HomeMy WebLinkAboutOpening of Bids - 2018 Demolitions Project No 118-307 - JW Concrete - Security Check SubmittedBID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2018 Demolitions
... . ....... ..
Project Number: 118-307
.......... For Bids Due: November 13, 2018, 9:30 AM Local Time
DIVISION A:
Asbestos
Item
Description
Abatement
Demolition
Total Amount
No. --.-.-,
[LSUMI .......
. _ILSyMI
A-01
Demolition of 721 S Lake
House, Garage, and Fence .....
$
$
A-02
Demolition of 2614 Fisher St .
House
"Duct
- -----
_/ .......... .
A-03
Demolition of 805 S Phillipa St.
House and Garage
'906� d
........
$
"Duct Wrap
. .
Demolition of 228 E Donald St.
A-04
House, Garage, Fences
V,
$
Furnace Tape Oniv
A-05
Demolition of 225 Chestnut St.
House, Garage, Fence
A
I A-06
. .... . . . .......
HouseDemolition of 314 Maple St.
A-07
Demolition of 933 §3rd-3-St . ............
House and Garage
- -------- . .......
. .... . .......
(e
. ......
zlve -ec)
. . . . ...........
A-08
Environmental Allowance
$10,000
DIVISION
A TOTAL
"Denotes Homes with Asbestos Material. Verify with inspections
& reports for proper
disposal.
Bidder (Firm) Name,,.,�
DIVISION B:
...........
Asbestos .
.. . ............
- --------
Item
Description
Abatement
Demolition
Total Amount
No. b_e_miolTffion
_W_a��hingio
-of
rLSUM
LSUM
B-01
14ii..
n
House
Duct Wrap
B-02
Demolition of 126 N Walnut St.
House, Garage, and Fences
Duct Wrap Duct Tape
230
and _-R_
e
. .....
.
B-03
Demolition of 319 N Johnson St.
House,
$
$ 20 L
Garage, and Shed
B-04
_' - - - ----- - - - ----------- -
Demolition of 122 N Carlisle St.
House and Fence mmmmm
- ------------ . ......
$
------
$
/ . ..........
-
$9256
B-05
Demolition of 2022 Linden Ave.mm�
House, Garage, and Fence
60
.
B-06
. ....... . . ......... ...... - -------------
� Demolition of 517 Walnut St.
House
Black Mastic rs)
------
--_
................
Version 7/20/2018 Contractor's Bid for Public Works - 7
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this _ _ day of 41„
Contractor/Bidder (Firrri
n No ��vN SUMMERS
aloe, of Contractor/Bidder or Its Agent
Elkhart County —Notary Sat of lllndiana-
Commission Number 711261 Printed Name and Title
My Commission Expires Met 8, 2026
Subscribed and sworn to before nie this day cif®� _ �'2 _...
My Commission Expires ( n K6 � w Vt �,,.
Notary Public
County of Residence
Version 7/20/2018 Contractor's Bid for Public Works - 6
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name: 2018 Demolitions
Project Number: 118-307
For Bids Due: November 13, 2018, 9:30 AM Local Time
m�mc�s
B-07
Demolition of 1123 Cedar St
House Fence
$
$
�,TyTy
$°
and
Demolition of 706 O'Brien St.
B-08
House, Garage, and Fence
**Duct Wrap and Rear Floor Covering
9106`6
�
$� ff
r7
$r , � °�� �
and Mastic
...e..............�
.- __.--.......... .......
Demolition of 723 Harrison Ave.
--.-----------_-----
�
. ......
B-09
House and Fence
**Duct Wrap, Duct Tape, and Black
$ 6OL506
$���"
Mastic with Floor Tile Sample
�
-10 Environmen
tal Allowance - $ 10,000
.......... .-- ._.....
DIVISION B TOTAL a
**Denotes Homes with Asbestos Material. Verify with inspections & reports for proper disposal'
Bidder (Firm) Name,
DIVISION C:
Item
Description
No..
C-01
Demolition of 2521 Hollywood Place
House and Garage
Demolition of 1726 O'Brien St. ._....__
House
2
Duct Wrapand Duct
Tie
C-03
Demolition of 1637 Elmer St.
..._..
House
Demolition..�.............
mof 2611 Humboldt St.
C-04
House Garage, and Fence
**Mastic with Floor Tile Sample
C-05
Demolition of 1137 N. Olive St.
House
Demolition of 810 Cleve _.
land Xve.
C-06
House and Fence
Wray._ ..... .....
Demolition of 1121 N. Elmer St.
C-07
House
** Duct Wray, Tape, and -Dr wWaI
C-08
Environmental Allowance
Asbestos
Abatement Demolition Total Amount
- 1I $ 10,000
DIVISION C TOTAL $
**Denotes Homes with Asbestos Material. Verify with inspections & reports for propertaosal
P n"
Bidder (Firm) Name: „m, °" �✓ �' /"..�
Version 7/20/2018 Contractor's Bid for Public Works - 8
BID/PROPOSAL
'WI 0r ,
CITY OF SOUTH BEND"
Project Name: 2018 Demolitions
Project Number: 118-307;.'
For Bids Due: November 13, 2018, 9:30 AM Local Time
ASBESTOS ABATEMENT UNIT PRICING (required for all bids):
....
Item No. Unit Pricing if Required
Unit
Add Per Unit Price
I Removal, Management, and Disposal of
Linear Feet
$ `
Duct Tape Material Containing Asbestos
If. Removal, Management, and Disposal of
Square Feet
$
Duct Wrap Material Containing Asbestos
Removal, Management, and Disposal of
Ill, Floor Tile and Mastic Material Containing
Square Feet
$
Asbestos
IV. Removal, Management, and Disposal of
Square Feet
$
Plaster Material ContainingAsbestos___
Removal, Management, and Disposal of
V. Corrugated Sheet Material Containing
Square Feet
$ CT
Asbestos
Removal, Management, and Disposal of
VI. Attic Insulation Material Containing
Square Feet
$c
Asbestos
.......................................... _.
Removal, Management, and Disposal of
�.. ........ ........ ................ �
VII. ransit e Siding Material Containing
Square Feet
$
Asbestos
Bidder (Firm):
m
Address:
City/State/Zip: Qk ---Z� -��Telephone Number:
(•, "7,`
By
(Signature)
(Printed Name of Person
Version 7/20/2018 Contractor's Bid for Public Works - 9
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORT
Project Name 2018 Demolitions
. ...........
Project No. 118-307
................... .......
..... _....... _.
For Bids Due November 13, 2018, 9:30 AM Local Time
PART
�r 0 Bidder Firm
Date: . � '' (Firm):
p se type or print)
us a completed or a bids. Plea �
Address: "
City/State/Zip: ;✓ elephone Number:
Agent of Bidder (if Applicable): _
Pursuant to notices
given, the undersigned offers to n
furnish labor ad/or material necessary to complete the
public project 1e o�,
the City of South Bend, Indiana, in accordance with plans
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separ
BY
(Sign tyre)
_./. ..... .�...._ ....
(Printed Name of er%on Signing)
ACCEPTANCE
The above bid is accepted this
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
James A. Mueller, Member
day of
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
20
Version 7/20/2018 Contractor's Bid for Public Works - 2
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his/her/its bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5)-years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 7/20/2018 Contractor's Bid for Public Works - 3
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM
The City of South Bend, Indiana has shown its commitment to addressing Minority Business ("MBE") and
Women's Business Enterprise ("WBE") participation in public contracting through the adoption of the City
of South Bend Ordinance No. 10081-11. Persons, partnerships, corporations, associations, or joint
ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall
not discriminate against any employee or applicant for employment in the performance of a City contract
with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or
indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age or
disability that does not affect that person's ability to perform work.
Minority and Women's Businesses are described on the Indiana Department of Administration website:
I tt ,, fL/W �ovdido //. It is the bidder's sole responsibility to verify whether any listed minority or woman
business meets the qualifications of a Minority or Women's owned business. Documentation shall be
provided with the bid that states the MBE/WBE that will be contracted, the dollar amount of the work that
will be performed on the project and the percentage of the dollar amount as it relates to the total bid amount
by using Form MWBE-1.0, MBE/WBE Participation Form.
