me morand v Ix /eetio
Community & Economic Development
• JIGS
1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021
To: Redevelopment Commission, Board of Public Works
From: Bill Schalliol, Economic Development Planne
Subject: Resolution 3011 and Addendum To Master Agency Agreement
Mayflower Road Planning Study
Date: April 4, 2012
Attached to this memorandum is Resolution 3011 and Addendum To Master Agency Agreement for
the Mayflower Road Planning Study. Also included with the Addendum is a professional service
proposal from Abonmarche in the amount of $12,900.00 to provide the planning study report.
The purpose of this project is to examine the design parameters and costs associated with the
construction of a roadway and bridge over the Indiana Toll Road connecting the intersection of
Nimtz and Moreau to Cleveland and Mayflower. The design study would also look at the potential to
incorporate or create joint access to the land parcels owned by the Indiana Toll Road (former state
police post and ITR maintenance service point) along the roadway corridor. The roadway would
allow connection of the Blackthorn Corporate Park and the Hutsfiled Square and Portage Prairie
and create a new local road ITR crosspoint between Bendix Drive and Olive Road.
The bridge concept is also an important linkage element for future pedestrian and bicycle circulation
in the NW corridor. The Nimtz Parkway Trail, proposed to be constructed from Moreau Court to the
Blackthorn GC entrance, would be able to connect into the network already in place in Hutsfield
Square and along Cleveland Road. The bridge would be designed to incorporate pedestrian and
bicycle access and allow a point of safe crossing over the Indiana Toll Road. Future trail sections
along Nimtz would benefit from the bridge being in place providing additional connectivity.
Staff requests approval of Resolution 3011 and the Addendum To Master Agency Agreement for the
Mayflower Road Planning Study.
What We Do Today Makes A Difference!
March 7, 2012
Proposal for Planning Study
Mayflower Connector Bridge
South Bend, Indiana
TASK #2 PRELIMINARY TRANSPORTATION ANALYSIS
Page 2
This task will consist of the study of the impacts to traffic patterns in the region as a result
of the Mayflower interconnect concept. We will assess mobility in, around, and through
the study area, including opportunities for restricted access for the ITR. This will include
several meetings with the City and the ITR Concession Company. This is not a detailed
Traffic Impact Study, which may or may not be required as part of final project
approvals.
TASK #3 CONCEPTUAL ROADWAY /BRIDGE DESIGN
This task will include the development of a conceptual design of the roadway and
bridge structure, including a detailed review of the geometric requirements of all the
road /highway components. This will also include a preliminary bridge structure size and
type selection.
TASK #4 LAND USE CONCEPTS
This task will include the development of schematic land use concepts, based upon the
conceptual roadway design, to assist with the analysis of potential benefits of the
implementing the interconnect concept.
Stakeholder Meetings / Consensus Building
Keys to the formulation of useful schematic designs are the discussions between the
City and key stakeholders. Key stakeholders include land owners in the study area, the
City, the ITR Concession Company, etc. We will meet with these stakeholders to gather
input and feedback.
Additional meetings may be held as needed and /or as identified by client, not
included in this proposal.
TASK #5 PROJECT COSTS ANALYSIS
This task will consist of the preparation of estimate total project costs to implement the
interconnect concept.
TASK #6 IMPLEMENTATION PROCESS AND SCHEDULE
This task will consist of the preparation of an outline of the approval process and
timeline to implement the interconnect concept. We will also prepare a report which
will include all of the findings and results of this study.
Engineers Architects Planners Surveyors
March 7, 2012
Proposal for Planning Study
Mayflower Connector Bridge
South Bend, Indiana
APPENDIX "B"
SCHEDULE OF FEES
ProjectPlanning Study .......................................................... ...............................
