HomeMy WebLinkAbout07/02/1919 Board of Public Works MinutesM_ Beard met 'in regular session at 7:15 P.M. Mr. R. F. Rostiser absent. Hearing had in improvement Resolution No. 688 for the pavement on Ford Strabt from Olive, Street to a point 345 feet east of the east line of Kosc ius$ko Street, in the City Of South Bend,, Thdiana. Upon told hearing, no remonstrators§ appeared and uo- nr itten remonstrance was filed, And the ,Boa;rd being fully' adv ised in the premises desiced, that the benefits to property, liable to be assessed for said improvements are equal to the estimated .cost of the same, as reported by the City Civil Eng inee and thereupon takes final action on said resolutiton ,as originally adopted, and the same ''is hereby in all things ratified, eonf. irmed and approved. Resolved further, that -notices be published on the 14th.0 day of .Jul* 1919 and on the 219t.,, day of July 1919 in: the `south Bend Daily'Tribune in said City, stating that this Board will ree a ive b ids f or the construction of said improvements up to 10:00 A.M. on the 5th., day of August 1919. The Board reserves : the right to reject any and all bids. Hear-ing had on improvement Resolution No. 689 for the pavement an Huron Street from Meade Street to first alley as t of Kesc iusake Street, 'in the City of South Bend, Indiana, Upon said hearing a,.. remonstrators appeared hUt no written remon- h'trance was f sled.. And the Board bein;. fully advised in t)ie premises, decides that the benefits to property l{able_to be assessed for said , Improvements are b equal is the estimated cost of the same, as reported by the City Civil Engineer, an thereupon takes final action on sails resolution as originally adopted and the same. is hereby in all things ratified, confirmed and approved. Resolved further, that notices b1e published on the 14th,, day of July 1919 and on the 21st: day of July 1919 in t South Bend Daily Tribune,. said :City, stating than this Board will rocs i o bids for the construction of said improvements up to 10:00 A.M on the 5th.,. aay of August 1919. The Board reserves the right to reject any and all bids.. Hearing had on improvement res,oliation No. 680 for the pavowent. of the let. alley berth of Monroe Street from Fella Street to Lincoln Way West In the City.of South Band, Indiana. Upon said hearing no remonstrat re appeared and no written roman strance was fil ,?d-. And the Board being fully advised in the `premises, decides that the benefits to property liable to be assessed for said improvements are e equal to the estimated cost of the same, as reps ted by the City Civil Engineer, and thereupon takes final action do said resolution as originally adopted, and" the same is hereby in all things ratified, eonf d and approved. Resolved further, that notices bpublished on the 12th., day of July 1919 and on the 18th. , day of July 1910 in the South Bend Daily Tribune, stating that this Beard will receive! bids- Per: th isonstructlen of said Improve- ment up to 10:00 A.M. on the 29th., day of July 1919. The Board reserves the right to reject any and all bids, Property Owners an Birdsell Stre t appeared and remonstrated against Birdsall Street being narrowed. The Bo d read, record of proceedings and advisadppop1e;present that_ the time for fill g remonstrance was past and that they could do nothing as the regular hear had been had and the c ontreet was awarded and signed. Hearing had om improvement Resolution No. 6€36 for the Resurfacing of Van Burn Street from Portage AYenue t Lawndale Avenue andLawndale Avenue from Lincoln Warr West to Van Buren Street, under. Improvement Resolution Ne. 686. in the City of South Bend, Indiana. y of property owners; appeared and upon said hearing a majprit stated to the Board; that they were in favor, of. asphalt res . iacw but no written remon atr$nCeas filed* iled. And the Board being fully advised in th `premises, decided that.. they would defer this heart g unt.il Wednesday July .Oth.,1919. at 7;15 P.M. Hearing had - on resolution fpr resul tse iag Macadam pavement on Eddy street from La Salle Avenue to Howard Street, ' upde:r 4aprsvement . ResOlut icon No. 687 In the City of South Bend; Indiana. : —Upono said : hearing prapert8 wners appeared but -no written remon�- stranca was filed. The Board after due eonsideratisrn decided to , defer this hearing until ... .. Wednesday duly '9(h..1919.0 , 7.15 P.M. . $ear ig had on res glut ion from North Shore .Drive L®Wdkawa Avenue under tmpi City of South &rid, Iatd i"kk. ...... sr pavement, sn,North Michigan Street avement Resolution No. 669. In the Atty. Fadrabaugh (a proper( owner on Michigan Street) appeared and explained about the street car company tracks, and said that the Street car company's representative had told him that they would not pay for resurfacing but would put Is base under car tracks, as this is a private right of wady. The Board decided to defer this hearing until Wednesday JFly 9th.,1919 at 7:15 P.M. The Board agreed to notify Mr. R.. R. Smith Mgr. of the Chicago, tat South Bend & Northern Indiana Railway Company to be prewsent 6b meeting to be held Wednesday July 9th.,1919 at 7:15 P.M. in regard to dieoto4lig permanent improvement on North Michigan Street. Pseperty ©w7tere residing o Seventeen th Street appeared before the Board in regard to water mains. The Board sd ised them that,water mains would be put in on Seventeenth Street just as soon as the aeessary pipe was secured. Benjamin F. Page of 1522 SQL. Ms in Street Lot Nei 23 Elder Place Addition on Elder Street appeared before the Board in regard to rebate for water c onnect ion on above mentioned lot. The Board ad r ad Mr. Paege to pay assessment abd the Board would refund the price of $18.75 t ough the Water department. The Board ordered res glut i ns prepared for pipe sewers on George Avenue and on St. Peter Street. Petition filed by Andrew Ni Hildebrand for pavement of alley between Wenger Street and Pennsylvania Avenue and 2nd alley East Of Fellows Street* The Board ordered a resolut ivn prepared on same. Financial report of the Ci y Cemetery Sexton received , read and placed on. file. f� The Board ordered the central Union Telephone Company notified to reset to the south a pole owned by their compw which stands in the way of an entrance. to garage at 234 Chapin Street. Also to to remover entirely any wire which is in the way of a new garage door a t 236 E. Paris Street. The following bonds and contracts were approved by the Bard. PUBLIC IIIQ'ROVEMUT COST TRACT. , This agromnent, .Made and entered into this 2nd. day of July 1919 by and between The Western Construction Company df the County of St. Joseph an State of Indiana(hereinafter referred to as the " Contracter"), and the City of South. Bead, in the 'County of St• Jssoph, and 'Stater of Ind`isne, by and through Its' :Beard of Public *Works,, (hereinafter referred to as the " City") under, and by virtue of an Act • of the General Assembly of the .State of Indiana, entitled " An Act C one ern ing Municipal Co>rpsrat i na ` " approved March 6,1905, and all amendatory and supplemental sets thereto: Witnesseth,cthat-the contractor covenants and agrees to construct Shut Asphalt pavmment on Walnut Street from Ditiis ion Street. to Semple Straot in the City of South Bend Indiana at and for tl a following prices:- cugr er Lix! ....�•..••..•.•.••. •3 2373 cu. yds of grad �er cu. ... • ... , • ....... •.. 10 storm grates, each.............;...........,i..•.•.•9.00 260 tin. f*et .sf conduit pipe, per tin ft............ • • 81 22 inlets reset,- each ................................ 2.04 380 11n. feat of marginal curb, per 1 in ft..... • . • ... .20 6 manholes reset each........... ..................... 2.00 9092 sq. yds. '©f Trinidad Lake Shoot Asphalt pavement per sq. yd........:..... 2.70 old to perform all work in the prosecution of said improvement under and according to the terme arrd cent • (( , ditions of Improvement Rresolution No. __ 617Q---_--_--_, adopted by the Board of .Public Works., AM i1�0- 39 and the,plans, profile and specifications on. file in the office c 4 the Department of Public Works; WYI 1�sai� tesohttiori, glans rofil and specifications are made apart hereot. as fully and effectually as isf copied set out herein at #aft length. The contractor further expressiv covenants and agrees that ir} the prosp�utinri of saie# skill and care s �isl be exercise,; that he 1=-on�r'� l ^�t all excavations anti d --ill use -it dangerous places and due a+,3 p-.�Pr nr�ca `.io11 to+T�r'v� t ±.1w •1 V person OT 1" Y_i-* 't -arty injury or.dama a resulting frrrn the .�;�---"nr r: - t• »� g $ , f ''n> a yr: ,+*Pr or 11i"Ier e'orS;^"t• 4l ther-ewi or arising therefrom, ro.any pers� i or property, he_ . ll n-wv a.., • li ; idate the senme at .