Loading...
HomeMy WebLinkAboutRatify Quotation - Emergency Repairs for Century Center Broken Storm Line Flooding - Bob Frame Plumbing Services Inc1316 COUNTY -CITY BUILDING 227 W. JEFFERSON BOULEVARD SOI JTH BEND- INDIANA 46601-1830 Al 4 1865 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORV-'K-- November 13, 2018 Bob Frame Plumbing Services, Inc. 2442 Jaclyn Court South Bend, IN 46614 PHONE 574/ 235-9251 FAx 574/ 235-9171 RE: Ratify Quotation — Ratify Emergency Repairs for Century Center Broken Storm Line Flooding Dear Vendor. The Board of Public Works, at its meeting held on November 13, 2018, ratified the award of the above referenced emergency quotation to you in the amount of $10,344.96. Please call this office with any questions regarding this matter at (574) 235-9251. Sincerely, m. Linda'M, Martin, Clerk Enclosure GARY A. GILOT SUZANNA M. FRITZBERG ELIZABETH A. MARADIK JAMEs A. MUELLER THERESE J. DoRAu Service Invoice BOB FRAME PLUMBING SERVICES, INC. 2442 JACLYN COURT SOUTH BEND, IN 46614-3700 Phone: (574)291-7511 Fax: (574)299-1297'Gd ML1 2018 Billed Customer: #019369 ^° 04 9N uce"99 NO. PCU700"0 PLUMBING SERVICES Pagel of 2 VPA-CENTURY CENTER N m x p p Po a a w...... ........ CENTURY CENTER SCOTT SCOTT 120 S. DR MARTIN LUTHER KING JR BLV 120 S. DR MARTIN LUTHER KING JR BLV SOUTH BEND, IN 46601 SOUTH BEND, IN 46601 55380 8/23/2018 S-55380 08/23/2018 Amount Paid CallSlip Number Invoice Date Invoice Number Due Date Contractor's License # 55380 8/23/2018 S-55380 08/23/2018 PC887700840 LABOR, MATERIAL & EQUIPMENT TO REPAIR 6" STORM LINE. 8/16/18 CUT PIECE OF 6" CAST IRON OUT. USED THE PUSH CAMERA TO TELEVISE STORM LINE 20 FT. OUT THE LINE IS BROKEN. WILL NEED TO RETURN TO TROUBLE SHOOT FURTHER INTO THE BREAK. 8/20/18 TRIED TO CLEAN THE 6" STORM DRAIN WITH THE SEWER MACHINE; THE CABLE KEPT SCREWING OUT INTO THE DIRT. TELEVISED AND LINE IS BROKEN WITH VOID. LOCATED THE AREA AGAIN. LARGE RAIN STORM WAS MOVING IN. TALKED TO SCOTT AND DECIDED TO TRY AND DIVERT SOME OF THE WATER TO RELIEVE THE PRESSURE UNDER THE FLOOR. RAN 160 FT. OF 6" PIPE OVER TO THE CRAWL SPACE THAT LEADS TO THE RIVER. 8/22/18 USED THE ELECTRIC PARTNER SAW TO WET CUT THE FLOOR. USED THE JACK HAMMER TO REMOVE THE CONCRETE. HAND DUG DOWN TO THE 6" STORM LINE AND REPAIRED THE BROKEN SECTION. BACKFILLED THE HOLE. TELEVISED THE REST OF THE STORM LINE. THE LINE IS OPEN AND FLOWING. 8/2.3/1-8 FINISHED BACK FILLING HOLE IN THE BATHROOM CLEANED UP THE AREA. MATERIAL (1) 6 X 6 NO HUB (1) DIABLO BLADE (160')6" SCH 40 PVC PIPE (1) 6" SCH 40 PVC TEE (9) 6" SCH 40 PVC 45 (3) 6" SCH 40 PVC ST. 45 (3) 6" SCH 40 PVC COUP. (1) 6" SCH 40 MALE ADAPT. (1) 6" HUSKY BAND CLAMP (1) PACKAGE DTABLO SAW BLADES (2) 3/4 X 10 GALV. BAND IRON (1) PACKAGE TAPCONS (1) PACKAGE FENDE-WASHER (3) 6" SCH 40 PVC 90 6" LAY FLAT HOSE WITH 6" FITTINGS (2) 6" PL X 6" CLAY SHIELDED FERNCOS (2) 4" PL X 4" PL SHIELDED FERNCOS (10) 6" SCH 40 PVC PIPE (10) 4" SCH 40 PIPE (2) ROLLS VISQUEEN (2) 6" NO HUB BANDS (1) CRUSHED CEMENT REMOVED TEMP. 6" PIPE AND HAULED AWAY; 20.80 13.28 347.04 38.87 211.68 Undor Number, 71.58 56.76 Approvals 16.44 PO 61.62 66.36 (iT-, ACct 4.98 28.36 Amount 12.90 Date Entered 91.21 9-itc o` Chcck Ck # 1152.38 78.00 46.80 50.10 AITUOV r. 25.40 of Public NVorkq 93.50 41.60 Service Invoice BOB FRAME PLUMBING SERVICES, INC. 2442 JACLYN COURT SOUTH BEND, IN 46614-3700 Phone: (574)291-7511 Fax: (574)299-1297 %N MR"" No, Pcumftm =vAvR MN E PLUMBING SERVICES Page 2 of 2 (Continued from previous page) s0 MISCELLANEOUS/EQUIPMENT PUSH CAMERA 96.00 ELECTRIC PARTNER SAW 125.00 AIR COMPRESSOR/JACK HAMMER 110.00 DUMP TRUCK 75.00 VISQUEEN EXTENSION POLES 25.00 DIG TRUCK 40.00 2-DUMP TRUCK 75.00 PICK UP TRUCK 40.00 LABOR 8/16/18 DRAIN RATE 2.25 HRS @ $185.00 416.25 LABOR 8/20/18 PLUMBER 8.75 HRS @ $115.00 1006.25 2-PLUMBER 8.75 HRS @ $115.00 1006.25 APPRENTICE 3.25 HRS @ $ 85.00 276.25 2-APPRENTICE 3.75 HRS @ $ 85.00 318.75 LABOR 8/22/18 PLUMBER 7.5 HRS @ $115.00 862.50 OPERATOR 10.5 HRS @ $115.00 1207.50 APPRENTICE 10.75 HRS @ $ 85.00 913.75 LABOR 8/23/18 PLUMBER 1.5 HRS @ $115.00 172.50 OPERATOR 4.0 HRS @ $115.00 460.00 APPRENTICE 4.0 HRS @ $ 85.00 340.00 Material 2,597.16 Labor 6,980.00 Misc 586.00 Subtotal 10,163.16 Tax 181.80 Grand Total 10,344.96 NET 30, 2% FINANCE CHARGE AFTER 30 DAYS *** PLEASE CONTACT US IMMEDIATELY IF YOU ARE TAX EXEMPT ***