Task # 1 Existing Conditions /Base Maps
Task #2 Preliminary Transportation Analysis
Task #3 Conceptual Roadway /Bridge Design
Task #4 Land Use Concepts
Task #5 Project Cost Analysis
Task #6 Implementation Process and Schedule
TOTAL:
Page 3
.... $12,900
$12,900
Engineers Architects Planners Surveyors
March 7, 2012
Proposal for Planning Study
Mayflower Connector Bridge
South Bend, Indiana
APPENDIX "C"
SCHEDULE
Page 4
Anticipated
Completion
Feasibility Study Phase
Task #I Existing Conditions /Base Maps March 16
Task #2 Preliminary Transportation Analysis March 23
Task #3 Conceptual Roadway /Bridge Design March 30
Task #4 Land Use Concepts April 6
Task #5 Project Cost Analysis April 6
Task #6 Implementation Process and Schedule April 13
Engineers Architects Planners Surveyors
ABONM_ARCHE
Confidence By Deign
Abonmarche Professional Services Agreement
AGREEMENT between:
Client Name: CITY of SOUTH BEND, REDEVELOPEMENT COMMISSION
Abonmarche Project Number;
Client Address: COUNTY -CITY BUILDING, ROOM 1200, 227 WEST JEFFERSON BLVD
SOUTH BEND, IN 46601
Cell: Fax: 574 - 235 -9021 Email:
Date: 03/07/12
Phone: 574- 235 -5834
to as the Client, and Abonmarche Consultants, Inc., referred to as Abonmarche, of 750 Lincoln Way East, South Bend, IN 46601.
The Client contracts with Abonmorche to perform professional services with regard to the Client's project generally referred to as:
Project Name: MAYFLOWER ROAD PLANNING STUDY
hereinafter referred
Location; MAYFLOWER ROAD FROM CLEVELAND ROAD TO NIMTZ PARKWAY
SOUTH BEND, INDIANA
The professional services to be provided by Abonmarche, collectively referred to as the Work Plan, are as follows:
Scope of work: DESCRIBED IN APPENDIX A
Project schedule: OUTLINED IN APPENDIX C
Special Provisions: NONE
Abonmarche proposal /work plan, dated March 7, 2012 is incorporated into this Agreement by reference, and is limited to the services
described therein. The Client agrees to promptly pay for services provided by Abonmarche for the Scope of Work according to the following:
fee as detailed In APPENDIX B: $ 12,900.00 AS DETAILED IN APPENDIX B
Prior to commencement of services, the Client will specify any and all documentation that the Client requires for submission with the invoice for services
provided by Abonmarche. Absent any special request from the Client, Abonmorche will send its standard form of invoice.
If, after receipt of an invoice from Abonmarche, the Client has any questions, or if there are any discrepancies in the invoice, the Client shall identify the issue in
writing within ten (10) days of its receipt. If no written objectlon is made within the fen (10) day period, any such objection shall be deemed waived.
Abonmarche invoices ore due upon receipt.
The Client has designated Mr. BILL SCHALLIOL as its Representative. The Representative shall have the authority to
• - --- - -• • -•• °• •a •• • - • •o••••�• • •� •�• •�� • ��, no n rcrcw, ur ru rvr iris upprvvai OT an cnange oraers, oaaenaa, and additional services to
M by Abommnrchrl
AemOroranorr a rrOC"d arse CWwamN of Payment By signing this Agreement the Client authorizes Abonmarche to provide services described above, and
that the Client is the responsible party for making payment to Abonmarche. By signing bgtow f ocknow -dae that I have received and agree to the Terms
and Cendl7ons on Pace 2 of this Agreement arid) understand that the Terms and Gon: ifions,>C_k9 Q=edence over oA prior oral and written and Rt^ ^, ,;,
These Terms and Conditions can only be amended, supplemented, modified, or canceled by a written instrument signed by both parties. Any notice or other
communications shall be in writing and shall be considered to have been duly given when personally delivered or upon the third day after being deposited
into first class certified mail, postage prepoid, return receipt requested.
