -City Building, South Bend, Indiana, no later than the advertised time on the advertised date of the bid opening. It shall be the responsibility of the bidder to see that his/her bid is received prior to the deadline stipulated in the bid advertisement. Bids submitted by mail and received after the advertised time deadline will not be considered by the Board. CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Linda M. Martin, Clerk NOTE: Incoming mail does not reach the Board of Public Works until after 9:30 a.m. Local Time. If you are sending your bid via Federal Express or another overnight source, please confirm that your package will arrive before the bid opening date and time. Version 7/20/2018 General Conditions - 1 CITY OF SOUTH BEND EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING PROVISIONS DIVERSITY UTILIZATION It is the policy of the City of South Bend to provide equal employment and business opportunity for all persons, partnerships, companies, and corporations in accordance with the rules, regulations and guidelines of the applicable federal, state and local laws. This policy of equal employment and business opportunity shall apply to every contractor or subcontractor bidding or holding a public contract with the City of South Bend. In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part of every construction contract entered into by the City of South Bend and all subcontractors entered into pursuant to any such contract and the bidder hereby certifies that it/he/she will abide by these provisions. The contractor will not discriminate against any applicant or employee because of race, color, religion, sex, national origin, or handicap. The contractor will take affirmative action to ensure that all applicants or employees are treated fairly and equitably. Such action shall include but not be limited to the following: hiring, up- grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates of pay or other forms of compensation and selection for training including apprenticeship programs. The contractor shall agree to post in conspicuous places available to employees and applicants, notices to be provided setting forth the provisions of the Non -Discrimination Clause. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. The contractor will send to each labor union or representative of workers with which it/ he/she has a bargaining agreement or other contract or understanding, a notice to be provided, advising the labor union or worker's representatives of the contractor's commitment under this section, and shall post copies of the notices in conspicuous places available to applicants and employees. The contractor will comply with all provisions of Executive Order 11246 (as amended by 11375) and of the rules, regulations and relevant orders of the Department of Labor. Subpart B --Contractors' Agreements Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government contracting agencies shall include in every Government contract hereinafter entered into the following provisions: "During the performance of this contract, the contractor agrees as follows:" "(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated equally during employment, without regard to their race, color, religion, sex or national origin. Such action will include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or Version 7/20/2018 General Conditions - 2 recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause." "(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin." "(3) The contractor will send to each labor union or representative of workers with which it/ he/she has a collective bargaining agreement or other contract of understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment." "(4) The contractor will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules and regulations, and relevant orders of the Secretary of Labor." "(5) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders." "(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, in this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked* as provided in Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law." "(7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the contractor may request the United States to enter into such litigation to protect the interests of the United States." The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate Version 7/20/2018 General Conditions - 3 in work on or under the contract. The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance. The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings. * Corrected to read "invoked". In the original text the word "involved" was printed in error. Version 7/20/2018 General Conditions - 4 MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM The City of South Bend, Indiana has shown its commitment to addressing Minority Business ("MBE") and Women's Business Enterprise ("WBE") participation in public contracting through the adoption of the City of South Bend Ordinance No. 10081-11. Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age or disability that does not affect that person's ability to perform work. Minority and Women's Businesses are described on the Indiana Department of Administration website: htt :/lwww. in, ovdidoa/. