Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Opening of Bids - Lafayette Bldg Exterior Renovation - Project No 117-100R - C&S Masonry Restoration LLC
CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Lafayette Building Exterior Renovation Project No. 117-10OR For Bids Due October 9, 2018 PART I (Must be completed for all bids. Please type or print) Date: 1 0/6/2018 _ Bidder (Firm); C Address; City/State/Zip: SOUTH BEND 1N 46628 Telephone Number: 574 208-8484 Agent of Bidder (if Applicable): STEVE FIELDS Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of; LAFAYETTE BUILDING EXTERIOR RENPVATION the City of South Bend, Indiana, in accordance with plans and specifications prepared by: KIL ARCHITECT / PLANNING and dated SEPTEMBER 21 2018 for the sum of (enter the Total Bid as shown on the Proposal) TWO HUNDRED THIRTY SIX THOUSAND SEVEN HUNDRED & FIVE 236 705.00 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attach ent., By (Siproaiiire) "'- ' STEVE FIELDS (Printed Name of Person Signing) ACCEPTANCE The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS day of Gary A. Gilot, President Suzanna M. Fritzberg, Member Elizabeth A. Maradik, Member Therese J. —Do rau, Member James A. Mueller, Member Attest: Linda M. Martin, Clerk Version 7/20/2018 Contractor's Bid for Public Works - 2 20 BID/PROPOSAL CITY OF SOUTH BEND Project Name: Lafayette Building Exterior Renovation Project Number: 117.1001R For Bids Due: October 9, 2018 Contractor Name: (Name Here) C&S MASONRY RESTORATION LLC BASE BID DIVISION A: SKYLIGHT REPLACEMENT Item Description No. Quantity Unit Unit Price Total Amount 1 Removal and replacement of existing skylight at the ulpper level roof LS 2 Allowance for skylight curb reinforcement and repair 1 LS $251000.00 $25,000.00 DIVISION A BASE BID TOTAL NO BID BASE BID DIVISION B: EXTERIOR BRICK ANIn r 1MFcTr%1= RnAerNkiov Item-- No Description Quantity - ��UnjitUnit --.....r.......,.�... n „.,.. Price Total Amount Limestone and brick masonry rehabilitation on north, east, south and 1west facades of building, includes crack repair, tuck -point, masonry replacement L 123,505.00 and rebuilding, soft control joint installation, and limestone atchin 2 Contigency allowance for Division B mason acka e 1 LS $15,000.00 $15,000.00 DIVISION B ALTERNATE #1 Item Description No, 1 Masonry Cleaning of East Fagade and North and South Returns DIVISION B ALTERNATE #2 It4D�escriptionNMasonry Cleaning of North, West, and South Facades DIVISION B BASE BID TOTAL 13g 505.00 Quantity I Unit I Unit Price I Total Amount 4,000 SF I . LS 120,000.00 DIVISION B ALTERNATE #1 TOTAL 20 000.00 Quantity I Unit I Unit Price I Total Amount 16,000 SIF LS 44,000.00 DIVISION B ALTERNATE #2 TOTAL 44,000.00 DIVISION B ALTERNATE #3 Item Description No. Quantity Unit Unit Price Total Amount 1 Water Repellent on East Fagade and returns at North and South Walls 4,000 SF LS =7,20.00 DIVISION B ALTERNATE 43 TOTAL 7,200,00 Version 7/20/2018 Contractor's Bid for Public Works - 7 Project Name: Project Number: For Bids Due: Contractor Name: BIDIPROPOSAL CITY OF SOUTH BEND Lafayette Building Exterior Renovation 117-10t1R October 9, 2018 (Name Here) C&S MASONRY RESTORATION LLC DIVISION B ALTERNATE #4 ' h BO Item No.Quantity Description Unit Unit Price Total Amount � Water Repellent on !North, West and LS 27,000.00 South Facades 16,000 DIVISION B ALTERNATE #4 TOTAL 27 000.00 DIVISION! B ALTERNATE #5 Item No. Description Quantity Unit Unit Price Total Amount Restore painted "Lafayette Building" sign 1 on brick masonry at east end of LS NO BID -.-parapets on north and south walls DIVISION B ALTERNATE 45 TOTAL NO BID UNIT RRIMNP' item No. Description DEDUCT/SF ADD/SF 1 Masonry Brick Tuck -pointing per SF 16.00 2 Masonry Limestone repointing per SF 6.00 3 Masonry Brick Re-building/Replacement -per SF 48.00 4 Brick and Limestone Cleaning (East Fa ade and NIS Returnsper SF 5.00 5 Brick and Limestone Cleaning (West, South and North Fa adeper SF 2.75 6 Water Repellent on East Fagade per SF 1.75 7 Water Repellent on North, West and South Facades per SF 1 75 Bidder (Firm): C&S MASONRY RESTORATION LLC Address: CitylState/Zip: SOUTH BEND, IN 46628 Telephone Number: (574 )208-8484 By (Signature) STEVE FIELDS (Printed Name of Person Signing) Version 712012018 Contractor's Bid for Public Works - 8 lYlrex the pPovectiye coldraefor is anable to c4'r11f � to atrp of Nre statements 6elrrly, it slrrrll rrllrrelr nn c-AIrlrrrrrrlinrr to this fi ffrdayh. CONTRACTOR'S NON -COLLUSION AND NON-DEBARIVIENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMNIITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (tvinst be completed For all quotes and bids. Please type or print) STATE OF lND[ANA ) ST,JOSEPH COUNT ) SS:Y ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Colltractol- has