HomeMy WebLinkAboutAward Quotation - WWTP Bank Stabilization Phase 2 - EFM Excavating IncINTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF ENVIRONMENTAL SERVICES
TO: Members of the Board of Public Works
Eric Horvath, Director of Public Works
Clara McDaniels, Assistant City Attorney Public Works
Linda M. Martin, Clerk
FROM: Al Greek, Director of Utilities
Jacob M. Klosinski, P.E., Assistant City Engineer
SUBJECT: Wastewater Treatment Plant St. Joseph Riverbank Stabilization Phase 2
Quote Award Recommendation
DATE: October 1, 2018
On September 25, 2018, the Board of Public Works opened and read quotations for the
above project. The Division of Utilities reviewed the documents and finds the information correct
and complete.
The bid(s) ranked as follows based on price:
Bidder
Quotation
Lump Sum Price
1. EFM Excavating (Walkerton, Indiana)
$99,650.00
2. Selge Construction Co., Inc. (Niles, Michigan)
$150,660.50
3. Indiana Earth, Inc.
$156,000,00
4. HRP Construction, Inc.
$159,367.00
5. C&E Excavating, Inc.
$199,499.00
The Division of Utilities recommends award of the contract for Wastewater Treatment
Plant St, Joseph Riverbank Stabilization — Phase 2 to the lowest, responsive, responsible
bidder, EFM Excavating (Walkerton, Indiana) at the total quotation price of $99,660.00
lump sum (not to exceed price). This recommendation is provided by the Division of Utilities.
The Division of Utilities will appropriate sufficient funds from Utilities, Wastewater, Other
Equipment Account (641-0630-793-36-05) to fund the project (and/or other Wastewater
Accounts).
For questions regarding the above recommendation or the subject project, contact Al Greek
(Ext. 4210) at the Division of Utilities or Jacob M. Klosinski (Ext. 9496) at the Division of
Utilities / Engineering.
PIR)W- 574/235-9251
1316 CouN'ry-Crry BUILDING
227 W. JEFFERSON BOULEVARD FAX 574/ 235-9171
solml I'NDIANA46601-1830
CITY OF Soui-Fi BEND PE,rE BUTTIGIFG, MAYOR
BOARD, OF PUBLIC WORKS
October 9, 2018
Edward Mackowicz
FFM Excavating, Inc.
20932 West I" C Road
Walkerton, IN 46574
RE: Quotation Award — Wastewater Treatment Plant Bank Stabilization Phase 2
Dear Mr. Mackowicz:
The Board of Public Works at its meeting held on October 9, 2018, awarded the above
referenced quotation to you in the amount not to exceed $99,650.
Please forward the following documents in one submittal by October 23, 2018 to my
attention for Board of Public Works approval:
1) One (1) original of the Contract (enclosed); and
2) Certificate of Insurance naming the City of South Bend as an additional insured.
If you have any further questions regarding this matter, please call this, office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
GARY A. Git,or SUZANNA M. FRITZBERG EuZABr-',,'i'i I A, MARADIK JAW"s A, MUE'LLER T[ 1ERESE, J, DORAU
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
THIS AGREEMENT, made and entered into this 9th Day of October, 2018, by and between,
EFM Excavating, Inc., 20932 West I" C Road, Walkerton, IN 46574, HEREINAFTER called
the Contractor, and the Board of Public Works herein called the "Board".
WITNESSETH: That the Contractor covenants and agrees to make the following improvement,
as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans,
and Bid Proposals, all of which are set forth as a part of this Contract, for:
DESCRIPTION: WASTEWATER TREATMENT PLANT BANK
STABILIZATION PHASE 2
COMPLETION DATE:
AMOUNT:
FUNDING:
SEE SPECIFICATIONS
NTE $99,650
UTILITIES, WASTEWATER, OTHER EQUIPMENT
The unit prices for this improvement were those prices as received and accepted by the Board on
the 25th Day of September, 2018.
The Contractor further agrees to notify the Engineer when this improvement is completed. This
notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final
acceptance of the improvement by the Engineer, the Contractors final estimate will be presented
to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of
a Waiver of Lien.
BOARD OF PUBLIC ORKS EFM EXCAVATING, INC.
