HomeMy WebLinkAboutOpening of Bids - Three Twenty at the Cascade Exterior Insulation and Finish System - Project No 118-074B - Gibson Lewis LLCDate: Project Name Three Twenty at the Cascade— Exterior Insulation and Finish System Project No. 118-074 B For Bids Due October 9, 201'8 PART I (Must be completed for all bids. Please type or print) 10/9/18 Bidder (Firm): Gibson -Lewis, LLC Address: 1001 W. I I th Street City/State/Zip: Mishawaka, IN 46544 Telephone Number: _L574 ) 259-8581 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Three Twenty at The Cascade - Exterior Insulation and Finish the City of South Bend, Indiana, in accordance with, plans and specifications prepared by: Panzica Building Corporation, 416 E Monroe Street, STE 320, South Bend, IN 46601 and dated September 2018 - for the sum of (enter the Total Bid as shown on the Proposal) Four Hundred Eighty -Seven Thousand Two Hundred Fifty -Three Dollars ($ 487,253.00 (Enter sum of Total Base Bid' shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend, If the bid is to be awarded on a unit basis, the itemization of the units shall be shown onv6 , �sarate attachment. By F / (Signature) Robert A. Lingenfolter, President (Printed Name of Person signing) ACCEPTANCE The above bid is accepted this day of 20 Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Suzanna M. Fritzberg, Member Elizabeth, A. Maradik, Member Therese J. Dorau, Member James A. Mueller, Member Attest: Lind'a M. Martin, Clerk Version 7/20/2018 Contractor's Bid for Public Works - 2 Project Name: Project Number: For Bids Due: Contractor Name: BASE BID BIDIPROPOSAL CITY OF SOUTH BEND Three Twenty at the Cascade — Exterior Insulation and Finish System 118-074 B October 9, 2018 Gibson -Lewis, LLC Item No. Description Quantity Unit Uit Price Total Amount 1 Exterior Insulation and Finish System a. Texture #1 (Accent Band Levell & Rf) 3,668 SF b. Texture #2 (Main Body Levels 2-7) 6,148 &F c. Texture #3 (Horiz. Band at Firs/ Roof) 636 &F d, Texture #4 (Vertical Wave Pattern) 915 SF e. Texture #5 (Metallic at Entry Arch) 824 SF Bidder (Firm); Mi 151 City/State/zip Gibson -Lewis, LLC 1001 W. I I tb Street Mishawaka, IN 46544 *Does not include Drive Thru Canopy ** 3D Wave and Metallic are Fedderlite Panels Exclude metal flashing and scuppers BASE BID TOTAL 487,253,0O Telephone Number: ( 574 259-8581 By (Signature,) Robert A. Lingenfelter, President (Printed Name of Person Signing) Version 7/20/2018 Contractor's Bid for Public Works - 7 When the prospective Contractor is unable to certify to any of the statements beloov, it shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF INDIANA ) ) SS: ST. JOSEPH COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded fom participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. Version 7/20/2018 Contractor's Bid for Public Works - 4 Bidder; Gibson -Lewis, LLC 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien, Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6, Persons, partnerships, corporations, associations, or joint ventures awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United. States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 7/20/2018 Contractor's Bid for Public Works - 5 rnay result in forfeiture of contractual payinents. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 9th day of October , 20 18 Gibson -Lewis, LLC Contractor Bidder (Firm) Signature of Contractor/Bidder or Its Agent Robert A. Lingenfelter, President Printed Name and Title Subscribed and sworn to before me this 'nth ,by of October 2018 My Commission Expires 08/05/2023 11 �_", .., I �_frhlo o w=ni , ec Irk No ry Public, County of Residence St. Joseph Version 7/20/2018 Contractor's Bid for Public Works - 6 '14q, 1 U VV PHONE 574/2.35-92.51 227 MlJEHERSON 1301 11,RVAM) k I -A X 574/ 235-917 S0I1'11 I N"0% I NIOMNA,16001-1 930 TDT) 5741235-5567 Crry o�-'Sou'n I BEND PUIT�_: BUTTIGIRG, MAYOR BOARD OF PUBLIC WORKS Date: September 27, 2018 , I , 0: All Plan Holders From Linda M. Martin, Clerk, Board of Public Works Sub' ject Addendurn Number: I Project Narne: Three