CITY OF SOUTH BEND
Client: REDEVELOPMENT COMMISSION
� Signature:
?HN
Signature:
' Printed Name:
-i
i _LINN, PE —_ - - -- -- _-
Printed Name: _ _ _ ` – _—
; Title:
PRESIDENT / CEO
Originating
rile: _ _
Office
ABONMARCHE CONSULTANTS, INC.
Address:
750 Lincoln Way East
ATTEST:
South Bend, IN 46601
BOARD of PUBLIC WORKS:
T 574.232.8700
F 574.251.4440
Signature:
Signature:
Signature:
Signature:
Date Signed:
i
Date Signed:
March 7, 2012
F: \Pro orals \P thru T\S \South Bend Cil \Dou Las Road \Bus Shelters \COSB PSA 05- 19- 11.docx
COSB reviewed 05 -04-11
Page 1 of 2
TERMS AND CONDITIONS OF PROFESSIONAL SERVICES AGREEMENT
1. Agreement. These Terms and Conditions shall be incorporated by reference and
shall prevail as the basis of the Client's Agreement to Abonmorche. Any Client
Abonmarche, unless specifically stated otherwise In an amendment to this
Agreement.
document a communication In addition to or in conflict with these Tema and
Any eleclrork media provided under this Agreement to the Client
ore only for the convenience of the Client. Any conclusions Of information
Conditions shall be subordinate and subject to these provisions.
2. Execution. Abonmorche has the option to render this Agreement null and void.
obtained or derived from such electronic riles will be at the user's sale risk.
15. Bonds and Permits. The Client will be responsible for the adoption of any
If It is not executed within thirty (30) days of delivery.
3. Client ResponslbOss. The Client will provide all criteria and information
she
access or right of way bonds that may be initiated on their behalf. At
concerning the requirements of the Protect, The Client will assume responsibility
completion of Abonmarche's services, the Client will take responsibility and pay
any ongoing bond or permit costs for any bonded or permitted services.
for interpretation of contract documents and for construction observation and
16.Third party Invoking. If the Client directs Abonmarche to invoice third party
will waive all claims against Abonmarche that may be In any way connected,
unless Abonmorche's services under this Agreement include full -time
payers, Abonmarche will do so, but the Client agrees to be ultimatety,
construction observation or review of contractor's performance.
responsible for Abonmorche's compensators until the Client provides
Abonmarche with the third party's written acceptance of oil terms this
4. Pedonnanee. The standard of core for services performed by or provided by
of
Agreement and until Abonmorche agrees to the substitution.
Abonmorche will be the Core and skill ordinarily used by Abonmarche's
profession procticing under similar circumstances of the some time and In the
17.Thkd Party tenelklarles. Nothing contained in this Agreement shall create a
same locality. Abonmarche makes no warronty, expressed or Implied, with
contractual relationship win or a cause of action in favor of a third party
against either the Client or Abonmarche. Abonmarche's services under this
respect to any services provided by Abonmarche. Abonmarche will not be
liable for any claim, damages. cost, or expense (including attorney's fees) or
Agreement are being performed solely for the Client's benefit, and no other
other liability or loss not directly and solely caused by the negligent acts, errors,
party or entity shall have any claim against Abonmarche because of this
Agreement ar performance or nonperformance of services hereunder.
or omissions of Abonmarche.
5. NWS1y tWhg Notes. If payment Is on an hourly rate, Client will pay Abonmarche
The
Client and Abonmarche agree to require a similar provision in all contracts with
contractors, subcontractors, sub-consultants, vendors and other
at the current hourly billing rates. The hourly rates ore adjusted annually or as
entities involved
In this Project to carry out the Intent of this provision.
deemed appropriate.