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. Documentation shall be provided with the bid that states the MBE/WBE that will be contracted, the dollar amount of the work that will be performed on the project and the percentage of the dollar amount as it relates to the total bid amount by using Form MWBE-1.0, MBENVBE Participation Form. The City, its agencies, boards, or commissions requires the Contractor's good faith efforts to obtain participation by those Contractors classified as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE"). Failure to provide ALL the required evidence of good faith efforts with the bid will be grounds for rejecting a bid as non -responsive. The requirements that bidders shall supply as good faith efforts to have active participation from MBEs and/or WBEs on this Project is written documentation evidencing the efforts by using Form MWBE-2.0, Evidence of Good Faith Efforts and Form MWBE-2.1, MBE/WBE Contacted. Such documentation shall include but is not limited to the following items: a. A listing of all MBE/WBEs contacted including: (1) the name and address of the MBE/WBE; (2) the date of contact; (3) the type of contact (i.e. phone call, written solicitation, etc.); (4) the nature or type services or goods requested; and (5) the result of the contact. b. Written evidence of outreach and copies of email exchanges inviting and receiving quotes or other responses from MBE/WBE businesses or other documentations of efforts to encourage and secure competitive quotes from MBE/WBE and local businesses to be included in the benefits of building this Project. c. Written documentation of letters of introduction, invitations to forging majority/minority strategic alliances for capacity building including but not limited to mentoring, extensions of assistance on payroll, insurance, bonding, line of credit, technical skills or business skills. All bidders are actively encouraged to reach out to the MBE/WBE businesses in St. Joseph County, Indiana and other local Indiana counties to utilize a good faith effort to forge constructive and lasting business partnerships. Notwithstanding the foregoing, the award and performance of all City contracts shall comply with applicable federal, state, and local laws. Version 7/20/2018 General Conditions - 5 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Airport Annexation Area Sanitary Sewer Extension Project No. 117-108 For Bids Due November 27, 2018 Contractor Name: Woodruff & Sons, Inc. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 st for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/2018 General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/2018 General Conditions - 7 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) (iv) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. Version 7/20/2018 General Conditions - 8 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) X By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) X By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) X By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) X By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: (i) X Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) X List identifying all former business names. (iii) X Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) x Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) X Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) X _ Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) X Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) _X Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 (ix) X _ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) x List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date; owernber 27, 2018 (sign Here) Bruce R. Woodruff, Vice President (Print Name Here) Woodruff & Sons, Inc. (Name of Company) 2125 E. US Highway 12 (Address of Company) Michigan City (City) Indiana (State) 219-872-8605 (Telephone Number) Version 7/20/2018 General Conditions -10 to E® Alb 01 Rar60 q BAN eu SINCE 1946 • :.; 10127 Bradenton, ' • :o: 450 Equal Opportunity Employer November 27, 2018 RE: Pre -Qualification Checklist (For Bidders that are not pre -qualified) Please see attached ii. Not Applicable iii. January 2015 —The company was cited for matters associated with excavation requirements and protective systems. All appropriate corrective action and training has subsequently been performed and put in place to satisfy OSHA requirements. iv. Woodruff & Sons, Inc. is currently staffed by 210 employees between our two locations, with over 70 years of experience. We are also affiliated with Teamsters Local #135 and Local #142, Laborers Local #81 and Local #645, and Operators Local #150. v. Persons working on the project shall be lawfully employed by Woodruff & Sons, Inc. or their Subcontractors. All Woodruff & Sons, Inc. employees are verified through E-verify. vi. See attached copies of apprenticeship statement and additional training program log. vii. See attached copy of the Company Substance Abuse Policy for Woodruff & Sons, Inc. Woodruff & Sons, Inc. is also affiliated with the BCRC Administrator Inc. viii. See attached evidence of Approved Sureties ix. Not applicable of any