Loading...
HomeMy WebLinkAboutChange Order No 6 - Downtown Cross Street Improvements Projet No 117-041A - Walsh and Kelly Inc1316 COUNTY -CITY BUILDING 227 W.JEFFERSON BOULEVARD SOI ITH BEND. INDIANA 46601-1830 CITY OF • BEND PETE BUTTIGIEG, MAYI BOARD i WORKS November 13, 2018 Edward Pilipow Walsh & Kelly, Inc. 24358 SR 23 South Bend, IN 46614 PHONE 574/235-9251 FAX 574/235-9171 RE: Change Order No. 6 - Downtown Cross Street Improvements — Project No. 117- 041 A Dear Mr. Pilipow: The Board of Public Works, at its meeting held on November 13, 2018, approved the above referenced Change Order for an increase of thirteen (13) days, bringing the current contract completion date to November 16, 2018. Enclosed is a copy of the Change Order for your records.. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure CITY OF SOUTH BEND, INDIANA DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO: SUBJECT OF CHANGE ORDER: 10/31 /2018 0:00:00 117-041 A Downtown Cross Street Improvements 4/24/2018 R Contract Completion Date Extension The original contract sum $ 1,659,060.60 Net change by previously authorized change orders $ 69,665.62 The contract sum prior to this change order $ 1,728 726.22 By this Change Order, the project amount is Increased HDecreased $ 0.00 The new contract sum including this change order $ 1,728,726.22 This Change Order represents a total change of 0.00 % Total change for entire project 4.20 % Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR Contractor Signature Printed Name and Title Walsh & Kell Company Name 24358 SR23 Address South Bend, IN 46614 City, State, Zip 10/26/2018 0:00:00 8 days 13 days CITY OF SOUTH BEND BOARD OF PUBLIC 70 KS Approved Date: Gary A. Gilot, resident Ellizabeth A. Maradik, Member herese J.-DoraVIM ember James A. Mueller, Member y (G.iCU U a 1 Aftira Skro �, b 2 358 State, Road 23 O)o Fax (2 � 9) 9 24 -8 768 Fax (574) 289-7,174 " �"�U�O'�rtd Wd an a 46319 ;"o uffi BpndS Prudi v)�a ,46614 rNdvm.wa1s'hkcvIHyr.c urn Alicia Czarnecki, Project Engineer October 31, 2018 Department of Public Works 1316 County City Building 227 Jefferson Boulevard South Bend, IN 46601-1830 RE: Cross St Improvements; Contract Completion Date Extension Request Good Afternoon; We are writing this letter to request an Extension to current Contract Completion Date. See summary of the remaining work and associated comments. 1. ADA pede_sria ossimp„ush pa N yna Michigan_& fax intersection, m„tn cri .............. This new work was added at the 9/21/18 "pre -final" walk thru. These were NOT part of the contract until this point. Pricing for this extra work will be submitted shortly. Its anticipated that materials should be received to allow installation to be completed by 11 9 18. 2. Sloecial sl n. "10 minute ticket pick up, This sign should not be considered as punchlist work. It contains a special unique message not typical of common MLITCD signs. Also, the request to add this sign, was on 10/10/18. Its anticipated that materials should be received to allow installation to be completed by!w 3. Storefront facade Replacement a. Special masonry material panels have been received and prepped. Masonry material production took longer than anticipated and was out of our control. b. Third coat of paint has been applied today. c. The two-day glazing process will begin tomorrow. d. Shipment will follow after a couple days of curing. e. Removal of existing panels and any required prep work can begin as early as end of this week. This would allow overlap between glazing/cure process and removal/prep work. Hence reducing overall field time. f. Estimated install time is 4 to 5 calendar days g. Caulking and cleaning should require an additional 2 calendar days h. Its anticipated that installation should be complete by 11 18 18 weather g1Titt1n 4. Rye lace damaged bollard All bollards, decorative and plain have been installed. Therefore, our contractual obligation, concerning these bollards were satisfied, at that time. However, after Michigan Street was open to motoring public, a vehicle struck a bollard outside of the LaSalle building parking lot. We were requested to replace this bollard October 16, 2018. Its anticipated that materials should be received to allow installation to be completed by 11 9 18. EQUAL 0,PPORTUNITYEANPLOYER S. Bolt down istin benches armed trash cans Can the final location of the existing benches and trash cans be provided so that we can complete this work? There has been much discussion and opinions regarding their ideal location. It is important to note that our original contract work has been completed. The pedestrian plaza and roadways are being enjoyed by the public. The outstanding items listed above were added later. Walsh & Kelly and our subcontractors are making every effort to complete these new items in a timely fashion. Material production/fabrication time for masonry fagade panels, decorative bollards and sheet signs are many times outside of our control. Hopefully, all of the necessary materials, when delivered, will be correct and fit for final install. Considering the above comments, we respectfully request that the Final Contract Completion date be revised to November 16, 2018. Your consideration is very much appreciated. Please call if you have any questions or prefer to sit down and discuss in further detail, Edward J. Pilipow, P.E. Project Manager/Estimator BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 11/02/2018 Department Public Works Name Roger Nawrot Division/Bureau Engineering ... ...... . ..... . . .... BPW Date 11/13/2018 Phone Extension 532 ............ --"- .. Re---quired Prior to Submittal to Board ­­­ ................... .. ...___­ ............ . . . —"—.i'_ ........... . . .. ... ...... — Legal [:] Attorney Name. - Controller E] Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing Check the Agreement Professional Services Bid Opening Quote Opening Change Order No. 6 Ease/Encroach. Other: ir9priate Item T y M Contract El Resolution El Bid Award F] Quote Award F� C/O & PCA No. F-1 Traffic Control: ,,d fo r or All Submissions F] Proposal E] Req. to Advertise Reggired Information F-1 PCA Addendum El Title Sheet Company or Vendor Name Walsh & Kelly, Inc. E Yes® No El If Yes, Approved by New Vendor Purchasing MBE/WBE Contractor MBE WBE MBEANBE Contractor Requested No - - ­ Yes Name of Comp�)qy Project Name Downtown East-West Streetscapes — - — ------- ...... Project Number 117-041 A Funding Source RWDA TI F Account No. ..... k� U121,701:095 __q Amount Terms of Contract Purpose/Description This a no change in cost invoice that is for a contract time extension of 13 days because of added extra work for the storefront facade replacement. F-1 Required Contractor's Certification Forms Attached (Non - Collusion Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) R�Nuired For Change Orders ON . ......... . . ...... Amount of Increase $ , 0.00 F1 Decrease $0.00 Previous Amount $ 1,728,726.22 Current Percent of Change: 0.00% New Amount 1,728,726.22 Total Percent of Change: 4.20% .... ......... . . ... . . ........... ............ Dispersal After Ar)Droval Copy Original F-1 D F-1 F El El