6. Nelnlbuaable Expenas. Reimbursable expenses, the actual costs Incurred
I8.3uspenslon of Services. In the event of non- payment by Client, Abonmorche
will hove the absolute right to cease performance of any services,
directly or indirectly for the Client's Project, will be charged at Abonmorche's
19. Conhaetor's Woric Abonmarche shall hove no authority to direct or control the
current rotes. Examples of reimbursable expenses include, but are not limited to:
Work of the Contractor or to stop the Work of the Contractor. Abonmarche
mileage, tests and analyses, special equipment services, postage and delivery
shall
not be liable to any party for the failure of the Contractor to perform the Work
charges, telephone and telefox charges, copying, printing, and binding
consistent with the Plans and Specifications and applicable Codes and
charges, commercial transportation, meals, lodging, special fees, licenses, and
Regulations. Abonmarche shall hove no responsibility or be liable for safety
permits, Subconsullont and outside technical or professional services will be
procedures of the Contractor or its subcontractors.
charged on the basis of the actual costs times a factor of 1.15.
20. Corn "flillat Damages. The Client and Abonmorche waive consequential
7 Additional tervkes. Additional services that may be provided pursuant to the
damages for claims, disputes, or other matters In question relating to services
Agreement or any subsequent modification of the Agreement will be
authorized, when possible, by written amendment signed on behalf of the Client
provided as a part of this Agreement. Including for example, but not limited to,
loss of business,
and Abonmarche. Additional services, performed by Abonmarche are subject
21. Governing Low. This Agreement will be deemed to have been made in St.
to all Terms and Conditions and the Client will be responsible for payment.
Should the Client, regulatory agency, or any public body or inspector direct
Joseph County, Indiana and shall be governed by and construed in
modification or addition to services covered by this Agreement, the cost will be
accordance with the laws of the $tote of Indiana.
22. Venue. The parties (a) irrevocably submit to the jurisdiction of any Indiana
added to the agreed price. Requests for extra services should be made in
court
sitting in St, Joseph County, Indiana in any action arising out of this agreement,
writing via a change order, but none the less. Abonmarche Is entitled to be paid
and (b) waive. to the fullest extent that they may effectively do so, the defense
for extra services provided whether or not It Is in writing,
8. Underground Shuehrrra or Waled UWPa& The Client is responsible for
of an Inconvenient forum. The parties also agree that a final judgment in any
such action shall be conclusive and may be enforced in other jurisdictions by
Identification and location of all public and private burled structures on the
suit on the judgment, or In any other manner provided by law.
Client's property and the Project site, such as, but not limited to, storage tanks
23.Condderchons, The successors, executors, administrators, and legal
and lines, or gas, water, sewer, electrical, phone, cable. or any other public or
representatives of the Client and Abonmarche are hereby bound onto the
private utilities. It is agreed that Abonmarche is not responsible for accidental
other with respect to the covenants, Agreements, and obligations of this
damage to utilities or underground structures, whether known, unknown or
Agreement.
Improperly located. The client shall be responsible for design fees if changes are
24. Acts of God. Neither the Client nor Abonmarche will have any kaboty for
necessary. Utility locating or making services provided by Abonmarche are not
nonperformance caused In whole or in part by causes beyond Abonmorche's
substitutes for complying with the utility owner notification requirements or the
reasonable control. Such causes include, but are not limited to. Acts of God,
locating services (B 11 systems) required prior to on excavation. Utilities shown as
civil unrest and war, labor unrest and strikes, acts of authorities, and events that
located by ground penetrating radar are approximate only. No excavation
could not be reasonably anticipated,
took place to verify the positions shown or to verify the type of utility (except as
25. Termbsotion. Either the Client or Abonmarche may terminate this Agreement by
noted). Careful excavation is required for verification of the buried utility. The
giving ten (10) days written notice to the other party. In such on event, the
owner or customer assumes the risk of error and the actual location of the
Client will pay Abonmarche in full for all services previously authorized and
underground utility. Abonmarche is not providing any certification or guarantee
performed prior to the effective date of the termination, plus (at the dspetion
regarding the exact location of any underground utility,
of Abonmarche) a termination charge to cover finalization of services necessary
9. Underground CondMons. Abonmarche shall have no responsibility for the
to trig ongoing services to a logical conclusion. Upon receipt of such
identification of existing or unforeseen /differing underground conditions. The
payment. Abonmarche will return to the Client all documents and information
Contractor shall have sole responsibility for determining the nature of
that are the o
pr peaty of the Client.
