Loading...
HomeMy WebLinkAboutOpening of Bids - Gemini at Washington-Colfax Apartments - Project No 118-080B - Pauls Welding Inc - Bid Security Chk SubmittedDate: tzd CITY OF SOUTH BEND, INDIANA JO CONTRACTOR'S BID FOR PUBLIC WORK Project Name Gemini at Washington -Colfax Apartments — MASONRY & STAIR REPAIR Project No. 118.080B For Kids Due October 4, 2018 PART I (Must be completed for alll bids 1015/18 Bidder (Firm): Address: 7930 West 1000 North City/State/Zip: Nappanee, IN 465 Agent of Bidder (if Applicable): Pursuant to notices given, the undersig public works project of: Please type or print) PWI Telephone Number: ( 574 ) 646-2015 is to furnish labor and/or material necessary to complete the Fire Stair Demolition(2.02) anid Fire Stair Installation Division 13 the City of South Bend, Indiana, in accordance with, plans and specifications prepared by: South Bend Heritage Foundation, linc, and dated 10/5/18 for the sum of (enter the Total Bid as shown on the Proposal) one hundred and sixty-eight thousand eight hundred and forty-four dollars ($ 168,844 (Enter sum of Total Base Bid plus Alternates shown on Proposals) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified !in the notice of the leffing. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendurns attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed', , the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall b h separate attachment. By � , Kvle D, Miller (Signature) IiAyffkvr� The above bid is accepted this day of Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member (Printed Name of Person Signing) Suzanna M. Fritzberg, Member Therese J, Dorau, Member James A. Mueller, Member Attest: Linda M. Martin, Clerk 017 Version 7/20/2018 Contractor's Bid for Public Works - 2 BIDIPROPOSAL CITY OF SOUTH BEND Project Name: Gemini at Washington -Colfax Apts — MASONRY & STAIR REPAIR Project Number: 118-080B For Bids Due. October 99 2018 Contractor Name: Item No. Description Quantity Unit Unit Price Total Amount Masonry Repair section A (see drawing 1 page A2.4) — rebuild parapet including 1 LS reset 2 finials Masonry Repair section B (see drawing 2 page A2.4) — rebuild parapet including 1 LS, reset 2 finials UNIT PRICES — Division A Item Description, Quantity Unit Unit Price Total Amount I Unit price: replace one 3rd floor lintel EA below a section of rebuilt para2et,.'.'.., 2 unit price: replace deteriorated 1 lineal EA foot of structural terra cotta with CMU 3 Unit Price: credit to repoint each 1 lineal EA foot of paraet in lieu of rebuilding Item No. Description Quantity Unit Unit Price Division B Base Bid: replace 1 LS southernmost 2 fire stairs. 2 Division B Add Alternate:replace LS r.,1-2 -1 northern most 2 fire stairs 1 Bidder (Firm): W J� Address: 0 I/V 0 0 o City/State/Zip: DV '/ 6 '50 Telephone Number: ( f'7'1) 6#61 ­ 20 IS By (Signature) 1< / (Printed Name of Person Signing) 'Version 7/20/2016 Contradoi's Bid fOf Public Works - 6 Ha B, 1',; 4 6 1 8 3 PFACY T D F �74,2 1 S -S:; 7 I, k"K Le k J 1, '1 x Ot-Al- 11 1"0 st A,I�11 Date: To: From Subject Project Narne: Project No.: ACKNO Date Received: October 4, 2018 All Planholders Linda M. Martin, Clerk, Board of Public Works Addendum Number: I GEMINI APARTMENTS ATWASHINGTON-COLFAX MASONRY AND STAIR REPAIR 1,18-080B This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171 within 48 hours of receipt. A copy MUST also be included with your bid package upon submittal. 11,6141,11 Notes: The attached documents are hereby added to the Specifications and Contract Documents and become part of herein. Company: P W Authorized Signature: Date: GEMINI APARTMENTS AT WASHINGTON-COLFAX MASONRY & STAIR REPAIR PROJECT NO. 118-080B ADDENDUM NO. 1 Date: October 4, 2018 To: All Plan Holders From: Patrick Lynch You must acknowledge receipt of this addendum by signing the first page and returning a copy with your bid. The following clarifications of the special provisions are offered in response to questions and comments received via email and at the Pre -Bid Meeting held on October 1, 2018: The items included in the addendum are to become apart of the Original Plans and Specifications as if included therein. Only these items are to be altered. The remainder of the Original Plans and Specifications remain valid in their entirety. The Special Provisions are modified as follows: 1) Document: Responsible Bidder Checklist. Page: General Conditions-7 Change: date indicated on the "For Bids Due" line is changed from Oct. 4, 2018 to Oct. 9, 2018. 2) Document: Contractor's Bid for Public Work - Checklist for Bidders Page: Contractor's Bid for Public Work —1 Change: date indicated on the "For Bids Due" lure is changed from Oct. 4, 2018 to Oct. 9, 2018. 3) Document: Contractor's Bid for Public Work Page: Contractor's Bid for Public Work ---- 2 Change: date indicated on the "For Bids Dike" line is changed from Oct. 4, 2018 to Oct. 9, 2018. 4) Document: Special Provisions Page: Special Provisions —1 Change: Replace the first paragraph in its entirety with: PROJECT DESCRIPTION Division A: Masonry parapet repair and/or repoinf. Provide a lump sum price to rebuild brick veneer at each of the Section A and Section B parapet walls indicated on drawing sheet A2.4 as revised in this addendum. Assume that the structural terra cotta behind the brick veneer is intact and sound. Provide unit price to replace 1 LF of structural terra cotta with CMU block if deterioration is encountered when rebuilding the brick veneer. Provide a credit unit price to repoint 7LF section of wall in lieu of rebuilding. Provide a unit price to replace and flash a third floor window lintel below a section of wall that is being rebuilt. 5) Document: Page: Contractor's Bid for Public Work — 8 Change: Page 8 of the bid form document is changed in its entirety and is replaced as follows: 6) Document: Drawing set, Roof Plan Sheet: A2.2 Change: Roof plan now divides the parapet rebuild work into two sections. Section A and Section B. Each section is referenced as a lump sum line item on the bid form. These two sections of parapet brick/limestone veneer are to be rebuilt as described in the specifications. Additionally, contractor shall provide unit prices to accommodate any deteriorated structural terra cotta block, sections of wall that only require repointing, and deteriorated steel window lintels. -- end of addendum I -- I WMITOA 1011c9a ":s lia;-Wis Xviloods3M gza-Lig , 9 3DV11NMc3H vOuNaU H I III III! nOS XV:d100O.-Osrrrrur! n. jail 117hetr the prospective Contractor is rtttrrGle to certify to aikj} of'the statements below, it shall attack an r_,rplanation to this Affi(lrrrit. CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF Indiana } ) SS: Koskiusko COUNTY } The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of pequry that: 1. Contractor has not, nor has any other member, representative, or agent of the finn, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding. and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or itastrurnentality of Iran, or as otherwise defined at hid, Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by hid. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services oftwenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Version 7/20/2018 Contractor's Bid for Public Works - 5 Contractor agrees that he/she/it shall enroll in and verify (lie work eligibility status of all of Contractor's newly hired employees through the E-Verily Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under- this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract i-vith (he City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. b. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity; sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by (lie State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor- in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it inay not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for Nvbich the discriminatory practice or noncornpliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender- expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned Bidder- or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand 1 have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States, I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior- to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director- of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. Version 7/20/2018 Contractor's Bid for Public Works - 6 I hereby affirru under the penalties of perjury that the facts and infonuation contained in the foregoing bid for public works are true and correct. Dated this 5 day of October 20 18 KENDRA GINGERICW Notary Public SEAT. State of Indiana MY Commission Expirea February 15, 2025 Subscribed and sworn to before me this My Commissioa Expires (O• ��� County of Residence PWI Contractor/Bidder (Finu) Le,L� Signature of Contract ' er or Its Agent _Kyle D. Miller - Project Manager / Sales Printed Name and Title . day of QCk • , 20 1 V, Id C, z A 01,e jd Notar), Public E (Knav+ Version 7/20/2018 Contractor's Bid for Public Works - 7 N EM TieTTEM Project Name Gemini Washington -Colfax Apartments — MASONRY& STAIR REPAIR Project No. 118-08013 For Bids Due October 4, 2018, From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requ�irements. In preparing your blid, please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security iincluded, The bidder has the option of providing either a Certified Check or Bid Bondl. