HomeMy WebLinkAbout6C (6)& c (&) me morand v Ix /eetio Community & Economic Development • JIGS 1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 To: Redevelopment Commission, Board of Public Works From: Bill Schalliol, Economic Development Planne Subject: Resolution 3011 and Addendum To Master Agency Agreement Mayflower Road Planning Study Date: April 4, 2012 Attached to this memorandum is Resolution 3011 and Addendum To Master Agency Agreement for the Mayflower Road Planning Study. Also included with the Addendum is a professional service proposal from Abonmarche in the amount of $12,900.00 to provide the planning study report. The purpose of this project is to examine the design parameters and costs associated with the construction of a roadway and bridge over the Indiana Toll Road connecting the intersection of Nimtz and Moreau to Cleveland and Mayflower. The design study would also look at the potential to incorporate or create joint access to the land parcels owned by the Indiana Toll Road (former state police post and ITR maintenance service point) along the roadway corridor. The roadway would allow connection of the Blackthorn Corporate Park and the Hutsfiled Square and Portage Prairie and create a new local road ITR crosspoint between Bendix Drive and Olive Road. The bridge concept is also an important linkage element for future pedestrian and bicycle circulation in the NW corridor. The Nimtz Parkway Trail, proposed to be constructed from Moreau Court to the Blackthorn GC entrance, would be able to connect into the network already in place in Hutsfield Square and along Cleveland Road. The bridge would be designed to incorporate pedestrian and bicycle access and allow a point of safe crossing over the Indiana Toll Road. Future trail sections along Nimtz would benefit from the bridge being in place providing additional connectivity. Staff requests approval of Resolution 3011 and the Addendum To Master Agency Agreement for the Mayflower Road Planning Study. What We Do Today Makes A Difference! March 7, 2012 Proposal for Planning Study Mayflower Connector Bridge South Bend, Indiana TASK #2 PRELIMINARY TRANSPORTATION ANALYSIS Page 2 This task will consist of the study of the impacts to traffic patterns in the region as a result of the Mayflower interconnect concept. We will assess mobility in, around, and through the study area, including opportunities for restricted access for the ITR. This will include several meetings with the City and the ITR Concession Company. This is not a detailed Traffic Impact Study, which may or may not be required as part of final project approvals. TASK #3 CONCEPTUAL ROADWAY /BRIDGE DESIGN This task will include the development of a conceptual design of the roadway and bridge structure, including a detailed review of the geometric requirements of all the road /highway components. This will also include a preliminary bridge structure size and type selection. TASK #4 LAND USE CONCEPTS This task will include the development of schematic land use concepts, based upon the conceptual roadway design, to assist with the analysis of potential benefits of the implementing the interconnect concept. Stakeholder Meetings / Consensus Building Keys to the formulation of useful schematic designs are the discussions between the City and key stakeholders. Key stakeholders include land owners in the study area, the City, the ITR Concession Company, etc. We will meet with these stakeholders to gather input and feedback. Additional meetings may be held as needed and /or as identified by client, not included in this proposal. TASK #5 PROJECT COSTS ANALYSIS This task will consist of the preparation of estimate total project costs to implement the interconnect concept. TASK #6 IMPLEMENTATION PROCESS AND SCHEDULE This task will consist of the preparation of an outline of the approval process and timeline to implement the interconnect concept. We will also prepare a report which will include all of the findings and results of this study. Engineers Architects Planners Surveyors March 7, 2012 Proposal for Planning Study Mayflower Connector Bridge South Bend, Indiana APPENDIX "B" SCHEDULE OF FEES ProjectPlanning Study .......................................................... ............................... Task # 1 Existing Conditions /Base Maps Task #2 Preliminary Transportation Analysis Task #3 Conceptual Roadway /Bridge Design Task #4 Land Use Concepts Task #5 Project Cost Analysis Task #6 Implementation Process and Schedule TOTAL: Page 3 .... $12,900 $12,900 Engineers Architects Planners Surveyors March 7, 2012 Proposal for Planning Study Mayflower Connector Bridge South Bend, Indiana APPENDIX "C" SCHEDULE Page 4 Anticipated Completion Feasibility Study