Twenty at the Cascade — Exterior Insulation and Finish System, Project Number: 1118-074 B ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 9/27/18 This addendurn is being fbi,warded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Company. Gibson -Lewis, LLC Authorized Signature,. on Version 4/212015 Re—rt A. —Lingenfelter, President 10/9/18 13 1O Cou.,o-y-Crry BUILDING 727 W. JEFFERSON BOIJI EVARD ,Sol 17 11 [IFNI), INDI ANA 46601-1830 NIONE ' 574/ 235-925 1 FAX 574/ 235-91,71 TDD 5 74/ 235-5567 C11),o+'Som1rBi,'.Ni) Pi;, rr, Bt rr-ri(iiii(i, MAYOR BOARD OF PUBLIC WORKS Date: October 2, 2018 To: All Plan Holders From Linda M. Martin, Cli Subject Addendum Number: F1 Board of Public Works Project Name: Three Twenty at the Cascade — Exterior Insulation and Finish System Project Number: 11 B-074 B ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: 10/2/18 This addendum is being forwarded to you flor the above referenced project, Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-91,71 within 48 hours of receipt. A copy iN1.JST also be included with your bid package upon submittal. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herei6. Company: Gibson -Lewis, LLC Authorized Signature: Date: Versioti 4/2/2015 Rober(A. Lingenfelter, President 10/2/18 1316 COUNTY -CITY BUILDING 227 W. kiry msoN BOULEVARD $0i011 INN[). INDIANA 40.001-1830 CITY OF SOUTH BEND PETS BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS September 5, 2018 Mr. Robert Lingenfelter Gibson -Lewis, LLC 1001 W. 11 to Street Mishawaka, IN 46544 RE: Pre -Qualification Verification Dear Mr. Lingenfelter: PHONE 574/235-9251 FAx 574/ 235-9171 This letter serves as verification of Pre -Qualification status of your company for bidding with the City of South Bend. This Pre -Qualification status is effective for twelve (12) months from the date of this letter. Thereafter you are required to re -submit a complete application for continuation of pre -qualification status prior to December 31 for the upcoming calendar year. A copy of this Verification Letter must be included with every bid exceeding $150,000 submitted to the City of South Bend Board of Public Works, along with your Pre -Qualified Bidder Checklist and attachments. If you have any further questions regarding this matter, please call this office at (574) 235-9251. Sincerely, Linda M. Martin, Clerk OARY A. 611,01' DAVID P. ItIims EE:IZAIM!I1i A, MAKAINK Mmr.&A. Mul31:,1.1'.R '1`1-iri1 nsE J. DORAU Document A31 OTA —2010 L-,onforms with The American Institute of Architects AIA Document 310 CONTRACTOR: (Name, legal status and address) Gibson -Lewis, LLC IGO 1 West 11 th Street Mishawaka, IIN 465,44 OWNER: (Name, legal status and address) City of South Bend 227 West Jefferson Uvd, South Bend, IN 46601 Bond Number; 03992-CNA-18-162 SURETY: (Name, legal status and principal place of business) The Continental Insurance Company 151 N Franklin Street Chicago, IL 60606 State of inc: Pennsylvania BOND AMOUNT: Five Percent of Amount Bid (5%) (Name, location or address, and Project nitinber, if any) Three Twenty at the Cascade - Exterior Insulation and Finish System This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the: Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days, If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to cornply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. "S ned and sealed this 5th, day of October 2018 ned and sealed Gibson -Lewis, LLC (Principal) (Seal) trees (Title) Juli Hodowaniec! I �* (Title) Robert A. Li—nkenfelter, President The Contin,nt,l,*ulurance Company (Seal�i (Surety� (Witness) (TitleYeKathy L. DelGreco, Attorney -in -Fact STATE OF MICHIGAN COUNTY OF OAKLAND On this,�;t>"/? day of 2018, before me personally came Kathy L. DelGreco who, being by me duly sworn, did depose and say that she is an Attorney -in -Fact of the The Continental Insurance Company and knows the corporate seal thereof-, that the seal affixed to said annexed instrument is such corporate seal, and was thereto affixed by authority of the Power of Attorney of said Company, of which