not, nor has any other member, representative, or agent of the firth, company, corporation or partnership represented by liim, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persoils, firths, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, cotllllliss1011 Or thing Of Value on account of such sale; and 2. Contractor certifies by submission of this proposal that Neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded fi•orn participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. FOr ptn•poses ofthis Certification, "Iran" means tale government of Iran and any agency or instrumentality of ]ran, or as otherwise defined at Itld. Code § 5-22--16.5-5, as amended from time -to -tinge. b. As provided by Ind. Code § 5-22-16.5-8, as amended froln tune -to -tine, a Contractor is engaged in investment activities in Iran if either: Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for Forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified oil list published by the Indiana Department of Administration. Version 7/2012018 Contractor's laid for Public Works - 4 d. Contractor does not knowingly employ or contract with an 111Mt€tl3arized alien, nor retairh any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that Ile/she/it shall enroll in and verify the work eligibility status of aft of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's doCrrmentatiota of enrollnrent and participation in tic E-Verify Progrann is inciuded and auaclhed as pa€-t of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ ot• contract with an unauthorized alien, not- retain Illy employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in tine E-Verify Program. The Contractor agrees to rnaintain this certification throughout the tern] of the contract with tine City of South Bend, and understands that the City may terminate tine contract for default if the Contractor fails to cure a breach of this provision rho later than thirty (30) clays after being notified by the City. G. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or comnnissiohs shall not discriminate against arty employee or applicant forempioymennt in the performance of a City contract with respect to hire, tenure, terms, conditions, Or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation] or disability that does not affect that persons ability to perform the work. In awarding contracts for the purchase of work, Jabot-, services, supplies, equipment, materials, or any combination of tlhe foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. h] no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an Ml3E/WB7 ; however, it may not unlawfully discriminate against said WBE/MBE;. A finding of a discriminatory practice by file City's MBE/WBE Utilization Board shall prohibit that person] or entity fi•onn being awarded a City contract for' a period of one (1) year from the date of such determination, and such determination play also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. Y. The undersigned contractor agrees that the following nondiscrimination comrntittntent shall be made a part of any contract which it ntay henceforth enter into with the City of South Bznid, Tndiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any ]hatter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of Contract. 1, the undersigned bidder or' agent as contractor on a public works project, understand mStatutory y statuto obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby certify that I and all subcontractors employed by me for this project will use steel products o€• foundry products made in the United States on this project if awarded. 1 understand 1 have all affirmative duty to notify tlhe City in my bid that Illy proposal does not include the use of steel products or foundry products made in the United States. 1 understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or roundry products is unreasonable. Arlo'- to award and upon] submission of bid which does not use steel products or. foundry •ough its director of public works, shall ]hake a dcternnination products made in tine United States, the City, flit if the price or United States made steel or fotntichy is unreasonable, I understand that violations thereunder may result in forfeiture of contractual payinents. Version 7/20/2018 Contractor's Bid for Public Works - 5 I hereby affirm under• the penalties of pei jury that the facts and information contained in the foregoing bid for public works are true and correct. Dated thisOCTOBER day of —BTU, 2018 Subscribed and sworn to before ine this i My Commission Expires -/ County of .Residence C&S MASONRY RESTORATION LLC Contractor/Bidder (Pirl s Signature of Contractor/Bidder or Its Agent STEVE FIELDS / PRESIDENT Printed Naive and