HomeMy WebLinkAboutContribution in Aid of Construction Agreement - American Electric Power - Convert Street Light Power at 6777 Enterprise Drive13 16 COUNTY -CITY 11MIJANG.
227 W. JEFFELRSON BouLEVARD
�01 ITH BEND. WMANA 46601-1830
CITY OF SOUTj-i BEND PETEBUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
October 23, 2018
Robert Strasburg
American Electric Power
2929 Lathrop Street
South Bend, IN 466,28
RE: Contribution -in -Aid -of -Construction Agreement
Dear Mr. Strasburg:
PF10Nr',, 574/235-9251
FAX 574/ 235-9171
The Board of Public Works, at its meeting held on October 23, 2018, approved the above
referenced agreement for I&M to convert street lighting power at 6777 Enterprise Drive
from 277/480-volt three (3) phase to 120/208 single phase in the amount of $17,232.64.
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 23,5-
9251.
Sincerely,
Linda M. Mai -tin, Clerk
Enclosure
GA A, Gii.,oi, SUZANNA M. MuTZBER(i ELIZABI'ri-1 A. MARADIK JAMEs A. MUELLER T] IERESI a J , DOR A I J
Indiana Michigan Power Company - IN
Contribution -In -Aid -Of -Construction Agreement
For Electric Distribution Service
Contract #: DWMS00000438736 Work Request #: 70049782 Date: 9/27/2018
Customer Name: CITY OF SOUTH BEND Tariff: GS-Sec
Service Address: 6777 Enterprise Dr. Mailing: 731 S. LAFAYETTE ST.
South Bend, IN South Bend, IN 46601
Project Description: The Customer has requested the installation of electric distribution facilities (hereinafter
referred to as "Basic Service") as follows: Convert existing 277/480v 3Ph Service to a
120/208v lPh (200amp) Service for Customer owned/maintained Street Lights.
Indiana Michigan Power Company - IN (hereinafter referred to as "Company") agrees to install 3Ph UG Primary, Pad
Transformer, Pedestal, 32h UG Sec, 1Ph UG Service and Metering.
Customer agrees to the following: > Install 1Ph 200amp Service (Tesco Cabinet) to NEC and Company Specs and have
inspected by Local inspecting Authority. > Provide Company with as -built drawings related to Eagle way Drive.
> Assist Company with the securing of required easements.
1. Customer Revenue Credit - Customer hereby agrees that the following electrical load and/or housing units will be
installed A) within three (3) months from completion of extension unless stated otherwise in the comments above; or
B) within six (6) years from completion of extension if customer is developing a subdivision or manufactured housing
park.
RESIDENTIAL
NUMBER OF SUBDIVISION LOTS
NUMBER OF LOTS USED TO DETERMINE REVENUE 0.00
House Size
Base Load
Geothermal &
ASHP(# units)
Resistance &
ETS(# units)
AOHF
(# units)
COMMERCIAL D
Demand kW 5 Monthly kWH 1,100 11
Load Factor % 30
Based on the customer's preceding representation, the Company estimates the 2-1/2 year revenue to be $4,899.45.
Customer agrees to pay to the Company the potentially refundable amount of $0.00, which is the difference between
the Company's cost of installing the necessary facilities and the estimated revenue credit. In addition, the
customer agrees to pay a non-refundable amount of $17,232.64, for any work requested that exceeds what is required
to provide adequate service.
Total amount due including both the refundable and the non-refundable amount is $17,232.64
Payment shall be made prior to the start of Company's construction of facilities.
2. Recalculated Revenue - If the customer has not installed or contracted for the installation of the electric
equipment as stated in paragraph #I, then the Company shall recalculate the estimated revenue. If the recalculated
revenue is less than the Company's cost of facilities, then the customer shall, within thirty (30) days of receiving
an invoice from the Company, pay to Company as aid to construction, the difference between the estimated revenue and
the Company's cost of the facilities. The fact that the customer may no longer be associated with or have a
property interest in the project served under this agreement does not release the customer from this obligation.
3. Customer Refund - if the customer made an aid to construction payment, then the customer shall, after the number
of services used in the original revenue calculation has been installed, receive a refund for any additional
permanent customers utilizing the same line extension within six (6) years from completion of the extension.
Refunds will be made for each additional permanent customer equal to 2-1/2 times the estimated annual revenue, less
the estimated cost of service drop or laterals and metering equipment required to serve the new permanent
customer(s). The total of all refunds or allowances shall not exceed the total payment made by the customer.
Refunds will be made once customer has notified the Company of any new customers that are added to this extension.
4. Underground Service_
a. The customer shall provide, at no cost to the company, the necessary right of way for the underground
electric service and shall make the right of way accessible to the company's equipment. The owner shall remove all
obstacles, grade the right of way to within 4" of: finished grade, and provide continuing access to the Company for
expansion, operation, and maintenance of all electric service facilities. Seeding and restoration or replacement of
all trees, shrubs, and landscaping, shall be the responsibility of the customer.
b. The Company may provide the necessary excavation, trenching and backfill and shall install the electrical
conductors and related facilities. The customer may elect to do all trenching and backfill in order to reduce
company charges for installing underground service. All trenching and backfill must be done in accordance with
Company specifications.
