Loading...
HomeMy WebLinkAboutOpening of Bids - Airport Annexation Area Sanitary Sewer Extension Proj No 117-108 - HRP Construction IncCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Airport Annexation Area Sanitary Sewer Extension Project No. 117-108 For Bids Due November 27, 2018 PART I (Must be completed for all bids. Please type or print) Date: Nov. 27, 2018 Bidder (Firm): HRP CONSTRUCTIONIINC. Address: _..U27 U,l elanri Road P.O. Box 266 City/State/Zip: South Bend, IN 46624-Telephone Number: ( 574 ) 271 -7800 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Airport Annexation Area Sanitary Sewer Extension the City of South Bend, Indiana, in accordance with plans and specifications prepared by: A & Z Engineering LLC and dated 1.0 _ 31 / 1 8 for the sum of (enter the Total Bid as shown on the Proposal) e Enter sum e Attached ) .. ( Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of Sout nd, If t i is to be awarded on a unit basis, the itemization of the units shall be shown o a sepa ` t. - By :Signalur Matthew D. Cain, res ent (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member day of Suzanna M. Fritzberg, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk 20 Version 7/20/2018 Contractor's Bid for Public Works- 2 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Airlport Annexation Area Sanitary Sewer Exten.Won Project Number: 117-108 For Bids Due: November 27, 2018 Contractor Name: H R P CONSTRUCTION BASE. BID Item Description quantity Unit Unit Price Total Amount No yp 1 I HMA f e B Surface 37 Tons 2 HMA Type B, Intermediate 1 .rW.. 61 Tons 3 HMA Type B Base 22 Tons 4 Asphalt for Tack Coat _ 53 186 .._._...70�...mmSYs 5 Co _99 No �86 Tons ���QD_ ._. _7,..a���?•�4..., mpacted A regate, . 6 1 StrtJst614a1-Ra4*W 400 Tens P/0w wo Tons 1 Plain Cement Concrete Pavement, 97 s S Apiroach, 6 inches Y 8 Combination Curb and Gutter Type A 30 �Lft O !a Concrete Median 9 Sys _a...__m..._... __........ _ ._. _...._....... ._? _5�0 10 Mulched Seeding, Type R 6000 Sys 1 LL Pipe, Sanitary Sevver, PVC SDRJ35, 12" 2797 __. Lftmm I? Pipe, Sanitary Sevver, PVC SDR 21, 12 1600 Lft 12A Pipe, SeorMmy Sewer, t'VC SDI? 2', 8" 28 Lft 13 Pipe Type 3 Circular, '12" 162 Lft n ® ®o 14 Abandon Existing Pi _ _... p e 310 Lft . 15 Manhole, Remove 2 Each�•�� �_�.��,.� 16 Modify tPO ExistirManhole h1 Each 17 Existing 48 SanitaryManhole, Convert 1 Each to[)oManole IS—._D,D ,.._.._. w D � 18 48" Sanitary Manhole w/Solid Casting 9 Each __ _ _... ..... .µ. .... ...W lc151 QD.., 19 3 Each Castinr�itarY.Drop_Manholew/Solid...,. ....... .. .._ ._. ' 4185 Lft v_ 5�oTernF'orary Inlet Protection Silt Fence p Each �2 FilterSock ��-... ._ 900_ . � W._�..�r �.�.R� .._._ 4_.'. larger �.Lft__�. 3 Tree Removal, 8 and la m. ..2..... ._.__Each ...,,. .. } d lar er .. ... �.b.._ Each._..Poo 4 Tree Removal, 36" an g D HRP CONSTRUCTION INC. Version '7/20/2019 Contractor's Bid for Public Works - 7 I t BASE HID 25 ? Tree Rewovai, f "and iaigei 770. ...a.... �-6 wee Rerneyal, 6" and lafW 4 _.Each EaGh .�6 Cona � tiucfion Eni ineerin r g f LS11M ��--_— 7 Clearing Right of Way 1 LSum. 28 Pot H ole for LJtilitiea ,­ ._.. 2 Each ._ ___ ___-___ 2 _ 9_. aMobilization and Demobilization 1 LSum'9 BASE HID TO'r,RL ....�._.� (o!v 9 57. 0 0 _....., ...x...�_.......�..��.. Bidder (Firm): HRP CONSTRUCTION INC. Address: 5777 Cleveland Road, P.O. Box 266 City/State/Zip: South aBend, _IN 46622FelephoneNumber: 57 271-7800 By (Signature) Matthew 0Cain., President (Printed Name of Person Signing) Version 7/20/2018 Contractor's Bid for Public Works - 8 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana ) ) SS: St, Joseph COUNTY The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 7/20/2018 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. TheContractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). I hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 7/20/2018 Contractor's Bid for Public Works- 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 2 7 t h day of Nov , 20 18 HRP CONSTRUCTION INC. Contractor/Bid Signature of Contractor/Bidder or Its Agent Matthew D. Cain, President Printed Name and Title Subscribed and sworn to before me this 2 7 t h day of Nov. „ 20, 18 l , My Commission Expires 3L ?4 Notary Publi Cindy Uanheste County of Residence St. Joseph Version 7/20/2018 Contractor's Bid for Public Works- 6 Init. �!®rOTM 1 AIA Document A311 -2010 Bid Bond CONTRACTOR: (Name, legal status and address) BRP Construction Inc. P.O. Box 266 South Bend, IN 46624-0266 SURETY: (Name, legal status and principal place of business) Fidelity and Deposit Company of Maryland Baltimore, MD OWNER: (Name, legal status and address) City of South Bend Board of Public Works County -City Building Room 1316, 227 West Jefferson Blvd South Bend, IN 46601 BOND AMOUNT: Five Percent of the Total Bid PROJECT: (Name, location or address, and Project number, if any) Airport Annexation Area Sanitary Sewer Extension; Project No. 117-108 This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered 5% of Total Bid ) plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 6th day of November 2018 4r ................... ......... (i'r )............._ .._ ....... (Seal) ........... ......... (Witness) c y kSec/Treasurer ..... t (Tit ) Matthew D. Cain, P e MryFtdeliand Deposit Company Maryland (Witness) Sure (Seal) (Title) anir„r L. laata„tcy in Fact CAD'"'llr'lllf�t ; You sou atlttunu airorltllrmalll AIA, Contract III':1mnm� a mmmaurmt, amrm w1th this text faulnllfweaurs Irn HIRED. An orlgiriatlll atssuir ms thiia�at r.Ilhmainges vtlllllll rmot be a.rllbsr,wr°seat AIA Document A310 2010. Copyright 1963, 1970 and 2010 by The American institute of Arc t ,_ . ed. ARN ___ _.....e.... n"" �. nslpfote of Archktect�s. All rlgh�� reserved. v�PAUf i9Mt &nms Ad.A'rt Document is protected Iby US CopyrB¢,tllnt Law avid IIrntein"ado nai Treaties. tUnaauathorioed repu°aadaucfion or Wstdbtuiiomn ofthis A$0 Document, or any paarborm of IR, mnnay resuUt in severe civil and crllimllinn v Ipmeinnalities, ai nd wHf line prosecuted to the unaaxllm urmn mexteint possIllhote under the taw. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@ala.org. 061110 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by MICHAEL BOND, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Barbara E. PEARSON, Nicole L. BICKNELL, Mark E. WOBBE, Cheryl E. ALKIRE, Jennifer L. KASZNIA, William J. CERNEY, III, Theresa M. BURNS and Megan E. RIESENBERG, all of South Bend, Indiana, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 19th day of June, A.D. 2018. ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND Secretary Vice President Michael McKibben Michael Bond State of Maryland County of Baltimore On this 19th day of June, A.D. 2018, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, MICHAEL BOND, Vice President, and MICHAEL MCKIBBEN, Secretary, of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. I, ,� ' ad �y yap'+ypP F"Nti by"wn Constance A. Dunn, Notary Public My Commission Expires: July 9, 2019 POA-F 044-4495 1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1330 PHONE 574.!235-9251 FAX 5741235-9171 TDD 574 235-5567 CITY OF SOIJTI-I BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 19, 2018 To: All Planholders From Linda M. Martin, Clerk, Board of Public Works Subject Addendum Number: 1 Project Name: Airport Annexation Area Sanitary Sewer Extension Project Number: 117-108 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: N9rc1'�..4'FW1pX�11iWiUb'N4MNN'NMI.111�41MIINWMN0.'IMN�.p19 MFMAIIPfMiiFW�p'..NWX4i�KtMMMN'MilNMMM Crl'WAIMINYW,WMR'PWM4MIpMNRMAWMNpWkpM/tlpF1Y�1W.'kgNNlkll'I�GI�fiW. This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxim), this sheet to the Board of Public Works at (574) 235-•9171 wiill:hin 413 hours of receipt. A copy bid package upon submittal. Note UST also be included withi your THIS ADDENDUM MAY AFFECT YOUR BID. The attached documents are hereby added to the Specifications and Contract Documents and become a pant of herein. Company:.._ - Authorized Signature: Date: I / / Version 4/2/2015 1316 COUNTY -CITY BUILDING •'� "° w d PHONE 574/ 235-9251 227 W. JEFFERSON BOULEVARD �� i" d i� Jd � FAX 574/ 235-9171 SouTiI BEND, INDIANA46601-1830 + 186 TDD 574/ 235-5567 CITY OF SOUTI-I BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS Date: November 20, 2018 To: All Planholders From Linda M. Martin Clerk Board of Public Works Subject Addendum Number: 2 Project Name: Airport Annexation Area Sanitary Sewer Extension Project Number: 117-108 ACKNOWLEDGEMENT OF RE CEIPT OF ADDENDUM Date Received: a This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy .MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company: ...�� J-C....G'. Authorized Signature: Date: 1/ _Q I Ilk Version 4/2/2015 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Airport Annexation Area Sanitary Sewer Extension Project No. 117-108 For Bids Due November 27, 2018 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. ✓' Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and _✓ Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not / met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted Form [MWBE-2.1]. Acknowledge Receipt of 1 , 2 Addendum(s) included with the bid. i/ All required additional information is included with the bid. / Proposal statements and other affidavits all signed by the proper party with name either Zprinted or typed underneath signature. ✓ This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: HRP CONSTRUCTION INC. Date: November 27, 2018 By Authorized Repr( Signature: Print Name &Title: Matthew�p . Cain, Preside Version 7/20/2018 Contractor's Bid for Public Works- 1 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/20/2018 Contractor's Bid for Public Works- 3 CITY OF SOUTH BEND � �41 MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-1.0 MBEIWBE PARTICIPATION This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects involving MBEIMBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. Project Number: 117-108 Project Name: Airport Annexation Area Sanitary Sewer Extension Bidder: H R P CONSTRUCTION INC. Total Bid Amount: MBENME Goal: _................. _ _........._...._ Page 1 of Primary Contact Person Scope of Work to be Performed Dollar Amount of Percentage Name &Address of MBElWBE Namerrele hone ( p ) (Attach scope/schedule if you need additional space) MBEANBE Component of TotalBid/Pro oral 5lusser's Green Thtmb P.O. Box 33 John William on Seeding Logansport, IN 800-762-7442 28,800.00 46947 State Barricading James Michb ski P.O. Box 3751 Traffic Control 5,000.00 South n.? _IN466119574-287-207'3 ...... ......... ..._..... Submitted by: Matthew D. Cain, Presiden November 27,,ITIT-201,8m Print Name Signature Date Version 7/20/2018 Contractor's Bid for Public Works- 9 CITY OF SOUTH BEND ors MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.0`�� EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 117-108 Date: November 27, 2018 Project Name: Airport Annexation Area Sanitary Sewer Extension Bidder: HRP CONSTRUCTION INC. Contact Person: Matthew D. Cain, Piesident Telephone: (574) 271-7800 Address: 5777 Cleveland Road, P.O. Box 266 City: South Bend State: IN Zip: 46624-0266 Email: mattc@hrpconstruction.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South Bead requires that all perspective bidders complete no less than 2 of the following: Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBE/WBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 7/20/2018 Contractor's Bid for Public Works- 10 ist Source Bank Job oppor- tunities! www.lstsource.com Indiana University South Bend www.iusb.edu/--hr _­._ ____....,..--------._ DISPATCHER See Our Larger Display Ad At The Front Of This Section Peoplelink Industrial & Clerical Staffing. 574-245-5800 Oaklawn Psychiatric Center www.oaklawn.org Teachers Credit Union T'1BNE tcunet.com/employment EEO/ AA/Vet/Disability Institution % SU ,. HIRING CDL-A DRIVERS!! In In- dianapolis: SEASONAL $$Com- pletion Bonus Offered$$, FT & PT Routes Available. Up to $27.11/HR. Apply at www.ursa. jobs or call at 414-436-0335 The best way to get a job with one of the premiere employers in the region. Tribune Classifieds Classified ........235-6000 Legals .............235-6216 Circulation ......235-6464 Switchboard ...235-6161 We're working hard to serve you better! SouthBendTribune.com November 7, 2018 1 D3 HRP Construction Inc., an EEO Employer, is seeking propos- als from qualified MBE/WBE/ DBE businesses for the City of South Bend, IN; Airport An- nexation Area Sanitary Sewer Extension, Project No. 117-108. This project bids on Tuesday, November 27, 2018 at 9:30 a.m. All proposals must be received prior to noon on November 26, 2018 and must be per the con- tract documents. Anyone inter- ested in bidding on any part of this project should contact Jeff Wells by phone at 574-271-7800 or by fax at 574-271-0524. Proj- ect documents are available for review at our office with prior ar- rangements at 5777 Cleveland Rd, South Bend, IN 46628 or e-mail Jeff at estimatingQhrp- construction.com Hspaxlp It 11:7 Legal Notice Cause No. 45159 PETITION OF NORTHERN IN- CITY OF SOUTH BENDS d , MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM' FORM MWBE-2.1 MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 1 OF Project Number: 117-108� MBE/WBE Participation Goal Project Name: Airport