�7s otivn ex Fuse, and as: sume the -liability therefor- arid: in the event of a.n mil. ' $"� y . a: e o laiiris bang made or any ac ion or actions beit3g brought against the city by. reaso.z or on account of or gro :'rig out of slid ���or . or->fis eetrt+orlon, th® said contractor will at his own expense defend the same, and will pay any judgment recovery Cheretn, n$ _vt, all respects fully indemnify and save=harmless said city, its fficers; agents or representatives from all cast expense, payyment or judgment recovered in connection wit 'such claim or claims, actions ox,actions, Aria within tort days aftar any such action is begun, the city shal notify the contractor oi'tee:pest�ieney there then any judgment rendered against the city shall be conch± ive against the contractor and against the surety an his construction bond, as. to th - amount, liability and: oth r maxters pertaining thereto. And the epproctor sgreas to maintain said im, rovcme t a,(i make such repairs as may be necessary fc,, �wrjp and j1S the fnanrter ass fixed by the sDPci`tca+ions, nd to secure t:ie maintenance and repair theroi With 016 206114- of Public Works' a bond c,,:th su:yzcie at surety thereon and in an amount as fixed by the sPLet`iA6oti613i, And in doing such repair work the contractot and the surety on his guarantee bond shall be lub)"t4® the 68ttia fability to the City and any other persolL for any injury or damage -to any pers;rn or prop- MY 16 the 94100MAnner and to the same extent as is fixed •n the last preceding paragra struatph covering the c9rt= ll" Work old It IN further agreed by and between said parties that the acceptance .of the work provided for in this 0001PA41t OF the p8yritent thereof, iha,11 vt constitute a aiver } �: the part of the city o any of the provis= iOhs W thig c®lltract, nor ®half it rijleaae said contractor or the sureties on his bond for the -faithful perform - AM thlPcof ; nor s,.all the acceptant F e be prima 'facie e�ri 'epee of the per,ormance of any provision of this ®pins e s h.rpt to the extent of erttitlirlg the contractor t the contract price therefor. The t ® tr&ct®r a tees to pay for all labor and materials used or furnished to be used in the making t lx: ��� a r�s,_._� �� if in the performance of this contract, g t, whether done or furnished for him, or his agent, 8l1§i @at etlgti@190t' 0r 88bcont&aor; and the city mP-y reserve out of any allowance made on any estimate Of ilia etaitra.ctor or • `, ikssigns, or out of the am unt due hint or his assigns upon the eompletiou of tht Work, 90 rough as ma-.,-cessary to pay all laborers or materiai men for amounts due theft for W%?a d§R% ur Materials wse� ;:, .4ralshed to be used in the performance of this contract and the doing of 94.14 W004 &VA tht li-,fadftty treasunr, acting as city treasurer, may retain money coVacted from property A It a nsstt tt said tnprovemexrt to pay such debts o until the contractor shows that they hiye bet ' Mid ft %ati$if@d ' , a9- e: to remo all rub);yh, earth, and unt:sed material in the streets or sides _, upon the completion of the imnrovem!ngt or the repairing thereof. The work of makiri such imp rovement p, wement shall be co before a co di tot s of this contract on or bef©re the 2Atia- vci09der --•-------•------------ ----- -----day of--- -- un less, the. time for the com+ile*ion of the 5a? e shall be Py+..............................' 1 ........... 9 And it is agreed that extended in vvr t; b the Board of Public Wo. s g any 'lipl ion o i the of +;me + y rl' . od of doing such work sh�'ll.in r:o wayaffect the or any alterrition of this contract or of the manner or meth ties. duties, obligations or liabilities of the contractor or his sure - It is agreed that the contractor shall he don, hereunder, wihor t the not l.ssign this C< :t act, or sub -let" the work or any part thereof to nit ^n co..: -t of the It is further agreed a::d sti u z:_-d the Boa- "' P;-blie Works." preference in the em to r^cnt of �1 la or :,e eoy`zactor shall rive to residents of -said city and county p y ° c...,sai t7 the rfor�, a.rce of this contract, and failing to do so, shall forfeit to the city the sum of ten dollars for each" failure,-ko observe this stipulation. And'_upon'the' performance of all the tennis and conditions of this contract, and "things to be done and performed by said contractor the said city agrees to cause the cost ei doing such work to be assessed, col- lected and paid to said contractor in the anner fixed by the statute governing the making of such improve- ments._ To each of the conditions and stipulations of this -contract; including all and singular the provisions and terms of the plans, profile, specifications and resolution aforesaid, the undersigned binds himself or itself, and the respective successor or assigns of such parties. _. 