Loading...
HomeMy WebLinkAboutAward Quotation - WWTP Bank Stabilization Phase 2 - EFM Excavating IncINTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENVIRONMENTAL SERVICES TO: Members of the Board of Public Works Eric Horvath, Director of Public Works Clara McDaniels, Assistant City Attorney Public Works Linda M. Martin, Clerk FROM: Al Greek, Director of Utilities Jacob M. Klosinski, P.E., Assistant City Engineer SUBJECT: Wastewater Treatment Plant St. Joseph Riverbank Stabilization Phase 2 Quote Award Recommendation DATE: October 1, 2018 On September 25, 2018, the Board of Public Works opened and read quotations for the above project. The Division of Utilities reviewed the documents and finds the information correct and complete. The bid(s) ranked as follows based on price: Bidder Quotation Lump Sum Price 1. EFM Excavating (Walkerton, Indiana) $99,650.00 2. Selge Construction Co., Inc. (Niles, Michigan) $150,660.50 3. Indiana Earth, Inc. $156,000,00 4. HRP Construction, Inc. $159,367.00 5. C&E Excavating, Inc. $199,499.00 The Division of Utilities recommends award of the contract for Wastewater Treatment Plant St, Joseph Riverbank Stabilization — Phase 2 to the lowest, responsive, responsible bidder, EFM Excavating (Walkerton, Indiana) at the total quotation price of $99,660.00 lump sum (not to exceed price). This recommendation is provided by the Division of Utilities. The Division of Utilities will appropriate sufficient funds from Utilities, Wastewater, Other Equipment Account (641-0630-793-36-05) to fund the project (and/or other Wastewater Accounts). For questions regarding the above recommendation or the subject project, contact Al Greek (Ext. 4210) at the Division of Utilities or Jacob M. Klosinski (Ext. 9496) at the Division of Utilities / Engineering. PIR)W- 574/235-9251 1316 CouN'ry-Crry BUILDING 227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171 solml I'NDIANA46601-1830 CITY OF Soui-Fi BEND PE,rE BUTTIGIFG, MAYOR BOARD, OF PUBLIC WORKS October 9, 2018 Edward Mackowicz FFM Excavating, Inc. 20932 West I" C Road Walkerton, IN 46574 RE: Quotation Award — Wastewater Treatment Plant Bank Stabilization Phase 2 Dear Mr. Mackowicz: The Board of Public Works at its meeting held on October 9, 2018, awarded the above referenced quotation to you in the amount not to exceed $99,650. Please forward the following documents in one submittal by October 23, 2018 to my attention for Board of Public Works approval: 1) One (1) original of the Contract (enclosed); and 2) Certificate of Insurance naming the City of South Bend as an additional insured. If you have any further questions regarding this matter, please call this, office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk GARY A. Git,or SUZANNA M. FRITZBERG EuZABr-',,'i'i I A, MARADIK JAW"s A, MUE'LLER T[ 1ERESE, J, DORAU BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, INDIANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 9th Day of October, 2018, by and between, EFM Excavating, Inc., 20932 West I" C Road, Walkerton, IN 46574, HEREINAFTER called the Contractor, and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: DESCRIPTION: WASTEWATER TREATMENT PLANT BANK STABILIZATION PHASE 2 COMPLETION DATE: AMOUNT: FUNDING: SEE SPECIFICATIONS NTE $99,650 UTILITIES, WASTEWATER, OTHER EQUIPMENT The unit prices for this improvement were those prices as received and accepted by the Board on the 25th Day of September, 2018. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLIC ORKS EFM EXCAVATING, INC. Gary . Gi ot, President .