Gary . Gi ot, President .-- *Eliza elh"AVMjar�adik, Member Printed Name
A = IAI
"Suzarma. M. Fritzbed, Y James A. Mueller, Member Signature
Member
Therese J. Dorau, Member._ -est: t"Linda M. 'Martin,
Clerk
CERTIFICATION (To be completed if Contractor is a Corporation)
1, , certify that I am Secretary of the Corporation named as
Contractor herein; that who signed this Agreement on behalf of the Contractor
was then of said Corporation; that said agreement was duly signed for and in
behalf of said Corporation by authority of its governing body, and is within the scope of its
corporate powers.
Secretary
Corporate
Seal
CITY OF SOUTH BEND, INDIANA
-CANT" RACT" OR'S.Q-UOTE FOR PUBLIC WORK
Wastewater Treatment Plant Bank Stabilization Phase 2
n/a
September 25, 2018
(Must be completed for all quotes. Please type or print)
Date: ,,�VA-Ci"b eCj, irm:
21 b el,
Address: "
Cit /State/Zi a Telephone Number: C-3,4) 1 el) n
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of,,.
J1, es le 6) eci'u' 1�'tlel el 1A If A, "I I J I I3fi k- S-11i, A; 4.'o ),o
the City of South, Bend, Indiana, in accordance with plans and specifications prepared by:
The City of South Bend, Dopartment of Public Works & Cardno
and dated �_b for the sum of (enter the Total Quote as shown on the Proposal)
(Enfdr Sum of Total Quote plus Alternates shown on"Proposal) "(Nurnerical)
If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendurns attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the City of South Bend, If the quote is to be awarded on a unit basis, the
itemization of the units shall be shown on a separate attachment.
By
(ture,
S'M2
OI& C_
(Printed Name of Person Signing)
The above quote is accepted this I/ day of
Subject to the following conditions:
B7 RD OF PU7��S'
G,_ AIGGI lot, Pre dent
Elizabeth A. Maradik, Member
James A. Mueller, Member
—S- _r_:t _49 e 20 /
"
Suzaliti'a'M-Frit berg, M4fnber
Version 10/18/2016 Page - 7 Public Works Quote
QUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME Wastewater Treatment Plant Bank Stabilization Phase 2
PROJECT No, n/a
QUOTES DUE September 26, 2018
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
WWTP Bank Stabilization Phase 2
9
LS
$ ��-
$ ;ec
Total Amount of Quote
$ qq
Firm:
F
Address: _ 0 '7-; 2—
City/State/Zip: _. Q 161 '1 � � Zq
t/-1) C
Telephone Number: (,,5'7V) �P 6 — 2 7— C1 6
Fax Number: C' cir j Z eo
By f
(Signature)
Printed Name of Person Signing)
Version 10/18/2016 Page - 11 Public Works Quote
Date
Name
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
October 1, 2018
Jacob M. Klosinski
Department Utilities Env. Serv.
BPW Date October 9, 2018 Phone Extension (574) 235-9496
Required Prior to Submittal to Board
Legal ® Attorney Name Clara McDaniels
Controller ® Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Al Greek (Dir. of Utilities) and Susan Zeeb (Dir. Of Fin. Serv. Env.
Purchasing ® Services)
Check the Apprppriate; Item Type -Required for A1LSubmi'ssions
❑ Agreement 0 Contract ❑ Proposal ❑ Addendum
❑ Professional Services ❑ Resolution
❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening ® Quote Award
❑ Change Order No. [ CIO & PCA No. ❑ PCA
❑ Ease/Encroach. ❑ Traffic Control
fl Other:
Required Information
Company or Vendor Name EFM Excavating (Walkerton, IN)
New Vendor ❑ Yes ® No ❑ If Yes, Approved by Purchasing
MBEIWBE Contractor ❑ MBE ❑ WBE
MBEIWBE Contractor Requested ❑ No ❑ Yes Name of Company
Project Name WWTP - St. Joseph Riverbank Stabilization - Phase 2
Project Number nla
Funding Source Utilities - Wastewater - Other Equipment
Account No. 641-0630-793-36-05
Amount $ 99,650.00
Terms of Contract Lump Sum, Not to Exceed
Purpose/Description The Division of Utilities requests to award the WWTP St. Joseph
Riverbank Stabilization Phase 2 prolect to EFM Excavating
(Walkerton, IN) as the lowest, responsive, responsible bidder.
® Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verity, Iran, etc.
