Loading...
HomeMy WebLinkAbout6C (8)�UTH 1, I1' ,� r „tee Community & Economic Development” IKS 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission Board of Public Works From: Bill Schalliol, ADED Subject: Resolution 3024 and Amendment to the Addendum To Master Agency Agreement Olive Road Right -Of -Way Acquisition - Supplement #1 Date: April 19, 2012 Attached to this memorandum is Resolution 3024 and Amendment to the Addendum To Master Agency Agreement for the Olive Road Right -Of -Way Acquisition - Supplement #1. For the last several years, the City of South Bend has been working with DLZ on design and plans for the remaining section of Olive Road improvements between Lincoln Way West /US 20 and Nimtz Parkway. The roadway plans are at about 95% completion and we are finalizing the acquisition of the necessary right -of -way for this section of improved roadway. This Supplement #1 specifically deals with Professional Service work necessary to the design and bidding of site improvements on the Olive Road Basin which is part of the roadway construction project related to the future Olive Road improvements. The City is preparing to bid and construct improvements to the pond as the work is part of the acquisition agreement reached between the City's Board of Public works and the Michiana Lutheran Education Association (MLEA) for the acquisition of right -of -way property at the southeast corner of Nimtz and Olive. The improvements contemplated by the work need to be done during the summer session so as not to disrupt the education activities at the school during the school year. Supplement #1 deals only with the design and bidding work necessary for this project and Supplement #2 will set up a budget for the construction work to be done on site. Staff requests approval of Resolution 3024 and the Amendment to the Addendum To Master Agency Agreement for the Olive Road Right -Of -Way Acquisition - Supplement #1. What We Do Today Makes A Difference! RESOLUTION NO. 3024 RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT (Olive Road Right -Of -Way Acquisition - Supplement #1) WHEREAS, effective January 1, 2012, the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, effective January 1, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for the limited purpose of contracting for and managing the completion of existing Projects; and WHEREAS, pursuant to the Master Agency Agreement, the Commission added the Olive Road Right -Of -Way Acquisition to the Master Agency Agreement by way of an Addendum on February 19, 2010; and WHEREAS, the Commission desires to amend the Addendum by way of this Amendment. NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment Commission as follows: Section 1. The Commission hereby approves the Amendment to the Addendum to the Master Agency Agreement (Olive Road Right -Of -Way Acquisition - Supplement #1) and hereby authorizes its execution in substantially the form attached hereto with such changes as the Commission may deem necessary or appropriate upon the advice of counsel, said execution thereof to be conclusive evidence of the Commission's approval of such changes. The Clerk is hereby directed to file a copy of this Amendment to the Addendum with the BPW. Section 2. This Resolution shall be in full force and effect after its adoption by the Commission. Section 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. ADOPTED at a meeting of the South Bend Redevelopment Commission held on April 24, 2012, at 4:00 p.m., in Room 1308, County -City Building, South Bend, Indiana 46601. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission AMENDMENT TO THE ADDENDUM TO THE MASTER AGENCY AGREEMENT (Olive Road Right -Of -Way Acquisition - Supplement #1) 3024 -11 This Amendment to the Addendum to the Master Agency Agreement (this "Amendment "), made and entered into as of the 8th day of May, 2012, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Olive Road Right -Of -Way Acquisition - Supplement #1 (the "Project ") WHEREAS, effective January 1, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, effective January 1, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for the limited purpose of contracting for and managing the completion of existing Projects; and WHEREAS, pursuant to the Master Agency Agreement, the Commission added the Olive Road Right -Of -Way Acquisition to the Master Agency Agreement by way of an Addendum on February 19, 2010 WHEREAS, the Commission desires to amend the Addendum by way of this Amendment. NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: 1. The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement, to act as the Commission's agent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being originally described in "Exhibit A ", and now amended as described in "Exhibit B ", attached hereto and made a part hereof. 