1 In Testimony Whereof, We, the foregoing named parties, hereunto set our hands this 2nd. day of July 1919 . C ITY OF SOUTH BEND, INDIANA. BY G.A. ELLIOTT Its - Board of Pub 1 is Works. CONSTRUCTION BOND. THE WESTERN CONSTRUCTION COMPANY 'RED RANKERT , Pros. "Know all men by these presents, That we The Western Construction Company of the County of St. Joseph , State of Indiana. as principal and The Aetna Casualty SSW and Surety Company of Hartfifird, Cenneciicut as sureties, are held and flrtsly bound lto the City of South Bend, Indiana, in the sum of Thirteen Thousand Five Hundred " and sixty six Dollars ($13, 566. o0) for the paymeat of which, well and truly to be made we jointly and severally bind ourselves, our heirs, executors, administrators and assigns,, firmly by these presents, The conditions of theoobll. Lion are such that if the above bound The Western Construction Company shall faithfully I 'omply with the foregoing contract, made and entered into the 2nd. day of July 1919 wi h the City of South Bend, Indiana,, - and shall fulfill all the conditions and stipulations herein contained, according to the true intent and meaning thereof, in all respects, Zhen this obligation to be void, otherwise to be and remain in full force and virtuI in law. In the event the said City, shall extend the time for the completion of said work, such extension shall not in any way release the sureties on this bond. This shall be a eonstrueti,n bond, and the sureties on the same shall ins not be held responsible- for the maintenance and repair of the improvement after it has been accepted by the second :arty, bu such sureties shall be hold responsible for the faithful compliance with all other conduti na, stipulations, and requirements coverer by or set out in the contract. Witness our hands and seals THE AST NA CASUALTY - be SURETY CO. BY WILLIAM E. GELTZ ATTEST: - . Frank H. Dunnahoo, Attorney in fact. The above bond approved this G. A. ELLIOTT J-IOHN P. DEHAVEN Board of Public Works. PUBLIC IMPROVEMENT a 2nd.day- of July 1919. • THE WESTERN CONSTRUCTION COMPANY Fred Rankert, President. day of July .1919. ..This agreement, Made and entered into this second #6y of July 1919 bynand between The Western Construction -Company of the County of St. Joseph and State of Indiana (hereinafter referred to s the " Contra for"), and the City of South Bend,, in the County of St Joseph,, -and State of Indiana, by and through its Beard of Public Works(hereinafter referred to as th& ":City"), under and by *irtue of an Act of the General assembly of the State of Indiana, ent itled. " An Act Concerning Municipal Corporations approved March 6,1005, and all amendatory,. and supp emental opts thereto: - ' Witnesseth, that the contra:Jan r covenants and agrees to constructed: shoot asphalt, pavement on Allen Street,, from, Va7i Street tto Portage, Avenue, in the City of South .Bend, Indiana at and for the f of lowing prices:- eurbing.-per lin i°t........:..:.:.......................32 1628 cu..-yde. of grading per cu. yd............... *go 12 storm grates, each,.. ...... ................:...9.00 112 lin. feet of conduit pipe, `per linft049640.0649000 .80 6 inlets reset, each .......... ....�............... 2.00 220 l in. feet of marginal curb; per' l in ft..... , .: $. 20 6 marshaled reset, each,.......................2..Q0 6780Sq. yds. of Trinidad LakeSheet Asphalt o . pavement per s q� yc1 ..... ............ 2. 63 4.94 W pgrf i all work in the prosecution of said improvement under and accorditq to the twrma aid t on— ditiO4a of I>fprov eot Itesollition No. ._..... __, adopted by the Board of Public- Werlra....,�A,'r il,,, 019 9nd she VlaM, profile ar-d specifications on file , the office of the Department of Public Work�� �l�zPh s € oh -aloe, plan§, rofilt and specifications are made a part Hereof as fully and effectually as ij copi/d &ad go further e'=tpresply covenan•s and agr es that in the rospcution of saltl work l*1l , .to !f All l at <f care 'll be e, irc'All ea;rsvations a'1El daft cr®t1a ayC a field ' ell (We F d p� 'per ter +o i to or�v ,,t inn . y `') ;,` v person rr � • +}�r61'; tM�t i �t`�P# 0 �t Q air#'�1°3%rptlai�e ra3t i'1 gE 1 tillSV Or r r z r frnn1 c< y tr :e`er or thi,1 Pf1ni.'