federal, state or local tax liens or tax delinquencies. x. Projects of similar size within the last three years: **Fir Street Alleys Sanitary Sewer Replacement — Sanitary Sewer — Michigan City Sanitary District; contract amount $353,650.27 **Madison Street Alley Sanitary Sewer Replacement — Sanitary Sewer — Michigan City Sanitary District; contact amount $173,888.88 **East Dock Sanitary Sewer— Sanitary Sewer— Ports of Indiana; contract amount $185,485.00 **Michigami Trail Woodlawn Ave Water Main Replacement — Water Main — Indiana American Water Company; contract amount $443,246.72 **South Bend One Way to Two Way — Sanitary Sewer, Storm Sewer, Water Main — City of South Bend; contract amount $1,467.033.00 **E|ston'sLegacy Apartments —SanbarySevver,StonnSewer,VVatmr Main— Michigan City Redevelopment Commission; contract amount $1,251,634.45 PO. Box 450 Equal Opportunity Employer l BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE 10/02/2018 09:12 AM / 5, ��/i6 ; � %N!��f�i Business Name: WOODRUFF & SONS, INC. Business ID: 194316-057 Entity Type: Domestic For -Profit Corporation Creation Date: 03/28/1961 Principal Office Address: PO BOX 450, 2125 EAST US 12, MICHIGAN CITY, IN, 46361, USA Jurisdiction of Formation: Indiana Title Name Address Business Status: Active Inactive Date: Expiration Date: Perpetual Business Entity Report Due 03/31/2019 Date: Years Due: Secretary WAKEMAN.LINDA. P.O. BOX 10127, BRADENTON, FL, 34282 - 0127, USA Vice President Bruce R Woodruff 2125 E US 12, Michigan City, IN, 46360, USA President Donald P. Woodruff P.O. Box 10127, Bradenton, FL, 34282 - 0127, USA r r ✓/ //, r / rRISEN, /, / //, /,,.,, l l � r � t�Itartt l� // // i �, rii �� r��iµu:lti�.,�,..,.41�:«����a �li Type: Individual Name: Bruce Woodruff Address: 2125 E US 12, Michigan City, IN, 46360, USA CAN ®U 1946 • Box 10127 Bradenton, I fAuzgF, • • • Equal Opportunity Employer November 27, 2018 Woodruff & Sons, Inc. hires laborers and operators under an apprentice program. Labor Apprenticeship: Union 81, 41, and 645 have apprentice programs for laborers. Currently, we have 1 employee: Jacob Jones (81), Anthony Munoz (645), and Angel Perez (81) are laborer apprentices with Woodruff & Sons, Inc. We have hired many laborers in the past and have placed them in the apprentice program. Operator Apprenticeship: Union 150, also has an operator apprentice program. Currently, we do not have any operator apprentices in the program because all of our operators are journeymen. Woodruff & Sons has had apprentice operators in the past and they have worked through the program. 0W ®papers®"" A0:1CaN eu%"fie P.O. Box 10127 Bradenton, FL 34282-0127 Phone: 941-756-1871 Fax: 941-755-1379 ••• P.O. Box 450 Michigan City, IN 46361 ice Equal Opportunity Employer 1/01/2018 Woodruff & Sons, Inc. strives to provide a safe work environment and encourages individual health and safety. In regard to this, this company considers the abuse of drugs or alcohol, on or off the job, to be unsafe and a counterproductive work practice. With this in mind, Woodruff & Sons, Inc. has established the following policy with regard to the use, possession, or sale of alcohol or illegal drugs at work. This, in turn, keeps Woodruff & Sons, Inc. in compliance with the Federal Government mandated Drug Free Workplace. It is company policy that an employee found with the presence of alcohol or illegal drugs in his/her system, in possession of, using, selling, trading, or offering for sale, illegal drugs or alcohol during working hours, may be subject to disciplinary action up to and including termination. (Company sponsored activities, which may include the serving of alcoholic beverages, are not included under this provision.) Substance abuse includes possession, use, purchase or sale of drugs or alcohol on company premises (including job sites) or in company vehicles. It also includes reporting to work under the influence of drugs or alcohol. Drugs prescribed by the employee's physician may be taken during working hours. The employee must notify the supervisor if the use of properly prescribed medication will affect the employee's work performance. Woodruff & Sons, Inca will maintain screening practices to identify employees who use illegal drugs or abuse alcohol. It shall be a condition of continued employment for all employees to submit to drug and/or alcohol screening. Individuals who may be tested for substance abuse; All new employees are subject to pre -employment drug screening. ❖ When there is reasonable suspicion to believe that an employee is using illegal drugs or has used alcohol during working hours. ❖ When there is any mishap or accident involving an employee or caused by an employee in which injury to persons or damage to property has occurred. ❖ When there is an accident or mishap involving a company vehicle. 4. Upon return from extended absences. Random Testing: Tests which are unannounced and in which every employee has an equal chance of selection. This policy is intended to be a helpful tool in working toward and maintaining a drug and alcohol free workplace, and to comply with Indiana Code 4-13-18, which in turn, will make a safer and more productive place to work. This policy will be reviewed each year for any necessary changes or additions. -4 cf,""fiRd Thank you, Guarantee Company of North America USA ("Fix, Square S CT, C.,F CC, FL (�A HI IC it IN, !A KS, YY We NC NO OH OK, OR P-,, � �I SC St 71 Hanover InsufaiKe Company (Thej (NWC 0 BU-SiNESSAEEPESS 4AO LINCOLN STREE IJNGfR'.'