2. All of the terms and conditions of the Master Agency Agreement shall control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above. (Signature Page Follows) CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Gary Gilot, President Don Inks, Member Kathryn Roos, Member ATTEST: Linda Martin, Clerk Exhibit "A" OLIVE ROAD RIGHT -OF -WAY ACQUISITION See attached Acquisition Information prepared by DLZ, Inc. and approved by the Board of Public Works on February 22, 2010 ADDENDUM TO MASTER AGENCY AGREEMENT (Olive Road Right -Of -Way Acquisition) This Addendum to Master Agency Agreement (this "Addendum "), made and entered into as of the 22nd day of February, 2010, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Olive Road Right -Of -Way Acquisition (the "Project ") WHEREAS, effective January 1, 2010, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2010; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Olive Road Right -Of -Way Acquisition to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement, to act as the Commission's agent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being more specifically described in "Exhibit A ", attached hereto and made a part hereof. 2. All of the terms and conditions of the Master Agency Agreement shall control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Don Inks or Jeff Gibney is authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT_ Garcia I. Jone rest ent South Bend Redevelopment Commission ATTEST: e 41 Nancy N. Ki , SecreUry South Bend Redevelopment Commission CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC W RKS /L Gary Gilot, President Car ittrell, Membe�ZL n Inks, Member ATTEST: i da Martin, Clerk Exhibit "A" The Olive Road Right -Of -Way Acquisition Project consists of the acquisition of parts of sixteen (16) parcels in the corridor between Lincoln Way West and Nimtz Parkway /Old Cleveland Road. The property acquisition is mainly located on the east side of Olive Road with one parcel acquisition located on the northwest corner of Olive and Lincoln Way West. See attached Right -Of -Way Tracking Sheet for specific information about the appraised value of each parcel A map of the target acquisition area identifying each parcel has also been included with this Exhibit. 1 I I W I iR I .Ii �I rr-�- it i I :I v 3 3i E o ZVI _� gogy o A � �►trit � QVOli 3DIA835 WWI ,a 1 f 1 I I W I iR I .Ii �I rr-�- it i I :I v 3 3i E o ZVI _� gogy o A m QY ci O 1-6 — - - — — — — — — — — — — -- Mgt MbGM-&-;r le Z z V' — — — — — — — — -- I z E 7z- La -5 Z3 F CL W 0 G 0-02) '0 z --- — — — — — — — — — — — — — — — — — — — — — — ON II O TKO ---------- —WftvdJfY— — — — — — — — — — — 00 aVO8 301A83S 1VO01 8 �, - i Y c V � E u '�' H m Exhibit "B" OLIVE ROAD RIGHT -OF -WAY ACQUISITION - SUPPLEMENT #1 See attached Letter Agreement for Professional Engineering from DLZ, Inc. dated February 2, 2012 February 2, 2012 Mr. Bill Schalliol City of South Bend 227 West Jefferson Boulevard South Bend, Indiana 46601 Re: Letter Agreement for Professional Engineering Bid Package for Olive Road Basin Construction City of South Bend South Bend, Indiana DLZ Indiana, LLC (ENGINEER) appreciates the opportunity to provide engineering services for the City South Bend (OWNER) for preparing contract documents for Olive Road Basin Construction along Olive Road in the City of South Bend. Constructing the Olive Road Basin this summer is a requirement of the memo of understanding for the Olive Road right of way acquisition for the Lutheran parcel. PROJECT DESCRIPTION The project will involve preparing contract documents to be bid for basin expansion on City's parcel, grading and storm sewer trunk line on the Lutheran parcel located at the southeast corner of Olive Road and Nimtz Parkway in the City of South Bend. Excess excavation from the basin will be used for grading the recreational area south of the Lutheran School. The project limits are shown in Exhibit A. SCOPE -OF- SERVICES We propose to provide the following scope of services: A. TASK 1 — PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATIONS AND BIDDING DOCUMENTS The ENGINEER will develop plans and specification documents for Olive Road Basin Construction (Exhibit A). 1. Specifications — The ENGINEER will prepare specification documents for the project. The specification documents will reference City of South Bend and INDOT specifications and will include supplementary conditions. The specification documents will include specification sections related to notice to bidders, instructions to bidders, and items specific and unique to each project location. 