^kfi� tl4.e arltiilt tbPrefrotn, o an. era -a or ro art 1 rt 411 r P. n lit¢ .i rh ri��'ri or y la °p• P y, � _ y .date tk+a sa+fie at his own expenll4 _ 914rNi ThqE liability Cher-io. „arch jn_t:he event.of or 01. its being made or ally, action or lwk li t; 1 bf figfi°n7t the city by Qisoa or on a.C.Coulit of. or g•rovaulg out of s^.id w arl or its cor gction @®ittr4f or will at his own; expense defend the same, and iay any jud metit recovered therein, n fill .wts fully. indemnify and save harmless said city, its . fiicersc, agents o i:�r representatives from all C 0 @n@e, payif?ent or judgment recovered in connection with such Flaim or claims, action or actions, And within t@fl days after any such action is •begun ; the city shall notify the contractor of tkCfeiidency t>'tore then airy jiid lest rendered against the city shall be conclusive,against the contractor and &pisu%the sup on We wa$trUction bond, as to tb amount, liabili* and other (natters pertaining ,thereto, And the contractor a leas to maintain4aid.improJ ment:aL,d rnake such repairs as may be necessdiy the period and in the "manner as fixed by the ssa,-cifications, avid to sec-ure_. Le maintenance,.and repair tnereoi c to file with 6e Board of Public Works a'bond WAh su.Tcient surety thereon and in an amount as Lced by the . `pecifteatiphs, And iri. doing such repair work the contractor and the surety on his guarantee bond,shall be subject tg_the same liability to the city and any other person for any injury or damage to any pers>n or prop- erty in the same manner and -to the same'extert as -is fixed in the last preceding paragraph covering the con- struction work. Arid it is ,further agreed by and between said parties that the acceptance of the work provided for in this contract, or the payment thereof, shall not constitute a waiver on the part of the city of any of the provis- ions of this contract, nor, shall it release said contractor or the sureties .on his,bond for the faithful perforrm Alice thereof; nor shall the acceptance be prima facie evidence of the performance of any provision of this cdntraet; except to the extent of entitling the contractor to the contract price therefor. The contractor agrees to pay for all labor and materials used or furnished to be used in the making of such improveme:it and in.the performance of phis contract, whether done or furnished for him, or his itgerit, assignee, successor or subcontractor; and the city may reserve out of any allowance made on any tstirmate_ in favor of the contractor or ' assigns, or out of the -mount due 'him or his assigns upon the eompletici i' of the work, so much as me- cessary to pay all labore s or materiai men for amounts due them for work done or materials use4 -4rnished to °be"used in the .performance of this contract and the doing of quid "work, and the county trecaurer, acting as city treasuifer, may retain money oclieeted_ frbm property ownera assaessed for said improvement to pay such debts or until the contractor shows that they have het ti 11Me1 or wished i 2g:-_eS to remo--w all ru --ish, earth, arA unt-sed material in the strr,,�ts or Sit,=, apou the cotripletion of the iir-provem:mt or the repairing thereof. The work of mskin such improvement" shall be comple*ed accordirg tot the of this coiitrAO. t«; e before the......,_.. — lids -- • - - -- day of .aQtt-K Ar... A A .......................... 19,....,., 4 unless the time for the completion of the sat~e shall b_ extended in writing by the Board of Public Worlu, And it is agreed th-,tt ar,.y such eKtenGion of tine, or any alto a*ion of this' contract or of the manner or in(,01m oil of 4oing su,:h I -work shall in i c> way affect the duties, obli 7ations or liabilities of the contractor_ or his sufe i ties. . It is agreed that the contractor shall not assign this contra..ct, or sub -let the work or any part therp.of to be done heremider, without the ;._i.,en co:` :_ . e of the Board of Ps_blic Works. It is further agreed and szirul2 -A `'gat'' contractor shall give to residents df-said city and county nc:n ►reference in the employrt of all labor i:�cn_ssary in the )erforma.nce of this coritraet, and failing to do so, shall forfeit to the city the sum of ten dollars for each failure to observe this stipulation. And upon the performance of all the terms and conditil ns of this contract, and things to be done and perforraed by said contractor the said city agrees to cause Phe cost of doing such work to be assessed, col- lected and paid to said contractor in the manner fixed by the statute governing the making of such improve. meats. To each of the conditions and stipulations of this contract, including all and singular the provisions and terms of the plans, profile, specifications and resolution aforesaid, the undergigned binds himself or itself, and the respective successor or assigns of such parties, In Testimony Whereof, We, the foregoing named Dart ieip herein set our hands -this 2nd. day of July 1919i THE WESTERN CONSTRUCTION . 