Loading...
HomeMy WebLinkAboutAward Quotation - Olive Production Well No 6 Rehabilitation Proj No 118-102 - Peerless Midwest Inc1316 COUNTY -Cry BUILDING 227 W. JEFFERsoN BOULEVARD SOI ITH BEND. INDIANA 46601-1930 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARDU LIC WORKS November 27, 2018 Frank Williams Peerless Midwest, Inc. 55860 Russell Industrial Parkway Mishawaka, IN 46545 PHONE 574/235-9251 FAx 574/235-9171 RE: Quotation Award — Olive Production Well No. 6 Rehabilitation — Project No. 118-102 Dear Mr. Williams: The Board of Public Works at its meeting held on November 27, 2018, awarded the above referenced quotation to you in the amount of $50,930. Please forward the following documents in one subm]#J , :1 pto my attention for Board of Public Works approval: 1) One (1) original of the Contract (enclosed); and 2) Certificate of Insurance naming the City of South Bend as an additional insured. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, � ��'�,-�� ram, �" �✓ , ,. � �.:� �;;:�.�r=�. Linda M. Martin, Clerk GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK .TAMES A. MUELLER THERESE J. DORAU isov'I'll P INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING 1865 TO: Linda M. Martin, Clerk Board of Public Works FROM: Becca Plantz, Engineer I SUBJECT: 118-102 Olive Production Well #6 Rehabilitation DATE: November 15, 2018 On November 13, 2018, the Board of Public Works opened and read quotes for the above project. I have reviewed them and found mathematical errors in the total quote amount from the Ortman Drilling Inc. proposal. These errors do not change the award for lowest responsible bidder. The quoters ranked as follows: I recommend award of a contract for Olive Production Well #6 Rehabilitation to the lowest responsive / responsible quoter, Peerless Midwest in the amount of $50,930.00. Sufficient funds have been appropriated from Water Works O&M, 620-0640-602-31-06. Please call with your questions (5998). Enc. Quote Tabulation a z a n a o c c 3 N O 7 i D a d X m ro CD 9 to ;a ; 0M=(AU) wzavv g N p .. 3 o m a m a m a m a 0 m< cao N" �� m �� .� W. '? m — y d m� d m m m d m a m o a (D 'm (e e (p a 0 N Q° 0 a m 3 3 3 3 a m a 3 (on CD c m m m m m T (CD Q— n o• O N Q N .�. N .�+ CO)N in .O. .�. U1 .�•. fA _ :: O (ocli m fc 3 0 0cm, c omc io = m= o o 0o=c d o ; 0M_ c C c i� m CD M 3 3> 3 3?v IA a m p c r' r m �G)3 ;3 1D c r 'm v m m a� n vy v° UI d N ID s o ID m O .L N i C� U, (D ^' m M 0 M 0 i 0 m m m % p T m m m °' m 3 a CL" 0 �'�• 0 O K2 N O (D i — O 0 m j 3 N n O (n a s n m r N T. 7 'm cn m � o o C aco Cp ju a CO) N N en Ro m C 7 a m ,,, ID O (—A3 C C C1 3 i i N n o (DD =' N m CD N ',,,. i m O '�C C a m 7 N N 7 co- C N 3 O j a 3 c 3 13 o, (a a a r N r u) r N r u) r ( r N r W r (n r N r r r N r c O. 4A ti (0 fA ffl fA fA fA fA w ffl ffl fA C N X M. O CO U1 O (O W O UI W O cn m O O N A (O W N O O O O O O (D O O O O O O O O O O O O O O O O O O O O O O O O O O m N �A fA ''.. W fA (A fA '..... fA fA 69 69 fA fA fA fA N 3 a m � 3 en 0 W W O N i0 O i W W A V W W A .— W O O O co O (11 N ''.... O '.. A (O ''..... (O W W N O O U7 O W O — O O O En VI O — O O O O ''.. O O O O O O O O O O O CD CD O '.. O O '.. C) C) C) C) CD O O ffl fA fA fA fA fA w w 69 69 fA fA (A C 7 W 0 W A (WO O s i j V W W A A O O Of V O o s En V U7 N U7 UI (1( V O Ul N m C)o p O o O (n o 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 o m 0 0 C) O O O O O o O O O o A m � 3 � ''.0 O i W V (O W A A O C) 0) A O) V i O O V O i s a, O N p (n O (T O Vl O V Qn O O Ul O A .. O — O O 0 O O 0 O 0 O O 0 O 0 O v 'n a A c c o O o .