The City, its agencies, boards, or commissions requires the Contractor's good faith efforts to obtain
participation by those Contractors classified as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE").
Failure to provide ALL the required evidence of good faith efforts with the bid will be grounds for
rejecting a bid as non -responsive.
The requirements that bidders shall supply as good faith efforts to have active participation from MBEs
and/or WBEs on this Project is written documentation evidencing the efforts by using Form MWBE-2.0,
Evidence of Good Faith Efforts and Form MWBE-2.1, MBE/WBE Contacted. Such documentation shall
include but is not limited to the following items:
a. A listing of all MBE/WBEs contacted including: (1) the name and address of the MBE/WBE; (2) the
date of contact; (3) the type of contact (i.e. phone call, written solicitation, etc.); (4) the nature or
type services or goods requested; and (5) the result of the contact.
b. Written evidence of outreach and copies of email exchanges inviting and receiving quotes or other
responses from MBE/WBE businesses or other documentations of efforts to encourage and
secure competitive quotes from MBE/WBE and local businesses to be included in the benefits of
building this Project.
c. Written documentation of letters of introduction, invitations to forging majority/minority strategic
alliances for capacity building including but not limited to mentoring, extensions of assistance on
payroll, insurance, bonding, line of credit, technical skills or business skills.
All bidders are actively encouraged to reach out to the MBE/WBE businesses in St. Joseph County, Indiana
and other local Indiana counties to utilize a good faith effort to forge constructive and lasting business
partnerships.
Notwithstanding the foregoing, the award and performance of all City contracts shall comply with applicable
federal, state, and local laws.
Version 7/20/2018 General Conditions - 5
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name 2018 Demolitions
Project No. 118-307
For Bids Due November 13, 2018
Contractor Name
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594=18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 315t for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though. the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 7/20/2018 General Conditions - 6
CITY OF SOUTH BEND��r"�
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY r m
DEVELOPMENT PROGRAM- "
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS "
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
r Wo
as
i __ ...._ Date
oPro ect Numberned busi1185307defined by the Indiana Department of Administration (:IDOA").
Project Name: 2018 Demolitions
Bidder:
Contact Person
Address:
City:
Email:
P' ____ Telephone
Z 2-
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE/WBE LISTS : The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
........... ....... ..
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
fgpportuniti'es„ and allow MBE/WBEs reasonable time to respond.
3. a, Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to
articipate effectively.
4 ,,,,Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBE/WBE firms.
**Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs,
including providing such MBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SSMALLMBENVCOEs N order toSncreas id _ .. p _ _ __ the
� _ ......a by
e bidder selected specific portions of the work to be performed by
e the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
...._ ._ _ _ .....__.. _ _..... ......
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
....... _............� ....._
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 7/20/2018 Contractor's Bid for Public Works -11
H
m
oc
w
G
w
N
2
a�
a
In LU
mw0
a
IL
0Zz
N N w
LL
0IL
m0
H w w
Vow
�m
C
z
rQ
F
0
z
i
o c
% 4
So
R O
a z,
w
m 0
� c
wg
mm
24-
a, o
c U)
•� c
0
or
c
r
o as
aw
U) ffJ
O d
E
v N
- in
� d
3 C
IL a
aci c
m �
' 3
o
m o
oY
V c
$ E
c •a
'�o r
� W
a�
r+ C
R m
t
m t
t 3
� d
d>
a°
a
7 ++
0.0
m .y
'a O
' a
o U)
z y
U�
E
0
u,
w+ y S
d •p •-
aa3
E.5
V t d
La y c
H = o
O
m
0
(D
w a)
m 0)
Co
w
m
2
r
E
N
G
ao
U
(u
L
E
z
U L:
CD a)
O �
a` m
CA
0
U_
7
CL
O
07
`0
U
N
C
0
U
00
O
N
O
N
C
0
in work on or under the contract.
The applicant agrees that it will assist and cooperate actively with the administering
agency and the Secretary of Labor in obtaining the compliance of contractors and
subcontractors with the equal opportunity clause and the rules, regulations, and
relevant orders of the Secretary of Labor, that it will furnish the administering
agency and the Secretary of Labor such information as they may require for the
supervision of such compliance, and that it will otherwise assist the administering
agency in the discharge of the agency's primary responsibility for securing compliance.
The applicant further agrees that it will refrain from entering into any contract or
contract modification subject to Executive Order 11246 of September 24, 1965, with
a contractor debarred from, or who has not demonstrated eligibility for, Government
contracts and federally assisted construction contracts pursuant to the Executive
Order and will carry out such sanctions and penalties for violation of the equal
opportunity clause as may be imposed upon contractors and subcontractors by the
administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the
Executive Order. In addition, the applicant agrees that if it fails or refuses to comply
with these undertakings, the administering agency may take any or all of the following
actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan,
insurance, guarantee); refrain from extending any further assistance to the applicant
under the program with respect to which the failure or refund occurred until satisfactory
assurance of future compliance has been received from such applicant; and refer the
case to the Department of Justice for appropriate legal proceedings.
* Corrected to read "invoked". In the original text the word "involved" was printed in error.
Version 7/20/2018 General Conditions - 4
recruitment advertising; layoff or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship. The contractor
agrees to post in conspicuous places, available to employees and applicants for
employment, notices to be provided by the contracting officer setting forth the
provisions of this nondiscrimination clause."
"(2) The contractor will, in all solicitations or advertisements for employees placed by
or on behalf of the contractor, state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex or national
origin."
"(3) The contractor will send to each labor union or representative of workers with
which it/he/she has a collective bargaining agreement or other contract of
understanding, a notice, to be provided by the agency contracting officer, advising
the labor union or workers' representative of the contractor's commitments under
Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post
copies of the notice in conspicuous places available to employees and applicants for
employment."
"(4) The contractor will comply with all provisions of Executive Order No. 11246 of
September 24, 1965, and of the rules and regulations, and relevant orders of the
Secretary of Labor."
"(5) The contractor will furnish all information and reports required by Executive Order
No. 11246 of September 24, 1965, and by the rules, regulations, and orders of
the Secretary of Labor, or pursuant thereto, and will permit access to his books,
records, and accounts by the contracting agency and the Secretary of Labor for
purposes of investigation to ascertain compliance with such rules, regulations, and
orders."
"(6) In the event of the contractor's noncompliance with the nondiscrimination
clauses of this contract or with any of such rules, regulations, or orders, in this
contract may be cancelled, terminated or suspended in whole or in part and the
contractor may be declared ineligible for further Government contracts in accordance
with procedures authorized in Executive Order No. 11246 of September 24, 1965, and
such other sanctions may be imposed and remedies invoked* as provided in
Executive Order No 11246 of September 24, 1965, or by rule, regulations, or order of
the Secretary of Labor, or as otherwise provided by law."
"(7) The contractor will include the portion of the sentence immediately preceding
paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract
or purchase order unless exempted by rules, regulations, or orders of the Secretary
of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24,
1965, so that such provisions will be binding upon each subcontractor or vendor.
The contractor will take such action with respect to any subcontract or purchase
order as the administering agency may direct as a means of enforcing such
provisions including sanctions for noncompliance: Provided, however, that in the
event a contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency
the contractor may request the United States to enter into such litigation to protect
the interests of the United States."
The applicant further agrees that it will be bound by the above equal opportunity
clause with respect to its own employment practices when it participates in federally
assisted construction work: Provided, that if the applicant so participating is a State
or local government, the above equal opportunity clause is not applicable to any
agency, instrumentality or subdivision of such government which does not participate
Version 7/20/2018 General Conditions - 3
CITY OF SOUTH BEND
STATEMENT OF POLICY
The Board of Public Works of the City of South Bend has adopted the following policy regarding
the receipt of sealed bids:
All sealed bids submitted to the Board of Public Works must be
received in the Board of Public Works Office, 1316 County -City
Building, South Bend, Indiana, no later than the advertised time on
the advertised date of the bid opening.