Title day of C1 6 20 Notary Public MARSHA L, BROW1`4 Notary Public, State of Indiana County of st loseph Comrnissinn 4541846 Commission Expires June 28, 2021 Version 7/20/2018 Contractor's Bid for Public Works - 6 MERCHANTS+ BONDING COMPANY,. MERCHANTS NATIONAL BONDING, INC. P.O. BOX 14498, DES MOINES, IOWA 50306-3498 Bid Bond PHONE: (800) 678-8171 FAX: (515) 243-3854 CONTRACTOR: (Name, legal staters and acklf•ess) C & S Masonry Restoration, LLC 3725 N. Foundation Court, Suite AR South Bend, IN 46628 OWNER: (Name, legal status and address) City of South Bend, Indiana Board of Public Works 227 W. Jefferson Blvd., Room 1316 South Bend, IN 46601 BOND AMOUNT: Five Percent (S%) of the Accompanying Bid PROJECT: (Name, location or address, and Project number, if a)v) Lafayette Building Exterior Renovation, Project No. 117-100R South Bend, Indiana Bond Number: SURETY: (Name, legal status and principal place of business) Merchants National Bonding, Inc, A Corporation 6700 Westown Parkway, West Des Moines, lA 50266 This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or wlthin such time period as may be agreed to bythe Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof-, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said hid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 9th day of October, 2018 _ C & S Masonry Restoration LL— UIIA If _4" _,J�(Principal) `jJl - (Seal) (1lji n ss) Steven Fields President (Title) ..... Merchants National Bonding, Inc. (Surely) / Seal' (1l fitness) (Tit e) J Cevin Hughes, Attorney -in -Fact - CON 0657 (2115) Printed in cooperation with America It itute of Architects (AIA). The Iai guage in this document conforms exactly to the language used in AIA Document A310-Bid Bond-2010 MERCHANT BONDING COMPANY,. POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Connie J Messer, Dawn M Pequignot; Elaine K Miller; Harold E Everett; J Kevin Hughes; Jada M Karst; Jessica K Callahan; Marie E Comparet; Thomas J VanDyck; Tom McGovern their true and lawful Attorneys) -in -Fact, to sign its name as surety(€es) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, It Is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 3rd day of July 2017 �,.s I10N4 ••.., ,•' \11G Ca'•. (Q•ej 1�po MERCHANTS BONDING COMPANY (MUTUAL) •'��: �� �� . 2 • �: VO R9j .yam MERCHANTS NATIONAL BONDING, INC. —ate �•:�: aH:2 —b— rho • x '~ 2003 r s� : •� 1933 ��c: By >� •. 'J. President ��.� •,b� . a .• STATE OF IOWA •••+.r. ..•�•` •, • • • , • . COUNTY OF DALLAS ss. On this this 3rd day of July 2017 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. E'IA' ALICIA K. GRAM Commission Number 767430 My Commission Expires April 1, 2020 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; ao hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is Still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 9th day of October. 2018 w�'2 o p.D; -b- • d' 1933 ' 3• Secretary rJ : 2003 r : �J. "Y: :•d�•• ;•••�a�,;° '•,b,,�w. .••tea; • POA 0018 (3/17) ''�••,••'••, 316 COUNTY-CrrY BUILDING j w `:'', }IONf 227 W. JrFITRSON BOULLVARD �� �. JU;; FAX SUUTHBEND, INDIANA46601-1830 TDD lF3G5 CITY OF SOUTH BEND PCTE, $lPl no1EG, MAYOR BOARD OF PUBLIC WORKS Date: To: From October 5, 2018 All Planholders Linda M. Marlin, Cleric, Board of Public Works Subject Addcnduln Number: 1 Project Name: Lafayette Building Skylight and Masonry Repairs Project No,: 117-100R ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM 574/235-9251 574/ 235-9171 574/235-5567 Date Received: 10/8/2018 This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR BID. Notes: The attached documents are hereby added to the Specifications and Contract Documents and become a pant of herein. Company: C&S MASONRY RESTORATION LLC Authorized Signature: Date: 10/8/2018 0 Addendum #1 Date: October 5, 2018 To: All Bidders and others to whom Plans & Specifications have been issued From: Kil Architecture/ Planning Gregory A, Kil, AIA, NCARB Architect RE: Lafayette Building, Project 117-017R For City of South Bend, Board of Public Works 227 W. Jefferson Blvd, Room 1316 South Bend, IN 46601 This addendum forms part of the Contract Documents and modifies the original Bidding Documents only as noted below. The remainder of the drawings and Specifications are to remain in their entirety. Acknowledge receipt of this addendum in the space provided on the Bid Form, This addendum consists of the following changes identified in bold: PROJECT MANUAL; A. Special Provisions, Art. XXI, Description of Work 1. Paragraph 13.2, Alternates: Add subparagraphs c, d and a as follows: "c. Division B Alternate 3: Water Repellent on East Facade and returns at North and South Walls: Provide water repellent per Section 07 1900 at the brick and limestone masonry of the East Facade after the work of