2211 East Jefferson Blvd. • South Bend, Indiana 46615 • (574) 236 -4400 • FAX (574) 236 -4471 With Offices Throughout The Midwest www.dlz.com DLZ ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS • SURVEYORS February 2, 2012 Mr. Bill Schalliol City of South Bend 227 West Jefferson Boulevard South Bend, Indiana 46601 Re: Letter Agreement for Professional Engineering Bid Package for Olive Road Basin Construction City of South Bend South Bend, Indiana DLZ Indiana, LLC (ENGINEER) appreciates the opportunity to provide engineering services for the City South Bend (OWNER) for preparing contract documents for Olive Road Basin Construction along Olive Road in the City of South Bend. Constructing the Olive Road Basin this summer is a requirement of the memo of understanding for the Olive Road right of way acquisition for the Lutheran parcel. PROJECT DESCRIPTION The project will involve preparing contract documents to be bid for basin expansion on City's parcel, grading and storm sewer trunk line on the Lutheran parcel located at the southeast corner of Olive Road and Nimtz Parkway in the City of South Bend. Excess excavation from the basin will be used for grading the recreational area south of the Lutheran School. The project limits are shown in Exhibit A. SCOPE -OF- SERVICES We propose to provide the following scope of services: A. TASK 1 — PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATIONS AND BIDDING DOCUMENTS The ENGINEER will develop plans and specification documents for Olive Road Basin Construction (Exhibit A). 1. Specifications — The ENGINEER will prepare specification documents for the project. The specification documents will reference City of South Bend and INDOT specifications and will include supplementary conditions. The specification documents will include specification sections related to notice to bidders, instructions to bidders, and items specific and unique to each project location. 2211 East Jefferson Blvd. • South Bend, Indiana 46615 • (574) 236 -4400 • FAX (574) 236 -4471 With Offices Throughout The Midwest www.dlz.com DL ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS • SURVEYORS February 2, 2012 Olive Road Bid Package for Lutheran Basin Construction Page 2 2. Basin, Storm Sewer and Site Grading - The ENGINEER will include general instructions for pipe backfill and compaction, final grades and temporary seeding. B. TASK 2 — RULE 5 PERMIT The ENGINEER shall prepare and submit the application and back -up documentation for Rule 5 - Erosion Control Permit. 1. Prepare a Project Location Map. 2. Prepare Plan and Profile Sheets and Erosion Control Plans to show existing vegetation, drainage patterns, adjacent land use, storm water discharge locations, ultimate receiving waters, the proposed storm water system, construction details of outlet protection below the storm water outlets and watercourses on and adjacent to the project site. 3. The erosion control plan will show the location, dimensions and construction details for the initial perimeter protection. The plan shall also show the location, dimensions and construction details of all Temporary Erosion Control Measures. 4. Provide the specifications and Details for proposed Storm Inlet Protection, Stable construction entrances and erosion and sediment control on individual lots, as required. 5. Provide maps showing the Floodplains, Floodways, and Floodway Fringes. 6. Determine soil types within the project area. 7. Provide a schedule when disturbed areas will be stabilized and specifications for permanent seeding. Delineate the disturbed and preserved areas and proposed locations of soil stockpiles and borrow areas. 9. Complete permit application form. C. TASK 3 — BID PHASE AND CONSTRUCTION PHASE OFFICE SERVICES The ENGINEER will attend the Pre -bid meeting. The ENGINEER will collect contractor questions as they occur. The ENGINEER shall address any contractor questions in the form of a published addendum(s). The ENGINEER shall publish addendum(s) for the project as necessary. The ENGINEER will attend the bid opening and assist in the review of all bids, providing OWNER with a written recommendation as to which is the lowest qualified and responsive bidder for the scope of work identified herein. DLZ ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS • SURVEYORS February 2, 2012 Olive Road Bid Package for Lutheran Basin Construction Page 2 2. Basin, Storm Sewer and Site Grading - The ENGINEER will include general instructions for pipe backfill and compaction, final grades and temporary seeding. B. TASK 2 — RULE 5 PERMIT The ENGINEER shall prepare and submit the application and back -up documentation for Rule 5 - Erosion Control Permit. 1. Prepare a Project Location Map. 2. Prepare Plan and Profile Sheets and Erosion Control Plans to show existing vegetation, drainage patterns, adjacent land use, storm water discharge locations, ultimate receiving waters, the proposed storm water system, construction details of outlet protection below the storm water outlets and watercourses on and adjacent to the project site. 3. The erosion control plan will show the location, dimensions and construction details for the initial perimeter protection. The plan shall also show the location, dimensions and construction details of all Temporary Erosion Control Measures. 