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely V execulted. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and V Certification of use of United States Steel Products or Foundry Products. Proof Of IMBEANBE Participation Goal Form [MWBE-1.0]. If milnimuirn participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted NA Form [MWBE-2.1]. NA Acknowledge Receipt of Addendum(s) included with the bid. V All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either V printed or typed underneath signature, V This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not refieve the bidder of the need to read and comply with the specifications. Bidder: PWI Date: 10/5/18 By Authorized Repr Signature: Print Name & Title: Kyle Miller - Project Manganer / Sales Version 7/20/2018 Contractor's Bid for (Public Works - 1 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK RESPONSIBLE BIDDER CHECKLIST Project Name Gemini Washington -Colfax Apts. — MASONRY & STAIR REPAIR Project No. 118-080B For Bids Due October 4, 2018 Contractor Name: PWI (Paul's Welding Inc.) The City seeks to enhance its ability to identify responsive and responsible bidders on all City public works projects by institution of comprehensive submission requirements in compliance with State law. Quality workmanship, efficient operation, safety, and timely completion of projects requires that all bidders meet certain minimum requirements to be responsive and responsible bidders. THIS FORM MUST BE SUBMITTED WITH YOUR BID. INSTRUCTIONS: If you are a pre -qualified bidder, complete Section I only. If you are not a pre -qualified bidder, complete Section II only. Section II acts as an application for pre -qualification. Submission of Section II will allow the bidder to be considered for pre -qualification for bids with the City of South Bend Department of Public Works. Pre - qualified bidders will then be exempt from a portion of the submission requirements outlined in Section 6- 63 of The Responsible Bidding Ordinance No. 10694-18 (hereinafter, "Responsible Bidding Ordinance") for a period of twelve (12) months. Thereafter, contractors who are pre -qualified must submit a complete application for continuation of "pre - qualified" standing, on a form provided by the City ("Responsible Bidder Checklist (1) Pre -Qualified Bidders") by December 31 si for the upcoming calendar year, or within twelve (12) months of obtaining pre - qualified standing. If the status of any item changes within the twelve (12) months, it is the responsibility of the contractor to notify the City. Failure by any pre -qualified contractor to submit its complete application for continuation of "pre -qualified" standing within the time prescribed above shall result in automatic removal of the designation, effective January 1 of the following year, or immediately following the twelve (12) months of pre -qualified standing. However, the "removed" contractor or subcontractor shall still be permitted to bid on City public works projects, though the contractor must submit all required documents under 6-63 until "pre -qualified" status is re-established. Please Note: The City reserves the right to request supplemental information from the bidder, additional verification of any information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of pre -qualified standing. It is the sole responsibility of the potential bidder to comply with all submission requirements applicable to the bidder in Section 6-63 of the Responsible Bidding Ordinance no later than the date of the public bid opening. Version 7/20/2018 General Conditions - 7 POST BID SUBMISSIONS: Post -bid submissions must be submitted in accordance with Section 6-64 of the Responsible Bidding Ordinance. The post -bid submission requirements are as follows: 1. All bidders shall collect, maintain, and provide upon request, a current written list that discloses the name, address, licensing status, and type of work for any subcontractor from whom the bidder has accepted a bid and/or intends to hire on any part of the public work project, including individuals performing work as independent contractors. 2. Each subcontractor, whose portion of the project is estimated to be at least one -hundred fifty thousand dollars ($150,000.00), shall be required to adhere to the requirements of Section I of the Responsible Bidder Ordinance as though it were bidding directly to the City, except that the subcontractor shall submit the required information (including the name, address, and type of work) to the successful bidder prior to the commencement of work. 3. Failure of a subcontractor to submit the required information shall not disqualify the successful bidder from performing work on the project and shall not constitute a contractual default and/or breach by the successful bidder. However, the City may withhold all payment otherwise due for work performed by a subcontractor, until the subcontractor submits the required information and the City approves such information, 4. The disclosure of a subcontractor list ("Disclosed Subcontractor(s)") to the City by a bidder shall not create any rights in the Disclosed Subcontractor(s). Thus, a bidder may substitute another subcontractor for a Disclosed Subcontractor by giving the City, upon request, written notice of the name, address, licensing status, and type of work of the substitute subcontractor. 5. The successful bidder and all subcontractors on a public works project are required to submit certified payroll utilizing the federal form known as WH-347 or a similar form on a bi-weekly basis, submitted within 10 days after the end of each bi-weekly payroll period. Certified payrolls shall identify the job title and craft for each employee. Certified payrolls shall be submitted electronically. Please Note: Submissions deemed inadequate, incomplete, or untimely by the City may result in the automatic disqualification of the bid. The City, after review of complete and timely submissions, shall, in its sole discretion, after taking into account all information in the submission requirements, determine whether a bidder is responsive and responsible, and provide a Pre -Qualification Verification Letter. The City specifically reserves the right to utilize all information provided in the contractor's submission and any information obtained by the City through its own independent verification of the information provided by the contractor. Version 7/20/2018 General Conditions - 8 PRE -QUALIFIED BIDDER CHECKLIST (a) Acknowledgements: W By checking this box, I hereby acknowledge that I am a pre -qualified bidder with the City of South Bend and that I have met the pre -qualification requirements within the last twelve (12) months. A copy of my Pre -Qualification verification letter is attached. (ii) By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided by me, and may also conduct random inquiries of my current and prior customers. (b) Attachments: 0 Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) Statement on staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work. It outlines how I intend to meet the staffing needs of the work. (iii) _ Evidence that I am utilizing a surety company which is on the United States Department of Treasury's Listing of Approved Sureties as required in the bid specifications or contract. (iv) _ List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within the last three (3) years. Version 7/20/2018 General Conditions - 9 Ill. PRE -QUALIFICATION CHECKLIST (FOR BIDDERS THAT ARE NOT PRE -QUALIFIED) (a) Acknowledgements: (i) By checking this box, I hereby acknowledge that I am not a pre -qualified bidder with the City of South Bend. (ii) By checking this box, I hereby acknowledge that the City reserves the right to request supplemental information, additional verification of any information provided, and may also conduct random inquiries of my current and prior customers. The City reserved the right to utilize all information provided in this submission and all information obtained in inquiries or requests to determine if a bidder is responsive and responsible. Additionally, I acknowledge that all information provided to the City shall be regarded as public