Annexation Area Sanitary Sewer Extension Bidder: r TRUUIT 0 INC. ew MBE/WBE Firm See Attached Owner or Contact at MBE/WBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEANBE FIRM: President (Title) Email: MBE/WBE Firm Owner or Contact at MBE/WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM:. n Version 7/20/2018 Contractor's Bid for Public Works-11 November 27,,2018 (Date) Airport Annexation Area Sanitary Sewer Extension COMPANY OWNER or CONTACT PHONE FAX Email Type of Work Results AT MANBE FIRM C-Tech Corporation D. Sherwood 317-835-2745 317-835-2781 4s LqML>Uc Qq-jechincjiet Traffic Control No quote 'Earth Images, Inc. Laura Yurs 800-325-2543 317-885-1529 Lail(gyLl (,�Cftplaj 1, corn Landscaping No quote Highway Safety Service, Inc. Mike Madrid 765-474-1000 inike,nadridj2aL �jqjqc)LqqM Traffic Control No quote Indiana Sign & Barricade Kirby Faulkner 317-377-8000 317-377-8008 _qkfauikner Liq Traffic Control No quote LaPorte Construction Lori Schrad 219-393-5555 219-393-5556 IschraLj dz la ortecoirstmrirtior ccrrtt Structural Walls No quote Premium Concrete Services, Inc. Max Yea key 574.264-0196 574-266-5392 max Mgmiun- �@ ...... tconcreteonlne.corn Concrete work No quote Slussers Green Thumb Nelson Slusser 800-762-7442 574-722-2993 MQ&L,uLsaf!,coo Landscaping Yes -Using in bid State Barricading, Inc. Mary Michalski 574-287-2078 574-287-1744 ,tatebarrjf4d_e.1@ao1&pnj Traffic Control Yes -Using in 4id Traffic Control Specialists, Inc, Kerry Kopka 574-772-7001 574-772-7002 esfirnafin i _pLP Wisligijet Traffic Control No quote V & R Trucking, Inc. Veda Godette 574-234-1268 574-234-0748 ffnflLin. q�Lisq&.qqL _ ��L)m Trucking Yes - Using Airport Annexation RFQ Tracking 11/28/2O18 o M m/ cmMpAmv pnoms FAX Email a o o s s s AbonmarcheConsultarts. Inc. 574 32-8700 574-2514440 Acorn Landscaping 574-288-6850 574'289'1090 8VVPArea Wide Protective 269'683'1499 268'083'1494 Bertsch -Frank & Associates, LLC 280459'3388 260'459'8303 Core &Main 574'231'8739 574'231'8794 Jorge. a(n;1qLgaco l | C'ToohCorpomdon 817'835'2745 317'835'2781 DBLGemiceo 574'868'2028 574'255'8406 DewindDowmtering.Inc. 616'875'7580 018'875'7834 DiQocoConce«o 708'754'5681 708'754'5132 sJ.Pveocott 200'482'2100 260-482'2121 X | Earth Images, Inc, 800'325'2543 317'885'1529 Ferguson Waterworks 574'282'2323 574'287'8523 FuorbringorLandeoaping 574'271'9714 574'271'2861 � | Highway Safety Service, Inc, 765'474'1000 U | Indiana Sign &Barricade 817'377'8000 317'377'8008 JameoH Drew Corporation 317'878'3739 817'876'3829 JC| Bridge Group, Inc. 219'324'9393 218'824'8762Lj JPRJones Petrie RafinskiCorp. 574'232'4388 574'2324338 KCTree, Inc. 574'674'7722 574'074'7721 Klink Trucking, Inc. 574'287'9000 574'287'2300 | } LaPorte Construction 219'393'5555 218'383'5556 Lowell Concrete Products 219'696'3338 219'090'3937 K8ichianaAggregates Inc 288'685'7669 269'695'1229 Midwest Tile & Concrete Products 260'749'5178 200'498'2477 Milestone Fence 574'259'3101 574'259'3104 Neenah Foundry 317'875'7245 317'875'8637 Phond&Brown 800'898'4234 574'858'4584 Phoenix Services 219'787'0010 219'787'0010 | Pioneer Associates, Inc 260'638'3000 260'636'3001 | I Premium Concrete Services, Inc. 574'284'0198 574'286'5392 Rieth'Ri|eyConotmction 574'288'8321 574'238'3464 RoadGofeTraffic Systems 785471'8891 785'471'8882 LsrnithAroadsafetraf fie, cam Robert Henry Corporation 574'232'2091 574'232'3879 8ohueUFonoa 574'272'8200 574'271'8156 / 8|uuaomGreen Thumb 800'762'7442 574'722'2993 Soil Solutions Company 574'320'2825 574'389'0668 South Lake Stone 574'532'2353 Specialties Company, LLC 317'594'0291 317'594'0271 U | State Barricading, Inc. 574'287'2078 574'2874744 V ] Traffic Control Specialists, Inc. 574'772'7001 574'772'7002 U88ggego0eu'Fnonceovi||e 219'507'8155 219'567'8942qL V [ V& RTmoking. Inc. 574'234'1268 574'234'0748 Walsh &Kelly, Inc. 574'2884811 574'289'7174 dtiiLtt�Lti@w-ai-sL,�e-![Y,.qo-m—LnLo-@mLalst—lkel!ys in Watson's Tree Service 268'083'5305 288'688'7385 Yellow Creek Gravel Services 574'862'3196 574'862'1567 Page 1of1 HRP CONSTRUCTION$ EXCAVATING•SEWERS•WATERMAINS REQUEST FOR QUOTE Jeff Wells PHONE: 574 271 7800 ..... EMAIL: je ffw@hrpconstruction.com _�.. ffw hrpconstruction.com FAX: 574 271 0524 Please quote any work in our field associated with the followr rr wt PROJECT: Airport Annexation Area Sanitary Sewer Extension TYPE OF PROJECT: .Construction Wof. a.sanita,ry sewer LOCATION: South Bend, IN ENGJARCH: A&Z Enmmmmmineerin , LLC, 260-485-7077 QUOTES DUE: Mon.day.� ...e � ........... 6th.....a�..._... �...... da November 26 b 1w000 am BIDS: November 27, 2018 Plans and specs may be downloaded from Dropbox. Click HERE for access, or call/email our office for download instructions. This bid has the following DBE goals, please do your part to meet these goals. % MBE % WBE % DBE None (See below) Notes/Comments: Good faith efforts for M/WBE aoals reauired per specs. IF YOU ARE RECEIVING THIS RFQ VIA FAX AND WOULD PREFER EMAIL, PLEASE INDICATE YOUR EMAIL ADDRESS BELOW PLEASE COMPLETE INFORMATION BELOW AND FAX OR EMAIL BACK ASAP. COMPANY: PHONE: CONTACT: FAX: EMAIL: ❑ We plan on bidding the following on this project: Please provide a scope sheet as soon as possible. We will NOT be bidding on this project. We are a state qualified MBE WBE 0 DBE Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 HRP CONSTRUCTION EXCAVATING •SEWERS •WA TERMAINS !,' VVO'Ll2LI2Q JO JI& D _�-SE7(JL0E1I NOTICE OF ADDE14DUM 1 FROM: Jeff Wells PHONE: 574-271-7800 EMAIL: leffw a�hrpconstruction.com FAX: 574 271 0524 Please quote any work PROJECT: TYPE OF PROJECT: LOCATION: ENGJARCH: QUOTES DUE: BIDS: In your rlela associatea wim the TOliowing pr9jeci. Airport Annexation Area Sanitary Sewer Extension Construction of a sanitary sewer South Bend, IN ........................................................................................._......._._.................................................................................................................................................................................. A&Z En�c ineerina, mLLC, 260-485-7077 _._._..........._._._........................................_._----� Ifi Monday, November 26 b 10:00 am ......................................... _... November 27, 2018 Plans, specs, and addenda may be downloaded from Dropbox. Click HERE for access, or call/email our office for download instructions. This bid has the following DBE goals, please do your part to meet these goals. % MBE % WBE % DBE None (See below) Notes/Comments: Good faith efforts for M/WBE aoals reauired per s IF YOU ARE RECEIVING THIS RFQ VIA FAX AND WOULD PREFER EMAIL, PLEASE INDICATE YOUR EMAIL ADDRESS BELOW PLEASE COMPLETE INFORMATION BELOW AND FAX OR EMAIL BACK ASAP. COMPANY: PHONE: CONTACT: FAX: EMAIL: We plan on bidding the following on this project: Please provide a scope sheet as soon as possible. We will NOT be bidding on this project. We are a state qualified F] MBE WBE DBE Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 HRP CONSTRUCTION "( VV04i"3 _ "-&- IJf'SE4Vi0E-" 0 11Q1 fw_h��.