.R1TBNG LH14TATON t,' S143 -592 5 f'Y-- FL ak W 0 IL, IN IA K'-;, KY, LA SIE ND Ofl,, 43K OR PA- Ri Sr SD TN TX UT Hamps,h,rle- HADCO NATIORAI, IINSUPANCE COMPAN) 5US,jNFS,S ADGRE�=,i 70? CeERUN ROAD, LINEERIARMP,r- 0.1,1TATION hi SIE, 3G6 00 T�C F, -.A 11). 1 I IN, IA, 1CS :KY bk Vhff ND OH OK OR PA, R, SC SC, TN TX 0 hasifroid Accklewond hWo,w0ty CornXkloy x", FI '::a h�, D 1, HN, 10;, id,"Y LA, kir H3900IdC*SkW11ty 141UHMIC0 (,'00$p40y (NM M" TAT LIK.N b� -',,D CC, FL, 4�A Na.IC�L'IN IA KS K-Y'LA ME NO CH, OK OR PA R� SC _SZ, TN TX LJ Hartford Fire Insurance Company (MAIC #11 6USINESS AlDrDPESS Cr*Kwfford Plaza P. LINCE, RVMIDN-3 L! M-'7ATI,'DN � S, 3.1-1 052 CE EIC FL CA,GLI MI €D IL kN [A KS KY NY MIC ND OH, 0K, OR PA PR R! SC S1 CCf'r'F<u-"1 Hartford frisumico Company of Illinois (KA 131J-SINEgS A)DPESS Cr.P Hx1'7-J P�J a L01.VTATJ1,--4'N V IN 11knos Hartford Insurance Compam of the PAdwei BUSINESS ADCRESS Ca,* Fad ord N aza I- WICERViM� N,G U I-117ATIC�4 th( S47331,00 DC FL- GA. HI ILI kL IN [4, K--, KY LA ME, NO Oh 04K OR PA FZ! SC SD TN TX UT Hartford Insurwice, Company of the Southe 5111SINESSADC Ess C'*HaMlordpaw t� UNDER'.';RjT�N13L!i.IITATiO-ttt! $5=STOXD UCCRPORATED IN Gwx-,-wut Eliziabeth Lang �I'V' VIMMP 1112, Surety Customer Service Representative A, WIMP, Arrerican Global of Florida LLC o: 3 5-351-9135 c: 786-597-3929 a: 2 .21 SW 3rd Ave, 5th F1 " ami, FL 33129 Nv: wwwameriqangjq�g!&qM e: Elizabeth.1 encanglobal.Som 2 DEPARTMENT OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA SPECIAL PROVISIONS AIRPORT ANNEXATION AREA SANITARY SEWER EXTENSION Project No. 117-108 I. PROJECT DESCRIPTION Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to provide and install sanitary sewer improvements according to the intent of the plans and specifications at airport annexation area between US31 & US20 Interchange and City's sanitary pump station just west of Poppy Road on US20. II. PREVAILING SPECIFICATIONS AND DESIGN & CONSTRUCTION STANDARDS The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN & CONSTRUCTION STANDARDS, most recent version, are to be used on this project. Each Bid provider is specifically instructed to become completely familiar with the most recent version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION STANDARDS prior to submitting a Bid. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2018 INDOT Standard Specifications for the letting effective after September 1, 2017. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, the SPECIAL PROVISIONS will govern. A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 102 B. Additions: 1. Each Bid provider shall completely execute and submit the following documents with the Bid: a. City of South Bend Contractor's Bid for Public Work Form b. Bid Bond stating 5% of the total Bid or Certified Check of 5% of the bid. c. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investment with Iran, Employment Eligibility Verification, Non -Discrimination Commitment and Certification of use of United States Steel Products or Foundry Version 7/20/2018 Special Provisions - 1 Products. d. Responsible Bidder Checklist IV. TERM "OR EQUAL" A. Prevailing Specifications: None B. Additions: 1. Where the term "or equal" is used in these specifications, the Bid provider deviating from specified item shall file with his/her Bid a letter fully explaining and justifying his/her proposed article or equal. The City of South Bend shall be the sole judge in determining if the "or equal" offered meets the specification. V. TAX EXEMPT A. Prevailing Specifications: None B. Additions: 1. Materials and properties purchased under contract with the Owner that becomes a permanent part of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon award. VI.. INDEMNIFICATION A. Prevailing Specifications: None B. Additions: 1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, and other expenses, arising from or out of the negligent performance of this Contract by Contractor, or because of arising out of any defect in the goods, materials or equipment supplied by the Bid provider. VII. INSURANCE A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 103 B. Additions: 1. All Contractors and subcontractors doing business with the City of South Bend shall present a Certificate of Insurance showing coverage in the following minimum amount: a. General Liability: Premises -Completed Operations or Products, Bodily Injury and Property Damage Combined Single Limit - $5,000,000. b. There shall be no exclusion for explosion, collapse or underground hazard. c. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000. d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - Version 7/20/2018 Special Provisions - 2 $1,000,000 e. City of South Bend shall be named as additional insured on the Certificate of Insurance. f. Contractor and subcontractors shall provide any and all insurance policies, documents, endorsements, or certificates related to this Contract immediately upon the request of the City of South Bend. VIII. AWARD OF CONTRACT A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 103 B. Additions: 1. All Bids will remain subject to acceptance for sixty (60) calendar days after the day of the Bid opening, but the City of South Bend may, in its sole discretion, release any Bid and return the Bid security prior to that date. 2. Successful bidder from award notice will have fourteen (14) calendar days to submit a fully executed contract, Certificated of Insurance, and other require documents from either the awarded contactor and/or the subcontractors. Failure to comply within the award period may be cause for the Board of Public Works to rescind the award. A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 103 B. Additions: 1. The successful Bid provider shall supply the following bonds: a. Payment Bond within seven (7) days of Notification of Award for an amount equal to one hundred percent (100%) of the contract amount. b. Performance Bond within seven (7) days of Notification of Award for an amount equal to one hundred twenty-five percent (125%) of the contract amount. c. Maintenance bond within ten (10) days of acceptance of the project by the City of South Bend, for an amount equal to ten percent (10%) of the final contract price, guaranteeing for a period of three (3) years after the date of acceptance of the project by the City of South Bend. X. CONTROL OF WORK A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 105 B. Additions: 1. The complete responsibility for this project lies with the Director of Public Works of the City of South Bend, Indiana acting through his authorized representatives. 2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform all work required under this item. There will be no direct payment for this item. Version 7/20/2018 Special Provisions - 3 3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, site security, erosion control, and protecting adjacent properties. 4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South Bend Department of Public Works. XI. LEGAL RELATIONS A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 107 B. Additions: 1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, where mentioned in these documents, is Owner's duly appointed representative. 2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, and federal agencies and shall comply with permit requirements, including the Indiana Department of Transportation, St. Joseph County / City of South Bend Building Department. 3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with the Secretary of State of Indiana to engage in business within the State of Indiana. 4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner reserves the right to immediately terminate the public work project awarded should the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result in the forfeiture of Contractor's performance bond to the Owner. XII. SUBMITTALS A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 106 B. Additions: 1. Submit four (4) copies or an electronic version of the submittals for all equipment or materials used in this project to the South Bend Department of Public Works for approval. All submittals must be delivered within 7 calendar days from the notice to proceed. 2. The Department of Public Works will review and return two (2) copies or an electronic version of the submittals within five (5) working days. 3. The review of the submittal information by the Department of Public Works is to facilitate the satisfactory acceptance of the equipment. This review shall neither relieve the contractor from the responsibility for deviations from the Specifications, nor from errors and omissions in the shop drawings or literature. Parts found not meeting the requirements of these Specifications shall be removed, repaired or replaced at no cost to the OWNER. 4. Submittals shall include complete manufacturer's descriptive information and shop drawings for all the parts furnished under this contract. Version 7/20/2018 Special Provisions - 4 5. Upon completion of project, the Contractor will supply one (1) conformed set of all submittals to the City of South Bend. XIII. PROSECUTION AND PROGRESS A. Prevailing Specifications: 2018, INDOT Standard Specifications Sec. 108 B. Additions: The project will have a completion date of July 31, 2019 for all work. The contract time will start when the Notice to Proceed is delivered and signed. 2. The City, Engineer, and Contractor will hold a pre -construction meeting following award of the contract. The date of the Notice to Proceed will be agreed at that meeting. 