It shall be the responsibility of the bidder to see that his/her bid is
received prior to the deadline stipulated in the bid advertisement.
Bids submitted by mail and received after the advertised time
deadline will not be considered by the Board.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
Linda M. Martin, Clerk
NOTE: Incoming mail does not reach the Board of Public Works until after 9:30 a.m. Local
Time. If you are sending your bid via Federal Express or another overnight source, please
confirm that your package will arrive before the bid opening date and time.
Version 7/20/2018 General Conditions - 1
CITY OF SOUTH BEND
EQUAL EMPLOYMENT OPPORTUNITY CONTRACTING
PROVISIONS DIVERSITY UTILIZATION
It is the policy of the City of South Bend to provide equal employment and business opportunity
for all persons, partnerships, companies, and corporations in accordance with the rules, regulations
and guidelines of the applicable federal, state and local laws. This policy of equal employment and
business opportunity shall apply to every contractor or subcontractor bidding or holding a public
contract with the City of South Bend.
In furtherance of this policy, the following Equal Opportunity Clauses are hereby made a part
of every construction contract entered into by the City of South Bend and all subcontractors
entered into pursuant to any such contract and the bidder hereby certifies that it/he/she will abide
by these provisions.
The contractor will not discriminate against any applicant or employee because of
race," color, religion, sex, national origin, or handicap. The contractor will take
affirmative action to ensure that all applicants or employees are treated fairly and
equitably. Such action shall include but not be limited to the following: hiring, up-
grading, demotion or transfer, recruitment, advertising, lay-offs or termination, rates
of pay or other forms of compensation and selection for training including
apprenticeship programs.
The contractor shall agree to post in conspicuous places available to employees and
applicants, notices to be provided setting forth the provisions of the Non -Discrimination
Clause.
The contractor will, in all solicitations or advertisements for employees placed by or
on behalf of the contractor, state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex, or national
origin.
The contractor will send to each labor union or representative of workers with
which it/ he/she has a bargaining agreement or other contract or understanding, a
notice to be provided, advising the labor union or worker's representatives of the
contractor's commitment under this section, and shall post copies of the notices
in conspicuous places available to applicants and employees.
The contractor will comply with all provisions of Executive Order 11246 (as amended
by 11375) and of the rules, regulations and relevant orders of the Department of Labor.
Subpart B -- Contractors' Agreements
Sec. 202. Except in contracts exempted in accordance with Section 204 of this Order, all Government
contracting agencies shall include in every Government contract hereinafter entered into the following
provisions:
"During the performance of this contract, the contractor agrees as follows:"
"(1) The contractor will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, or national origin. The contractor
will take affirmative action to ensure that applicants are employed, and that
employees are treated equally during employment, without regard to their race,
color, religion, sex or national origin. Such action will include, but not be limited to
the following: employment, upgrading, demotion, or transfer; recruitment or
Version 7/20/2018 General Conditions - 2
City of South Bend, Indiana
Department of Public Works
2018 Demolitions
Project No. 118-307
Notice to Bidders
General Conditions
Special Provisions
Traffic Closure Request Form
Indiana Administrative Code Tile 326 Article 14
IDEM Notification of Demolition and Renovations Operations Instructions and Form
Basement and Asbestos Information
Division A
Division B
Division C
Area Map
City of South Bend Contractor's Bid for Public Work Form
Version 1/11/2017 Table of Contents
2 Pages
5 Pages
15 Pages
1 Page
21 Pages
6 Pages
36 Pages
40 Pages
32 Pages
1 Page
12 Pages
CONTRACT DOCUMENTS AND SPECIFICATIONS
2018 Demolitions
Project No. 118-307
November 2018
Prepared for
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
DEPARTMENT OF PUBLIC WORKS
DEPARTMENT OF NEIGHBORHOOD CODE ENFORCEMENT
%
f \STE
N
i No. 60016991
STATE qF
l
J71
ROrERT. NAWROT, P.E.
Registered Professional Engineer
State of Indiana No. 60016991
FOR BIDS DUE: November 13, 2018 at 9:30 AM EST
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF ,1., "Id )
. ) SS:
COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
i i. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 7/20/2018 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified. by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 7/20/2018 Contractor's Bid for Public Works - 5
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
RESPONSIBLE BIDDER CHECKLIST
Project Name 2018 Demolitions
Project No. 118-307
For Bids Due November 13, 2018
Contractor Name:
The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works
projects by institution of comprehensive submission requirements in compliance with State law. Quality
workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet
certain minimum requirements to be responsive and responsible bidders.
THIS FORM MUST BE SUBMITTED WITH YOUR BID.
INSTRUCTIONS:
If you are a pre -qualified bidder, complete Section I only.
If you are not a pre -qualified bidder, complete Section II only.
Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be
considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre -
qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6-
63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance")
for a period of twelve (12) months.
Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre -
qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified
Bidders") by December 31st for the upcoming calendar year, or within twelve (12) months of obtaining pre -
qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of
the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application
for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal
of the designation, effective January 1 of the following year, or immediately following the twelve (12) months
of pre -qualified standing.
However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works
projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status
is re-established.
Please Note: The City reserves the right to request supplemental information from the bidder,
additional verification of any information provided by the bidder, and may also conduct random
inquiries of the bidder's current and previous customers regardless of pre -qualified standing.
It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to
the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid
opening.
Version 7/20/2018 General Conditions - 6
PRE -QUALIFIED BIDDER CHECKLIST
(a) Acknowledgements:
(i) _ By checking this box, I hereby acknowledge that I am a pre -qualified bidder with
the City of South Bend and that I have met the pre -qualification requirements within
he last twelve (12) months. A copy of my Pre -Qualification verification letter
s attached.
By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided by me, and may also conduct random inquiries of my current and prior
customers.
(b) Attachments„
(i) Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) Statement on staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work. It
outlines how I intend to meet the staffing needs of the work.
Oii) Evidence that I am utilizing a surety company which is on the United States
epar'tment of Treasury's Listing of Approved Sureties as required in the bid
specifications or contract.
(iv) List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within the last three (3) years.
Version 7/20/2018 General Conditions - 8
POST BID SUBMISSIONS:
Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding
Ordinance. The post -bid submission requirements are as follows:
1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the
name, address, licensing status, and type of work for any subcontractor from whom the bidder has
accepted a bid and/or intends to hire on any part of the public work project, including individuals
performing work as independent contractors.
2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty
thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the
Responsible Bidder Ordinance as though it were bidding directly to the City, except that the
subcontractor shall submit the required information (including the name, address, and type of work)
to the successful bidder prior to the commencement of work.
3. Failure of a subcontractor to submit the required information shall not disqualify the successful
bidder from performing work on the project and shall not constitute a contractual default and/or
breach by the successful bidder. However, the City may withhold all payment otherwise due for
work performed by a subcontractor, until the subcontractor submits the required information and
the City approves such information.
4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall
not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another
subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the
name, address, licensing status, and type of work of the substitute subcontractor.
5. The successful bidder and all subcontractors on a public works project are required to submit
certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis,
submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall
identify the job title and craft for each employee. Certified payrolls shall be submitted
electronically.
Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in
the automatic disqualification of the bid.
The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into
account all information in the submission requirements, determine whether a bidder is responsive and
responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to
utilize all information provided in the contractor's submission and any information obtained by the City
through its own independent verification of the information provided by the contractor.
Version 7/20/2018 General Conditions - 7
II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED)
(a) Acknowled ents:
0) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder
-with the City of South Bend.
(ii) By checking this box, I hereby acknowledge that the City reserves the right to
request supplemental information, additional verification of any information
provided, and may also conduct random inquiries of my current and prior
customers. The City reserved the right to utilize all information provided in this
submission and all information obtained in inquiries or requests to determine if a
bidder is responsive and responsible. Additionally„ I acknowledge that all
information provided to the City shall be regarded as public records.