�._._�......._._�_..... ............................ FROM:�.... ... Jeff Wells PHONE: [--574-271-7800 EMAIL: Jef � r construction .co FAX: 574 271-0524 Please quote any work in your field associated with the following ojo'ect PROJECT: Airport Annexation Area Sanitary SewerExtension TYPE OF PROJECT: Construction of a sanitary sewer LOCATION: South Bend, IN Engineering, QUOTES DUE: Monda November 26 �'6b�480:00mammmmmm�mm������mmmm��mm��mmmmm�mm�� m BIDS: PNovember 27, 2018 ....... Plans, specs, and addenda may be downloaded from Dropbox. Click HERE for access, or call/email our office for download instructions. This bid has the following DBE goals, please do your part to meet these goals. % MBE % WBE % DBE None (See below) Notes/Comments: Good faith efforts for M/WBE goals required per specs. IF YOU ARE RECEIVING THIS RFQ VIA FAX AND WOULD PREFER EMAIL, PLEASE INDICATE YOUR EMAIL ADDRESS BELOW PLEASE COMPLETE INFORMATION BELOW AND FAX OR EMAIL BACK ASAP. ---. �--- ................_...-�..�............................�_�_�_�_�.�... COMPANY: PHONE: ........................................................................... CONTACT: FAX: EMAIL: We plan on bidding the following on this project: Please provide a scope sheet as soon as possible. We will NOT be bidding on this project. We are a state qualified M: Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? When Contract Amount Class of Work Completedmm Name and Address of Owner 1,937,254.00 Utility & Excavation .. 2017 CSO 6 & 7 Storage and Pump Facility, ....._ ....._50,410.00 W& WetWork Grand River Construction 3,4 avation 2016 Watson CSF Phase II, City-of ....�ry_.._...... Sit .............._ .�w...... ........u. ka 1,929,485.00 a Utility 2017 Goshen 5 ' Street Phase II, City of Replacement em Goshen ri'�01,438 00 Road & Utility ����................................... 2017 ..gym......... 4 St LTCP Improvements, City of a Replacement Mishawaka What public works projects are now in process of construction by your organization? When to be .. Contract Amount of Wor........ Completed Name and Address of Owner 3,894,289.00 pClass Water Main 2018 mm Monroe St., Logan St., WM Replacement, C� ity„of Goshen 1,163,781.00 Site Utilities 2018 R-36881, Boland Drive, South Bend ... ............... .............. ... ........ 8,142,841.... 00 ................................... ..............._....._. Combined Sewer 2018 Nappanee LTCP Div A, City of Nappanee 5,662,029.00 Storm/Sewer 2018 R-37480-A McKinley and Ash, INDOT Have you ever failed to complete any work awarded to you? No If so, where and why? 4. List referenced from private firms for which you have performed work. Shiel Sexton; Indianapolis, IN JJ White Incorporated; Philadelphia, PA Edward Rose of Indiana; Kalamazoo MI Skillman Corporation, Indianapolis, IN Pepper Construction; Dublin OH HRP CONSTRUCTION INC. responses to SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Our intent would be to start the work after receiving a contract and Notice to Proceed per project documents. We would perform our work per a schedule approved by the owner and/or owner's representative. 2. A partial listing of subcontractors used in the past five (5) years. Further information will be submitted if deemed necessary. Asphalt and Concrete Brooks Construction E&B Paving Premium Concrete Pioneer Associates Rieth-Riley Construction Walsh & Kelly, Inc. Bores & Directional Drilling H&G Underground Utilities Lowe Construction Midwest Mole Electrical & Traffic Controls Bender Electric Current Electric J&J Electric of Indiana Michiana Construction State Barricading Traffic Control Specialists Hauling Bettcher Trucking J&R Trucking Nowacki Trucking Nowatzke Farms Trucking Radabaugh Truck Service V&R Trucking Landscaping Fuerbringer Landscaping Hydro-Tek Seeding Inc. Slusser's Green Thumb Acorn Landscaping Dewatering Contract Dewatering Service Griffin Dewatering Kelly Dewatering Mersino Dewatering 3. We do intend to sublet various portions of this work. However, at this time, we are not certain who the subcontractors would be. If we are awarded this contract, we would furnish you with the names of all subcontractors. 4. We intend to first use equipment from our fleet of fifteen excavators, nine front-end loaders, etc. To the extent necessary, we would rent, lease, or purchase any other equipment needed. 5. We have received offers for all materials within pricing used in preparing for bid. ~ CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Airport Annexation Area Sanitary Sewer Extension Project No. 117-108 For Bids Due November 27, 2018 Contractor Name: HRP CONSTRUCTION INC. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -qualified'. Bidders") by December 311" for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify, the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed"' contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre-qualified°status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/2018 General Conditions - 6 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification, of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/2018 General Conditions - 7 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: (i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) _ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: (i) _ Indiana Secretary of Skate's on -:line records (ie. Business verification) dated within sixty (Bg) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Deport, and eligible for a certificate of good standing. (loot applicable to individuals, sole proprietors or partnerships). Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) List of projects of similar size and scope of work performed in all areas, including the State of Indiana:, within the last three (3) years. Version 7/20/2018 General Conditions - 8 PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowled ments: (i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) _V_ By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all / information provided to the City shall be regarded as public records. (iii) ✓ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments- (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) List identifying all former business names. (iii) Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) ✓ years. (iv) Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work 1 am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor ✓ under all applicable state and federal laws and local ordinances. (vi) Evidence of participation in apprenticeship and training programs, applicable to the work -to be -performed on the -project, which are approved by -and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project. and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) '� Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties' as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 (ix) '/ Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: Novem- ,2 , (Sign Here) Matthew D. Cain, President (Print Name Here) HRP CONSTRUCTION INC. (Name of Company) 5777 Cleveland Road, P.O. Box 266 (Address of Company) South Bend (City) Indiana (State) 46624-0266 574 271-7800 (Telephone Number) Version 7/20/2018 General Conditions - 10 BUSINESS INFORMATION CONNIE LAWSON INDIANA SECRETARY OF STATE 07/12/2017 10:09 AM 4' w Tsr�e��r� 4 r ai r ?� l� f r� i � u� E�a� Business Name: HRP CONSTRUCTION INC. Business ID: 1989051420 Entity Type: Domestic For -Profit Corporation Business Status: Active Creation Date: 06/01/1989 Inactive Date: Principal Office Address: 5777 Cleveland Road, P.O. Box 266, SOUTH Expiration Date: Perpetual BEND, IN, 46624, USA Report Due Business Entity Rep Domicile State: Indiana 06/30/2019 Date: Years Due: &`i'tLlPmtl�'1tuf9rmxa,�Inttti r r a , �m'i Title Name Address Secretary NANCY KNAPIK 57337 MARY BETH COURT, SOUTH BEND, IN, 46619, USA President MATTHEW DAVID CAIN 53200 LEHNER COURT, Granger, IN, 46530, USA VICE PRESIDENT - SPECIAL PROJECTS PAUL J FALLON 63600 BIRCH ROAD, Vandalia, Ml, 49095, USA 'RN s er,�`dha�'9.�'it�1ji6,fi,14' 11.it�+�zda��4 ' ��, r�r� tie i va e �ap � „ i� � ;�k. � i � "�'�° � 'i.._.. _._�� Type: Individual Name: MATTHEW D. CAIN Address: 53200 LEHNER COURT, Granger, IN, 46530, USA HRP CONSTRUCTION EXCAVATING•SEWERS•WATERMAINS "cK' iin9 go is, vjeSs¢v1eErf Responsible Bidder Checklist Airport Annexation Area Sanitary Sewer Extension November 27, 2018 Pre -Qualification Checklist (For Bidders That Are Not Pre -Qualified) Section II (b) (ii) HRP Construction Inc. former names: June 25, 1980 known as H.R.D. Corp. May 31, 1991 known as HRP Construction, Inc. May 25, 1994 known as HPR Construction Inc. (b) (iii) HRP Construction Inc. has no court or governmental agency violations of federal, state or local laws within the preceding five (5) years. (b) (iv) HRP Construction Inc. will have a qualified senior project manager, senior field supervisor, project manager, field supervisor along with qualified union operators and laborers. (b) (v) Individuals who perform work on the public works project for HRP Construction Inc. will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (b) (ix) HRP Construction Inc. has no federal, state or local liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. Equal Dpportunitt E-P&YF" Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Mailing: P.O. Box 266 South Bend, IN 46624-0266 Phone 574-271-7800 FAX 574-271-0524 HRP CONSTRUCTION EXCAVATING•SEWERS•WATERMAINS 9" _s v f , S&Tviaz If November 27, 2018 To Whom It May Concern Re: Drug and Alcohol Testing Airport Annexation Area Sanitary Sewer Extension We have a long standing tradition of requiring all new employees to be tested for drugs and retaining the right to require further tests at random or for cause. In 2006 a new state law went into effect requiring any contractor that works for the state (which includes INDOT) to have a much more formal and rigid program, and to certify that this program is in place at the time of their bid. June 1, 2007 we signed an agreement with BCRC to provide our drug testing program. We selected the BCRC, Building and Construction Resource Center Inc., for a number of reasons: a) They are approved by the State. b) Their program is the one included by addendum in the 150 Heavy Highway Contract. c) Their program's allowed by the State Laborers Council. d) They will also accept our non -union employees (who also, by statute, must be included). e) All of our employees will be subject to the same rules and regulations. f) BCRC's plan also includes an EAP (Employee Assistance Program). ElUaf DPP0aEunit3 �in��ot�ez Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 October 17, 2018 To Whom It May Concern, Please be advised that HRP Construction, located at 5777 Cleveland Rd., South Bend, IN 46628 is a participating employer in good standing with BCRC. All of HRP Construction's Employees are subject to the terms and conditions of the BCRC Drug Testing Policy which meets or exceeds the requirements of IC 5-16-13-11 or IC 4-13-18-6. Please direct any questions regarding this correspondence to me. Thank you, Tish Roach Executive Director BCRC Administrator, Inc. 219-764-1488 Promoting the Safety and Well -Being of Employees in the Workplace Building & Construction Resource Center, Inc. • Phone: (219) 764-9500 • Fax: (219) 764-9505 6050 Southport Road, Suite B'# Portage, Indiana 46368 • www.bcrcnet.com b i v v IV � °� i ca ° w ) to w to m to ( U to m to o Z o z w to 7 � m d 11 E to U X ZR a ZR m m to m o to m In m oo m o m to o0 w c w w n u E W O a u 0 Y O C tw w w O d C Y c .o E w wNl°a 0 `w 3 m �� � ty ti ._ L O1 m m Z m w u m w o .°�. O N C Y � _ OC O w w of V O v c m c O o OC w m C to E .� C U C ` ° Y ° .0 Y w 0 aY E— E a; `o `w m m m > c E 3 '� c Y 3 C 0 to u� m in 3 m 3 u uli Z LL :: in :: to u° a w m N Oo V O O oo in O N cl O O n m ttoo W T V V N toC V Y a l0 V W rl n t0 +n .••t M vv to ° tri to M to m in co" .-i of t-i of O E u Q u c w > C alW w c C L' C E N owm > N C to notO OO Q m •Y > N 00 r w LA W 0 V Z 0-1 aj p N M In Z C m J Z 1 O J z a O w N� 10 C to a w Nco � 3 a = N N - cr t: z w Oo C C ,aL-. C C m OO N w E o .w 3 O. E a w 2 to 0 '° °° O Ent a a �/ >' m m w u m w m E lO w m tO V C c O O m c m to C M V Z N w m m L m w a J m N aw.. In M C M C N M C c N w w C O ui L .0 U C E t0 m > O v O O a w w co 7 F C M C O m 0 M 'y y to u N w p ^ p n •' O O O N C W VMI m m M L N m to Z C N C O N O n m Q O to m N O N to W U N (7 u n u o0 O Q m I- n m to to a w E t m w > w Q O N w wcr m C C J L In m m 3 m w m to n o E E 4 c o ., w m v to c S c o M u v In c a w l7 m Z si to N W w w li L O N w z N a U '-t a N Y > >, C Q m 'o C OO ° C L ,n M in aL+ Gl p O L oo o -wi z l7 v C tU m J w z to O z~ u >, w m t0 E n L v w o v to w N o w E to m c w O o u p z c00.1 o w t r", c o ?i a � m in t v z . cc N m >. w O a m m o L c 3 O a O L V M V ^ V o > O a C m L O 'y O w N m o C O a .>+ !