records. By checking this box, I hereby acknowledge that copies of all Applicable apprenticeship certificates or standards for training programs applicable to the work performed on the project may be requested at any time and shall be furnished upon request. (iv) By checking this box, I hereby acknowledge and ensure that I and all sub- contractors, from whom I have accepted a bid and/or intend to hire to perform work on the public work project, are properly licensed. Furthermore, I acknowledge my understanding that it is my responsibility to ensure that all sub- contractors have the necessary licenses to undertake the work called for in this bid. If a sub -contractor loses their license at any point, it is the responsibility of that sub -contractor to notify the City. (b) Attachments: (i) Indiana Secretary of State's on-line records (ie. Business verification) dated within sixty (60) days of the submission of said document showing that business is in existence, current with the Indiana Secretary of State's Business Entity Report, and eligible for a certificate of good standing. (Not applicable to individuals, sole proprietors or partnerships). (ii) _V List identifying all former business names. (iii) NA Any determinations by a court or governmental agency any violations of federal state, or local laws including, but not limited to, violations of contracting or antitrust laws, tax or licensing laws, environmental laws, Occupational Safety and Health Act (OSHA), or federal Davis -Bacon and related Acts, within the preceding five (5) years. (iv) A/_ Statement about staffing capabilities, including labor sources. This statement indicates and ensures I have sufficient employees on staff to complete the work I am bidding on OR outlines how I intend to meet the staffing needs of the work. (v) Statement that individuals who will perform work on the public work project on my behalf will be properly classified as an employee or as an independent contractor under all applicable state and federal laws and local ordinances. NO NA Evidence of participation in apprenticeship and training programs, applicable to the work to be performed on the project, which are approved by and registered with the United States Department of Labor's Office of Apprenticeship, or its successor organization. (vii) Copy of a written plan for employee drug testing that covers all of my employees who will perform work on the public work project and meets or exceeds the requirements set forth in IC 4-13-18-5 or IC 4-13-18-6. (viii) NA Evidence that I am utilizing a surety company which is on the Bureau of Fiscal Service "Department of Treasury's Listing of Approved Sureties" as required in the bid specifications or contract. Version 7/20/2018 General Conditions - 10 (ix) NA Written statement of any federal, state or local tax liens or tax delinquencies owed to any federal, state or local taxing body in the preceding three years. (0 '�4 List of projects of similar size and scope of work performed in all areas, including the State of Indiana, within three (3) years prior to the date on which the bid is due. Date: 10/5/18 4 (Sign ere) Kyle D, Miller (Print Name Here) PWI (Name of Company) 7930 West 1000 North (Address of Company) Nappanee (City) Indiana (State) 1 (574) 646-2015 (Telephone Number) Version 7/20/2018 General Conditions - 11 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his/her/its bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of ail subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South. Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 7/20/2018 Contractor's Bid for Public Works - 3 Version 7/20/2018 Contractor's Bid for Public Works - 4 0 w ui LU V) E a. W Z I.- w z mw 0 w CL w 0 Z Z V) W LL E 0 0CL Z i W w 0 is 0 z E ui to 0 0 cn .2 0 > rr (A (A CL E o E Eca L 0 0 OD 0 o G E 0 0 C o rp 0 CL CL V) 0 r- W v 0-0 O'D 0 Ed,0 E 0 CL 0 E 'r- 0 0 M >, 0 M, E6 m z 0 CL m 0 co 9 tsp m 0 E Q. .1 (9 -Fu 0 as 4C) DL 0 0 -6 a- :3 E 0 0 EO < LLI Co ig � 0 co 75 as ws 0.0 0 Q a) 0 0 0 0 0 2 -@1 Q) oC: z CL ru W 0 c) E 03 M E Ili 4 6 '0 E 4a) m 0 .0 U) W E co z CL co Ca IN I CD 0 a) CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS Igo This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBEfVVBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDO-5"). ) Project Number-, 118-080B Date: Project Name: Gemini Washington -Colfax. Apartments.. —..MASONRY & STAIR REPAIR Bidder: Contact Person: Address: City: Kyle Miller Telephone: 574-221-9225 0 �60 0 IMILA Nappanee state: Indiana Email: kmiller@pwiworks.com EWA• To determine whether a bidder has demonstrated good faith efforts to reach the MBENVBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*-. EVIDENCE OF GOOD FAITH EFFORTS MBEIWIBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISEICONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all, perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBENVBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. 4. Utilize pro -existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in, the recruitment and placement of MBENVBE firms. "Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with, interested MBE/WBES, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBEANBEs in order to increase the likelihood of meeting the MBENVBE goals (including breaking down contracts into smaller units to facilitate MBENVBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBENVBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version, 7/20/2018 Contractor's Bid for Public Works - 10 This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. Project Number: 118-080B PAGE OF, MBEIWBE Participation Goal Project Name: Gemini Washington -Colfax Apartments — MASONRY & STAIR REPAIR Bidder: PWI - Kyle Miller By: Project Manager 1 Sales 10/5118 (Signature) (Title) (Date) MBENVBE Firm Owner or Contact at MBENVBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBENVBE FIRM: MBEIWBE Firm Owner or Contact at MBEIWBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: Version 7/20/2018 Contractor's Bid for Public Works - 11 DIVISION 2 — DEMOLITION 2.01 Masonry Demolition 1. Before work begins, conduct through inspection of existing parapet. In coordination with SBH, determine which sections of parapet must be rebuilt and which sections can be repointed. Determine which, if any, third floor steel lintels should be replaced. Priority is to be given to the most decayed areas and the efficient allocation of the unit prices. Contractor to provide a written schedule, staging, and plan for completing the designated work. New 60 mil EPDM roof membrane will not be secured to parapet. Roof work will leave the membrane edge in a configuration that may be folded back to complete the adjacent coping and wall work. Mason must protect the roof membrane from damage during masonry work. It is the mason's responsibility to not puncture, tear, or in any way damage the EPDM membrane. Mason to provide night and weekend weather protection to the underlying structure. After masonry work is complete, roof contractor will return to secure membrane to coping and install aluminum coping cap. 3. Carefully remove existing masonry units, clean, and stack for reuse. 4. Contractor is responsible for removing waste generated by their work from the job -site, Coordinate dumpster location with SBH. Coordinate truck and/or lift access with SBH. 2.02 Fire Stair Demolition Remove existing fire steel fire stairs from the east side of the building including landings, rails, treads, and support posts. Care must be taken to either cut or carefully remove any steel elements built into the existing masonry walls. Notify SBH of any new or existing damage to surrounding masonry walls. 2. Equipment access to east side of the building is limited. SBH will arrange lift and crane access with the adjacent property owner. 3. Assess suitability of existing concrete piers for reuse. SBH to remove and replace any piers determined to be unusable. Location of any replacement piers and type of anchors to be indicated on fabrication shop drawings. DIVISION 4 - MASONRY SECTION 040100 - MAINTENANCE OF MASONRY PART 1 GENERAL 1.1 SECTION INCLUDES C. Repointing mortar joints, rebuilding of deteriorated masonry, and decorative finial restoration. 1.2 REFERENCE STANDARDS A. ACI 530/530.11ERTA - Building Code Requirements and Specification for Masonry Structures; American Concrete Institute International; 2009. 1.3 ADMINISTRATIVE REQUIREMENTS A. Preinstallation Meeting: Convene one week prior to commencing work of this section. 1. Require attendance of parties directly affecting work of this section. 