a Certified Copy is hereto attached, and that she signed said instrument as an Attorney - in -Fact of said Company by like authority. My Commission Expires Jamie M Laurencelle Notary Public, Oakland County, Michigan My Commission Expires: February 2, 2024 Aelmowledged andSworn to before me on the date above written (Xo?qiy1Pub1ic) POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT V,vtakv All Mort By These Presents, That The Gantinental Insurance Company, a Pennsylvania insurance oompaoy, is a duly organized and oxisting insurance company having its principal officp in the City of Chicago, and State of Illinois, and that it does by virtue oftlic, signature and seal herein affixed hereby knalke, mnstitu(c and afypoiot Kathy L. DelGreco , 1)ndkddua4lV of Southfield, MI , its true and lawful Attorney(s)-in-Fact wiffi CoU power and authority hereby con6erred to sign, seal and ex.ccule bor and on its behalf bonds, undcrtakings and other obligatory instruments of similar nature — In Unlimited Amounts -- Surety Bond Nurnbpv: 03992-CNA-18-162 Principal: Gibson -Lewis, LLC Obhgce: City of South Bend and to bind them thereby as fully mid to the same extent as if such instruments were signed by a duty authorized officer of the insurance company and all the acts of said Attoravy, pursuant to the authority hereby given is hereby ratified and confirmed, This Power of Attorney is tua& and executed pursuant to and by authority of the By -Law and RcsoWtions, printed on the reverse hereof, duly adopted, as indicated, by the Board of Directors of the insurance company. In Wi0pers. Where6f, The Continental Insurance Company has caused these presents to be signed by its Vice President and its corporate seal to be hereto afflixed on this 3rd day of June, 2015. The Continental Insurance Company M Paul 'U', Bruflat ice President State of South Dakota, County of Minnehaha, ss: On this 3rd day of June, 2015, before me personally came Paul T. Bruflat to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is a Vice President of The Continental Insurance Company, a Pennsylvania insurance company, described in and which executed the above instrument; that he knows the seal of said insurance company; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said insurance company and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said insurance company. 6, EICH SetNOTARY Funtic SOL11H 000"A My Commission Expires February 12, 2021 CERTIFICATE Notary Public 1, D. Bult, Assistant Secretary of The Continental Insurance Company, a Pennsylvania insurance company, do hereby certify that the Power of Attorney herein above set forth is still in force, and further certify that the By -Law and Resolution of the Board of Directors of the insurance company printed on the reverse hereof is still in force., In testimony whereof I have hereunto subscribed my name and atExed the seal ofthe said insurance company this 5th day or October , 2018 , The Continental Insurance Company WM 0 a S UL D, Bulttttly Faun F6850-4-20N Bidder: Gibson -Lewis, LLC PART it (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. *Please see attached Financial Statement Version 7/20/2018 Contractor's Bid for Public Works - 3 ACCEPTANCE The above bid is accepted this day of subject to the following conditions: Contracting Authority Members: PART II (For projects of $150,000 or more — /C 36-1-12-4) Governmental Unit: City of South Bend, Indiana Bidder (Firm) Gibson -Lewis, LLC Date (month, day, year); October 9, 2018 These statements to be submitted under oath by each bidder with and as a part of his bid, Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1.. What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? Contract Amount Class of Work Completion Date Name and Address of Owner 3,175,000.00 2017 Michigan City Prison- Michigan City, IN 1,880,000.00 2017 LaPorte Public Library - LaPorte, IN 4,830,000.00 2017 VA Outpatient Clinic - Mishawaka, IN 1,780,000.00 2017 Rolling Prairie Library - Rolling Prairie, IN 2. What public works projects are now in process of construction by your