Phase Task #I Existing Conditions /Base Maps March 16 Task #2 Preliminary Transportation Analysis March 23 Task #3 Conceptual Roadway /Bridge Design March 30 Task #4 Land Use Concepts April 6 Task #5 Project Cost Analysis April 6 Task #6 Implementation Process and Schedule April 13 Engineers Architects Planners Surveyors ABONM_ARCHE Confidence By Deign Abonmarche Professional Services Agreement AGREEMENT between: Client Name: CITY of SOUTH BEND, REDEVELOPEMENT COMMISSION Abonmarche Project Number; Client Address: COUNTY -CITY BUILDING, ROOM 1200, 227 WEST JEFFERSON BLVD SOUTH BEND, IN 46601 Cell: Fax: 574 - 235 -9021 Email: Date: 03/07/12 Phone: 574- 235 -5834 to as the Client, and Abonmarche Consultants, Inc., referred to as Abonmarche, of 750 Lincoln Way East, South Bend, IN 46601. The Client contracts with Abonmorche to perform professional services with regard to the Client's project generally referred to as: Project Name: MAYFLOWER ROAD PLANNING STUDY hereinafter referred Location; MAYFLOWER ROAD FROM CLEVELAND ROAD TO NIMTZ PARKWAY SOUTH BEND, INDIANA The professional services to be provided by Abonmarche, collectively referred to as the Work Plan, are as follows: Scope of work: DESCRIBED IN APPENDIX A Project schedule: OUTLINED IN APPENDIX C Special Provisions: NONE Abonmarche proposal /work plan, dated March 7, 2012 is incorporated into this Agreement by reference, and is limited to the services described therein. The Client agrees to promptly pay for services provided by Abonmarche for the Scope of Work according to the following: fee as detailed In APPENDIX B: $ 12,900.00 AS DETAILED IN APPENDIX B Prior to commencement of services, the Client will specify any and all documentation that the Client requires for submission with the invoice for services provided by Abonmarche. Absent any special request from the Client, Abonmorche will send its standard form of invoice. If, after receipt of an invoice from Abonmarche, the Client has any questions, or if there are any discrepancies in the invoice, the Client shall identify the issue in writing within ten (10) days of its receipt. If no written objectlon is made within the fen (10) day period, any such objection shall be deemed waived. Abonmarche invoices ore due upon receipt. The Client has designated Mr. BILL SCHALLIOL as its Representative. The Representative shall have the authority to • - --- - -• • -•• °• •a •• • - • •o••••�• • •� •�• •�� • ��, no n rcrcw, ur ru rvr iris upprvvai OT an cnange oraers, oaaenaa, and additional services to M by Abommnrchrl AemOroranorr a rrOC"d arse CWwamN of Payment By signing this Agreement the Client authorizes Abonmarche to provide services described above, and that the Client is the responsible party for making payment to Abonmarche. By signing bgtow f ocknow -dae that I have received and agree to the Terms and Cendl7ons on Pace 2 of this Agreement arid) understand that the Terms and Gon: ifions,>C_k9 Q=edence over oA prior oral and written and Rt^ ^, ,;, These Terms and Conditions can only be amended, supplemented, modified, or canceled by a written instrument signed by both parties. Any notice or other communications shall be in writing and shall be considered to have been duly given when personally delivered or upon the third day after being deposited into first class certified mail, postage prepoid, return receipt requested. CITY OF SOUTH BEND Client: REDEVELOPMENT COMMISSION � Signature: ?HN Signature: ' Printed Name: -i i _LINN, PE —_ - - -- -- _- Printed Name: _ _ _ ` – _— ; Title: PRESIDENT / CEO Originating rile: _ _ Office ABONMARCHE CONSULTANTS, INC. Address: 750 Lincoln Way East ATTEST: South Bend, IN 46601 BOARD of PUBLIC WORKS: T 574.232.8700 F 574.251.4440 Signature: Signature: Signature: Signature: Date Signed: i Date Signed: March 7, 2012 F: \Pro orals \P thru T\S \South Bend Cil \Dou Las Road \Bus Shelters \COSB PSA 05- 19- 11.docx COSB reviewed 05 -04-11 Page 1 of 2 TERMS AND CONDITIONS OF PROFESSIONAL SERVICES AGREEMENT 1. Agreement. These Terms and Conditions shall be incorporated by reference and shall prevail as the basis of the Client's Agreement to Abonmorche. Any Client Abonmarche, unless specifically stated otherwise In an amendment to this Agreement. document a communication In addition to or in conflict with these Tema and Any eleclrork media provided under this Agreement to the Client ore only for the convenience of the Client. Any conclusions Of information Conditions shall be subordinate and subject to these provisions. 2. Execution. Abonmorche has the option to render this Agreement null and void. obtained or derived from such electronic riles will be at the user's sale risk. 15. Bonds and Permits. The Client will be responsible for the adoption of any If It is not executed within thirty (30) days of delivery. 