Division B, Alternate 1. This bid alternate shall include an area of 5,880 SF. Additions to or deductions from this quantity shall be paid by unit price, d. Division B Alternate 4: Water Repellent on !North, West and South Facades: Provide water repellent per Section 071900 at the brick and limestone masonry of the North, West and South Facades after the work of Division B, Alternate 2. This bid alternate shall include an area of 15,087 SF. Additions to or deductions from this quantity shall be paid by unit price." e. Division B Alternate 5: Restore painted "Lafayette Building" sign on brick masonry at east end of parapets on north and south walls. Graphics shall be provided by Architect to replicate original painted sign. Submit coating materials for approval." B. City of South Bend Contractor's Bid for Public Work, Bid Form: a. Delete pages 7 and 8 and replace with attached pages 7 and S. C. Section 040100, Maintenance of Masonry 1. Paragaph 1.1.A: Delete the word "water" replace with the word "chemical". 2. Article 2.2, Cleaning Materials: K f L Addendum ##1 ARCHITECTURE page 1 PLANNING W8y kftfdtLnC-1 q1J,es 1126 LINCOLNwAY EAST SOUTH BEND IN 46601 (574) 288.2654 VOICE 2892420 FA X 1. Delete subparagraph A and replace with the following subparagraph: "A. Cleaning Agent for Limestone: Acid solution type. 1. Product: a. PROSOCO; Sure Klean Limestone Restorer or approved equivalent product." ii. Add the following subparagraph: "B. Cleaning Agent for Brick: Acid solution type. 1. Product; a. PROSOCO; Sure Klean Heavy Duty Restoration Cleaner or approved equivalent product." 3. Article 2.3, Masonry Materials I. Add the following paragraph: "B. Brick in excess of Owner's stockpile: Used Buff Chicago Common units available from the following distributors: 1. Old Fort Building Supply: (574) 289-5566 2. )Rase Brick and Materials, Inc.: (574) 234-2133" 4. Remove Articles 3.5 and 3.6 in their entirety and replace with the following articles: "3.6 RESTORATION CLEANING OF LIMESTONE A. Clean surfaces and remove large particles with wood scrapers or non- ferrous wire brush. B. Spray coat limestone type masonry with Sure Klean limestone Restorer restoration cleaner, mixed into solution in accordance with manufacturer's instructions. C. Provide a second application if required to match mock-up area. D. Allow sufficient time for solution to remain on masonry and agitate with soft fiber brush or sponge. E. Rinse from the bottom up with potable water applied at 400 psi and at a rate of 4 gal/min. 3.7 RESTORATION CLEANING OF BRICK A. Clean surfaces and remove large particles with wood scrapers or non- ferrous wire brush. B. Execute measures to protect all limestone, metal objects and glass from acidic cleaner. C. Spray coat common brick and roman brick type masonry with Sure Klean Heavy Duty Restoration Cleaner restoration cleaner, mixed into solution in accordance with manufacturer's instructions. K ! L Addendum #1 ARCHITECTURE page 2 PLANNING rw h arc iter. i re coy 1126 LINCOLNWAY EAST SOUTH BEND I N 46601 (674) 208,2654 VOICE 289, 2420 FA X 0 D. Provide a second application if required to match mock-up area. E. Allow sufficient time for solution to remain on masonry and agitate with soft fiber brush or sponge. F. Rinse from the bottom up with potable water applied at 400 psi and at a rate of 4 gal/min." D. Add new Section 07 1900, Water Repellents, in accordance with attached Section 07 1900. E. Section 08 6300, Metal -Framed Skylights 1. Article 2.1, Manufacturers, Subparagraph A, Metal -Framed Skylights: I. Add the following subparagraph: "6. Wisconsin Solar Design Inc.; E Mnr�wisconsinsolardesi n.com" DRAWINGS: A. Drawing A3.2, Proposed South Elevation 1. Change the note in the rectangle at the east end of the parapet to read as follows: "Division B Alternate 5: Area of painted sign on brick masonry — restore brick as required -- protect sign area and do not clean in Division 13 Alternate 4 — Restore paint to condition of original sign application — if construction contract does not include Alternate 5, clean masonry in Alternate 4" B. Drawing A3.4, Proposed North Elevation 1. Change the note in the rectangle at the east end of the parapet to read as follows: "Division B Alternate 5: Area of painted sign on brick masonry -- restore brick as required -- protect sign area and do not clean in Division B Alternate 4 — Restore paint to condition of original sign application — if construction contract does not include Alternate 5, clean masonry in Alternate 4" END OF ADDENDUM #1 ATTACHMENTS, Bid/Proposal Form, Pages 7 and 8 Specification Section 07 1900, Water Repellents K ! L Addendum #1 ARCHITECTURE page 3 PLANNING M8Z,i.h JarchiteclUEL,coffl 1126 LINCOLNWAY EAST SOUTH REND I N 46601 (574) 288.2654 VOICE 289, 2420 FA X Lafayette Building Exterior Renovation South Bend, Indiana SECTION 07 1900 - WATER REPELLENTS PART 1 GENERAL Copyright, Kil Architecture / Planning October, 2018 1.1 SECTION INCLUDES A. Water repellents applied to exterior, masonry, stone, and concrete surfaces, L2 A 1.3 1.4 A. B. C. D. E. P, G RELATED REQUIREMENTS Section 04 0100 Maintenance of Masonry. REFERENCE STANDARDS SUBMITTALS See Section 013000 - Administrative Requirements, for submittal procedures. Product Data: Provide product description. Manufacturer's Installation Instructions: Indicate special procedures and conditions requiring special attention; cautionary procedures required during application. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. Manufacturer's Field Reports: Report whether manufacturer's "best practices" are being followed; if not, state corrective recommendations. Email report to Architect the same day as inspection occurs; mail report on manufacturer's letterhead to Architect within 2 days after inspection. Manufacturer's Qualification Statement, Installer's Qualification Statement. 1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with not less than three years documented experience. B. Installer Qualifications: Company specializing in performing work of type specified and with at least three years of documented experience L6 MOCK-UP A. Prepare a representative surface 36 inch by 36 inch in size using specified materials and preparation and application methods on surfaces identical to those to be coated; approved rrrock-up constitutes standard for workmanship. WATER REPELLENTS 07 E 900 - 1 Lafayette Building Exterior Renovation © Copyright, Kil Architectut-e / Planning South Bend, Indiana September, 2018 B. For proposed substitutions, prepare side -by -side mock-ups of specified and substitute products. C. Locate where directed. D. Mock-up may remain as part of the Work. 1.7 WARRANTY A. Correct defective Work within a five year period after Date of Substantial Completion, PART 2 PRODUCTS 2.1 MANUFACTURERS A. Silane, Siloxane, Silane-Siloxane Blend, and Siliconate Water Repellents. 1. PROSOCO, Inc: www.prosoco.com/#isle. 2.2 MATERIALS A. Water Repellent: Non -glossy, colorless, penetrating, water -vapor -permeable, non -yellowing sealer, that dries invisibly leaving appearance of substrate unchanged, 1. Applications: Vellical surfaces and non -traffic horizontal surfaces. 2. Number of Coats: Two applications within ten minutes. 3. Maintains dry appearance when wetted. 4. Water -based Siloxane, silane, or blend that reacts chemically with concrete and masonry. a. Products: 1) PROSOCO, Inc; Sure Klean Weather sEal Siloxane PD: www.prosoco.cona. 2) Approved equivalent products. PART 3 EXECUTION 3.1 EXAMINATION A. Verify existing conditions before starting work. B. Verify joint sealants are installed and cured. C. Verify surfaces to be coated are dry, clean, and free ofefflorescence, oil, or other matter detrimental to application of water repellent. 3.2 PREPARATION A. Protection of Adjacent Work: 1. Protect adjacent landscaping, property, and vehicles from drips and overspray, 2. Protect adjacent surfaces not intended to receive water repellent. WATER REPELLENTS 07 1900 - 2 Lafayette Building Exterior Renovation South Bend, Indiana © Copyright, Kil Architecture / Planning September, 2018 B. Prepare surfaces to be coated as recommended by water repellent manufacturer for best results. C. Do not start work until masonry mortar substrate is cured a minimum of 60 days. D. Remove loose particles and foreign matter. E. Remove oil and foreign substances with a chemical solvent that will not affect water repellent. F. Coordinate with work of Section 04 0100, Maintenance of Masonry. C, Allow surfaces to dry completely to degree recommended by water repellent manufacturer before starting coating work. 3.3 APPLICATION A. Apply water repellent in accordance with manufacturer's instructions, using procedures and application methods recommended as producing the best results. B. Apply at rate recommended by manufacturer, continuously over entire surface. C. Apply two coats, minimurn. D. Remove water repellent from unintended surfaces immediately by a method instructed by water repellent manufacturer. E. Provide manufacturer's field service representative to inspect preparation and application work continuously during entire application period to ensure that manufacturer's "best practices" for preparation and application are being followed. END OF SECTION WATER REPELLENTS 07 1900 - 3 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC U 0; RK CHECKLIST FOR BIDDERS Project Name Lafayette Building Exterior Renovation Projoct No. 117-10OR For Bids Due October 9, 2018 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. _ / Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond, V Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed, Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments V with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of MBEIWBE Participation Goal Form jMWBE-1.0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0) and MBEIVVBE Contacted Form [MWBE-2.11. Acknowledge Receipt of _J Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name; either printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: C&S MASONRY RFgTnRATIf1N I I r Date: 10/6/2018 By Authorized Representative: Signature: Print Name & Title: 7 EVE FIELDS / PRESIDENT Version 7/20/20-18 Contractor's Bid for Public Works - 1 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Lafayette Building Exterior Renovation Project No, I1 1-1 UUR For Bids Due October 9, 2t118 Contractor Name: tivame here) C&S MASONRY RESTORATION LLC. The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID, INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. if you are not a pre -qualified bidder, complete Section Il only, Section 11 acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10594-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31' for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works Projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The city reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/2012018 General Conditions - 6 POST Blip SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information. 4. The disclosure of a subcontractor list ("Disclosed Subcontractors)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period, Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter, The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor_ Version 7/20/2018 General Conditions - 7 PRE -QUALIFIED BIDDEN CHECKLIST (a) Acknowledgements; (i} By checking this box, 1 hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my pre -Qualification verification letter is attached. By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments; W (li) (iii) (iv) Version 7/20/2018 Indiana Secretary of State's on-line records (i.e. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. Evidence that i am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. General Conditions - 8 II, PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE-QUALIF FED) (a) Acknowledgements: (i) �,o[ By checking this box, 1 hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. _&9Z By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information (iii) provided to the City shall be regarded as public records. By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request, (iv) By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub -contractors have the necessary licenses to undertake the work called for in this bid, If a sub- contractor loses their license at any point, it is the responsibility of that sub- contractor to notify the City. (b) Attachments: 0) Indiana Secretary of State's on-line records (i,e. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships), 00 NA List identifying all former business names. (iii) _ N/A Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) (iv) years. Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees / (v) V on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or independent (vi) as an contractor under all applicable state and federal laws and local ordinances. Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office (vii) of Apprenticeship, or its successor organization. �� Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or (viii) exceeds the requirements set forth in IC 4-13-18-5 or 1C 4-13-18-6. Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 9 {ix) N/A Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. 0)y- List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due, Date:, 8 (Sign Here) STEVE FIELDS (Print Name Here) C&S MASONRY RESTORATION LLC (Name of Company) 3725 N. FOUNDATION CT {Address of Company} SOUTH BEND (City) INDIANA (State} 574-208-8484 (Telephone Number) Version 7/20/2018 General Conditions - 1p CITY OF SOUTH BENIJ MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-1,O „r< M13E1WBE PARTICIPATION 1 ^ V t�•'y.