C. Where abnormal site or soil conditions are found to exist after Contri.bution-In-Aid-Of-Construction
Agreement For Electric Distribution Service has been accepted, the customer shall pay those charges resulting from
the abnormal conditions which axe in excess of the original customer payment.
d. The customer hereby agrees to install an approved electric service entrance of sufficient capacity for
present requirements of the building to be erected on the property, Service shall normally terminate on the
building exterior at a location suitable to the Company. Service entrance capacity shall be as indicated on the
C:orrtr.buti,on-"En-Aid,-O.f-Construction Agreement For Electric Distribution service.
e. The customer shall coordinate the installation of underground electric facilities with other- utilities and
services to permit efficient completion of Company's work, unimpeded access to the installation site, and
installation of underground facilities at proper depth to avoid accidental dig -ins or other installation problems.
f. Customer understands that in order for Company to perform the above described work, Company (and/or its
contractor) may be required to excavate, dig, bore or bring large, heavy equipment onto the property. This presents
a danger to hidden underground structures/facilities. It is the customer's responsibility to locate and/or expose
all privately owned structures/facilities located within the proposed work area. The Company (and/or its
contractor) will not assume responsibility for damage to water lines, drain tiles, septic systems, etc., that have
not been properly identified and/or exposed by the customer.
Customer understands that all facilities installed by the Company will be and remain property of the Company. The
Company expressly retains the right to use said lines and equipment for any purpose which Company deems advisable,
including the distribution of electric service to other customers.
Gather utilities may have lines and/or equipment that utilize Company's pole or other facilities. Company is not
responsible for the installation, relocation or removal of lines and/or equipment owned by other utilities at this
location. Each utility is responsible for its own equipment and the time it takes to install, remove or relocate
it. Any fees charged by other utilities are the responsibility of the customer, riot the Company, The customer is
responsible for contacting the other utilities and making arrangements with them for any work that must be done to
facilitate this contract...
Nothing herein contained shall be construed as a waiver: or relinquishment by Company or any right .i.t has or may
hereafter have to discontinue service for or on account of default in the payment, of any bill owing or to become
owing thereunder or for any reason or cause stated in the Company's Tariff.
It is agreed and understood that, if Customer alters the terms of this Agreement, it may be voided at the discretion
of the Company.
It is further understood and agreed that should circumstances, on the part of either the Company or the customer,
delay rendering service beyond 90 days after this Agreement is signed, the terms of this agreement may be.
renegotiated at the request of either party.
The quoted price and terms set; forth in this Contr.i.buti.on-.In-Aid-Of-Construction Agreement For Electric Distribution
may be withdrawn if not accepted before 10/27/2018
Terms of this agreement begin upon Company's completion of the line extension.
Binding Authority -- The .individual. executing this Agreement hereby warrants to the Company that he or she has full
authority to do so and has authority to bind the customer.
Customer agrees to accept above desri.bed terms and conditions and further agrees that the Company shall not be
liable for any claim of loss, injury, or damage, caused by the installation of service to the customer or for work
on behalf of customer under this Agreement except that which results from the negligence of the Company.
CUSTOMER USR :
lka,�",' ,�.;ov
COMPANY OSE :
Date:
BMPoaik.r rr 1:?i i'* r
d i.
Date:
Customer Name;
Print Name:
By:
141 y
Accepted By:
Title •
�*„
`i'.l..tle:
PLEASE
>>
Please remit To:
Invoice No:
`
American Electric Power
DETACH
>>
I&M CIAC - IMPC 25
Company No:
STUB
)>
PO Box 60
Contract No:
Fort Wayne, IN 46801-2604
Customer No:
ARID
>>
Amount Due:
Bill
Bill To:
RETURN
>>
CITY OF SOUTH BEND
731 S. LAFAYETTE ST.
WITH
>>
South Bend, IN 46601
Amount Remitted:
PAYMENT
>>
Contract No: DWMS00000438736
Date: 9/27/2018
170
DWMS00000438736
11076181
9/27/2018
17,232.64
Invoice No:
Customer No: 11076181
Work Request #: 70049782
Description Quantity UOM Init Amt Net Amount
Convert existing 277/480v 3Ph 1.0 EA 17,232.64 1-1,232.64
Service to a 120/208v 1Ph (200amp)
Service for Customer
owned/maintained Street Lights.
Amount Due: 17,232.64
Payment Options:
1. Check: Send payment and top section of this Pro -Forma to the address shown above.
2. For ACH/Wire Transfer or Credit card payments, contact CIAC clerk to obtain an invoice
number prior to attempting payment: Phone # 260-408-3594
a. ACH/Wire 'Transfer - Send Funds to: Sndiana Michigan Power
Citibank, N.A. New York
ABA/Routing #: 021000089
Account #: 00034403
b. Credit Card:
i. Visa, Mastercard or Discover only
ii. Transactions are limited to $1,500.00 per card per transaction
iii. Contact FiSery directly after receiving your invoice number from CIAC clerk
866-270-'7946 or www.aepTA,creceivables.com
*}* No work will be scheduled until payment has cleared ***
** Contact CIAC clerk with any billing related questions **
Date
Name
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
October 12, 2018
Roger Nawrot
Purchasing
Agreement
Professional Services
Bid Opening
Quote Opening
Change Order No.
Ease/Encroach.
Other:
Company or Vendor Name
Contract
❑ Resolution
Department
Division/Bureau
Proposal
Public Works
Engineering
❑ Bid Award ❑ Req. to Advertise
❑ Quote Award
❑ C/O & PCA No. ❑ PCA
❑ Traffic Control:
New Vendor
MBENVBE Contractor
MBE/WBE Contractor Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Addendum
❑ Title Sheet
Yes M No If Yes, Approved by
Purchasina
U MBE Lj WBE
❑ No ❑ Yes Name of Company
6777 Enterprise Drive
Light Up South Bend - COIT
404-0602-431.31-06
$17,232.64
Terms of Contract Lump Sum
Previous Amount
Current Percent of Change
New Amount
Total Percent of Change:
rsal After
Copy
Original
❑
❑
❑
❑