� Q m Z J O n Z w to O n U N l7 to !' o n U M Z N 'I W tD l7 F L F- $ Q tO e-t Z 10 J N J O 1.1 to m > w C N O u ]L m C '= wJ 2 O 03 .m Z m Z Z C Z O� Z m Z > Z VI Y j Z W Y w C p C m ) > C w w C C w C O `l m O m C m ` a cc C Lyy LO S L VI NO C m L O a w w co > Y C L C L L L Q Q t:J � U' U U F Z J w m to N lU Q Owo m C U w .O c O u Z z c O to 2 I a > m o ZO - N t j Y G n w m m 3 tc° Li 000 C M o w Y w 1- > z u z D t—c° Z o u z �e Z o l7 m to z 7 J ¢ w z 'n a. :!c tti w > z m w m m co v a u v c y m n c E w o w E- w c c o 3 3 w od m m w to m O it w i- K p w Q u w ty o mQ. in , m m ou L al L y S V C Z z U 0a K iJ J O Z J W & n U N v co 00 c v° > ° z c i ' o uo a ' eo a v a W 7v a m E V1 U a8\' ZR Z N co Ln W co W O n W N c - y " E E m o a u c O to C _ "' C C EE" a c E '0 f0 c �- d @ c `w o o _ n '03 ;? 3 i 00 E N Z m c X H t m 07 H N Oo N W W C _uN •C C C '0 C C m C •H - m iY ° W .2 O m T O E m m c mY oci �' �v °° E Ev w 3 CL o `o -'� m m `o v `o `o m 3 m 3 3 3 -00 tn w oo .__ o O t'n n 0 O to lii a�i O N Vl It O N O %0 to Do ci Ln O LA to M Do V1 to C ti � -IT O iM/F rNl' t0/F O � � U Q li u O O to -O C) > O V m m 0 C H 01 C_ M OD m C V] to Ln to C L m r, m> N l0 N C O 7 0 O pp N d • N IO •C C T C W p 1* V W p �7 to m CO u N z iL-. T Z z aL+ ? Z OO •Z CwZ d O N ci 'O cc C vi M CL d m y u m O u m Eto c o O ti O u m E > o m m C V O m3 t ' M N m N E ° m vM m 0 O n m m N a mt v O m m uz m }j M "O Q O U rl N VI O u r, C m O. Z Vl O u 14 C U O_ 4n C ^ LO x eM•1 C _ IJ Y V C N C E Lto W O E �j U -cc K W 10 p C Lnai c N m c O C V1 •- N W Vl C N �Ao m O C h N w ,n o 7 Z m Q. N es C O cc MO •C Z W m Z C C CL Z m Z m C C n�� wMl O n3 �� p C c i N m �z «� cN 'o m °' m N= o U ai m e ai m m _ o w Z E E v m o m r y J w •m p O d A w n u C, -,n o Q '' n o Y m O L m N O n D_ n LL `l E �- O n m I� t' W 11 m t W V O u C M N O N Y 7 Y O O. V' O m Y O O. `,k � N n Vl > O m a N 1� .c M O u O U v°1 J Vnl U M Z Vnl m O O••I Z Q U M Z Vnl J M l:J p N p a V C M U lNrl c°' n T U w LL a�i t Z O Z U Z m? N S z Z O ut w a v ww ww `Lm mw mzjz m °_ co " c c m m d p u O- c O. m w e m 01 m 3 w o v -c > o a s m m v o m 0. Z m a o c m m "- m ° o Q �n Z Z n. Z z z Z C7 m m r c m c m `u 3 Z_ c ! u to E > — m z Y `o " `° ai `o m U. Z' m O C 3 a u 2 in m m r U w Z �? Z ° m >z E S Z c? CC x v w o 01 O m ro w m Z� av ww °m ww co Y ii m 4 E w U m t m a n cpd m m n n v y ar 3 c m 0C>O O zv � N 0 m m pO Z m a o mm y" O n tOU x u 0.mn Z ° v, In z z :3 Z z z W 0 In E m m lL co Do co 00 00 (n '•I ei 00 00 W N C a O y- (n O Z z O w O m O 7.9 -0 a 0/ E tn u° 0 cn 00 n r, V N Ln •Ln 7 d C W m a 2 E m 0 0. u v O H O ,'Op m C m M V v, N N 12 7 m - C w •C •_ 'n p O Yl m m �f0 'x E m YI u E I .m `o - 3 c «_ •� a+ _ - 7 u m C m C O u O m O 'O MC u of . u 3 m m r m '' m C m T m >' -U 3 C Y m ` 3 c >a = n m 3 E 3 m N c +_ o 0 3 `m o 3 o a m 0 e 3$ E Y 3 0 m y m Ul i z u to �' 0 ;Ll in vi v CD o m m 0 0 0 0 m o .i o o N m a m Iri 00 � ai N to y.� 12 V). rj to V} N M• N VT C O tol. o E ¢ ucli 0 u 00 c 00 m m W •� r N m �+ 7 m a+ •7 u C M .0 y O a N 7 m O O. V1 7 w p W. C C v�i C C a p U V '^ 0 M Z y tD z (7 Z Z ca c Z^ u W Q O v1 M Vl J O m y O .J Y Z •— C Z m L 1� ai L O y C 'O f-c C 0 C a C •GcW m-6 C C VO N 7 O C M C l0 O J a 7 7 M H N m M L 0 �i dl 7< m a)m 7 C m E m 0 l0 Cl t m U t+ 'w m Y m C V- y 7 m C~ N L L N L C L N 0 3 L N v1 m CL Z 3 O L N= ` ¢ O ❑ C u 0 7 J V O 7 J 7 V 3 V1 V O. M U L N H �n in `1 ei e'-I M '4 VI ❑ In Ln J Ln {/I Ln U IL l0 U c m N J V1 VI Ln T y — ai C O U c 01 Lcl > o m E a m E vi v w m a m m a ❑ C- In m >; O. c Z M lD O A m a Y Ln m�� V C M 0 v Y M Y d t>0 7 Y m 3 `�1% Z 12 1 0 _C 3 vm zco co u �wz 3 v -0 i� m t m n m Y `" > m Q� `i to vl t m?^ M m e-1 o w y °' E Q a •� 0Ln Y '° M Z L N C O E ec G O 3 00 N C 00 N m Cll C� G X Y0 3. 00 •�—�1' •U m �• W m M ,^•1 X Y 00 m C 7 a 0 7 O m t �I V D m ❑ 7 V 0 t�D O m m N h w M m O Y m L Ln m O LC O t0i o ry v aT. i7 a Ian ? z Ln z tn � u a aL+ z¢ ` -A m N Ln V r, Ln u a Ln w E c 0 C Z O1 all Om m M Z v7 IjZ `m o 3 0 > co 0 N m 70 O U > m 0 ai 0 Occ > Q m Y Y E Y C Y m O m -0 d p 7 M L L 03 m L O ,Li, N m T m m L` m V ¢ M L M H '—^ Q V m 2 C h 3 C O U 7 z > H dal rG C N O N C m m Y N C m E 1j U Z v p n C N m m O Ln>O O. z c E m L r m E 0 C N z v w 02f ccw m _ H m > m 7 U ir v Z Q Z Y °ii Z '° Z a z j Z Imo- .0 01 U > W 1p U O Z = Ol .tm. 'O Q Z o m m m a N 2 u o > Y 0 m E m c '^ Y oii M c Y O m p u v m Ln o f E 3 7 M m m Ln C m v❑ w `r 3 �0 3 n c E m 7 J� N m N M m= n v C ❑ m L m L z 2 U m O_ Z o 7 u C G K m m m c 3 Z Z > m L w -C c ❑ M m ho cri c c v a va c -0v v a °1 E 0 0 v ajCL aj E `w O a u c E O O w tw c e �N O C 0! O O it C y O •N o 7 tg N E W .yCL 0 0 OC ate+ U O Y Y N N O S'i3 O z.c 3a o m L 7 w C O VV E l01 m Y Z oa E Z E oo ro c v Ln m rj I c v m tb L a m e Ol � t m m c N nJ v E C r N M n� S 4 E Q O to Lnl in p to v1 in as t c o ca in cl O av a as 8 n: CA, Z Z v — v — O Y CCN O m d N ,D 130 N ry Lcc CN W N O O to C .O O Z 0 N d Z v ull G O Z � Y C m m m s 2 u m n Z aL 0 a p v to a LD t N Z Z Z c ( O N 7 N a a a E o Ln v c o f0 v E v o o b E N c u -p c O v o d N o c v c o6 a O c p m v a O > o o v o ° 3 o > c o� a a s E v c u OXJ fo C fo vui in N N p L r+ = C N m i Ln +✓ d N Y ,C Ol Na) C E E y y Ol 7 N C 0 0 3 m 2 a v 3 u m w 3 o v, Ln.� v16i U In up v •E in rco In in u OO lD N O M 1-1 Lr lnD lMn u c 7 C O m O V m n r-I M 00 c-I lD n M O N Ol 00 N 1m O pop o E u Q T r C fo a E N VI N LnGl LnN E n U in lD in W ti in lD Ln t Cl.c 0 u 0 c lD lD lD m l%7 00 CL CO 0 2 0 Q C Z C Z C Z b0 pp n N c In O N N❑ r Z Z L c c f0 `� V c O N n OO L N c Z Ln N �' OD C J n O "� 2 T L f0 f0 U N u m ur O 0 Ul V v n � L 01 U O O f�'1 c a Y p 2 00 iy C M a Lin Y m C L m C L CO L 00 L C Otka>, W L Y U n Q O C n L-C .0 N{ C m p L m �,.� �,.� NCNB� �„� J U p N O Ln N Q o ❑ N LA N O ❑ N Ln N O ❑ N V7 2 ci U M C+' O W V N (D L ri Vl N O O �--� 1 ❑ lD O O^ In ❑ In N O n J In In m Ol to 0- (U Ln O v C a O Cl. ,u Ln mLn V1 c 'O ' w O Y m C M LnV N LD Z O VT1 O 0. u lD f0 a m m �e a w `CO M Z, °' vi °' °' C " 0 �° > d m M Z ti Z O Z Y N O O � Z N 2 O VI D ID N M y W v Z W 3 V C X 0 3 oo Ln _ m ( c a c S o c c O' M— o 0 3 ao C O V7 N O O O CO L rN O c_ m O W t Vl O v O O m t N OrN O U r 4 w U Q_ ti w U C1 Vnl ? m C U (7 Lni m m U m U D_ Eni v c _ > Z Q p ?o N c v Z v Z Z Y Y (Y Z Z C N K . V Y yi j 3 CU1 p w 0 e � L f0 iJ N fo fo > c w m L O L +" -0 M U -O Y Y L L yr in L' (UL fo M Lt° Y O _N f6 p Ol rO W N N —'W- Q w w a w In l7 Co V) m m w a = 0 E > c m a m O E rO w E L E m Z N O O ULn V2 W Ln L O li ho ccN G Q E Y_ Vl m N O > In O Z ^ a Y m Z 'o Z c 2 c CC m t6 Z Ob Y Z O O v V) m °o to rO to m ai F ,� d w w ro v o o L 0 2 O c o. 0 v O to p m , 3 O 2 u O a Z �On Y V W O Y u W {On V1 ❑ Y Z J L 0 Ln (7 m U/ O m 2 Vpl L C 3 m cO d C J Ln a lD n n 00 n n n n Z ii `O p O O p a c 3 c a, v o ^ v v 3 > ) u 06 u c > w � a c c v w E v )n v c u o m Y m u '^ m 2 L m a Y v Y m a`, v E _m E v v E 0 0 M o_ 3 �; `O O- `O a mo mo V) 3 "= o � m �,cc 3 Six rl m 00 w o Ln oc m Lr LR m C c in m C N 0000 00 m ID Ln IDm Ln N 7 O lD V1 r-I L} LF n N VT DD ti loD Ln to Dl to O E �y` V Q C O i N ti �> U> C a) a) Y E O C N w E 0 O O kc O .0 m> m l0 O U O t V) t VI C V N C V N i+ C, C ON lC+ Q 0a a N CO O. � N Co l.) Z L T v m l,J Z L T m l.) Z L T p) al O N Z C_ Z L N C V) O al a) C VI O al J C 7 C C J C C C V) Z O N E �` 0 m 00 .L lnD in t0 C 0a N W Z 0a L N Z O v w U m o v w U m o v v w U m> 3 u w e Y m m ii a (~!) Y c m m H o l7 c o O c .u�+ L O lD L O ID 3 L O ID L F t0 - M c Y N 0 3 L N C O W L C O L j L i n n Y ti n N N o a OM rL+ o v 3 ZI v a m y al m y 0a N Vo) U rI N Vo) V rI N V) J J d N Vo) 0 Vl J V) on If o. w U ON Q w U ON Q d J a) al U U C V7 V) c C C c N Y m C O C CC) Ou V) Z e-1 N Z O L C_ Ln 7 C t' m L c_ V1 > C t' CA L C -_ Ln 7 t' D7 f0 C 0; Z ON ko O N Z O LO Z O m m )n voi m �i LO 0 Ln m C9 V c v x 3 00 l7 v l7 +� v C m O L a] N m O y t0 N m O y Ia N w v L N L v m O W L Vl o O m ,n t N v m O W L V) m O W L V1 7 o V O V O V a) O 7 V V Lz �T, V O V 'A J V1 V Ln _l V) U V) J In Q c-I V)) U C14 V) V O_ G Vl U oN V In U ON V V) t 0 0 m U o Y E Z ` Z Z Z Z W E m C c C c > z a)Y N Z? O U ( m L a a) fu0 N 71 w L 0 Ll L O L C L u L 0 a) L )a a) L al `m U m o. J v1 a) a) a E N N ion ion m Ln V) l7 �° (D 0 Y C a) H c o u E v E o aa)) u c _ V a E 0 7 = —aa)) ii1 ` > O Q. aC m O c c u m a c 0 C m E E C Z m Z Z Z ; U Z EO L O U a J w Z U N V1 Z 0 p C )a N m L C O. C u a) m a) a m C a) m L Z S c Y N a] a1 V Z O a3 V y S 0 Q) al 'p E 3 L N J 0 L C N 7 C L - 7 y t C 7 O t E t-' L L N N~ L S Z w m O m O U o_ U V) m m V) l7 voi a l7 LL a l7 (0 ^ ^ 00 ^ rn 00 00 00 ti ti ti ti ti ti 1� 1� u u j L m h0 a)a) u 0 0 i O Z W Q Q C a O a O u 0 al o ` m a ,� g Q c Ou v c c v O al a) N C L a O a' Y a T E y E (, mu a) 0 E c 3 O O LA 0 u p p Y 0 00 W o m a rn V C J .�-I 00 00 W 00 V 0) 0 Ln d' N W O V} rl V} m lff N m VT N VL N VT O E U Q U U al c 000 c 000 O u_ u C W ♦+ O2 a w � 0 ID W o O c O me O. O E >, s 0 v z v o m 0 m c �-+ w Z°> u v Q c ar .� O v o m u u, )n W v C- n m^ m a° in rn- v s z^ O o n Y Y `o Z z oo c^ Y ii 0 c m v o v c E a o L W E =m C n L w oa r+ L 00 W3�i t O> .— 0] w o0nn L 00 N,' o mmF 3 L N a1 u°3m O� L 1� Z v 00 Y L w L O 3 O L C O u 0) U Z L O y - O L C O V Q) V 3 In 7 V fl. > e-I I� 7 N N to Q Q I- VLn Of rl N V CL c-I W 1% rl N J Ln tO � LL V ."I N N F > > C a ai to Ln to ai m C N U U j hc 0 c 0 00 - OL u l00 �O u w a C lm0 lm0 E O W V ro Ya Ln o a y m v O v o w )o Y L a c E E .� m YLn v 3 o Z u N a° m c z t''j i/ m al O U N� Nto v Z 0 N n 3 Z m z N C a 3 l0 N lD ^ Y L U� J O Y L R O Z L U J 0 Y H l0 1p a+ a N O Lo N X o W N V Z W 4 0] V X Y W V1 O O V1 a^ L O M Y 00 C O m L N LLi O L O L O= rl t O L 00 t O m L N p m O N N j T O m N L 3 O > 4+ O V CL V1 N u ��1 u VI rl N +T+ 7 ON Y U d W m u ��-1 V In N + O U CL I� a'' O C I, J L N fo .'-1 rl ll) U Vf In Q U CL In Z_ Z_ al O Z a Y U J z J U O > a Q N a N m a K 6 v Qm c m f0 C o m O u c a .00 c � m L N a 00 fYa n 3 a a L Y u O L E � u L 12 Y L >' a> N L > C L Q C J C ccO Cc C G J W cc G c� O G W {O VOj a c C G C 3 0 4 m u m Z u Ln w 3 Z c O E O x E O ^ h0 in cu 'D > N Z Y (0 Z J 0) D u Do a 7 O Z i0 a! >. Z Z c Z m` Z z N d a V Y 3 V J Z c O V y Q Y N V C C C Y Z° 0 0 N N aE V a) m n0 m a 3 c a! m m a) v m m v m 3 W N N N in a+ O` 0. U N N E Y a C V N N u E L L L 3 -c1• O x u O` 0] n. Z C O E w L fa o O a) 7 z 0 7 0 Ln v� 00 m 00 0 m J a (a g J a N ❑ 0 a) o w 'a) _5 ar v a aj E u o vl V C O ' a — 7 v ` 0 a y E a, E E c 3 -oar z v ar 3 u c o o ar a N o m 'a ai � C as C C 2O C o N J 01 f0 ai Y w as — N E O + to O O > J C O_ O O O V a Ln Lo m o rn Lo m u c J N n N Ln Ol O O E 44 l)- c-I V} in U a Li o c c m > o o a oco m m v c J Z O t, m L., V z 0 m U c z O ra Y a V O O 4:5 .>, N Y_ O Z Z U al 00 O J v a! Y -O m l0 m C L W 3 ry W N` 5 C m N r Ln m 0 o L u N o O •V L L J O N o 1 > V J �' O O V .--I n o a ❑ Vo7 In u o-N W ¢ I, Ln Ln u U .--I N VI V Y c t m 2 m � O ` 3 v InU v Ln c c m Z l0 I� J O , D_ U c C m V U N J m ra .ti o 3 n d U Z N o L'ii ^� r m z J a/ m v r+ a C Ol Ln m g Ln m O m t N V1 to N O �i d m� O L a] N 3 O c v ' v O cam_ U d G L m N W Ln O Z V) U In J Lr) Z w N Z Z v � Y c Z a v v c Ul u > > a N t LO O f3a J N , L Y d d O L > o ¢ L u � in w al z a ° � u v E a`, to v a)m U Ln z n o Z v c 0 o m 3 N V N m Z n N a Z K U J a Z 6 C Ln L N Y a) z 00 Q1 c N E z o O, in m > ¢ v in v ° o al w E 0 fa J L > L E O_ E a a) N L > a 2 U a Z U in w Ln Z u= Ln INDIANA LABOREJO TRAIY NG TR UST FUND David A. i}ye Secretary -Treasurer JenyJ. Balk Ciuis L, Guerrero Ricky Henson, Jr. Ramon Mendoza, Jr. Robert S.. Wright P.O. Box 758 - Bedford, Indiana 47421 (8I2) 279.-; 51 November 27, 2018 To Whom It May Concern: Sean Coakley, Director John P. frown Chainnan Kelly Abel Brad Dreibelbis Michael Ferrara Stan Meyer Jim Wiseman FAX: (812) 279-5545 This letter is to confirm that "TIRP Construction, Inc." is a signatory contractor in good standing with the Indiana laborers' Training Trust .patted. "lie above mentioned company is a participant in the ioint Apprenticeship and. Training Committee through this Union and ha been in active participant in good standing for each of the past five plus consecutive years, and is currently eligible to use oaar apprentices on a project, Further, our organization's pro,grana is approved by the U.S. "Veterans Admiaaistxatioal to participate in the Cl, educational benefits program. A copy of our approval letters are attached along vddl the collective bargaining agreement stating the ratios of Journey Workers to Apprentices; which, is one (1) Apprentice for every live () Journey workers and, thereafter may 'lot employ galore that (1) apprentice for every Journey workers. Sincerely, Sean. Coakley, Director SC:dc www. indianalaborerstraining. org N LO O i O O C l INDIANA DEPARTMENT OF TRANSPORTATION Driving Indiana's Economic Growth 23 100 North Senate Avenue PHONE: (317) 233-2412 Eric Holcomb, Governor Room N750 Joe McGuinness, Commissioner Indianapolis, Indiana 46204 January 8, 2018 Nancy Knapik Controller HRP Construction Inc Re: 2018 OJT Training Program Agreement HRP Construction Inc: Enclosed you will find a copy of the approved 2018 OJT Program and Partnership Agreement, The primary objective of the program is to provide training and advancement opportunities to minorities and women toward journey level positions in all phases of the highway construction Industry. Thank you in advance for your participation in the Program and I look forward to working with you this year. Please feel free to contact me at 317-233-2412 or kdaniels2@indot.in.gov if you have any questions. Respe Lilly Katle Daniels Contract Compliance Specialist Indiana Department of Transportation - Economic Opportunity Division Enclosure Www.in.gov/dot/ An Equal Opportunity Employer I.16 Araaaitaa�I "1"i1^ai>raiirag+da��at 'la:talatroat aiattt 1'z�i°`�ner�Faa�i A��temaatnt . Step 1: Determine the total number of hours worked in the highway couastl`taction trades on INDOT federaat-aid, contracts (cither as a prime contractor or subcontractor) during the past three years, Do not include hours worked on state -funded and private work, HOURS WORKED DURING 2015 HOURS _. 