organization? Contract Amount Class of Work Expected Completion Date Name and Address of Owner 2,543,000.00 2018 ND McCourtney - Notre Dame, IN 3,796,000.00 2018 Charles Black Center - South Bend, IN 3,057,000.00 2019 ND Hesburgh Phase 4 - Notre Dame, IN 4,261,000.00 2020 Columbia City HS - Columbia City, IN Bidder: Gibson -Lewis, LLC Have you ever failed to complete any work awarded to you? No If so, where and why? List references from private firms for which you have performed work. University of Notre Dame - Notre Dame, Indiana Memorial Hospital of South Bend - South Bend, Indiana St. Joseph Regional Medical Center - South Bend, Indiana 1st Source Bank - South Bend, Indiana SECTION I) PLAN AND EQUIPMENT QUESTIONNAIRE Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the governmental unit to consider your bid.) Apply adequate personnel to complete the work Z Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. Please see attached listing SELECTED SUBS FOR FORM 96 RV SUTTON, INC, EXCAVATING RITSCHARD BROS,, INC. 150 W RAIL ROAD UNIT 1 1204 W SAMPLE STREET CHESTERTON, IN 46304 SOUTH BEND, IN 46619 WALSH & KELLY PAVING RIETH RILEY CONSTRUCTION 24358 STATE ROAD 23 25200 STATE ROAD 23 SOUTH BEND, IN 46614 SOUTH BEND, IN 46614 ZIOLKOWSKI CONSTRUCTION MASONRY MCL.AUGHLIN MASONRY 1005 S LAFAYETf'E STREET 56110 TIMOTHY ROAD SOUTH BEND, IN 46601 NEW CARLISLE, IN 46552 STEVENS IRON WORKS, INC STRUCTURAL 5TEEL CRANE INDUSTRIAL SERVICES P0, BOX 730 11035 ANDERSON ROAD DEMOTTE, IN 46310 GRANGER, IN 46530 EC BABILLA ROOFING DUDECK ROOFING & SHEET METAL 3974 HARRISON STREET 1634 SOUTH FRANKLIN STREET GARY, IN 46409 SOUTH BEND, IN 46614 WERNTZ SUPPLY GLASS & GLAZING PRECISION WALL 1002 KERR STREET 3801 S MAIN STREET SOUTH BEND, IN 46601 SOUTH BEND, IN 46614 OVERHEAD DOOR COMPANY OVERHEAD DOOR INDUSTRIAL DOOR OF NORTHERN IN P.O. BOX 907 3839 S. MAIN STREET MISHAWAKA, IN 46546 SOUTH BEND, IN 46614 MASTER TILE FLOORING INTERIOR FINISHES, INC. 1205 WEST LINCOLN HIGHWAY 1616 W THIRD STREET MERRILLVILLE, IN 46410 OSCEOLA, IN 46561 KROPP FIRE PROTECTION FIRE PROTECTION RYAN FIRE PROTECTION 59685 MARKET STREET 9T40 EAST 148TH STREET SOUTH BEND, IN 46614 NOBLESVILLE, IN 46060 DA DODD, INC PLUMBING & HVAC EDWARD J WHITE P.O. BOX 430 1011 S. MICHIGAN STREET" ROLLING PRAIRIE, IN 46371 SOUTH BEND. IN 46601 MARTELL. ELECTRIC ELECTRIC MCMANN ELECTRIC, INC 4601 CLEVELAND ROAD 1454 THIRD STREET SOUTH BEND, IN 46628 OSCEOLA, IN 46561 Bidder: Gibson -Lewis, LLC 3.: If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor on the proposed project. Unresolved 4.. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors may also be required to be listed by the governmental unit. All necessary 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, please explain the rationale used which would corroborate the prices listed. m SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement Is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the governing body awarding the contract must be specific enough in detail so that said governing body can make a proper determination of the bidder's capability for completing the project if awarded. *Please see attached Financial Statement LLI Cl) R 0. w Lu z I-- Lij Z co w 0 =) w �- 0 z Z (1) 7) W 0 CO 13. 0 �z i w ui C5 5 � 0 La z 0 Z 5 z 2 CL IL w 0 LL w & 0 0 a 1= 4) m E 0 m 0 m� LJJ 'c: 0 uj co 5-- 0 0 > Q Cr 0) (L 0 -V 0 0 E 0 0 0) CL r E0 0 0) 0 4— 0 0 E .0 'a An CL';+ 4R C 03 X: tU > a V c 5 0 0 CL 0 E .2 L. 0 40 0 o r "a 0 0-0 T = 0 w E m z dlm 0' To 9 co E :3 Z a) a) I ff "a CL m 0) Lo 0 a 2 d IDC ID 0 CL E 0 0 E C) < LU 0 ca (47 '0 0! w (D 0 0 a:3 0 CL ca CL ca ql E Z— Lrl fp atS z 'WI m E ci 0) co - 0 0 0 0 M.