Required For Change Orders Qnly
Amount of ❑ Increase $
❑ Decrease $
Previous Amount $
Current Percent of Change: %
New Amount $
Total Percent of Change: %
Dispersal After Approval
Copy Original
® ❑ Al Greek, Director of Utilities
® ❑ Jacob Klosinski, Assistant City Engineer
® ❑ Susan Zeeb, Director of Financial Services, Environmental Services
1316 COUNTY-Crry Bmimmo
227 W. JEFFERSON BonEIVARD
S01 JT1 I BFNID. INDIANA 46601-1930
Thad Bessinger
C&E Excavating, Inc.
53767 County Road 9
Elkhart, IN 46514
PEACF
CITY OF Souni BEND PETEBUTTiCALG, MAYOR
BOARD OF PUBLIC WORKS
October 9, 2018
PHOW 574/235-9251
FAX 574/ 235-9171
RE: Quotation Award — Wastewater Treatment Plant Bank Stabilization Phase 2
Dear Mr. Bessinger:
The Board of Public Works, at its meeting held on October 9, 2018, awarded the above
referenced quotation to EFM Excavating, Inc., in the amount not to exceed $99,650.
We thank you for bidding and hope you will bid with us again in the future.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
4--
Linda M. Martin, Clerk
GMy A, Gu,()-i SUZANNA M. FRITZBE'RG ELIZABL]TH A, MARADIK ,FAMES A. M Ljia,is,,'it Tf I FRESE J. DORAU
y'
tiu
1316 Coum Y-Crry BuILDIN0, P110M.- 574/23�5-9251
227 W. JEATERSON BoULEVARD FAX 574/ 235-9171
Sol l'I'l I BFM). INDIANA 4660 1 - 19.10
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
October 9, 2018
Mark Osler
Indiana Earth, Inc,
10343 McKinley Highway
Osceola, IN 46561
RE: Quotation Award — Wastewater Treatment Plant Bank Stabilization Phase 2
Dear Mr. Osler:
The Board of Public Works, at its meeting held on October 9, 2018, awarded the above
referenced quotation to EFM Excavating, Inc., in the amount not to exceed $99,650,
We thank you for bidding and hope you will bid with us again in the future.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
01"
Linda M. Martin, Clerk
GARY A. Gii,o'r SUZANNA M, FRITZBFRo EiVABETH A. MARADIK ,DAME;' A, MUE'LLEIR T1 1EREM I DoRAU
1316 COUNTY-C'rry BUILDING
227 W, JEFFERSON BOULEVARD
SOUTH REND. INDIANA 46601-1830
C]'"FY OF SOUTH BEND PFU BUTTIGIEG, MAYOR
BC1ARD OF PUBLIC WORKS
October 9, 2018
Matthew Cain
I-IRP Construction, Inc.
5777 Cleveland Road, PO Box 266
South Bend, rN 46624
PwNrl 574/235-9251
FAX 574/ 235-9171
RE: Quotation Award -- Wastewater Treatment Plant Bank Stabilization Phase 2
Dear Mr. Cain:
The Board of Public Works, at its meeting held on October 9, 20,18, awarded the above
referenced quotation to EFM Excavating, Inc., in the amount not to exceed $99,650.
We thank you for bidding and hope you will bid with us again in the future.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251,
Sincerely,
J
Linda M. Martin, Clerk
GARY A. Gii-o'r SUZANNA M. Hu'rZBER(i ELIZABETH A. MARAINK JAN1I s A. MUELIA]Z Tia,'Ri-,'si� J. DoRAU
13 t6 COUNTY -CITY f-WILDING
227 WAEFFERSON BOULE'"VARD
S01 I'll I BEND. I NDI ANA 46601-1930
CHN OP SOL)Tvi BEND PETL? BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
October 9, 2018
1�obert Kuhns
Selge Construction Co., Inc.
2833 S. 11"' Street
Niles, MI 49120
PIIOW� 574/235-9251
F`AX 574/ 235-9171
IZE: Quotation Award — Wastewater Treatment Plant Bank Stabilization Phase 2
Dear Kuhns:
The Board of Public Works, at its meeting held on October 9, 2018, awarded the above
referenced quotation to EFM Excavating, Inc., in the amount not to exceed $99,650.
We thank you for bidding and hope you will bid with us again in the future.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
GARY A. Gii,o,r Sit ZANNA M. FRtTZBi.-,R(3 ELIZABi.:'rjt A. MARATAK JAMm A. MUF'1,tA-1'R T1 I E R ESE J, DORAU