3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. XIV. CHANGE OF CONTRACT TIME A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108 B. Additions: The Contract Time may only be changed by Change Order. Any Claim for an extension in the Contract Time shall be based on written notice delivered to the Department of Public Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) calendar days after such occurrence unless an official of the Public Works Department allows an additional period of time to ascertain more accurate data. The Contract Time will be extended in an amount equal to time lost to delays beyond the control of the Contractor if a claim is made in accordance with this provision. Such delays shall include acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics, abnormal weather conditions, governmental procedures, or acts of God. 2. Unless otherwise provided, the Contract time is based upon normal weather conditions. An extension is granted for weather conditions significantly more severe than normal if the Contractor demonstrates to the satisfaction of the City that the delay in the progress of the work was due to such weather. The basis to define normal weather with be the data compiled by the United States Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). 3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction, including fault or negligence of Contractor's subcontractors, caused the delay, or for which any remedies are provided under any other provision of this agreement. 4. The grant of an extension of time under this Section in no way constitutes a waiver by the City of any rights or remedies existing under this contract at law or in equity. XV. DEFAULT AND TERMINATION A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108 B. Additions: 1. Events of Default shall include Contractor's failure to perform any of its obligations under Version 7/20/2018 Special Provisions - 5 this contract including failure to commence work at the time specified, failure to perform the work in accordance with these specifications, unauthorized discontinuation of the work, failure to carry out the work in a manner acceptable to the City, failure to observe Federal, State, or local laws or regulations, and failure to comply with any other term of this contract. 2. If an Event of Default occurs, the City shall provide Contractor written notice and may permit Contractor ten (10) calendar days after the date of the notice to cure the default. If the default is not cured within the ten (10) day cure period, the City may at any time thereafter terminate this contract in which case the termination shall be final and effective. 3. Upon an Event of Default, the City may invoke the following remedies in addition to those remedies provided under separate provisions of this contract, the right of set-off against any payments due or to become due to the Contractor against the retainage, the right to take over and complete the Work. If the City notifies Contractor that City is invoking its right to complete the Work, all rights that the Contractor has in order under Contractor's subcontracts are assigned to the City, subject to the City's right to take assignment of all or only selected subcontracts at the City's discretion. The sole obligation accepted by the City under such subcontracts is to pay for Work satisfactorily performed after the date of the assignment. In the event a conditional assignment has not been executed, the Contractor shall execute or cause to be executed any assignment, agreement, or other document that may be necessary in the sole opinion of legal counsel to the City's Board of Public Works to evidence compliance with this provision. The Contractor shall promptly deliver such documents upon the City's request. In the case of such assignment, unless otherwise agreed in writing, The Contractor remains liability to subcontractors for any payment already involved, and for any claim, suit or cause of action based upon or resulting from any error, omission, negligence or other breach of contract by the Contractor, its officers, employees, or agents arising prior to the date of assignment to the City. XVI. LIQUIDATED DAMAGES A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108 B. Additions; 1. The contractor shall proceed with the work at such rate of progress to insure full completion within the Contract Time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the Contract Time for completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work, and excludes the time for unavoidable delays which were beyond the control and without the fault of the Contractor. 2. If the Contractor shall fail to complete the work within the Contract Time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages a sum of one -thousand dollars ($1000.00) for each calendar day that the Contractor shall remain in default after the time of completion stipulated in the Contract Documents. 3. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following and the Contractor has promptly given written notice of such delay to the Owner and Engineer/Architect. a. To any preference, priority, or allocation order duly issued by the Owner. b. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Version 7/20/2018 Special Provisions - 6 Owner, acts of another Contractor in the performance of a Contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. XVII. RETAINAGE AND FINAL PAYMENT A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 109 B. Additions: 1, Payments will be made every thirty (30) calendar days. Contractor is required to submit the completed "EJCDC Document C-620 Contractor's Application for Payment" form to the City of South Bend Board of Public Works along with electronic certified payrolls for the billed time period. 2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of payments throughout the duration of the project. 