2. Review conditions of installation, installation procedures, and coordination with related work. B. Scheduling: 1. Perform cleaning and washing of masonry between the hours of 7 am to 6 pm only. 1.6 SUBMITTALS A. See Special Provisions section - Submittals for submittal procedures C. Product Data: Provide data on cleaning compounds. E. Manufacturer's Instructions: For cleaning materials, indicate special procedures, conditions requiring special attention. 1.7 MOCK-UP A. 3' x 3' area or rebuilt or repointed masonry to assess mortar color. Approved mock up may become part of the finished work. 1.8 DELIVERY, STORAGE, AND HANDLING A. Deliver masonry neatly stacked and tied on pallets. Store clear of ground with adequate waterproof covering. PART 2 PRODUCTS ► WLTIY_1RItJgFTI&tIfJCi9(M A. Restoration and Cleaning Chemicals: 1. Diedrich Technologies, Inc : www.&edri h q�qh qL �e corn, or approved equal, __.­g­.1L -.!I- 0(mi­ 2. PROSOCO ; Product BioKlean and EK Restoration Cleaner: VAwj,2osoco.corn. or approved equal, 3, Masonry sealant: Prosoco or approved equal water based penetrating siloxane clear sealant, 4. Flashing at new steel lintel: HB TeXtroflash or approved equal. 2.2 MASONRY UNITS 1. Existing intact brick and limestone units to be cleaned and reused. 2. Assume that all stone and cast decorative pieces can be reused. 3. Replacement brick blend to be determined. 4. Four existing decorative cast concrete urns to be carefully removed, cleaned, patched, and reset as part of a unit price. New limestone block below reset urns per detail. 5. Replacement terra-cotta structural block — any damaged and removed terra cotta structural blocks to be replaced with new CMU masonry units. Thickness of new units to be compatible with existing adjacent terra cotta blocks. 2.3 MORTAR MATERIALS A. For repointing, provide type "0"' Lime Putty Mix Mortar, with sieved and grades clean, aggregate to match existing mortar, or approved equal. Provide mock-up sample for Owner/Architect review and approval. B. For rebuilt walls, provide type "N" mortar. C. Aggregate for Mortar: ASTIM C 1144. 1. Colored -Mortar Aggregate: Natural or manufactured sand selected to produce mortar color indicated. 5. For pointing mortar, provide sand with rounded edges. 3. Match size, texture, and gradation of existing mortar as closely as possible. MAINTENANCE OF MASONRY 040100-3 2.3 CAST STONE CEMENTITIOUS PATCHING MATERIAL A. Cathedral Stone Products, Inc.: www.cathedralstone.com Jahn "M90" for precast concrete at cracked cast concrete features or approved equal. PART 3 EXECUTION 3.1 EXAMINATION A. Verify that surfaces to be cleaned are ready for work of this section, 3.2 PREPARATION A. Protect surrounding elements from damage due to restoration procedures. B. Carefully remove and store removable items located in areas to be restored, including fixtures, fittings, finish hardware, and accessories; reinstall upon completion. C. Separate areas to be protected from restoration areas using means adequate to prevent damage. D. Cover existing landscaping with tarpaulins or similar covers. E. Mask immediately adjacent surfaces with material that will withstand cleaning and restoration procedures. F. Protect roof membrane and fiashings from damage with 112 inch plywood laid on roof surfaces over full extent of work area and traffic route. G. When using cleaning methods that involve water or other liquids, install drainage devices to prevent runoff over adjacent surfaces unless those surfaces are imperious to damage from runoff. H. Do not allow cleaning runoff to drain into sanitary or storm sewers. 3.3 REPOINTING A. Perform repointing prior to cleaning masonry surfaces. B. Cut out loose or disintegrated mortar in joints to minimum 112 inch to % inch depth or until sound mortar is reached. C. Use power tools only after test cuts determine no damage to masonry units will result. D. Do not damage masonry units. E. When cutting is complete, remove dust and loose material by brushing. F. Premoisten joint and apply mortar. Pack tightly in maximum 114 inch layers. Form a smooth, compact concave joint to match existing. G. Moist cure for 72 hours. H. Re -pointed head joints of stone band with a soft caulked joint to match color of stone with sand finish broadcast while sealant has not set and is still wet (do not use standard lime putty mortar joint). Level of brick masonry damage requiring brick replacement include: spalled brick (beyond'/" depth and 1 " x 1" square, cracked brick (crack running completely through the unit). 3.4 REBUILD MASONRY PARAPET A. Carefully fold back and temporarily secure EPDM roof membrane at work area. Protect membrane and roof deck from damage during masonry work with plywood. Do not puncture EPDM membrane. Use separate tarp or other means for rain/night protection. B. Support roof structure as necessary in advance of removing parapet masonry. C. Remove limestone coping cap and inspect condition of masonry wall below coping cap. Remove decorative limestone urn and connection bar where occurs. Carefully remove face masonry down to and including limestone trim band. Notify Owner if structural terra cotta substrate is deteriorated. Notify Owner if joists behind or bearing into the terra cotta are damaged or unsupported. D. Inspect condition of steel lintels immediately below work area. Recommend to Owner if further masonry disassembly and replacement of lintel is recommended. E. Clean individual masonry units of old mortar and prepare for reuse. Stack carefully and protect from damage. All limestone trim and quoins to be reinstalled in the same location removed from. P. Replace damaged or deteriorated structural terra cotta with new CMU masonry of same thickness as intact adjacent terra cotta blocks. G. Relay original limestone trim band, any mist. limestone trim pieces, original bricks, and limestone coping into their original configuration to match and align with existing, with joints and coursing true and level, faces plumb and in line. If decorative limestone urn was removed reinstall with new steel connection bar. Build in all openings, accessories and fittings. H. Mortar used to relay parapet masonry to be of appropriate softness to be compatible with historic masonry units. Color and proportion to match existing work. Match aggregate sand in mortar to obtain similar color and texture as original mortar. I. Backer rod and elastomeric sealant at limestone coping head joints. Sonoborne NP-1 or approved equal. Color to match limestone. J. Secure EPDM membrane to top of limestone coping when finished with parapet section using the same interim method employed by the roofing contractor. Roofing contractor will return and install aluminum coping cap over limestone coping per detail. Carefully inspect and vacuum clean decking/insulation of any loose masonry or mortar before securing EPDM. 3.6 CLEANING REPOINTED & REBUILT MASONRY A. Verify mortar is fully set and cured. B. Clean surfaces and remove large particles with wood scrapers, brass or nylon wire brushes. C. Scrub walls with muriatic acid cleaning solution using stiff brush. Thoroughly rinse and wash off cleaning solution, dirt and mortar crumbs using clean, pressurized water. D. Before solution dries, rinse and remove acid solution and dissolved mortar, using clean, pressurized water. 3.7 CLEANING A. Immediately remove stains, efflorescence, or other excess resulting from the work of this Section. B. Remove excess mortar, smears, and droppings as work proceeds and upon completion. C. Clean surrounding and adjacent masonry surfaces. 3.8 SEALANT A. Apply clear siloxane sealant to repaired precast concrete finial urns. DIVISION 13 — SPECIAL. CONSTRUCTION 13.01 Fire stairs - General 1. Base Bid: Provide and install 4 sets of fire stairs as indicated on the drawings, New stairs to match general tread & riser configuration of the existing fire stairs. 2. Alternate bid: In lieu of replacing the 4 fire stairs on the east side of the building, replace only the two southern fire stairs on the east side of the building. 3. For purposed of this bid, assume that any adjustments or repairs required to the concrete flatwork or supporting piers at finish grade will be made by other. 6. Assume truck and lift access to east elevation via adjacent property will be available. SBH will coordinate this access with adjacent property owner. 7. Storage, overnight staging, dumpsters or other similar items shall not be set on adjacent property. 8, Removal of existing wood fence to facilitate stairway work will be by SBH. 13.02 Demolition — refer to Division 2. 13.03 Building code Building code InBC 2014 (IBC 2012 + Indiana amendments). IBC Chapter 34 Section 3404 exception 1 allows for the new stair tread & riser configuration to match the existing (to be replaced) configuration. Other than stair treads and risers, new stair must comply with IBC Section 1009. Risers shall be solid. Handrails and guards shall comply with IBC Section 1012 except in cases where full extension of handrails would create a hazard. 