* I VO CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY p:nesmgr ore "4, DEVELOPMENT PROGRAMw FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS unas This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 118-074 B Date: Project Name: Bidder: Contact Person: Address: City: 10/9/18 Three TwenV at the Cascade — Exterior Insulation and Finish System Gibson -Lewis, LLC Robert A. Lingenfelter, President 1001 W. 1 Ith Street Mishawaka State: IN Email: rlingenfelter@gl.nceusa.coin Telephone: 574-259-8581 Zip 46544 To determine whether a bidder has demonstrated good faith efforts to reach the MBEMIBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISEICONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBEIWBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBEIWBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. **Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBEMIBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBEIWBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBEMIBE that has bid on the subcontracting opportunity, 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBEIWBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 7/20/2018 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND o,k MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM V FORM MWBE-2.1 MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bond Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE OF Project Number: 11118-074B MBE/WBE Participation Goal Project Name: Three Twenty at the Cascade — Exterior Insulation and Finish System Bidder, Gibson -Lewis, LLC By; Robert A. Lingenfelter, President 10/9/18 4(1 'nature) (Title) (Date) MBE/WBE Firm, Owner or Contact at IMBE/WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: MBE/WBE Firm Owner or Contact at MBE/WBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEANBE FIRM: Version 7/2012018 Contractor's Bid for Public Works - 10 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Three Twenty at the Cascade —Exterior Insulation and Finish System Project No. For Bids Due 118-074 B October 9, 2018 Contractor Name: Gibson -Lewis, LLC The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID, INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 3111 for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/2018 General Conditions - 6 Bidder: Gibson -Lewis, LLC POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after considering all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/2018 General Conditions - 7 I. PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: W X By checking this box, l hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: W _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _ Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) _ Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. Version 7/20/2018 General Conditions - 8 II. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: 0) _ By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend, 00 By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. (iii) _ By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) By checking this box, l hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid. If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: 0) _ Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _ List identifying all former business names. (iii) _ Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) _ Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) ___ Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. (vi) _ Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) _ Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) _ Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 (N) Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (i:) List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: 10/9/18 (Sign Here) Robert A. Lingenfetter, President (Print Name Here) Gibson -Lewis, LLC (Name of Company) 1001 W. 11 th Street (Address of Company) Mishawaka (City) IN (State) 574-259-8581 (Telephone Number) Version 7/20/2018 General Conditions - 10 [SKM 1. MIN ice] ;J":-J 11!J 191MU11111 :114 LOATITOR-4 Ll 41 :19154 1 PA 3301 -.1 -.1111 M 3 M�� Project Name Three Twenty at the Cascade — Exterior Insulation and Finish System Project No. 118-074 B For Bids Due October 9, 2018 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does, not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check X or Bid Boindl. X Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non-Debarmenit Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and