(iii) By checking this box, I hereby acknowledge that copies of all Applicable
apprenticeship certificates or standards for training programs applicable to the
work performed on the project may be requested at any time and shall be furnished
upon request.
(iv) By checking this box, I hereby acknowledge and ensure that I and all sub-
contractors, from whom I have accepted a bid and/or intend to hire to perform work
on the public work project, are properly licensed. Furthermore, I acknowledge my
understanding that it is my responsibility to ensure that all sub -contractors have
the necessary licenses to undertake the work called for in this bid. If a sub-
contractor loses their license at any point, it is the responsibility of that sub-
contractor to notify the City.
(b) Attachments;
W Indiana Secretary of State's on-line records (ie. Business verification) dated within
sixty (60) days of the submission of said document showing that business is in
existence, current with the Indiana Secretary of State's Business Entity Report,
and eligible for a certificate of good standing. (Not applicable to individuals, sole
proprietors or partnerships).
(ii) ast identifying all former business names.
(iii) ��Any determinations by a court or governmental agency any violations of federal
state, or local laws including, but not limited to, violations of contracting or antitrust
laws, tax or licensing laws, environmental laws, Occupational Safety and Health
Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5)
"1�ears..
(iv) " * Statement about staffing capabilities, including labor sources. This statement
indicates and ensures I have sufficient employees on staff to complete the work I
am bidding on OR outlines how I intend to meet the staffing needs of the work.
(v) _Statement that individuals who will perform work on the public work project on my
behalf will be properly classified as an employee or as an independent contractor
under all applicable state and federal laws and local ordinances.
(vi) Evidence of participation in apprenticeship and training programs, applicable to the
work to be performed on the project, which are approved by and registered with
the United States Department of Labor's Office of Apprenticeship, or its successor
organization.
(vii) Copy of a written plan for employee drug testing that covers all of my employees
who will perform work on the public work project and meets or exceeds the
requirements set forth in IC 4-1 -16-5 or IC 4-1:--18-6.
(viii) Evidence that I am utilizing a surety company which is on the Bureau of Fiscal
Service "Department of Treasury's Listing of Approved Sureties" as required in the
bid specifications or contract.
Version 7/20/2018 General Conditions - 9
(ix) Written statement of any federal, state or local tax liens or tax delinquencies owed
to any federal, state or local taxing body in the preceding three years.
(i) Z,List of projects of similar size and scope of work performed in all areas, including
the State of Indiana, within three (3) years prior to the date on which the bld Is due.
Date; r ✓' ,
d kre)
(Print Name Here) -
✓
(Name of Company)
( dress of Compan ,)
(City)
(State)
(Telephone Number)
Version 7/20/2018 General Conditions - 10
DEPARTMENT OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
SPECIAL PROVISIONS
2018 Demolitions
Project No. 118-307
PROJECT DESCRIPTION
The Project includes the demolition services associated with 23, More or Less, Vacant and
Abandoned Homes within the City of South Bend. Work includes, but is not limited to, the furnishing
of all equipment, material, and labor to complete the demolition as described in these Special
Provisions. The Work to be performed shall be the demolition and removal of the complete structure
including the basement, basement flooring, and other basement walls or stairways, and all other
appurtenant work on the site as specified in these documents, removal and disposal of all
demolition materials, remediation of asbestos containing materials as necessary, and final filling,
grading and white dutch seeding of the site as described in these documents. Unit pricing for
Asbestos Abatement is asked for each division in the event asbestos reports have not been
completed due to unforeseen conditions.
The homes are being demolished under an administrative action by the City's Department of Code
Enforcement and as such, the City reserves the right to adjust the number of homes to be
demolished by providing written notice to the Contractor. Accordingly, award of this Project is not
a guarantee to the Bidder that all 23 homes will be included in the final listing of properties to be
demolished under this contract. This is a divisible bid (Parts A-C) with each part being awarded in
its entirety.
II. PREVAILING SPECIFICATIONS AND DESIGN & CONSTRUCTION STANDARDS
The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN &
CONSTRUCTION STANDARDS, most recent version, are to be used on this project.
Each Bid provider is specifically instructed to become completely familiar with the most recent
version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION
STANDARDS prior to submitting a Bid.
Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the
2018 INDOT Standard Specifications for the letting effective after September 1, 2017.
These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING
SPECIFICATIONS and are to be used only in conjunction with the PREVAILING
SPECIFICATIONS.
In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING
SPECIFICATIONS, the SPECIAL PROVISIONS will govern.
w
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 102
B. Additions:
Version 8/16/2018 Special Provisions - 1
1. Each Bid provider shall completely execute and submit the following documents with the
Bid:
a. City of South Bend Contractor's Bid for Public Work Form
b. Bid Bond stating 5% of the total Bid or Certified Check of 5% of the bid
c. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment and Certification of use of United States Steel Products or Foundry
Products.
d. Responsible Bidder Checklist
IV. TERM "OR EQUAL"
A. Prevailing Specifications: None
B. Additions:
1. Where the term "or equal" is used in these specifications, the Bid provider deviating from
specified item shall file with his/her Bid a letter fully explaining and justifying his/her
proposed article or equal. The City of South Bend shall be the sole judge in determining if
the "or equal" offered meets the specification..
V. TAX EXEMPT
A. Prevailing Specifications: None
B. Additions:
1. Materials and properties purchased under contract with the Owner that becomes a
permanent part of the structure or facilities constructed are not subject to the Indiana Gross
Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon
award.
VI. INDEMNIFICATION
A. Prevailing Specifications: None
B. Additions:
1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its
agents, officers and employees, from all costs, losses, claims and suits, including court
costs, attorney fees, and other expenses, arising from or out of the negligent performance
of this Contract by Contractor, or because of arising out of any defect in the goods,
materials or equipment supplied by the Bid provider.
VII. INSURANCE
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 103
B. Additions:
Version 8/16/2018 Special Provisions - 2
1. All Contractors and subcontractors doing business with the City of South Bend shall
present a Certificate of Insurance showing coverage in the following minimum amount:
a. General Liability: Premises -Completed Operations or Products, Bodily Injury and
Property Damage Combined Single Limit - $5,000,000.
b. There shall be no exclusion for explosion, collapse or underground hazard.
c. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000.
d. Auto Liability: Bodily Injury and Property Damage Combined Single limit -
$1,000,000
e. City of South Bend shall be named as additional insured on the Certificate of Insurance.
f. Contractor and subcontractors shall provide any and all insurance policies, documents,
endorsements, or certificates related to this Contract immediately upon the request of
the City of South Bend.
g. If the Contractor is a joint venture or a limited liability company, the insurance policy
must name the joint venture or limited liability company as a named insured.
h. The policies reflecting this insurance coverage shall endorsed to provide the City with
at least thirty (30) days written notice of reduction, cancellation, or intent not to renew
such coverage.
i. If insurance is cancelled, reduced, non -renewed or otherwise not in effect to the
minimum required coverage, the Contractor shall notify the City and shall cease work
on the Project.
j. When any insurance policy is renewed or replaced, the policy retroactive date shall
coincide with or precede start of work on the contract.
k. When any asbestos abatement work is performed in connection with this contract, the
Contractor or its subcontractor performing such work shall provide Asbestos Liability
Insurance with limits of not less than $1,000,000 per occurrence insuring bodily injury,
property damage and environmental cleanup.
I. The Contractor is responsible for all loss or damage to personal property, including
materials, equipment, tools and supplies, owned, rented or used by Contractor.
VIII. AWARD OF CONTRACT
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 103
B. Additions:
1. All Bids will remain subject to acceptance for sixty (60) calendar days after the day of the
Bid opening, but the City of South Bend may, in its sole discretion, release any Bid and
return the Bid security prior to that date.