underground condtilons and the means and methods of dealing with those
26.En*o Agreement. This Agreement contains the entire agreement between the
conditions. Abonmarche Is entitled to rely upon the information provided by
parties and there ore no agreements, representations, statements, or
geotechrical consultants and shall have no responsibitiy, for the accuracy or
understandings which have been relied on by the porffes which ore not stated
correctness of the data contained in the geotechnical reports.
in this Agreement.
101111te Access and SeesxRy, With the exception of access rights that land surveyors
End of Agreement
are afforded by law, the Client will provide Abonmarche access to the Project
site and the Client will be responsible for obtaining any necessary permission
from any affected third party property owners for use of their lands. The Client is
solely responsible for site security.
11.Conritaift. Abonmarche may engage Consultants at the request of the Client
Reviewed by City of South Bend Legal Department 05/04/2011.
to perform services which are typically the Client's responsibility, such as surveys,
geotechnical and environmental assessments, The Client agrees that
Abonmarche will not be responsible for. or in any manner guarantee, the
performance of services by the Consultants. The Client agrees that
Abonmarche will not be liable for any claim, liability, or defense cost for injury or
loss sustained by any party allegedly caused by the Consultants' negligence or
willful misconduct.
12.0pinlom of Cost Any opinions of probable construction cost and /or total
project cost provided by Abonmarche will be on the bash of experience and
judgment, but these are only estimates. Abonmarche does not warrant that bids
or ultimate construction or total project costs will not vary from such estimates.
13.Olwm Mp OF Work hoduat. Abonmarche will remain the owner of all original
drawings, reports, and other materials provided to the Client, whether In had
copy or magnetic media forth. The Clienf Is authorized to use the copies
provided by Abonmarche only in connection with the Project. Any other use or
reuse by the Client for any purposes whatever will be at the Client's risk and full
legal responsibility, without liability to Abonmarche and the Client will defend,
indemnify, and hold Abonmarche harmless from ail claims, damages, losses,
and expenses, including attorney fees arising out of or resulting there from.
14,19eelronk Media. Copies of data, reports, drawings, specifications, and other
materials furnished by Abonmarche that may be relied upon by the Client ore
limited to the printed copies (also known as hard copies) that are delivered to
the Client pursuant to the services under this Agreement. Computer files of text,
data, graphics, or of other types of electronic media are the sole possession of
COSB reviewed 05-04-11
Page 2 of 2
\/
\\ \
6k
z
A." 19
`jl
Interstate 94P
Indiana East -West o Road
Dal Traffic Counts 2790
Development Parcels
Lot
Approx. Area
Potential Uses
1
3.16 ac. (137,565.7 s.f.)
Restaurant / Retail
2
7.60 ac. (331,272.2 s.f.)
Senior Living/ Residential
3
1.86 ac. (62,862.2 s.f.)
Senior Living / Residential
4
5.79 ac. (252,017.2 s.f)
Senior Living / Residential
5
1.67 ac (72,702.4 s.f.)
Restaurant/ Retail
6
1.39 ac. (60,346.9 s.f.)
Restaurant / Retail
7
1.39 ac. (60,662.5 s.f.)
Restaurant / Retail
8
9.15 ac. (398,693 s.f.)
Restaurant / Retail
9
1.55 ac. (67,562.4 s.f.)
Restaurant / Retail
10
1.33 ac. (58,044 s.f.)