4. Provide the specifications and Details for proposed Storm Inlet Protection, Stable construction entrances and erosion and sediment control on individual lots, as required. 5. Provide maps showing the Floodplains, Floodways, and Floodway Fringes. 6. Determine soil types within the project area. 7. Provide a schedule when disturbed areas will be stabilized and specifications for permanent seeding. 8. Delineate the disturbed and preserved areas and proposed locations of soil stockpiles and borrow areas. 9. Complete permit application form. C. TASK 3 — BID PHASE AND CONSTRUCTION PHASE OFFICE SERVICES The ENGINEER will attend the Pre -bid meeting. The ENGINEER will collect contractor questions as they occur. The ENGINEER shall address any contractor questions in the form of a published addendum(s). The ENGINEER shall publish addendum(s) for the project as necessary. The ENGINEER will attend the bid opening and assist in the review of all bids, providing OWNER with a written recommendation as to which is the lowest qualified and responsive bidder for the scope of work identified herein. DLZ ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS • SURVEYORS February 2, 2012 Olive Road Bid Package for Lutheran Basin Construction Page 3 2. The ENGINEER will provide Construction Phases throughout the construction phase of the project as requested and directed by the OWNER. This item includes the following work elements: a. Attend pre- construction conference. b. Review Project Submittals for compliance with Specifications. C. Issue Supplemental Instruction and Proposal Requests. INFORMATION AND SERVICES TO BE FURNISHED BY THE OWNER The OWNER shall do the following in a timely manner so as not to delay the services of the ENGINEER: 1. Designate in writing a person to act as OWNER's representative with respect to the services to be rendered under this Agreement. 2. Assist the ENGINEER by placing at ENGINEER's disposal all available information, as provided to the OWNER, pertinent to the Project. 3. Arrange for access to and make all provisions for ENGINEER to enter upon public and private property as required for ENGINEER to perform services under this Agreement. 4. Examine all studies, reports, sketches, drawings, specifications, proposals and other documents presented by the ENGINEER, obtain advice of attorney, insurance counselor and other consultants as OWNER deems appropriate for such examination and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of ENGINEER. 5. Furnish, or direct ENGINEER to provide, Additional Services as stipulated in this Agreement or other services as required. ADDITIONAL SERVICES BY THE ENGINEER (NOT INCLUDED IN THE SCOPE OF WORK AND FEE) If authorized in writing by the OWNER, ENGINEER shall furnish or obtain from others Additional Services of the types listed in the following paragraphs. These services are not included as part of the basic services of the ENGINEER except to the extent otherwise identified in the ENGINEER'S Scope of Services. Preparation of supporting documents for private or governmental grants, loans or advances in connection with the project. DLZ ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS • SURVEYORS February 2, 2012 Olive Road Bid Package for Lutheran Basin Construction Page 4 2. Services to make measured drawings of or to investigate existing conditions or facilities other than those specifically identified under the ENGINEER's Scope of Services, or to verify the accuracy of drawings other information furnished by the OWNER. 3. Any services required or associated with anticipated unforeseen issues, including but not limited to, demolition and environmental /abatement issues. 4. Services required for relocation of existing utilities. 5. Preparing documents for alternate bids requested by the OWNER for the Contractor's work, other than stated in the ENGINEER's Scope of Services. 6. Furnishing services of independent professional associates and consultants. 7. Assistance in connection with bid protests, rebidding or renegotiating contracts for demolition, materials, equipment or services. 8. Preparing to serve or serving as a consultant or witness for OWNER in any litigation, arbitration or other legal or administrative proceeding involving the project. 9. Post demolition topographic and as -built survey. 10. Preparation of a Phase I and Il Environmental Site Assessment. The work described herein does not constitute a Phase I Environmental Site Assessment. 11. Additional Services in connection with the project, including services, which are to be furnished by OWNER and services not otherwise provided for in this Agreement. 12. Verifying compaction of earthwork. 13. Printing costs associated with project documents. 