X Certification: of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1,0], If minimum participation goal is not X met, also provide Evidence of Good Faith Efforts Form [MWBE-2,0] and MBE/WBE Contacted Form [MWBE-2.1]. X Acknowledge Receipt of 1,2 Addendum(s) included with the bid. X Ali required additional information is included with the bid, Proposal statements and other affidavits all signed by the proper party with name either X printed or typed underneath signature. X This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with, the specifications. Bidder: Gibson -Lewis, LLC Date: By Authorized Represe Signature: Print Name & Title: Robert A. Lingenfelter, President 10/9/18 Version 7/20/2018 Contractor's Bid for Public Works - 1 General Porn No, 96-a Prescribed by the State Board of Accounts of Indiana Revised 1949 STANDARD QUESTIONNAIRES AND FINANCIAL STATEMENT FOR BIDDERS Prescribed_ b_y_ THE STATE BOARD OF ACCOUNTS OF INDIANA For use in investigating and determining the qualifications of bidders on public Finance construction when the aggregate cost of any such work or improvement will be Five Thousand Dollars or more. These statements to be submitted under oath by each bidder with and as a part of his bid, as provided by Chapter 306, page 1248, Acts of 1947. OWNER: City of South Bend, Indana 227 West Jefferson Blvd South Bend, IN 46601 PROJECT: Three Twenty at the Cascade — Exterior Insulation and Finish System South Bend, IN Submitted by: GIBSON-LEWIS, LLC 1001 W. 111". Street Mishawaka, Ind. 46544 DATE: October 9, 2018 Filed: () A Corporation () A Co -partnership () An Individual (X) A Limited Liability Company The following farms of questionnaires and fivancial statement are prescribed by the State Board of Accounts in conformity with the statute set out on the proceeding page. These forms, properly filled out and attested, must accompany each bid of Five Thousand Dollars or more on any public work. The forms are designed to cover all contracts for all kind of work and the bidder is required to answer such questions as are pertinent to the work upon which he is bidding. The purpose of the questionnaire and financial statement, as set forth in the law, is to enable the awarding body to determine the qualifications of the bidder to carry out successfully the contract if the same is awarded to him. The bidder will find it to his advantage to answer fully all questions coming within the range of the work upon which he is bidding. Particular attention should be given the "-Financial Statement" and the details relative to the assets and liabilities set out. This form is made in extensive detail so that the bidder may explain his assets and liabilities in proper sequence and in a uniform.. manner. Section 2 of an Act entitled "An ACT concerning the awarding for the performance of public work and authorizing the board of accounts to prescribe certain forms to be used in ascertaining the responsibility of contractors who submit bids for the performance of such work, providing for plaits and specifications, providing for bids repealing certain laws and declaring an emergency". Section 2. Whenever the aggregate costs of any work or improvement will be five thousand dollars ($5,000.00) or more, for the purpose of enabling such board, commission, trustee, officer or agent to ascertain and determine which of the bidders submitting bids for the performance of any such public work is, in the judgement of such board, coiamission, trustee, officer or agent, the lowest and/or best bidder and to exercise intelligently the discretion hereby conferred on such board, co=:dssion, trustee, officer or agent, each bidder shall be required to submit under oath with and as a part of his bid, a statement of his experience, his proposed plan for performing such work and the equipment which he has available for the performance of such work and a financial statement. The statements, herebyrequired shall be submitted on forams which shall. be prescribed by the state board of accounts. The fm-ms so