2. Successful bidder from award notice will have fourteen (14) calendar days to submit a fully
executed contract, Certificated of Insurance, and other require documents from either the
awarded contactor and/or the subcontractors. Failure to comply within the award period
may be cause for the Board of Public Works to rescind the award.
Version 8/16/2018 Special Provisions - 3
3. This is a divisible bid and may be awarded by division.
ll:�iel'LN II?Lc%j urtlU kj,
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 103
B. Additions:
1. The successful Bid provider shall supply the following bonds:
a. Payment Bond within seven (7) days of Notification of Award for an amount equal to
one hundred percent (100%) of the contract amount.
b. Performance Bond within seven (7) days of Notification of Award for an amount equal
to one hundred twenty-five percent (125%a) of the contract amount.
2. In the event that the Bidder fails to provide the Performance Bond and Payment Bond
within the prescribed seven (7) calendar days noted above, the Owner reserves the right
to reject the contract and/or contract award for failure to furnish the Performance Bond.
X. CONTROL OF WORK
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 105
B. Additions:
1. The complete responsibility for this project lies with the Director of Public Works of the City
of South Bend, Indiana acting through his authorized representatives.
2. This Project is being undertaken under the authority of the Unsafe Building Act, IC §36-7-
9-1 et seq. which is subject to certain administrative hearing procedures. Accordingly, the
City reserves the right to add or to delete properties from the listing of properties
proposed to be demolished during the term of the contract and to adjust the
corresponding contract sum.
3. The sites are not publicly owned. They are still titled to private owners. The City and its
Contractors are allowed on the site solely for the purpose of correcting unsafe conditions.
Only activities directly pursuant to completing this work may be undertaken while at the
sites.
4. The City assumes no responsibility for the actual condition of the structures to be
demolished. The person employed by the Contractor to survey or verify the condition of
the structures shall be licensed as required and/or shall possess specific experience and
training so as to be competent to determine the condition of the structure and the
possibility of any unplanned collapse of any portion of the structure and to take prompt
corrective action as necessary.
5. Contractor shall ensure that the structures are vacant prior to commencing any demolition
work.
6. Construction Engineering - The Contractor shall provide all the necessary, qualified
personnel, equipment and supplies to perform all work required under this item. There will
be no direct payment for this item.
Version 8/16/2018 Special Provisions - 4
7. The Contractor is responsible to maintain the site which includes but is not limited to; dust
control, site security, erosion control, and protecting adjacent properties.
8. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through
Friday. No work shall be permitted on weekends, Holidays, or after hours unless approved
by the City of South Bend Department of Public Works through the Building Commissioner.
XI. LEGAL RELATIONS
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 107
B. Additions:
1. The Owner, where mentioned in these documents, is the City of South Bend. The
Engineer, where mentioned in these documents, is the City of South Bend Department of
Public Works Division of Engineering.
2. The Contractor shall apply for and obtain any and all required permits for the work from
local, state, and federal agencies and shall comply with permit requirements, including the
St. Joseph County / City of South Bend Building Department.
3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the
Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified
and registered with the Secretary of State of Indiana to engage in business within the State
of Indiana.
4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The
Owner reserves the right to immediately terminate the public work project awarded should
the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and
such violation shall result in the forfeiture of Contractor's performance bond to the Owner.
XII. SUBMITTALS
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 106
B. Additions:
1. Submit four (4) copies or an electronic version of the submittals for all equipment or
materials used in this project to the South Bend Department of Public Works for approval.
All submittals must be delivered within 7 calendar days from the notice to proceed.
2. The Department of Public Works will review and return two (2) copies or an electronic
version of the submittals within five (5) working days.
3. The review of the submittal information by the Department of Public Works is to facilitate
the satisfactory acceptance of the equipment. This review shall neither relieve the
contractor from the responsibility for deviations from the Specifications, nor from errors and
omissions in the shop drawings or literature. Parts found not meeting the requirements of
these Specifications shall be removed, repaired or replaced at no cost to the OWNER.
4. Submittals shall include complete manufacturer's descriptive information and shop
drawings for all the parts furnished under this contract.
Version 8/16/2018 Special Provisions - 5
5. Upon completion of project, the Contractor will supply one (1) conformed set of all
submittals to the City of South Bend.
XIII. PROSECUTION AND PROGRESS
A. Prevailing Specifications: 2018, INDOT Standard Specifications Sec. 108
B. Additions:
1, Contractor must submit Performance Bond, Payment Bond, and insurance submittals to
the City within seven (7) working days after notification of award and shall begin work in
conformity with these specifications.
2. The Effective Date of this contract shall be the date that the Bidder's proposal is accepted
and signed by the City's Board of Public Works. Time for performance shall commence
upon the issue of the Notice to Proceed which will be issued after the City's acceptance
of the Contractor's Performance Bond, Payment Bond, and insurance submittals. The
contract shall remain in effect until all Work has been completed to the satisfaction of the
Owner, unless earlier terminated as provided herein.
3. The Contractor will send the "Notification of Demolition and Renovations Operations" to
IDEM upon the Owner's notice of contract award. Notice to Proceed will be effective upon
the end of the ten (10) working day notification period for the notice of demolition. The
Indiana Department of Environmental Management (IDEM) "Notification of Demolition"
form and instructions shall be provided as included in these specifications.
4. The Contractor shall submit a proposed detailed Project Schedule for the Work including
a utility schedule, permitting, traffic control plan and erosion control plan if necessary.
The Project Schedule is subject to the approval of the Owner, and may be modified only
by written Change Order after Work commences. If Contractor's progress in performing
the Work is less than the agreed upon Project Schedule, the Owner may declare
Contractor in default.
5. Within two (2) business days of the City's issuance -of the Notice to Proceed, the
Contractor shall secure at least three (3) demolition permits for each Division awarded
from the Building Department. Thereafter the Contractor shall secure the remainder of
the permits for each Division within two (2) additional business days. The Contractor shall
provide the Department of Public Works copies of all permits prior to commencing any
demolition activity on each property.
6. The Contractor may commence demolition work at more than one demolition site,
provided that the Contractor completes in its entirety Work on not less than four (4)
properties within two (2) calendar weeks per each Division awarded including backfill and
mulched white dutch seeding. For each additional division awarded to the contractor, a
factor of four (4) properties shall be added to the total summation of properties that are to
be completed in its entirety of Work within two (2) calendar weeks among the Divisions.
For example if the Contractor is awarded two (2) Divisions, an additional four (4)
properties shall be added so that eight (8) properties within two (2) calendar weeks are to
be completed in its entirety of Work between the two Divisions. Clearing and grubbing of
sites may begin in advance of demolition, if desired, provided organic and inorganic
debris is promptly removed from the site or fenced as a hazard. Once demolition of a
structure commences on a site, progress shall be continuous through removal of all
debris. Inspections of the completed demolition sites and Department of Public Works
approval is required before Contractor proceeds to the next property or properties to be
demolished. There will be no relief of this schedule if the same Contractor is awarded
contracts for more than one Division of this project, or other separate contracts for work
Version 8/16/2018 Special Provisions - 6
under the City's Vacant and Abandoned Housing Initiative. Multiple contracts to the
same Contractor must be performed simultaneously, not consecutively.
7. In the event that a building and/or structure appears to be occupied or to have rehab
work performed on it, Contractor shall notify the Department of Public Works and obtain
approval to proceed before commencing any demolition work.
8. The Contractor shall work continuously until all site demolitions have been completed in
accordance with these specifications.
9. The City has the right to remove any property from the listing of proposed demolitions in
the event that such properties require further legal or administrative procedures related to
the work to be performed.
10. The total contract time for completing each division is listed below. The contract time will
start when the Notice to Proceed is delivered and signed. All sites shall be completed in
accordance with the approved Project Schedule:
a. Division A shall be twenty-eight (28) calendar days.
b. Division B shall be thirty-six (36) calendar days.
c. Division C shall be twenty-eight (28) calendar days.