2016HOURS 2017 HOURS TOTAL `"\�. -. 4� \%4 31. o0 Step 2: Add the total number of hours from each year and divide by three (3): 1�.Sc3 + "`-4,� + 3= 2015 2016 2017 Average Hours Step 3: Multiply the "Average Hours" by five percent (5%): X 1 .05 Average Hours 2018 Training Goal I hereby agree to all of the terns and conditions contained herein and affirm under penalty and perjury that the information stated above is true and accurate. FOR CONTRACTOR USE FOR INDOT USE n\A �.,k, o— C Please detach Section 1.16 and return to INDOT clo Katie DaWels at lydcrnielamkrloa:in. near 7 ILI Nancy Kna ik NOWNENWO From: Daniels, Kathryn <KDaniels2@indot.IN.gov> Sent: Monday, January 8, 2018 11:52 AM To: Nancy Knapik Subject: 2018 OJT Partnership Agreement Approval Attachments: HRP 2018 OJT Partnership Agreement Approval..pdf Importance: High HRP Construction: Please see the attached 2018 On -the -Job Training Program and Partnership Agreement approved for your company. Listed below are some resources which you may find helpful in administering your company's OJT Program this year. Approved Apprenticeship Pro ram:. I. Companies must utilize an apprenticeship program which has been approved. An approved program is one that has been registered with the U.S. Department of Labor (USDOL) or approved by the appropriate Federal Highway Administration (FHWA). 2. The point of contact for obtaining a registered program with the USDOL is John Delgado, USDOL Apprenticeship Training Representative, 317-226-7003. 3. Once a registered program or "Standards of Apprenticeship" is obtained from the USDOL, it is the responsibility of your company to administer the program accordingly. Journe worker to A rentice Trainee Ratios: 1. The Journeyworker to Apprentice (Trainee) Ratio is available in the Standards of Apprenticeship, see item 1 above. Ratio example: If the ratio of journeyworkers to apprentices for an occupation classification is 4:1; then, for every four (4) journeyworkers on a given project, there can be one (1) apprentice working in that same classification on that same project. Recruiting Agencies: 1. An Indiana RecruitiDg A yencyList is available as a reference on the Econorni �c O ortun`rt Division website under the Contract Compliance Section, under On -the -Job Training. Your company can reference this list when recruiting potential apprentices. I look forward to working with you this year. Katie Daniels Contract Compliance Specialist & OJT Lead Indiana Department of Transportation 100 N. Senate Ave., IGCN 750 Indianapolis, IN 46204 Office: (317) 233-2412 Email: kdaniels2@indot.in y a r01ndiina. DA A DEPARTMENT OF TRANSPORTATION 100 North Senate Avenue PHONE: (317) 233-2412 Eric Holcomb, Governor Room N750 Joe McGuinness, Commissioner Indianapolis, Indiana 46204 January 22, 2018 Nancy Knapik Controller HRP Construction Inc Re: 2017 On -the -Job Training (OJT) Review Dear Ms. Knapik: Enclosed is our review of your company's 2017 OJT program. As indicated on the spreadsheet, your company has met its 2017 OJT goal. Please feel free to contact me at 317-233-2412 or kdaniels2 indot.in.gv regarding any questions you may have. Respe ully, Katie Daniels Contract Compliance Specialist & OJT Lead Indiana Department of Transportation — Economic Opportunity Division Enclosures www.in.gov/dot/ An Equal Opportunity Employer 0 Indiana nsu�em�wor 0 ZURICH November 27, 2018 City of South Bend Re: HRP Construction Inc., 5777 Cleveland Road, PO Box 266, South Bend, IN 46624 Prequalification To whom it may concern: Zurich American Insurance Company and/or its subsidiary, Fidelity and Deposit Company of Maryland, have provided surety credit to HRP Construction Inc. for single projects of $12,000,000 and an aggregate uncompleted backlog of $$20,000,000. Zurich/F&D is Zurich North America Surety rated "A+" (Superior) with a financial size category of XV ($2 billion +) by AM Best and has 300 S. Riverside PI, Suite 2100 a US Treasury Limit exceeding $300 million. Chicago, IL 60606 http://www.zudch.com If HRP Construction Inc. is awarded a contract with the City of South Bend and requests Direct Phone 317-753-3076 that we provide the necessary Performance and/or Payment Bonds, we will be prepared to execute the bonds subject to our acceptable review of the contract terms and conditions, bond forms, appropriate contract funding and any other underwriting considerations at the time of the request. Our consideration and issuance of bonds is a matter solely between HRP Construction Inc. and ourselves, and we assume no liability to third parties or to you by the issuance of this letter. We trust that this information meets with your satisfaction. If there are further questions, please feel free to contact me. Sincerely Zurich American Insurance Company Fidelity and Deposit Comp any of Maryland icle L. Bicknell Attorney in Fact ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Barbara E. PEARSON, Nicole L. BICKNELL, Mark E. WOBBE, Cheryl E. ALKIRE, Jennifer L. KASZNIA, William J. CERNEY, III, Theresa M. BURNS and Megan E. RIESENBERG, all of South Bend, Indiana, EACH its true and lawful agent and Attomey-in-Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 24th day of September, A.D. 2018. ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert D. Murray Vice President t%ray"d,�r- By: Dawn E. Brown Secretary State of Maryland County of Baltimore On this 24tb day of September, A.D. 2018, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by the duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Constance A. Dunn, Notary Public A�bppbt My Commission Expires: July 9, 2019 Ydytii* EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, tIT;. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By -Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 10th day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 27th day of November 2ot8 ...... � 2 Michael C. Fay Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRH'TION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: Zurich Surety Claims 1299 Zurich Way Schaumburg, IL 60196-1056 y .regort,t' It uni@gurtchna.co(ri 800-626-4577