3. Before final payment and retainage are released the Contractor must satisfy the following: a. All parts and labor meet requirements stated in the specifications. b. Provide copies of test reports or cut sheets on all materials supplied. c. Provide As -Built drawings in accordance with the City of South Bend Prevailing Specifications for Public Works. d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver of Lien. XVIII. WARRANTY A. Prevailing Specifications: None B. Additions: 1. All parts shall include the following: (i) Performance specifications; (ii) Bill of materials (iii) Warranties on all parts; and (iv) Installation and safety requirements. XIX. OTHER UTILITIES A. Prevailing Specifications: None B. Additions: 1. The Contractor shall verify the locations of all utilities by contacting Holey Moley at 1-800- 382-5544 at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before proceeding with construction. It shall also be the Contractors Version 7/20/2018 Special Provisions - 7 responsibility to contact any other utility that is not contacted by Holey Moley and verify the utility locations. 2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, etc. in order to assure that all utilities that need to be replaced or relocated can be done with a minimum disturbance to service. The Contractor shall also be responsible for coordinating schedules with the various utilities such that they can proceed with their relocation work as efficiently as possible. 3. If the odor of natural gas is detected in a work area at any time during the course of work, the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also immediately notify the residents of adjacent properties. The Contractor shall advise the residents to evacuate their homes immediately if the odor is present within the dwelling. 4. Unless an allowance is specified in the bid tab, the restoration of sprinkler systems damaged by the Contractor's operations shall be repaired at no cost to the City and Owner of the system. If an allowance is provided in the bid tab, the City will reimburse the Contractor up to the allowance amount for sprinkler repairs. Restoration of sprinkler systems damaged by the Contractor's operations exceeding the allowance will be considered incidental to the contract. XX. MAINTENANCE OF TRAFFIC A. Prevailing Specifications: 2018, INDOT Standard Specifications Sections 105 & 801, City of South Bend Construction Standards and Specifications Sections 1-7, 1-8 B. Additions: 1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform Traffic Control Devices" and the City of South Bend Design and Construction Standards. 2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or closures and required to be filled out and sent to the Department of Public Works. 3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner that traffic on existing streets is unrestricted throughout the Project. INDOT district office and Engineer shall approve the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary facilities shall be left unattended in the right-of- way of any street or left parked overnight without proper marking and lighting. 4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its proposed schedule of operations for the review of the Engineer. The schedule of operations as reviewed by the Engineer shall be maintained at all times. 5. There will be no direct payment for this work. XXI. DESCRIPTION OF WORK A. Prevailing Specifications: None B. Additions: 1. Work to be performed shall include furnishing all labor, services, materials, insurance and equipment to construct the sanitary sewer. Version 7/20/2018 Special Provisions - 8 2. The Base Bid covers construction of sanitary sewer and manholes according to the intent of the Plans and Specifications. 3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and their property from damage caused by the Contractor's operations. XXII. MUNICIPAL OPERATIONS A. Prevailing Specifications: None 1. The Contractor shall be responsible for trash, yard waste, and recycling collection within the project limits. The Contractor shall coordinate with the City of South Bend Solid Waste, Waste Management, and other pickup services as requested to ensure collection services are maintained. The Contractor shall be required to collect bins, place them in a common point for easy access by automated truck services, and redistribution after pickup as requested. 2. The Contractor shall be responsible for snow removal within the project limits and shall coordinate with City of South Bend Public Works. The Contractor is responsible for protecting his/her/its project site from excessive wear and tear during snow removal. XXIII. PLANS A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. The plans consist of 15 Sheets. 2. The work shall conform to the plans. 3. The drawings are schematic in nature. 4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. 