�lN65' ,. is . This completed form should be supplied with Bids that pertain to City of South 11Bend Public Works Projects invotvinr� MBEflV36E participation, o is the bidder's sole responsibility to verifywhether any listed minority orwoman business meets the qualifications of a Minority or Women's owned business. Project Number; 117-1OOR Project Name: Lafa Otte Building Exterior Renovation Bidder: N1,4 Total Bid Amount: � MBENWBE Goal: Submitted by: STEVE FIELDS Print Name 5tgnaiure e 10/8/2018 Date Version 7/2012018 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND ti1u:ii;�; MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.0 EVIDENCE OF GOOD FAITH - EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MSEIWBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as dofined by the Indiana Department of Administration ("IDOA"). Project Number: 117-1 t1UR Date: 101$12018 Project Name: Lafa ette Building Exterior Renovation Bidder; C&S MASONRY RESTORATION LLC Contact Person; STEVE FIELDS Telephone: �Z Address: 3725 N. FOUNDATION CT. City: SOUTH BEND State: INDIANA Zip: 46628 Email: To determine whether a bidder has demonstrated good faith efforts to reach the MBENBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below``: EVIDENCE OF GOOD FAITH EFFORTS MBW EIBE L1ST(S): The bidder reviewed the City of South Bend's Minority and Women Business EnterpriDi se versity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISEICONTACT): In order for your bid to be deemed responsive, the City of South Bond requires that all perspective bidders complete no less an 2 of the following: than 1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3. PC r€orm any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBE1WBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBE/WBE firms. '*Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with Interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBE/WBEs as unqualified without sound business reasons based on a thorough Investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBE/WBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBE/WBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity; 1. Name, address, and telephone number; 2. A description of information provided by the bidder or, subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBEANBE was unqualified to perform the job, Proper demonstration of Goad Faith Effort requires your initials nex# to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works, The City of South Bend reserves the right to request additional information. Version 7/20/201 s Contractor's Bid for Public Works - 10 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.1� MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Womews owned business. Project Number: 117-10OR PAGE OF MBEIWBE Participation Goal Project Name: Lafayette Buiidin Exterior Renovation Bidder: By: (Signature) (Title) (mate) MBE_/WBE Firm Owner or Contact at MBEIWBE Firm Telephone: Fax: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: MSE/WBE Firm Email: Owner or Contact at MBEIWBE Firm Telephone: Fax: Email: TYRE OF WORK SOLICITED FOR THIN PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: Version 7/20/2018 Contractor's Bid for Public Works - 11 PART 11 (For projects of $100,000 or more -- IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor, 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval_ Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that You subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid, The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/20/2018 Contractor's Bid for Public Works - 3 PART II Section I Experience Questionnaire Previous jobs from the past year Job Name Contact Information Private Hospital 219) 392-7576 Private University 574) 307-7310 Private University (574) 631-4200 Elkhart School (574) 533-7176 Community Hospital (219) 852-3063 SOUTH BEND ARMORY (574)286-7119 1. What public works projects have has our organization completed for the period of one (1) year prior to the date of the current bid? SOUTH BEND ARMORY 2. What public works projects are now in process of construction by our organization? NONE AT THIS TIME Reference List: Reference List: Scott Herczeg -574-235-9130 Tom Boomershine — 574-533-7176 Russ Cain — 219-392-7567 Jin-i Hiss- 574-993-3335 Brad Emberton 574-286-7119 Section It Plan and Equipment Questionnaire Plan for proposed project. Our main goal is to provide excellent service while working as efficiently as possible. We have spent time looking over the blueprints and reference material to not only complete the job on time and on budget, but we have formulated a "visitor friendly" plan to help maintain your regular business activities during the construction process. This will be done by working closely with Owner or other staff members to ensure that work zones are clear of problems and issues, as well as ensuring that entrances and areas are accessible to staff. List of equipment that will be available for use during the proposed project, • Air Compressor • Hammer Drill • Brick Cart • Ladders • Brick Saw • Lifts (rented) • Caulk Cutter • Mortar Stands • Circular Saw • Pallet Jack • Concert Mixer • Pressure Washer • Converted Saw • Roof Gator • Dumpster (rented) • Scaffold • Gang Box • Shop Vac • Generator • Trailer • Grinders • Wheelbarrow