13.03 Tread and Landing Materials 8 518" bar grate stair treads (excluding winders) with checker plate nosing. Treads to be 1 1/" bar height and 3116" bar thickness. Winder treads may be bar grate wl diamond plate nosing or plain 118" thick checker plate at contractor's option. Solid risers from checker plate. Landings to be 1.25" bar grate with checker plate nosing at top riser. 1 '/4" bar height and 3/16" bar thickness. 8" steel channel construction for stair stringers. 7" steel channel for landings. 1.6" OD Round Tubular Handrail on both sides of stairway and at 36" from top of tread and as otherwise required by code. 13.04 Finish: Black ext paint — primer + 2 coats black epoxy finish. Touch up in the field after erection. 13.05 Submittals 1. Shop drawings indicating profiles, sizes, connection attachments, reinforcing, anchorage, size and type of fasteners, and accessories. Include erection drawings and connections using standard AWS A2.0 welding symbols. Indicate net weld lengths. END OF SECTION Page I of I PWI Staffing Information October 5, 2018 7930 W. 1000 N. Nappanee, IN 46550 574-646-2015 fax 574-646-2203 pw1wo4o'com PWI will perform all work for SBH Washington Colfax project using its existing workforce of 60 employees. No shop work or on -site work will be performed by or outsourced to any other sub. contractors. PWI employees approximately 25 personnel for shop work and crews with a total of 20 on -site personnel. All personnel working on project are licensed to work in the state of Indiana and are AWS Qualified Welders. Page I of I PWI Similar Projects October 5, 2018 7930 W. 1000 N" ' Nappanee, IN 46550 574-646-20 15 fax 574-646-2203 pwiwotks.com Grand Design RV Bldg. 6, 7, 8, and 9. Jayco RV 80 and 82 Thor Motorcoach 240 Each building had 3-8 stairways similarly constructed to Ibid job Numerous stairway jobs for local houses of worship including Northview Church We currently have (70) stairs on queue to fabricate and install Page I of I Previous Company Names Ocfober 5, 2018 7930 W. 1000 N. Nappanee, IN 46550 574-646-2015 fax 574-646-2203 pw1works,cam Year 1979: Established Name: Paul's Welding and Repair Year 2004: Changed Name: Paul's Welding Inc. Year 2018: Paul's Welding Inc, ( Doing Business As: PWI) State of Indiana Office of the Secretary of State Certificate of Assumed Business Name of PAUL'S WELDING, INC. In Witness Whereof, I have caused to be affixed my signature and the sea[ of the State of Indiana, at the City of Indianapolis, January 05, 2017. CONNIE LAWSON SECRETARY OF STATE 2004072000013 / 7470S57 To ensure the certificate's validity, go to https://bsd.sos.in.gov/PubiicBusinessSearch PENDING APPROVAL. CONNIE LAWSON INDIANA SECRETARY OF STATE 05/07/2018 07:38 AM BUSINESS ID 2004072000013 BUSINESS TYPE Domestic For -Profit Corporation BUSINESS NAME PAUL`S WELDING, INC. ENTITY CREATION DATE 07/19/2004 JURISDICTION OF FORMATION Indiana PRINCIPAL OFFICE ADDRESS 7930 W 1000 N. Nappanee, IN, 465509 USA YEARS 2018/2019 EFFECTIVE DATE 05/07/2018 EFFECTIVE TIME 739 AM REGISTERED AGENT TYPE Individual NAME Ryan Miller ADDRESS 7930 W 1000 N, Nappanee, IN, 46500, USA SERVICE OF PROCESS EMAIL rmillera pwiworks,com I acknowledge that the Service of Process email provided above is (he email address at which clectronic service of process may be accepted and is publicly viewable, A. L0 Substance Abuse Policy For Paul's Welding Inc DBA: PWi 7930 W 1000 N Nappanee, IN 4646550 Forward Paul's Welding inc most vital concerns are the safety, health, and well being of its employees and all people who come into contact with its workforce, property, and/or its products, and services. It is our goal to provide a healthy, satisfying work environment that promotes personal opportunities for growth Furthermore, our employees have the right to work with persons free from the effects of alcohol and/or drugs. Paul's Welding inc does not intend to intrude into the private lives of its employees and recognizes the employees' off -the -job as well as on -the -job - involvement with illegal drugs can have a negative impact on the workplace, fellow employees and customers. Employees are expected to report for work with no illegal drugs in their bodies and free of all adverse effects of alcohol misuse. Paul's Welding Inc encourages employees to seek professional assistance any time for personal problems, including alcohol or drug dependency that adversely affects their ability to perform their assigned duties. Supervisors are dedicated to the fair and equitable application of this policy. They are required to apply all aspects of this policy and to use it in an unbiased and impartial manner. Purpose The purpose of this policy is to comply with the Regulations (DOT) 49 CFR Part 40, Procedure Drug Testing Programs, 49 CFR Part 382, Alcohol use and Testing -Federal Motor Carrier CFR Part 29, Drug -Free Workplace Act of 1988. regulations for safety sensitive employees. C. Applicability s Department of Transportation for Transportation Workplace Controlled Substances and Safety Administration, and 49 This policy incorporates these This policy applies to all employees that are required to have a Commercial Driver's License (CDL), or are considered by the DOT to be in a safety -sensitive position, full or part-time, contract employees and contractors when they are on Paul's Welding Inc property or when performing any safety -sensitive function for Paul's Welding Inc. Performing a safety -sensitive function means from the time an employee is ready to work, begins work, and is relieved from all responsibility for performing work. Safety -sensitive functions may include, however, are not limited to the following items: (i) All time on Paul's Welding Inc property, or shipper property, terminal, facility, or other property, or on any public property, waiting to be dispatched, unless the driver has been relieved from duty by Paul's Welding inc. (ii) All time inspecting equipment as required by 49 CFR Part 392 (392.7 & 392.8) or otherwise inspecting, servicing, or conditioning any Commercial Motor Vehicle (CMV) at any time. (iii) All time spent at the driving controls of a CMV. (iv) All time, other than driving time, in or upon any CMV except time spent resting in a sleeper berth (the berth must conform to the requirements of 49 CFR Part 393.7.) (v) All time loading or unloading, attending a CMV being loaded or unloaded, remaining in readiness to operate the CMV or in giving or receiving receipts for shipments loaded or unloaded. (vi) All time repairing, obtaining assistance, or remaining in the attendance of a disabled CMV. D. Legal Drugs For a drug to be legally prescribed the employee must have a prescription or other written approval in his/her name from a licensed physician for the use of the drug in the course of medical treatment. The prescription or written document must also contain the name of the substance, the quantity/amount to be taken, and the period of authorized use. Any abuse or misuse of legal drugs while performing a safety -sensitive function is prohibited by Paul's Welding Inc. The appropriate use of legally prescribed drugs and non-prescription medications is not prohibited by Paul's Welding inc. However, the use of any substance which carries a warning label that indicates that motor skills, mental functioning, or judgment may be affected; the employee must report this to supervisory personnel immediately. An employee must obtain a written release from the attending physician releasing the employee from performing safety -sensitive duties any time the employee is using a performance altering prescription. 2 E. Prohibited Substances In accordance with DOT rules, testing will be conducted for the presence of the following substances: ALCOHOL AMPHETAMINES COCAINE MARIJUANA OPIATE METABOLITES PHENCYCLIDINE (PCP) Detection levels requiring a determination of a positive result shall be in accordance with the guidelines adopted by the DOT in accordance with the recommendations established by the Substance Abuse and Mental Health Services Administration (DHHS; formerly "DHHS'}. The Designated Employee Representative (DER) will, when possible, confer with the medical review officer, and in the sole discretion of the Designated Employee Representative (DER), in consultation with the medical review officer, should the effect of these medications adversely affect an employee in a federally regulated (DOT/CDL) position, that Employee may be temporarily removed or reassigned from the federally regulated (DOT/CDL) position if deemed appropriate. F. Prohibited Conduct Alcohol concentration No driver shall report for duty or remain on duty requiring the performance of safety - sensitive functions while having an alcohol concentration of 0.04 or greater. No employer having actual knowledge that a driver has an alcohol concentration of 0.04 or greater shall permit the driver to perform or continue to perform safety -sensitive functions. On -duty use: No driver shall use alcohol while performing safety -sensitive functions. No employer having actual knowledge that a driver is using alcohol while performing safety -sensitive functions shall permit the driver to perform or continue to perform safety -sensitive functions. Pre -duty use: No driver shall perform safety -sensitive functions within four hours after using alcohol. No employer having actual knowledge that a driver has used alcohol within four hours shall permit a driver to perform or continue to perform safety -sensitive functions. Use following an accident. No driver required to take a post -accident alcohol test under 382.303 shall use alcohol for eight hours following the accident, or until he/she undergoes a post -accident alcohol test, whichever occurs first. Refusal to submit to a required alcohol or controlled substances test (1) Fail to appear for any test (except a pre -employment test) within a reasonable time, as determined by the employer, consistent with applicable DOT agency regulations, after being directed to do so by the employer. This includes the failure of an employee (including an owner -operator) to appear for a test when called by a CITPA (see 40.61 a of this title); (2) Fall to remain at the testing site until the testing process is complete. Provided, that an employee who leaves the testing site before the testing process commences (see 40.63 c of this title) a pre- employment test is not deemed to have refused to test; (3) Fail to provide a urine specimen for any drug test required by this part or DOT agency regulations. Provided, that an employee who does not provide a urine specimen because he or she has left the testing site before the testing process commences (see 40.63 c of this title) for a pre -employment test is not deemed to have refused to test; (4) In the case of a directly observed or monitored collection in a drug test, fails to permit the observation or monitoring of the driver's provision of a specimen (see 40.67 I and 40.69(p) of this title); (5) Fail to provide a sufficient amount of urine when directed, and it has been determined, through a required medical evaluation, that there was no adequate medical explanation for the failure (see §40.193(d)(2) of this title); (6) Fail or declines to take a second test the employer or collector has directed the driver to take; (7) Fail to undergo a medical examination or evaluation, as directed by the MRO as part of the verification process, or as directed by the DER under §40.193(d) of this title. In the case of a pre- employment drug test, the employee is deemed to have refused to test on this basis only if the pre -employment test is conducted following a contingent offer of employment; 4 (8) Fail to cooperate with any part of the testing process (e.g., refuse to empty pockets when so directed by the collector, behave in a confrontational way that disrupts the collection process), or (9) Is reported by the MRO as having a verified adulterated or substituted test result. Controlled substances use: No driver shall report for duty or remain on duty requiring the performance of safety - sensitive functions when the driver uses any controlled substance, except when the use is pursuant to the instructions of a licensed medical practitioner, as defined in 38§ 2.107, who has advised the driver that the substance will not adversely affect the driver's ability to safely operate a commercial motor vehicle. (b) No employer having actual knowledge that a driver has used a controlled substance shall permit the driver to perform or continue to perform a safety -sensitive function. (c) An employer may require a driver to inform the employer of any therapeutic drug use. Controlled substances testing: No driver shall report for duty, remain on duty or perform a safety -sensitive function, if the driver tests positive or has adulterated or substituted a test specimen for controlled substances. No employer having actual knowledge that a driver has tested positive or has adulterated or substituted a test specimen for controlled substances shall permit the driver to perform or continue to perform safety -sensitive functions. Engaging in unlawful manufacture, distribution, dispensing, possession, or use of prohibited substances is prohibited by any safety -sensitive employee of Paul's Welding Inc employees who violate this provision will be terminated. All employees of Paul's Welding Inc are required to notify their supervisor within five (5) days of any criminal drug statue conviction. Failure to comply with this provision shall result in termination. G. Compliance with Testing Requirements All employees in safety -sensitive positions will be subject to urine drug testing and breath alcohol testing. A refusal to test is considered a positive test result and will lead to immediate removal from duty, referral to a Substance Abuse Professional (SAP), and termination of employment. The following items constitute a refusal to test. 5 (i} Failure to appear or remain at the test site. (ii) Failure to provide urine specimen when required. (iii) Failure to permit direct observation or monitored collection. (iv) Declines to take a second test when directed. (v) Failure to provide sufficient urine or breath without a valid medical explanation. (vi) Failure to undergo a medical evaluation. (vii) Failure to cooperate with the testing process. (viii) Attempt to dilute, substitute, or tamper with a specimen. (ix) Failure to sign the Custody Control Form or Breath Alcohol Form. H. Testing Procedures Federal regulations required analytical urine drug testing and breath alcohol testing to be conducted when circumstances warrant or as outlined in the regulations. Paul's Welding Inc affirms the need to protect individual dignity, privacy, and confidentiality throughout the testing process. If at any time the integrity of the testing procedures or the validity of the tests results are compromised, the test will be cancelled. Drug _Tests The drugs that will be tested for include marijuana (THC), cocaine, opiates, amphetamines, and phencyclidine (PCP). Urine specimens will be conducted using the split specimen sample method as described in 49 CFR Part 40. Each specimen will be accompanied by a DOT Chain of Custody and Control Form (CCF) and identified using a unique identification number that attributes the specimen to the correct individual. The specimen will be sent to a laboratory where a validity test will be performed to ensure that it is non -adulterated human urine. Then an initial drug screen test will be conducted on the primary specimen. For the primary specimen that is not negative, a confirmatory Gas Chromatography/Mass Spectrometry (GC/MS) test will be performed. The primary test will be considered positive if the amounts present are above the minimum thresholds established in 49 CFR Part 40. All test results from the laboratory will be reported to a Medical Review Officer (MRO). The MRO is a licensed physician with detailed knowledge of substance abuse disorders and drug testing. The MRO will be knowledgeable in the DOT regulations and MRO guidelines, DOT operating administration regulations and any changes to any of these. The MRO must obtain the appropriate qualification training as mandated in 49 CFR Part 40. The MRO will review all test results to ensure the scientific validity of the test and to determine whether there is a legitimate medical explanation for a confirmed positive test result. The MRO will contact the employee, notify him/her of the positive laboratory result, and provide the employee with an opportunity to 0 explain the confirmed test result. The MRO will subsequently review the employee's medical history/records to determine whether there is a legitimate medical explanation for the positive test result. If no legitimate medical explanation is found, the test will be verified positive and reported to the Paul's Welding inc Designated Employee Representative (DER). If a legitimate medical explanation is found, the MRO will report the test result as negative. The split specimen sample will be stored at the initial laboratory until the analysis of the primary specimen is complete. If the primary specimen is negative, the split sample will be discarded. However, if the primary specimen is positive, the split sample specimen will be retained by the initial laboratory for testing if so requested by the employee through the MRO within 72 hours of being notified. The split sample specimen, if requested to be tested, will be sent to an alternate certified laboratory for testing, at the expense of the employee or applicant. Safeguards for Controlled Substance Testing • The Collector must complete mandated qualification training as defined in 49 CFR Part 44 to be able to perform collections. • The Collector must obtain photo identification from the employee or be identified by a Paul's Welding Inc representative prior to administering the test. • The Collector will ask the employee to display the contents of their pockets prior to the test being taken. • The Collector will ask the employee to wash their hands only with water. • The Collector and employee will check the identification numbers of the seals with the number on the CCF. • The Collector will ask the employee to sign the CCF signifying the correctness of the data for test reporting. • The Collector will unwrap and wrap the specimen containers in the presence of the employee. • After the specimen is collected, the Collector will inspect the specimen for sufficient volume, temperature and signs of tampering. • The specimen sample containers are placed in a shipping container, sealed with tamper proof seals in the presence of the employee. The employee will be asked to initial the seals on the specimen sample containers. • The Laboratory will check the seals on the specimen bottles upon receipt to ensure they are not broken, if they are broken, the laboratory will report the test as cancelled. • The Laboratory will report the results to the MRO by electronic communication. 