-- *Eliza elh"AVMjar�adik, Member Printed Name A = IAI "Suzarma. M. Fritzbed, Y James A. Mueller, Member Signature Member Therese J. Dorau, Member._ -est: t"Linda M. 'Martin, Clerk CERTIFICATION (To be completed if Contractor is a Corporation) 1, , certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary Corporate Seal CITY OF SOUTH BEND, INDIANA -CANT" RACT" OR'S.Q-UOTE FOR PUBLIC WORK Wastewater Treatment Plant Bank Stabilization Phase 2 n/a September 25, 2018 (Must be completed for all quotes. Please type or print) Date: ,,�VA-Ci"b eCj, irm: 21 b el, Address: " Cit /State/Zi a Telephone Number: C-3,4) 1 el) n Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of,,. J1, es le 6) eci'u' 1�'tlel el 1A If A, "I I J I I3fi k- S-11i, A; 4.'o ),o the City of South, Bend, Indiana, in accordance with plans and specifications prepared by: The City of South Bend, Dopartment of Public Works & Cardno and dated �_b for the sum of (enter the Total Quote as shown on the Proposal) (Enfdr Sum of Total Quote plus Alternates shown on"Proposal) "(Nurnerical) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendurns attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend, If the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. By (ture, S'M2 OI& C_ (Printed Name of Person Signing) The above quote is accepted this I/ day of Subject to the following conditions: B7 RD OF PU7��S' G,_ AIGGI lot, Pre dent Elizabeth A. Maradik, Member James A. Mueller, Member —S- _r_:t _49 e 20 / " Suzaliti'a'M-Frit berg, M4fnber Version 10/18/2016 Page - 7 Public Works Quote QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME Wastewater Treatment Plant Bank Stabilization Phase 2 PROJECT No, n/a QUOTES DUE September 26, 2018 Item No. Description Quantity Unit Unit Price Total Amount 1 WWTP Bank Stabilization Phase 2 9 LS $ ��- $ ;ec Total Amount of Quote $ qq Firm: F Address: _ 0 '7-; 2— City/State/Zip: _. Q 161 '1 � � Zq t/-1) C Telephone Number: (,,5'7V) �P 6 — 2 7— C1 6 Fax Number: C' cir j Z eo By f (Signature) Printed Name of Person Signing) Version 10/18/2016 Page - 11 Public Works Quote Date Name BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM October 1, 2018 Jacob M. Klosinski Department Utilities Env. Serv. BPW Date October 9, 2018 Phone Extension (574) 235-9496 Required Prior to Submittal to Board Legal ® Attorney Name Clara McDaniels Controller ® Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Al Greek (Dir. of Utilities) and Susan Zeeb (Dir. Of Fin. Serv. Env. Purchasing ® Services) Check the Apprppriate; Item Type -Required for A1LSubmi'ssions ❑ Agreement 0 Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ® Quote Award ❑ Change Order No. [ CIO & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control fl Other: Required Information Company or Vendor Name EFM Excavating (Walkerton, IN) New Vendor ❑ Yes ® No ❑ If Yes, Approved by Purchasing MBEIWBE Contractor ❑ MBE ❑ WBE MBEIWBE Contractor Requested ❑ No ❑ Yes Name of Company Project Name WWTP - St. Joseph Riverbank Stabilization - Phase 2 Project Number nla Funding Source Utilities - Wastewater - Other Equipment Account No. 641-0630-793-36-05 Amount $ 99,650.00 Terms of Contract Lump Sum, Not to Exceed Purpose/Description The Division of Utilities requests to award the WWTP St. Joseph Riverbank Stabilization Phase 2 prolect to EFM Excavating (Walkerton, IN) as the lowest, responsive, responsible bidder. ® Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verity, Iran, etc. Required For Change Orders Qnly