00. CITY OF SOUTH BEND, IND IANA. ( FRED RANMT, Pz*tj ideat BY G. A. ELLIOTT Its Board of Public Works. r 0 p CONSTRUCTION BOND. ° ° Know all men- by these presents, That we,- The Western* Construction Company of the Coutuy of St. Joseph, State of Indiolta and the Aetna Clasualty & Surety Company of Hartford, Connecticut, as sureties; arehold and firmly bound to the City of South Bend, Ind ian°s, in ' the =sum of Nine Thousand Ei.ght� hundred' end seventy two Dohlara ($99872.00) tot the payment of which, well amd truly to be made,,.we jointly and severally b ind oursolVes, our heirs, executors, admis.istriktors and assigns, firmly" by these presents The c sitWdi ions of the abl igat ion are such that if the above bsuxd Tho Web -tern COnstiouct ibn from any shall falthfully comply with. tho ' for®g s.g contract, made and entered ia►ta: the- 2nd.' d6y. of July lglg with the City of South Bend;_, Indiana, and shill. fulfill all the conditions and stipulations therein contained, &&Cording to the true intent, and meaning thereof, in all respee a, then this obligation to be void, otherwise to be and remain in full farce and virtue 'in lair. 'In the'event- the said City shall extend the time for the completion of said w�rk, such extension shall net in any way release- the sureties an this bond. ! - This shall be a construction b0imi and the sureties on the same shall not be held responsible for the ma intenanca and repair of the improvement after it has been accepted by the second party, but such sureti s shall be held responsible for the faithfull compliance with all other conditions, stipulations and requirements covered by or set out in the contract. Witness our hands end seals this 2nd.. day of July 1919. THE AETNA CASUALTY 8e SURETY COMPANY BY WILLIAM E. GELTZ Attorney in fact. ATTESTED: - Frank R. Dunnahoo, Attorney in fact. The above bond approved this G. A. ELLIOTT Board of Public Works. THE WESTERN CONSTRUCTION COMPANY FRED RANKERT, Pros . day of July 19190 _43 Board met In special session at 2:00 PAY- Mr. H. P. Rostiser absent. CoAcerning -the improvement of the roadway of Califormis Avenue from Portage Avenue to .Blaine Avenue In,pursuance to Resolution Yo6 666 the Board finds.that no petit Ion has been filed with said Board by ik ma4erity in number of the freeholders residing on said st'eet to be Improved requesting that it be Improved with a,&:Lrrarent kind of pavement than the kind he'reto.fore, a4opted, by, the Board In Its preliminary order; and the City Enginper reports . that Will istol,i:Cans truction Company is the lowest and beat bidder for -the kind ofpsvement heretofore adopted by the -Board, said the Board find that said Williston Cortstruction Company Is t�e lowest and beat bidder and; hereby lots the contract for said Improvement to him, and;erdere that said Improvement be mad* with Mexican Miaot Asphalt and all .proceed ings hareliofore had in this matter are hereby confirmed and rat if 176d. BOARD OF PUBLIC WORKS G.- A. ELLIOTT JOHN.F.. DERAVEN Attested: - Veronica C. Sweeney, .-,Clark of 'the Board. Dated this lot. day of July 1919. .kl CioncernIng the Imprbvement of the roadway of Bartlett Street; from Michigan Street' to Lafayette Blvd. In pursuance toy Resolution No. 668. the Boa6d finds that no petition has been flied with said Board by a major itylin number of the freeholders residing on said street to tie Improved requesting that it be,improved with, a,differn6t kin of pavement th&3f the kind heretofore` adopted b :tbW Board -An its preliminary order; and the City Engineer reports that The W17111ston. C notructlai Company Is'the lowest and best bidder for the kind of pavement heretofore ad - pied by the Board, and the Board find that said Williston Construction Company'is the lowest 7d beat bidder and hereby lots the contract for said Impr-ovoment ;to him.- ai2d orders tast said improvement be made with Mexican Asphaltic c mcrete and all proceedings ber)tofore had in this matter are hereby confirmed and ratified. ELLIOTT A. BOARD OF PUBLIC RKS. G. 61 JOHN F.-DERAVEN Attested:- Varcinict C. Sweeney, Clerk of the'Boarde Dated this lot'.* day- of July 1919F.