5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. XXIV. Bid Items 1 2 and. 3� HMA Pavement Surface Intermediate and Base A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 402 B. Additions: 1. Match existing pavement, shoulder and driveway approach sections as directed by Engineer XXV. Bid Item 4: Asphalt for Tack Coat. A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 406, City of South Bend Construction Standards and Specifications Section 2-4 A. Prevailing Specifications: 2018, INDOT Standard Specifications Sections 300 and 303 Version 7/20/2018 Special Provisions - 9 B. Additions: 1. Match existing pavement, shoulder and driveway approach sections as directed by Engineer. XXVII. Bid Item 6: Structure Backfill A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 211 B. Additions: 1. Placed in pipe trench under driveways and street crossing. XXVIII. Biid Item 7: Plain Cement Concrete Pavement ARproach, 6 inches A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 502 B. Additions: 1. Match existing driveway approach sections as directed by Engineer. XXIX. Bid Item 8: Combination Curb and Gutter Type A A. Prevailing Specifications: City of South Bend Design and Construction Standards, 2018, INDOT Standard Specifications Section 605 B. Additions: 1. Match existing adjacent curbs and construct at original locations. XXX. Bid Item 9: Concrete Median A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 605 B. Additions: 1. Match existing adjacent median and construct at original location. XXXI. Bid Iterns 10: Mulched Seeding, Type R A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 621 XXXII. Bid Items 11 and 12: Pie Sanitary Sewer PVC SDR 35 and SDR 21 12" A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. The bid item unit price shall include all labor and material for pipe installation including excavation, backfill, excess soil disposal, borrow, and surface restoration. XXXIII. Bid Item 13. Pipe, Type,,% C'ircular, 12" A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 715 Version 7/20/2018 Special Provisions - 10 B. Additions: 1. The bid item unit price shall include all labor and material for culvert, driveway pipe and end sections installation including removal of existing pipe, end sections and disposal, excavation, backfill, and surface restoration. XXXIV. Bid Item 14: Abandon Existing Pipe A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. The bid item unit price shall include all labor and material for filling the pipe with non - removable flowable fill in place. XXXV. Bid Item 15: Remove Manhole A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. The bid item unit price shall include all labor and material for manhole removal, disconnecting the pipes, excavation, backfill and surface restoration. XXXVI. Bid Item 16. Modify Existing Manhole A. Prevailing Specifications: City of South Bend Design and Construction Standards B. Additions: 1. The bid item unit price shall include all labor and material for connecting new pipes, rework benches and flow channels. XXXVII. Bid Item 17: Existing 4 " Sanitaly Manhole Convert to Drop Manhole A. Prevailing Specifications: City of South Bend Design and Construction Standards. XXXVIII. Bid Items 18 and 19: 48" Sanitary Manhole w/Solid Casting and 8"' SanitaEy Drop, Manhole w/Solid Casting A. Prevailing Specifications: City of South Bend Design and Construction Standards XXXIX. Bid Items 20,21 and 22. Temporary Erosion and Sediment Control A. Prevailing Specifications: City of South Bend Design and Construction Standards and 2018 INDOT Standard Specifications B. Additions: 1. Include maintenance of temporary erosion and sediment control in bid item unit price. 0 fi - .. ,� A. Prevailing Specifications: None Version 7/20/2018 Special Provisions - 11 B. Additions: 1. Trees felled inside or outside the right-of-way as a result of clearing and excavation for sanitary sewer construction shall be logged and disposed to suitable offsite location as directed by Engineer. 2. Undistributed quantity has been added in the bid item list. 3. Obtain right of entry from property owner for tree removal if necessary. XLL Bid Item 27: Clearing Right of Way A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 201 B. Additions: 1. All trees, bushes and other vegetation smaller than 6" located inside the right-of-way shall be removed, logged and disposed to suitable offsite location as directed by Engineer. Trees felled outside the right-of-way as a result of clearing and excavation for sanitary sewer shall be logged and disposed to suitable offsite location at no additional cost and as directed by Engineer. 2. Limits of clearing right of way shall be as indicated in the plans. 3. Obtain right of entry from property owner for tree removal if necessary. XLII. Bid Item 28: Pot Hole for Utilities A. Prevailing Specifications: None B. Additions: 1. Pot hole at locations indicated in the Plans and as directed by Engineer. Includes material and labor, maintenance of traffic, permit and permit fees, re -patching the hole with material in kind and other incidentals required to complete the work. XLIII. Bid Items 29: Mobilization and Demobilization A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 110 XLIV. Miscellaneous Work A. Prevailing Specifications: None B. Additions: 1. There will be no direct payment for saw cutting pavement, repairing retaining wall, coordinating with and bracing utilities and other items not in the bid item list. Version 7/20/2018 Special Provisions - 12