°. m N O W a - m i r CO C N A)Z W Q �1 O 7 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S QUOTE FOR PUBLIC WORK PROJECT NAME: Oliver Production Well #6 Rehabilitation PROJECT NO. 118-102 QUOTES DUE November 13, 2018, 9:30 AM (Must be completed for all quotes. Please type or print) Date: November 13, 2018 Firm: Peerless Midwest, Inc. Address: 55860 Russell Industrial Parkway City/State/Zip: Mishawaka, IN 46545 Telephone Number: ( 574 ) 254-9050 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Olive Production Well #6 Rehabilitation the City of South Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend Department of Public Works and dated October 25, 2018 ] for the sum of (enter the Total Quote as shown on the Proposal) fifty thousand nine hundred thir and zero cents 505930.00 (Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. The above quote is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A ilk Presid t3 Eliza�bth A. Maradik, Member James A. Mueller, Member BY 6idl(,"'14— (Signature) Frank Williams (Printed Name of Person Signing) ACCEPTANCE �2 7 day of 20 Suz nna M. R tzbe mber Therese J. D�orau, Member Attest: Linda M. Martin, Clerk /V Version 10/31/2017 Page - 11 Public Works Quote QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME: Oliver Production Well #6 Rehabilitation PROJECT NO. QUOTES DUE November 13, 2018, 9:30 AM BASE QUOTE Item ................ . _.... No. Description ._..._.............--_�... Quantity ......v Unit Unit Price _ Total Amount 1 Step drawdown test 1 LS $550.00 550.00 2 ....................... __� Well Cleaning and Redevelopment 1 LS $21,400.00 $ 21,400.00 Pre.. Post Cleaning Video Inspection of 3 Casing and Screen 1 LS $810.00 $ 810.00 Disassembling and reassembling related to 4 inspection of pump and driver 1 LS $330.00 $ 330.00 New Driver/Motor Premium Efficient Inverter 5 Duty Unit. US Motor Brand 1 LS $12,350.00 $ 12,350.00 150HP 5173Amps Frame: L444TP16 Part Winding Start 3 stage 14FKH Floway Pump Replacement 6 or equal must conform to Hydraulic Institute 1 LS $ HI 14.6 Grade 1U $10,100.00 10,100.00 Replacement S40 Column Pipe: Pipe size 7 12" 10-foot sections: Coupled 1 LS $732.00 $ 732.00 8 .................................................. ... Replacement S40 Column Pipe: Pipe size 1 LS $493 .00 $ 493.00 12" 5-foot sections: Coupled Replacement Suction Pipe: Pipe size 10" 9 10-foot sections 1 LS $619.00 $ 619.00 10 Replacement SS Column Line Shaft 1 LS $304.00 $ 304.00 10-Foot: Shaft Size: 1-1/2" Replacement SS Column Line Shaft 11 5-Foot: Shaft Size: 1-1 /2" 1 LS $152.00 $ 152.00 Shop / Refurbishment 12 Hourly Labor Rate i 1 LS $90.00 $ 90.00 �.� Miscellaneous Well Components: 13 reconditioning/replacement 1 LS ALLOWANCE $3,000.00 Total Amount of $ 50,930.00 Quote Version 10/31/2017 Page - 16 Public Works Quote Firm: Address: Peerless Midwest, Inc. 55860 Russell Industrial Parkway City/State/Zip: Mishawaka, IN 46545 Telephone Number: 574 254-9050 Fax Number: (74) 254-9650 By�U (Signature) Frank Williams (Printed Name of Person Signing) Version 10/31/2017 Page - 17 Public Works Quote BOARD OFm PUBLIC WORKS CITY OF SOIL 1 H RENDD,,w 1ND1ANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 27th Day of November, 2018, by and between, Peerless Midwest, Inc., 55860 Russell Industrial Parkway, Mishawaka, IN 46545, HEREINAFTER called the Contractor, and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: PROJECT NO. 118-102 DESCRIPTION: OLIVE PRODUCTION WELL #6 REHABILITATION COMPLETION DATE: SEE SPECIFICATIONS AMOUNT: $50,930 FUNDING: WATER WORKS O&M The unit prices for this improvement were those prices as received and accepted by the Board on the 13th Day of November, 2018. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC WOR S PEERLESS MIDWEST, INC. GaryGilot Presid 'ent Elizabeth A. Maradik, Member Printed ted Name Srx a Ana M. Frit.�zz, Janes A. Mueller, Member Signature Mena Therese J. D rau, Member test, Linda M. Martin, Clerk CERTIFICATION (To be completed if Contractor is a Corporation) I, ............... w__, certify that I am Secretary of the Corporation named as Contractor herein; that _—.._..._ who signed this Agreement on behalf of the Contractor was then_ _w ..... of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. ...._ .................. Corporate Secretary Seal BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date _November 15, 2018 Name Becca Plantz..................� Department Public Works Division/Bureau Engineering BPW Date November 27, 2018 Phone Extension 5998 IW Ifl MmVMtl NNI!NWINNNNNPAWINVMWq!A mmmmmmmmmmWmfl ImP mW@MN ..W .. ..._...._.._.e _Re Prior to Submittal to Board uired Legal ❑ Attorney Name: Clara McDaniels Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing ❑ Michael Schmidt Check the [] Agreement Amendment ❑ Professional Services E] Bid Opening Quote Opening ❑ Change Order No. ❑ Ease/Encroach. F Other: Company or Vendor Name )ropriate Item Type - El Contract Resolution Bid Award Quote Award FC/O &PCANo. F Traffic Control: New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description Amount of LJ Increase Decrease Previous Amount $ Current Percent of Change: New Amount $ Total Percent of Change: Copy Original for All Submissions ] Proposal ❑ Req. to Advertise ired Information Peerless Midwest ❑ PCA Addendum ❑ Title Sheet El Yes No ❑ If Yes, Approved by Purchasing MBE [] WBE No El Yes Name of Compaq Olive Production Well #6 Rehabilitation ._...............m 118-102 wwwwwwwwww,,,...................... _.. Water Works O & M _......__.......... ww_.... .................. ............... ... 620-0640-602-31-06 $50,930.00 Lump Sum e cleaning and ins ec�ion of well #6 at the Oliver Well Field. Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) equired For Change Orders Only Disraersal After Becca Plantz .............. Bradlev VanOosterum 1316 CouNTY-CITY BUILDING 227 W. JEFFERSON BOULEVARD SOT )TH BEND. INDIANA 46601-1930 Deanna Ortman Ortman Drilling, Inc. 241 N. 300 W. Kokomo, IN 46901 U Th U 1865 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS November 27, 2018 PHONE 574/235-9251 FAx 574/ 235-9171 RE: Quotation Award —Olive Production Well No. 6 Rehabilitation —Project No. 118-102 Dear Ms. Ortman: The Board of Public Works, at its meeting held on November 27, 2018, awarded the above referenced quotation to Peerless Midwest, Inc. in the amount of $50,930. We thank you for bidding and hope you will bid with us again in the future. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk GARY A. GILOT SUZANNA M. FRrrZBERG ELIZABETH A. MARADIK JAMEs A. MUELLER THERESE J. DoRAu