11. A calendar day is every day shown on the calendar. A calendar day includes Saturday,
Sunday or State recognized holidays. In addition, a calendar day does not include a day
which weather and other conditions not under the Contractor's control prohibits the
Contractor's normal working force from working at least 50% of the day. The City of South
Bend Board of Public Works shall have the sole discretion to determine what conditions
are outside of the Contractor's control. However, if weather is below 20 degrees Fahrenheit
at 7:00 a.m., Eastern Standard Time, according to the weather forecast from the United
States Department of Commerce, National Oceanic and Atmospheric Administration, or
if/when the Mayor declares a Snow Emergency, a time extension may be granted to the
Contractor, consistent with Section XIX Change of Contract Time.
XIV. CHANGE OF CONTRACT TIME
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108
B. Additions:
The Contract Time may only be changed by Change Order. Any Claim for an extension in
the Contract Time shall be based on written notice delivered to the Department of Public
Works within seven (7) calendar days of the occurrence of the event giving rise to the claim.
Notice of the extent of the claim with supporting data shall be delivered within fourteen (14)
calendar days after such occurrence unless an official of the Public Works Department
allows an additional period of time to ascertain more accurate data. The Contract Time
will be extended in an amount equal to time lost to delays beyond the control of the
Contractor if a claim is made in accordance with this provision. Such delays shall include
acts of neglect by the Public Works employees, or to fires, flood, labor disputes, epidemics,
abnormal weather conditions, governmental procedures, or acts of God.
2. Unless otherwise provided, the Contract time is based upon normal weather conditions.
An extension is granted for weather conditions significantly more severe than normal if the
Contractor demonstrates to the satisfaction of the City that the delay in the progress of the
work was due to such weather. The basis to define normal weather with be the data
compiled by the United States Department of Commerce, National Oceanic and
Atmospheric Administration (NOAA).
Version 8/16/2018 Special Provisions - 7
3. No extension of time will be granted if the Contractor, by his/her/its own action or inaction,
including fault or negligence of Contractor's subcontractors, caused the delay, or for which
any remedies are provided under any other provision of this agreement.
4. The grant of an extension of time under this Section in no way constitutes a waiver by the
City of any rights or remedies existing under this contract at law or in equity.
Xv. DEFAULT AND TERMINATION
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108
B. Additions:
1. Events of Default shall include Contractor's failure to perform any of its obligations under
this contract including failure to commence work at the time specified, failure to perform
the work in accordance with these specifications, unauthorized discontinuation of the work,
failure to carry out the work in a manner acceptable to the City, failure to observe Federal,
State, or the local laws or regulations, and failure to comply with any other term of this
contract.
2. -If an event of Default occurs, the City shall provide Contractor written notice and may permit
Contractor ten (10) calendar days after the date of the notice to cure the default. If the
default is not cured within the ten (10) day cure period, the City may at any time thereafter
terminate this contract in which case the termination shall be final and effective.
Upon an Event of Default, the City may invoke the following remedies in addition to those
remedies provided under separate provisions of this contract, the right of set-off against
any payments due or to become due to the Contractor against the retainage, the right to
take over and complete the Work. If the City notifies the Contractor that the City is invoking
its right to complete the Work, all rights that the Contractor has in order under Contractor's
subcontracts are assigned to the City, subject to the City's right to take assignment of all
or only selected subcontracts at the City's discretion. The sole obligation accepted by the
City under such subcontracts is to pay for Work satisfactorily performed after the date of
the assignment. In the event a conditional assignment has not been executed, the
Contractor shall execute or cause to be executed any assignment, agreement, or other
document that may be necessary in the sole opinion of legal counsel to the City's Board of
Public Works to evidence compliance with this provision. The Contractor shall promptly
deliver such documents upon the City's request. In the case of such assignment, unless
otherwise agreed in writing, the Contractor remains liable to subcontractors for any
payment already involved, and for any claim, suit or cause of action based upon or resulting
from any error, omission, negligence or other breach of contract by the Contractor, its
officers, employees, or agents arising prior to the date of assignment to the City.
XVI. LIQUIDATED DAMAGES
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108
B. Additions:
1. The Contractor shall proceed with the work at such rate of progress to insure full completion
within the Contract Time. It is expressly understood and agreed, by and between the
Contractor and the Owner, that the Contract Time for completion of the work described
herein is a reasonable time, taking into consideration the average climatic and economic
conditions and other factors prevailing in the locality of the work, and excludes the time for
unavoidable delays which were beyond the control and without the fault of the Contractor.
Version 8/16/2018 Special Provisions - 8
2. If the Contractor shall fail to complete the work within the Contract Time, or extension of
time granted by the Owner, then the Contractor will pay to the Owner the amount for
liquidated damages a sum of five hundred dollars ($500.00) for each calendar day that the
Contractor shall remain in default after the time of completion stipulated in the Contract
Documents.
3. The Contractor shall not be charged with liquidated damages or any excess cost when the
delay in completion of the work is due to the following and the Contractor has promptly
given written notice of such delay to the Owner and Engineer/Architect.
a. To any preference, priority, or allocation order duly issued by the Owner,.
b. To unforeseeable causes beyond the control and without the fault or negligence of the
Contractor, including but not restricted to acts of God, acts of public enemy, acts of the
Owner, acts of another Contractor in the performance of a Contract with the Owner,
fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and
abnormal and unforeseeable weather.
. -�
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 109
B. Additions:
1. Payments will be made every thirty (30) calendar days. Contractor is required to submit
the completed "AIA Document G7027m - 1992" form to the City of South Bend Board of
Public Works along with electronic certified payrolls for the billed time period.
2. Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a
percentage of payments throughout the duration of the project.
3. Before final payment and retainage are released the Contractor must satisfy the following:
a. All parts and labor meet requirements stated in the specifications.
b. Provide copies of all of the Manifest Reports and Certificates of Completion for each
of the demolition properties.
c. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final
Waiver of Lien.
XVIII. OTHER UTILITIES
A. Prevailing Specifications: None
B. Additions:
1. The Contractor shall verify the locations of all utilities by contacting Holey Moley at 1-800-
382-5544 at least two (2) working days, not counting Saturdays, Sundays or federal and
state holidays before proceeding with construction. It shall also be the Contractors
responsibility to contact any other utility that is not contacted by Holey Moley and verify the
utility locations.
2. The Contractor shall be responsible for working with the other utilities, (e.g., gas electric,
telephone, etc.) in order to assure that all utilities that need to be replaced or relocated can
Version 8/16/2018 Special Provisions - 9
be done with a minimum disturbance to service. The Contractor shall also be responsible
for coordinating schedules with the various utilities such that they can proceed with their
relocation work as efficiently as possible.
3. If the odor of natural gas is detected in a work area at any time during the course of work,
the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall
also immediately notify the residents of adjacent properties. The Contractor shall advise
the residents to evacuate their homes immediately if the odor is present within the dwelling.
XIX. MAINTENANCE OF TRAFFIC
A. Prevailing Specifications: 2018, INDOT Standard Specifications Sections 105 & 801
B. Additions:
1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform
Traffic Control Devices" and the City of South Bend Design and Construction Standards.
2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or
closures and required to be filled out and sent to the Department of Public Works prior to
construction.
3. The Contractor shall arrange and prosecute the work specified for this contract in such a
manner that traffic on existing streets is unrestricted throughout the Project. The Engineer
shall approve the method of traffic control. No construction equipment, vehicles, materials,
supplies or temporary facilities shall be left unattended in the right-of-way of any street or
left parked overnight without proper marking and lighting.
4. After the award of the contract and before beginning the work, the Contractor shall submit
his/her/its proposed schedule of operations for the review of the Engineer. The schedule
of operations as reviewed by the Engineer shall be maintained at all times.
5. There will be no direct payment for this work.
XX. pESCRIPTION OF WORK
A. Prevailing Specifications: None
B. Additions:
1. Work to be performed shall include furnishing all labor, services, materials, insurance and
equipment to provide demolition services associated with the Vacant and Abandoned
Properties Initiative within the City of South Bend. The "Work" to be performed shall
include construction engineering, temporary erosion control, safety and site security,
asbestos abatement, demolition, clearing and grubbing, backfilling and grading, topsoil
and mulched seeding, and concrete approach, sidewalk, and curb.