3. Client ResponslbOss. The Client will provide all criteria and information she access or right of way bonds that may be initiated on their behalf. At concerning the requirements of the Protect, The Client will assume responsibility completion of Abonmarche's services, the Client will take responsibility and pay any ongoing bond or permit costs for any bonded or permitted services. for interpretation of contract documents and for construction observation and 16.Third party Invoking. If the Client directs Abonmarche to invoice third party will waive all claims against Abonmarche that may be In any way connected, unless Abonmorche's services under this Agreement include full -time payers, Abonmarche will do so, but the Client agrees to be ultimatety, construction observation or review of contractor's performance. responsible for Abonmorche's compensators until the Client provides Abonmarche with the third party's written acceptance of oil terms this 4. Pedonnanee. The standard of core for services performed by or provided by of Agreement and until Abonmorche agrees to the substitution. Abonmorche will be the Core and skill ordinarily used by Abonmarche's profession procticing under similar circumstances of the some time and In the 17.Thkd Party tenelklarles. Nothing contained in this Agreement shall create a same locality. Abonmarche makes no warronty, expressed or Implied, with contractual relationship win or a cause of action in favor of a third party against either the Client or Abonmarche. Abonmarche's services under this respect to any services provided by Abonmarche. Abonmarche will not be liable for any claim, damages. cost, or expense (including attorney's fees) or Agreement are being performed solely for the Client's benefit, and no other other liability or loss not directly and solely caused by the negligent acts, errors, party or entity shall have any claim against Abonmarche because of this Agreement ar performance or nonperformance of services hereunder. or omissions of Abonmarche. 5. NWS1y tWhg Notes. If payment Is on an hourly rate, Client will pay Abonmarche The Client and Abonmarche agree to require a similar provision in all contracts with contractors, subcontractors, sub-consultants, vendors and other at the current hourly billing rates. The hourly rates ore adjusted annually or as entities involved In this Project to carry out the Intent of this provision. deemed appropriate. 6. Nelnlbuaable Expenas. Reimbursable expenses, the actual costs Incurred I8.3uspenslon of Services. In the event of non- payment by Client, Abonmorche will hove the absolute right to cease performance of any services, directly or indirectly for the Client's Project, will be charged at Abonmorche's 19. Conhaetor's Woric Abonmarche shall hove no authority to direct or control the current rotes. Examples of reimbursable expenses include, but are not limited to: Work of the Contractor or to stop the Work of the Contractor. Abonmarche mileage, tests and analyses, special equipment services, postage and delivery shall not be liable to any party for the failure of the Contractor to perform the Work charges, telephone and telefox charges, copying, printing, and binding consistent with the Plans and Specifications and applicable Codes and charges, commercial transportation, meals, lodging, special fees, licenses, and Regulations. Abonmarche shall hove no responsibility or be liable for safety permits, Subconsullont and outside technical or professional services will be procedures of the Contractor or its subcontractors. charged on the basis of the actual costs times a factor of 1.15. 20. Corn "flillat Damages. The Client and Abonmorche waive consequential 7 Additional tervkes. Additional services that may be provided pursuant to the damages for claims, disputes, or other matters In question relating to services Agreement or any subsequent modification of the Agreement will be authorized, when possible, by written amendment signed on behalf of the Client provided as a part of this Agreement. Including for example, but not limited to, loss of business, and Abonmarche. Additional services, performed by Abonmarche are subject 21. Governing Low. This Agreement will be deemed to have been made in St. to all Terms and Conditions and the Client will be responsible for payment. Should the Client, regulatory agency, or any public body or inspector direct Joseph County, Indiana and shall be governed by and construed in modification or addition to services covered by this Agreement, the cost will be accordance with the laws of the $tote of Indiana. 