14. Preparing more than one bid package. DLZ ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS •SURVEYORS February 2, 2012 Olive Road Bid Package for Lutheran Basin Construction Page 5 SCHEDULE This schedule is based on receiving a notice to proceed by February 14, 2012. Project Plans, Specifications and Bidding Documents Ready March 16, 2012 Open Bids April 24, 2012 Construction June - August 2012 COST OF SERVICES Compensation to DLZ for services described herein shall be on a lump sum basis. The total not -to- exceed fee is $14,000.00. * For those services performed as an "Hourly Rate ", DLZ will be paid on the basis of actual hours of work performed by essential personnel exclusively on this Agreement at the rates identified in Exhibit B for each classification of employee. Reimbursable expenses are in addition to the basic compensation and include actual expenditures for fees expended for state and local approvals, permitting fees, newspaper notices, printing bidding documents and postage. For services and Reimbursable expenses of independent professional associates and consultants employed by ENGINEER to render Additional Services, the ENGINEER shall be reimbursed for the invoiced amount of said services, and ENGINEER shall also be paid an administrative fee in an amount not to exceed 20% of the amount of the invoice. STANDARD TERMS AND CONDITIONS The Standard Terms and Conditions, as attached, are incorporated here into and made part of this Letter Agreement (Exhibit Q. The Client referred to in the Standard Terms and Conditions means the City of South Bend. ENGINEER affirms under the penalties of perjury that he /she /it does not knowingly employ an unauthorized alien. ENGINEER shall enroll in and verify the work eligibility status of all his/her /its newly hired employees through the E- Verify program as defined in IC 22- 5- 1.7 -3. ENGINEER shall not DESCRIPTION ESTIMATE TASK AMOUNT a. Olive Basin and Grading Plans and Documents $3,500.00 b. Project Specifications and Bidding Documents $2,500.00 c. Rule 5 $3,000.00 d. I Bidding Phase and Construction Phase Services, Hourly Rate* $5,000.00 TOTAL $14,000.00 * For those services performed as an "Hourly Rate ", DLZ will be paid on the basis of actual hours of work performed by essential personnel exclusively on this Agreement at the rates identified in Exhibit B for each classification of employee. Reimbursable expenses are in addition to the basic compensation and include actual expenditures for fees expended for state and local approvals, permitting fees, newspaper notices, printing bidding documents and postage. For services and Reimbursable expenses of independent professional associates and consultants employed by ENGINEER to render Additional Services, the ENGINEER shall be reimbursed for the invoiced amount of said services, and ENGINEER shall also be paid an administrative fee in an amount not to exceed 20% of the amount of the invoice. STANDARD TERMS AND CONDITIONS The Standard Terms and Conditions, as attached, are incorporated here into and made part of this Letter Agreement (Exhibit Q. The Client referred to in the Standard Terms and Conditions means the City of South Bend. ENGINEER affirms under the penalties of perjury that he /she /it does not knowingly employ an unauthorized alien. ENGINEER shall enroll in and verify the work eligibility status of all his/her /its newly hired employees through the E- Verify program as defined in IC 22- 5- 1.7 -3. ENGINEER shall not DL ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS • SURVEYORS February 2, 2012 Olive Road Bid Package for Lutheran Basin Construction Page 6 knowingly employ or contract with an unauthorized alien. ENGINEER shall not retain an employee or contract with a person that ENGINEER subsequently learns is an unauthorized alien. ENGINEER is not required to participate in the E- Verify program should the E- Verify program cease to exist. Additionally, the ENGINEER is not required to participate if the ENGINEER is self - employed and does not employ any employees. CLOSING DLZ trusts that this Letter Agreement meets with your approval. We look forward to working with the City and appreciate the opportunity to submit this Letter Agreement. Should you have any questions, please do not hesitate to contact either of the undersigned at (574) 236 -4400. If you agree with the terms expressed herein, please indicate your authorization and Notice to Proceed by signing where indicated below and returning one (1) executed copy to our office. Very truly yours, DLZ INDIANA, LLC ry Fisk, P . Vice President St�� rr., �e-- Brian M. Smith, P.E. Highway Department Manager Z -Z--iZ Date AGREED AND ACCEPTED: CITY OF SOUTH BEND BOARD OF PUBLIC WORKS : am Date M: \PROJ \0761\2664 \docs \agreement \t.utheran Basin \Olive Road Basin Bid scope of services.docx a$ o� `o E � o E% e°o oa r� N � O N N � Ym N, NIMT7 DL F og coso "to� DLZ INDIANA. LLC SHEET DRAWING NUMBER :XHIBIT A EXHIBIT B DLZ INDIANA, LLC STANDARD FEE STRUCTURE ENGINE ERING /ARCHITECTURAL 2012 Activity Code Employee Classification 2012 Hourly Rate 1 Principal $220.00 49 Division Manager (Chief Engineer) $185.00 50 -Department Manager $160.00 55 Registered Land Surveyor $130.00 21 Project Manager $140.00 214 Senior Right-of-Way Engineer $140.00 330 Electrical Engineering Specialist $150.00 53/58 Engineer III /Architect III /Landscape Architect III/ Planner III /Scientist III/Geologist III $125.00 52/57 Engineer II /Architect II /Landscape Architect II/ Planner II/Designer III /Scientist II/Geologist I1 $115.00 51/56 Engineer I /Architect I /Landscape Architect I/ Planner I/ Designer II /Scientist I /Geologist 1 $90.00 28 Designer I $80.00 29 Technician $65.00 147 Construction Administrator $105.00 152 Construction Observer $85.00 43 Clerical $55.00 Reimbursable Ex enses Crew Classification 2012 Hourly Rate 143/99/99 3 - person Survey Crew $185.00 142/99 142/99 Topographic Survey Crew (straight time) Topographic Survey Crew (over time) $145.00 $220.00 63 1 - person Field Crew $100.00 63 1 - person Field Crew (over time) $140.00 GPS 1 - person GPS /RTK Field Crew $160.00 13 Field Survey Technician $55.00 Reimbursable Ex enses Rate Mileage $0.555 /mile Travel Expenses Cost Living Expenses Cost Reproduction Cost plus 20% Subconsultants Cost plus 20% Equipment Rental Cost plus 20% Rates are subject to revision on January 1, 2013. Cost of living /inflation increases of 3 to 7% per annum can be anticipated. S V DeptA Administration AClerical \RATESV201 I Hourly Rates doc EXHIBIT C DLTS STANDARD TERMS AND CONDITIONS 1. INVOICE AND PAYMENT PROCEDURES: DLZ shall submit invoices, once a month, at a minimum, to the CLIENT for Services accomplished during each calendar month. The CLIENT hereby agrees that payment will be made for DLZ's Services within thirty (30) days from the date of the invoice; and, in default of such payment, hereby agrees to pay all cost of collection, including reasonable attorney's fees, regardless of whether legal action is initiated. If an invoice remains unpaid sixty (60) days after the date of the invoice, DLZ may, upon giving seven (7) days written notice of its intent to do so, suspend all Services on the CLIENT's project. This suspension shall remain in effect until all unpaid invoices are paid in full. If an invoice remains unpaid ninety (90) days after the date of the invoice, DLZ may, upon giving seven (7) days written notice of its intent to do so, declare CLIENT to be in breach of this Agreement and pursue its remedies for collection. 2. CONSTRUCTION SERVICES: Construction Phase Services are not intended to include exhaustive detailed inspections of contractor work but site observations to become generally familiar with and to keep CLIENT informed about the progress and quality of work. The Contractor is solely responsible for its compliance or noncompliance with the Contract Documents. If, under this Agreement, professional services are provided during the construction phase of the project, DLZ shall not be responsible for or have control over contractor means, methods, techniques, sequences, or procedures; or for safety precautions and programs in connection with the Work. Nor shall DLZ be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents or for Contractor's failure to comply with applicable laws, ordinances, rules or regulations. Under no circumstances will DLZ have any direct contractual relationship with the Construction Manager, Contractor, any subcontractors, material suppliers or other consultants unless DLZ and the CLIENT expressly agree otherwise in writing. CLIENT agrees that DLZ will perform on -site construction observation for this project and that such services will not be performed by others. 3. SUBSURFACE INVESTIGATION: DLZ makes no representations concerning soil conditions unless specifically included in writing in this Agreement, and DLZ is not responsible for any liability that may arise out of the making or failure to make soil surveys, or sub - surface soil tests, or general soil testing. 4. AGENCY REVIEW: In the event that, due to a change in applicable laws or a change in the requirements or policies of a governmental agency after the date of this Agreement, additional office or field work is required, said additional work shall be paid for by CLIENT as extra work. 5. SURVEY STAKING: In the event that any survey staking is disturbed by an act of God or parties other than DLZ, the cost of restaking shall be paid for by CLIENT as extra work. 6. MISCELLANEOUS EXPENSES: The CLIENT shall pay the costs of checking and inspection fees, zoning and annexation application fees, assessment fees, soils engineering fees, soils testing fees, aerial topography fees, and all other fees, permits, bond premiums, title company charges, blueprints and reproductions, and all other charges not specifically covered by the terms of this Agreement. 