7 Direct Observation Collection is Mandatory in the Following Circumstances • The Laboratory reports an invalid test and the MRO reports there isn't a medical reason for it. • The test results are reported as positive adulterated or substituted cancelled with no split specimen sample available. • The Collector observed signs that indicate an attempt was made to tamper with the specimen. • The Collector notes that the temperature of the specimen is not within range. Note: The Collector is NOT required to take the employee's body temperature. The DER from Paul's Welding Inc will be notified of the out of temperature specimen after the direct observation test is completed. • Direct observation testing for return -to -duty and/or follow-up testing. The observer must be the same gender as the employee. The observer may be someone other than the collector to ensure the same gender; however, this individual may not handle the specimen. Shy Bladder Procedure If the employee cannot provide a specimen at the initial attempt, the employee will be urged to drink up to 40 oz of water. The amount of water is to be spaced out over a three hour period. The employee is not required to drink the water by 49 CFR Part 40 regulations. If the employee does not provide a specimen, or refuses to provide a specimen, the test will be marked as a "Refusal to Test" and considered a positive test result. The employee will be sent to a physician with expertise in the field, within five (5) days for an evaluation as to why the individual was not able to provide a specimen. If there is a valid medical reason, the test result will be changed to "Cancelled. " Breath Alcohol Test All tests for breath alcohol will be conducted using a National Highway Traffic Safety Administration (NHTSA) approved Evidential Breath Testing (EBT) device. The device must be operated by a certified trained Breath Alcohol Technician (BAT), The certified training must meet the qualification as defined in 49 CFR Part 40. A blank air test will be administered prior to the initial test and the confirmation test. This indicates the EBT chamber is clear. An initial breath test will be given, if the results are less than a concentration of 0.02, the test results is negative. No additional tests will be required. If the initial test results in a concentration of 0.02 or higher, a second confirmation test will be 1.1 L J. conducted. A waiting period of at least 15 minutes but no longer than 30 minutes after completion of the initial test must be completed before the confirmation test is done. If the results of the confirmation test are between 0.020-0.039; the employee must be removed from the safety sensitive position for at least 24 hours. If the result is 0.040 or higher the employee is considered under the influence of alcohol and the employee must be removed from service, referred to a Substance Abuse Professional (SAP). Any result on the confirmation test of 0.020 or higher is considered a positive test result. The confirmation test will be completed using the same EBT as the screening test. Each test will have its own unique sequential number. A printout of each test will be provided and attached to the Alcohol Test Form. The printout will also include the time the test was taken, and EBT identification number. The test will be performed in a private, confidential manner as required by 49 CFR Part 40. Safeguards for Alcohol Testing • The BAT will request photo identification form the employee or be identified by a Paul's Welding Inc representative prior to administering the test. • The Employee will select an individually sealed mouthpiece and it will be opened by the BAT while in the presence of the employee for the initial test. • Calibration checks will be frequently performed to insure the EBT is working efficiently. The employee may ask to see the last calibration. • The Employee will select an individually sealed mouthpiece and it will be opened by the BAT while in the presence of the employee for the confirmation test_ Positive Test Results Any employee of Paul's Welding Inc that has a confirmed positive drug or alcohol test will be terminated from his/her safety sensitive position, informed of the educational and rehabilitation programs available, and referred to a Substance Abuse Professional (SAP) for assessment. Compliance with the Treatment Program Requirements Employees are encouraged to make use of the available resources for treatment of alcohol misuse and/or illegal drug use problems. Under certain circumstances, employees may be required to undergo treatment for substance abuse or alcohol misuse. Any employee of Paul's Welding Inc who refuses or fails to comply with a SAP's requirements for treatment, after care or return -to -duty shall be subject to termination. The cost of treatment will be paid by the employee or their insurance provider. I7 K. Types of Testing Pre -Employment Testing Any individual that seeks employment with or transfers into a DOT safety - sensitive position will be required to take and pass a urine drug test. The receipt of a negative urine drug test is required. If the results of the urine drug test are negative -diluted, the result will be considered negative. If the test was cancelled, Paul's Welding Inc requires the applicant to take and pass a second urine drug test. Anytime an employee of Paul's Welding Inc is off work for 30 consecutive days or more, the employee will be required to take and pass another pre -employment urine drug test. Reasonable Cause Tesfin_g Reasonable Cause referral testing will be made on the basis of documented objective facts and circumstances, which are consistent with the short-term effects of substance abuse. At least one supervisor that has been trained in Reasonable Cause detection is needed to make a Reasonable Cause referral for testing. The training must include ways to determine the signs and symptoms of drug and alcohol use. The supervisor must conclude that the employee is impaired in his/her work performance. Documentation as to the physical appearance, behavioral and performance indicators, speech and body odors of the employee must be completed prior to the test result being received. Examples of Reasonable Cause include, but are not limited to, the following: Physical signs and symptoms consistent with prohibited substance use or alcohol misuse. Evidence of the manufacture, distribution, dispensing, possession, or use of controlled substances, drugs, alcohol, or other prohibited substances. Occurrence of a serious or potentially serious accident that may have been caused by prohibited substance abuse or alcohol misuse. Physical contact (meaning fights), assaults, and flagrant disregard or violations of established safety, security, or other operating procedures. IN Post Accident Testing All employees of Paul's Welding Inc are required to undergo urine drug testing and breath alcohol testing if they are involved in an accident with a vehicle owned or Leasingd by Paul's Welding Inc .if one or all to the following conditions are met. (i) The accident resulted in a fatality. (ii) The employee of Paul's Welding Inc was issued a moving citation and a vehicle was towed from the scene of the accident. (iii) The employee of Paul's Welding Inc was issued a moving citation and an individual involved in the accident received bodily injury requiring immediate medical treatment away from the scene of the accident. The surviving employee that operated the vehicle or any other employee whose performance cannot be completely discounted as contributing to the accident