prescribed shall be designated, respectiveIy, as the experience questionnaize, the plan and equipment questionnaire and the contractor's financial statement, and shall be based, so far as applicable, on the standard questionnai ms and financial statement for the bidders as approved and recommended by the joint conference on construction practices, for use in investigating the qualifications of bidders on public construction work, and the forms so prescribed are, hereby, prescribed as the forms which shall, hereafter, be. used by all such boards, commissions, trustees, officers and agents in obtaining the information which is required in the administration of this act. If the information submitted by any bidder on the forms herein prescribed is found, on examination, to be unsatisfactory, the bid submitted by such bidder shall not be considered. Submitted by Gibson -Lewis, LLC Principal Office at 1001 W. I Ith Street, Mishawaka, IN To City of South Bend, Indiana EXPERIENCE QUESTIONNAIRE ❑ A Corporation ❑ A Co -partnership An Individual X united Liability Compan The signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers to interrogatories hereinafter made. 1. How many years has your organization been in business as a general contractor under your present business name? 2. How many years' experience in Specialty construction work has your organization had: (a) Asa general contractor Thirty -Nine (39) years 3. What projects has your organization completed? (b) as asub-contractor Fifty (50) years CONTRACT AMOUNT CLASS OF WORK WHEN COMPLETED _..... .... . NAME AND ADDRESS OF OWNER 3,175,000 2017 Michigan City Prison - Michigan City, IN 1,880,000 2017 LaPorte Public Libras - LaPorte, IN 4,830,000 2017 VA Outpatient Clinic - Mishawaka, IN 1,780,000 2017 Rolling Prairie Libra - Rolling Prairie IN 3A What projects has your organization now in process of construction? CONTRACT AMOUNT CLASS OF WORK WHEN To BE COMPLETED NAME AND ADDRESS OF OWNER 2,543,000 2018 ND McCourtney - Notre Dame IN 3,796,000 2018 Charles Black Center - South Bend IN 3,057,000 2019 ND Hesbur h Phase 4 - Notre Dame IN 4,261,000 2020 Columbia City HS - Columbia Ci IN 4. Have you ever failed to complete any work awarded to you? No If so, where and why? 5. Has any offer or partner of your organization ever been an officer or partner of some other organization that failed to complete a construction contract? No If so, state name of individual, other organization and reason therefor. 6. Has any officer or partner of your organization ever failed to complete a construction contract handled in his own name? No If so, state name of individual, name of owner and therefor. -2- Gibson -Lewis, LLC 7. In what other lines of business are you financially interested? 8. For what corporation or individuals have you performed work, and to whom do you refer? Memorial Hospital of South Bend IN Lar Lies - 574-647-1474 Indiana University - South Bend Mike Prater- 574-520-4319 First Source Bank, South Bend, IN Doug Way - 574-286-6514 9. For what cities have you performed work and to whom do you refer? South Bend Indiana (County -City Building) 574-235-9554 Mishawaka, Indiana 574-258-1607 LaPorte, Indiana 219-326-6808 Elkhart, Indiana 574-535-6775 10. For what countries have you performed work and to whom do you refer? St. Joseph County 574-235-9554 Elkhart County 574-535-6775 11. For what State bureaus or departments have you performed work and to whom do you refer? Purdue University - Indiana 765-494-7342 Indiana University - South Bend, Indiana 574-520-4319 12. Have you ever performed any work for the U.S. Government? Yes If so, when and to whom do you refer? Hammond Courthouse & Andrews Library was a federal building 13. What is the construction experience of the principal individual of your organization? INDIVIDUAL'S NAME PRESENT POSITION OR OFFICE YEARS OF CONSTRUCTION EXPERIENCE MAGNITUDE AND TYPE OF WORK IN WHAT CAPACITY Robert A. i_ingenfelter President 28 Supv. & Mgmt supervision James Nagle Vice President 32 Supv. & Mgmt Supervision Nicholas Gurbick Vice President 5 Supv. & Mgmt Supervision Randall H. Rice Secretary 32 Supv. & Mgmt Supervision David Folck Superintendent 47 Supv. & Mgmt Supervision -3- Gibson -Lewis, LLC PLAN AND EQUIPMENT QUESTIONNAIRE The signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers to interrogatories hereinafter made. 1. In what manner have you inspected this proposed work? Explain in detail. Site Visit 2. Explain your plan or layout for performing the proposed work Review shipping dates for all material suppliers and subcontractors and develop a detailed construction schedule. Provide sufficient qualified manpower to meet the schedule. 