7. CHANGE OF SCOPE: The scope of Services set forth in this Agreement is based on facts known at the time of execution of this Agreement, including, if applicable, information supplied by DLZ and CLIENT. DLZ will promptly notify CLIENT of any perceived changes of scope in writing and the parties shall negotiate modifications to this Agreement before commencement of any change in scope. 8. SAFETY: DLZ shall establish and maintain programs and procedures for the safety of its employees. DLZ specifically disclaims any authority or responsibility for general job site safety and safety of persons other than DLZ employees. 9. REUSE OF PROJECT DELIVERABLES: Reuse of any documents or other deliverables. including electronic media. pertaining to the Project by CLIENT for any purpose other than that for which such Revised March 2011 documents or deliverable were originally prepared, or alternation of such documents or deliverables without written verification or adaption by DLZ for the specific purpose intended, shall be at CLIENT's sole risk. 10. OPINIONS OF CONSTRUCTION COST: Any opinion of construction costs prepared by DLZ is supplied for the general guidance of the CLIENT only. Since DLZ has no control over competitive bidding or market conditions, DLZ cannot guarantee the accuracy of such opinions as compared to contract bids or actual cost to CLIENT. 11. INSURANCE: DLZ will maintain insurance coverage for Professional, Comprehensive General, Automobile, Worker's Compensation and Employer's Liability in amounts in accordance with all legal requirements and DLZ business requirements. Certificates evidencing such coverage will be provided to CLIENT upon request. For projects involving construction, CLIENT agrees to require its construction contractor, if any, to include DLZ as an additional insured on its policies relating to the Project. DLZ coverage referenced above shall, in such case, be excess over contractor's primary coverage. 12. INDEMNITY: To the fullest extent permitted by law, DLZ shall indemnify and save harmless CLIENT from and against liability and damages sustained by CLIENT, its employees, and representatives by reason of injury or death to persons or damage to tangible property to the proportionate extent caused directly by the negligence of DLZ or its employees. 13. LIMITATION OF LIABILITY: No employee of DLZ, its parent, subsidiary or affiliate companies, shall have individual liability to CLIENT. CLIENT agrees that, to the fullest extent permitted by law, DLZ's total liability to CLIENT for any and all injuries, claims, losses, expenses or damages whatsoever arising out of or in anyway related to the Project or this Agreement from any causes including, but not limited to, DLZ's negligence, error, omissions, strict liability, or breach of contract shall not exceed the total compensation received by DLZ under this Agreement. If CLIENT desires a limit of liability greater than provided above, CLIENT and DLZ shall include in the Agreement the amount of such limit and the additional compensation to be paid to DLZ for assumption of such risk. 14. PREVAILING PARTY LITIGATION COSTS: In the event any actions are brought to enforce this Agreement, the prevailing party shall be entitled to collect its litigation costs from the other party. Any litigation shall be governed by the laws of the state in which the Project is located. 15. AUTHORITY: The persons signing this Agreement warrant that they have the authority to sign as, or on behalf of, the party for whom they are signing. 16. STATUTE OF LIMITATIONS: To the fullest extent permitted by law, parties agree that, except for claims for indemnification, the time period for bringing claims regarding DLZ's performance under this Agreement shall expire one year after Project Completion. 17. SCHEDULE: DLZ shall not be responsible for the Contractor's schedule or failure to carry out the Work in accordance with the Contract documents. DLZ shall not have control over or charge of acts or omissions of the Contractor, Subcontractors, or their agents or employees, or any other persons performing portions of the Work. 18. SHOP DRAWINGS: Review of such submittals is not conducted for the purpose of determining the accuracy of completeness of other details such as dimensions and quantities, or for substantiating and /or coordinating instructions for installation or performance of equipment of systems with other contract disciplines, all of which remain the responsibility of the Contractor as required by the Contract. DLZ's review shall not constitute approval of safety precautions or, of any construction means, methods, techniques, sequences or procedures. DLZ's approval of a specific item shall not indicate approval of an assembly of which the item is a component. M APRODA 0761 ,7664Vdocs�agreenentAI.utheran BasimExhibit C Standard Terms and Conditions doc<