Restaurant / Retail
Hutsfield Square
4t .S<scuetty ';?a�tast
. 4l�
a
i
To Meijer / Walmart Stores
at Portage Road: 1.8 Miles
University of Notre Dame:
4.5 Miles
Lot
Approx. Area
Potential Uses
Existing
1.33 ac. (58,045.8 s.f.)
Single - Family
— —
Residential
_
L —
To Meijer / Walmart Stores
at Portage Road: 1.8 Miles
University of Notre Dame:
4.5 Miles
Lot
Approx. Area
Potential Uses
11
1.33 ac. (58,045.8 s.f.)
Restaurant / Retail
12
1.59 ac. (69,201.5 s.f)
Restaurant / Retail
13
1.74 ac. (75,794.4 s.f.)
Restaurant / Retail
14
3.78 ac. 064,656.8 s.f.)
Restaurant / Retail
o. 6000s.f. Building Pad
b. 5000 s f. Building Pad
c. 3500 s.f. Building Pod
15
3.16 ac. 037,649.6 s.f.)
Hotel / Hospitality
'Note This
plan is strictly conceptual. Further detailed studies are required to determine
actual deselopment yw& per mning ordinance requirenents, engineering standards
snd other regulatory requirements of governing agencies as well as municipal site plan
approwls.
'A Mixed -Use Commercial / Retail & Housing Development'
Development Plan
City of South Bend, Indiana
p,epr,.d fo, prep.,.d by
.nrk M..d UC land D.aignstwM
do "M. Imwl.Mnls, Inc 18161 W. W"son MIN, tub 8J
sa000e NN M.ad S.. Wl" Michigan Ma.3
W".1 .Mkhipan.6167 Ph- 248.14a.3220
ph.n.: 248we63570
RESOLUTION NO. 3011
RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION
APPROVING AND AUTHORIZING THE EXECUTION OF
AN ADDENDUM TO THE MASTER AGENCY AGREEMENT
(Mayflower Road Planning Study)
3011 -12
WHEREAS, effective January 3, 2012, the South Bend Department of
Redevelopment, acting by and through its Redevelopment Commission (the
"Commission ") and the South Bend Board of Public Works (the "BPW ") entered into a
Master Agency Agreement which authorized the BPW to act as agent for and on behalf
of the Commission for certain projects during 2012; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the Mayflower Road Planning Study to the Master Agency Agreement by way of
this Addendum.
NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment
Commission as follows:
Section 1. The Commission hereby approves the Addendum to Master
Agency Agreement (Mayflower Road Planning Study) and hereby authorizes its
execution in substantially the form attached hereto with such changes as the Commission
may deem necessary or appropriate upon the advice of counsel, said execution thereof to
be conclusive evidence of the Commission's approval of such changes. The Clerk is
hereby directed to file a copy of the Addendum with the BPW.
Section 2. This Resolution shall be in full force and effect after its adoption
by the Commission.
Section 3. Commission staff members are authorized to execute on behalf of
the Commission any documents necessary to carry out the intent of this resolution.
ADOPTED at a meeting of the South Bend Redevelopment Commission held on
April 10, 2012, at 4:00 p.m., in Room 1308, County -City Building, South Bend, Indiana
46601.
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
ADDENDUM TO
MASTER AGENCY AGREEMENT
(Mayflower Road Planning Study)
3011 -12
This Addendum to Master Agency Agreement (this "Addendum "), made and
entered into as of the 24th day of April, 2012, by and between the South Bend
Department of Redevelopment, acting by and through its Redevelopment Commission
(the "Commission ") and the City of South Bend, Indiana, a municipal corporation duly
organized and existing pursuant to the laws of the State of Indiana, acting by and through
its Board of Public Works (the "BPW ") for purposes of the Commission designating the
BPW to act as the Commission's agent to undertake the Mayflower Road Planning Study
(the "Project ").
WHEREAS, effective January 3, 2012, the Commission and the BPW entered
into a Master Agency Agreement which authorized the BPW to act as agent for and on
behalf of the Commission for certain projects during 2012; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the Mayflower Road Planning Study to the Master Agency Agreement by way of
this Addendum.