2. Construction engineering, temporary erosion control, safety and site security, clearing,
backfilling and grading, topsoil and mulched seeding, and concrete approach, sidewalk,
and curb will not be measured directly and shall be paid and based on the Lump Sum
Unit Price established in the pay item "Demolition".
3. The Contractor shall preserve and protect all surrounding property, structures, tenants,
visitors and their property from damage caused by the Contractor's operations.
Version 8/16/2018 Special Provisions - 10
4. Project limits shall be defined as the property boundary for each lot and the area between
the property frontage and curb, which includes any sidewalk and/or tree lawn in that area.
5. Contract award(s), if any, will be made to the lowest responsible and responsive bidder in
each Division.
XXI. DIVISION OF BID
A. Prevailing Specifications: None
B. Additions:
1. The Work of this project is offered in three (3) Divisions: Division A, Division B, and Division
C.
a. Division A: 7 Houses, A-01 — A-07
b. Division B: 9 Houses, B-01 — B-09
c. Division C: 7 Houses, C-01 — C-07
2. Bidders may bid on any or all of the Divisions.
3. Bidder must present a unit price for each and every item inieach Division where a bid is
made and unit pricing for Asbestos Abatement. On page 2 of the Contractor's Bid for Public
Work forms present the total base bid for all Divisions being bid.
XXII. SAFETY AND SITE SECURITY
A. Prevailing Specifications: None
B. Additions:
1. The Contractor(s) and all Sub -Contractors and their personnel onsite shall maintain safe
working conditions according to OSHA Regulations and safety plan and policies.
2. The Contractor shall describe the safety plan actions to the Engineer for each site. The
safety plan shall include a Maintenance of Traffic Plan which describes the method of
protecting the vehicles and pedestrians in the public right-of-way.
3. Use of "snow fencing," prefabricated chain link panels, or other temporary barriers effective
in keeping the public and passers-by from contacting hazards shall be allowed.
4. Contractor shall put the barriers in place when leaving each work site if debris piles and/or
open excavations or other hazards exist on the site.
5. Existing fences in good condition may be used as part of the security barrier.
6. Except for existing fences marked for preservation, all fencing shall be removed upon
completion of demolition and backfill activity.
7. There will be no direct payment for safety and site security. This item will not be measured
directly, but shall be included in the Lump Sum Unit Price established in the Pay Items for
Demolition. Demolition shall not be paid until this item is 100% completed.
XXIII. TEI' PORAR"y ERO SION CONTROL
Version 8/16/2018 Special Provisions - 11
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 205
B. Additions:
1. The Contractor shall be responsible for temporary erosion measures to control erosion on
the site and any material leaving the site. All inlets around the site shall be protected from
sediment. An erosion plan shall be submitted to the engineer for review prior to
construction. The Contractor shall follow IDEM's guidelines.
2. The Contractor shall be responsible to maintain all erosion control measures in place until
all "Work" is completed at each demolition site. The Contractor is responsible for obtaining
Erosion Control permits for sites larger than one acre.
3. The Contractor shall follow IDEM's guideline for erosion control as shown in the Indiana
Stormwater Quality Manual with weekly inspections and inspections following one-half inch
or more rainfall.
4. Dirt and sediment from the demolition site shall not to be tracked onto public right-of-way
by construction vehicles and any dirt migrating into the public right-of-way due to work on
the Project shall be cleaned up daily that is within public right-of-way.
5. The Contractor shall provide construction entrance for access to each of the demolition
sites, erosion control measures so that rain or snow will not wash dirt or sediment into
public right-of-way, and inlet protection for any inlets that are adjacent or near the site. This
item will not be measured directly, but shall be included in the Lump Sum Unit Price
established in the Demolition.
XXIV. ASBESTOS ABATEMENT
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 202
B. Additions:
1, Asbestos abatement is required for most but not all of the properties. Federal, State, and
IDEM guidelines must be followed for abatement. All costs associated with removal and
disposal including documentation and disposal fees shall be included in the Lump Sum
cost for Asbestos Abatement for each of the identified properties.
2. Any above ground or underground storage tanks found during demolition shall be drained
of all contents, disposal and removal of the tanks and any contaminated ground or other
products shall follow Federal, State and IDEM guidelines. The cost associated with removal
and disposal shall be included in the lump sum prices for each property.
3. The asbestos inspections for each of the affected properties are an indication of what was
found and are not to be considered as the only asbestos that may actually exist at those
locations. Test results are attached for those properties where asbestos -containing
materials were found. The type of material is noted on the Bid Form. The type of material
is noted on the Bid Proposed. Contractor shall remove and properly dispose of all
asbestos -containing materials. In the event of additional asbestos containing material has
been discovered during the demolition process that was not included in the reports,
Asbestos Abatement Unit Pricing supplement to the Bid/Proposal may apply for proper
abatement and shall be paid from environmental allowance.
a. Prior to removal of the additional asbestos material, the Contractor shall notify the City
and the City shall inspect the site to verify and quantify the additional asbestos material.
Version 8/16/2018 Special Provisions - 12
The Contractor shall not be paid for additional asbestos material removed without prior
inspection by the City.
4. The Contractor and any of its subcontractors performing asbestos abatement are expected
to inspect the properties to be demolished. No additional allowances will be made for any
difficulties that may be encountered in executing the required work due the failure of the
Contractor or any of its subcontractors to inspect the site.
5. In the event asbestos reports are not included due to unsafe or unable structures or
conditions to obtain samples, the attached documents referring to the Indiana
Administrative Code 326; Article 14; Rule 10; Section 1. (b). shall apply. The Contractor
shall send all asbestos for disposal to IDEM approved facilities. Proper documentation
(manifesting, disposal tickets, etc.) shall be stored and provided to the Engineer for review.
6. Payment for Asbestos Abatement shall be the Lump Sum Unit Price for Asbestos
Abatement as set forth in the bid/proposal for each house.
XXV. DEMOLITION AND CLEARING
A. Prevailing Specifications: ASTM D698
B. Additions;.
1. The Contractor shall remove all the structures indicated on the Bid/Proposal including but
not limited to basements and their contents and all walkways, driveways, curbing, steps,
slabs, pavements whether concrete or asphalt, retaining walls, signs, and foundations.
2. The Contractor shall remove fences if listed on the bid sheet to be removed.
3. Demolition Procedure:
a. All demolition procedures shall be conducted in such a way that non -regulated
asbestos containing materials on or within the structures shall remain non friable.
b. Arrangements have been made to disconnect utilities and the work has been
completed or in the process of completion. If a utility line is found active, notify the
Engineer and suspend work on that site.
c. The use of explosives on the site shall not be permitted. No open fires or burning shall
be permitted.
d. Use water sprinkling, temporary enclosures, and other suitable methods to limit the
amount of dust and dirt rising and scattering into the air. Do not use water when it may
create hazardous or unsafe conditions such as ice, flooding, and pollution.
(i) The Contractor shall not draw water from hydrants.
e, The Contractor shall remove all the structures including basements and their contents
and all walkways, driveways, curbing, steps, slabs, pavements whether concrete or
asphalt, fences, retaining walls, signs and foundations, saplings, bushes, shrubs, dead
trees and any other such items from within property boundaries. Trees that interfere
with the work to be done may be removed from the site for the Contractor's
convenience. Trees along the curb may only be removed if permitted by the Parks
Department through the City Forester. No additional payments will be made for tree
removal. Some sites have garages, fences, walls, and other items that must be
Version 8/16/2018 Special Provisions - 13
preserved. The Contractor will take care to note those items and preserve them.
