HomeMy WebLinkAboutRatify Quotation - Emergency Repairs for Century Center Broken Storm Line Flooding - Bob Frame Plumbing Services Inc1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BOULEVARD
SOI JTH BEND- INDIANA 46601-1830
Al 4
1865
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORV-'K--
November 13, 2018
Bob Frame Plumbing Services, Inc.
2442 Jaclyn Court
South Bend, IN 46614
PHONE 574/ 235-9251
FAx 574/ 235-9171
RE: Ratify Quotation — Ratify Emergency Repairs for Century Center Broken
Storm Line Flooding
Dear Vendor.
The Board of Public Works, at its meeting held on November 13, 2018, ratified the
award of the above referenced emergency quotation to you in the amount of $10,344.96.
Please call this office with any questions regarding this matter at (574) 235-9251.
Sincerely,
m.
Linda'M, Martin, Clerk
Enclosure
GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMEs A. MUELLER THERESE J. DoRAu
Service Invoice
BOB FRAME PLUMBING SERVICES, INC.
2442 JACLYN COURT
SOUTH BEND, IN 46614-3700
Phone: (574)291-7511 Fax: (574)299-1297'Gd
ML1
2018
Billed Customer: #019369 ^° 04
9N uce"99 NO. PCU700"0
PLUMBING SERVICES
Pagel of 2
VPA-CENTURY CENTER N m x p p Po a a w...... ........ CENTURY CENTER
SCOTT SCOTT
120 S. DR MARTIN LUTHER KING JR BLV 120 S. DR MARTIN LUTHER KING JR BLV
SOUTH BEND, IN 46601 SOUTH BEND, IN 46601
55380 8/23/2018 S-55380 08/23/2018 Amount Paid
CallSlip Number Invoice Date Invoice Number Due Date Contractor's License #
55380 8/23/2018 S-55380 08/23/2018 PC887700840
LABOR, MATERIAL & EQUIPMENT TO REPAIR 6" STORM LINE.
8/16/18 CUT PIECE OF 6" CAST IRON OUT. USED THE PUSH CAMERA TO TELEVISE STORM LINE 20 FT.
OUT THE LINE IS BROKEN. WILL NEED TO RETURN TO TROUBLE SHOOT FURTHER INTO THE BREAK.
8/20/18 TRIED TO CLEAN THE 6" STORM DRAIN WITH THE SEWER MACHINE; THE CABLE KEPT SCREWING OUT
INTO THE DIRT. TELEVISED AND LINE IS BROKEN WITH VOID. LOCATED THE AREA AGAIN. LARGE RAIN
STORM WAS MOVING IN. TALKED TO SCOTT AND DECIDED TO TRY AND DIVERT SOME OF THE WATER TO
RELIEVE THE PRESSURE UNDER THE FLOOR. RAN 160 FT. OF 6" PIPE OVER TO THE CRAWL SPACE THAT
LEADS TO THE RIVER.
8/22/18 USED THE ELECTRIC PARTNER SAW TO WET CUT THE FLOOR. USED THE JACK HAMMER TO REMOVE
THE CONCRETE. HAND DUG DOWN TO THE 6" STORM LINE AND REPAIRED THE BROKEN SECTION. BACKFILLED
THE HOLE. TELEVISED THE REST OF THE STORM LINE. THE LINE IS OPEN AND FLOWING.
8/2.3/1-8 FINISHED BACK FILLING HOLE IN THE BATHROOM
CLEANED UP THE AREA.
MATERIAL
(1) 6 X 6 NO HUB
(1) DIABLO BLADE
(160')6" SCH 40 PVC PIPE
(1) 6" SCH 40 PVC TEE
(9) 6" SCH 40 PVC 45
(3) 6" SCH 40 PVC ST. 45
(3) 6" SCH 40 PVC COUP.
(1) 6" SCH 40 MALE ADAPT.
(1) 6" HUSKY BAND CLAMP
(1) PACKAGE DTABLO SAW BLADES
(2) 3/4 X 10 GALV. BAND IRON
(1) PACKAGE TAPCONS
(1) PACKAGE FENDE-WASHER
(3) 6" SCH 40 PVC 90
6" LAY FLAT HOSE WITH 6" FITTINGS
(2) 6" PL X 6" CLAY SHIELDED FERNCOS
(2) 4" PL X 4" PL SHIELDED FERNCOS
(10) 6" SCH 40 PVC PIPE
(10) 4" SCH 40 PIPE
(2) ROLLS VISQUEEN
(2) 6" NO HUB BANDS
(1) CRUSHED CEMENT
REMOVED TEMP. 6" PIPE AND HAULED AWAY;
20.80
13.28
347.04
38.87
211.68 Undor Number,
71.58
56.76 Approvals
16.44 PO
61.62
66.36 (iT-, ACct
4.98
28.36 Amount
12.90 Date Entered
91.21 9-itc o` Chcck Ck #
1152.38
78.00
46.80
50.10 AITUOV r.
25.40 of Public NVorkq
93.50
41.60
Service Invoice
BOB FRAME PLUMBING SERVICES, INC.
2442 JACLYN COURT
SOUTH BEND, IN 46614-3700
Phone: (574)291-7511 Fax: (574)299-1297
%N MR"" No, Pcumftm
=vAvR MN E
PLUMBING SERVICES
Page 2 of 2
(Continued from previous page) s0
MISCELLANEOUS/EQUIPMENT
PUSH CAMERA
96.00
ELECTRIC PARTNER SAW
125.00
AIR COMPRESSOR/JACK HAMMER
110.00
DUMP TRUCK
75.00
VISQUEEN EXTENSION POLES
25.00
DIG TRUCK
40.00
2-DUMP TRUCK
75.00
PICK UP TRUCK
40.00
LABOR 8/16/18
DRAIN RATE
2.25
HRS
@
$185.00
416.25
LABOR 8/20/18
PLUMBER
8.75
HRS
@
$115.00
1006.25
2-PLUMBER
8.75
HRS
@
$115.00
1006.25
APPRENTICE
3.25
HRS
@
$ 85.00
276.25
2-APPRENTICE
3.75
HRS
@
$ 85.00
318.75
LABOR 8/22/18
PLUMBER
7.5
HRS
@
$115.00
862.50
OPERATOR
10.5
HRS
@
$115.00
1207.50
APPRENTICE
10.75
HRS
@
$ 85.00
913.75
LABOR 8/23/18
PLUMBER
1.5
HRS
@
$115.00
172.50
OPERATOR
4.0
HRS
@
$115.00
460.00
APPRENTICE
4.0
HRS
@
$ 85.00
340.00
Material
2,597.16
Labor
6,980.00
Misc
586.00
Subtotal
10,163.16
Tax
181.80
Grand Total 10,344.96
NET 30, 2% FINANCE CHARGE AFTER 30 DAYS
*** PLEASE CONTACT US IMMEDIATELY IF YOU ARE TAX EXEMPT ***