NOW, THEREFORE, in consideration of the mutual covenants and promises
contained herein, and for other good and valuable consideration, the receipt of which is
hereby acknowledged, the BPW and the Commission agree as follows:
1. The Commission hereby empowers and appoints the BPW, pursuant to the
Master Agency Agreement, to act as the Commission's agent for the limited purpose of
contracting for and managing the completion of the Project, the scope of said Project
being more specifically described in "Exhibit A ", attached hereto and made a part hereof.
2. All of the terms and conditions of the Master Agency Agreement shall
control this appointment and this Addendum shall be attached to the Master Agency
Agreement.
3. Commission staff members are authorized to execute on behalf of the
Commission any documents necessary to carry out the intent of this resolution.
IN WITNESS WHEREOF, the undersigned execute this Addendum to Master
Agency Agreement to be effective as of the date first written above.
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Gary Gilot, President
Kathryn Roos, Member
Don Inks, Member
ATTEST:
Linda Martin, Clerk
Exhibit "A"
Mayflower Road Planning Study
See attached proposal from Abonmarche dated March 7, 2012
= M ABONMARCH E
Confidence By Design
March 7, 2012
City of South Bend
Redevelopment Commission
County -City Building, Room 1200
227 West Jefferson Blvd.
South Bend, IN 46601
ATTENTION: Mr. Bill Schalliol,
Project Manager
RE: MAYFLOWER ROAD PLANNING STUDY
Proposal for Professional Services
Dear Bill:
Engineering
Architecture
Land Surveying
Marina / Waterfront
Community Planning
Landscape Architecture
Development Services
Abonmarche Consultants is pleased to present this proposal to provide engineering services
for the project referenced above. We have developed this proposal based upon our past
meetings and discussions.
We greatly appreciate the opportunity to submit our proposal and look forward to working
with you on this project. Our scope of services and proposed work schedule are set forth in
Appendix A, along with the associated fees in Appendix B and schedule in Appendix C.
If our proposal is acceptable please sign and return the enclosed standard agreement to
authorize us to proceed. We thank you for this opportunity to serve the City of South Bend. if
you have any questions or concerns, please do not hesitate to contact our office.
Sincerely,
Abonmarche Consultants, Inc.
ohn W. Linn, PE,
Principal /Chairman of the Board
750 Lincoln Way East 341 Airport North Office Park 95 West Main Street
South Bend, IN 46601 Fort Wayne, IN 46825 Benton Harbor, MI 49022
574,232.8700 260.497.8823 269.927.2295
www.obonmarcho.com
361 First Street
Manistee, MI 49660
231.723.1198
503 Quaker Street
South Haven, MI 49090
269,637 1293
March 7, 2012
Proposal for Planning Study
Mayflower Connector Bridge
South Bend, Indiana
PROJECT UNDERSTANDING
91...
PROJECT APPROACH
Page 1
APPENDIX "A"
WORK PLAN
The project concept consists of
extending Mayflower Road from
Cleveland Road to Nimtz Parkway,
including a new bridge over the
Indiana Toll Road (1- 80/90). The
benefit of the concept is to
provide enhanced connectivity
between the Blackthorn Office
Park and retail /commercial
properties along Cleveland Road;
benefiting both business areas.
This interconnect /access also
---- opens the door to additional
development potential and
market interest. This development
will likely consist of a mixture of
uses including hotel, retail,
restaurant, office and other similar
commercial and office uses.
PROJECT PLANNING STUDY (Abonmarche Scope of Services)
TASK #1 EXISTING CONDITIONS / BASE MAPS
This task consists of gathering the needed record data of existing features within the
study area. This includes obtaining city GIS maps and aerial photographs, utility
information, roadway configurations, etc. This also includes the preparation of base
maps for use in the study.
Engineers Architects Planners
Surveyors