3. The work, if awarded to you, will have the personal supervision of whom? A Foreman/Superintendent will be drawn from our pool of qualified personnel when a start date is established * 4. Do you intend to do the hauling on the proposed work with your own forces? If so, give amount and type of equipment used Undetermined until detailed * 5. if you intend to sublet the hauling or perform it through an agent, state amount of sub -contract or agent's contract, and if known, the name and address of sub -contractor or agent, amount and type of his equipment and financial responsibility * Items 4, 5, 6, and 7 may not be applicable in all building contracts; if not, omit. -4- Gibson -Lewis, LLC * 6. Do you intend to do the grading on the proposed work with your own forces? if so, give type of equipment to be used * 7. If you intend to sublet the grading or perform it through an agent, state amount of subcontract or agent's contract, and if known, the name and address of sub -contractor or agent, amount and type of his equipment and financial responsibility. S. Do you intend to sublet any other portions of the work? If so, state amount of sub -contract, and if known, the name and address of the sub -contractor, whether subcontract is a minority and/or women's business enterprise, amount, and type of his equipment and financial responsibility. 9. From which sub -contractors or agents do you expect to require a bond? 10. What equipment do you own that is available for the proposed work? QUANTITY ITEM DESCRIPTION, SIZE CAPACITY, ETC. CONDITION YEARS OF SERVICE PRESENT LOCATION 2 Fork Lifts !Fype Good Various Warehouse 2 Skid Streer .....Shop 4 Wheel Drive Good Various Various Jobs 1000 Scaffold Sets Various Good Various various Jobs 10 Trucks Various Good Various Various Jobs 1 Ail Terrian Fork Lift 22' RWD Go d Various Various Jobs 1 Laser Screed Copperhead Good Various Various Jobs i Reach Forklift 44" Reach 4WD Good Various Various Jobs 1 Street Sweeper Skid Steer Attachment Good Various Various Jobs -5- Gibson -Lewis, LLC 1, What equipment do you intend to purchase for use on the proposed work, should the contract be awarded to you? OIJANTITY I i'rEM I DESCRIPTION, SIZE, CAPACITY, ETC. I APPROXIMATE COST 12, How and when will you pay for the equipment to be purchased? 13. Do you propose to rent any equipment for this work? if so, state type, quantity and reasons for renting. 14. Have you made contracts or received firm offers for all materials within prices used in preparing your proposal? Do not give names of dealers or manufacturers 15. List all permits, licenses, or registrations, which you have and are required by law to maintain in order to bid on this work. Please include the type of the permit, license, or registration; the name of the issuing entity; the number of the licenses, permit, or registration; and the expiration date. Bated at Mishawaka, IN this 9th day of October 20 18 STATE OF COUNTY OF ST.JOSEPH Gibson -Lewis, LLC (Name of Organization) By Robert A. Linqenfelter, President SS: (Title of Person Signing) Robert A. Ungenfeiter Being duly sworn, deposes and says that lie is President of the above —Gibson-Lewis, LLC of the above (Name of Organization) and that the answers to the questions in the foregoing questionnaires and all statements therein contained are true and correct, Subscribed and sworn to before me this My Commission expires ,8/05/2023 Residing in St. Joseph County 9th day, of October 20 18 Notary Public -6- J 1i Hodowaniec