In all cases where it is necessary to work on the public right-of-way, including the
sidewalks and alleys, the Contractor shall submit a traffic control plan to the
Engineering Department using the attached form for approval a minimum of five (5)
working days prior to beginning the work at that structure. The Contractor will provide
all barricades, warning signs and lights, flaggers, or other methods in compliance with
the Indiana Manual for Uniform Traffic Control Devices to control traffic. Alleys shall
be used wherever possible for truck and equipment access to the structures. No
tracked vehicles shall be operated on public streets or public sidewalks. Loading of
debris into trucks located within the right of way will not be approved without proof that
there is no other way to accomplish the work without damage to private property.
g. The Contractor shall coordinate the termination and removal of the sewer and water
services with the Engineer. The Contractor shall cap and mark all existing sewer and
water services at the sites at the property line and remove them. Documentation in the
form of an as -built sketch is to be provided where the sewer and water lines were
capped at the right-of-way (ROW) line. Photo documentation shall also be required.
h. All concrete generated from the demolition of the structures and appurtenances shall
be removed from the site and disposed of as provided in these Specifications.
All demolition debris, rubbish, and all other material removed from the site as part of
the work shall be transported in a lawful manner to landfill(s) or other disposal facilities
licensed to receive such material. The Contractor shall inform the Owner in writing of
the identity of those facilities, the nature of materials disposed there, and a statement
from the facility that it is licensed to receive such material prior to any work starting on
site. Trucks leaving the work area shall be adequately covered, protected and secured
to prevent debris from spilling or blowing from the trucks during transport.
Foundation walls and their footings, floors and spread footings are to be removed to
their full depth. Under floor water pipe, sewer pipe, electric wire and conduit, ducts,
valves, tunnels, and all other constructed appurtenances shall be completely removed.
Crushing inorganic materials in place without removal shall not be permitted. It is the
Contractor's sole responsibility to complete its due diligence on determining the size of
each basement and other characteristics of the property to be demolished. Information
available from the Saint Joseph County Assessor is included regarding basement size
and other information. In addition, City employees have visited each site and made
notes about basements found. Those notes are included in these Specifications.
Contractors are advised that the information contained therein is not guaranteed to be
100% accurate. The Contractor is responsible for examining each site prior to
demolition.
k. Backfill shall be clean sand or sand and gravel free of roots, clay, or other deleterious
materials meeting INDOT's borrow specification. Backfill shall be compacted in thin
lifts with a vibratory roller compactor using the number of passes recommended by the
manufacturer to compact that thickness of lift to ninety five (95) percent of standard
proctor maximum dry density, ASTM D698. Backfill shall be approved by the Owner
prior to placement. The Owner may disapprove backfill deemed unsuitable at the
Owner's discretion. Any unsuitable backfill delivered or placed on the site prior to
approval shall be removed at no additional cost to the Owner.
I. The Contractor shall follow all federal, state, and local requirements when handling
and disposing of lead based paint debris.
Version 8/16/2018 Special Provisions - 14
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name 2018 Demolitions
Project No. 118-307
For Bids Due November 13, 2018, 9:30 AM Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
mProper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted
Form [MWBE-2.1].
Acknowledge Receipt of Addendum(s) included with the bid.
All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
This checklist submitted with the Bid.
This checklist is provided for bidder's
documentation; however, it does not includ
relieve the bidder of the need to read and co
Bidder:._"
By Authorized Representative:
Signature:
Print Name & Title:
e
use in assuring compliance with required
all specifications requirements and does not
ply with the specifications.
Version 7/20/2018 Contractor's Bid for Public Works - 1
Date: Z/'l...._.
118-307atr� p city of South Bend N
2018 Demolitions
Dept. of Public Works _
227 W Jefferson Blvd. #1316
Figure 1 of 1 south Bend, IN assol� Phone: (574) 235.9251
10/26/2018 - ax
Fax: (574) 235.9171 Vacant and Abandoned Homes �,
3,300 1,650 0 3,300 Feet
IN
City of South Bend Public Works
,r
6' Engineering Division
4227 W. Jefferson, County City Building 1316
"uo South Bend, IN 46601-1830
�a5;'
Phone: 574.235.9251
Email: rowpermitsoffice@southbendin.gov
TRAFFIC CONTROL AND OCCUPANCY REQUEST
SUlllt IIIT 5 W01CKING DAYS MINIMUM PRIOR "iC PIII OJEC"III" S"rR"Ill' D '1E
P[.AIN YOUR S"iAIRF Ii ATE ACCORDINGLY10 AVOID DELAYS
"'"IIIu°°°°IIIIw I - S Incomplete Submittals Cannot Be Processed
Parking Lane Travel Lane Full Road Closure Alley Sidewalk Closure
Excavation/Boring? > Requires Excavation Form
Construction? > Requires Curb Cut
application or sidewalk permit
Submission Date: ........................ Applicant/Company:
Name: Email Address:
Offiice
Phone #:...... cell Contractor Performing Work:
i On -Site Contact:
Project STREET ADDRESS (eg: 110 W. Smith RD.):
Phone #:
Project Location (Block limits/Streets From and To):
Office
Cell
Requested Start & End Dates: ................... Requested Start & End Times: .._............. ... .
Reason for Closure: ............. ....._
Affected Customers:
Confraic ors are i-esp; n�s1ble fornm�:)Mng s(:ifety ISSUE?s (.'nO c� '_(..:s ��::cnc° rn s 0h affected cu,u�w�ion�-�ers .�.�.
A `1A(- A THE FOLf f )WING 1T 5 1. Traffic Control Plan
(Refer to MUTCD for Traffic 2. Detour Plan
Control Device Requirements) 3. Barricades, Signs, or Flashers Placement
Failure to use traffic control for traffic restrictions or closures will result in
stop work orders and/or delay in permitting.
ENGINEERING OFFICE USE ONLY:
Approved Approved as Noted Revise
Comments:
City of South Bend/Engineering Division Authorized Signature
Not Approved
Date:
Version 2.1 [7/28/20171
m. After backfilling, the ground shall be graded with a .5' to 1' depression sloping towards
the middle of the site. The grading shall remove any ruts or holes caused by demolition
equipment or procedures on the site.
A. Prevailing Specifications: 2018, INDOT, Standard Specifications Section 202
B. Additions:
1. All existing concrete sidewalks, drive approaches, curbing, and curb ramps in the public
ROW are to remain in place and be preserved in existing condition. If damaged during
demolition beyond a serviceable conditions, it shall be the responsibility of the Contractor
to repair the damaged item to its previous condition at the expense of the Contractor.
2. Use of adequate timber ramps and earth fill will be acceptable means of protecting these
facilities. Care shall be taken to avoid tracking dirt onto streets. Daily sweeping shall be
required at each access location.
3. There will be no direct payment for replacement of damaged concrete. This item will not
be measured directly, but shall be based on and incidental to the Lump Sum Unit Price
established in the Pay Items for Demolition. Demolition shall not be paid until this item is
100% completed.
XXVII. TOPSOIL AND MULCHED WHITE DUTCH SEEDING
A. Prevailing Specifications: 2018, INDOT Standard Specification Section 621
B. Additions:
1. The entire Project site shall receive four (4) inches of rich topsoil from an offsite source,
approved by the City prior to placement and be graded prior to the placement of seed.
2. A pH test shall be required from a third party testing agency and approved for each topsoil
source.
3. Topsoil shall contain no rocks or rubble over '/4" inch diameter, construction debris, or
organic waste (e.g. roots, branches, sticks, etc.).
4. The entire project limits shall be made smooth and uniform. The seed bed, if not loose,
shall be loosened to a minimum depth of three (3) inches. before seed is applied.
5. Each site is to receive White Dutch seeding. The seeding shall be applied in a mixture of
water and mulching material.
a. Application shall have a minimum of 95% coverage, with no bare areas greater than
eighteen (18) inches in dimension.
b. The Contractor is responsible for watering for thirty (30) calendar days after placement
of the seed per the schedule set forth in the Prevailing Specifications.
6. Payment for the Seeding and Topsoil shall be included in the Lump Sum Price for
Demolition for the properties as set forth in the proposal.
Version 8/16/2018 Special Provisions - 15