22. Venue. The parties (a) irrevocably submit to the jurisdiction of any Indiana added to the agreed price. Requests for extra services should be made in court sitting in St, Joseph County, Indiana in any action arising out of this agreement, writing via a change order, but none the less. Abonmarche Is entitled to be paid and (b) waive. to the fullest extent that they may effectively do so, the defense for extra services provided whether or not It Is in writing, 8. Underground Shuehrrra or Waled UWPa& The Client is responsible for of an Inconvenient forum. The parties also agree that a final judgment in any such action shall be conclusive and may be enforced in other jurisdictions by Identification and location of all public and private burled structures on the suit on the judgment, or In any other manner provided by law. Client's property and the Project site, such as, but not limited to, storage tanks 23.Condderchons, The successors, executors, administrators, and legal and lines, or gas, water, sewer, electrical, phone, cable. or any other public or representatives of the Client and Abonmarche are hereby bound onto the private utilities. It is agreed that Abonmarche is not responsible for accidental other with respect to the covenants, Agreements, and obligations of this damage to utilities or underground structures, whether known, unknown or Agreement. Improperly located. The client shall be responsible for design fees if changes are 24. Acts of God. Neither the Client nor Abonmarche will have any kaboty for necessary. Utility locating or making services provided by Abonmarche are not nonperformance caused In whole or in part by causes beyond Abonmorche's substitutes for complying with the utility owner notification requirements or the reasonable control. Such causes include, but are not limited to. Acts of God, locating services (B 11 systems) required prior to on excavation. Utilities shown as civil unrest and war, labor unrest and strikes, acts of authorities, and events that located by ground penetrating radar are approximate only. No excavation could not be reasonably anticipated, took place to verify the positions shown or to verify the type of utility (except as 25. Termbsotion. Either the Client or Abonmarche may terminate this Agreement by noted). Careful excavation is required for verification of the buried utility. The giving ten (10) days written notice to the other party. In such on event, the owner or customer assumes the risk of error and the actual location of the Client will pay Abonmarche in full for all services previously authorized and underground utility. Abonmarche is not providing any certification or guarantee performed prior to the effective date of the termination, plus (at the dspetion regarding the exact location of any underground utility, of Abonmarche) a termination charge to cover finalization of services necessary 9. Underground CondMons. Abonmarche shall have no responsibility for the to trig ongoing services to a logical conclusion. Upon receipt of such identification of existing or unforeseen /differing underground conditions. The payment. Abonmarche will return to the Client all documents and information Contractor shall have sole responsibility for determining the nature of that are the o pr peaty of the Client. underground condtilons and the means and methods of dealing with those 26.En*o Agreement. This Agreement contains the entire agreement between the conditions. Abonmarche Is entitled to rely upon the information provided by parties and there ore no agreements, representations, statements, or geotechrical consultants and shall have no responsibitiy, for the accuracy or understandings which have been relied on by the porffes which ore not stated correctness of the data contained in the geotechnical reports. in this Agreement. 101111te Access and SeesxRy, With the exception of access rights that land surveyors End of Agreement are afforded by law, the Client will provide Abonmarche access to the Project site and the Client will be responsible for obtaining any necessary permission from any affected third party property owners for use of their lands. The Client is solely responsible for site security. 11.Conritaift. Abonmarche may engage Consultants at the request of the Client Reviewed by City of South Bend Legal Department 05/04/2011. to perform services which are typically the Client's responsibility, such as surveys, geotechnical and environmental assessments, The Client agrees that Abonmarche will not be responsible for. or in any manner guarantee, the performance of services by the Consultants. The Client agrees that Abonmarche will not be liable for any claim, liability, or defense cost for injury or loss sustained by any party allegedly caused by the Consultants' negligence or willful misconduct. 