must be tested. Following the accident, the employee(s) must be tested as soon as possible, but not to exceed eight (8) hours for alcohol testing and thirty-two (32) hours for urine drug testing. Any employee of Paul's Welding Inc involved in an accident must refrain from alcohol use for eight (8) hours following the accident or until he/she has completed an alcohol test or released from duty. Any employee of Paul's Welding Inc who voluntarily leaves the scene of an accident prior to submission to drug and alcohol testing will be considered to have refused the test and the employee will be terminated. An alcohol test should be administered within two (2) hours of the accident. If this has not been done, Paul's Welding Inc will document the reason the test was not completed within two (2) hours of the accident and will continue to attempt to obtain a test and document their attempts within the eight (8) hour period. At the end of the eight (8) hours, Paul's Welding inc will cease the attempt to administer the test and document why the test was not completed. The employee must remain readily available for testing, until they are released from the scene of the accident. If the employee is required to leave the scene under the authority of medical or police personnel, they must notify Paul's Welding Inc as to their whereabouts. If Paul's Welding Inc is unable to perform a urine drug test and a breath alcohol test, (i.e., employee is unconscious, employee is detained by a police agency), Paul's Welding Inc may use drug and alcohol post -accident test results administered by the State and/or Local law enforcement officials if they were completed. Paul's Welding Inc will obtain the results in conformance with State and Local law. 11 Testing for Non -DOT Circumstances Paul's Welding Inc requires an employee to submit to drug and alcohol tests following a motor vehicle accident or property damage accident involving injury to any individual involved in the accident not requiring immediate medical treatment away from the scene, serious damage to any motor vehicle or equipment involved in the accident, or serious property damage even if the employee did not receive a moving citation. Any employee having a physical injury that requires immediate medical attention away from the work site will be required to submit to drug and alcohol tests. Tests will not be required if the supervisor in charge determines, using the best information available at the time of the decision, that the employee's performance can be completely discounted as a contributing factor to the accident. The CCF used will be a Non -DOT form. At the discretion of management for Paul's Welding Inc, a driver or employee may be tested under these guidelines if a complaint is filed or if any of the above circumstances apply. If a positive result returns, it will be treated in the same manner as a "positive" in the DOT regulations. Random DrLtq and Alcohol Testin All employees of Paul's Welding inc that work in safety -sensitive positions will be subject to random unannounced testing. The selection of these employees for random testing of drug and alcohol will be made using a scientifically valid method that ensures each covered employee will have an equal chance of being selected each time selections are made. The random test will spread throughout the year. Tests can be conducted at any time during an employee's shift. Employees are required to proceed immediately to the collection site upon notification of their random selection_ There is no discretion on the part of management in the selection and notification of employee who are to be tested. The percentages of the number of safety -sensitive employees in the random program are established by 49 CFR Part 40 on an annual basis. Currently the rates are 50% for drug testing and 10% for alcohol testing. Return -to -Duty Testing Employees of Paul's Welding Inc, under certain circumstance, that previously tested positive on a drug and/or alcohol test must be evaluated and released by a Substance Abuse Professional (SAP) before returning to work. A SAP is a licensed physician, certified psychologist, social worker, employee assistance professional, or addiction counselor. The SAP must also have clinical experience in the diagnosis and treatment of drug and alcohol related diseases. The SAP must have completed the required qualification training and completed the continuing education trainings as detailed in 49 CFR Part 40. Before the return -to -duty test, the SAP must assess the employee and determine if the required treatment has been completed. 12 Follow -Up Testin_g Under certain circumstances employees of Paul's Welding Inc will be required to undergo frequent unannounced random urine and/or breath testing following their return -to -duty test. Follow-up testing on an employee will be performed for a period of one (1) to five (5) years with a minimum number of six tests performed the first year. The employee will remain in the random testing program. A qualified SAP will determine the frequency and duration of the follow-up tests, beyond the minimum number. L. Confidential Result Record Keeping The results of all drug and alcohol testing results will be maintained in a secure confidential manner by the employer, laboratory, collection site, MRO, SAP, and the Consortium/Third Party Administrator (CTPA). information can only be released in the following circumstances and with the employee being notified in writing of the release. (i) To a third party only as directed by specific written instructions of the employee. (ii) To the decision -maker in a lawsuit, grievance, or other proceeding initiated by or on behalf of the employed tested. (N) To a subsequent employer upon receipt of a written request from the employee as required by 49 CFR Part 40 of the DOT regulations. (iv) To the National Transportation Safety Board during an accident investigation. (v) To the DOT or any DOT agency with regulatory authority over the employer or any of its employees, or to a State agency with oversight. (vi) To the employee upon written request. M. Employee/Supervisor Training All employees of Paul's Welding inc in a safety -sensitive position will undergo a minimum of 60 minutes of training on the signs and symptoms of drug use including the effects and consequences of drug use on personal health, safety, and the work environment. The training must include manifestations and behavioral cues that may indicate prohibited drug use. In addition, all employees will also receive a minimum of 60 minutes of training on the signs and symptoms of alcohol misuse including the effects and consequences on personal health, safety, and work environment. 13 N. Employee Contract for Policy Violations Under certain circumstances, employees of Paul's Welding Inc who re-enter the workforce must agree to a re-entry contract. The contract may include, but is not limited, to the following items: (i) A release to return to work statement from the SAP. (ii) A negative test result for drugs and/or alcohol. (iii) An agreement to unannounced frequent follow-up testing for a period of one (1) to five (5) years with at least six (6) tests performed the first year. (iv) A statement of expected work -related behaviors of the employee. (v) An agreement to follow specified after care requirements with the understanding that a violation of the re-entry contract is grounds for termination. O. System Contacts Employer. Name: Paul's Welding Inc Address: 7930 W 1000 N Nappanee, IN 46528 Telephone: 574-646-2015 Fax: 574-646-2203 Medstat 1001 N Main St Suite One, Nappanee, IN 46550 Telephone. 574-646-2509 Fax: 574-773-2512 Designated Employee Representative: Name: Ryan Miller Title: President Cell Telephone: 574-356-6095 Name: Kendra Gingerich Title: Office Manager Cell Telephone: 574-354-1241 14 BID/PROPOSAL . ...... i , )11 1 " CITY OF SOUTH BEND Project Name: Gemini at Wash in gto n-Co lfax Apts — MASONRY& STAIR REPAIR!, Project Number: 118-0808 For Bids Due: October 4, 2,018 Contractor Name: P\All BASE BID — Division A Item No. Description Quantity Unit Unit Price 'Total Amount 1 Division A: Masonry Repair — rebuild 20 LF 2 Division A: Masonry Repair — repoint 10 LF 3 Division A: Masonry Repair — new lintel 1 lintel 4 Division k Masonry Repair — reset all 4 1 all finials finials BASE BID TOTAL BASE BID — Division B Item No,. Description Quantity Unit Ulnit Price Total Amount Division B Base Bid: replace 1 LS southernmost 2 fire, stairs. $84,422 $84,422 2 Division B Add Alternate: replace LS $84,422 $84,422 northern most 2 fire stairs 1 Bidder (Firm): PWl Address: 7930 West 1000 North, City/State/Zip: Nappanee, IN 46550 Telephone Number M A'z'ASE BID TOTAL $168,844 E 574 ) 646-2015 (Signature) (Printed Name of Person Signing) Version 7/20/2018 Contractor's Bid for Public Works - 8