Amount of ❑ Increase $ ❑ Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Dispersal After Approval Copy Original ® ❑ Al Greek, Director of Utilities ® ❑ Jacob Klosinski, Assistant City Engineer ® ❑ Susan Zeeb, Director of Financial Services, Environmental Services 1316 COUNTY-Crry Bmimmo 227 W. JEFFERSON BonEIVARD S01 JT1 I BFNID. INDIANA 46601-1930 Thad Bessinger C&E Excavating, Inc. 53767 County Road 9 Elkhart, IN 46514 PEACF CITY OF Souni BEND PETEBUTTiCALG, MAYOR BOARD OF PUBLIC WORKS October 9, 2018 PHOW 574/235-9251 FAX 574/ 235-9171 RE: Quotation Award — Wastewater Treatment Plant Bank Stabilization Phase 2 Dear Mr. Bessinger: The Board of Public Works, at its meeting held on October 9, 2018, awarded the above referenced quotation to EFM Excavating, Inc., in the amount not to exceed $99,650. We thank you for bidding and hope you will bid with us again in the future. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, 4-- Linda M. Martin, Clerk GMy A, Gu,()-i SUZANNA M. FRITZBE'RG ELIZABL]TH A, MARADIK ,FAMES A. M Ljia,is,,'it Tf I FRESE J. DORAU y' tiu 1316 Coum Y-Crry BuILDIN0, P110M.- 574/23�5-9251 227 W. JEATERSON BoULEVARD FAX 574/ 235-9171 Sol l'I'l I BFM). INDIANA 4660 1 - 19.10 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS October 9, 2018 Mark Osler Indiana Earth, Inc, 10343 McKinley Highway Osceola, IN 46561 RE: Quotation Award — Wastewater Treatment Plant Bank Stabilization Phase 2 Dear Mr. Osler: The Board of Public Works, at its meeting held on October 9, 2018, awarded the above referenced quotation to EFM Excavating, Inc., in the amount not to exceed $99,650, We thank you for bidding and hope you will bid with us again in the future. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, 01" Linda M. Martin, Clerk GARY A. Gii,o'r SUZANNA M, FRITZBFRo EiVABETH A. MARADIK ,DAME;' A, MUE'LLEIR T1 1EREM I DoRAU 1316 COUNTY-C'rry BUILDING 227 W, JEFFERSON BOULEVARD SOUTH REND. INDIANA 46601-1830 C]'"FY OF SOUTH BEND PFU BUTTIGIEG, MAYOR BC1ARD OF PUBLIC WORKS October 9, 2018 Matthew Cain I-IRP Construction, Inc. 5777 Cleveland Road, PO Box 266 South Bend, rN 46624 PwNrl 574/235-9251 FAX 574/ 235-9171 RE: Quotation Award -- Wastewater Treatment Plant Bank Stabilization Phase 2 Dear Mr. Cain: The Board of Public Works, at its meeting held on October 9, 20,18, awarded the above referenced quotation to EFM Excavating, Inc., in the amount not to exceed $99,650. We thank you for bidding and hope you will bid with us again in the future. If you have any further questions regarding this matter, please call this office at (574) 235- 9251, Sincerely, J Linda M. Martin, Clerk GARY A. Gii-o'r SUZANNA M. Hu'rZBER(i ELIZABETH A. MARAINK JAN1I s A. MUELIA]Z Tia,'Ri-,'si� J. DoRAU 13 t6 COUNTY -CITY f-WILDING 227 WAEFFERSON BOULE'"VARD S01 I'll I BEND. I NDI ANA 46601-1930 CHN OP SOL)Tvi BEND PETL? BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS October 9, 2018 1�obert Kuhns Selge Construction Co., Inc. 2833 S. 11"' Street Niles, MI 49120 PIIOW� 574/235-9251 F`AX 574/ 235-9171 IZE: Quotation Award — Wastewater Treatment Plant Bank Stabilization Phase 2 Dear Kuhns: The Board of Public Works, at its meeting held on October 9, 2018, awarded the above referenced quotation to EFM Excavating, Inc., in the amount not to exceed $99,650. We thank you for bidding and hope you will bid with us again in the future. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk GARY A. Gii,o,r Sit ZANNA M. FRtTZBi.-,R(3 ELIZABi.:'rjt A. MARATAK JAMm A. MUF'1,tA-1'R T1 I E R ESE J, DORAU