12.0pinlom of Cost Any opinions of probable construction cost and /or total project cost provided by Abonmarche will be on the bash of experience and judgment, but these are only estimates. Abonmarche does not warrant that bids or ultimate construction or total project costs will not vary from such estimates. 13.Olwm Mp OF Work hoduat. Abonmarche will remain the owner of all original drawings, reports, and other materials provided to the Client, whether In had copy or magnetic media forth. The Clienf Is authorized to use the copies provided by Abonmarche only in connection with the Project. Any other use or reuse by the Client for any purposes whatever will be at the Client's risk and full legal responsibility, without liability to Abonmarche and the Client will defend, indemnify, and hold Abonmarche harmless from ail claims, damages, losses, and expenses, including attorney fees arising out of or resulting there from. 14,19eelronk Media. Copies of data, reports, drawings, specifications, and other materials furnished by Abonmarche that may be relied upon by the Client ore limited to the printed copies (also known as hard copies) that are delivered to the Client pursuant to the services under this Agreement. Computer files of text, data, graphics, or of other types of electronic media are the sole possession of COSB reviewed 05-04-11 Page 2 of 2 \/ \\ \ 6k z A." 19 `jl Interstate 94P Indiana East -West o Road Dal Traffic Counts 2790 Development Parcels Lot Approx. Area Potential Uses 1 3.16 ac. (137,565.7 s.f.) Restaurant / Retail 2 7.60 ac. (331,272.2 s.f.) Senior Living/ Residential 3 1.86 ac. (62,862.2 s.f.) Senior Living / Residential 4 5.79 ac. (252,017.2 s.f) Senior Living / Residential 5 1.67 ac (72,702.4 s.f.) Restaurant/ Retail 6 1.39 ac. (60,346.9 s.f.) Restaurant / Retail 7 1.39 ac. (60,662.5 s.f.) Restaurant / Retail 8 9.15 ac. (398,693 s.f.) Restaurant / Retail 9 1.55 ac. (67,562.4 s.f.) Restaurant / Retail 10 1.33 ac. (58,044 s.f.) Restaurant / Retail Hutsfield Square 4t .S<scuetty ';?a�tast . 4l� a i To Meijer / Walmart Stores at Portage Road: 1.8 Miles University of Notre Dame: 4.5 Miles Lot Approx. Area Potential Uses Existing 1.33 ac. (58,045.8 s.f.) Single - Family — — Residential _ L — To Meijer / Walmart Stores at Portage Road: 1.8 Miles University of Notre Dame: 4.5 Miles Lot Approx. Area Potential Uses 11 1.33 ac. (58,045.8 s.f.) Restaurant / Retail 12 1.59 ac. (69,201.5 s.f) Restaurant / Retail 13 1.74 ac. (75,794.4 s.f.) Restaurant / Retail 14 3.78 ac. 064,656.8 s.f.) Restaurant / Retail o. 6000s.f. Building Pad b. 5000 s f. Building Pad c. 3500 s.f. Building Pod 15 3.16 ac. 037,649.6 s.f.) Hotel / Hospitality 'Note This plan is strictly conceptual. Further detailed studies are required to determine actual deselopment yw& per mning ordinance requirenents, engineering standards snd other regulatory requirements of governing agencies as well as municipal site plan approwls. 'A Mixed -Use Commercial / Retail & Housing Development' Development Plan City of South Bend, Indiana p,epr,.d fo, prep.,.d by .nrk M..d UC land D.aignstwM do "M. Imwl.Mnls, Inc 18161 W. W"son MIN, tub 8J sa000e NN M.ad S.. Wl" Michigan Ma.3 W".1 .Mkhipan.6167 Ph- 248.14a.3220 ph.n.: 248we63570 RESOLUTION NO. 3011 RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION APPROVING AND AUTHORIZING THE EXECUTION OF AN ADDENDUM TO THE MASTER AGENCY AGREEMENT (Mayflower Road Planning Study) 3011 -12 WHEREAS, effective January 3, 2012, the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Mayflower Road Planning Study to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment Commission as follows: Section 1. The Commission hereby approves the Addendum to Master Agency Agreement (Mayflower Road Planning Study) and hereby authorizes its execution in substantially the form attached hereto with such changes as the Commission may deem necessary or appropriate upon the advice of counsel, said execution thereof to be conclusive evidence of the Commission's approval of such changes. The Clerk is hereby directed to file a copy of the Addendum with the BPW. Section 2. This Resolution shall be in full force and effect after its adoption by the Commission. Section 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. ADOPTED at a meeting of the South Bend Redevelopment Commission held on April 10, 2012, at 4:00 p.m., in Room 1308, County -City Building, South Bend, Indiana 46601. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission ADDENDUM TO MASTER AGENCY AGREEMENT (Mayflower Road Planning Study) 3011 -12 This Addendum to Master Agency Agreement (this "Addendum "), made and entered into as of the 24th day of April, 2012, by and between the South Bend Department of Redevelopment, acting by and through its Redevelopment Commission (the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly organized and existing pursuant to the laws of the State of Indiana, acting by and through its Board of Public Works (the "BPW ") for purposes of the Commission designating the BPW to act as the Commission's agent to undertake the Mayflower Road Planning Study (the "Project "). WHEREAS, effective January 3, 2012, the Commission and the BPW entered into a Master Agency Agreement which authorized the BPW to act as agent for and on behalf of the Commission for certain projects during 2012; and WHEREAS, pursuant to the Master Agency Agreement, the Commission desires to add the Mayflower Road Planning Study to the Master Agency Agreement by way of this Addendum. NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, the BPW and the Commission agree as follows: 1. The Commission hereby empowers and appoints the BPW, pursuant to the Master Agency Agreement, to act as the Commission's agent for the limited purpose of contracting for and managing the completion of the Project, the scope of said Project being more specifically described in "Exhibit A ", attached hereto and made a part hereof. 2. All of the terms and conditions of the Master Agency Agreement shall control this appointment and this Addendum shall be attached to the Master Agency Agreement. 3. Commission staff members are authorized to execute on behalf of the Commission any documents necessary to carry out the intent of this resolution. IN WITNESS WHEREOF, the undersigned execute this Addendum to Master Agency Agreement to be effective as of the date first written above. CITY OF SOUTH BEND, DEPARTMENT OF REDEVELOPMENT South Bend Redevelopment Commission ATTEST: South Bend Redevelopment Commission CITY OF SOUTH BEND, INDIANA BOARD OF PUBLIC WORKS Gary Gilot, President Kathryn Roos, Member Don Inks, Member ATTEST: Linda Martin, Clerk Exhibit "A" Mayflower Road Planning Study See attached proposal from Abonmarche dated March 7, 2012 = M ABONMARCH E Confidence By Design March 7, 2012 City of South Bend Redevelopment Commission County -City Building, Room 1200 227 West Jefferson Blvd. South Bend, IN 46601 ATTENTION: Mr. Bill Schalliol, Project Manager RE: MAYFLOWER ROAD PLANNING STUDY Proposal for Professional Services Dear Bill: Engineering Architecture Land Surveying Marina / Waterfront Community Planning Landscape Architecture Development Services Abonmarche Consultants is pleased to present this proposal to provide engineering services for the project referenced above. We have developed this proposal based upon our past meetings and discussions. We greatly appreciate the opportunity to submit our proposal and look forward to working with you on this project. Our scope of services and proposed work schedule are set forth in Appendix A, along with the associated fees in Appendix B and schedule in Appendix C. If our proposal is acceptable please sign and return the enclosed standard agreement to authorize us to proceed. We thank you for this opportunity to serve the City of South Bend. if you have any questions or concerns, please do not hesitate to contact our office. Sincerely, Abonmarche Consultants, Inc. ohn W. Linn, PE, Principal /Chairman of the Board 750 Lincoln Way East 341 Airport North Office Park 95 West Main Street South Bend, IN 46601 Fort Wayne, IN 46825 Benton Harbor, MI 49022 574,232.8700 260.497.8823 269.927.2295 www.obonmarcho.com 361 First Street Manistee, MI 49660 231.723.1198 503 Quaker Street South Haven, MI 49090 269,637 1293 March 7, 2012 Proposal for Planning Study Mayflower Connector Bridge South Bend, Indiana PROJECT UNDERSTANDING 91... PROJECT APPROACH Page 1 APPENDIX "A" WORK PLAN The project concept consists of extending Mayflower Road from Cleveland Road to Nimtz Parkway, including a new bridge over the Indiana Toll Road (1- 80/90). The benefit of the concept is to provide enhanced connectivity between the Blackthorn Office Park and retail /commercial properties along Cleveland Road; benefiting both business areas. This interconnect /access also ---- opens the door to additional development potential and market interest. This development will likely consist of a mixture of uses including hotel, retail, restaurant, office and other similar commercial and office uses. PROJECT PLANNING STUDY (Abonmarche Scope of Services) TASK #1 EXISTING CONDITIONS / BASE MAPS This task consists of gathering the needed record data of existing features within the study area. This includes obtaining city GIS maps and aerial photographs, utility information, roadway configurations, etc. This also includes the preparation of base maps for use in the study. Engineers Architects Planners Surveyors